- Vehicles & accessories
- Motor vehicle accessories & components
- Engine
- S&S Cycle
- KN P SH
- Owner's manual
- 28 Pages
S&S Cycle KN P SH Owner's Manual
S&S Cycle KN P SH engines are air-cooled, v-twin engines designed to offer Proven Performance® and reliability. These engines are taller than stock engines, so ensure there's adequate clearance. An upgraded clutch is recommended due to the increased power they produce. They require synthetic engine oil, like S&S Premium Synthetic 20W50, for optimal performance. For fuel, use gasoline with a US octane rating of 91 or higher. Remember, these are air-cooled engines, so avoid heavy traffic and congestion, and keep RPMs between 2750-3500 for normal highway speeds.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
Owners Manual
S&S® KN, P, and SH-Series Engines
DISCLAIMER:
S&S parts are designed for high performance, closed course, racing applications and are intended for the very experienced rider only. The installation of S&S parts may void or adversely effect your factory warranty. In addition such installation and use may violate certain federal, state, and local laws, rules and ordinances as well as other laws when used on motor vehicles used on public highways, especially in states where pollution laws may apply. Always check federal, state, and local laws before modifying your motorcycle. It is the sole and exclusive responsibility of the user to determine the suitability of the product for his or her use, and the user shall assume all legal, personal injury risk and liability and all other obligations, duties, and risks associated therewith.
The words Harley®, Harley-Davidson®, H-D®, Sportster®, Evolution®, and all H-D part numbers and model designations are used in reference only. S&S Cycle is not associated with Harley-Davidson, Inc.
SAFE INSTALLATION AND OPERATION RULES:
Before installing your new S&S part it is your responsibility to read and follow the installation and maintenance procedures in these instructions and follow the basic rules below for your personal safety.
• Gasoline is extremely flammable and explosive under certain conditions and toxic when breathed. Do not smoke. Perform installation in a well ventilated area away from open flames or sparks.
• If motorcycle has been running, wait until engine and exhaust pipes have cooled down to avoid getting burned before performing any installation steps.
• Before performing any installation steps disconnect battery to eliminate potential sparks and inadvertent engagement of starter while working on electrical components.
• Read instructions thoroughly and carefully so all procedures are completely understood before performing any installation steps. Contact S&S with any questions you may have if any steps are unclear or any abnormalities occur during installation or operation of motorcycle with a S&S part on it.
• Consult an appropriate service manual for your motorcycle for correct disassembly and reassembly procedures for any parts that need to be removed to facilitate installation.
• Use good judgment when performing installation and operating motorcycle.
Good judgment begins with a clear head. Don’t let alcohol, drugs or fatigue impair your judgment. Start installation when you are fresh.
• Be sure all federal, state and local laws are obeyed with the installation.
• For optimum performance and safety and to minimize potential damage to carb or other components, use all mounting hardware that is provided and follow all installation instructions.
Motorcycle exhaust fumes are toxic and poisonous and must not be breathed. Run motorcycle in a well ventilated area where fumes can dissipate.
WARRANTY:
All S&S parts are guaranteed to the original purchaser to be free of manufacturing defects in materials and workmanship for a period of twelve (12) months from the date of purchase. Merchandise that fails to conform to these conditions will be repaired or replaced at S&S’s option if the parts are returned to us by the purchaser within the 12 month warranty period or within 10 days thereafter.
In the event warranty service is required, the original purchaser must call or write
S&S immediately with the problem. Some problems can be rectified by a telephone call and need no further course of action.
A part that is suspect of being defective must not be replaced by a Dealer without prior authorization from S&S. If it is deemed necessary for S&S to make an evaluation to determine whether the part was defective, a return authorization number must be obtained from S&S. The parts must be packaged properly so as to not cause further damage and be returned prepaid to S&S with a copy of the original invoice of purchase and a detailed letter outlining the nature of the problem, how the part was used and the circumstances at the time of failure. If after an evaluation has been made by S&S and the part was found to be defective, repair, replacement, or refund will be granted.
OWNERS MANUAL — S&S® KN, P, AND SH-SERIES ENGINES
ADDITIONAL WARRANTY PROVISIONS:
(1) S&S shall have no obligation in the event an S&S part is modified by any other person or organization.
(2) S&S shall have no obligation if an S&S part becomes defective in whole or in part as a result of improper installation, improper maintenance, improper use, abnormal operation, or any other misuse or mistreatment of the S&S part.
(3) S&S shall not be liable for any consequential or incidental damages resulting from the failure of an S&S part, the breach of any warranties, the failure to deliver, delay in delivery, delivery in non-conforming condition, or for any other breach of contract or duty between S&S and a customer.
(4) S&S parts are designed exclusively for use in Harley-Davidson® and other
American v-twin motorcycles. S&S shall have no warranty or liability obligation if an
S&S part is used in any other application.
Table of Contents:
Introduction ........................................................................................................ 2
Engine Installation ...............................................................................2
Oil Line Hook up ........................................................................................... 2
Oil Recommendations ................................................................................ 2
General Break-in Procedure ..................................................................... 5
Tune Up Information ...........................................................................7
Super Stock Ignition System .................................................................... 7
Super E & G Carburetors ............................................................................ 7
Engine Service Intervals ...........................................................................12
Engine Specifications ........................................................................13
Engine Dimensions ....................................................................................14
Torque Specifications ...............................................................................16
Specifications and Wear Limits .............................................................18
4
OWNERS MANUAL — S&S® KN, P, AND SH-SERIES ENGINES
INTRODUCTION
The S&S® engine you have purchased is an air-cooled, v-twin. It is designed to offer Proven Performance® and reliability. Specifications for both the 3 7 ⁄
16
" and 3 5 ⁄
8
" bore engines are found in this manual. We have covered the most popular configurations, 74ci, 80ci, 93ci, 93ci high compression, and 103ci, based on their original S&S production designs. Some changes may have been made over time as these engines have been in production for a number of years. The specifications in this manual are based on the most recent production specifications.
ENGINE INSTALLATION
The procedure for installing an S&S engine is basically the same as outlined in the factory service manual for the model of motorcycle the engine is being installed in. However S&S engines are sometimes taller then a stock engine so the installer must check to make sure there is adequate clearance between the engine and all chassis components include the frame and fuel tanks. An upgraded clutch should also be considered, since the S&S engine will produce more power than the stock engine it is replacing.
OIL LINE HOOK-UP
These diagrams show how the oil lines should be hooked up for S&S
KN-Series engines, P-Series, and SH-Series engines.
Viscosity
SAE 20W50
SAE 50
SAE 25W60
SAE 60
Ambient Temperature (°F)
Above 30°–100°
Above 60°–100°
Above 80°
Above 80°
OIL RECOMMENDATIONS
S&S recommends synthetic engine oil such as S&S Premium Synthetic
20W50. However a premium petroleum based engine oil such as S&S
Heavy Duty 20W50 or 25W60 is acceptable.
S&S recommends using S&S oil, as it has been designed specifically for our engines. S&S motor oil has higher concentrations of anti-wear and corrosion additives along with high quality base stock oils that work well in the high load and high temperature environment. Optimum oil temperatures are between 180–230°F if temperatures exceed
250°F on a regular basis the addition of an oil cooler is recommended.
Regardless of what type of oil you select, be sure to only use oil specifically designated for use in an air-cooled motorcycle and select the viscosity suggested for the temperature range you will be operating your motorcycle in.
5
OIL LINE HOOK-UP ALT GEN, KN-KONE AND KN-SERIES
6
OIL LINE HOOK-UP P AND SH-SERIES
OWNERS MANUAL — S&S® KN, P, AND SH-SERIES ENGINES
7
FUEL REQUIREMENTS
The gasoline used in your engine should have a US octane rating of
91. The United States uses the method of octane rating. In many countries outside the United States, the RON (Research Octane
Number) is used, which will result in a higher octane requirement of about 96.
BREAK-IN OIL CONSIDERATIONS.
Either petroleum or synthetic oil designed for air-cooled v-twin engines can be used during the break-in period and during normal use.
If preferred, petroleum oil can be used for the break-in period, after which, the engine can be changed over to synthetic oil.
GENERAL BREAK-IN NOTES
8
• Remember that these are air-cooled engines. Sufficient air movement is required to keep engine temperatures within safe operating limits.
• Avoid heavy traffic and congestion or extended idle periods whenever possible.
• S&S v-twin performance engines are designed for, and happiest when running between 2750-3500 at normal highway speeds.
• Today’s heavier bikes and taller gearing can easily push a high performance engine into a lugging condition which increases loads on engine components, causes detonation, builds excessive heat and increases fuel consumption. If the engine does not accelerate easily when given some throttle, downshift to a lower gear.
• S&S engines benefit from a warm-up period any time they are started, to get to operating temperature before being subjected to heavy loads or quick throttle revs.
BREAK-IN PROCEDURE
1. Initial start up. Run engine approximately one minute at 1250-
1750 RPM. DO NOT crack throttle or subject to any loads during this period as head gaskets are susceptible to failure at this time.
During this time, check to see that oil pressure is normal, that oil is returning the oil tank, and that no leaks exist.
2. Shut off engine and thoroughly check for any leaks or other problems. Let engine cool to the touch.
3. After engine has cooled, start up again and allow the motor to build some heat. Engine should be run no longer than three to four minutes. When the cylinders become warm/hot to the touch
(approximately 150°F) shut the motor down and let it cool to room temp. Follow the same cautions as for the initial start-up, and continue to check for problems.
4. First 50 Miles: a. Street: Ride normally, do not lug the engine. Avoid high heat conditions and vary the RPM while riding. No stop and go traffic, extended idle periods, or high load or high RPM conditions. Max of 3,500 RPM or 60 MPH. b. Dyno: A chassis dynamometer can be used to put the first 50 miles on a new engine. See the notes and procedure below for chassis dyno break-in.
OWNERS MANUAL — S&S® KN, P, AND SH-SERIES ENGINES
5. 50–100 Miles: Ride normally, do not lug the engine. Avoid high heat conditions, no stop and go traffic or extended idle periods.
Limited short bursts of throttle can aid in ring seating from this point forward during the break-in, but avoid continuous high speed or load conditions. Max of 4,250 RPM/70 MPH.
6. 100–500 Miles: Avoid lugging the engine and high heat conditions.
Max of 5,000 RPM. Change oil at 500 miles.
7. 500–1,000 miles: Ride bike normally, but avoid continuous high load operation and high heat conditions.
8. From 1,000 miles on: Break-in is complete, enjoy!
NOTES FOR COMPLETING INITIAL 50 MILE BREAK-IN AND INITIAL
TUNING ON A CHASSIS DYNO
• When running the bike on the dyno it is critical that engine temperatures are monitored, AFR is kept between 12.5–14.7 and the engine is not overheated. Fans must be used to keep the engine cool. When tuning under higher loads stop regularly and allow the engine to cool.
• A load must be placed on the engine to properly seat the rings.
Running a new engine continually with no load will result in cylinder glazing and poor ring seal. The engine should be loaded to simulate close to the weight of the bike, a load of 10–15% on a Dyno jet 250i is usually sufficient. It is not recommended to use an inertia only dyno to break-in an engine as no load can be placed on the engine.
• Initial tuning on the engine can be completed during the initial 50 miles of dyno break-in. It is recommended the engine be run on the street for a minimum of 500 miles prior to completing tuning at full power. Monitor engine temperature during tuning to ensure the engine is not overheated.
DYNO BREAK-IN PROCEDURE (FIRST 50 MILES)
1. Follow the same procedure outlined above for initial start-up and heat cycling the engine.
2. Run the bike for 25 miles on the dyno under varying speeds and loads while going up and down through the gears. Keep engine
RPM below 3,500 RPM but do not lug the engine. The dyno must be operated so the engine runs under a load roughly equal to the power needed to move the bike down the road, this would be about 12 hp at 55 MPH. Keep engine head temperatures below
200°F at the temp sensor or surface of the head. Stop and cool the engine if needed.
3. Allow the engine to cool down to room temperature.
4. Run the bike for 25 more miles (50 miles total) under varying speeds, loads, gears as before. Make sure there is some load on the engine. Keep engine speed below 4,250 RPM but do not lug the engine. Limited short bursts of throttle can aid in ring seating as long as the calibration/tune keeps the AFR in control. Keep engine head temperatures below 225°F at the temp sensor or surface of the head.
9
5. After the first 50 miles on the dyno, it is recommended the normal break-in schedule be followed under normal riding conditions on the street. See Step 5 on the previous page.
The oil filter used on an S&S® KN, P, or SH-Series engine should be rated at 24 microns. Spin-on filters should not have an anti-drain back valve.
S&S filters are available to replace Harley-Davidson® #63805-80A and
63796-77A. The S&S part numbers are 31-4101 and 31-4102.
TUNE UP INFORMATION
S&S KN, P, and SH-Series engines come from the factory with Champion
RN12YC 14mm long reach spark plugs (S&S PN 55-1321) that should be gapped between .038- and .042-inch. If you are not using an S&S Super
Stock® ignition, refer to your ignition manufacturer for any additional recommendations.
SUPER STOCK™ IGNITION SYSTEM
S&S KN, P, and SH-Series engines come from the factory with an S&S
Super Stock™ ignition system installed. S&S Super Stock ignition modules are factory programmed for the specific engine they are intended for. In addition the module is installed and timed to S&S specified timing. Changing the timing or removing the Super Stock ignition may void your warranty.
If you choose to install another after market ignition module, make sure that the ignition advance is set according to these specifications.
If the ignition system has a rev limiter, make sure it is set no higher than
6200 RPM.
10
Engine
SH80
SH93
SH93H
SH103
P74
P93
P93H
P103H
KN74
KN93
35°
33°
35°
35°
35°
33°
40°
40°
Total Advance,
VOES Grounded
(deg BTDC)*
35°
35°
31°
30°
28°
35°
35°
30°
28°
30°
Max Advance,
Wide Open
Throttle (WOT)
30°
31°
5000
5000
2000
5000
5000
5000
2500
2500
RPM Max
Advance
@ WOT
2000
5000
START-UP — ENGINES EQUIPPED WITH S&S SUPER E
OR G CARBURETOR
1. S&S Super E & G carburetors have a mixture enrichment/fast idle lever used to aide in cold starts and help during the warm-up period. Do not ride the motorcycle with the lever engaged.
2. Turn the fuel supply valve on, wait a moment to make sure the carburetor bowl is full, and twist the throttle twice to prime the carburetor—starting in extremely cold weather may require additional priming.
3. Pull the fast idle lever up, turn on the ignition and press the start button or kick the engine through.
OWNERS MANUAL — S&S® KN, P, AND SH-SERIES ENGINES
4. If the engine does not start after several kicks or five seconds of cranking, shut the ignition off for 15 seconds to let the starter cool.
5. Open the throttle slightly and press the starter button or kick the engine through again. It may be necessary to re-prime the engine.
If the engine kicks back, the throttle may be opened too far.
6. Once the engine is running, use the fast idle lever to maintain the proper engine speed required during warm-up.
7. When the engine has warmed up enough to idle without the enrichment system, disengage the fast idle lever. The fast idle lever is not required to restart a hot engine.
SUPER E & G CARBURETOR TUNING GUIDE
1. Verify carburetor is set to stock settings: a. Idle mixture screw, 11/4 turns from lightly seated.
b. Idle speed screw, ½ turn clockwise from engagement point.
c. Accelerator adjustment screw, two turns counter-clockwise from seated.
2. Start bike, bring to operating temperature.
3. Set idle speed adjusting screw, clockwise to increase RPM, counter-clockwise to decrease RPM. Idle RPM range should be 950 to 1050 RPMs.
4. Adjust idle mixture by turning idle mixture screw slowly clockwise until the engine runs poorly. Note position. Slowly turn the screw counter-clockwise until it starts to stumble. Note position. Set the idle mixture screw halfway between the positions, or at the strongest idle. Inconsistent idle may indicate a manifold leak.
5. With engine idling, turn accelerator adjustment screw clockwise until it lightly seats. Snap throttle open—engine should stumble.
Turn screw counter-clockwise 1/4 or ½ of a turn at a time, until engine responds to throttle twist with smooth, quick response.
6. Ride motorcycle in various RPM ranges, and then try to maintain a consistent 40- to 50-MPH. If the engine has a flat spot, or is popping/sneezing in the air cleaner, it can indicate a lean condition. If you notice stumbling or sputtering, it can indicate a rich condition.
7. Low RPM operation is controlled by the intermediate jet (#11). If sneezing or popping is experienced below approximately 3000
RPMs the intermediate jet must be replaced with a larger sized
(richer) jet. If the engine does not run smoothly at low speeds, fouls plugs, blows black smoke or gets bad gas mileage a smaller
(leaner) intermediate jet needs to be installed. Always readjust the idle mixture (#2) and idle speed (#1) screws after making a jet change.
8. To test the main jet, do a roll-on from 50-MPH to 70-MPH in 3rd gear. If the engine backfires or breaks up in the carb, increase the main jet size .004". If the engine is flat or will not accelerate, decrease the main jet by .004".
9. Since 2004 S&S shorty carbs have been fitted with an adjustable main jet air bleed (#13). Changing this jet to a larger size will delay the signal to the main jet, therefore aiding with high speed tuning as described in step 8. This also aides with tuning an engine that is fitted with an exhaust system that is not intended for high performance. The air bleed uses main jets, the stock size is 40. If it needs to be changed the range is normally 50 to 60.
11
10. NOTE: Drag or straight pipes, especially large diameter or long designs, can prevent you from obtaining optimum carburetor performance.
11. If the S&S teardrop air cleaner is being replaced with an aftermarket air cleaner, be sure to remove the auxiliary bowl vent screw (#14).
Never use a velocity stack on a street driven motorcycle! Poor throttle response will be experienced.
12. Always be sure to attach the hose to the overflow tube fitting (#6) and route it toward the back of the engine.
12
OWNERS MANUAL — S&S® KN, P, AND SH-SERIES ENGINES
Approximate Jetting For S&S® Super E & G Carburetors
Displacement 883cc 74 – 88ci 96 – 107ci 111 – 124ci
Intermediate Jet
Main Jet
.265 – .028
.066
.0295
.072
.031
.076
.031
.078
These jetting recommendations are a starting point only. Re-jet carb for best performance.
2
3
1
4 5
1- Idle Speed Screw
2- Idle Mixture Screw
3- Accelerator Pump Adjustment Screw
4- Enrichment Device
5- Serial Number
13
8
7
6- Overflow Tube Fitting
7- Fuel Inlet
8- Bowl Vent Hole
9- Bowl Plug
14
9
6
10
11
12
10- Accelerator Pump Pushrod
11- Intermediate Jet
12- Main Jet
13- Main Jet Air Bleed
14- Auxiliary Bowl Vent Plug
14
13
OWNERS MANUAL — S&S® KN, P, AND SH-SERIES ENGINES
ENGINE SERVICE INTERVALS
Item
Engine Oil & Filter
Interval
Change at 50, 500, 2,500 miles (80, 800, 4,000 kilometers), every 2,500 miles (4,000 kilometers) thereafter1.
Air Cleaner Element
Tappet Oil Screen
Petcock, Lines, & Fittings,
Vacuum Lines
Fuel Tank Filter Screen &
In-Line Fuel Filter (If used)
Engine Idle Speed
Operation of Throttle &
Enrichment Device Controls
Spark Plugs
Ignition Timing
Engine Mounts
External Fasteners Except
Engine Head Bolts
Inspect at 50 and 500 miles (80 and 800 kilometers), every 2,500 miles (4,000 kilometers) thereafter2.
Replace every 5,000 miles (8,000 kilometers).
Inspect every 2,500 miles (4,000 kilometers). Replace every 5,000 miles (8,000 kilometers).
Inspect at 50 and 500 miles (80 and 800 kilometers), every 2,500 miles (4,000 kilometers) thereafter.
Inspect every 5,000 miles (8,000 kilometers).
Adjust as required.
Inspect at 500 miles (800 kilometers) and every 2,500 miles (4,000 kilometers) thereafter.
Inspect every 5,000 miles (8,000 kilometers). Replace every 10,000 miles (16,000 kilometers) or as needed.
Inspect every 5,000 miles (8,000 kilometers).
Inspect at 500 miles (800 kilometers) and every 5,000 miles (8,000 kilometers) thereafter.
Re-torque at 500 miles (800 kilometers) and every 5,000 miles (8,000 kilometers) thereafter.
1- S&S recommends that petroleum-based oil not specifically formulated for motorcycles should be changed every 1,000 miles (1,600 kilometers) after the break-in period.
2- Replace more frequently if required or if engine is operated in a dusty environment.
15
ENGINE SPECIFICATIONS
The following chart contains information about a number of S&S engines covered by this owners manual.
Engine
SH103
SH93
SH93H
SH80
P103
P93
P93H
P74
KN93
KN74
Displacement Bore
103"
93"
93"
79"
103"
93"
93"
74"
93"
74"
3 5 ⁄
8
"
3 5 ⁄
8
"
3 5 ⁄
8
"
3 7 ⁄
16
"
3 5 ⁄
8
"
3 5 ⁄
8
"
3 5 ⁄
8
"
3 7 ⁄
16
"
3 5 ⁄
8
"
3 7 ⁄
16
"
Stroke
5"
4 1 ⁄
2
"
4 1 ⁄
2
"
4 1 ⁄
4
"
5"
4 1 ⁄
2
"
4 1 ⁄
2
"
3 31 ⁄
32
"
4 1 ⁄
2
"
3 31 ⁄
32
"
CR
9.7:1
8.5:1
9.1:1
8.0:1
9.7:1
8.5:1
9.1:1
8.0:1
8.2:1
7.4:1
Cam
600
585
600
513
600
585
600
513
420
346
Tappets
Hydraulic w/HL2T
Hydraulic w/HL2T
Hydraulic w/HL2T
Hydraulic w/HL2T
Hydraulic w/HL2T
Hydraulic w/HL2T
Hydraulic w/HL2T
Hydraulic w/HL2T
Solid
Solid
Fuel System
Super G
Super E
Super G
Super E
Super G
Super E
Super G
Super E
Super E
Super E
Ignition
System
Super Stock
Super Stock
Super Stock
Super Stock
Super Stock
Super Stock
Super Stock
Super Stock
Super Stock
Super Stock
16
OWNERS MANUAL — S&S® KN, P, AND SH-SERIES ENGINES
ENGINE DIMENSIONS
Some S&S engines are taller than stock engines. These diagrams show the dimensions of various S&S engines. This information will be most useful to customers building custom motorcycles with after market frames. Note that KN-Series engines may be used in 1948-99 style frames if the provided spacer is installed under the front motor mount.
SH-Series
SH103
SH93
SH80
P-Series
P103
P93
P74
A
15.696
15.479
15.419
A
15.891
15.625
15.572
B
19.84
19.668
19.611
B
19.675
19.46
19.397
KN-Series
KN93
KN74
A
15.031
14.943
B
19.057
18.985
Front of Engine
17
Nothing lasts forever, and despite the superior materials and design of the components in your S&S engine, some day it will need to be serviced. Who better to repair your engine, than the technicians at the company where it was made? To obtain factory service for your S&S engine, have your S&S dealer contact the S&S Service & Speed Center.
To find an S&S dealer in your area go to the S&S Dealer Locator at www.
sscycle.com/dealer-locator
IMPORTANT INFORMATION
• S&S engines are not recommended for inexperienced riders because the increased performance requires a higher level of riding skill.
• Do not lug your S&S engine. This is a high performance engine, designed to produce excellent horsepower at higher RPM. It was not well suited to pull heavy loads at low RPM. We recommend that the engine not be operated below 2500 RPM for extended periods of time. Shift to a lower gear to keep the engine speed up when traveling at lower speeds.
• Your S&S Engine is air cooled, which means that it depends on air moving across the cooling fins to keep it from over heating. Do not allow your engine to idle for extended periods of time. Avoid stop and go traffic or any other situation where the motorcycle is not moving while the engine is running.
• To avoid engine damage, do not operate the engine above 6200
RPM.
SERVICE SPECIFICATIONS FOR S&S ENGINES
For the most part if an S&S engine requires service, a qualified mechanic who services Harley-Davidson® engines can do the work. However the specifications for S&S engines are somewhat different. These charts are provided for reference. For more detailed information about any specific S&S component, installation instructions are available for free download from the S&S website www.sscycle.com.
18
OWNERS MANUAL — S&S® KN, P, AND SH-SERIES ENGINES
TORQUE SPECIFICATIONS P & SH SERIES ENGINES
Item Torque Recommended
Rocker arm shaft retaining screws 90 in-lbs
Rocker arm shaft plug 90 in-lbs
Loctite® 243
Loctite 243
Lower rocker cover bolts
Rocker hollow flange bolts
Crankcase fasteners
90-120 in-lbs
18 ft-lbs
12-15 ft-lbs ( 1 ⁄
4
)
Loctite 243
Loctite 243
Cylinder head bolts
Cylinder base nuts
Pinion nut
Tappet guide fasteners
Pushrod locknuts
Gear cover fasteners
18-20 ft-lbs ( 5 ⁄
16
)
65 ft-lbs
35-40 ft-lbs
50 ft-lbs
90-120 in-lbs
90-120 in-lbs
120 in-lbs
Timing hole plug 120 in-lbs
Oil pump cover/mounting bolts (4) 90-120 in-lbs
Oil pump top mounting (2) 60 in-lbs
Intake manifold to head
Intake manifold to carb
16 ft-lbs
18 ft-lbs
Loctite 272
Loctite 272
Loctite 272
Loctite 243
Loctite 243
Anti-seize
Loctite 243
Loctite 243
Item
Exhaust flange to head
Spark plug
Flywheel sprocket shaft nut
Flywheel pinion shaft nut
Flywheel crankpin nuts
Torque
18 ft-lbs
11-18 ft-lbs
495 ft-lbs
290 ft-lbs
495 ft-lbs
Recommended
Anti-seize
Anti-seize
Green Loctite 609
Green Loctite 609
Green Loctite 609
19
20
TORQUE SPECIFICATIONS - KN-SERIES ENGINES
Item Torque Recommended
Rocker arm shaft nuts
Knuckle housing bolts
27-30 ft-lbs
27-30 ft-lbs
Loctite® 242 Tappet guide fasteners
Lifter locknuts
Gear cover fasteners
8 ft-lbs
Approx. 20 ft-lbs
10 ft-lbs
12-15 ft-lbs ( 1 ⁄
4
)
Loctite® 242
Crankcase fasteners
Cylinder head bolts
Cylinder base nuts
Pinion nut
Tappet guide fasteners
Pushrod locknuts
Gear cover fasteners
Timing hole plug
Oil pump cover/mounting bolts
(4)
Oil pump top mounting (2)
Intake manifold to head
Intake manifold to carb
18-20 ft-lbs ( 5 ⁄
16
)
65 ft-lbs
35-40 ft-lbs
50 ft-lbs
90-120 in-lbs
90-120 in-lbs
120 in-lbs
120 in-lbs
90-120 in-lbs
60 in-lbs
16 ft-lbs
18 ft-lbs
Loctite 272
Loctite 272
Loctite 272
Loctite 243
Loctite 243
Anti-seize
Loctite 243
Loctite 243
Item
Exhaust flange to head
Spark plug
Flywheel sprocket shaft nut
Flywheel pinion shaft nut
Flywheel crankpin nuts
Torque
18 ft-lbs
11-18 ft-lbs
495 ft-lbs
290 ft-lbs
495 ft-lbs
Recommended
Anti-seize
Anti-seize
Green Loctite 609
Green Loctite 609
Green Loctite 609
OWNERS MANUAL — S&S® KN, P, AND SH-SERIES ENGINES
SPECIFICATIONS & WEAR LIMITS
P & SH -SERIES ENGINES
Description Specification
Rocker Arm
Shaft in bushing .0007"-.0018"
Bushing fit in rocker arm (tight) .0012"-.0032"
Rocker arm endplay .004"-.015"
Cylinder Head
Valve to guide fit intake
Valve to guide fit exhaust
Valve guide in head (tight)
.0012"-.0020"
.0017"-.0025"
Valve seat in head (tight)
Seat width intake
Seat width exhaust
.0015"-.0030"
.0050"-.0070"
.031"
Valve stem protrusion
Pistons
.047"
2.045"-2.060"
Fit in cylinder (forged) .003"-.004"
Compression ring gap 3½" bore .014" - .022"
Compression ring gap 35⁄8" bore .017"-.026"
Oil ring gap .015"-.035"
Wear Limit
.0035"
<.0012"
.0035"
.0040"
<.0015"
<.0050"
.041"
.057"
2.080"
.0055"
.t030"
.030"
.050"
Description
Connecting Rods
Specification
Side play
Wristpin in rod
Crankpin running clearance
Flywheels
Run out at bearing
Timken endplay
Pinion bearing fit
.006"-.036"
.0005"-.001"
.001"-.0012"
.0005"-.001"
.001"-.005"
.0004"-.001"
Cam Chest
Breather gear endplay
Breather clearance
Camshaft in bushing
Camshaft endplay
.005"-.015"
.0015"-.003"
Pinion shaft in bushing .001"-.0025"
Bushing fit in gear cover (tight) .0007"-.0023"
Oil pump shaft
Lifters
Lifter fit in guide
.0007"-.002"
.005"-.015"
.0005"-.0025"
.0006"-.0017"
Wear Limit
.016"
.004"
.003"
.016"
.0035"
<.0006"
.0035"
.0022"
.040"
.002"
.002"
.006"
.005"
.002"
21
22
SPECIFICATIONS AND WEAR LIMITS
KN–SERIES ENGINES
Description
Rocker Arm
Specification
Shaft in bushing .0007"–.0018"
Bushing fit in rocker arm (tight) .0015"–.00275"
Rocker arm endplay .004"–.017"
Cylinder Head
Valve to guide fit intake
Valve to guide fit exhaust
Valve guide in head (tight)
.0017"–.0025"
.0025"–.0035"
.0015"–.0030"
Valve seat in head (tight)
Seat width intake
Seat width exhaust
Valve stem protrusion (intake)
.0030"–.0045"
.031"
.047"
1.690"–1.715"
Valve stem protrusion (exhaust) 1.706"–1.721"
Pistons
Fit in cylinder (forged)
Compression ring gap 3 7 ⁄
16
"
Compression ring gap 3 5 ⁄
8
"
Oil ring gap
.0035"–.004"
.014" – .022"
.017"–.026"
.015"–.035"
Wear Limit
.00415"
< .002075"
.0035"
.0050"
<.0015"
<.0030"
.041"
.057"
1.735"
1.741"
.0055"
.030"
.030"
.050"
Description
Connecting Rods
Side play
Wristpin in rod
Crankpin running clearance
Flywheels
Run out at bearing
Timken endplay
Pinion bearing fit
Cam Chest
Breather gear endplay
Breather clearance
Camshaft in bushing
Camshaft endplay
Pinion shaft in bushing
Bushing fit in gear cover
(tight)
Oil pump shaft
Lifters
Lifter fit in guide
Specification
.006"–.036"
.0005"–.001"
.001"–.0012"
.0005"–.001"
.001"–.005"
.0004"–.001"
.005"–.015"
.0015"–.003"
.0007"–.002"
.005"–.015"
.001"–.0025"
.0007"–.0023"
.0005"–.0025"
.0006"–.0017"
Wear Limit
.040"
.002"
.002"
.006"
.005"
.002"
.016"
.004"
.003"
.016"
.0035"
<.0006"
.0035"
.0022"
OWNERS MANUAL — S&S® KN, P, AND SH-SERIES ENGINES
23
24
OWNERS MANUAL — NOTES
OWNERS MANUAL — S&S® KN, P, AND SH-SERIES ENGINES
25
26
OWNERS MANUAL — S&S® KN, P, AND SH-SERIES ENGINES
27
S&S
®
Cycle, Inc
.
14025 County Hwy G
Viola, WI 54664
Phone: 608-627-1497 • Fax: 608-627-1488
Technical Service Phone: 608-627-TECH (8324)
Technical Service Email: [email protected]
www.sscycle.com
510-0364
02/28/15
Copyright © 2015 by S&S® Cycle, Inc. All rights reserved. Printed in the U.S.A.
advertisement