Frick XLP2 Evaporative Condensers are designed to provide efficient and reliable cooling for a variety of applications. They are ideal for use in industrial, commercial, and institutional settings. XLP2 Evaporative Condensers are available in a wide range of sizes and capacities to meet the specific needs of any application. They are constructed of durable materials and are built to last.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
Form 140.920-IOM (NOV 2009)
INSTALLATION - OPERATION - MAINTENANCE
File:
Replaces:
Dist:
SERVICE MANUAL - Section 140
NOTHING
3, 3a, 3b, 3c
XLP2 Evaporative Condenser
THIS MANUAL CONTAINS RIGGING, ASSEMBLY, START-UP,
AND MAINTENANCE INSTRUCTIONS. READ THOROUGHLY
BEFORE BEGINNING INSTALLATION. FAILURE TO FOLLOW THESE
INSTRUCTIONS COULD RESULT IN DAMAGE OR IMPROPER
OPERATION OF THE UNIT.
Please check www.johnsoncontrols.com for the latest version of this publication.
140.920-IOM (NOV 09)
Page 2
XLP2 EVAPORATIVE CONDENSERS
INSTALLATION - OPERATION - MAINTENANCE
INSTALLATION
RIGGING AND ASSEMBLY INSTRUCTIONS .............. 4
Check Unit Before Rigging ..................................................4
UNIT WEIGHTS ...................................................................4
Anchoring ...........................................................................4
Leveling ..............................................................................4
Rigging ...............................................................................4
Table 1 ................................................................................ 5
FLUME BOX INSTALLATION .................................... 6
POSITIVE CLOSURE PLATE OPTION .........................7
Positive Closure Plate Installation (Figures 11 and 12): ........7
OPERATION
INITIAL AND SEASONAL START-UP........................ 8
General ...............................................................................8
Cleaning ..............................................................................8
Inspection ...........................................................................8
Start-up ..............................................................................8
EXTENDED SHUTDOWN .......................................... 9
COLD WEATHER OPERATION .................................. 9
Inspection and Maintenance ...............................................9
Fan Section Icing Protection ...............................................9
Temperature Setting .......................................................9
Fan Control .....................................................................9
Dry Operation ...............................................................10
Coil Freeze Protection ......................................................10
Minimum Operation ......................................................10
Positive Closure Damper Hood and Insulation ...............10
Emergency Coil Drain ....................................................10
Basin Water and Internal Piping Freeze Protection ...........10
Cold Water Basin Protection .........................................10
Piping Freeze Protection ...............................................10
CORROSION PROTECTION .....................................11
Corrosion and Treatments ................................................ 11
Corrosion and Scale Control ............................................. 11
Table 2: Quality Guidelines for Chemically Treated Circulating Water .... 11
Contents
Chemical Treatment Requirements ................................... 11
Passivation ....................................................................... 11
BIOLOGICAL CONTROL ..........................................12
MAINTENANCE
COLD WATER BASIN .............................................13
Water Levels ..................................................................... 13
Table 3: Cold Water Basin Water Levels ........................... 13
Inspection and Maintenance ............................................. 13
FAN .......................................................................13
Inspection and Maintenance ............................................. 13
FAN DRIVE SYSTEM ..............................................13
Inspection and Maintenance ............................................. 13
Fan Belt Adjustment: ........................................................ 14
Alignment: ........................................................................ 14
FAN MOTORS ........................................................14
Inspection and Maintenance ............................................. 14
Adjustable Motor Base ..................................................... 14
FAN SHAFT SUPPORTS ........................................15
Ball Bearings ..................................................................... 15
Locking Collars ................................................................. 15
SPRAY NOZZLES AND HEAT TRANSFER ................15
WATER LEVEL CONTROL .......................................16
Mechanical Makeup Valve Assembly ................................. 16
Inspection and Maintenance: ............................................ 16
Optional Electric Water Level Control Package ................. 16
Inspection and Maintenance: ............................................ 16
SYSTEM CLEANING ...............................................16
Coil Cleaning ..................................................................... 16
Weld Byproduct Cleaning.................................................. 16
WATER TREATMENT .............................................16
Bleed Rate ........................................................................ 16
RECOMMENDED MAINTENANCE SERVICES
(1) ........... 18
RECOMMENDED SPARE PARTS .............................19
Drift Eliminators
Spray Branches
Casing
Coil
XLP2 Evaporative Condenser Heat Transfer Coil Section
XLP2 EVAPORATIVE CONDENSERS
INSTALLATION - OPERATION - MAINTENANCE
140.920-IOM (NOV 09)
Access Door
Water Bleedline
Step
Water Makeup
Valve Assembly
Spray Pump
Plenum Partition
Fan
Motor
Strainer
Adjustable Float
Fan Shaft
XLP2 Side Discharge Evaporative Condenser
Motor Base
Adjustment
Two-Stage
Axial-Flow Fan
Fan Ball
Bearing
Fan
Screen
Fan Drive
Page 3
Access Door
Water
Bleedline
Water Makeup
Valve Assembly
Adjustable
Float
Strainer
Two-Stage
Axial-Flow Fan
Fan Ball
Bearing
Spray Pump
Motor Base
Adjustment
Fan Motor
Fan Drive
XLP2 End Discharge Evaporative Condenser
Fan Shaft
140.920-IOM (NOV 09)
Page 4
XLP2 EVAPORATIVE CONDENSERS
INSTALLATION
INSTALLATION
INTRODUCTION
XLP2 units should be rigged and assembled as outlined in this bulletin. These procedures should be thoroughly reviewed prior to the actual rigging operation to acquaint all personnel with procedures to be followed and to assure that all necessary equipment will be available at the jobsite.
Locate the unit nameplate on the connection end of the unit and record the unit serial number and model number for reference.
Have a copy of the unit certified drawing available for reference.
If you do not have a copy of this drawing, contact your local
Representative.
RIGGING AND ASSEMBLY INSTRUCTIONS
Check Unit Before Rigging
When the unit is delivered to the jobsite, check it thoroughly to ensure all required items have been received and are free of any shipping damage before signing the bill of lading. The following parts should be inspected:
Sheaves and Belts
Bearings
Bearing Supports
Fan Motor(s)
Fan(s) and Fan Shaft(s)
Coils
Interior/Exterior Surfaces
Eliminators
Float Valve Assembly
Strainer(s)
Water Distribution System
Miscellaneous Items:
If required for field assembly, the following parts will be packaged and usually placed inside the basin-fan section: Sealer,
Self-Tapping Screws, and Accessory Items. A checklist inside the envelope attached to the side of the unit marked “Contractor’s
Installation Instructions” indicates what miscellaneous parts were included with the shipment and where they were packed.
Be sure to remove all accessory items from the basin before the unit is assembled.
UNIT WEIGHTS
Before rigging any XLP2 Product, the weight of each section should be verified from the unit certified drawing. Some accessories add aditional weight as shown on the respective accessory drawings.
These weights are approximate only and should be confirmed by weighing before lifting when available hoisting capacity provides little margin for safety. In preparing for a lift, individuals responsible for rigging Frick units must inspect the equipment before the lift to make certain that all water or other liquids have been drained from the unit and any debris removed.
During cold weather, the pre-lift procedure
must
include a check for and removal of accumulations of ice and snow, which will not naturally drain from the equipment and would add substantially to the equipment’s lifting weight.
Anchoring
Unit must be properly anchored in place before operation begins.
Seven-eighths inch (7/8”) diameter bolt holes are provided in the bottom flange of the basin section for bolting the unit to the support beams. Refer to the suggested support details on the certified drawing for locations of the mounting holes. Anchor bolts are supplied by others.
Leveling
The support beams and unit must be level for proper operation.
Shims should not be used between the basin and support beams to level the unit.
Operation, maintenance, and repair of this
equipment should be undertaken only by personnel qualified to do so.
Proper care, procedures and tools must be used in handling, lifting, installing, operating, maintaining and repairing this equipment to prevent personal injury and/or property damage.
Adequate precautions, appropriate for the installation and location of these products, should be taken to safeguard the public from possible injury and the equipment and the premises from damage.
Solid bottom panels
may be desirable or necessary for safety and other reasons depending on the location and conditions at the installation site.
PVC eliminators on this product are not designed to support the weight of a person or to be used as a storage or work surface for any equipment or tools. Use of these plastic eliminators as walking, working or storage surface may result in injury to personnel or damage to equipment. If covering a unit which has PVC eliminators, do not use a clear plastic tarpaulin.
For a discussion of Safety Precautions to be followed when operating or maintaining this equipment, please refer to the
Operation and Maintenance Sections of this manual.
WARRANTIES—Please refer to the Limitation of Warranties applicable to and in effect at the time of the sale/purchase of these products.
FREEZE PROTECTION—These products must be protected by mechanical and operational methods against damage and/or reduced effectiveness due to possible freeze-up. Please refer to the Operation and Maintenance sections of this Manual or contact the local Frick Representative for recommended protection alternatives.
Rigging
To simplify rigging and installation, most XLP2 Series Units are shipped in sections consisting of the basin and casing sections.
The basin and casing components
must
be rigged separately. Never assemble the unit before lifting as the lifting devices provided are not designed to support the weight of the entire assembled unit.
The proper rigging sequence is to lift the basin section into place, apply sealer to the basin where the casing(s) will be located,
XLP2 EVAPORATIVE CONDENSERS
INSTALLATION
and then lift the casing(s) into place. Lifting devices have been provided on all sections. Spreader bars, spanning the full width
of the section, must be used between the lifting cables to prevent damage to the section.
In the event of extended lifts or where hazards exist, the lifting devices should be used in conjunction with safety slings placed under the unit.
Refer to Table 1 for the recommended minimum size of the spreader bar and the recommended vertical dimension “H” from the lifting device to the spreader bar.
1. Rig the basin section. The rigging hook must be placed above the section’s center of gravity as detailed in Figures 1 and 2.
Before proceeding, bolt the basin section securely to the supporting steel. Units with multiple cold water basins may employ flume boxes to equalize the water level in the basin of each cell. Follow the directions in the Flume Box Installation section (see Table of Contents).
“L”
140.920-IOM (NOV 09)
Page 5
2. Wipe down the flanges with acetone to remove dirt, or moisture which may have accumulated during shipment and storage.
3. Install sealer tape on the mating flange of the basin section to ensure an airtight seal between the casing and basin section. Apply a layer of 1/4” x 1” sealer tape around the face of the flange over the centerline of the holes. Do not overlap or stretch too thinly at the corners. When it is necessary to splice the sealer, press the two ends together to form a smooth, continuous strip. The sealer is to be spliced only along the flanges with holes (Figure 3).
NOTE: The sealer tape is trapezoidal in shape and must be installed with the wide side down (see Figure 4).
“L”
Center of
Gravity
Center of
Gravity
Figure 2
4. Lower the flexible connection on the pump discharge piping below the elevation of the basin section top section before rigging the casing section.
5. After applying sealer tape to the basin flanges, remove the casing skid. Lift the casing (see Figure 6) and position it so that the casing flanges are about 2” above the basin section. Do not permit the casing to damage the sealer.
Figure 1
Table 1
No. of Casing
Sections
1
1
Basin Section Casing Section
Model Number
XLP2-512-130to512-203
XLP2-712-164to712-276
XLP2-812-235to812-343
XLP2-818-320to818-474
XLP2-1012-282to1012-545
XLP2-1018-433to1018-829
XLP2-1024-564to1024-1089*
XLP2-1036-866to1036-1658
XLP2-1012-282to1012-545
XLP2-1218-495to1218-1075
XLP2-1224-644to1224-1405**
XLP2-1236-989to1236-2148
No. of Basin
Sections
1
1
2
1
1
2
2
1
1
1
1
2
2
1
1
2**
2
1
1
1
1
2*
Spreader Bar
Length “L”
5'
6'
8'
8'
10'
10'
10'
10'
12'
12'
12'
12'
Minimum
Height “H”
10'5"
10'5"
10'5"
15'7"
10'5"
15'7"
10'5"
15'7"
10'5"
15'7"
10'5"
15'7"
Center of
Gravity
2B\,"
3¼"
3M\,"
3M\,"
6C\,"
6C\,"
6C\,"
6C\,"
7C\,"
7C\,"
7C\,"
7C\,"
Spreader Bar
Length “L”
5'
6'
8'
8'
10'
10'
10'
10'
12'
12'
12'
12'
Minimum
Height “H”
8'10"
8'10"
8'10"
8'10"
8'10"
8'10"
8'10"*
8'10"
8'10"
8'10"
8'10"**
8'10"
* For Models 1024-660, 668, 706, 745, 756, 799, 822, 833, 879, 881, 892, 940, No. of Casing sections = 1 and H = 12' 4".
** For Models 1224-743, 775, 812, 876, 917, 965, 992, 1012, 1034, 1064, 1084, 1090, 1139, 1196, 1281, No. of Casing sections = 1 and H = 12' 4".
140.920-IOM (NOV 09)
Page 6
XLP2 EVAPORATIVE CONDENSERS
INSTALLATION
Splice Sealer Tape Along
Flanges With Bolt Holes
rate is automatically controlled by a water treatment system.
See Bleed Rate section under Water Treatment at the end of the MAINTENANCE section.
Figure 3
6. Insert drift pins downward through the four corner screw holes in the casing (Figure 5). Continue to lower the casing slowly, maintaining alignment with the drift pins until it rests on the basin section.
Figure 5
“L”
Figure 4
7. Working from the corners towards the center, install the 3/8” bolts, using the drift pin to align the screw holes.
8. Secure the hose connecting the sections of the pump discharge pipe with the hose clamps provided.
9. On units with more than one casing, install the remaining casings using the same procedure as the first. When installing two or more casings, on the basin section, sealer tape must be applied to both cross flanges. (Figure 3)
10. On units operating with a remote sump tank, install a bleed line with valve between the system circulating pump discharge riser and a convenient drain. Locate the bleed line in a portion of the riser piping that drains when the pump is off. Units that are furnished with a factory-installed circulating pump include a bleed line with valve.
Bleed valves should remain open when the unit is in operation, unless the bleed
Figure 6
FLUME BOX INSTALLATION
(Required for Models XLP2-1024-xxxx, -1224-xxxx, -1036xxxx, and -1236-xxxx)
1. Position Cell #1 on the unit support and bolt in place.
2. Wipe down the mating surface by the flume opening to remove any dirt or moisture that may have accumulated during shipment.
3. Wipe down the flanges on both ends of the flume box. On one end, apply a layer of 1/8” x 1” butyl sealer tape around the face of the flange over the centerline of the holes. Do not overlap or stretch too thinly at the corners. When it is necessary to splice the sealer, be sure to press the two ends together to form a smooth, continuous strip. Apply a second layer of sealer tape over the first layer following the same procedure. Refer to Figure 8.
4. Using drift pins to align the bolt holes, place the flume box over the opening in the basin of Cell #1 and fasten into place.
Insert the 3/8” self-tapping screws or bolts from the flume box into the basin wall as illustrated in Figure 9 .
NOTE: Flume boxes furnished with units constructed with stainless steel basins are assembled with stainless steel bolts, washers and nuts in lieu of self-tapping screws.
XLP2 EVAPORATIVE CONDENSERS
INSTALLATION
5. Apply sealer to the other end of the flume box as described in Step 3.
Figure 7
6. Position Cell #2 on the unit supports, exactly 1” between basins (Figure 7). Wipe down the mating surface by the flume opening to remove any dirt or moisture.
7. Using drift pins to ensure alignment, draw Cell #2 tight against the flume box.
140.920-IOM (NOV 09)
Page 7
NOTE: Units equipped with the positive closure plate option, skip step 8 and go to the positive closure plate section of this document.
8. As illustrated in Figures 9 and 10, insert 3/8” self-tapping screws in each hole from the flume box into the basin wall and tighten.
POSITIVE CLOSURE PLATE OPTION
The optional Positive Closure Plate and gasket are furnished on multicell units to allow individual cells to be isolated for cleaning and maintenance. The plate ships loose inside the basin. To install the Positive Closure Plate and gasket, follow the steps from the
Flume Box Installation section, then complete the installation using the instructions listed.
Positive Closure Plate Installation (Figures 11 and 12):
1. Thread 3/8” self-tapping screws from the flume box into the basin wall with the positive closure plate as shown.
2. Position gasket and positive closure plate over the bolts and fasten in place with 3/8” wing nut and flat washers.
Figure 8
Figure 11
Figure 9
Figure 12
Figure 10
140.920-IOM (NOV 09)
Page 8
XLP2 EVAPORATIVE CONDENSERS
OPERATION
OPERATION
Do not perform any service on or near the fans, motors, drives, or inside the unit without first ensuring that the fans and the pumps are disconnected and locked out.
NOTES:
1. Recommended service intervals are for typical installations. Different environmental conditions may dictate more frequent servicing.
2. When operating in ambient temperatures below freezing, the unit should be inspected more frequently. Refer to
“Cold Weather Operation” section for more details (see
Table of Contents).
3. Tension on new belts must be readjusted after the first
24 hours of operation and quarterly, thereafter.
INITIAL AND SEASONAL START-UP
General
• If the unit is mounted on vibration isolators or isolation rails, refer to the vibration isolation manufacturer’s guidelines before loading/unloading weight from the unit.
• Verify fan and spray pump motors are disconnected and locked out.
• Conduct external inspection of the equipment. Check for leaks, corrosion, and any structural damage.
• Inspect piping and connections.
Cleaning
• Drain the cold water basin with the strainers in place.
• Remove all dirt and debris from the fan guards.
• Clean all mechanical components, such as the fans and motors.
• Flush the cold water basin interior to remove any accumulated dirt and debris.
• Remove, clean, and replace the strainers.
Inspection
Do not perform any service on or near the fans, motors, drives, or inside the unit without first ensuring that the fans and the pumps are disconnected and locked out.
• Thoroughly inspect the fan(s) for any mechanical or physical damage.
• At seasonal start-up or after prolonged shutdown, check the motor insulation with an insulation tester prior to the motor start-up.
• Prior to the seasonal start-up, check and adjust the belt tension. At the initial start-up, the belt tension may not require adjustment as the drive will be properly tensioned at the factory prior to shipment.
• Start the fan motors and check for proper fan rotation.
• Run the fans in manual mode for several minutes to check for any unusual noise or vibrations.
• Check that the float-operated makeup valve is operating freely.
Check to ensure the controls for the fan motors are set to allow a maximum of
6 on-off cycles per hour.
Figure 13 - Water Makeup Valve Assembly
Start-up
Do not perform any service on or near the fans, motors, and drives, or inside the unit without first ensuring that the fans and the pumps are disconnected and locked out.
Locking Nuts
(Typical of
Both Sides)
J-Bolts
Adjusting Screw
Figure 14 - Lubricating Motor Base Adjusting Screws
• Prior to seasonal start-up, lubricate the motor base adjusting screws and the fan shaft bearings. Then coat the motor base slides and adjusting screws every 3 months using good quality corrosion inhibiting grease such as one recommended for lubricating the fan shaft bearings (see
Figure 14). At initial start-up, no bearing lubrication is
required since the bearings are factory lubricated prior to shipment.
• Fill the cold water basin with fresh water to the overflow level via the makeup valve.
1. Water treatment for new installations: Initiate the biocide water treatment program at this time. Refer to
BIOLOGICAL CONTROL section for more details (see
Table of Contents).
2. Water treatment for seasonal start-up or after a
shutdown period in excess of 3 days: Resume the biocide treatment program and administer a shock treatment of appropriate biocides prior to operating the fans. This will eliminate accumulated biological contaminants. Refer to the BIOLOGICAL CONTROL section for more details (see Table of Contents).
• Set the makeup valve to shut off below the top of the basin at the operating water levels stated in Table 3 in the COLD
WATER BASIN section under MAINTENANCE.
• Start the spray pump. See SPRAY NOZZLES AND HEAT
TRANSFER section under MAINTENANCE for more details.
• Open the valve in the unit bleed line, and adjust the bleed by closing or opening the valve.
• Once the evaporative condenser is operating, check the current and voltage of all three phases (legs) of the fan motors with a heat load on the unit under warm ambient conditions. The current must not exceed the nameplate ratings.
• Check the operation of the optional vibration cutout switch.
After 24 hours of operation under thermal load, perform the following services:
• Check the unit for any unusual noise or vibrations.
• Check the operating water level in the cold water basin.
• Adjust makeup valve if necessary.
• Check the belt tension and readjust if necessary.
EXTENDED SHUTDOWN
Do not perform any service on or near the fans, motors, and drives, or inside the unit without first ensuring that the fans and the pumps are disconnected and locked out.
Perform the following services whenever the evaporative condenser is shut down in excess of 3 days:
• If the unit is mounted on vibration isolators or isolation rails, refer to the manufacturer’s guidelines before loading/ unloading weight from the unit.
• Drain the cold water basin and all the piping that will be exposed to freezing temperatures. Heat trace and insulate all exposed piping.
• Clean all debris, such as leaves and dirt, from the interior and exterior of the unit.
• Clean and flush the cold water basin with the basin strainers in place.
• Leave the cold water basin drain open so rain and melting snow will drain from the unit.
XLP2 EVAPORATIVE CONDENSERS
OPERATION
140.920-IOM (NOV 09)
Page 9
• Clean the basin strainer and re-install.
• Lubricate the fan shaft bearings, motor base, and motor base adjusting screw.
• Close the shutoff valve in the makeup water line (supplied by others), and drain all exposed makeup water piping.
Heat trace and insulate all exposed piping.
• Inspect the protective finish on the unit. Clean and refinish as required. Refer to the CORROSION PROTECTION section for more details (see Table of Contents).
• Secure the fan motors starting device(s) in the “OFF” position to ensure personal safety in case of future inspection or service.
COLD WEATHER OPERATION
Frick condensers can be operated at subfreezing ambient temperatures provided proper operating methods are established and diligently followed.
Inspection and Maintenance
• Carry out the frequent visual inspections and routine maintenance services during operation in subfreezing weather.
• Ensure all controls for capacity and freeze protection are set properly and functioning normally.
• Prevent excessively high water levels and possible overflow of the cold water basin due to overpumping, clogged strainers, or makeup valve malfunction.
• Resolve any icing condition that develops which may damage the unit or the supports or impair system performance.
Fan Section Icing Protection
There are three basic operational methods which can be used to provide the system’s required cooling: Temperature Setting, Fan
Control, and Dry Operation. The method of controls employed on a given application depends upon the climatic extremes which are expected, the variations in heat load that will be encountered, and the compatibility of the control system with other portions of the installation. Effective icing control in subfreezing ambient conditions will require a combination of these three methods.
Temperature Setting
Low leaving fluid temperature promotes ice formation. During operation in subfreezing ambient temperatures, maintain the leaving fluid temperature as high as possible. Ensure the unit operates with the maximum possible heat load. The recommended minimum fluid temperature is 45°F.
Fan Control
Reduce the unit capacity by cycling fans thus modulating the airflow through the unit. Rapid on-off cycles can cause the fan motor to overheat. Set the controls to allow a maximum of 6 on-off cycles per hour. Periodically, cycle the fans off to prevent ice formation and/or to melt ice that accumulates on the intake louvers or combined inlet shields and face of the fill.
Fan Cycling: Operate each unit with the highest thermal load it can handle, rather than evenly dividing the total heat load across all cells. During prolong periods, bypass the idle units and drain the basins.
140.920-IOM (NOV 09)
Page 10
Multi-Speed Motors: If the unit is equipped with 2-speed motors or Sentinel™/Sentinel PLUS™ Fan System, operation at a lower speed may be sufficient to prevent icing. When 2-speed motors are used, the motor starter should include a minimum
15 second time delay when switching from high to low speed.
Variable Frequency Drives: VFDs offer the most precise method of capacity control, by modulating fan motor speed. When using VFDs, avoid operating at or near “critical speeds.” Units with VFDs require inverter duty motors which are included as standard.
In subfreezing ambient temperatures, cycle the fan off for 5 minutes every 15 to 20 minutes for each cell. If ice continues to build on the louvers, decrease the on-time. Observe inlet louvers every 4 to 8 hours.
NOTE: Modulating the water flow rate to the unit is NOT a recommended method of controlling cooling capacity.
Dry Operation
One method of protecting fans from icing is dry operation. Dry operation of the evaporative condenser protects fans from ice formation due to mist and splash from the cold water basin.
Coil Freeze Protection
Use an industrial grade inhibited glycol solution for protection against coil freeze-up. When the use of glycol is not practical, the system must be designed to meet both minimum flow and minimum temperature requirements.
• Recommended solutions are an industrial grade inhibited ethylene glycol or propylene glycol solution.
• Coil volume for condenser models using liquid cooling circuits is job specific.
Minimum Operation
When a glycol solution is not utilized, operate the system to meet both of the following conditions.
• Maintain the minimum recommended flow through the coil at all the times per the job specifications.
• Maintain a minimum heat load on the circulating fluid so that the temperature of the fluid leaving the coil will not fall below 50°F (10°C).
• To maintain the leaving fluid temperature at 50°F (10°C) when the process load is extremely light or shut off, apply an auxiliary heat load to the circulating fluid.
Positive Closure Damper Hood and Insulation
The amount of auxiliary heat required can be substantially reduced by the use of a positive closure damper hood and insulation. The heat loss data can be found in publication 140.920-SED.
Emergency Coil Drain
Do not drain the coil as a normal method of freeze protection.
Frequent draining promotes corrosion inside the coil tube.
However, draining is acceptable as an emergency method of freeze protection if the coil is not protected by a glycol solution. If the coil is not protected, an automatic drain valve and vacuum breaker are recommended to drain the coil if flow stops or fluid temperature drops below 50°F (10°C) when the ambient temperature is below freezing. Contact your local Frick
Representative for guidelines on the installation of an emergency coil drain system.
XLP2 EVAPORATIVE CONDENSERS
OPERATION
• Further protection against coil freeze-up is possible with the installation of an alarm to alert personnel when the temperature of the fluid leaving the coil falls below 50°F
(10°C).
• For evaporative cooling applications only, the glycol solution will maintain the leaving fluid temperature as low as 45°F (7.2°C). Contact your local Frick Representative for necessary precautions.
Basin Water and Internal Piping Freeze Protection
Cold Water Basin Protection
The basin water could freeze when the unit is shut down and exposed to subfreezing ambient temperatures.
Indoor Sump: The ideal method of protection is a remote sump located in a heated indoor area. When the circulating pump stops, the water in the connecting piping will drain by gravity to this indoor sump.
Basin Heaters: On applications without a remote sump, provide heat to the cold water basin. Electrical immersion heaters, steam coils or hot water coils can provide the required function. Contact your local Frick Representative for details.
Electric Water Level Control: An electric water level control will maintain the proper water level regardless of the thermal load or variations in makeup water supply pressure. The two-position, slow closing solenoid valve provided in the Frick electric water level control package also minimizes valve freezing problems.
Heat Tracing: Heat trace and insulate all exposed water piping, including pump piping below the overflow level and makeup water lines, with electrical heater tape.
Piping Freeze Protection
• Eliminate all water in the optional SmoothLink™ Piping
Arrangement.
• It is essential to drain water from the SmoothLink™ Piping
Arrangement and internal piping whenever the potential for freezing temperatures exits. Drain the water by using
1/2” NPT drain port located on the inboard side of the
SmoothLink™ Piping Arrangement.
• There are three recommended methods for draining the piping:
1. Preferred: Install a normally open 1/2” solenoid valve on the 1/2” drain connection of the SmoothLink™ Piping
Arrangement. Wire the valve in the pump circuit such that the valve closes when the pump is energized. Select the solenoid valve to operate with a minimum pressure differential of 0 psi, which is required to limit the static head imposed on the valve from the water column.
2. Install a 1/2” manual valve on the 1/2” drain connection of the SmoothLink™ Piping Arrangement.
Open the valve during cold weather operation. Keep the valve closed during warm weather to achieve full thermal performance.
3. Remove the 1/2” plug from the 1/2” drain connection of
SmoothLink™ Piping Arrangement during cold weather operation. Reinstall the plug during warm weather to obtain full thermal performance.
XLP2 EVAPORATIVE CONDENSERS
OPERATION
CORROSION PROTECTION
Frick products are constructed of corrosion-resistant materials. The fill (if applicable) is made of a polyvinyl chloride (PVC), which requires no protection against rot, decay, rust or biological attack.
Other materials listed below are used in the equipment construction:
Galvanized Steel Components: Inspect the galvanized steel components for blemishes or corrosion. Wire brush and recoat the affected areas with a cold galvanizing compound such as zinc rich compound (ZRC).
Thermosetting Hybrid Polymer Components: Galvanized steel components protected with the Thermosetting Hybrid Polymer may develop scratches, scrapes or blemishes. Touch up these with a repair kit. In the unlikely event that the damage is more extensive than simple scratches or minor blemishes, contact your local Frick Representative.
Stainless Steel Components: Inspect stainless steel components for signs of blemishes or corrosion. Clean with stainless steel wool as necessary. If more extensive corrosion is prevalent, contact your local Frick Representative.
TripleGuard™ Corrosion Protection System: Inspect components protected with the TripleGuard™ Corrosion Protection
System for signs, deep scratches or blemishes, especially in areas with field penetrations. Touch these up with either rubberized polyurethane caulking such as Vulkem® or a repair kit.
Corrosion and Treatments
• Corrosion – Red rust on steel components and “white rust” on galvanized surfaces will affect the longevity of the unit.
• Scale Formation – Scale not only reduces heat transfer and system efficiency, but also may lead to under deposit corrosion.
• Biological Fouling – Slime and algae formations may reduce heat transfer, promote corrosion, and harbor pathogens such as Legionella.
Since the quality of the ambient air and makeup water varies significantly from job site to job site, Frick strongly recommends obtaining the services of a competent water treatment specialist prior to the initial start-up of the evaporative cooling equipment. Additionally, to protect against the risk of Legionella contamination, never operate the cooling equipment without adequate biological control.
Corrosion and Scale Control
• To control corrosion and scale, maintain the water chemistry of the recirculating water within certain parameters. The specific measures required vary from system to system and are dependent on the chemistry of the makeup water, the metallurgy of the piping and heat transfer devices exposed to the recirculating water, and the temperatures at which the system will be operating.
• Bleed/blowdown, the continuous flow of a small portion of the recirculating water to a drain, is used to control the concentration of dissolved solids. On rare occasions, this may be adequate to control scale and corrosion. More often, however, chemical scale and corrosion inhibitors
140.920-IOM (NOV 09)
Page 11
are necessary, which raise the allowable level of dissolved solids without the risk of scale and corrosion.
• Keep the chemically treated water within the guidelines given in Table 2. In cases where bleed/blowdown alone is being employed for corrosion and scale control, without chemical treatment, your water treatment specialist may recommend more conservative limits than those shown in
Table 2.
Table 2: Quality Guidelines for Chemically Treated
Circulating Water
Property of Water Recommended Level
pH 6.5 to 9.0
(1)
Hardness as CaCO
3
Alkalinity as CaCO
30 to 750 ppm
(2)
3
500 ppm maximum
(2)
Total Dissolved Solids (TDS) 1500 ppm maximum
Conductivity
Chlorides
Sulfates
Silica
2400 micromhos
(3)
250 ppm maximum Cl (410 ppm maximum as NaCl)
250 ppm maximum
150 ppm maximum
NOTES:
1. Galvanized steel units require passivation in order to prevent white rust (refer to passivation below).
2. Hardness and alkalinity limits may be exceeded under certain circumstances. Consult your water treatment specialist for recommendations.
3. The conversion factor used to determine conductivity is
0.625 (TDS = 0.625 x Conductivity).
Chemical Treatment Requirements
Chemical treatment programs must meet the following requirements:
• The chemicals must be compatible with the unit materials of construction as well as other materials used in the system (pipe, heat exchanger, etc.).
• Chemical scale and corrosion inhibitors, particularly acid
(if used), should be introduced into the circulating water through automatic feeders. This should be done at a point in the system where total mixing and dilution occur, before reaching the evaporative cooling equipment. The preferred injection point for chemical scale and corrosion inhibitors is on the discharge side of the system circulating pump(s).
These chemicals should not be batch fed directly into the unit’s cold water basin or water distribution system, as this can severely damage areas directly contacted.
• When chlorine is added to the system, free residual chlorine should not exceed 1 ppm, except as noted in start-up and shutdown section. Exceeding this limit may accelerate corrosion.
Passivation
• Passivation is the formation of a protective, passive, carbonate layer on galvanized steel surfaces.
• On the newly installed units, to provide maximum protection from corrosion, take special measures to passivate galvanized steel surfaces.
140.920-IOM (NOV 09)
Page 12
• To ensure proper passivation of the galvanized steel, keep the pH of the circulating water between 7.0 to 8.2 for four to eight weeks after start-up, or until new zinc surfaces turn dull gray in color.
• If white deposits form on galvanized steel surfaces after the pH is returned to normal service levels, it may be necessary to repeat the passivation process.
NOTE: Stainless steel cold water basins and basins protected by the TripleGuard™ Corrosion Protection System or
Thermosetting Hybrid Polymer do not require passivation.
However, if the upper structure is galvanized steel, passivation is required.
BIOLOGICAL CONTROL
• The warm, oxygen and nutrient rich environment inside evaporative cooling equipment provides an ideal environment conducive to the growth of algae, slime, and other micro-organisms. Uncontrolled, this can reduce heat transfer, promote corrosion, and promote the growth of potentially harmful organisms such as Legionella. To avoid biological contamination and minimize the risk of Legionella, initiate the biocide treatment program at start-up and continue on a regular basis thereafter in accordance with the treatment supplier’s instructions.
• Bleed/blowdown or chemical treatment used for corrosion and scale control alone is not adequate for control of biological contamination.
• Introduce solid or granular biocides through a chemical
“pot” feeder installed in parallel with the system circulating pump. Diluted liquid biocides may be added directly to the cold water basin.
• If ozone water treatment is used, at no point should concentrations exceed 0.5 ppm.
• Initial Start-up and Start-up Following a Shutdown Period:
1. To minimize the risk of biological contamination during a shutdown period of three days or more, it is recommended that the entire system (evaporative cooling equipment, system piping, heat exchangers, etc.) be drained.
2. To resume operation of a drained system and at initial start-up, clean all debris from the cold water basin and fill the system with fresh water. Then execute one of the following biocide treatment programs while operating the circulating pump and prior to operating the unit fans: a. Resume treatment with the biocide that was used prior to shutdown. Then run the pump only while maintaining the maximum recommended biocide residual for a sufficient duration (residual and time will vary with the biocide) as recommended by the
XLP2 EVAPORATIVE CONDENSERS
OPERATION
water treatment supplier. Start the fan only after this treatment period is completed.
b. Check the pH of the circulating water and, if necessary, adjust it to 7.0 - 7.6 pH. Then, running the pump only, treat the system with sodium hypochlorite to maintain a level of 4 to 5 mg/l (ppm) free chlorine (as Cl2) over a 6 hour period. Test kits for measuring the free residual of chlorine are commercially available. Start the fan only after this treatment period is completed.
c. When it is not practical to drain the system during shutdown periods, install a bypass line with shutoff valves to permit the recirculating water to circulate throughout the system, including the unit basin, while bypassing the fill section of the evaporative cooling equipment (fans should remain off).
d. Treat the system as per one of the above-described methods prior to restarting the unit.
XLP2 EVAPORATIVE CONDENSERS
MAINTENANCE
140.920-IOM (NOV 09)
Page 13
COLD WATER BASIN
The refrigerant to be condensed is circulated inside the tubes of the unit’s heat exchanger. Heat flows from the refrigerant through the coil to the spray water outside which is cascading over the tubes. The spray water collects in the cold water basin, passes through the suction strainer and is pumped back to the distribution system. The cold water basin is constructed from one of the following materials:
• Galvanized steel
• TripleGuard™ Corrosion Protection System
• Welded Type 304 stainless steel
Water Levels
Table 3: Cold Water Basin Water Levels
Model Number
Nominal
Box
Size
(ft x ft)
XLP2-1012-282 thru 1012-545 10 x 12
XLP2-1018-433 thru 1018-829 10 x 18
XLP2-1024-564 thru 1024-1089 10 x 24
XLP2-1036-866 thru 1036-1658 10 x 36
XLP2-1212-321 thru 1212-703 12 x 12
XLP2-1218-495 thru 1218-1075 12 x 18
XLP2-1224-644 thru 1224-1405 12 x 24
XLP2-1236-989 thru 1236-2148 12 x 36
XLP2-512-130 thru 512-203
XLP2-712-164 thru 712-276
XLP2-812-235 thru 812-343
XLP2-818-320 thru 818-474
5 x 12
7 x 12
8 x 12
8 x 18
Model
Type
Side
Discharge
End
Discharge
Operating
Water
Level
Below Top of Basin
11¾”
6¾”
• The makeup valve controls the operating level, which is maintained at the levels shown in Table 3.
• The operating water level in the cold water basin will vary with system thermal load (evaporation rate), the bleed rate employed, and the makeup water supply pressure.
• Check the operating water level monthly, and readjust the float when necessary to maintain the recommended operating level.
Inspection and Maintenance
Openings and/or submerged obstructions may exist in the bottom of the cold water basin. Use caution when walking inside this equipment.
• Inspect the cold water basin regularly. Remove trash or debris accumulated in the basin or on the strainer.
• Quarterly, or more often if necessary, drain, clean, and flush the entire cold water basin with fresh water. This will remove the silt and sediment, which normally collects in the basin during operation. If not removed, sediment can become corrosive and cause deterioration of the protective finish of metallic basins.
• When flushing the basin, leave the strainers in place to prevent the sediment from re-entering the system.
• Remove the strainers after the basin has been flushed.
MAINTENANCE
• Clean and replace the strainers before refilling the basin with fresh water.
• Adjust the float to maintain the design operating level. See
Table 3: “Cold Water Basin Water Levels”.
FAN
The XLP2 Evaporative Condenser uses axial fans. Thoroughly inspect the fans for damaged or deteriorated fan blades and replace the fan as required.
Inspection and Maintenance
• If the unit is already in operation, while the fans are still running, check for any unusual noise or vibration.
• With the fans off and the motor locked out and tagged, check the general condition of the fans:
1. Inspect for any loose or missing bolts in the fan shaft bushing, fan hub, and fan shaft bearing(s).
2. Check if the fan blades are loose, first by twisting the blade by hand; and then, by moving the blade tip up and down. There should be no play or slippage.
3. Inspect each blade for excessive scale buildup that could cause vibration.
4. Check each blade, in the area of the shank, for any signs of cracking. If cracking is found, the fan motor should be locked out immediately. Contact your local Frick
Representative for assistance.
• Tip Clearance: Check the clearance between the tip of the blade and the fan cowl. The clearance should be within
3/16” and 3/4”.
• Blade Pitch: Check to ensure that the blades are all at the same pitch. If uncertain, measure the pitch with an inclinometer. All blades should be within -1/2° to 0°.
• Rotation: Turn the fan shaft by hand to ensure that the shaft moves freely with no rough spots, binding or other malfunctions that could cause vibration or fan motor overload.
• Direction of Rotation: On initial start-up, or if the fan motor has been rewired, bump the fan motor and note the direction of rotation. While rotating the fan, check the blade tracking. All blades should track within a 3/4” band at any single point around the cowl.
• Operation: On initial start-up, run the fan in the manual position for several minutes and check for any unusual noises or vibration.
FAN DRIVE SYSTEM
Inspection and Maintenance
• These drives require a periodic check of the belt condition and, when necessary, tension adjustment. The recommended service intervals are as follows:
1. Initial Start-up: Servicing is not required prior to initial unit start-up. The drive has been tensioned and aligned at the factory.
2. Seasonal Start-up: Readjust the belt tension.
3. Operation: After the first 24 hours of operation, readjust the belt tension on a new unit start-up or installation
140.920-IOM (NOV 09)
Page 14
XLP2 EVAPORATIVE CONDENSERS
MAINTENANCE
of a new belt. Thereafter, check the belt condition monthly, and adjust tension as necessary. Readjust tension at least once every 3 months.
Fan Belt Adjustment:
To properly adjust the belt tension, position the fan motor so that moderate pressure on the belt midway between the sheaves will produce the deflection shown in Figures 15a and 15b.
• Side draft motor base and idler adjustment:
1. Loosen four motor base locknuts.
2. Rotate adjusting nut counterclockwise to tighten belt, clockwise to loosen belt.
3. Check belt tension.
4. Tighten four motor base locknuts.
• End draft motor base adjustment
1. Loosen two motor base locknuts on top side of J-Bolts.
2. Adjust motor base on J-Bolts by turning motor base nuts on bottom side of J-Bolts.
3. Check belt tension.
4. Tighten two motor base locknuts on top side of J-Bolts.
• Belt tension check:
1. Place a straight edge along the belt from sheave to sheave as shown in Figure 15a, or use a tape measure as shown in Figure 15b, to measure belt deflection.
2. Apply a moderate force by hand (approximately 40 lb/18.1 kg) evenly across the width of the belt in the center of the span between the sheaves.
3. There is adequate belt tension if the belt deflects between 1/4” and 3/8” as shown in Figures 15a and 15b.
• Belt tension adjustment (if required):
1. Loosen the locknut on the motor base adjusting screw.
2. Turn the motor base adjusting screw clockwise to tension the belt, or counterclockwise to relieve belt tension. During adjustment of belt tension, rotate the drives several times by hand to evenly distribute the tension throughout the belt.
• When the belt is properly tensioned, retighten the locknut on the motor base adjusting screw.
NOTE: There should be no “chirp” or “squeal” when the fan motor is started.
Figure 15b: Checking Belt Tension
Alignment:
• Check the drive alignment annually to ensure maximum belt life.
• Drive alignment check and adjustment:
1. Place a straight edge across the driver and the driven sheaves as shown in Figure 16.
2. The straight edge should contact all four points as shown in Figure 16 indicating proper drive alignment.
3. There should be no more than 1/16” deviation from four points of contact.
4. In case of realignment, loosen the motor sheave and align it with the fan sheave. Allow 1/4” for draw-up as the bushing screw is retightened.
Figure 15a: Checking Belt Tension
Figure 16 - Standard Drive Alignment
FAN MOTORS
XLP2 Evaporative Condensers use inverter duty, premium efficient, totally enclosed, single-speed, single-winding, reversible ball bearing type motor(s).
Inspection and Maintenance
• Clean the outside of the motor at least quarterly to ensure proper motor cooling.
• After prolonged shutdowns, check the motor insulation with an insulation tester prior to restarting the motor.
Adjustable Motor Base
Coat the motor base slides and adjusting screws (see Figure
14 in the Operation section) every 3 months using good quality corrosion inhibiting grease such as one recommended for lubricating the fan shaft bearings.
XLP2 EVAPORATIVE CONDENSERS
MAINTENANCE
FAN SHAFT SUPPORTS
The fan shafts are supported by ball bearings (see Figure 17) in the middle of the shaft with fans at each end. Each bearing is equipped with a lubrication fitting and locking collar. Lubrication lines are extended to the outside of the unit as standard
(see Figure 18).
Ball Bearings
140.920-IOM (NOV 09)
Page 15
Locking Collars
Each eccentric locking collar should be checked quarterly to ensure that the inner bearing race is secured to the fan shaft.
The locking collar can be set using the following procedure (see
Figure 19):
• Loosen the set screw.
• Using a drift pin or center punch, tap the collar (in the hole provided) tangentially in the direction of rotation while holding the shaft.
• Retighten the set screw.
Figure 17: Ball Bearing
Under normal operating conditions, the bearings should be greased every 2,000 operating hours or at least quarterly. The bearings should also be greased at seasonal start-up and shutdown. Only lubricate the bearings with one of the following
water resistant inhibited greases which are good for ambient temperatures ranging from -65°F (-53.9°C) to 250°F (121.1°C):
Amoco-Rycon Premium#3
Chevron-SRI
Citgo-Polyurea MP2™
Conoco-Polyurea 2™
Exxon-Polyrex® EM
Exxon-Unirex N™
MobilGrease®-AW2
Shell-Alvania RL3™
Shell-Alvania #3
Shell-Dolium “R”
SKF-LGHP2™
Unocal76-Unilife Grease™
Only lubricate the bearings with a hand grease gun. Do not use high pressure grease guns since they may rupture the
bearing seals. When lubricating, purge the old grease from the bearing by gradually adding grease until a bead of new grease appears at the seal.
Figure 19: Locking Collar Assembly
SPRAY NOZZLES AND HEAT TRANSFER
The water is distributed through a corrosion resistant polyvinyl chloride (PVC) spray distribution system. The drift eliminators are also made of PVC, which requires no protection against rot, decay, rust, or biological attack.
The spray nozzles and heat transfer section should be in-
spected and cleaned each month. Inspect as follows:
1. Shut off the fan, lock out and tag out the fan motor, but leave the system pump running.
2. Remove the drift eliminators to allow a clear view of the spray distribution system and nozzle patterns.
3. Check to see if the nozzles are all spraying consistently and producing the spray pattern in Figure 20.
Figure 18 - Extended Lubrication Lines
Figure 20: Nozzle Spray Pattern
4. Clean any nozzles which are clogged. If necessary, the nozzle and rubber grommet may be removed for cleaning.
If additional cleaning is necessary the branch may be removed for cleaning. Tools are not required to remove eliminator support channel or branches.
140.920-IOM (NOV 09)
Page 16
XLP2 EVAPORATIVE CONDENSERS
MAINTENANCE
5. Inspect the coil surface. Any corrosion, damage, or obstructions must be corrected.
Some units are provided with an extended surface finned coil.
During the winter season, when the ambient temperature is well below design, units can operate with the spray pump off.
The coil is designed for seasonal dry operation followed by seasonal wet operation, and not for frequent cycling of the spray pump. Frequent spray pump cycling may lead to excessive scale buildup.
Don’t use steam or high pressure water to clean PVC eliminators or materials other than steel.
WATER LEVEL CONTROL
There are two types of water level controls used on XLP2 units:
• Mechanical makeup valve assembly
• Optional electric water level control package
The unit water makeup valve assembly is located within easy reach from the access door at the connection end of the unit.
Mechanical Makeup Valve Assembly
A float-operated mechanical water makeup assembly is furnished as standard equipment on the unit. The standard makeup assembly consists of a corrosion resistant makeup valve connected to a float arm assembly actuated by a polystyrene-filled plastic float. The float is mounted on an all-thread rod held in place by wing nuts. The cold water basin operating water level can be adjusted by repositioning the float and all-thread rod using the wing nuts provided.
NOTE: If the unit has been ordered with the optional electric water level control package or is intended for remote sump application, a mechanical water makeup valve will not be provided.
Inspection and Maintenance:
• Inspect the makeup valve assembly monthly and adjust if necessary.
• Inspect the valve annually for leakage. Replace the valve seat if necessary.
• Maintain the makeup water supply pressure between 15 psig and 50 psig for proper operation. A surge protector
(provided by others) is recommended for pressures over
50 psig.
• Set the initial basin water level by adjusting the wing nuts, so that the makeup valve is completely closed when the water level in the cold water basin is at the overflow connection.
• With the design thermal load and the average water pressure (15 to 50 psig) at the valve, the above setting will produce operating water levels as stated in Table 3 in the
Water Level section (see Table of Contents).
• If the thermal load is less than the design load at the time of unit start-up, the procedure may produce operating levels greater than those shown in Table 3. If operating levels are higher than specified, readjust the float in order to attain the recommended operating level.
• Closely monitor the water level in the cold water basin and adjust the level if necessary during the first 24 hours of operation.
• Operating at the recommended water level will ensure that the unit basin contains sufficient water volume to prevent air entrainment in the circulating spray pump during system start-up.
Optional Electric Water Level Control Package
As an option, an electric water level control package is available in lieu of the mechanical makeup assembly. The package consists of a probe-type liquid level control assembly and a slow-closing solenoid valve. Stainless steel electrodes, factoryset at predetermined lengths, extend from an electrode holder into the cold water basin.
Inspection and Maintenance:
• Clean the stainless steel electrodes periodically to prevent accumulations of scale, corrosion, sludge or biological growth, which could interfere with the electrical circuit.
• The water level is maintained at the recommended operating level regardless of the system thermal load.
Therefore, it is not recommended that the operating level be adjusted.
• During the start-up of units equipped with the electric water level control package, by-pass the control unit in order to fill the unit to the overflow connection.
SYSTEM CLEANING
Coil Cleaning
Both the inside and outside of the heat exchange coil may require occasional cleaning. The chemicals used must be compatible with the materials being treated. For example, the standard coil outside is galvanized steel. The inside of the coil is black carbon steel. For finned coils, the coil cleaning must be careful not to damage the fins (outside of the coils) and the coils themselves.
For specific recommendations on coil cleaning, contact a qualified consultant.
Weld Byproduct Cleaning
The installation and manufacturing processes commonly used for field assembly of steel-piped systems may leave weld byproducts inside coils and connecting piping (especially in refrigeration systems). It is common practice to install filters and/or strainers that remove contaminants during initial system operation.
Shortly after system start-up, the filters and/or strainers should be cleaned or replaced.
WATER TREATMENT
A proper water treatment program, administered under the supervision of a competent water treatment specialist, is an essential part of routine maintenance to ensure the safe operation and longevity of evaporative cooling equipment, as well as other system components.
Bleed Rate
• In evaporative cooling, evaporation of a small portion of the recirculating spray water as it flows through the equipment causes the cooling effect. As this water evaporates, the impurities originally present remain in the recirculating
XLP2 EVAPORATIVE CONDENSERS
MAINTENANCE
water. The concentration of the dissolved solids increases over time and can reach unacceptable levels.
• In addition, airborne impurities are often introduced into the recirculating water. If these impurities and contaminants are not effectively controlled, they can cause scaling, corrosion, and sludge accumulations that reduce heat transfer efficiency and increase system operating costs, potentially shortening the useful life of the equipment.
• The degree to which dissolved solids and other impurities build up in the recirculating water may be defined as the cycles of concentration. Specifically, cycles of concentration is the ratio of the concentration of dissolved solids (for example - chlorides, sulfates, etc.) in the recirculating water to the concentration of the same material in the makeup water.
• In order to optimize heat transfer efficiency and maximize equipment life, “bleed” or “blowdown” a small amount of recirculating water from the system. This controls the cycles of concentration to maintain the quality of the recirculating water within the guidelines given in Table
3, under Corrosion and Scale Control in the OPERATION section.
• Replenish the “bleed” water with fresh makeup water, thereby limiting the buildup of impurities.
• Bleed/Blowdown:
1. Accomplish the bleed automatically through a solenoid valve controlled by a conductivity meter. The conductivity meter setpoint is the water conductivity at the desired cycles of concentration and should be determined by a competent water treatment expert.
NOTE: The solenoid valve and conductivity meter must be supplied by others.
2. Alternatively, use a bleed line with a valve to continuously bleed from the system. In this arrangement, adjust the rate of bleed using the valve in the bleed line. Measure the rate of bleed by filling a container of known volume while noting the duration. Check the bleed rate and water quality periodically to ensure that adequate control of the water quality is being maintained.
Bleed Line Calculations: Bleed rate is determined by the following formula:
Bleed Rate = B =
E
(n-1)
Where: B = Bleed Rate (GPM)
E* = Evaporation Rate (GPM) = Q (GPM) x R (°F) x .001
Q = Process Fluid Flow Rate (GPM)
R = Range n = Number of Cycles of Concentration = CR/CM
CR = Concentration in Recirculating Water
CM = Concentration in Makeup Water
* The evaporation rate “E” can be determined by any one of the following methods:
1. The evaporation rate is approximately 2 GPM per 1 million
BTUH of heat rejection.
2. The evaporation rate is approximately 3 GPM per 100 tons of refrigeration.
140.920-IOM (NOV 09)
3. Evaporation Rate = Q (GPM) x R x .001 (as shown in the example).
The following example illustrates a bleed rate calculation:
Given:
• Condenser
• Process Fluid Flow Rate = 800 GPM
• Maximum Allowable Chloride Concentration = 250 ppm
• Concentration of Chlorides in Makeup Water = 45 ppm
• Range = 10°F
Find: Bleed Rate
Solution: So in this case,
E = Q x R x 0.001 = 800 x 10 x 0.001 = 8 GPM n =
CR
CM
Bleed Rate = B =
=
250 ppm
45 ppm
E
(n-1)
=
= 5.55
8 GPM
(5.55-1)
Page 17
= 1.75 GPM
Therefore, in this case we must bleed approximately 1.75 GPM to limit the concentration of impurities.
NOTE: This example focuses on a single parameter (chloride concentration) of water only. The bleed rate required for a system (when evaluating more than one parameter) is the highest bleed rate required to keep all parameters within recommended limits.
140.920-IOM (NOV 09)
Page 18
XLP2 EVAPORATIVE CONDENSERS
MAINTENANCE
RECOMMENDED MAINTENANCE SERVICES
(1)
Type Service
Inspect and clean as necessary:
Inspect general condition of the unit (2) and check
unit for unusual noise or vibration
Clean and flush basin
Inspect spray nozzles
Clean basin strainer
Drain basin and piping
Check and adjust water level in basin
Check operation of makeup valve
Check and adjust bleed rate
Inspect heat transfer section
Inspect protective Finish
Mechanical equipment system:
Check belt condition
Adjust belt tension (3)
Lubricate fan shaft bearings
Lubricate motor base adjusting nut
Check drive alignment
Check motor voltage and current
Check fan bearing locking collars
Check fan motors for proper rotation
Check fans for rotation without obstruction
Start-Up
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Monthly
X
X
X
X
X
X
X
X
X
Quarterly
X
X
X
X
X
Annually
X
X
Shutdown
X
X
X
X
X
X
X
1. Recommended service intervals are for typical installations. Different environmental conditions may dictate more frequent servicing.
2. When operating in ambient temperatures below freezing, the evaporative condenser should be inspected more frequently. Refer to “Cold Weather
Operation” on Page N102 for more details.
3. Tension on new belts must be readjusted after the first 24 hours of operation and quarterly, thereafter.
XLP2 EVAPORATIVE CONDENSERS
INSTALLATION - OPERATION - MAINTENANCE
140.920-IOM (NOV 09)
Page 19
RECOMMENDED SPARE PARTS
Frick parts are the “Perfect Fit” for your condenser. These parts are specifically designed, engineered and manufactured to work in a condenser environment. They are the right parts, at competitive pricing levels, and Frick offers the best deliveries in the industry.
The most common repair and retrofit parts are in stock and can be ordered from Frick. In most cases they can ship overnight.
In addition, most Frick Representatives maintain a local inventory of commonly used parts.
Even with this fast delivery capability, it is still recommended that certain essential, emergency repair parts be maintained in your local inventory, to minimize any potential downtime.
Basic Recommended Spare Parts
Bearing set
Float valve or repair kit
Float ball
Solenoid valve (if unit is equipped with electric water level control)
Powerband or set of belts
Spray nozzle kit with grommets
Basin heater and low water cut out
Door gasket
Strainer (inlet and suction)
Fan and sheave bushings
Pump seal and gasket kit for coil products
Automatic bearing greaser refill kit
Parts to Consider if Extended Downtime is a Concern
Spray pump for coil products
Fan or fan wheel
Fan shaft
Sheave set
Fan motor
Q-NET
™
network technology...
Connect Your PC with QUANTUM
™
LX !
Take full advantage of Q-NET
™
technology with all Frick products!
System integration is what we do...
Q-NET
™... supports open-protocols for SCADA systems (i.e. Allen-Bradley
®
DF1, Modbus RTU,
Modbus ASCII, and Industrial Ethernet Protocols)
Q-NET
™... connects instantly for local or remote access; no software required
Q-NET
™... can be applied to both new and existing systems
Q-NET
™ means precise control 24 hours a day, seven days a week
Q-NET
™ distributed architecture mean faster, easier, economical installations
Q-NET
™ delivers increased operating efficiency and lowers energy costs
Available on Frick screw compressors, condensers, evaporators, AcuAir
®
hygienic air handlers, and refrigerant vessels.
Form 140.920-IOM (2009-11)
Supersedes: NOTHING
Subject to change without notice
Published in USA • GUI 1M
© 2009 Johnson Controls Inc. -
ALL RIGHTS RESERVED
JOHNSON CONTROLS
100 CV Avenue • P.O. Box 997
Waynesboro, PA 17268-0997 USA
Phone: 717-762-2121 • FAX: 717-762-8624 www.johnsoncontrols.com
advertisement
Key Features
- Rigging, assembly, start-up, and maintenance instructions are included in the manual.
- Positive Closure Plate option is available for added protection against freezing.
- Corrosion protection measures are included to extend the life of the unit.
- Biological control measures are also included to prevent the growth of bacteria and algae.
- The unit is easy to maintain, with simple access to all components.
- Replacement parts including spray branches, drift eliminators, casing and coil are available.
- Recommended maintenance services are outlined in the manual to ensure optimal performance.
Frequently Answers and Questions
What is the purpose of the Positive Closure Plate option?
What are the corrosion protection measures that are included in the unit?
What are the biological control measures that are included in the unit?
How often should the unit be maintained?
Related manuals
advertisement
Table of contents
- 4 RIGGING AND ASSEMBLY INSTRUCTIONS
- 4 Check Unit Before Rigging
- 4 UNIT WEIGHTS
- 4 Anchoring
- 4 Leveling
- 4 Rigging
- 5 Table
- 6 FLUME BOX INSTALLATION
- 7 POSITIVE CLOSURE PLATE OPTION
- 7 Positive Closure Plate Installation (Figures 11 and 12)
- 8 INITIAL AND SEASONAL START-UP
- 8 General
- 8 Cleaning
- 8 Inspection
- 8 Start-up
- 9 EXTENDED SHUTDOWN
- 9 COLD WEATHER OPERATION
- 9 Inspection and Maintenance
- 9 Fan Section Icing Protection
- 9 Temperature Setting
- 9 Fan Control
- 10 Dry Operation
- 10 Coil Freeze Protection
- 10 Minimum Operation
- 10 Positive Closure Damper Hood and Insulation
- 10 Emergency Coil Drain
- 10 Basin Water and Internal Piping Freeze Protection
- 10 Cold Water Basin Protection
- 10 Piping Freeze Protection
- 11 CORROSION PROTECTION
- 11 Corrosion and Treatments
- 11 Corrosion and Scale Control
- 11 Table 2: Quality Guidelines for Chemically Treated Circulating Water
- 11 Chemical Treatment Requirements
- 11 Passivation
- 12 BIOLOGICAL CONTROL
- 13 COLD WATER BASIN
- 13 Water Levels
- 13 Table 3: Cold Water Basin Water Levels
- 13 Inspection and Maintenance
- 13 FAN DRIVE SYSTEM
- 13 Inspection and Maintenance
- 14 Fan Belt Adjustment
- 14 Alignment
- 14 FAN MOTORS
- 14 Inspection and Maintenance
- 14 Adjustable Motor Base
- 15 FAN SHAFT SUPPORTS
- 15 Ball Bearings
- 15 Locking Collars
- 15 SPRAY NOZZLES AND HEAT TRANSFER
- 16 WATER LEVEL CONTROL
- 16 Mechanical Makeup Valve Assembly
- 16 Inspection and Maintenance
- 16 Optional Electric Water Level Control Package
- 16 Inspection and Maintenance
- 16 SYSTEM CLEANING
- 16 Coil Cleaning
- 16 Weld Byproduct Cleaning
- 16 WATER TREATMENT
- 16 Bleed Rate
- 19 RECOMMENDED SPARE PARTS