The Mach M2 and Mach M2 F ceiling lamps are designed for use in medical settings and feature a robust construction with a graduated circle diameter of 270mm and six bores diameter 15mm. They can be easily adjusted vertically to the required room height and secured to the solid ceiling through a ceiling anchorage ring.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
Mounting instructions Directions for use
CEILING ATTACHMENT
FOR MACH M2
59860005
Mach M2................................
Mach M2 F.............................
Order No. 170 120 3330
Order No. 170 230 3330
Ceiling lamps:
Dr. Mach
GmbH u. Co., Flossmannstrasse 28, D-85560 Ebersberg
Tel.: +49 (0)8092 2093 0, Fax +49 (0)8092 2093 50
Internet: www.dr-mach.com
, E-mail: [email protected]
Edition 03 24.10.2006 / Bak Page 1/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
List of contents
1. Safety instructions ............................................................................................................. Page 4
2. Mounting layout ceiling lamps ........................................................................................... Page 5
3. Ceiling attachment............................................................................................................. Page 6
3.1 Preparatory work on the ceiling.................................................................................. Page 6
3.1.1 Setting the safety dowels ................................................................................... Page 6
3.1.2 Mounting the ceiling anchorage ring to the solid ceiling ............................................................................................. Page 6
3.2 Pre-assembly of the ceiling flange and suspension tube........................................... Page 7
3.3 Mounting the flange and the suspension tube to the ceiling ...................................... Page 8
3.4 Min. roomheights for ceiling attachments................................................................... Page 9
4. Electrical connection.......................................................................................................... Page 10
4.1 Preparing the electrical connection ............................................................................ Page 10
4.2 Position of transformer – Dr. Mach lamps.................................................................. Page 11
4.3
4.4 Ceiling lamps with external transformer ..................................................................... Page 11
5. Mounting the articulated arms and the lamp head ............................................................ Page 12
5.1 Mounting the articulated arms to the suspension tube .............................................. Page 12
5.2 Mounting the lamp to the spring arm.......................................................................... Page 13
6. Cleaning ............................................................................................................................ Page 14
7. Maintenance ...................................................................................................................... Page 15
7.1 Periodical maintenance work ..................................................................................... Page 15
Adjusting
7.3 Maintenance of the segment...................................................................................... Page 16
8. Data ................................................................................................................................... Page 16
Technical data ............................................................................................................ Page 16
8.2
9. Disposal............................................................................................................................. Page 17
10. CE- mark ......................................................................................................................... Page 17
11. Dimensions and range of movement............................................................................... Page 18
12. Spare parts ...................................................................................................................... Page 19
13. Spare parts list................................................................................................................. Page 20
59860005 Edition 03 24.10.2006 / Bak Page 2/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
-
-
Static inspection
Note:
The static (structural) inspection must be carried out before the installation of the ceiling or wall anchorage!
-
The strength of the construction must be designed, checked and certified by a structural engineer.
-
The respective regional construction regulations that apply must be followed.
-
If a wrong hole is drilled by mistake, e.g. drilling of a reinforcement rod, the structural engineer who is responsible must be contacted, since adequate static load distribution in the ceiling may have been endangered.
Declaration of acceptance:
It is hereby certified that the supporting ceiling / wall and the ceiling anchoring / wall anchoring is safe and adequately strong.
Project
: ____________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Anchoring
(please check the one that is applicable) with dowels authorized by construction authority with counter-plate
- other
Location
: ____________________________________________
Signature / Stamp: (structural engineer / construction authority)
59860005 Edition 03 24.10.2006 / Bak Page 3/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
1. Safety instructions
The lamp must not be connected to the mains, until it has been fully assembled and installed.
This device is not suitable for use in hazardous locations.
The devices are not suitable for use in combustible blends of anaesthesia agents with oxygen or nitrous oxide.
Repairs to the ceiling attachment and special installation work on the sliding contacts should only be carried out by ourselves or a company expressly authorised by ourselves.
The manufacturer is only responsible for operational safety of the ceiling attachment when repairs and modifications are carried out by his own staff or by persons who guarantee compliance with the safety regulations.
The manufacturer is not responsible for damage to persons or property caused by incorrect or improper use, or when used for incorrect purposes.
General information
These installation instructions must be kept at hand together with the relevant operating instructions for consultation at any time.
All Dr. Mach lamps are supplied with a flange with a graduated circle diameter 270mm and six bores diameter 15mm. The flange supports the vertical suspension tube. It is attached to the solid ceiling by means of a ceiling anchorage ring.
Remark: The ceiling anchorage ring has to be ordered separately!
The ceiling anchorage ring has six precisely positioned threaded bolts M12. It makes it possible to fasten and adjust the lamp without causing dust or dirt after all building work has been completed.
The use of a ceiling anchorage ring is necessary in all cases of ceiling attachments.
During mounting, take care to ensure that neither the flange nor the attachment elements are in contact with reinforcement components of the solid ceiling.
In view of the slight weight of the Dr. Mach lamps, it is not fundamentally necessary to drill through the ceiling and use a counter-plate. Ceiling anchorage rings can be attached without any problems to ceilings in the concrete strength class greater than or equal to B25, using safety dowels
M8.
The forces arising when the widely extending articulated arms tilt, do make it necessary to drill very carefully with a certified hammer drill, paying close attention to the drilling tolerances.
The suspension tube of the lamp must be adjusted vertically to prevent the lamp body from moving.
For this purpose the M12 counter nuts on the attaching bolts must be adjusted accordingly.
In case of false ceilings, the suspension tubes for all lamps can be mounted directly through to the solid ceiling. The opening required for this purpose can be closed once the work has been completed, using the canopy diameter 450mm or a covering plate.
When using an intermediate flange (preferably for spaces exceeding 400mm and for room heights exceeding 4050mm), the length of the intermediate flange is to be measured to the lower edge of the false ceiling.
Also in this case a ceiling anchorage ring has to be used for fixation.
59860005 Edition 03 24.10.2006 / Bak Page 4/20
Ceiling attachment for Mach M2
Mach M2; Mach M2 F
2. Mounting layout ceiling lamps
Dr. Mach
Lamps and Engineering
Ceiling anchorage ring
Flange
Concrete ceiling
Suspension tube
Horizontal arm
Spring arm
Lamp
59860005 Edition 03 24.10.2006 / Bak Page 5/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
3. Ceiling attachment
3.1 Preparatory work on the ceiling
3.1.1 Setting the safety dowels
Attention:
Lamps, ceiling anchorage rings and intermediate flanges may only be attached to a ceiling of concrete strength class greater than or equal to B25. In case of light-weight ceiling coverings, the dowel anchor must be sunk completely into the concrete. To bridge this space use long threaded bolts for attaching the ceiling tube.
In addition, take care that neither suspension tube nor attaching elements come into contact with reinforcement components of the solid ceiling.
The lamp weight and the tilt of the long articulated arm(s) require that this work is performed meticulously. This refers particularly to the use of a certified hammer drill and to observe the drilling tolerances.
3.1.2 Mounting the ceiling anchorage ring to the solid ceiling
The scope of supply includes:
1 attachment set, consisting of:
• Six safety dowels Fischer FHA 12/50 galZn
• Mounting data Fischer
• Bore template
To attach the ceiling anchorage ring to a solid ceiling proceed as follows:
• Drill the bore holes according to the figure diameter 12mm and at least 100mm deep with a certified hammer drill, using the enclosed bore template. You can also use the ceiling anchorage ring as a template. In this case a second person may be needed to assist.
• Insert the safety dowels through the bores of the ceiling anchorage ring in such a way, that the washers lie flat to the ring.
• Tighten the screws carefully using a torque wrench (25Nm).
Light-weight ceiling panelling with a maximum thickness of 30mm can be bridged using the enclosed safety dowels. For panelling thicker than
30mm, it is necessary to remove the panelling before mounting.
59860005 Edition 03 24.10.2006 / Bak Page 6/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
3.2 Pre-assembly of the ceiling flange and suspension tube
and installing the electrical connections
The length of the suspension tube is adjusted to the required room height with a clearance height of at least 200cm under the lamp.
Aluminium cast flange and suspension tube
∅ 50mm
Standard version
For pre-assembly of ceiling flange and suspension tube proceed as follows:
• Cable or cord showing out the suspension tube is to be pushed carefully into the ceiling flange together with the suspension tube.
• Push the suspension tube upwards until the safety pin 1 can be pushed through the cross bores of the suspension tube.
• Then pull the suspension tube down until the safety pin 1 lies in recess A of the ceiling flange.
• Then secure the connection with six screws 2 and washers 3 to prevent wobbling.
If not possible, turn suspension tube by 180°.
• Pull the cable or cord through the bore 4 as shown in the diagram.
Attention:
The suspension tube is delivered with premounted retaining ring for the ceiling canopy.
Each connection journal is also equipped with:
• 2 spacer rings;
• 1 gib ring;
• 1 circlip (Seegerring).
59860005 Edition 03 24.10.2006 / Bak Page 7/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
3.3 Mounting the flange and suspension tube to the ceiling
Before mounting the flange and the suspension tube, assembly work on the ceiling (setting the dowels or mounting the ceiling anchorage ring and possibly mounting the intermediate flange) must be completed and all pre-assembly work finished.
Type with ceiling anchorage ring
• Screw three nuts B (each 120°) to the plate of the ceiling anchorage ring, holding the other three nuts 0,5cm away from the plate, unscrew nuts A.
• Position six washers C and six insulating washers D on the flange.
• Position the flange with suspension tube on the threaded bolts and adjust it to the required height using three nuts A and washers C, insulating washers D, and retaining washers E
(each 120°).
Note: Washers C, insulating washers D and retaining washers E must be put on the flange in the same order as shown in the figure.
• The three-point mounting allows a simple vertical adjustment of the suspension tube.
Vertical adjustment is very important and must be carried out with great care.
If the flange with suspension tube is not in the correct vertical setting, the support arms of the lamp do not remain precisely in the proper position, they could turn away and would therefore require excessive braking.
• Then position from above all six nuts B gently against the flange.
• Screw on the remaining three nuts A with washers C, insulating washers D and retaining washers E and tighten all six nuts equally cross-wise with a torque wrench (25 Nm).
Note: Washers C, insulating washers D and retaining washers E must be put on the flange in the same order as shown in the figure.
• Verify balance with a spirit-level.
59860005 Edition 03 24.10.2006 / Bak Page 8/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
Type with ceiling anchorage ring and
Intermediate flange
• Screw three nuts G (each 120°) to the plate of the ceiling anchorage ring, the other three 1cm away from the plate, unscrew nuts F.
• Position the intermediate flange on the threaded bolts and adjust it to the required height using three nuts F and washers H.
• Then position all six nuts G gently against the intermediate flange from above.
• Screw on the remaining three nuts F with washers H and tighten all six nuts equally cross-wise with a torque wrench (25 Nm).
• Verify balance with a spirit-level.
For mounting the flange to the intermediate flange proceed as described at the design with
ceiling anchorage ring.
3.4 Minimum room heights for ceiling attachments
Mach M2; Mach M2 F
59860005 Edition 03 24.10.2006 / Bak Page 9/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
Room heights H – single ceiling lamps
Mach M2
Mach M2 F
*
Lamps
Hmin* depending on ceiling attachment
2420
2420
Min. room height in the case of ceiling attachment with shortest suspension tube (180mm) for a passing height of 2 meters
4. Electrical connection
4.1 Preparing the electrical connection
Extent of supply:
• Cable on the suspension tube
• Line clamps on the flange
Put the cable through the flange. Ensure that the cables are cut to a length which allows approx. 15cm cable to extend from the suspension tube.
The flange is fitted with line clamps for connecting the light system to the electrical circuit. These clamps should be accessible for electrical safety checks during installation and also later.
Connect the mains supply and the cable from the suspension tube to the line clamps.
In case of lamps with external transformer the cross-sections of the cables must be designed in accordance to the cable-length and power consumption.
The following table shows the recommended cross-sections:
Lead length [m]
Power consumption
[W] up to 10 up to 20 up to 40 up to 70
80 2,5 4 10 16
Cross-section of lead [mm
2
]
Once the electrical connections have been completed, check that the system functions correctly in a noload operation trial run.
When connecting to an external transformer, the emerging voltage U will be approx. 10-20% above rated voltage because of no load and anticipated lead losses. There is no point in making any adjustments until the lamps have been completely mounted.
59860005 Edition 03 24.10.2006 / Bak Page 10/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
4.2 Position of transformer – Dr. Mach lamps
X*
Remark
Inside the wall bearing Mach 120 / 120F
4.3 Wiring diagrams
External transformer (Mach 120 / Mach 130)
1. Fuses
2. ON/OFF switch (4-pole for emergency power connection)
3. Transformer
4. Clamps on the flange
5. Coupling with sliding contact on lamp
6. Secondary ON/OFF switch
7. Light bulb
4.4 Ceiling lamps with external transformer
Single-phase transformer mounted on the flange
View
Flange
The single-phase transformer is already mounted on the flange.
At delivery it is already connected to the line clamp.
You have to connect the power supply and the lamp to the line clamp (see wiring).
Transformer
Wiring
Line clamp
59860005 Edition 03 24.10.2006 / Bak Page 11/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
5. Mounting the articulated arms and the lamp head
5
4
1
2
3
5.1 Mounting the articulated arms to the suspension tube
Suspension tube
Articulated arm
To mount the articulated arms proceed as follows:
• Loosen the screw 1.
• Remove cover 2 including the sliding contactplug.
• Remove circlip 3, gib washer 4 and levelling washer 5 from the suspension tube (tool: mounting plier).
• Slide the articulated arm onto the suspension tube.
• Slide the levelling washer, gib washer and circlip onto the suspension tube in the correct order.
Take care to ensure that the nose of the gib washer lies on the lateral bore (not shown) of the suspension tube, and that the safety ring slots properly into the groove of the suspension pipe (tool: mounting plier).
• Place the cover 2 back on the articulated arm and screw on with screw 1.
59860005 Edition 03 24.10.2006 / Bak Page 12/20
Ceiling attachment for Mach M2
5.2 Mounting the lamp to the spring arm
Dr. Mach
Lamps and Engineering
ATTENTION! Notice the rated voltage information!
Coupling journal
Lamp bow
Sticker with voltage information
Each lamp has a red sticker applied near the coupling journal at the lamp bow. The sticker shows the rated voltage of the lamp.
Connect the lamp only to the prescribed voltage, to avoid irreparable damage (e.g. the electrical
components).
Following rated voltage is usual:
22,8 V
After mounting the lamp take off the sticker and dispose it, otherwise it could fall down in the OTfield after some time!
59860005 Edition 03 24.10.2006 / Bak Page 13/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
Do not remove screw 13, it is designed to fix the sliding contact and provides earthling!
5
13
3
3
180°
3
6
2
4
1
Attention: If the spring arm is pushed downwards (the arm is under spring tension) it may bounce up and cause harm. While mounting the lamp head no other persons are allowed to be within the swivel range of the spring arm.
Mounting the lamp Mach M2 / M2F to the spring arm
• Loosen brake screw 1, so the plastic bushing 2 can be slipped easy onto the spring arm.
• Slip plastic bushing 2 onto the spring arm to overlap slots 3.
• Check if the journal 4 of the lamp is greased.
• Insert the greased journal 4 of the lamp and insert security segment 5 completely into slot 3, that the security segment leads in groove 6.
• Rotate plastic bushing 2 by 180° up to the
provided drilling for the brake screw and screw in brake screw 1 until you reach the desired brake effect for lamp head 4.
• Check if lamp head 4 is firmly fixed.
ATTENTION!
It is absolutely necessary to mount this securing segment!
6. Cleaning
Note: Before doing any cleaning work turn off the lamp, disconnect from mains and make sure that the lamp cannot be switched on again.
Please ensure, that no disinfection liquid flows into the joints or lamp head.
The surface of the ceiling attachment can be easily kept clean by simply wiping with a wet cloth. You can use conventional cleaning agents.
Caution:
In order to prevent any damage at plastic parts, do not use scouring agents or alkaline, acidic and
alcoholic cleaning agents.
For cleaning proceed as follows:
• Draw plug from mains.
• Wipe the surface of the ceiling attachment with a wet cloth. As a cleaning agent you can use water or a soap solution (washing-up liquid).
59860005 Edition 03 24.10.2006 / Bak Page 14/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
7. Maintenance
Note: Before doing any maintenance work, turn off the lamp, disconnect from mains and make sure, that the lamp cannot be switched on again.
7.1 Periodical maintenance work
The following maintenance work / tests has / have to be done every six months:
• check on defects in paint work;
• check on fissures at plastic parts;
• check on deformation of the suspension.
The following maintenance work / tests has / have to be done once a year:
• check the function;
• electrical safety test;
• check the suspension.
Remark:
Check and grease the security segment once a year.
7.2 Adjusting the spring force
Springs are wearing parts, thus the spring force can decrease in time and must be readjusted.
Note: Set the spring force in such a way, that the spring arm with the lamp head holds its position at every set height.
B
B
A
In case the spring arm with the lamp moves down on its own, proceed as follows:
• Remove lateral cover A. The adjusting screw (B) for the spring force is visible now.
• Push the lamp and spring arm upwards as much as possible, so the spring is without charge.
• Insert a slotted screwdriver into the screw B.
• Turn the adjusting screw to the left
(anticlockwise), until the lamp holds its position at every set height.
In case the spring arm with the lamp moves up on its own, proceed as follows:
• Remove lateral cover A. The adjusting screw (B) for the spring force is visible now.
• Push the lamp and spring arm upwards as much as possible, so the spring is without charge.
• Insert a slotted screwdriver into the screw B.
• Turn the adjusting screw to the right
(clockwise), until the lamp holds its position at every set height.
59860005 Edition 03 24.10.2006 / Bak Page 15/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
7.3 Maintenance of the segment
• Dismount the lamp head in reverse order of mounting (see chapter 5.2).
• Check the thickness of the segment. It must be at least 1,5mm. In case the thickness of the segment is less than 1,5mm, it has to be changed.
• Grease the segment and the coupling journal of the lamp.
• Mount the lamp to the spring arm (see chapter 5.2).
8. Data
8.1 Technical data
Ceiling attachment
Primary voltage
Secondary voltage
Frequency
Power consumption
Rated current at 24V
230V
22,8 V
50 / 60Hz
80W
3,3A
Protection class I.
The device is not suitable for use in combustible blends of anaesthesia agents with air or for use in combustible blends of anaesthesia agents with oxygen or nitrous oxide.
The device is designed for continuous operation.
8.2 Environmental conditions
Operation
Min. Max.
Relative atmospheric humidity
Air pressure
Relative atmospheric humidity
Air pressure
30%
700hPa
75%
1060hPa
Transport / storage
Min. Max.
30%
700hPa
75%
1060hPa
59860005 Edition 03 24.10.2006 / Bak Page 16/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
9. Disposal
The ceiling attachments do not contain any danger goods.
The components of the ceiling attachment should be properly disposed at the end of its shelf life. In order to respect all regulations for disposal, please contact us before disposing the product.
10. CE- mark
The ceiling attachments comply to the standards 93/42/EEC for medical products of the
European Community’s Council. Dr. Mach applies the standard EN 60601-2-41.
Dr. Mach GmbH is certified according to DIN EN 46001:1996 and DIN EN ISO
13485:2001.
59860005 Edition 03 24.10.2006 / Bak Page 17/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
11. Dimensions and range of movement
59860005 Edition 03 24.10.2006 / Bak Page 18/20
Ceiling attachment for Mach M2
12. Spare parts
2
1
4,5,6,7
8
30
37,38
39,42
10,11
12,13
14
17,18
15
16 (24)
43,44
25
22
Dr. Mach
Lamps and Engineering
21
20
19
3
36
31
23
26
27(28)
21
20
19
59860005
35
27(28)
Mach M2
27(28)
Edition 03
33
40,41
24.10.2006 / Bak Page 19/20
Ceiling attachment for Mach M2
Dr. Mach
Lamps and Engineering
13. Spare parts list
Item Pcs. Name
01 1
02 6
Ceiling anchoring ring TK 270
Safety dowels for ceiling anchoring ring
03 1 Ceiling flange TK 270mm
04 12(24) Nut M12 DIN 934-8 galZn
05 12 Washer 13 DIN 9021 galZn
07 6(12) Blocking washer SK12 galZn
08 1 Safety
09
10 6 Hexagonal head screw M6x16 DIN 933
11 6 Retaining ring B6:A2 DIN 127
12 1 Canopy
13 1 Canopy, divided 50/450
14 1 Ring
15 1 Suspension 50x4
EDVNO Remarks
50480001
74011018
50482301
65332023 ( ) with int. flange
65272001
50281222
( ) with int. flange
50753203
50222203 optional
50222208 optional
50222202
50221028 1500mm
16
17
1
6
18 6
19 1
Sliding contact socket (3-pole) 67330001 Not shown
Countersunk screw M6x16 DIN 7991 galZn 65162006
Cover,
Circlip 74011014
20 1 Gib
21 1 Levelling
22 1 Securing sleeve
23 1 Connecting 680-2000mm
74011013
74011012
74013012 Ondal 1502738
50224001-
50224028
24 1
25 1
26 2
Sliding contact complete
Brake
Screw for cover M3x4 DI´N 966
50223001-
50223028
Pos. 16 + Pos. 23 complete
74015007
65112029
27 2 Cover
28 2 Sliding contact for new-type swing
29
30 1
Flange tube
∅ 70mm
31
32
33
1
1
34
Transformer 130VA 230V
Spring arm 4-5 kg, complete
35 1 Securing
36 1 Cellular rubber seal, length 1430mm
37 1 Ring
38 1 Washer
39 1
Bolt
∅8x59
40 1 Lateral cover, left
41 1 Lateral cover, right
42 2 Cover,
43 1 Screw M3x10 D7985:Zn
44 1 Lock washer A3,2
74015022
Ondal T19694
50751001-
50751008
Length 300mm to
1000mm
67010202 At the flange
74861005
74015006
50222209
50754202
50753202
74015010 Ondal T37284
74015011 Ondal T38505
65152045
65582003
59860005 Edition 03 24.10.2006 / Bak Page 20/20
advertisement
Key Features
- Graduated circle diameter of 270mm
- Six bores diameter 15mm
- Adjustable vertical height
- Secured to solid ceiling
- Ceiling anchorage ring for attachment
- Robust construction
- Easy to clean surface
- Can be used in medical settings
- Adjustable spring force