Fairbanks Aegis Stainless Steel Floor Scale, Aegis Stainless Steel Lift Deck Installation Manual

Fairbanks Aegis Stainless Steel Floor Scale, Aegis Stainless Steel Lift Deck Installation Manual
Add to My manuals

The Aegis Stainless Steel floor scale features a rugged structural rib design and a nominal height of three inches -- among the lowest in the industry. With a full range of accessories, these scales can be configured to fit most floor scale applications. The Aegis Lift Deck Floor Scale is another addition to Fairbanks’ Aegis line of floor scales. It is designed to offer a safe and convenient way to lift the deck of the scale to facilitate cleaning. The Aegis Lift Deck Floor Scale is for pit installation only.

advertisement

Assistant Bot

Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.

Fairbanks Aegis Stainless Steel Floor Scale Installation Manual | Manualzz

Installation Manual

Aegis

Stainless Steel

Floor Scale

© 2007 by Fairbanks Scales Inc.

All rights reserved

51103

Revision 1 01/07

Amendment Record

Aegis Stainless Steel Floor Scale

51103

Manufactured by Fairbanks Scales Inc.

821 Locust

Kansas City, Missouri 64106

Revision 0

Revision 1

01/07

01/07

Preliminary Release

Manual Release

Disclaimer

Every effort has been made to provide complete and accurate information in this manual. However, although this manual may include a specifically identified warranty notice for the product, Fairbanks Scales makes no representations or warranties with respect to the contents of this manual, and reserves the right to make changes to this manual without notice when and as improvements are made.

51103 2 01/07 -- Rev. 1

51103

Table of Contents

Section 1: General Information

A. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

B. Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

C.Specification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Section 2: Installation

A. General Service Policy . . . . . . . . . . . . . . . . . . . . . . . 5

B. Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

C. Pre-Installation Checklist . . . . . . . . . . . . . . . . . . . . . . 6

D. Unpacking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

E. Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

F. Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 i. Analog Interface (Junction Box 67171) . . . . . . . . 8 ii. Intalogix Technology Interface (QMB 15291) . . . 9

Section 3: Accessories Installation

A. Bolt-Down Plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

B. Ramps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

C. Bumper Guards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

D. Pit Frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

Section 4: Maintenance and Service

A. Load Cell Replacement . . . . . . . . . . . . . . . . . . . . . . . 14

B. Junction Box/QMB PCB Replacement . . . . . . . . . . . 15

C. Foot Assembly Replacement . . . . . . . . . . . . . . . . . . 16

Section 5: Parts

A. Stainless Steel Platforms . . . . . . . . . . . . . . . . . . . . . . . . . . 17

Diagram: Stainless Steel models . . . . . . . . . . . . . . . . . . 18

B. Stainless Steel Lift Deck Platforms . . . . . . . . . . . . . . . . . 19

Diagram: Stainless Steel 3’ x 3’ and 4’ x 4’ models . . . 20

Diagram: Stainless Steel 5’ x 5’ models . . . . . . . . . . . . . 21

APPENDIX

I: Model Matrix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

APPENDIX

II: Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

APPENDIX

III: Standard Pit Frame and Installation Drawing . . . 24

APPENDIX

IV: Lift Deck Pit Frame Installation Drawing . . . . . . . . 25

3 01/07 -- Rev. 1

Section 1: General Information

A.

Introduction:

The Aegis Stainless Steel floor scale features a rugged structural rib design and a nominal height of three inches -- among the lowest in the industry. With a full range of accessories, these scales can be configured to fit most floor scale applications.

B.

Description:

The Aegis Industrial Stainless Steel series floor scale platform is fully assembled and pre-wired. Aegis stainless steel floor scale sizes range from 30" x 30" to 6' x 8', and have capacities from 1000 to 10,000 lbs.

The Aegis Lift Deck Floor Scale is another addition to Fairbanks’ Aegis line of floor scales. It is designed to offer a safe and convenient way to lift the deck of the scale to facilitate cleaning. The Aegis Lift Deck Floor Scale is for pit installation only.

The Aegis floor scales use a standard summing junction box to interface with analog indicators, and is equipped with a 25' interface cable. Junction boxes are constructed of stainless steel, and all models have threaded holes in the decks for attaching eyebolts to facilitate installation and cleaning.

C.

Specifications:

Models and sizes are included in a chart in Appendix

II.

Description

Platform deck plate

Aegis Stainless Steel

0.25”

Platform height 3.0”

Operating temperature 15º to 104º F

Humidity

Overload capacity

Endloading capacity

Construction

Grade level

-10º to 40º C

100% suitable for water washdown

150% of rated capacity

100% of rated capacity

Type 304 stainless steel

Within 3º of level

51103 4 01/07 -- Rev. 1

Section 2: Installation

A.

General Service Policy:

Prior to installation, it must be verified that the equipment will satisfy the customer's requirements as supplied, and as described in this manual. If the equipment cannot satisfy the application, and the application cannot be modified to meet the design parameters of the equipment, the installation should not be attempted.

It is the customer / operator’s responsibility to ensure the equipment provided by

Fairbanks is operated within the parameters of the equipment's specifications and protected from accidental or malicious damage. Other than the procedures authorized in the Operating manual, no service, repair, or adjustments may be performed by unauthorized / untrained service personnel. Any unauthorized repairs will void any verbal, implied, or written warranties.

B.

Overview:

1. These instructions apply to the floor scale and its specific installation procedures.

The instructions include a pre-installation checkout, which must be performed either at the service center before the technician goes to the site, or at the site before he places the equipment in service.

2. All electronic and mechanical calibrations and / or adjustments required to make this equipment perform to accuracy and operational specifications are considered to be part of the installation, and are included in the installation charge. Only those charges which are incurred as a result of the equipment's inability to be adjusted or calibrated to performance specifications may be charged to warranty.

3. Absolutely no physical or electrical modifications other than selection of standard options and accessories are to be made to this equipment. Electrical connections other than those specified may not be performed, and physical alterations (holes, etc.) are not allowed.

4. Before the installation is considered complete, the equipment is to be installed to satisfy any applicable Weights and Measures requirements. The installing technician is responsible to make certain that personnel are fully trained and familiar with the capabilities and limitations of the equipment. Be prepared to recommend the arrangement of components which will provide the most efficient layout, utilizing the equipment to the best possible advantage. The warranty policy must be explained and reviewed with the customer.

51103 5 01/07 -- Rev. 1

The complete installation consists of:

1. Verifying the application

2. Unpacking

3. Floor scale checkout

4. Customer and site readiness: a. Is the Location ready?

b. Is the customer aware there may be work disruptions?

c. Are the operators available for training?

5. Floor scale connections

6. Adjustments

7. Customer training

NOTE: It is the owner’s responsibility to document, notify, and follow-up with the carrier if

there is shipping damage.

NOTE: Above ground installations require the scale platform be protected from mobile

machinery that may be present in the area. Fairbanks Scales is not responsible for damages to unprotected platforms in above ground installations.

51103

The following points should be checked and discussed with the Area Sales Manager and/or the customer, if necessary, before the technician goes to the site to install the equipment.

1. Has the customer's application been checked to make certain that it is within the capabilities and design parameters of the equipment?

2. If the installation will disrupt the customer's normal operations, is he aware and has he made arrangements?

3. Is properly grounded power available at the installation location?

4. Will the equipment operator(s) be available for training?

5. Has the service technician thoroughly reviewed the installation procedures?

6. Has the service technician reviewed the recommended setup with the Area Sales

Manager or Area Service Manager, and identified all necessary variations to satisfy the customer's specific application?

6 01/07 -- Rev. 1

D.

Unpacking:

1. Check that all components are on hand, and agree with the customer's order.

2. Remove all components from their packing material, checking to make certain that all parts are accounted for and no parts are damaged. Advise the shipper immediately if damage has occurred. Order any parts necessary to replace those which have been damaged. Keep the shipping container and packing material for future use. Check the packing list.

3. Collect all necessary installation manuals for the floor scale.

4. Examine the floor scale and perform an inspection, making certain that all hardware, electrical, and PC connections are secure.

E.

Safety:

As is the case with any equipment, certain safety precautions should be observed during operation:

1. Ensure that any structure which supports the floor scale is capable of withstanding the weight of the scale and its rated capacity.

2. Beware of pinch points on the lift deck models. Severe personal injury could occur if safety precautions are not observed.

3. Use proper lifting technics when raising the lift deck platforms.

F.

Setup:

The setup of the floor scale consists of installing the scale on a level surface and wiring the scale to the indicator. Consult the appropriate indicator manual for further information regarding the indicator and its setup.

1. Select a location that is level and will fully support the weight of the platform plus a full capacity load.

2. Remove the top of the crate and all packing/banding material.

51103 7 01/07 -- Rev. 1

3. Screw two (2) eyebolts into the threaded adapters in the platform top and use a forklift or other lifting means along with chains, cables, or nylon straps to remove the scale from the crate.

CAUTION: Do NOT use grab or slip hooks to lift the scale. Failure to use the proper

lifting tools may result in personal injury.

4. Set the scale so that the interface cable exits in a direction where it can be protected. If possible, use a cable protector to reduce 'trip' hazards and to protect the interface cable from being damaged.

5. Level the scale by turning the foot pads.

6. Wire the scale cable to the proper type indicator as follows:

NOTE: The analog junction box and the QMB interface box on the Lift Deck models are

mounted remotely on a wall location. The boxes must be located above the splash line and in a secure area away from material handling traffic.

i. Analog Interface (Junction Box 67171):

L/C Wire Color

Black

Green

Yellow

White

Red

Function

(-) Excitation

(+) Excitation

Shield

(+) Signal

(-) Signal

Analog Instrument

(-) Excitation

(+) Excitation

Shield

(+) Signal

(-) Signal

51103 8 01/07 -- Rev. 1

ii. Intalogix™ Technology Interface (QMB 15291):

QMB

Terminal

1

2

5

6

3

4

7

8

9

10

Wire Color

Green

Red

Black

White

Brown

Blue

Orange

Yellow

Violet

Gray/Shield

Function

(-) Excitation

(+) Excitation

Ground

D out

D In

EOC

SCLK

CS

Temperature

Chassis

Intalogix™

Technology Inst

1

2

5

6

3

4

7

8

9

10

NOTE: 1. If the Gray/Shield wire is equipped with a screw lug, it can be attached using

one of the PCB screws.

2. Calibrate the Intalogix™ platform / indicator. Follow the calibration procedure in the appropriate indicator service manual.

7. Adjust the analog indicator to the platform. First, ensure all corners are within one division of each other at 25% of the rated capacity specification. Follow the calibration procedure in the appropriate indicator service manual to ensure a good calibration. a. Perform a coarse platform calibration approximate to the actual weight.

b. Identify the platform corner numbers.

2 3

Top View

1

50604-1

4

51103 9 01/07 -- Rev. 1

c. Cornering the scale: Place a load which is 25% of platform capacity upon the scale at the corner 1 location. Note the indication. Proceed to each successive corner with the weight and note each indication.

If corners require adjustment, place the load on the corner displaying the lowest weight and use the appropriate potentiometer to change the displayed weight to read the same as the highest reading by turning the potentiometer clockwise (CW). Repeat the process, rechecking all corners until there is no error. Perform a zero reference check with an unloaded platform, then repeat the corner test to ensure all readings are the same before proceeding.

Upon completing corner adjustments, check the zero reference of the scale and adjust if necessary.

When the corners are the same in reference to each other, final calibration may be accomplished as follows:

1. Remove all weights.

2. Zero the indicator.

3. Perform the full scale calibration with test weights.

4. Follow the appropriate indicator service manual to ensure proper calibration.

50604-4

NOTE: The platform junction box is preset at the factory by centering the adjusting pots.

Minimal corner adjustment should be required.

NOTE: Junction box assembly 67171 has four (4) extended range, multi-turn

potentiometers, one for each load cell. If you have difficulty adjusting the corners on the platform, turn all potentiometers to the fully counter clockwise (CCW) position until an audible clicking sound is heard when turned. With the weight on the lowest reading corner, adjust the corresponding potentiometer clockwise (CW) to indicate the same as the highest reading corner. Continue this process until each corner is correct.

51103 10 01/07 -- Rev. 1

Section 3: Accessories Installation

Bolt-down plates, ramps, bumper guards, and pit frames are installed as follows:

A.

Bolt-Down Plates:

Bolt down plates are used to keep the scale from sliding or moving when loads are applied. The plates are bolted via anchors at each of the scale's feet.

Installation:

1. Place the platform in position.

2. Place the bolt-down plate under the foot, plate edge extending out from under the scale.

3. Drill the two holes using a hammer drill. Insert anchors with the nut and washer already ON. Tap the anchor into the hole, then tighten the nuts securely. Repeat this process for each plate used.

NOTE: If ramps are NOT installed and bolt-down plates are necessary, a set of four (4)

bolt-down plates is required. See Appendix

II B.

B. Ramps:

Each ramp accessory comes with two integral bolt-down plates and four (4) anchors.

Installation:

1. Place the ramp in position, then lift and set the platform feet into the bolt-down plate holes.

C.

2. Drill the two holes using a hammer drill. Insert anchors with the nut and washer already ON. Tap the anchor into the hole, then tighten the nuts securely.

• If two ramps are installed, NO bolt-down plates are required.

• If one ramp is installed, a set of two bolt-down plates is required.

• Only two ramps total may be installed on opposite sides of a scale platform.

Bumper Guards:

Bumper Guards are designed to help protect the platform from forklift traffic. The guards are slightly higher than the scale, and will help deflect the forks.

1. Place the bumper guard so it will protect the platform from non-scale traffic, but it cannot contact or interfere with the platforms movement.

51103 11 01/07 -- Rev. 1

D.

2. Drill holes using a hammer drill or its equivilent. Clean the hole thoroughly. Insert the anchor(s) with the nut and washer in place. Tap the anchor(s) into the hole(s) and tighten the nuts securely.

Pit Frames:

The pit frame accessory is a one-piece welded unit with no additional welding required.

This accessory is designed for in-floor applications. In general, a hole is cut in the concrete, the pit frame accessory is installed in the hole, then concrete is poured around and under the frame. Once cured, the scale platform is set into the frame and installation can be completed.

Standard duty frames are available in stainless steel for all Aegis Industrial floor scale sizes. The concrete work and frame setting are usually done by a contractor, with a scale technician completing the project by setting and installing the scale.

NOTE: The Aegis Lift Deck Floor Scale is for pit installation only. For above ground

installations contact Fairbanks’ Solutions Group.

51103

1. Place the pit frame in the approximate position it will occupy on the floor.

2. Mark out the position of the hole to be made. The hole MUST be a minimum of 12" larger than the pit frame on all sides. Should pit drainage be required, slope the pit floor to an installed drain while maintaining a level area at each corner. Use the drawing in Appendix

III for measurements.

3. The hole must be deep enough to accommodate the pit coping, plus the thickness of the pit floor. Use the drawing in Appendix

III for measurements.

4. Once the properly sized and prepared hole has been cut in the concrete floor, use these steps to help set the frame properly.

• Set the frame in the hole supported at about the correct height.

• Set two 2 x 4s on edge (longer than the width of the hole) across the opening.

• Use soft wire to make 2 loops by twisting wire around each 2 x 4 and the frame.

• With the frame supported by the wire and 2 x 4s, use a level to set the frame flush with the surrounding floor, level, and at the correct height by twisting or untwisting the wire.

12 01/07 -- Rev. 1

51103

Wire

2 x 4

Frame

Assy

Pit

50604-2

• Use the drawing in Appendix

III for measurements, concrete specifications and amounts.

• Make sure the conduit for the scale cable is in place and secured into the frame opening.

• Pour the concrete around and under the frame ensuring a smooth and level finish.

• If a drain is required, form the pit to provide a slope in the pit floor to the drain.

Refer to the drawings in the Appendix.

• Cure to a minimum of 2000 psi before cutting wire.

• Pull the cable through the conduit before placing the scale platform in the frame.

• Level the platform before installing the instrumentation.

13 01/07 -- Rev. 1

Section 4: Maintenance and Service

A.

Load Cell Replacement:

1. Remove power to the indicator.

2. Remove the platform access cover then the junction box cover and disconnect the failed load cell cable at the junction box. Loosen the gland bushing and tie a string or wire to the end of the cable to act as a pull wire. (Check that all cells have wire markers on the cable ends. If not, identify cells with wire markers or other means).

3. Lift the platform end and secure using wood blocks for safety.

4. Remove the load cell mounting bolts (use a ¾" socket), then the cell, pulling the load cell cable through the scale while leaving the pull string/wire in the scale.

5. Remove the foot assembly from the old cell and install on the new cell, using antiseize on the threads.

6. Disconnect the pull string/wire from the old cell's cable and attach to the new cell's cable end. Pull the cable of the new cell through to the junction box, then mount the cell using anti-seize on the mounting bolts, torque to 90 ft/lbs.

7. Lower the scale to the surface removing the safety blocks.

8. Ensure that the weight is shared equally by all four (4) feet. Connect the load cell wires into the junction box, tighten the box gland bushing(s) then test and calibrate the scale. Replace the box cover and torque all screws to 18-20 in/lbs. Replace the platform access cover.

9. Recalibrate as necessary.

51103 14 01/07 -- Rev. 1

10. Load Cell Specifications:

Specifications

Material:

Resistance:

Rated Output:

Safe Overload:

Compensated Temp range:

Safe Operating Temp range:

Stainless Steel

Stainless Steel 17-4ph

1000 Ohm

2 mV/V

150%

-10ºC to 40ºC

-18ºC to 65ºC

B.

Analog Junction Box and Optional QMB PCB Replacement:

1. Remove power to the indicator.

2. Open the platform access cover, then the box cover.

3. Loosen all gland bushing nuts.

4. Check that all load cells have wire markers on the cable ends. If not, identify cells with wire markers or other means, then disconnect the load cells' wires from the terminal blocks. Disconnect the home-run wires.

5. Remove the PCB, clean the box, then install the new PCB.

6. Reconnect all load cell and home-run wires to the new PCB.

NOTE: For analog systems, leave the box cover removed until all corner adjustments are completed.

7. Tighten all gland bushing nuts.

8. Replace the box cover and torque all screws to 18-20 in/lbs. Replace the platform access cover.

9. Recalibrate as necessary.

51103 15 01/07 -- Rev. 1

1. Lift the platform end and secure using wood blocks for safety.

2. Remove the bolt which goes through the load cell and post of the foot.

3. Pull the foot assembly out of the load cell.

4. Lubricate the “O” ring on the new foot assembly and re-insert the post of the new assembly into the load cell.

5. Align the bolt hole in the part with the bolt hole in the load cell.

6. Install the bolt and tighten.

7. Removing the safety blocks, lower the scale to the surface.

8. Ensure that the weight is shared equally by all four (4) feet.

51103 16 01/07 -- Rev. 1

Item Part#

4

5

6

2

3

2

2

6

7

8

9

10

15291

15635

12838

11224

63592

11 17546

12 14278

14 54203

15 14721

16 14722

17 11175

63895

63896

63897

66754

63899

54503

67171

96141

Section 5: Parts

A. Stainless Steel Platforms

Description

Load Cell, 1K LCF HR 4060-2

Models

See Appendix

I

1K, 2.5K

Load Cell, 2.5K LCF HR 4060-3 5K

Load Cell, 5K LCF HR 4060-4

Load Cell Shim

10K

ALL

Foot Assembly ALL

Load Cell Mtg Bolt ½'-20 x 1 ¾" ALL

Analog Junction box

PCB for Analog box

ANALOG

ANALOG

QMB Junction box (optional)

PCB for QMB box (optional)

Cable Assembly

'Fairbanks Scales' Decal

'Aegis' Decal

Serial Tag

Liquid Tight Connector

Lock Nut (for #11 connector)

INTALOGIX™

INTALOGIX™

ANALOG

ALL

ALL

Individual

ALL

ALL

SS Hex Nut 10-24 (for ground) ALL

5" Velcro Loop (use with hook) ALL

5" Velcro Hook (use with loop) ALL

Rubber Bushing (for #11 conn) ALL

51103 17 01/07 -- Rev. 1

Parts Diagram - Stainless Steel Models

3

2

5

4

Corner No. 3

2 15/16" Ref

Section of Load Cell

1

Corner No. 2

9

51103

Corner No. 4

6 15 16

14

3

11 12

17

Bottom View

FAIRBANKS

SCALES

8

Serial Plate

7

10

Corner No. 1

18 01/07 -- Rev. 1

*

*

4

5

2

3

2

2

*

*

*

*

23902

15291

15635

24176

7

8

23429

23436

9 23437

10 11121

23426

23427

23428

66754

63899

54503

67171

96141

11 11105

12

13 23834

14 23836

15 11224

16 17613

17

18

B. Stainless Steel Lift Deck Platforms:

Item Part# Description Models

See Appendix

I

1K, 2.5K

Load Cell, 1K

Load Cell, 2.5K

Load Cell, 5K

Load Cell Shim

Foot Assembly

5K

10K

ALL

ALL

Load Cell Mtg Bolt ½'-20 x 1 ¾" ALL

Analog Junction Box

PCB for Analog box

ANALOG

ANALOG

J-Box, Remote Cradle Bracket ANALOG

QMB Junction Box (optional) INTALOGIX™

PCB for QMB Box (optional) INTALOGIX™

J-Box, Remote Cradle Bracket INTALOGIX™

Gas Spring, 250 lb

Ball Stud

Safety Clip

Flat Washer .31

Hex Nut .31-18

ALL

ALL

ALL

ALL

ALL

Label, Pinch Point

Label, Lifting Hazard

Label, Fairbanks

Wire Tie

Serial Tag

ALL

ALL

ALL

ALL

Individual

* Not shown on parts diagram.

51103 19 01/07 -- Rev. 1

Parts Diagram - Stainless Steel Lift Deck 3’ x 3’ and 4’ x 4’ Models

C4

C3

LOCATE ON

UNDERSIDE OF DECK

C1 C2

BOTTOM VIEW OF SCALE

CORNER 1 CORNER 2

3.10

REF

LOCATE

THESE

LABELS

ON

BASE

FRAME

ASSY

TUBE

SEE DETAIL "A"

INTERLOCK WIRE TIES TO

HOLD CABLES TO ANGLE

DETAIL "A"

CORNER 4

TOP VIEW OF SCALE

CORNER 3

13.

15.

51103

50604-7

NOTES:

1. APPLY ANTI-SEIZE SEALING COMPOUND TO BOLT THE LOAD CELLS

TO THE MOUNTING BLOCKS. TORQUE TO 90 FT-LB.

2. PULL LOAD CELL CABLES SLIGHTLY TAUGHT AND USE WIRE TIES

(ITEM 16) TO ATTACH THEM TOGETHER AND KEEP CABLES CLOSE

TO BASE FRAME ANGLE.

3. SHIP ITEMS 14 AND 20 LOOSE WITH SCALE, LIFTING LABEL TO BE

APPLIED TO THE TOP OF THE PIT COPING FRAME BETWEEN HANDLES.

20 01/07 -- Rev. 1

Parts Diagram - Stainless Steel Lift Deck 5’ x 5’ Models

C4 C3

LOCATE ON

UNDERSIDE OF DECK

C1

C2

BOTTOM VIEW OF SCALE

CORNER 1 CORNER 2

3.10

REF

LOCATE

THESE

LABELS

ON

BASE

FRAME

ASSY

TUBE

SEE DETAIL "A"

INTERLOCK WIRE TIES TO

HOLD CABLES TO ANGLE

DETAIL "A"

13.

15.

CORNER 4 CORNER 3

TOP VIEW OF SCALE

51103

50604-8

NOTES:

1. APPLY ANTI-SEIZE SEALING COMPOUND TO BOLT THE LOAD CELLS

TO THE MOUNTING BLOCKS. TORQUE TO 90 FT-LB.

2. PULL LOAD CELL CABLES SLIGHTLY TAUGHT AND USE WIRE TIES

(ITEM 16) TO ATTACH THEM TOGETHER AND KEEP CABLES CLOSE

TO BASE FRAME ANGLE.

3. SHIP ITEMS 14 AND 20 LOOSE WITH SCALE, LIFTING LABEL TO BE

APPLIED TO THE TOP OF THE PIT COPING FRAME BETWEEN HANDLES.

21 01/07 -- Rev. 1

Appendix

I: Model Matrix

63722

63723

63724

63725

63726

63727

63728

63729

A. Analog Stainless Steel Series

Product # Model

63715 PLF-HR3400-A1

Size

30" x 30"

Capacity

1000 lbs

Platform

Weldment

63545

63716

63717

PLF-HR3400-B1

PLF-HR3400-C1

3' x 3'

3' x 3'

1000 lbs

2500 lbs

63546

63546

63718

63719

63720

63721

PLF-HR3400-D1

PLF-HR3400-F1

PLF-HR3400-I1

PLF-HR3400-O1

4' x 4'

4' x 4'

4' x 4'

4' x 5'

2500 lbs

5000 lbs

10000 lbs

5000 lbs

63547

63547

63547

63548

PLF-HR3400-P1

PLF-HR3400-Q1

PLF-HR3400-R1

PLF-HR3400-G1

PLF-HR3400-J1

PLF-HR3400-H1

PLF-HR3400-K1

PLF-HR3400-S1

4' x 5'

4' x 6'

4' x 6'

5' x 5'

5' x 5'

5' x 7'

5' x 7'

6' x 8'

10000 lbs

5000 lbs

63548

63549

10000 lbs 63549

5000 lbs 63550

10000 lbs 63550

5000 lbs 63551

10000 lbs 63551

10000 lbs 63552

B. Analog Lift Deck Stainless Steel Series -- Diamond Deck

Product # Model Size

Platform

Capacity Weldment

23824

23825

PLF-HR3420-B1

PLF-HR3420-C1

3’ x 3’

3’ x 3’

1000 lbs

2500 lbs

23811

23812

23826

23827

23828

23829

23830

23831

PLF-HR3420-D1

PLF-HR3420-E1

PLF-HR3420-F1

PLF-HR3420-G1

PLF-HR3420-H1

PLF-HR3420-J1

4’ x 4’

4’ x 4’

4’ x 4’

5’ x 5’

5’ x 5’

5’ x 5’

2500 lbs

5000 lbs

10000 lbs

2500 lbs

5000 lbs

10000 lbs

23460

23461

23462

23190

23191

23192

51103 22 01/07 -- Rev. 1

Appendix

II: Accessories

4' x 4'

4' x 5'

4' x 5'

4' x 6'

4' x 6'

5' x 5'

5' x 5'

5' x 5'

A. Stainless Steel Ramps, Bumper Guards and Pit Frames:

Bumper Pit

Size

30"

Cap

1K

Ramp

64059 (30")

Guard Frame

3' x 3'

3' x 3'

4' x 4'

4' x 4'

1K

2.5K

2.5K

5K

63752 (3')

63752 (3')

63754 (4')

63754 (4')

72199 (3')

72199 (3')

72195 (4')

72195 (4')

63758

63758

63760

63760

5' x 7'

5' x 7'

6' x 8'

10K

5K

10K

5K

10K

2.5K

5K

10K

5K

10K

10K

63754 (4')

63754 (4')

63754 (4')

63754 (4')

63754 (4')

-

63756 (5')

63756 (5')

63756 (5')

63756 (5')

64061 (6')

72195 (4')

72191 (5')

72191 (5')

72197 (6')

72197 (6')

-

72191 (5')

72191 (5')

72193 (7')

72193 (7')

72201 (8')

63768

63768

64063

63760

63762

63762

63764

63764

-

63766

63766

B. Stainless Steel Bolt-Down Plates, Eyebolts, and Hole plugs:

Size

ALL

Cap

ALL

Bolt-Down Plates

63777 (Set of 4)

63779 (Set of 2)

Eyebolts

70895 (2) (Mild steel)

Hole Plugs

70896 (2)

51103 23 01/07 -- Rev. 1

Appendix

III: Standard Pit Frame and Installation Drawing

51103 24 01/07 -- Rev. 1

Appendix

IV: Lift Deck Pit Frame

Installation Drawing

51103 25 01/07 -- Rev. 1

Fairbanks Scales

This page intentionally left blank.

51103 26 01/07 -- Rev. 1

advertisement

Key Features

  • Rugged structural rib design
  • Low profile
  • Full range of accessories
  • Lift Deck option for easy cleaning
  • Pit installation for Lift Deck model
  • Stainless steel construction
  • Water washdown capability

Frequently Answers and Questions

What is the maximum capacity of the Aegis Stainless Steel floor scale?
The maximum capacity of the Aegis Stainless Steel floor scale varies by model size, ranging from 1000 to 10,000 lbs.
What is the platform height of the Aegis Stainless Steel floor scale?
The platform height of the Aegis Stainless Steel floor scale is 3.0 inches.
What is the operating temperature range of the Aegis Stainless Steel floor scale?
The operating temperature range of the Aegis Stainless Steel floor scale is 15º to 104º F (-10º to 40º C).
What is the difference between the Aegis Stainless Steel floor scale and the Aegis Lift Deck Floor Scale?
The Aegis Lift Deck Floor Scale is designed to offer a safe and convenient way to lift the deck of the scale to facilitate cleaning. It is for pit installation only.

Related manuals