- Industrial & lab equipment
- Measuring, testing & control
- Fairbanks
- Aegis Stainless Steel
- Installation manual
- 26 Pages
Fairbanks Aegis Stainless Steel Floor Scale, Aegis Stainless Steel Lift Deck Installation Manual
The Aegis Stainless Steel floor scale features a rugged structural rib design and a nominal height of three inches -- among the lowest in the industry. With a full range of accessories, these scales can be configured to fit most floor scale applications. The Aegis Lift Deck Floor Scale is another addition to Fairbanks’ Aegis line of floor scales. It is designed to offer a safe and convenient way to lift the deck of the scale to facilitate cleaning. The Aegis Lift Deck Floor Scale is for pit installation only.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
Installation Manual
Aegis
Stainless Steel
Floor Scale
© 2007 by Fairbanks Scales Inc.
All rights reserved
51103
Revision 1 01/07
Amendment Record
Aegis Stainless Steel Floor Scale
51103
Manufactured by Fairbanks Scales Inc.
821 Locust
Kansas City, Missouri 64106
Revision 0
Revision 1
01/07
01/07
Preliminary Release
Manual Release
Disclaimer
Every effort has been made to provide complete and accurate information in this manual. However, although this manual may include a specifically identified warranty notice for the product, Fairbanks Scales makes no representations or warranties with respect to the contents of this manual, and reserves the right to make changes to this manual without notice when and as improvements are made.
51103 2 01/07 -- Rev. 1
51103
Table of Contents
Section 1: General Information
A. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
B. Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
C.Specification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Section 2: Installation
A. General Service Policy . . . . . . . . . . . . . . . . . . . . . . . 5
B. Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
C. Pre-Installation Checklist . . . . . . . . . . . . . . . . . . . . . . 6
D. Unpacking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
E. Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
F. Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 i. Analog Interface (Junction Box 67171) . . . . . . . . 8 ii. Intalogix Technology Interface (QMB 15291) . . . 9
Section 3: Accessories Installation
A. Bolt-Down Plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
B. Ramps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
C. Bumper Guards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
D. Pit Frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Section 4: Maintenance and Service
A. Load Cell Replacement . . . . . . . . . . . . . . . . . . . . . . . 14
B. Junction Box/QMB PCB Replacement . . . . . . . . . . . 15
C. Foot Assembly Replacement . . . . . . . . . . . . . . . . . . 16
Section 5: Parts
A. Stainless Steel Platforms . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Diagram: Stainless Steel models . . . . . . . . . . . . . . . . . . 18
B. Stainless Steel Lift Deck Platforms . . . . . . . . . . . . . . . . . 19
Diagram: Stainless Steel 3’ x 3’ and 4’ x 4’ models . . . 20
Diagram: Stainless Steel 5’ x 5’ models . . . . . . . . . . . . . 21
APPENDIX
I: Model Matrix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
APPENDIX
II: Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
APPENDIX
III: Standard Pit Frame and Installation Drawing . . . 24
APPENDIX
IV: Lift Deck Pit Frame Installation Drawing . . . . . . . . 25
3 01/07 -- Rev. 1
Section 1: General Information
A.
Introduction:
The Aegis Stainless Steel floor scale features a rugged structural rib design and a nominal height of three inches -- among the lowest in the industry. With a full range of accessories, these scales can be configured to fit most floor scale applications.
B.
Description:
The Aegis Industrial Stainless Steel series floor scale platform is fully assembled and pre-wired. Aegis stainless steel floor scale sizes range from 30" x 30" to 6' x 8', and have capacities from 1000 to 10,000 lbs.
The Aegis Lift Deck Floor Scale is another addition to Fairbanks’ Aegis line of floor scales. It is designed to offer a safe and convenient way to lift the deck of the scale to facilitate cleaning. The Aegis Lift Deck Floor Scale is for pit installation only.
The Aegis floor scales use a standard summing junction box to interface with analog indicators, and is equipped with a 25' interface cable. Junction boxes are constructed of stainless steel, and all models have threaded holes in the decks for attaching eyebolts to facilitate installation and cleaning.
C.
Specifications:
Models and sizes are included in a chart in Appendix
II.
Description
Platform deck plate
Aegis Stainless Steel
0.25”
Platform height 3.0”
Operating temperature 15º to 104º F
Humidity
Overload capacity
Endloading capacity
Construction
Grade level
-10º to 40º C
100% suitable for water washdown
150% of rated capacity
100% of rated capacity
Type 304 stainless steel
Within 3º of level
51103 4 01/07 -- Rev. 1
Section 2: Installation
A.
General Service Policy:
Prior to installation, it must be verified that the equipment will satisfy the customer's requirements as supplied, and as described in this manual. If the equipment cannot satisfy the application, and the application cannot be modified to meet the design parameters of the equipment, the installation should not be attempted.
It is the customer / operator’s responsibility to ensure the equipment provided by
Fairbanks is operated within the parameters of the equipment's specifications and protected from accidental or malicious damage. Other than the procedures authorized in the Operating manual, no service, repair, or adjustments may be performed by unauthorized / untrained service personnel. Any unauthorized repairs will void any verbal, implied, or written warranties.
B.
Overview:
1. These instructions apply to the floor scale and its specific installation procedures.
The instructions include a pre-installation checkout, which must be performed either at the service center before the technician goes to the site, or at the site before he places the equipment in service.
2. All electronic and mechanical calibrations and / or adjustments required to make this equipment perform to accuracy and operational specifications are considered to be part of the installation, and are included in the installation charge. Only those charges which are incurred as a result of the equipment's inability to be adjusted or calibrated to performance specifications may be charged to warranty.
3. Absolutely no physical or electrical modifications other than selection of standard options and accessories are to be made to this equipment. Electrical connections other than those specified may not be performed, and physical alterations (holes, etc.) are not allowed.
4. Before the installation is considered complete, the equipment is to be installed to satisfy any applicable Weights and Measures requirements. The installing technician is responsible to make certain that personnel are fully trained and familiar with the capabilities and limitations of the equipment. Be prepared to recommend the arrangement of components which will provide the most efficient layout, utilizing the equipment to the best possible advantage. The warranty policy must be explained and reviewed with the customer.
51103 5 01/07 -- Rev. 1
The complete installation consists of:
1. Verifying the application
2. Unpacking
3. Floor scale checkout
4. Customer and site readiness: a. Is the Location ready?
b. Is the customer aware there may be work disruptions?
c. Are the operators available for training?
5. Floor scale connections
6. Adjustments
7. Customer training
NOTE: It is the owner’s responsibility to document, notify, and follow-up with the carrier if
there is shipping damage.
NOTE: Above ground installations require the scale platform be protected from mobile
machinery that may be present in the area. Fairbanks Scales is not responsible for damages to unprotected platforms in above ground installations.
51103
The following points should be checked and discussed with the Area Sales Manager and/or the customer, if necessary, before the technician goes to the site to install the equipment.
1. Has the customer's application been checked to make certain that it is within the capabilities and design parameters of the equipment?
2. If the installation will disrupt the customer's normal operations, is he aware and has he made arrangements?
3. Is properly grounded power available at the installation location?
4. Will the equipment operator(s) be available for training?
5. Has the service technician thoroughly reviewed the installation procedures?
6. Has the service technician reviewed the recommended setup with the Area Sales
Manager or Area Service Manager, and identified all necessary variations to satisfy the customer's specific application?
6 01/07 -- Rev. 1
D.
Unpacking:
1. Check that all components are on hand, and agree with the customer's order.
2. Remove all components from their packing material, checking to make certain that all parts are accounted for and no parts are damaged. Advise the shipper immediately if damage has occurred. Order any parts necessary to replace those which have been damaged. Keep the shipping container and packing material for future use. Check the packing list.
3. Collect all necessary installation manuals for the floor scale.
4. Examine the floor scale and perform an inspection, making certain that all hardware, electrical, and PC connections are secure.
E.
Safety:
As is the case with any equipment, certain safety precautions should be observed during operation:
1. Ensure that any structure which supports the floor scale is capable of withstanding the weight of the scale and its rated capacity.
2. Beware of pinch points on the lift deck models. Severe personal injury could occur if safety precautions are not observed.
3. Use proper lifting technics when raising the lift deck platforms.
F.
Setup:
The setup of the floor scale consists of installing the scale on a level surface and wiring the scale to the indicator. Consult the appropriate indicator manual for further information regarding the indicator and its setup.
1. Select a location that is level and will fully support the weight of the platform plus a full capacity load.
2. Remove the top of the crate and all packing/banding material.
51103 7 01/07 -- Rev. 1
3. Screw two (2) eyebolts into the threaded adapters in the platform top and use a forklift or other lifting means along with chains, cables, or nylon straps to remove the scale from the crate.
CAUTION: Do NOT use grab or slip hooks to lift the scale. Failure to use the proper
lifting tools may result in personal injury.
4. Set the scale so that the interface cable exits in a direction where it can be protected. If possible, use a cable protector to reduce 'trip' hazards and to protect the interface cable from being damaged.
5. Level the scale by turning the foot pads.
6. Wire the scale cable to the proper type indicator as follows:
NOTE: The analog junction box and the QMB interface box on the Lift Deck models are
mounted remotely on a wall location. The boxes must be located above the splash line and in a secure area away from material handling traffic.
i. Analog Interface (Junction Box 67171):
L/C Wire Color
Black
Green
Yellow
White
Red
Function
(-) Excitation
(+) Excitation
Shield
(+) Signal
(-) Signal
Analog Instrument
(-) Excitation
(+) Excitation
Shield
(+) Signal
(-) Signal
51103 8 01/07 -- Rev. 1
ii. Intalogix™ Technology Interface (QMB 15291):
QMB
Terminal
1
2
5
6
3
4
7
8
9
10
Wire Color
Green
Red
Black
White
Brown
Blue
Orange
Yellow
Violet
Gray/Shield
Function
(-) Excitation
(+) Excitation
Ground
D out
D In
EOC
SCLK
CS
Temperature
Chassis
Intalogix™
Technology Inst
1
2
5
6
3
4
7
8
9
10
NOTE: 1. If the Gray/Shield wire is equipped with a screw lug, it can be attached using
one of the PCB screws.
2. Calibrate the Intalogix™ platform / indicator. Follow the calibration procedure in the appropriate indicator service manual.
7. Adjust the analog indicator to the platform. First, ensure all corners are within one division of each other at 25% of the rated capacity specification. Follow the calibration procedure in the appropriate indicator service manual to ensure a good calibration. a. Perform a coarse platform calibration approximate to the actual weight.
b. Identify the platform corner numbers.
2 3
Top View
1
50604-1
4
51103 9 01/07 -- Rev. 1
c. Cornering the scale: Place a load which is 25% of platform capacity upon the scale at the corner 1 location. Note the indication. Proceed to each successive corner with the weight and note each indication.
If corners require adjustment, place the load on the corner displaying the lowest weight and use the appropriate potentiometer to change the displayed weight to read the same as the highest reading by turning the potentiometer clockwise (CW). Repeat the process, rechecking all corners until there is no error. Perform a zero reference check with an unloaded platform, then repeat the corner test to ensure all readings are the same before proceeding.
Upon completing corner adjustments, check the zero reference of the scale and adjust if necessary.
When the corners are the same in reference to each other, final calibration may be accomplished as follows:
1. Remove all weights.
2. Zero the indicator.
3. Perform the full scale calibration with test weights.
4. Follow the appropriate indicator service manual to ensure proper calibration.
50604-4
NOTE: The platform junction box is preset at the factory by centering the adjusting pots.
Minimal corner adjustment should be required.
NOTE: Junction box assembly 67171 has four (4) extended range, multi-turn
potentiometers, one for each load cell. If you have difficulty adjusting the corners on the platform, turn all potentiometers to the fully counter clockwise (CCW) position until an audible clicking sound is heard when turned. With the weight on the lowest reading corner, adjust the corresponding potentiometer clockwise (CW) to indicate the same as the highest reading corner. Continue this process until each corner is correct.
51103 10 01/07 -- Rev. 1
Section 3: Accessories Installation
Bolt-down plates, ramps, bumper guards, and pit frames are installed as follows:
A.
Bolt-Down Plates:
Bolt down plates are used to keep the scale from sliding or moving when loads are applied. The plates are bolted via anchors at each of the scale's feet.
Installation:
1. Place the platform in position.
2. Place the bolt-down plate under the foot, plate edge extending out from under the scale.
3. Drill the two holes using a hammer drill. Insert anchors with the nut and washer already ON. Tap the anchor into the hole, then tighten the nuts securely. Repeat this process for each plate used.
NOTE: If ramps are NOT installed and bolt-down plates are necessary, a set of four (4)
bolt-down plates is required. See Appendix
II B.
B. Ramps:
Each ramp accessory comes with two integral bolt-down plates and four (4) anchors.
Installation:
1. Place the ramp in position, then lift and set the platform feet into the bolt-down plate holes.
C.
2. Drill the two holes using a hammer drill. Insert anchors with the nut and washer already ON. Tap the anchor into the hole, then tighten the nuts securely.
• If two ramps are installed, NO bolt-down plates are required.
• If one ramp is installed, a set of two bolt-down plates is required.
• Only two ramps total may be installed on opposite sides of a scale platform.
Bumper Guards:
Bumper Guards are designed to help protect the platform from forklift traffic. The guards are slightly higher than the scale, and will help deflect the forks.
1. Place the bumper guard so it will protect the platform from non-scale traffic, but it cannot contact or interfere with the platforms movement.
51103 11 01/07 -- Rev. 1
D.
2. Drill holes using a hammer drill or its equivilent. Clean the hole thoroughly. Insert the anchor(s) with the nut and washer in place. Tap the anchor(s) into the hole(s) and tighten the nuts securely.
Pit Frames:
The pit frame accessory is a one-piece welded unit with no additional welding required.
This accessory is designed for in-floor applications. In general, a hole is cut in the concrete, the pit frame accessory is installed in the hole, then concrete is poured around and under the frame. Once cured, the scale platform is set into the frame and installation can be completed.
Standard duty frames are available in stainless steel for all Aegis Industrial floor scale sizes. The concrete work and frame setting are usually done by a contractor, with a scale technician completing the project by setting and installing the scale.
NOTE: The Aegis Lift Deck Floor Scale is for pit installation only. For above ground
installations contact Fairbanks’ Solutions Group.
51103
1. Place the pit frame in the approximate position it will occupy on the floor.
2. Mark out the position of the hole to be made. The hole MUST be a minimum of 12" larger than the pit frame on all sides. Should pit drainage be required, slope the pit floor to an installed drain while maintaining a level area at each corner. Use the drawing in Appendix
III for measurements.
3. The hole must be deep enough to accommodate the pit coping, plus the thickness of the pit floor. Use the drawing in Appendix
III for measurements.
4. Once the properly sized and prepared hole has been cut in the concrete floor, use these steps to help set the frame properly.
• Set the frame in the hole supported at about the correct height.
• Set two 2 x 4s on edge (longer than the width of the hole) across the opening.
• Use soft wire to make 2 loops by twisting wire around each 2 x 4 and the frame.
• With the frame supported by the wire and 2 x 4s, use a level to set the frame flush with the surrounding floor, level, and at the correct height by twisting or untwisting the wire.
12 01/07 -- Rev. 1
51103
Wire
2 x 4
Frame
Assy
Pit
50604-2
• Use the drawing in Appendix
III for measurements, concrete specifications and amounts.
• Make sure the conduit for the scale cable is in place and secured into the frame opening.
• Pour the concrete around and under the frame ensuring a smooth and level finish.
• If a drain is required, form the pit to provide a slope in the pit floor to the drain.
Refer to the drawings in the Appendix.
• Cure to a minimum of 2000 psi before cutting wire.
• Pull the cable through the conduit before placing the scale platform in the frame.
• Level the platform before installing the instrumentation.
13 01/07 -- Rev. 1
Section 4: Maintenance and Service
A.
Load Cell Replacement:
1. Remove power to the indicator.
2. Remove the platform access cover then the junction box cover and disconnect the failed load cell cable at the junction box. Loosen the gland bushing and tie a string or wire to the end of the cable to act as a pull wire. (Check that all cells have wire markers on the cable ends. If not, identify cells with wire markers or other means).
3. Lift the platform end and secure using wood blocks for safety.
4. Remove the load cell mounting bolts (use a ¾" socket), then the cell, pulling the load cell cable through the scale while leaving the pull string/wire in the scale.
5. Remove the foot assembly from the old cell and install on the new cell, using antiseize on the threads.
6. Disconnect the pull string/wire from the old cell's cable and attach to the new cell's cable end. Pull the cable of the new cell through to the junction box, then mount the cell using anti-seize on the mounting bolts, torque to 90 ft/lbs.
7. Lower the scale to the surface removing the safety blocks.
8. Ensure that the weight is shared equally by all four (4) feet. Connect the load cell wires into the junction box, tighten the box gland bushing(s) then test and calibrate the scale. Replace the box cover and torque all screws to 18-20 in/lbs. Replace the platform access cover.
9. Recalibrate as necessary.
51103 14 01/07 -- Rev. 1
10. Load Cell Specifications:
Specifications
Material:
Resistance:
Rated Output:
Safe Overload:
Compensated Temp range:
Safe Operating Temp range:
Stainless Steel
Stainless Steel 17-4ph
1000 Ohm
2 mV/V
150%
-10ºC to 40ºC
-18ºC to 65ºC
B.
Analog Junction Box and Optional QMB PCB Replacement:
1. Remove power to the indicator.
2. Open the platform access cover, then the box cover.
3. Loosen all gland bushing nuts.
4. Check that all load cells have wire markers on the cable ends. If not, identify cells with wire markers or other means, then disconnect the load cells' wires from the terminal blocks. Disconnect the home-run wires.
5. Remove the PCB, clean the box, then install the new PCB.
6. Reconnect all load cell and home-run wires to the new PCB.
NOTE: For analog systems, leave the box cover removed until all corner adjustments are completed.
7. Tighten all gland bushing nuts.
8. Replace the box cover and torque all screws to 18-20 in/lbs. Replace the platform access cover.
9. Recalibrate as necessary.
51103 15 01/07 -- Rev. 1
1. Lift the platform end and secure using wood blocks for safety.
2. Remove the bolt which goes through the load cell and post of the foot.
3. Pull the foot assembly out of the load cell.
4. Lubricate the “O” ring on the new foot assembly and re-insert the post of the new assembly into the load cell.
5. Align the bolt hole in the part with the bolt hole in the load cell.
6. Install the bolt and tighten.
7. Removing the safety blocks, lower the scale to the surface.
8. Ensure that the weight is shared equally by all four (4) feet.
51103 16 01/07 -- Rev. 1
Item Part#
4
5
6
2
3
2
2
6
7
8
9
10
15291
15635
12838
11224
63592
11 17546
12 14278
14 54203
15 14721
16 14722
17 11175
63895
63896
63897
66754
63899
54503
67171
96141
Section 5: Parts
A. Stainless Steel Platforms
Description
Load Cell, 1K LCF HR 4060-2
Models
See Appendix
I
1K, 2.5K
Load Cell, 2.5K LCF HR 4060-3 5K
Load Cell, 5K LCF HR 4060-4
Load Cell Shim
10K
ALL
Foot Assembly ALL
Load Cell Mtg Bolt ½'-20 x 1 ¾" ALL
Analog Junction box
PCB for Analog box
ANALOG
ANALOG
QMB Junction box (optional)
PCB for QMB box (optional)
Cable Assembly
'Fairbanks Scales' Decal
'Aegis' Decal
Serial Tag
Liquid Tight Connector
Lock Nut (for #11 connector)
INTALOGIX™
INTALOGIX™
ANALOG
ALL
ALL
Individual
ALL
ALL
SS Hex Nut 10-24 (for ground) ALL
5" Velcro Loop (use with hook) ALL
5" Velcro Hook (use with loop) ALL
Rubber Bushing (for #11 conn) ALL
51103 17 01/07 -- Rev. 1
Parts Diagram - Stainless Steel Models
3
2
5
4
Corner No. 3
2 15/16" Ref
Section of Load Cell
1
Corner No. 2
9
51103
Corner No. 4
6 15 16
14
3
11 12
17
Bottom View
FAIRBANKS
SCALES
8
Serial Plate
7
10
Corner No. 1
18 01/07 -- Rev. 1
*
*
4
5
2
3
2
2
*
*
*
*
23902
15291
15635
24176
7
8
23429
23436
9 23437
10 11121
23426
23427
23428
66754
63899
54503
67171
96141
11 11105
12
13 23834
14 23836
15 11224
16 17613
17
18
B. Stainless Steel Lift Deck Platforms:
Item Part# Description Models
See Appendix
I
1K, 2.5K
Load Cell, 1K
Load Cell, 2.5K
Load Cell, 5K
Load Cell Shim
Foot Assembly
5K
10K
ALL
ALL
Load Cell Mtg Bolt ½'-20 x 1 ¾" ALL
Analog Junction Box
PCB for Analog box
ANALOG
ANALOG
J-Box, Remote Cradle Bracket ANALOG
QMB Junction Box (optional) INTALOGIX™
PCB for QMB Box (optional) INTALOGIX™
J-Box, Remote Cradle Bracket INTALOGIX™
Gas Spring, 250 lb
Ball Stud
Safety Clip
Flat Washer .31
Hex Nut .31-18
ALL
ALL
ALL
ALL
ALL
Label, Pinch Point
Label, Lifting Hazard
Label, Fairbanks
Wire Tie
Serial Tag
ALL
ALL
ALL
ALL
Individual
* Not shown on parts diagram.
51103 19 01/07 -- Rev. 1
Parts Diagram - Stainless Steel Lift Deck 3’ x 3’ and 4’ x 4’ Models
C4
C3
LOCATE ON
UNDERSIDE OF DECK
C1 C2
BOTTOM VIEW OF SCALE
CORNER 1 CORNER 2
3.10
REF
LOCATE
THESE
LABELS
ON
BASE
FRAME
ASSY
TUBE
SEE DETAIL "A"
INTERLOCK WIRE TIES TO
HOLD CABLES TO ANGLE
DETAIL "A"
CORNER 4
TOP VIEW OF SCALE
CORNER 3
13.
15.
51103
50604-7
NOTES:
1. APPLY ANTI-SEIZE SEALING COMPOUND TO BOLT THE LOAD CELLS
TO THE MOUNTING BLOCKS. TORQUE TO 90 FT-LB.
2. PULL LOAD CELL CABLES SLIGHTLY TAUGHT AND USE WIRE TIES
(ITEM 16) TO ATTACH THEM TOGETHER AND KEEP CABLES CLOSE
TO BASE FRAME ANGLE.
3. SHIP ITEMS 14 AND 20 LOOSE WITH SCALE, LIFTING LABEL TO BE
APPLIED TO THE TOP OF THE PIT COPING FRAME BETWEEN HANDLES.
20 01/07 -- Rev. 1
Parts Diagram - Stainless Steel Lift Deck 5’ x 5’ Models
C4 C3
LOCATE ON
UNDERSIDE OF DECK
C1
C2
BOTTOM VIEW OF SCALE
CORNER 1 CORNER 2
3.10
REF
LOCATE
THESE
LABELS
ON
BASE
FRAME
ASSY
TUBE
SEE DETAIL "A"
INTERLOCK WIRE TIES TO
HOLD CABLES TO ANGLE
DETAIL "A"
13.
15.
CORNER 4 CORNER 3
TOP VIEW OF SCALE
51103
50604-8
NOTES:
1. APPLY ANTI-SEIZE SEALING COMPOUND TO BOLT THE LOAD CELLS
TO THE MOUNTING BLOCKS. TORQUE TO 90 FT-LB.
2. PULL LOAD CELL CABLES SLIGHTLY TAUGHT AND USE WIRE TIES
(ITEM 16) TO ATTACH THEM TOGETHER AND KEEP CABLES CLOSE
TO BASE FRAME ANGLE.
3. SHIP ITEMS 14 AND 20 LOOSE WITH SCALE, LIFTING LABEL TO BE
APPLIED TO THE TOP OF THE PIT COPING FRAME BETWEEN HANDLES.
21 01/07 -- Rev. 1
Appendix
I: Model Matrix
63722
63723
63724
63725
63726
63727
63728
63729
A. Analog Stainless Steel Series
Product # Model
63715 PLF-HR3400-A1
Size
30" x 30"
Capacity
1000 lbs
Platform
Weldment
63545
63716
63717
PLF-HR3400-B1
PLF-HR3400-C1
3' x 3'
3' x 3'
1000 lbs
2500 lbs
63546
63546
63718
63719
63720
63721
PLF-HR3400-D1
PLF-HR3400-F1
PLF-HR3400-I1
PLF-HR3400-O1
4' x 4'
4' x 4'
4' x 4'
4' x 5'
2500 lbs
5000 lbs
10000 lbs
5000 lbs
63547
63547
63547
63548
PLF-HR3400-P1
PLF-HR3400-Q1
PLF-HR3400-R1
PLF-HR3400-G1
PLF-HR3400-J1
PLF-HR3400-H1
PLF-HR3400-K1
PLF-HR3400-S1
4' x 5'
4' x 6'
4' x 6'
5' x 5'
5' x 5'
5' x 7'
5' x 7'
6' x 8'
10000 lbs
5000 lbs
63548
63549
10000 lbs 63549
5000 lbs 63550
10000 lbs 63550
5000 lbs 63551
10000 lbs 63551
10000 lbs 63552
B. Analog Lift Deck Stainless Steel Series -- Diamond Deck
Product # Model Size
Platform
Capacity Weldment
23824
23825
PLF-HR3420-B1
PLF-HR3420-C1
3’ x 3’
3’ x 3’
1000 lbs
2500 lbs
23811
23812
23826
23827
23828
23829
23830
23831
PLF-HR3420-D1
PLF-HR3420-E1
PLF-HR3420-F1
PLF-HR3420-G1
PLF-HR3420-H1
PLF-HR3420-J1
4’ x 4’
4’ x 4’
4’ x 4’
5’ x 5’
5’ x 5’
5’ x 5’
2500 lbs
5000 lbs
10000 lbs
2500 lbs
5000 lbs
10000 lbs
23460
23461
23462
23190
23191
23192
51103 22 01/07 -- Rev. 1
Appendix
II: Accessories
4' x 4'
4' x 5'
4' x 5'
4' x 6'
4' x 6'
5' x 5'
5' x 5'
5' x 5'
A. Stainless Steel Ramps, Bumper Guards and Pit Frames:
Bumper Pit
Size
30"
Cap
1K
Ramp
64059 (30")
Guard Frame
3' x 3'
3' x 3'
4' x 4'
4' x 4'
1K
2.5K
2.5K
5K
63752 (3')
63752 (3')
63754 (4')
63754 (4')
72199 (3')
72199 (3')
72195 (4')
72195 (4')
63758
63758
63760
63760
5' x 7'
5' x 7'
6' x 8'
10K
5K
10K
5K
10K
2.5K
5K
10K
5K
10K
10K
63754 (4')
63754 (4')
63754 (4')
63754 (4')
63754 (4')
-
63756 (5')
63756 (5')
63756 (5')
63756 (5')
64061 (6')
72195 (4')
72191 (5')
72191 (5')
72197 (6')
72197 (6')
-
72191 (5')
72191 (5')
72193 (7')
72193 (7')
72201 (8')
63768
63768
64063
63760
63762
63762
63764
63764
-
63766
63766
B. Stainless Steel Bolt-Down Plates, Eyebolts, and Hole plugs:
Size
ALL
Cap
ALL
Bolt-Down Plates
63777 (Set of 4)
63779 (Set of 2)
Eyebolts
70895 (2) (Mild steel)
Hole Plugs
70896 (2)
51103 23 01/07 -- Rev. 1
Appendix
III: Standard Pit Frame and Installation Drawing
51103 24 01/07 -- Rev. 1
Appendix
IV: Lift Deck Pit Frame
Installation Drawing
51103 25 01/07 -- Rev. 1
Fairbanks Scales
This page intentionally left blank.
51103 26 01/07 -- Rev. 1
advertisement
Key Features
- Rugged structural rib design
- Low profile
- Full range of accessories
- Lift Deck option for easy cleaning
- Pit installation for Lift Deck model
- Stainless steel construction
- Water washdown capability
Frequently Answers and Questions
What is the maximum capacity of the Aegis Stainless Steel floor scale?
What is the platform height of the Aegis Stainless Steel floor scale?
What is the operating temperature range of the Aegis Stainless Steel floor scale?
What is the difference between the Aegis Stainless Steel floor scale and the Aegis Lift Deck Floor Scale?
Related manuals
advertisement
Table of contents
- 4 A. Introduction
- 4 B. Description
- 4 C.Specification
- 5 A. General Service Policy
- 5 B. Overview
- 6 C. Pre-Installation Checklist
- 7 D. Unpacking
- 8 i. Analog Interface (Junction Box 67171)
- 9 ii. Intalogix Technology Interface (QMB 15291)
- 11 A. Bolt-Down Plates
- 11 C. Bumper Guards
- 12 D. Pit Frames
- 14 A. Load Cell Replacement
- 15 B. Junction Box/QMB PCB Replacement
- 16 C. Foot Assembly Replacement
- 17 A. Stainless Steel Platforms
- 18 Diagram: Stainless Steel models
- 19 B. Stainless Steel Lift Deck Platforms
- 20 Diagram: Stainless Steel 3’ x 3’ and 4’ x 4’ models
- 21 Diagram: Stainless Steel 5’ x 5’ models
- 22 I: Model Matrix
- 23 II: Accessories
- 24 III: Standard Pit Frame and Installation Drawing
- 25 IV: Lift Deck Pit Frame Installation Drawing