- Home
- Domestic appliances
- Floor care
- Vacuum cleaners
- AERTECNICA
- PERFETTO TXA
- Technical manual
- 37 Pages
Aertecnica Perfetto TXA, TPA, TP, Classic TC, Studio TS, C500, QB, Kompatta KT central vacuum system, BRAVO vacuum system power unit Technical Manual
Below you will find brief information for Perfetto TXA, Perfetto TPA, Perfetto TP, Classic TC, Studio TS, C500, QB, Kompatta KT and BRAVO. The Perfetto TXA, Perfetto TPA, Perfetto TP, Classic TC, Studio TS, C500, QB, Kompatta KT and BRAVO vacuum system are designed for installation in residential and commercial buildings.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
Residential technical manual
DT3
Technical Manual 97
98 General Catalogue Technical Manual
IndEX
99 TUBÒ sysTEm dEsIgn
102 TUBÒ vacUUm sysTEm prEparaTIon
109 TUBÒ sysTEm ElEcTrIcal connEcTIon
115 vacUUm sockET InsTallaTIon
118 cEnTral powEr UnIT sElEcTIon
120 InsTallaTIon of ThE sInglE-phasE
cEnTral powEr UnIT
123 QB cEnTral powEr UnIT sElEcTIon
124 InsTallaTIon of ThE QB cEnTral
powEr UnIT
127 wIrElEss kIT
127 Bravo powEr UnIT
128 kompaTTa kT
130 TUBÒ vacUUm sysTEm InspEcTIon
131 pErfETTo Tpa lInE
TEchnIcal spEcIfIcaTIons
132 lIsT of maTErIal for InsTallIng ThE cEnTralIZEd vacUUm sysTEm
TUBÒ vacUUm sysTEm dEsIgn
posITIonIng of ThE vacUUm sockETs
The correct positioning of the vacuum sockets makes cleaning operations easier for the user and makes it possible to reach all areas of the building, also reducing system costs.
The main parameter for positioning the sockets is the length of the flexible hose; in the residential sector a 7 m or a 9m hose is recommended.
Main criteria for positioning the vacuuM sockets
1 - position the vacuum socket near to the doors to prevent them from being covered by furnishings.
2 - position the vacuum socket at the bottom of stairs
3 - assess the entire area of the building that must be reached by the flexible hose, including balconies, store-rooms, outdoor stairs, porch, etc.).
a b b a - Dynamic Control Display (CMT800) or REMOTE panel kit (CM8890) b - Vacuum socket a b
General Catalogue Technical Manual 99
how To calcUlaTE ThE nUmBEr of vacUUm sockETs - rEsIdEnTIal sEcTor
Proceed as follows to correctly position the vacuum sockets.
analyTIcal mEThod
REQUIRED TOOLS
1 - map to scale
2 - ruler and pencil
3 - compass
7
Position the central power unit in the garage or in an adequate equipment room.
synThETIc mEThod
The formula below can be used to quickly calculate an approximate number of vacuum sockets using the total usable surface:
7 m. flEXIBlE hosE
n° of vacuum sockets =
total surface
30m
2 ground fLoor how to proceed
1
Remember that the length of the tube is 7 or 9 m. therefore consider the presence of future furnishing that could obstruct them when distributing the sockets.
c
9 m. flEXIBlE hosE n° of vacuum sockets =
total surface
50m
2
2
Use the compass and building map.
According to the drawing scale ratio, set the opening of the compass to a measurement of 1 m. less than the length of the flexible hose.
3
Position the first socket at the bottom of the stairs (see point p on the
GROUND FLOOR ).
4
Trace a circumference on the drawing, placing the centre at the point where the socket will be installed, drawing the operating range of the socket itself.
5
Position the subsequent sockets, considering the operating range of the first socket and a limited overlapping of the operating ranges as a safety margin.
6
Use a rule to check that the positioning is sufficient in order to cover all rooms
(very important phase).
first fLoor vacuum socket c central power unit with built-in socket dynamic control display or reMote panel kit positioning the first socket
100 General Catalogue Technical Manual
how To calcUlaTE ThE nUmBEr of vacUUm sockETs - TErZIary sEcTor
sockets instaLLed in corridor sockets instaLLed in corridor rEcommEndEd mEThod for ThEsE EnvIronmEnTs
( 9m. flEXIBlE hosE)
There is a formula for roughly calculating the number of vacuum sockets, even without the working plan which consists in calculating the total surface of the building (including the service rooms)
9m. flEXIBlE hosE
n° of vacuum sockets =
total surface
40m
2 sockets instaLLed in the rooMs
General Catalogue Technical Manual 101
TUBÒ vacUUm sysTEm prEparaTIon
maTErIal sElEcTIon
Aertecnica supplies a complete line of articles for installing the TUBÒ centralised vacuum system.
TypEs of pIpIng
All of Aertecnica’s fittings have been designed to obtain a completely smooth inner surface with perfect joints in order to prevent possible clogging.
YES coLd bonded piping perfectly smooth inner surface
NO hot weLded piping inner surface with burrs from casting
NO NO socketed piping coLd bonded inner surface with steps socketed piping with o-ring inner surface with steps
102 General Catalogue Technical Manual
offTakE orIEnTaTIon
When installing the fittings, it is important to orient the offtakes towards the central power unit. This makes it possible for the central power unit to aspirate the material as easily as possible.
YES
CENTRAL
POWER UNIT
4 correctLy oriented offtake the suction of the dust flows along line 1 or line 2
CENTRAL
POWER UNIT
YES
CENTRAL
POWER UNIT incorrectLy oriented offtake the suction of the dust along line 2 proceeds in the opposite direction of the central power unit correctLy oriented offtake the suction of the dust from line 1 proceeds towards the central power unit in a flowing manner The dust transiting in the offtake does not fall inside line
2.
CENTRAL
POWER UNIT incorrectLy oriented offtake when aspirated by line
1, the dust transiting in the offtake could drop due to gravity into line
2, clogging the inlet of the vacuum socket connected to the base
how To rEdUcE ThE prEssUrE drops
To optimise the system, eliminating all risks of clogging and reducing loss of pressure, it is recommended to install the tubing in a manner that makes it possible to create the widest curving radiuses possible.
The solutions shown to the side are all optimal.
Aertecnica also supplies an elbow and an offtake with a 90° curvature.
offtake for two end Lines coMposed 90° offtake coMposed 90° eLbow u boLt type
General Catalogue Technical Manual 103
pIpE and UnIon assEmBly
The pipe must only be cut using a specific pipe cutter in order to obtain a perfect cut
YES NO
clEanIng ThE BUrrs
Once the piping is cut, remove any burrs of material inside and outside of the cut with the deburring tool built into the pipe cutter (code AT110) or with scissors.
1 - pipe cutting
2 - burr material cleaning note
Before gluing, it is recommended to preassemble the fittings to check the correct installation.
correct cut correct assembly of the union incorrect cut incorrect pipe cut, use the wheeled pipe cutter
2
1
applIcaTIon of ThE adhEsIvE
Clean the surface to be glued.
Apply the adhesive only on the “male” union and in a quantity that adhesive residue can be seen when the union is inserted.
3 - the adhesive is applied on the
“male” union
4 - the adhesive is not applied on the
“female” union
3
YES
4
NO
104 General Catalogue Technical Manual
InsTallaTIon of ThE sysTEm BUrIEd In ThE floor
pIpIng passagE
The minimum thickness for laying the piping and the fittings is:
minimum floor slab = ø piping + 2 cm
Install the piping along the passage of the doors to prevent making chases in the walls that divide two environments.
InlET framE InsTallaTIon
The inlet frames have housings for the electric connection sheathing inlets.
Install the inlet frame in the wall flush with the plaster, keeping the recommended orientation. Check that the inlet frame is perfectly horizontal.
instaLLation notes for buiLt-in
5
Is possible to install socketframes for:
ø50, ø40 and 2 inch piping, with curved union or straight union
1 - curved union
2 - electrical pre-wired
3 - flush plaster
4 - cover
5 - straight union
6 - 90° alignment
7 - pipe gluing
6
4
1
3
2 7
9
parallEl connEcTIon
BETwEEn vacUUm sockETs
The vacuum socket parallel connection is done in succession using the prewired 2x1 ø16.
8 - pre-wired sheathing 2x1 ø16
9 - inlet frame with sheathing inlet for socket connection
8
General Catalogue Technical Manual 105
sysTEm InsTallaTIon In movaBlE walls
In this type of wall, it is possible to install the NEW AIR, LOGIk NEW AIR,
SqUARE SOCkETS and the ECLETTIS
SOCkET
A
Is possible to install on plasterboard:
A - ø50 and ø40 with curved union
B - 2 inch with straight union instaLLation's exaMpLe in MovabLe waLLs
Legend
2 - plasterboard wall
3 - panel fixing screws
4
5
6
- wall fixing collar
- flush plaster
- activation line 12V
2
5
5
6
3
4
6
2
5
A
B
6 new air socket frame
vac pan kIT InsTallaTIon
1 - socket for furniture VAC PAN
2 - flexible hose for connecting the piping with the socket
3 - socket activation line 12V
4 - socket electrical connection
Vac Pan
5 - on/off lever for socket activation
6 - kitchen furniture skirting board
7 - piping from the system note
The vacuum system is turned on and off by pressing and releasing the lever
(5) . The dust that is brought near the socket using a broom is aspirated quickly.
4 sQuare socket frame
6 CUT TO BE MADE in the furniture-skirting board ecLettis socket frame
PLAN VIEW
WALL
7
2
4
SECTION VIEW
3 1
5
106 General Catalogue Technical Manual
2
VAC PAN soCket frAme built-iN iNstAllAtioN
1 - Vac Pan socket frame built-in
2 - built-in trace for wall
3 - ø50 flexible hose with union
4 - socket frame cover with extractor
5 - vacuum line
6 - 12V electrical line
7 - Vac Pan socket
8 - socket electrical connection
Vac Pan
9 - frame finish
4
1
3
2
8
Note
The vacuum system is turned on and off by pressing and releasing the lever
(10) . The dust that is brought near the socket using a broom is aspirated quickly.
7
8 9
10
system iNstAllAtioN iN A fAlse CeiliNg
For systems installed in a false ceiling, it is important to use collars with rubber along the main line to prevent noise caused by vibration and to permit settling.
It is recommended to install the electric boxes in chases under the false ceiling so they can be inspected.
LEGEND
1 - false ceiling
2 - electrical connection lines
3 - electric box accessible for inspection
4 - surface piping fastened to the roof
5 - elastic fastening collar
6 - piping buried in the wall
5
1
4
2
3
1
6
7
7 - clamps
8 - socket frame
9 - air conditioning channel
5
5
9
6
6
5
8
7
8
General Catalogue Technical Manual 107
sysTEm InsTallaTIon wITh pIpIng on ThE sUrfacE
This type of system is installed in two cases: a - when the walls are made out of reinforced concrete, therefore the chases cannot be made in the walls 1 b - when the building is already finished and the chasing work would require a complicated project
2
3
1 - surface tubing
2 - watertight junction box
3 - fastening collar with pin
4 - electric line to the sockets
5 - reinforced concrete walls
6 - turret
1
4
6
4
ThE VACUUM SOCkETS ThAT CAN BE
USED FOR ThIS TyPE OF SySTEM ARE:
ø50 mm
ø50 mm
5 open socket pa450 open socket pa455 tc100 turret
For the NEW AIR and LOGIk NEW
AIR sockets, which are not suitable for surface installation, the covering white aluminium turret code TC100, is available, inside of which the vacuum socket is installed.
108 General Catalogue Technical Manual
TUBÒ sysTEm ElEcTrIcal connEcTIon
ThE Two ElEcTrIcal lInEs
The system consists of a 2x1 low voltage electrical line which connects the vacuum sockets circuit in parallel, making it possible to start the central power unit.
A second 4x1 electrical line is necessary to connect the optional remote disposal
8 generaL coMponents
1 - electric junction box for powering central power unit
2 - electric junction box for 12v socket cable line + remote control
3 - technical room for central power unit
4 - electric junction box
5 - pre-wired sheathing 2x1 ø16 for socket line
6 - pre-wired sheathing 4x1 ø16
7 - socket frames
8 - dynamic control display or remote panel
7
5
6
4
2
3
1
1
0
5
7
1
2
8
6
4
General Catalogue Technical Manual 109
ElEcTrIcal connEcTIon for ThE rEsIdEnTIal sEcTor
GENERAL COMPONENTS
1 - Flush-mounted junction box for powering central power unit
2 - 12v socket cable line + Dynamic
Control Display
3 - electric junction box
4 - pre-wired sheathing 2x1 ø16 for socket line
5 - pre-wired sheathing 4x1 ø16
6 - socket frames
7 - Dynamic Control Display
NOTE
If installing more than one Dynamic
Control Display arrange for an auxiliary power supply.
OK mbar
2
1
2
4
5
4
3
7
5
6
ElEcTrIcal connEcTIon for TErTIary sEcTor
GENERAL COMPONENTS
1 - electric board for vacuum module
2 - electric board for dust separator
3 - pre-wired sheathing 2x1 ø16 for socket line
4 - pre-wired sheathing 4x1 ø16 for
Dynamic Control Display
5 - electric junction box (SEE NOTE)
6 - Dynamic Control Display
7 - electric junction box for vacuum sockets line
8 - socket frames
1
6
5
2
4
NOTE
If installing Dynamic Control Display is necessary auxiliary power supply.
3
7
4
3
2
1
8
110 General Catalogue Technical Manual
dynamIc conTrol dIsplay
(cmT800)
(for pErfETTo TXa, Tpa, Tp and classIc Tc powEr UnITs)
The Dynamic control display is compatible in MODBUS mode with all central power unit models. It signals the start of operation of the central power unit and makes it possible to
RESET the system without having to access the machine.
It resets itself according to the type of central power unit to which it is connected.
visuaL indicators
a - cLean bag fiLLing
This detects the filling level of the dust container and displays 5 different levels.
b FILTER CARTRIDGE saturation
It displays the saturation level of the filter cartridge based on the calculation of the differential sensors.
c centraL power unit on
This signals that the centralised vacuum system is operating.
ElEcTrIcal connEcTIon for modBUs mode
(for pErfETTo TXa, Tpa, Tp and classIc Tc powEr UnITs) generaL coMponents
1 - flush-mounted junction box for powering central power unit (see note 1)
2 - 12v socket cable line + Dynamic Control
Display (see note 2)
3 - electric junction box
4 - pre-wired sheathing 2x1 ø16 for socket line
5 - pre-wired sheathing 4x1 ø16
6 - socket frames
7 - Dynamic Control Display (see note 3) note 1 - externaL centraL power unit
The central power unit can also be installed externally; in this case ensure that the junction box is equipped (1) with suitable electrical protection.
OK mbar d
B c
E d operating vacuuM range
This displays the vacuum level at which the system is operating:
LO - Ok - hI
2 a
1
4 note 2 - 12v socket cabLe Line + dynaMic controL dispLay
Cable supplied with the central power unit to be wired according to these specifications:
2 wires for micro line
3 power supply wires for Dynamic
Control Display.
2 e operating vacuuM
This displays the operating vacuum in mbar when the system is operating.
5
4
3
6
7
5 note 3 - dynaMic controL dispLay
The central power unit can power only one
Dynamic Control Display.
If installing more than one Dynamic Control
Display arrange for an auxiliary power supply.
General Catalogue Technical Manual 111
dynamIc conTrol dIsplay
(cmT800)
(for QB cEnTral powEr UnIT)
The Dynamic control display is compatible in LM mode with qB central power unit. It signals the start of operation of the central power unit and makes it possible to RESET the system without having to access the machine.
visuaL indicators
A - CONTAINER FILLING LEVEL
This calculates the presumed filling level of the dust container, using 5 progressive stages.
B FILTER CARTRIDGE SATURATION
It displays the saturation level of the filter cartridge based on the calculation of the differential sensors.
d a
B
C CENTRAL POWER UNIT ON
This signals that the centralised vacuum system is operating.
ElEcTrIcal connEcTIon for lm mode
(for QB powEr UnIT)
GENERAL COMPONENTS
1 - flush-mounted junction box for powering central power unit (SEE NOTE 1)
2 - 12v socket cable line + Dynamic Control Display
3 - electric junction box
4 - pre-wired sheathing 4x1 ø16
5 - Dynamic Control Display
6 - pre-wired sheathing 2x1 ø16 for socket line
7 - socket frames
NOTE 1 - ExTERNAL CENTRAL POWER UNIT
The central power unit can also be installed externally; in this case ensure that the junction box is equipped (1) with suitable electrical protection.
QB
WALL
2
1
3
6
4 c
D CENTRAL POWER UNIT hOURS OF
OPERATION
This displays the total hours of central power unit operation.
7
5
112 General Catalogue Technical Manual
dynamIc conTrol dIsplay
(cmT800)
(for sTUdIo Ts and c500 powEr
UnITs)
The Dynamic control display is compatible in LM mode with STUDIO and C500 central power units.
It signals the start of operation of the central power unit and makes it possible to RESET the system without having to access the machine.
d a
B
visuaL indicators
A - CONTAINER FILLING LEVEL
This calculates the presumed filling level of the dust container, using 5 progressive stages.
B FILTER CARTRIDGE SATURATION
It displays the saturation level of the filter cartridge based on the calculation of the differential sensors.
C CENTRAL POWER UNIT ON
This signals that the centralised vacuum system is operating.
ElEcTrIcal connEcTIon for lm mode
(for sTUdIo Ts and c500 powEr
UnITs)
4 5 6
3
3 2 1 generaL coMponents
1 - flush-mounted junction box for powering central power unit
2 - dual plug cable
(not supplied - cod. 3000388)
3 - plug socket
(not supplied- cod.3000400)
4 - electric junction box
5 - pre-wired sheathing 2x1 ø16 for socket line
6 - pre-wired sheathing 4x1 ø16 for Dynamic control display
7 - socket frames
8 - Dynamic control display
2
1
Reset www.aertecnica.com
cod.CM889
5
STUDIO TS
CENTRAL
POWER UNIT c
D CENTRAL POWER UNIT hOURS OF
OPERATION
This displays the total hours of central power unit operation.
6
6
5
7
4
8
General Catalogue Technical Manual 113
9
3
Reset www.aertecnica.com
cod.CM889
4
2
rEmoTE panEl kIT
(for QB, sTUdIo Ts and c500 powEr UnITs)
The REMOTE panel shows operation of the central power unit. It can be located anywhere in the home, integrating perfectly with the most commonly installed electrical switches available.
PLUG with interface REMOTE and dual plug cable are components supplied.
visuaL indicators
GREEN ON
SYSTEM RUNNING
Indicates that the central power unit is operating correctly.
3
1
BLINkING GREEN - RED ON
CENTRAL POWER UNIT LOCK DUE TO
STARTS ANOMALY
Indicates that the central power unit has locked due to more than 6 starts in one minute.
BLINkING GREEN - BLINkING RED
SAFETY LOCK INTERVENTION
Indicates that the central power unit has locked after continuous use for more than
30 minutes. Safety timer intervenes.
rEmoTE panEl kIT connEcTIon
(for QB, sTUdIo Ts and c500 powEr UnITs)
Using the electronic card of PLUG with REMOTE interface to connection
REMOTE panel with central power units.
1 - qB built-in central power unit
2 - STUDIO TS or C500 central power units
3 - PLUG with REMOTE interface
4 - dual plug cable
5 - pre-wired sheathing 2x1 ø16 for socket line
6 - pre-wired sheathing 4x1 ø16
for REMOTE panel
7 - REMOTE panel
Reset www.aertecnica.com
cod.CM889
9
3
2
1 - REMOTE panel
2 -PLUG with interface for REMOTE panel
3 - Dual plug cable
FIxED yELLOW
CHECK DUST CONTAINER FILLING
Indicates the possibility that the dust container is full
BLINkING yELLOW
FILTER MAINTENANCE NECESSARY
Indicates imminent clogging of filter cartridge
BLINkING yELLOW - RED ON
FILTER MAINTENANCE NECESSARY
Indicates imminent clogging of filter cartridge
8 - socket frames
9 - 220v power supply
10 - ø16 pre-wired 3x1 for connection between plug and qB
7
10
1 5 6
8
5
6
7
8
114 General Catalogue Technical Manual
vacUUm sockET InsTallaTIon
sockET BodIEs adapTaBlE To ThE ElEcTrIcal swITch plaTEs
Aertecnica produces NEW AIR series socket bodies and adapter supports that are compatible with the electric switch plates widely found on the market.
NOTE
The electric switch plates are not included in the supply with the exception of the complete vacuum socket models indicated below new air socket body new air adapter support for electrical switch plates
1
2
1 - parallel electric connection with the preceding socket
2 - vacuum socket body
3 - adapter support for switch plate
4 - fixing screws
5 - electrical switch plate
(not supplied by Aertecnica)
6 - OR gasket to be lubricated
7 - easy door opening
8 - parallel electric connection with the following socket
8
6
4
3
5
7
complETE vacUUm sockET
Aertecnica also produces the following complete vacuum socket lines.
NEW AIR SOCkET WITh NORMAL OPENING
The central power unit turns on with the insertion of the flexible hose or, with an electrified hose, by using the switch on the handle.
Electrical switch plates included.
The socket may be equipped with the microswitch kit for turning on the central power unit when the door is opened
(code NA699)
LOGIk NEW AIR SOCkET
The central power unit turns on with the insertion of the flexible hose or, with an electrified hose, by using the switch on the handle.
SqUARE SOCkET BODy
The central power unit turns on with the insertion of the flexible hose or, with an electrified hose, by using the switch on the handle.
new air touch socket
New Air Touch covers the sockets with elegant retractable systems. The sockets include a socket body, plate support and electrical switch plate.
The central power unit turns on with the insertion of the flexible hose or, with an electrified hose, by using the switch on the handle.
General Catalogue Technical Manual 115
EclETTIs TUBÒ vacUUm sockET
The Eclettis TUBÒ socket represents the ideal solution for architecturally sophisticated environments.
A brushed stainless steel finish combines aesthetic design with high technology.
The central power unit turns on with the insertion of the flexible hose or, with an electrified hose, by using the switch on the handle.
The Eclettis TUBÒ vacuum socket can be installed in masonry walls, with a curved union or a straight union, and in plasterboard walls.
1 - parallel electrical connection
2 - Eclettis TUBÒ socket body
3 - inlet frame with Eclettis socket frame
4 - fixing screws
5 - OR gasket to be lubricated
1
5
3
2 ecLettis tubÒ white
4 ecLettis tubÒ inox
TUrnIng on ThE cEnTralIsEd vacUUm sysTEm
Turning on the centralised vacuum system depends on the type of hose and the installed vacuum socket model.
new air
E
ThERE ARE TWO TyPES OF hOSES: with the TyPE 1 flexible hose the central power unit turns on by inserting the hose in the inlet A .
with the TyPE 2 flexible hose, the central power unit turns on by pressing the switch on the hose itself.
A
B
VACUUM SOCkET ELECTRIC
CONTACTS
The electric contacts are inside the vacuum socket. (E) .
The centralised vacuum system turns on when the union (B) of the TyPE 1 flexible hose or the plates (D) of the
TyPE 2 flexible hose come into contact with the electric contacts.
type 1 flexible hose with activator union (b)
E
NOTE
With socket models Air Active, Open and the NEW AIR sockets with a microswitch (NA699), the central power unit turns on when the socket door is opened.
ecLettis tubÒ
E new air
A
C type 2 flexible hose with switch (c)
E
Logik new air sQuare
E
D
116 General Catalogue Technical Manual
InsTallaTIon of ThE plasTEr moUld
The plaster mould is used with the
NEW AIR inlet frames, in the case of wall irregularities, cement must be used.
B
A
E
D
1 - insert the plaster mould (A) into the NEW AIR inlet frame (B)
2 - arrange the plaster (C) around the mould
3 - cut the part of the extension that exits from (D) the plaster line flush with the wall using an appropriate cutter (E) .
4 - fit the NEW AIR vacuum socket (F) to proceed with the installation
NOTE
The mould for the finishing is only used with the NEW AIR inlet frames.
C
F
InsTallaTIon of ThE EXTEnsIon for vacUUm sockETs
The extensions are necessary when the inlet frame is not properly built into the wall with respect to the surface of reference and the airtight seal of the system is not guaranteed.
fLush with pLaster for d between 20 and 32mm use the extension vacuuM by cutting off 13mm froM the part opposite of the or socket surfaces to gLue extension socket fraMe for d between
7 and 20 mm engage the extension froM the part of the or in the socket and cut it to 2 mm.
gLue it using cianoacryLic gLue perpendicuLar cut for d between 20 and 32mm use the extension by cutting off 13mm froM the part opposite of the or for d between 32 and 43mm, use the entire extension for d Longer than 43mm use two or More extensions
General Catalogue Technical Manual 117
SELECTION OF THE CENTRAL POWER UNIT
PERFETTO TPA-TP LINES
The TP line represents a new conception of advanced vacuum systems. The TPA line also has the APF self-cleaning system.
It can also be installed outside.
PART dESCRIPTION
1 - Right and left double air exhaust
2 - Electronic card protection
3 - Electric motor
4 - Temperature sensor
5 - AVI display
(PERFETTO INOx TxA, PERFETTO TPA,
PERFETTO TP models)
6 - Sound-proofed chamber
7 - Integrated vacuum socket
(PERFETTO INOx TxA, PERFETTO TPA,
PERFETTO TP models)
8 - Self-Cleaning filter APF system
(PERFETTO INOx TxA, PERFETTO TPA models)
9 - PRECISION filter cartridge
4
3
10 - Cone conveyor
11 - CLEAN BAG dust bag with dust contact preventing quick closure
12 - CLEAN BAG blocking system
(points 16 and 17 only for PERFETTO
INOx TxA, PERFETTO TPA, PERFETTO TP models)
13 - Dust container
14 - Ergonomic handles
15 - Side multifunction pockets
(not included in TC, Tx1A, TP1A and
TP1 models)
16 - qUICk FIx bracket and front hook
17 - Double right and left dust inlet
2
1
PERFETTO INOx TxA LINE
The TxA line includes all of the prestigious solutions of the TPA line, enclosed in an
Inox AISI 304 stainless steel body.
It can also be installed outside.
5
6
7
8
17
16
9
15
CLASSIC TC LINE
The TC line represents the best solution at a limited cost among advanced vacuum systems.
It can also be installed outside.
10
11
12
14
13
118 General Catalogue Technical Manual
STUdIO TS LINE
Studio TS, new central power units with electronic, featuring SOFT START starting and boasting remote monitoring thanks to the REMOTE Control Panels (cod.
CMT800 - CM8890).
4
11
12
15
16
17
1
2
5
4
16
PART dESCRIPTION
1 - Sound-proof motor compartment
2 - Electric motor
3 - Motor air intake
4 - Dual right/left dust inlet
5 - Air Exhaust line (only TS4)
6 - Power supply
7 - Operation Signal input
8 - Green Led On: power unit on
9 - Green Led On: power unit running
C500
C500 central power unit installing two motors and ø63mm top air expulsion.
With simplified electronics, but still with optimal performance.
10 - Fuse
11 - Filter cartridge
12 - Fixing knob
13 - Fixing bracket
14 - Locks lever
15 - Cone conveyor
16 - Ergonomic handles
17 - Dust container
18 - Dust inlet closing cap
PART dESCRIPTION
1 - Top air exaust, ø63
2 - Cover
3 - Sound-proof motor compartment
4 - Power supply input
5 - Operation signal input
6 - Left dust inlet
7 - Right dust inlet
8 - Fixing bracket
9 - Dust container hinges
10 - Filter cartridge
11 - Dust conveyor
12 - Dust container
3
6
7
1
2
10
3
18
14
13
12
4
5
8
9
11
9
10 6
8
7
General Catalogue Technical Manual 119
InsTallaTIon of ThE sInglE-phasE cEnTral powEr UnIT
posITIonIng
The central power unit of PERFETTO
TxA, PERFETTO TPA,PERFETTO TP and
CLASSIC TC lines, are installed in service areas (for example, store-rooms, garages, cellars) aired and protected from extreme temperature changes.
The high degree of electrical protection and resistance to atmospheric conditions also allows external installation.
The dust inlet and air expulsion on both sides offer maximum installation flexibility. The installation area must be sufficiently spacious and lighted to allow filter cartridge and dust bag substitutions.
Legend
1 - air exhaust line
2 - dust inlet line
3 - 220/240V central power unit power supply
4 - 12v socket line+ Dynamic
Control Display (optional)
5 - silencer
6 - dust inlet + cap
7 - air exhaust + cap
8 - air exhaust grille
InsTallaTIon wITh
EXhaUsT To ThE amBIEnT aTmosphErE
When the central power unit is installed externally, the air exhaust conveyor is not needed.
The air grille provided with the central power unit must be installed on both air exhaust openings following the directions indicated below.
6
7
OK mbar
2
1
8
5
1
OK mbar
2
7
3
4
6
5
3
4
8 exterior interior note this solution is recommended only for central power units installed externally.
120 General Catalogue Technical Manual
connEcTIng ThE cEnTral powEr UnIT To ThE cEnTralIsEd vacUUm sysTEm
3
POWER SUPPLy
CONNECTION
The power supply cable with Schuko plug (3) for the central power unit is supplied as standard equipment with the central power unit (2) .
SOCkET CABLE
CONNECTION
A cable is supplied for connecting the socket line and the Dynamic Control
Display (1) with the socket activation consent line and the remote data transmission (4) as standard equipment with the central power units.
2 1
240v
12v
4
5
NOTE
When installing the central power unit externally ensure that a junction box (5) with an adequate degree of electrical protection is used.
InsTallaTIon allowancEs - (pErfETTo TXa, Tpa, Tp and classIc Tc powEr UnITs)
I
D
C
B
240 V
12 V
E
N
Q
PERFETTO TXA PERFETTO TP - PERFETTO TPA
TX1A TX2A TX3A
C
D
A
B
138
350
257
328
350
257
300 300
E
F
286 286
230 230
G 34 34
418
350
257
340
304
340
34
I
L
H 600 900
273 273
115 137
1115
308
137
112 M 103
N 560 560
P 1500
112
1400
600
1400
P
Q
340
304
340
34
TX4A
418
350
257
1115
308
137
112
600
300
286
230
34
TP1/TP1A TP2/TP2A TP3/TP3A TP4/TP4A
138 328 418 418
350
257
350
257
350 350
257 257
300
286
230
34
340 340
304 304
340 340
34 34
600
273
115
900 1115 1115
273 308 308
115 137 137
103
560
103 112 112
560 600 600
1400 1500
Recommended allowance
Floor line
The indicates measurements are in mm.
1400 1400 1400
300
286
230
34
TC1
138
350
257
600
273
115
103
560
1500
CLASSIC TC
300
286
230
34
TC2
328
350
257
900
273
115
103
560
340
304
340
34
TC3
418
350
257
1115
308
137
112
600
1400 1400
340
304
340
34
TC4
418
350
257
1115
308
137
112
600
1400
General Catalogue Technical Manual 121
InsTallaTIon allowancEs - (sTUdIo and c500 powEr UnITs)
B
F C
D
E
STUDIO TS LINE
Q
H
A
C500 g h e f c d a b i
M p
P Recommended allowance q Floor line
The indicates measurements are in mm.
STUDIO TS1
143
400
330
280
270
314
124
650
250
47
1500
122 General Catalogue Technical Manual
D
STUDIO TS2
298
400
330
280
270
321
124
900
250
47
1400
E
B
M
F
Q
STUDIO TS4
360
350
260
320
290
370
200
1038
285
51
1400
I
C500
360
350
-
320
290
400
-
1030
285
-
-
SELECTION OF THE QB CENTRAL POWER UNIT
BUILT-IN ENCLOSURE WALL ENCLOSURE QB CENTRAL POWER UNIT - Q200
It represents the best central power unit alternative that minimises the space occupied in modern homes and keeps all the functionalities of advanced vacuum systems.
Thanks to its reduced depth (23 cm) it can be installed in perimeter walls with a minimum thickness of 25 cm.
The door can be painted the same colour as the wall.
The total depth of the enclosure is
23.5 cm, with a degree of electrical protection equal to IP55, and can be installed in walls anywhere.
The entire enclosure can be painted the same colour as the wall.
THE TWO QB CENTRAL POWER UNIT SOLUTIONS
PART dESCRIPTION
1 - box for built-in power unit
2 - insulation
3 - door
4 - box for wall power unit
5 - fastening brackets
6 - qB central power unit body
4
5
5
2
1
6
3
3
6
General Catalogue Technical Manual 123
INSTALLATION OF THE QB CENTRAL POWER UNIT
QB InsTallaTIon wITh BUIlT-In EnclosUrE
technicaL features
1 - Insulation
2 - Box
3 - Central power unit body
4 - Door arrangeMent
The built-in box has a depth of only
23 cm. This makes it possible to install it in perimeter walls with a minimum thickness of 25 cm.
The enclosure and the door are made out of galvanized steel and have a gasket.
The qB central power unit reaches degree of electrical protection IP55 with channelled air exhaust and IP45 with air exhaust from the door.
This solution is suitable for outdoor installations.
14,5
1
2
3
DIMENSIONS OF ThE BUILT-IN BOx
The measurements of reference (in cm) for the box are provided to the side.
27
54
5
23
25
58
80 13
CENTRAL POWER UNIT INSERTION
AND FIxING
The installation phase of the central power unit is simple and quick: insert the central power unit body and hook it into the two holes in the box using the appropriate pivots (A) .
The dust inlet fitting will engage in the housing in the central power unit.
Fix the central power unit to the built-in enclosure using the appropriate screws.
a
4
3
124 General Catalogue Technical Manual
QB InsTallaTIon wITh wall EnclosUrE
TEChNICAL FEATURES
1 - Box
2 - Door with reversible opening
3 - Central power unit
ARRANGEMENT
The wall box has a total depth of 23.5 cm.
The wall installation is very simple and quick thanks to the fixing brackets and the cabling prepared for the electric connection already inserted in the enclosure.
The qB central power unit reaches degree of electrical protection IP55 with channelled air exhaust and IP45 with air exhaust from the door.
This solution is suitable for outdoor installations.
WALL BOx MEASUREMENTS
The measurements of reference (in cm) for the box are provided to the side
1
2
9 34
3
26
52
CENTRAL POWER UNIT INSERTION
AND FIxING
The installation phase of the central power unit is simple and quick: insert the central power unit body and hook it into the two holes in the enclosure using the appropriate pivots (A) .
The dust inlet fitting will engage in the housing in the central power unit.
Fix the central power unit to the wall enclosure using the appropriate screws.
a
General Catalogue Technical Manual 125
QB cEnTral powEr UnIT ElEcTrIc and hydraUlIc connEcTIon
QB cEnTral powEr UnIT wITh BUIlT-In EnclosUrE
ELECTRIC AND hyDRAULIC PREPARATION
The following electric connections are made:
1 - connection between the building's electrical line and the central power unit power supply cable
2 - connection of the 12V line to the vacuum sockets
3 - 220/240V line switch
4 - dust inlet fitting
5 - dust inlet line
The qB central power unit can be connected both to the Dynamic Control
Display as well as to the REMOTE panel kit.
2
60
cm
1
4
5
3
R
ExPULSION OF ChANNELLED AIR
Recommended for central power units that are located indoors or in closed environments
The aspirated air is released through the union R to be installed in place of the closing cap.
To be ordered separately:
L - Silencer (code CM835)
M - Conical increase adapter (code TR250)
N - Grille (codeTR310)
L M N max 5 m
ø 50
QB cEnTral powEr UnIT wITh wall EnclosUrE
ELECTRICAL PREPARATION
The following electric connections are made:
1 A - schuko electrical socket for
220/240V power supply
2 - electric board for 12V aspiration line sockets
3 - 220/240V line switch/disconnector
(only in the case of installation with direct connection to the electrical power supply, without the use of a schuko plug) h - recommended height from the ground: min 80 cm
The qB central power unit can be connected both to the Dynamic
Control Display as well as to the
REMOTE panel kit.
NOTE
If the enclosure is installed externally, ensure that an electrical junction box with appropriate electrical protection is used
126 General Catalogue Technical Manual
1
2
AIR ExPULSION FROM ThE DOOR
Recommended for central power units located on a terrace or outside.
The the aspirated air is released through the outlet P prepared in the door.
3
P
wIrElEss kIT
ThE wIrElEss flEXIBlE hosE
Is the solution for situations in which the system does not have the electrical preparation or to add a new socket to an already existing system without installing the 12V socket line.
It can be used with all types of vacuum sockets.
RECEIVER
Inside a building, the transmission range between the wireless hose and the receiver is 15 m, which makes it possible to go up or down 2 floors.
1 - wireless hose
2 - receiver
3 - direct connection line to the central power unit
OK mbar
3
1,5 mt.
2
1
Bravo
vacUUm sysTEm powEr UnIT
The BRAVO built-in vacuum system power unit was designed to solve space related problems that are found in all types of modern homes with smaller surfaces.
BRAVO is recommended for oneroom flats, shops, small offices, bars, garages, etc...
INSTALLATION IN AN ExTERNAL WALL
The built-in vacuum system power unit must be installed in the external wall of the room of installation.
A minimum of a 25 cm diameter, 30 cm deep hole is sufficient for housing the vacuum system power unit.
Its dimensions guarantee the venting of the aspirated air directly outdoors.
INSIDE
Built-in support
ø 25 cm
EXTERNALL WALL
OUTSIDE
Air outlet grill
Flexible hose
Floor
BRAVO minimum
30 cm
TECHNICAL ROOM SIDE
TECHNICAL ROOM
EXTERNAL SIDE
Convolve built-in support
Alluminium flexible hose
Flangia air exaust
Air vent grille
Flexible hose
Electrical connection input
BRAVO
Adjust stirrup
General Catalogue Technical Manual 127
1
2
3
4
6
7
5
8
9
KOmPATTA KT
The kOMPATTA kT line was created to satisfy the requirements of terziary/professional sector to offer a guarantee of absolute reliability, and above all the top swiftness of installation speeding up the product setup and reducing the size.
Main caracteristics are:
1 - engine housing with three-phase motor inside in the upper section;
2 - electric board integrated in the machine frame;
3 - from one to three simultaneous operators;
4 - 4 models with air filter and selfcleaning system;
5 - speed and swiftness of installation;
6 - installation size reduced;
7 - dust container capacity 150 liter.
10
12
11
13
15
16
14
17 dESCRIPTION OF THE PARTS
1 - Sound proof sponge
2 - Exhaust valve
3 - Compressed air cylinder
4 - Vacuum display
5 - Main switch
6 - Electric panel
7 - Self-cleaning timer
8 - Condensation drain valve
9 - Compressor for air
cylinder recharge
10 - Reversible air outlet
11 - Motor support
12 - Turbine motor
13 - Self-cleaning valve
14 - Polyester filter cartridge
15 - Dust container release lever
16 - Fixed nut filter cartridge
17 - Dust container
8
1
2
10
9
INSTALLINg KOmPATTA KT
1 - Air vent grill
2 - Silencer
3 - Self-cleaning compressor
4 - Supporting feet
5 - Suction manifold
6 - Ball valve
7 - Vertical rising pipe
8 - Orizontal rising pipe
9 - 400V power supply
10 - 12V vacuum sockets line
5
3
4
7
6
128 General Catalogue Technical Manual
TERTIARY SECTOR
Mixed central vacuum systems for multi operators
1 - Single-fase power unit
2 Three-phase power unit
3 - Vacuum sockets
4 - Pipes
5 - False ceiling
6 - Dynamic or Remote panel
1
RESIdENTIAL SECTOR
Central vacuum systems for one operator
1 - Single-fase power unit
3 - Vacuum sockets
4 - Pipes
6 - Dynamic or Remote panel
4
3
6
2
1
3
6
5
1
4
1
4
6
3
General Catalogue Technical Manual 129
TUBÒ
vacUUm sysTEm InspEcTIon a b
Electric consent inspection
To check the correct position of the activation line, connect the inlet line with the outlet line in parallel on each inlet frame. In the last socket, short circuit the two wires together
(A) . Connect a tester instrument to the activation line of the central power unit (B) , select the function
“CONTINUITy” and check that the circuit is ring connected. The value 0 ohm will display on the instrument.
piping inspection
This check is used to make sure that there are no air leaks in the piping still without sockets and the central power unit.
It must be performed when completing the positioning preparations and repeated before gluing the screed.
Use the TUBÒ system tester kit (AT380) or, if not available, a portable vacuum cleaner, a vacuum gauge to measure the vacuum and a series of caps for inspection.
c f
of approx. 150 mbar (vaLue 1).
Note the value that appears.
4 - Connect the TUBÒ system tester hose in the dust inlet line arriving from the central power unit and read the vacuum value shown on the vacuum gauge (vaLue 2), which must be similar to the previously written down value 1 (approx. 150 mbar), first checking the opening of the safety valve.
If value 2 is similar to value 1, the inspection is positive.
If the difference between value 1 and value 2 is greater than 15 mbar, this means that there are abnormal leaks in the piping: check with the system in a vacuum where the air leaks are and repair them.
Note keep the tubÒ system tester kit in a vacuum for a maximum continuous period of 5 minutes. if the system tester kit must be used in a vacuum for a longer period of time, remove the flexible hose from the socket in which it is inserted for a minimum of 3 minutes and then reinsert it, restarting the control phase.
general centralised vacuum system inspection
The general centralised vacuum system inspection must be done after the final assembly of all vacuum sockets and the selected central power unit
The detection of the operating vacuum and the features of the central power units differ from each other. It is recommended therefore to follow the specific inspection procedures indicated in the user manual that is provided with each central power unit.
e d
1 - Insert a system tester cap on each inlet frame.
2 - Power the TUBÒ system tester with the flexible hose inserted in the builtin socket (C) .
3 - Start the TUBÒ system tester and seal off the other end of the hose with your hand (D) . The safety valve (E) must open and the integrated vacuum gauge (F) should read a vacuum value
OK mbar
130 General Catalogue Technical Manual
TEchnIcal spEcIfIcaTIons -
PERFETTO TPA LINE
UPPER sECtioN
Motor: housed in a sound-proofed chamber with a low noise emitting internal channelled system.With SOFT START system for gradual starting and motor protection.
Degree of protection : ThROUGh FLOW electric motor with an electrical degree of protection of IP55 or IP43 (models TP1A and TP2A). RADIAL electric motor with a degree of protection of IP45 or IP43 (models TP3A and TP4A).
Dual air exhaust: opening on the right side and on the left side with the possibility of choosing the direction of the air exhaust line.
EVoLUtioN 1.0 electronic card : supporting the MODBUS protocol and which can be interfaced with the most widely available home automation systems.
AVi Display : (With Immediate Display), displays the central power unit's operating parameters in real time, including: central power unit's operating time, expressed in hours filter cartridge saturation expressed as a percentage filling level of the dust bag or CLEAN BAG operating vacuum with an indication of the operating range motor chamber temperature.
FiLtER sECtioN
PRECisioN type: washable polyester, with a large filtering surface, with conical centring system, and built-in plastic fastening system.
APF system* filter cartridge self-cleaning system with vibration and self-powered mechanical shaking. the vacuumed air is conveyed in a purpose-provided chamber equipped with a helicoidal turbine. the storage chamber, in glass sphere filled nylon, is situated between the motor compartment and the filter cartridge. the rotation of the helicoidal turbine acts on a shaking pin. the device consists of a steel spring with a rubber half-sphere that rotates on high velocity bearings with dust-proof seal.
the fully mechanical self-cleaning system requires no electrical connections and is always active when the central power unit is in operation; the pressure drops do not exceed 3 mbar. the system is equipped with electronic sensors to detect the vacuum, displaying the power range on the display, signalling any drop in performance due to anomalies and locks the central power unit when the vacuum value exceeds 220 mbar for more than 15 seconds
*APF System (Europe PATENT pending n. 067934216.6)
Central power unit body : made of a metal structure hOT TREATED WITh EPOxy POLyESTER PAINT, guaranteed and certified for 1,000 hours of salty mist. Cup, Instrument panel with keyboard, Multifunction pockets, Ergonomic handles and Dust container, are made of plastic WITh UV PROTECTION.
Dual dust inlet: opening on the right side and on the left side to facilitate the connection of the dust inlet line with the central power unit.
service socket : built into the front instrument panel, activated via the START button on the instrument panel.
QUiCk Fix fastening bracket: qUICk FIx type, or quick fitting, with front central power unit insertion and fastening kit with antivibration brackets.
Multifunction pockets : to the side of the machine body to house the dust bag and the technical documentation, etc. (not included in model tP1A)
DUst CoNtAiNER
Dust container : with BLOCkING SySTEM using pressure clips to hook the dust bag onto the bottom of the container, washable, made of plastic.
Ergonomic handles : with SECURING SySTEM, for safe hooking and unhooking of the dust container and rapid removal of the dust bag, with wide grip to facilitate manual opening, made of plastic.
CLEAN BAG: with built-in string and strip, for immediate and safe closing of the bag without any contact with the dust.
Cone conveyor: Made of plastic, built-in and fixed to the machine body, with strong seal, retains the dust deposited and facilitates dust bag closure.
a - preparation - made with AERTECNICA PVC PIIP/C certified ø 50 mm piping and fittings, cold bonded with self-sealing adhesive, with low voltage 12 Volt electrical line. Preparation buried in the floor and wall.
Cad. €......................................................x........................ Tot. €......................................................................
b - vacuuM SOCkETS - Socket bodies and adapter supports arranged for coupling with the following electrical switch plates: BTICINO brand - models
INTERNATIONAL, LIVING, LIGhT, LIGhT TECh, AxOLUTE, MATIx; VIMAR brand - models IDEA, RONDO, PLANA, PLANA SILVER, EIkON, EIkON NExT; AVE brand - models SISTEMA 45, BANqUISE, SISTEMA 44 GEWISS brand - models PLAyBUS, ChORUS; LEGRAND brand - models VELA, CROSS, MOSAIC; ABB brand - ELOS models.
Cad. €......................................................x........................ Tot. €......................................................................
c - cLeaning ACCESSORIES kIT - Comprising: container for brushes with support for flexible hose and plastic hook for wand, set of dusting brush, crevice nozzle, radiator brush, clothes brush, upholstery brush with felt, chrome-plated wand, 30cm universal brush with floor bristles with castors.
Cad. €......................................................x........................ Tot. €......................................................................
d - fLexibLe hOSE - STANDARD type, 9 metres long, ø32 diameter, with pressure regulator. qUICk FLOW type, electrified, 9 metres long, ø32 diameter, with ergonomic grip, with switch for starting the central power unit and pressure regulator. qUICk FLOW WITh SPEED VARIATOR, electrified, 9 metres long, ø32 diameter, with ergonomic grip, with switch for starting the central power unit and speed variator
Cad. €......................................................x........................ Tot. €......................................................................
e - cLean bag - i.e. CLEAN BAG with built-in string and strip, for immediate and safe closing of the bag without any contact with the dust, pack of 5
Cad. €......................................................x........................ Tot. €......................................................................
g - precision fiLter cartridge - PRECISION type, with high filtering efficiency, made of washable polyester.
Cad. €......................................................x........................ Tot. €......................................................................
General Catalogue Technical Manual 131
list of material for installing the centralised vacuum system
residential sector
The following table shows a grid that can be used for general reference in order to have a reliable indication of the quantity of installation material necessary based on the number of vacuum sockets to be installed.
The first column shows the number of vacuum sockets; the row corresponding to the number of vacuum sockets to be installed shows the quantity of the fitting articles and installation material that is required.
sockets point nº inlet frame n° pipe
ø50 per m.
90° ff elbow
Ø50
45°mf elbow
Ø50
45°ff elbow
Ø50
90°ff
Ø50 sleeve with head
Ø50
2X1 Ø16 pre-wired
100m
250-g adhesive for PVC
PVC wiring clamps
PVC conical adapter
Ø50F/82
Exhaust grille
Ø 82
Flushmounted electric
Wallmounted bracket note
If the remote devices Dynamic Control Display or the REMOTE panel kit are to be installed, the sheathing 4x1 ø16 code PE130 must be purchased.
132 General Catalogue Technical Manual
Space for Aertecnica’s Distributor Stamp
EN
www.aertecnica.com
advertisement
Key Features
- Quiet operation
- Easy installation
- Powerful suction
- Self-cleaning filter system
- Multiple operator support
- Built-in enclosure option
- Remote control
- Wireless hose option