Grainger International 2XZG5 Operating Instructions & Parts Manual
Grainger International 2XZG5 is a versatile and durable folding gate designed to provide secure access control for a variety of applications.
With its sturdy construction and easy-to-install design, the 2XZG5 is an excellent choice for both residential and commercial use. The gate is made from high-quality materials and features a powder-coated finish for added durability. It is also available in a variety of sizes to fit any opening.
The 2XZG5 is easy to operate and can be quickly folded away when not in use. It is also equipped with a padlock for added security.
Some of the potential use cases for the Grainger International 2XZG5 include:
Advertisement
Advertisement
OPERATING INSTRUCTIONS & PARTS MANUAL (OIPM)
Folding Gate (
2XZG5/2XZG6/2XZG7/2XZG8/2XZG9/2XZH1
)
Pin &
Hinge bar
Left Gate Assembly (A)
Open Position Right Gate Assembly (B)
Pin &
Hinge Bar
Pin &
Washer
Washer
Pin & Washer ( E )
Figure 2
Pin,
Hinge bar
( C/D )
Figure 3
CASTER
Caster Wheel
Pin &
Washer
Figure 1
1. Stand folded gate ( A ) against the doorframe where you intend to mount it. (See Figure 1)
2. Mark center of hole on floor 1.5” away form wall to fit the 5/8” pin at bottom of gate. (See Figure 2)
3. Drill 3/4” hold in floor.
4. Place washer ( E ) over 3/4”hole.
5. Put gate pin ( A ) through washer into hole. (See Figure 2)
6. Install hinge bar ( C ) on wall. Mark the mounting surface through the holes in the hinge bar with a pen or pencil.(See
Figure 3) For mounting into:
Wood: use 5/16”
×
2” Lag Bolts.
Steel: drill and tap for 5/16”
×
1” Bolts.
Brick or concrete: 5/16”
×
2” Lag Bolts in 3/8” holes with lead anchors.
7. Drill appropriate size holes in the mounting surface.
8. Mount the gate ( A ) by inserting the appropriate bolts through
Fixing bar (E) the hinge bar.
9. Stretch the gate ( A ) across the opening.
2XZG5/2XZG6/2XZG7/2XZG8/2XZG9/2XZH1
Manufactured for Grainger International, Inc. Lake Forest, IL 60045
Figure 4
10. Repeat step 1 to 9. Mount another piece of Gate.
11. Pull the gate ( A&B ) together, and insert a padlock. (See Figure 1)
12. When moving gate, please use fixing bar ( E ) to lock for safety. (See Figure 4)
13. For Gate 2XZH1: Gate has Drop Pin mounted in center of gate web, one for each side of gate. Install gate using Steps 1 to 9. Open gate and mark floor for Drop Pin holes. Drill
3/4in. holes in floor for Drop Pins and secure gate.
NOTE:
Product images are shown for display purposes only and may not be representative of the final product.
PARTS LIST
Ref. # Description Part Number Qty
1 Left Hinge Bar MLHB001 1
2 Right Hinge Bar MHRHB001 1
Ref. No.
Part A B
1
C
2
D
3
E
Part
Figure
Description
Part
Number
Left Gate Assembly Right Gate Assembly
Left Hinge bar
MLHB001
Right Hinge bar
MHRHB001
1 pc.
WASHER
(COMMON)
OD 1 ¾" ID
5/8" Thickness
1/8"
2 pcs. Qty 1 pc. 1 pc.
3 Common Washer OD 1 ¾ X ID 5/8” X 1/8” Thick (Common Hardware Item)
PARTS
1 pc.
CAUTION !
Keep hands and fingers out of moving diamonds of web when handling gate.
WARNING: Consult safety codes and/or local authorities regarding proper use of this product.
2XZG5/2XZG6/2XZG7/2XZG8/2XZG9/2XZH1
Manufactured for Grainger International, Inc. Lake Forest, IL 60045

Download
Advertisement