here - Nord Pool Spot
UMM system 2013
UMM system
training course
Agenda
Intro
Why do we send UMM`s
Application training
– Training
– User cases
General
– Customer service
– Documentation
Q&A
2 / UMM system 2013
UMM system
INTRODUCTION
3 / UMM system 2013
4 / UMM system 2013
The project
Finalize
technical
specification
(Jan 2012)
Finalize
functional
specification
(Jan 2012)
5 / UMM system 2013
Start
implementation
(Q2 2012)
Finish
development
(Q1 2013)
Launch
(Q2 2013)
Stabilization
(Q2 2013)
The project organization
CAB
Project management
CFG
NPS project
team
TFG
6 / UMM system 2013
Codento
UMM system
WHY DO WE SEND UMM`S
7 / UMM system 2013
UMM system
DISCLOSURE REQUIREMENTS
8 / UMM system 2013
Disclosure requirements
Market Conduct Rules: Appendix 5 to the
Rulebook Nord Pool Spot
REMIT: Regulation (EU) no 1227/2011 of the
European Parliament and of the council of 25
October 2011 on wholesale energy market
integrity and transparency (REMIT)
9 / Presentation footer
Market Conduct Rules
3.1 Members shall disclose to NPS any information relating to the Nordic and Baltic electricity
market regarding the Member’s own business or facilities of which the concerned owns or
controls or has the balance responsibility for in whole or in part, in particular information relevant to
facilities for production, consumption or transmission of electricity, regarding:
a) any planned outage, limitation, expansion or dismantling of capacity in the next 6-weeks
period of more than 100 MW for one generator, consumption or transmission facility, or
more than 200 MW for one production station, including changes of such plans;
b) any planned outage, limitation, expansion or dismantling of capacity of more than 400
MW for one production station, consumption or transmission facility for the current
calendar year and three (3) calendar years forward, including changes of such plans
c) any unplanned outage or failure relating to more than 100 MW for one generator,
consumption or transmission facility, and more than 200 MW for one production station,
including updates on such outages or failures.
d) any other information that is likely to have a significant effect on the prices of one or
more Products if made public.
10 / UMM training April 2013
What should be published in a UMM
3.4 Where an incident is subject to disclosure pursuant to this Section 3 , the disclosure shall when relevant as a minimum
include information on:
a) the affected geographical area or interconnection;
b) the affected generator, station or line;
c) the time of decision or occurrence of outage;
d) the available capacity to the market of electrical effect in MW during the incident;
e) the estimated starting time of the planned or unplanned outage, and the corresponding stop time;
f)
the cause of the incident; and
g) if the incident relates to an outage, limitation, expansion or dismantling of capacity of more than 400 MW for one
production station, consumption or transmission facility within the next three (3) calendar years, an indication of
the uncertainty relating to the incident’s duration shall be indicated on a scale from 1 to 6 as follows:
1. +/- 0 – 24 hours
2. +/- 1 – 3 days
3. +/- 4 – 7 days
4. +/- 8 – 31 days
5. +/- more than 31 days (specify if possible)
6. Open/undetermined (specify reason).
11 / UMM training April 2013
Information required in a UMM
Where: geographical area or interconnection
What: relevant generator, station or line
When: time of decision or occurrence of outage
Consequence: information on available capacity in MW
during the incident
Period: event start and stop
Reason: information of the cause of the event
Duration: information about the uncertainty in duration
12 /
To be disclosed within 60 minutes
3.5 All information which shall be disclosed pursuant to
this Section 3.1 to 3.4 shall be disclosed immediately,
and no later than sixty (60) minutes after occurrence of
the event which leads to the relevant information by
means of an Urgent Market Message (UMM), except as
specified in section 3.6
13 /
REMIT
Article 4:
– All inside information should be published to the market
Guidance on what information shall be published is described in
ACER Guidance on the application of REMIT. Please consult
these guidelines for recommendations on how to fulfil the
obligation of publishing inside information as set out in REMIT.
14 /
UMM system
MESSAGE CATEGORIES
15 / UMM system 2013
Market Conduct Rules
3.1 Members shall disclose to NPS any information relating to the Nordic and Baltic electricity market regarding the
Member’s own business or facilities of which the concerned owns or controls or has the balance responsibility for
in whole or in part, in particular information relevant to facilities for production, consumption or transmission of
electricity, regarding:
a) any planned outage, limitation, expansion or dismantling of capacity in the next 6-weeks period of
more than 100 MW for one generator, consumption or transmission facility, or more than 200 MW for
one production station, including changes of such plans;
b) any planned outage, limitation, expansion or dismantling of capacity of more than 400 MW for one
production station, consumption or transmission facility for the current calendar year and three (3)
calendar years forward, including changes of such plans
c) any unplanned outage or failure relating to more than 100 MW for one generator, consumption or
transmission facility, and more than 200 MW for one production station, including updates on such
outages or failures.
d) any other information that is likely to have a significant effect on the prices of one or more Products if
made public.
16 / UMM training April 2013
Message categories
Outage or limitation
Expansion or dismantling
Market information
17 / UMM training April 2013
Outage or limitation
When informing about an event that affects available
capacity in MW a on station, unit or connection level
Information reported is displayed in a graph
18 / UMM training April 2013
Expansion or dismantling of
capacity
When informing about changes in installed capacity in
MW on a station, unit or connection level
19 / UMM training April 2013
Market information
When informing about:
– Information related to a station, unit or connection
where installed and available capacity can not be
stated, and;
– Information related to several stations
– other information that may significantly affect the
price
20 / UMM training April 2013
Type of event
Depending on the combination of message category
and message type chosen various types of events can
be chosen from a drop-down menu.
21 / UMM training April 2013
Message categories
22 / UMM training April 2013
Hourly values for available capacity
Information for message category “Outage or limitation”
shall relate to available capacity.
If there is precise information available, it shall be
stated on hourly level.
Significant changes to the published hourly values shall
be published to the market.
/
Variations available capacity during
event
If the available capacity varies during the time of the
event being reported and there is no precise
information about when the available capacity will vary,
the available capacity can be stated as the available
capacity in MW at a point in time during the event when
the available capacity is at its’ minimum.
Further information must be provided in the “Remarks
field”.
/
UMM system
TRAINING
25 / UMM system 2013
Training
Message list view
Subscription
Log in
User management
Publish a UMM
26 / UMM system 2013
Examples
Name: UMMY Power
Name: UMMY Trans
Stations:
Stations:
Production: Mario
Connections:
Consumption: Luigi
NO1 – SE3
NO2 – DK1
Country: Norway
Country: Norway
Names:
Names:
Ronald Ruben (1st)
Bob Hoskins(1st)
Peter Cullen
27 / UMM system 2013
Message list view
28 / UMM system 2013
Message list view
29 / UMM system 2013
Message list view - filter
30 / UMM system 2013
Message list view - filter
31 / UMM system 2013
Message list view – more filters
32 / UMM system 2013
Message list view – more filters
33 / UMM system 2013
Graph view
34 / UMM system 2013
Graph view
35 / UMM system 2013
Graph view
36 / UMM system 2013
Gantt view
37 / UMM system 2013
Gantt view
38 / UMM system 2013
Gantt view
39 / UMM system 2013
Subscription
40 / UMM system 2013
Subscription
41 / UMM system 2013
Log in
42 / UMM system 2013
Log in
43 / UMM system 2013
Log out
44 / UMM system 2013
Change a user
45 / UMM system 2013
Change a user
46 / UMM system 2013
Change a user
47 / UMM system 2013
Change company information
48 / UMM system 2013
Change company information
49 / UMM system 2013
Change company information
50 / UMM system 2013
Change company information
51 / UMM system 2013
Edit a station / unit
52 / UMM system 2013
Edit a station / unit
53 / UMM system 2013
Edit a station / unit
54 / UMM system 2013
Set up publishing rights
55 / UMM system 2013
Set up publishing rights
56 / UMM system 2013
Edit connections
57 / UMM system 2013
Edit a connection
58 / UMM system 2013
Edit a connection
59 / UMM system 2013
Publish a UMM
60 / UMM system 2013
Publish a UMM
61 / UMM system 2013
Publish a UMM
62 / UMM system 2013
Publish a UMM
63 / UMM system 2013
Publish a UMM
64 / UMM system 2013
Publish a UMM
65 / UMM system 2013
Publish a UMM
66 / UMM system 2013
Publish a UMM
67 / UMM system 2013
Publish a UMM
68 / UMM system 2013
Publish a UMM
69 / UMM system 2013
Publish a UMM
70 / UMM system 2013
Publish a UMM
71 / UMM system 2013
Publish a UMM
72 / UMM system 2013
Publish a UMM
73 / UMM system 2013
Upload prepared data
74 / UMM system 2013
Upload prepared data
75 / UMM system 2013
Upload prepared data
76 / UMM system 2013
Upload prepared data
77 / UMM system 2013
Update a message
78 / UMM system 2013
Update a message
79 / UMM system 2013
Update a message
80 / UMM system 2013
Update a message
81 / UMM system 2013
Cancel a UMM
82 / UMM system 2013
Cancel a UMM
83 / UMM system 2013
Save a message as a draft
84 / UMM system 2013
Save a message as a draft
85 / UMM system 2013
Save a message as a draft
86 / UMM system 2013
UMM system
USER CASES
87 / UMM system 2013
Transmission
Outage or limitation
User cases
Message category
Message type
Type of event
Failure affecting one or more connections
Outage or limitation
Transmission
Failure
Failure not having immediate impact on
available capacity
Outage or limitation
Transmission
Failure (not immediate)
Limitation in the grid
Outage or limitation
Transmission
Limitation in the grid
Transmission
Maintenance
Transmission
Outage of line
Transmission
Transmission
Transmission
Strike
Test
Other
Maintenance affecting available capacity for
one or more connections
Outage or limitation
Available capacity changed due to outage
on a line
Outage or limitation
Available capacity changed due to strike
Available capacity changed due to test
Other
88 / UMM training April 2013
Outage or limitation
Outage or limitation
Outage or limitation
Transmission
Expansion or dismantling of capacity
Message type
Type of event
Increased installed capacity on existing
connection
Expansion or dismantling
Transmission
Installed capacity
Decreased installed capacity on existing
connection
Expansion or dismantling
Transmission
Installed capacity
Permanent closure of connection
Expansion or dismantling
Transmission
Dismantling
Start date new connection
Expansion or dismantling
Transmission
New transmission facility
Other
Expansion or dismantling
Transmission
Other
User cases
89 / UMM training April 2013
Message category
Transmission
Market information
User cases
Message category
Message type
Type of event
Decision by regulatory authority
Information about new transmission
facility
Market information
Transmission
Market information
Transmission
Decision regulatory
body
New transmission
facility
Information affecting the market
The capacity can lower down to a certain
value under normal circumstances
Market information
Transmission
Market situation
Market information
Transmission
Minimum capacity
Other
Market information
Transmission
Other
90 / UMM training April 2013
Production
Outage or limitation
User cases
Message category Message type Type of event
Failure on a production station/unit
Outage or limitation
Failure not having immediate impact on available
capacity on one or more production units or a station Outage or limitation
Information about the fuel type on a station related to
available capacity
Outage or limitation
Production
Failure
Production
Failure (not immediate)
Production
Fuel type
Limitation on a station where the unavailable capacity must be
Outage or limitation
given on a station level due to f.ex. Icing on the river
Production
Limitation river
Isolation from grid - one station
Outage or limitation
Production
Isolation from grid
Maintenance on a production station/unit
Outage or limitation
Production
Maintenance
Station/unit part of peak load capacity
Outage or limitation
Production
Peak load capacity
Seasonal closing of production station/unit
Outage or limitation
Production
Seasonal closing
Strike on one or more production units or a station
Outage or limitation
Production
Strike
Tests on one or more production units or a station
Outage or limitation
Production
Test
Other
Outage or limitation
Production
Other
91 / UMM training April 2013
Production
Expansion or dismantling
User cases
Message category Message type Type of event
Increased installed capacity on power plant Expansion or dismantling Production
Decreased installed capacity on production
station/unit
Expansion or dismantling Production
Permanent closure of production
station/unit
Expansion or dismantling Production
Information about the fuel type on a
Expansion or dismantling Production
station related to installed capacity
Installed capacity
Installed capacity
Dismantling
Fuel type
Mothballed
Expansion or dismantling Production
Mothballed
Information about new production unit
Expansion or dismantling Production
New production unit
Information about new generation unit
Expansion or dismantling Production
New generation unit
Other
Expansion or dismantling Production
Other
92 / UMM training April 2013
Production
Market information
User cases
Message category Message type Type of event
Decision by regulatory authirity
Information about the fuel type on a
production unit
Isolation from grid - one station
Market information
Production
Decision regulatory body
Market information
Production
Fuel type
Market information
Production
Isolation from grid
Information about peak load reserves
Changing the stand-by time on prduction
station
Market information
Production
Peak load reserve
Market information
Production
Stand-by time
Icing on the river
Market information
Production
Limitation river
Information affecting the market
Market information
Production
Market situation
New generation unit added to production
station
Market information
Production
New generation unit
Reservoir levels
Market information
Production
Reservoir level
Market information
Production
Other
93 / UMM training April 2013
Other
Consumption
Outage or limitation
User cases
Message category Message type Type of event
Failure on a consumption unit
Failure not having immediate impact on available
capacity on a consumption unit
Outage or limitation
Consumption
Failure
Outage or limitation
Consumption
Failure (not immediate)
Isolation from grid - one consumption unit
Outage or limitation
Consumption
Isolation from grid
Maintenance on a consumption unit
Outage or limitation
Consumption
Maintenance
Consumption unit part of peak load capacity
Outage or limitation
Consumption
Peak load capacity
Seasonal closing of consumption unit
Outage or limitation
Consumption
Seasonal closing
Strike on one or more consumption units
Outage or limitation
Consumption
Strike
Test on consumption unit
Outage or limitation
Consumption
Test
Other
Outage or limitation
Consumption
Other
94 / UMM training April 2013
Consumption
Expansion or limitation
User cases
Message category
Message type Type of event
Increased installed capacity on consumption unit Expansion or dismantling
Consumption
Installed capacity
Decreased installed capacity on consumption unit Expansion or dismantling
Consumption
Installed capacity
Permanent closure of consumption unit
Expansion or dismantling
Consumption
Dismantling
Start date of new consumption unit
Expansion or dismantling
Consumption
New consumption unit
Other
Expansion or dismantling
Consumption
Other
95 / UMM training April 2013
Consumption
Market information
User cases
Message category
Message type Type of event
Decision regulatory authority
Market information
Consumption
Decision regulatory
body
Consumption unit isolated from grid
Market information
Consumption
Isolation from grid
Peak load capacity
Market information
Consumption
Peak load capacity
Changed stand-by time on a consumption unit
Market information
Consumption
Stand-by time
Information affecting the market
Market information
Consumption
Market situation
Other
Market information
Consumption
Other
96 / UMM training April 2013
General
Market information (1)
User cases
Message category Message type Type of event
Countertrade
Market information
General
Countertrade
Decisions regulatory authority Market information
General
Decisions regulatory body
Icing on the river
Market information
General
Limitation river
Isolation from grid
Market information
General
Isolation from grid
Peak load capacity
Market information
General
Peak load capacity
Reservoir level
Market information
General
Reservoir level
New connection
Market information
General
New transmission facility
New consumption unit
Market information
General
New consumption unit
New production station
Market information
General
New generation unit
New production
unit
97 / UMM training April 2013
Market information
General
New production unit
Other
Market information
General
Other
General
Market information (2)
User cases
Message category Message type Type of event
Elbas
Market information
General
Elbas
Elbas capacity
Market information
General
Elbas capacity
Elbas order
Market information
General
Elbas order
Elspot
Market information
General
Elspot
Elspot areas
Market information
General
Elspot areas
Elspot capacity
Market information
General
Elspot capacity
Elspot order
Market information
General
Elspot order
98 / UMM training April 2013
UMM system
CUSTOMER SERVICE &
DOCUMENTATION
99 / UMM system 2013
Terms and conditions
The UMM system is a tool provided by NPS to help
members comply with the disclosure requirements.
Users must be sufficiently trained
Terms and conditions
Non-members publishing on behalf of a member
Non-member publishing information on his own behalf
100 / UMM training April 2013
Help material
Help section: Under the tab “Help” a help section can
be found including relevant information regarding
publishing of UMMs.
–
–
–
–
User manual
Guidelines
Videos (https://www.youtube.com/NordPoolSpot)
Frequently Asked Questions
101 / UMM training April 2013
Questions prior to launch
Ellen Charlotte Stavseth, Trading adviser, +47 67 10 91 83
Elisabeth Melsom, Adviser Market Surveillance, +47 67 10 91 37
or send an e-mail to [email protected]
102 / UMM training April 2013
Testing
[email protected]
103 / UMM training April 2013
Next steps
Launch date
22.05.2013
End of test
26.04.2013
Test and Infrastructure setup
Launch preparation
All UMMs concerning information about
events applicable on 22 May and going
forward must be entered into the
system.
UMM
End date after
22.05.2013
End date before
22.05.2013
UMM
UMM
UMM
104 / UMM system 2013
Questions after launch
Assistance with the UMM system:
– NPS trading desk +47 67 10 91 10
Advice on content in UMMs:
– Market Surveillance weekdays from 08:00 to 15:30 CET on +47
67 10 91 35.
– NPS trading desk on +47 67 10 91 10
Training on the UMM system:
– Sales representative
105 / UMM training April 2013
Contact
Tel +47 67 10 91 35 (this line is recorded)
[email protected]
www.nordpoolspot.com
*Correspondance with Market Surveillance is
confidential.
106
UMM system
QUESTIONS & ANSWERS
107 / UMM system 2013
Help pages and contact
Help pages :
For further help documentation and videos please go to:
http://www.nordpoolspot.com/About-us/Help/UMM-help-page/
Contact :
Report errors via e-mail to [email protected]
Give other feedback via [email protected]
108 / UMM system 2013
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement