CWI Lighting 1090P32-16-620 Carolina 140-Watt Integrated LED Gold Leaf Contemporary Chandelier Installation Guide
Advertisement
Advertisement
Assembly Instruction Sheet #IS-1090P32-16
For Style 1090P32-16
Tools Required:
Light Source:
Preparation:
Flathead screwdriver, Phillips screwdriver, pliers, wire cutters, wire strippers, electrical tape, safety glasses.
(16) 120V LED *1W DIMMABLE (4000K)
Estimated Assembly Time: 10-20 minutes
Identify and inspect all parts before beginning installation. Check package content list and diagrams below to be sure all parts are present. If any parts are missing or damaged, do not attempt to assemble, install, or operate the fixture. Contact customer service for replacement parts.
arnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture.
We strongly recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
Package Contents
ll
[ID
Glass x6
STEP 2 - Attach Crossbar to Outlet Box.
A.Pass the supply wires through the Crossbar (EE).
Attach the Crossbar (EE) to the Outlet Box (CC) with the head of the Green Ground Screw facing you.
Secure it with Outlet Box
Screws (not included).
Tighten until snug.
-Outlet Box
[A]
Fixture Body x1 [Q]
Glass x5
[Q]
Glass x5
Hardware Contents
PART
AA
BB cc
DD
EE
AA
1:1
DESCRIPTION QUANTITY
Mounting Balls 4pcs
Wire nut 2pcs
Outlet Box Screw 2pcs
Mounting Screw 4pcs
Crossbar 1pcs
BB cc DD 8 I I EE
)(
STEP 1 - Attach Mounting Screws, Lock Washers and Hex Nuts to Crossbar.
A. Line up a set of holes on the
Crossbar (EE) and Holes x EE on the ceiling canopy.
Thread Mounting Screws (DD) into the holes on the
Crossbar (EE). Pass Lock
Washers and thread Hex
Nuts onto the Mounting
Screws (DD) .
Hand tighten until snug.
[gt-DD
,
----,.-
I iiiilll
I
Figure 1
I
__...
III 1
Ceiling
Caaopy
71
1
Supply Wires with
Outlet Box Screws Ground Wire
I
Figure 2
I
STEP 3 - Fit Ceiling Canopy to Crossbar Assembly
A. Fit the ceiling canopy to Mounting Screws (DD) and secure with Mounting Balls (AA). Note: The ceiling canopy should be snug against the ceiling and the Mounting Balls (AA).
If not, adjust the length of the
Mounting Screws (DD) by unscrewing the Hex Nut and Lock Washer and then screwing Mounting
Screws (DD) in or out of the Crossbar
(EE) until the correct length is achieved.
I
I
Once the ceiling canopy is secure, remove the Mounting
Ball (AA) and ceiling canopy f ml
Figure 3
I cm
DI i
IIII
'
, til
DD
AA
1 of 2 ReleasedDate:2017-08-14

Download
Advertisement