Steamist 1500 550 cf 15kW 240V Single Phase Steam Generator Installation Manual
Steamist 1500 is the device that will help you maximize relaxation and well-being at home. If you wish to know if this device is right for you, below you will find brief product information which will help you learn its capabilities and find out more about its possible use cases. This device was designed to help relieve stress, relax muscles and improve blood circulation thanks to the steam it generates. It can fit in residential steambath installations and is designed to be as easy to install as possible. Be aware that improper installation may result in injury or damage to the device.
Advertisement
Advertisement
Steambath Generators
Models:
SM-12 and SM-15
Plumbing Installation Instructions
C
®
US
LISTED 995C
WARNING: Elderly persons, pregnant women, or those suffering from heart disease, high blood pressure, diabetes, or who are otherwise not in good health, do not use this device unless directed to do so by a physician. Also, do not use steambath while under the influence of alcohol.
!
IMPORTANT: the warranty of this product is voided if it is used in a commercial application or for anything other than a residential steambath installation.
The Steamist “SM” Generator comes factory assembled, carefully wired and tested.
The Plumbing Installation must conform to local and national codes. All electrical power should be turned OFF when working with Steam Generator.
1. Pre-Installation a) b) c)
Be sure that the proper size Steam Generator has been selected by using the sizing page in the “Full
Line Brochure,” “Pricing Guide,” “The Generator
Sizing Guide,” Architectural Guidelines,” or in the
Residential Systems/Steambath Product Information section of the Steamist web site - www.steamist.com.
CAUTION: An improperly sized Steam Generator may NOT produce the amount of steam necessary to reach selected temperature.
IMPORTANT: Refer to page 4 for model required for cubic foot rating.
The Steam Generator should be located as close as possible to the Steam Room/Shower or tub enclosure.
Steam pipe should NOT exceed twenty-five feet in length. If the steam pipe exceeds ten feet, use an appropriate pipe insulation rated for a minimum of
212°F. Possible locations include Vanity, Closets, Attic
(insulated), or Basement near bath area. The serial number plate should be visible and the Steam Generator should be accessible for service. Refer to
Installation Suggestion on the page 4. Do NOT install
Generator outdoors, in a moist humid area, or in an area where parts may freeze or corrode. Also, do NOT install near flammable materials such as paints, thinners, gasoline, etc.
The steam line and safety valve reach a temperature of 212°F during operation and should be appropriately protected to prevent personal injury by accidental contact.
2. Plumbing Rough-In
Plumbing rough-in is required for the water supply and steam line, this should be completed before the walls are closed. For operation, the “SM” Steam Generator requires a ⅜” O.D. copper tubing to the fitting on the generator for water inlet and ¾” copper or brass pipe for steam outlet.
06/06 - 1 -
NOTE: Safety Valve should be connected to a minimum
¾” indirect waste or as required by local plumbing codes.
In the unlikely event this valve should open, the discharge must be directed to prevent damage to the home.
a) b)
Water Inlet - A water line should be roughed-in from existing ½” hot or cold water pipe. Using a ½” x ⅜” tee, cut and solder tee into the existing water line. (See
Figure 3 on page 3). Solder a piece of ⅜” copper tubing into tee. Rough-in for water supply is now complete.
Steam Outlet - Rough-in the steam line using a minimum of a ¾” copper or brass pipe, do NOT use black iron or galvanized pipe, it will rust and discolor the wall of the steam bath. The steamhead location should be 18” above the shower floor or 6” above the rim of the bathtub, as far from the seating area as possible.
CAUTION: No shut-off valve can be installed in the steam line. Do NOT create traps or valleys in this line which would trap condensation and block the flow of steam. The steam pipe should be pitched toward the Steam Generator allowing condensation to run back toward the Steam
Generator (preferred), or toward the steamhead.
Knock-out for
Control Cable
Electrical
Panel Cover
Figure 1
Steam Generator
Install Upright and Level
Knock-outs for
Electrical Supply Line
¾“ Steam
Outlet
¾“Safety
Relief Valve
Water Inlet
⅜“ Compression
Fitting
Optional Auto
Drain Installed
Pub. No. 324-F
3. Steam Generator Installation
The Steam Generator should be mounted in a location convenient for hook-up and service by the Plumber and
Electrician.
CAUTION: The steam generator is designed to be used
ONLY in an upright and level position, to do otherwise would damage the unit and void the warranty.
a) b) c) d)
The steam generator can be mounted to a wall or set on the floor. However, the unit must be secured. To secure the unit to a vertical wall, loosen the two screws holding the electrical access cover, remove cover (see
Figure 1). Located inside the cabinet near the top left and right corners are mounting holes. Place top cover back and secure.
Connect the 3/8” water supply, described in Section 2 to the Steam Generator by first soldering a 3/8” valve into the previously installed water line. The valve must be kept in an open position during normal operation.
In areas where high water pressure may be a problem a water hammer arrestor or a pressure regulator should be installed. Complete water supply by connecting 3/8” copper tubing from the valve to the water inlet compression fitting. Refer to Plumbing
Diagram below.
IMPORTANT: Do NOT use a “saddle valve” or piercing type valve for water connection.
Connect the steam line from rough-in location described in Section 2 to the ¾” nipple on the steam generator using a union.
In the shower, place the center of the escutcheon onto the steam pipe and screw the steamhead into place.
Care must be taken not to scratch the steamhead or escutcheon with wrench. Be sure the steam slot in the steamhead is facing down. After the plumbing connections are complete the electrician may finish wiring the unit.
Steam Generator Electric Water
Solenoid Valve
1.
2.
3.
4.
5.
Installation Instruction for Steamhead & Escutcheon
(Supplied with control package)
Be sure the steam pipe is installed with the proper length pipe protruding through the wall.
Apply silicone sealant around the pipe to seal the pipe to the wall.
Slip the Escutcheon over the steamhead loosely.
Screw on the steamhead making sure the steam opening is facing down.
Hold the Escutcheon against the wall and tighten the retaining screw facing down.
Steam Pipe
Apply silicone around the steam pipe to form a water tight seal
Escutcheon
Steamhead
Tighten the screw to the
steamhead with the screw to face down
WARNING: When installing a steam pipe into a steam room made out of Acrylic, Cultured Marble, Corian, Swanstone,
Resin, Plastic or an equivalent type of material, consult the manufacturer of the material for their recommendation on location of the steam pipe. Verify that the type of material used for the construction of the steam room is rated for a steam room environment. When installing a steam pipe, in the mentioned material type rooms, it is very critical in making sure that when the steam pipe protrudes into the steam room that it is centered in its 1¼” hole and does not touch the edge of the wall material around the steam pipe.
Water Level Probe
Union
(Required)
Free Flowing
Steam Line
Shut-off
Valve
IMPORTANT: An optional steam diffuser
(Not Included) is strongly recommended for small steam rooms. This option helps to better diffuse the steam and makes the steambath more comfortable. This option may not be necessary in larger steam rooms where the bather is sitting a few feet away from the steamhead.
Hot or Cold
Incoming Water
Supply
IMPORTANT: Install steam head 18” above the shower floor or 6” above the rim of the
Bathtub.
Figure 2: Plumbing Diagram
Optional Auto Drain Valve
Connect to Indirect Waste or as Required by Local Codes.
06/06
Pressure Safety Valve
Connect to Indirect Waste or as Required by Local Codes.
- 2 Pub. No. 324-F
WARNING: When installing the
Steamist Unit in conjunction with an acrylic modular tub/shower unit, please consult the “manufacturer of the module” for location of the steamhead.
The Plumbing Instructions must be given to the homeowner for future use.
Slope ceiling 2” per foot
Outside Installation
TC-110 or
DSP Timer Only
30
TIMER
TIMER START
STOP
TC-135, DSC-425, and
DSP Temperature Control
MUST be installed inside the Steam Room.
115
TEMP
TEMP START
STOP
⅜” Shut-off Valve
Keep in open position during normal operation.
½“ x ½” x ⅜” Tee.
Using existing Hot or
Cold water supply.
Steamhead Installation
Steamhead should be mounted
18” above the finished floor or
6” above the rim of the tub as far from the bather as possible .
06/06
Union
Required
Safety Valve
Connect ¾” pipe to an indirect waste or as required by Local Codes.
Drain Line
Remains capped unless
Optional Auto Drain is installed.
A ⅜” air gap is recommended below the door and the door should incorporate a splashguard. The top and sides of the shower opening must be sealed.
Steam Outlet Pipe - Use a minimum of a ¾” Copper or Brass pipe.
CAUTION: Do NOT install a Shut-off valve on the Steam outlet pipe. Do NOT create traps or valleys in this line which would prevent the flow of steam. The steam outlet pipe should be pitched toward the Steam Generator (preferred), allowing condensation to run back into the Steam Generator or toward the steam head. If the steam pipe exceeds ten feet, use an appropriate pipe insulation rated for a minimum of 212°F.
Figure 3: Typical installation
- 3 Pub. No. 324-F
Access Requirements
Use 35” with
Optional Auto Drain
25”
Select a location for mounting the Steam Generator that is accessible for installation and service. The access requirement indicates the minimum space for convenient access to Steam
Generator.
CAUTION: All models must be installed INDOORS, in a DRY,
NON-FREEZING location away from flammable materials such as: Gasoline, Paints, Thinners, Etc...
IMPORTANT: Steam Generator must be installed upright and level.
Model
No.
SM-12
SM-15
SPECIFICATION CHART
* Max. Cu. Ft.
For Area Up To KW Volt Phase Amps
450 12
240
208
240
208
3
3
1
1
50
58
29
33
550 15
240
208
240
208
3
3
1
1
63
72
36
42
Wire Size 90ºC
Copper AWG
6
4
8
8
8
6
4
4
Line
Fuse
70
80
40
45
80
90
45
60
* Refer to the Steamist Sizing Guide for actual Cu. Ft. capacity.
Installation Suggestions
Alternate Attic Location
(Insulate to Prevent Freezing)
30
TIMER
TIMER START
STOP
122
TEMP
TEMP START
STOP
06/06
Steam
Generator in Vanity
Alternate
Closet
Location
Alternate Basement Location
(Insulated and Dry)
East Coast Office: 275 Veterans Blvd., Rutherford, NJ 07070 ● Tel: (800) 577-6478 ● Fax: (201) 933-0746
West Coast Office: 315 W. Pondera St., Suite F, Lancaster, CA 93534 ● Tel: (800) 355-6478 ● Fax: (661)940-1617
- 4 Pub. No. 324-F

Download
Advertisement