warning

Add to my manuals
52 Pages

advertisement

warning | Manualzz

310A

SINGLE--STAGE DELUXE

INDUCED--COMBUSTION

4--WAY MULTIPOISE GAS FURNACE

Installation, Start--up, Operating, and

Service and Maintenance

Instructions Series 130/D

SAFETY CONSIDERATIONS . . . . . . . . . . . . . . . . . . . . . . . .

2

INTRODUCTION

Safety

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

CODES AND STANDARDS . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4

3

4

General Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Combustion and Ventilation Air . . . . . . . . . . . . . . . . . . . . .

5

5

Duct Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Acoustical Lining and Fibrous Glass Duct . . . . . . . . . . . . .

5

5

Gas Piping and Gas Pipe Pressure Testing . . . . . . . . . . . . .

5

Electrical Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Venting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

LOCATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5

5

6

AIR FOR COMBUSTION AND VENTILATION

INSTALLATION

. . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8

11

Bottom Return Air Inlet . . . . . . . . . . . . . . . . . . . . . . . . . .

Side Return Air Inlet . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Leveling Legs (If Desired) . . . . . . . . . . . . . . . . . . . . . . . .

11

11

11

Bottom Return Air Inlet . . . . . . . . . . . . . . . . . . . . . . . . . .

Suspended Furnace Support . . . . . . . . . . . . . . . . . . . . . . .

Platform Furnace Support . . . . . . . . . . . . . . . . . . . . . . . . .

12

12

13

Roll--Out Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Bottom Return Air Inlet . . . . . . . . . . . . . . . . . . . . . . . . . .

13

13

Side Return Air Inlet . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Ductwork Acoustical Treatment . . . . . . . . . . . . . . . . . . . .

13

14

14

Supply Air Connections

Return Air Connections

. . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . .

START--UP, ADJUSTMENT, AND SAFETY CHECK . . . . .

14

20

31

General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Start--Up Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

31

31

Adjustments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Check Safety Controls . . . . . . . . . . . . . . . . . . . . . . . . . . .

34

37

Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

38

SERVICE AND MAINTENANCE PROCEDURES

Introduction

. . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

46

46

Care and Maintenance

Sequence of Operation

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

46

50

Wiring Diagrams

Troubleshooting

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

51

51

ama

ISO 9001:2000

REGISTERED

CERTIFIED

NOTE: Read the entire instruction manual before starting the installation.

Portions of the text and tables are reprinted from NFPA 54/ANSI

Z223.1--2006E, with permission of Nation Fire Protection

Association, Quincy, MA 02269 and American Gas Association,

Washington DC 20001. This reprinted material is not the complete and official position of the NFPA or ANSI on the referenced subject, which is represented only by the standard in its entirely.

SAFETY CONSIDERATIONS

!

WARNING

FIRE, EXPLOSION, ELECTRICAL SHOCK, AND

CARBON MONOXIDE POISONING HAZARD

Failure to follow this warning could result in personal injury, death, or property damage.

Improper installation, adjustment, alteration, service, maintenance, or use can cause carbon monoxide poisoning, explosion, fire, electrical shock, or other conditions which may cause personal injury or property damage. Consult a qualified service agency, local gas supplier, or your distributor or branch for information or assistance. The qualified service agency must use only factory--authorized and listed kits or accessories when modifying this product.

!

CAUTION

FURNACE RELIABILITY HAZARD

Failure to follow this caution may result in unit component damage.

Application of this furnace should be indoors with special attention given to vent sizing and material, gas input rate, air temperature rise, unit leveling, and unit sizing.

!

CAUTION

CUT HAZARD

Failure to follow this caution may result in personal injury.

Sheet metal parts may have sharp edges or burrs. Use care and wear appropriate protective clothing, safety glasses and gloves when handling parts, and servicing furnaces.

Improper installation, adjustment, alteration, service, maintenance, or use can cause explosion, fire, electrical shock, or other conditions which may cause death, personal injury, or property damage. Consult a qualified installer, service agency, or your distributor or branch for information or assistance. The qualified installer or agency must use factory--authorized kits or accessories when modifying this product. Refer to the individual instructions packaged with the kits or accessories when installing.

Follow all safety codes. Wear safety glasses, protective clothing, and work gloves. Have a fire extinguisher available. Read these instructions thoroughly and follow all warnings or cautions include in literature and attached to the unit. Consult local building codes, the current editions of the National Fuel Gas

Code (NFGC) NFPA 54/ANSI Z223.1 and the National

Electrical Code (NEC) NFPA 70.

In Canada, refer to the current editions of the National Standards of Canada CAN/CSA--B149.1 and .2 Natural Gas and Propane

Installation Codes, and Canadian Electrical Code CSA C22.1

Recognize safety information. This is the safety--alert symbol .

When you see this symbol on the unit and in instructions or manuals, be alert to the potential for personal injury.

Understand the signal words DANGER, WARNING, and

CAUTION. These words are used with the safety--alert symbol.

DANGER identifies the most serious hazards which will result in severe personal injury or death. WARNING signifies hazards which could result in personal injury or death. CAUTION is used to identify unsafe practices which may result in minor personal injury or product and property damage. NOTE is used to highlight suggestions which will result in enhanced installation, reliability, or operation.

1. Use only with type of gas approved for this furnace. Refer to the furnace rating plate.

2. Install this furnace only in a location and position as specified in the “Location” section of these instructions.

3. Provide adequate combustion and ventilation air to the furnace space as specified in “Air for Combustion and

Ventilation” section.

4. Combustion products must be discharged outdoors. Connect this furnace to an approved vent system only, as specified in the “Venting” section of these instructions.

5. Never test for gas leaks with an open flame. Use a commercially available soap solution made specifically for the detection of leaks to check all connections, as specified in the “Gas Piping” section.

6. Always install furnace to operate within the furnace’s intended temperature--rise range with a duct system which has an external static pressure within the allowable range, as specified in the “Start--Up, Adjustments, and Safety

Check” section. See furnace rating plate.

7. When a furnace is installed so that supply ducts carry air circulated by the furnace to areas outside the space containing the furnace, the return air shall also be handled by duct(s) sealed to the furnace casing and terminating outside the space containing the furnace. See “Air Ducts” section.

8. A gas--fired furnace for installation in a residential garage must be installed as specified in the warning box in the

“Location” section.

9. The furnace may be used for construction heat provided that the furnace installation and operation complies with the first CAUTION in the LOCATION section of these instructions.

10. These Multipoise Gas--Fired Furnaces are CSA (formerly

A.G.A. and C.G.A.) design--certified for use with natural and propane gases (see furnace rating plate) and for installation in alcoves, attics, basements, closets, utility rooms, crawlspaces, and garages. The furnace is factory--shipped for use with natural gas. A CSA (A.G.A. and C.G.A.) listed accessory gas conversion kit is required to convert furnace for use with propane gas.

11. See Fig. 1 for required clearances to combustible construction.

12. Maintain a 1--in. (25 mm) clearance from combustible materials to supply air ductwork for a distance of 36 in. (914 mm) horizontally from the furnace. See NFPA 90B or local code for further requirements.

13. These furnaces SHALL NOT be installed directly on carpeting, tile, or any other combustible material other than wood flooring. In downflow installations, factory accessory floor base MUST be used when installed on combustible materials and wood flooring. Special base is not required when this furnace is installed on manufacturer’s

Coil Assembly Part No. CNPV, CNRV, CAR or CAP or when Coil Box Part No. KCAKC is used. See Fig. 1 for clearance to combustible construction information.

2

(664mm)

26-1/8"

(FLUE COLLAR)

(733mm)

28-7/8"

(641mm)

25-1/4"

22-9/16"

(573mm)

JUNCTION BOX

LOCATION

(22mm)

7/8" DI A

ACCESSORY

5-15/16"

1/2" DIA THERMOSTAT

WIRE ENTRY

3-15/16"

LEFT HAND GAS

ENTRY

33-5/16"

(846mm)

A

F

D

13/16"

(21mm)

4-13/16"

(122mm)

2-7/16"

(62mm)

1-5/16"

(33mm)

1-1/8"

(29mm)

8-9/16"

(217mm)

AIRFLOW

19"

(483mm)

OUTLE T

13/16"

(21mm)

1/2" DIA. K.O.THERMOSTAT

WIRE ENTRY

(13mm)

1-3/4" DIA.RIGHT HAND

GAS ENTRY

(44mm)

11/16" 7-3/4"

(17mm) (197mm)

9-5/8"

(244mm)

11-1/2"

(292mm)

7/8" DIA. K.O. WIRE ENTRY

(22mm)

24-7/8"

(632mm)

ALTERNAT E

JUNCTION BOX

LOCATIONS (TYP)

VENT OUTLE T

5 PLACES (TYP)

7/8" DIA. ACCESSORY

14-7/8"

(378mm)

7/8" DIA. ACCESSORY

(22mm)

5-1/2"

(140mm)

11/16"

(17mm)

(549mm)

21-5/8"

BOTTOM INLE T

24"

CASING

(610mm)

1-11/16"

(43mm)

5-1/2"

(140mm)

E

11/16"

(17mm)

3-3/4"

(95mm)

1-1/2"

(38mm)

(560mm)

22-1/16"

SIDE INLE T

1-1/4"

(32mm)

1"

(25mm)

A04037

NOTES:

1. Two additional 7/8---in. (22 mm) diameter holes are located in the top plate.

2. Minimum return---air openings at furnace, based on metal duct. If flex duct is used, see flex duct manufacturer’s recommendations for equivalent diameters.

a. For 800 CFM---16---in. (406 mm) round or 14 1/2 x 12---in. (368 x 305 mm) rectangle.

b. For 1200 CFM---20---in. (508 mm) round or 14 1/2 x 19 1/2---in. (368 x 495 mm) rectangle.

c. For 1600 CFM---22---in. (559 mm) round or 14 1/2 x 22 1/16---in. (368 x 560mm) rectangle.

d. For airflow requirements above 1800 CFM, see Air Delivery table in Product Data literature for specific use of single side inlets. The use of both side inlets, a combination of 1 side and the bottom, or the bottom only will ensure adequate return air openings for airflow requirements above 1800 CFM.

Fig. 1

--- Dimensional Drawing

INTRODUCTION

Series 130/D 4--way multipoise Category I fan--assisted furnace is

CSA design--certified. A Category I fan--assisted furnace is an appliance equipped with an integral mechanical means to either draw or force products of combustion through the combustion chamber and/or heat exchanger. The furnace is factory--shipped for use with natural gas. This furnace is not approved for installation in mobile homes, recreational vehicles, or outdoors.

This furnace is designed for minimum continuous return--air temperature of 60_F (16_C) db or intermittent operation down to

55_F (13_C) db such as when used with a night setback thermostat. Return--air temperature must not exceed 85_F (29_C) db. Failure to follow these return--air temperature limits may affect reliability of heat exchangers, motors, and controls. (See

Fig. 3.)

Table 1—Dimensions -- In. (mm)

FURNACE SIZE A

CABINET WIDTH

IN (mm)

D

SUPPLY---AIR

WIDTH

IN (mm)

E

RETURN---AIR

WIDTH

IN (mm)

045---08/024045

045---12/036045

070---08/024070

070---12/036070

070---16/048070

090---14/042090

090---16/048090

090---20/060090

110---12/036110

110---16/048110

14---3/16 (360)

14---3/16 (360)

14---3/16 (360)

14---3/16 (360)

17---1/2 (445)

17---1/2 (445)

21 (533)

21 (533)

17---1/2 (445)

21 (533)

12---9/16 (319)

12---9/16 (319)

12---9/16 (319)

12---9/16 (319)

15---7/8 (403)

15---7/8 (403)

19---3/8 (492)

19---3/8 (492)

15---7/8 (403)

19---3/8 (492)

12---11/16 (322)

12---11/16 (322)

12---11/16 (322)

12---11/16 (322)

16 (406)

16 (406)

19---1/2 (495)

19---1/2 (495)

16 (406)

19---1/2 (495)

110---22/066110

135---16/048135

135---22/066135

155---20/060155

21 (533)

21 (533)

24---1/2 (622)

24---1/2 (622)

19---3/8 (492)

19---3/8 (492)

22---7/8 (581)

22---7/8 (581)

19---1/2 (495)

19---1/2 (495)

23 (584)

23 (584)

* 5---in. or 6---in. (127 or 152 mm) vent connector may be required in some cases.

F

C.L. TOP AND

BOTTOM FLUE

COLLAR

IN (mm)

9---5/16 (237)

9---5/16 (237)

9---5/16 (237)

9---5/16 (237)

11---9/16 (294)

11---9/16 (294)

13---5/16 (338)

13---5/16 (338)

11---9/16 (294)

13---5/16 (338)

13---5/16 (338)

13---5/16 (338)

15---1/16 (383)

15---1/16 (383)

FLUE

COLLAR*

IN (mm)

4 (102)

4 (102)

4 (102)

4 (102)

4 (102)

4 (102)

4 (102)

4 (102)

4 (102)

4 (102)

4 (102)

4 (102)

4 (102)

4 (102)

SHIP WT

LB (KG)

104 (47)

107 (48)

111 (50)

115 (52)

126 (57)

127 (58)

140 (64)

146 (66)

135 (61)

146 (66)

152 (69)

149 (68)

163 (74)

170 (77)

3

Fig. 3

--- Return Air Temperature

80 / 27 C

60 / 16 C

A06745

For accessory installation details, refer to the applicable instruction literature.

A08471

Fig. 2

--- Clearances to Combustibles

4

NOTE: Remove all shipping brackets and materials before operating the furnace.

CODES AND STANDARDS

Follow all national and local codes and standards in addition

to these instructions. The installation must comply with regulations of the serving gas supplier, local building, heating, plumbing, and other codes. In absence of local codes, the installation must comply with the national codes listed below and all authorities having jurisdiction. In the United States and

Canada, follow all codes and standards for the following:

Step 1

—Safety

S US: National Fuel Gas Code (NFGC) NFPA

54--2006/ANSI Z223.1--2006 and the Installation

Standards, Warm Air Heating and Air Conditioning

Systems ANSI/NFPA 90B

S CANADA: CSA B149.1--05 National Standard of

Canada Natural Gas and Propane Installation Codes

(CAN/CSA--B149.1--05)

Step 2

—General Installation

S US: Current edition of the NFGC and the NFPA 90B.

For copies, contact the National Fire Protection Association Inc., Batterymarch Park, Quincy, MA 02269;

(www.NFPA.org) or for only the NFGC, contact the

American Gas Association, 400 N. Capitol Street,

N.W., Washington, DC 20001 (www.AGA.org).

S

CANADA: CAN/CSA--B149.1--05. For a copy, contact Standard Sales, CSA International, 178 Rexdale

Boulevard, Etobicoke (Toronto), Ontario, M9W 1R3

Canada

Step 3

—Combustion and Ventilation Air

S US: Section 9.3 of the NFGC, NFPA 54 / ANSI

Z223.1--2006 Air for Combustion and Ventilation

S CANADA: Part 8 of CAN/CSA--B149.1--05, Venting

Systems and Air Supply for Appliances

Step 4

—Duct Systems

S US and CANADA: Air Conditioning Contractors Association (ACCA) Manual D, Sheet Metal and Air

Conditioning Contractors National Association

(SMACNA), or American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE)

2001 Fundamentals Handbook Chapter 34 or 2000

HVAC Systems and Equipment Handbook Chapters 9 and 16.

Step 5

—Acoustical Lining and Fibrous Glass

Duct

S US and CANADA: current edition of SMACNA and

NFPA 90B as tested by UL Standard 181 for Class I

Rigid Air Ducts

Step 6

—Gas Piping and Gas Pipe Pressure

Testing

S US: NFGC; NFPA 54 / ANSI Z223.1--2006 chapters 5,

6, 7 and 8 and National Plumbing Codes

S CANADA: CAN/CSA--B149.1--05 Parts 4, 5, and 6 and Appendices A, B, E, and H.

Step 7

—Electrical Connections

S US: National Electrical Code (NEC) ANSI/NFPA

70--2008

S

CANADA: Canadian Electrical Code CSA C22.1

Step 8

—Venting

S US: NFGC NFPA 54 / ANSI Z223.1--2006; chapters

12 and 13

S CANADA: CAN/CSA--B149.1--05 Part 8 and Appendix C

ELECTROSTATIC DISCHARGE (ESD)

PRECAUTIONS PROCEDURE

!

CAUTION

FURNACE RELIABILITY HAZARD

Failure to follow this caution may result in furnace component damage.

Electrostatic discharge can affect electronic components.

Follow the Electrostatic Discharge Precautions Procedure listed below during furnace installation and servicing to protect the furnace electronic control. Precautions will prevent electrostatic discharges from personnel and hand tools which are held during the procedure. These precautions will help to avoid exposing the control to electrostatic discharge by putting the furnace, the control, and the person at the same electrostatic potential.

1. Disconnect all power to the furnace. Multiple disconnects may be required. DO NOT TOUCH THE CONTROL OR

ANY WIRE CONNECTED TO THE CONTROL PRIOR

TO DISCHARGING YOUR

ELECTROSTATIC CHARGE TO GROUND.

BODY’S

2. Firmly touch the clean, unpainted, metal surface of the furnace chassis which is close to the control. Tools held in a person’s hand during grounding will be satisfactorily discharged.

3. After touching the chassis, you may proceed to service the control or connecting wires as long as you do nothing to recharge your body with static electricity (for example;

DO NOT move or shuffle your feet, do not touch ungrounded objects, etc.).

4. If you touch ungrounded objects (and recharge your body with static electricity), firmly touch a clean, unpainted metal surface of the furnace again before touching control or wires.

5

THE BLOWER IS

LOCATED BELOW THE

BURNER SECTION, AND

CONDITIONED AIR IS

DISCHARGED UPWARD.

THE BLOWER IS LOCATED

TO THE RIGHT OF THE

BURNER SECTION, AND

AIR CONDITIONED AIR IS

DISCHARGED TO THE LEFT.

THE BLOWER IS

LOCATED ABOVE THE

BURNER SECTION, AND

CONDITIONED AIR IS

DISCHARGED DOWNWARD

THE BLOWER IS

LOCATED TO THE LEFT

OF THE BURNER SECTION,

AND CONDITIONED AIR IS

DISCHARGED TO THE RIGHT.

A02097

Fig. 4

--- Multipoise Orientations

5. Use this procedure for installed and uninstalled (ungrounded) furnaces.

6. Before removing a new control from its container, discharge your body’s electrostatic charge to ground to protect the control from damage. If the control is to be installed in a furnace, follow items 1 through 4 before bringing the control or yourself in contact with the furnace. Put all used and new controls into containers before touching ungrounded objects.

7. An ESD service kit (available from commercial sources) may also be used to prevent ESD damage.

LOCATION

!

WARNING

CARBON MONOXIDE POISONING AND UNIT

DAMAGE HAZARD

Failure to follow this warning could result in personal injury or death, and unit component damage.

Corrosive or contaminated air may cause failure of parts containing flue gas, which could leak into the living space.

Air for combustion must not be contaminated by halogen compounds, which include fluoride, chloride, bromide, and iodide. These elements can corrode heat exchangers and shorten furnace life. Air contaminants are found in aerosol sprays, detergents, bleaches, cleaning solvents, salts, air fresheners, and other household products. Do not install furnace in a corrosive or contaminated atmosphere. Make sure all combustion and circulating air requirements are met, in addition to all local codes and ordinances.

GENERAL

This multipoise furnace is shipped in packaged configuration.

Some assembly and modifications are required when used in any of the four applications shown in Fig. 4.

This furnace must:

S be installed so the electrical components are protected from water.

6

S not be installed directly on any combustible material other than wood flooring (refer to SAFETY

CONSIDERATIONS).

S be located as close to the chimney or vent and attached to an air distribution system. Refer to Air Ducts section.

S be provided ample space for servicing and cleaning.

Always comply with minimum fire protection clearances shown on the furnace clearance to combustible label.

S The following types of furnace installations may require OUTDOOR AIR for combustion due to chemical exposures:

S Commercial buildings

S Buildings with indoor pools

S Laundry rooms

S Hobby or craft rooms, and

S Chemical storage areas

If air is exposed to the following substances, it should not be used for combustion air, and outdoor air may be required for combustion:

S Permanent wave solutions

S Chlorinated waxes and cleaners

S Chlorine based swimming pool chemicals

S Water softening chemicals

S De--icing salts or chemicals

S Carbon tetrachloride

S Halogen type refrigerants

S Cleaning solvents (such as perchloroethylene)

S Printing inks, paint removers, varnishes, etc.

S Hydrochloric acid

S Cements and glues

S Antistatic fabric softeners for clothes dryers

S Masonry acid washing materials

All fuel--burning equipment must be supplied with air for fuel combustion. Sufficient air must be provided to avoid negative pressure in the equipment room or space. A positive seal must be made between the furnace cabinet and the return--air duct to prevent pulling air from the burner area and from draft safeguard opening.

!

WARNING

FIRE AND EXPLOSION HAZARD

Failure to follow this warning could result in personal injury, death, and/or property damage.

When the furnace is installed in a residential garage, the burners and ignition sources must be located at least 18 inches above the floor. The furnace must be located or protected to avoid damage by vehicles. When the furnace is installed in a public garage, airplane hangar, or other building having a hazardous atmosphere, the furnace must be installed in accordance with the NFGC or

CAN/CSA--B149.1--05. (See Fig. 5.)

!

CAUTION

PERSONAL INJURY AND/OR PROPERTY

DAMAGE HAZARD

Failure to follow this caution may result in furnace component damage.

This gas furnace may be used for heating buildings under construction provided that:

--The furnace is permanently installed with all electrical wiring, piping, venting and ducting installed according to these installation instructions. A return air duct is provided, sealed to the furnace casing, and terminated outside the space containing the furnace. This prevents a negative pressure condition as created by the circulating air blower, causing a flame rollout and/or drawing combustion products into the structure.

--The furnace is controlled by a thermostat. It may not be hot wired to provide heat continuously to the structure without thermostatic control.

--Clean outside air is provided for combustion. This is to minimize the corrosive effects of adhesives, sealers and other construction materials. It also prevents the entrainment of drywall dust into combustion air, which can cause fouling and plugging of furnace components.

--The temperature of the return air to the furnace is maintained between 55_F (13_C) and 80_F (27_C), with no evening setback or shutdown. The use of the furnace while the structure is under construction is deemed to be intermittent operation per our installation instructions.

--The air temperature rise is within the rated rise range on the furnace rating plate, and the gas input rate has been set to the nameplate value.

--The filters used to clean the circulating air during the construction process must be either changed or thoroughly cleaned prior to occupancy.

--The furnace, ductwork and filters are cleaned as necessary to remove drywall dust and construction debris from all

HVAC system components after construction is completed.

--Verify proper furnace operating conditions including ignition, gas input rate, air temperature rise, and venting according to these installation instructions.

18-IN. (457.2 mm)

MINIMUM TO BURNERS

A93044

Fig. 5

--- Installation in a Garage

!

WARNING

FIRE HAZARD

Failure to follow this warning could result in personal injury, death and/or property damage.

Do not install the furnace on its back or hang furnace with control compartment facing downward. Safety control operation will be adversely affected. Never connect return--air ducts to the back of the furnace. (See Fig. 6.)

7

A02054

Fig. 6

--- Prohibit Installation on Back

LOCATION RELATIVE TO COOLING EQUIPMENT

The cooling coil must be installed parallel with, or on the downstream side of the unit to avoid condensation in the heat exchangers. When installed parallel with the furnace, dampers or other flow control must prevent chilled air from entering the furnace. If the dampers are manually operated, they must be equipped with means to prevent operation of either unit unless the damper is in the full--heat or full--cool position.

AIR FOR COMBUSTION AND

VENTILATION

Provisions for adequate combustion, ventilation, and dilution air must be provided in accordance with:

S U.S. installations: Section 9.3 of the NFPA 54 / ANSI

Z223.1--2006, Air for Combustion and Ventilation, and applicable provisions of the local building codes.

S Canadian installations: Part 8 of CAN/CSA--

B149.1--05, Venting Systems and Air Supply for Appliances, and all authorities having jurisdiction.

!

CAUTION

FURNACE CORROSION HAZARD

Failure to follow this caution may result in furnace damage.

Air for combustion must not be contaminated by halogen compounds, which include fluoride, chloride, bromide, and iodide. These elements can corrode heat exchangers and shorten furnace life. Air contaminants are found in aerosol sprays, detergents, bleaches, cleaning solvents, salts, air fresheners, and other household products.

!

WARNING

CARBON MONOXIDE POISONING HAZARD

Failure to follow this warning could result in personal injury or death.

The operation of exhaust fans, kitchen ventilation fans, clothes dryers, attic exhaust fans or fireplaces could create a

NEGATIVE PRESSURE CONDITION at the furnace.

Make--up air MUST be provided for the ventilation devices, in addition to that required by the furnace. Refer to Carbon

Monoxide Poisoning Hazard warning in venting section of these instructions to determine if an adequate amount of make--up air is available.

The requirements for combustion and ventilation air depend upon whether or not the furnace is located in a space having a volume of at least 50 cu/ft. per 1,000 Btuh input rating for all gas appliances installed in the space.

S Spaces having less than 50 cu/ft. per 1,000 Btuh require the OUTDOOR COMBUSTION AIR

METHOD.

S Spaces having at least 50 cu/ft. per 1,000 Btuh may use the INDOOR COMBUSTION AIR, STANDARD or

KNOWN AIR INFILTRATION METHOD.

Outdoor Combustion Air Method

1. Provide the space with sufficient air for proper combustion, ventilation, and dilution of flue gases using permanent horizontal or vertical duct(s) or opening(s) directly communicating with the outdoors or spaces that freely communicate with the outdoors.

2. Fig. 7 illustrates how to provide TWO OUTDOOR

OPENINGS, one inlet and one outlet combustion and ventilation air opening, to the outdoors.

a. One opening MUST commence within 12 in. (300 mm) of the ceiling and the second opening MUST commence within 12 in. (300 mm) of the floor.

b. Size openings and ducts per Fig. 7 and Table 2.

c. TWO HORIZONTAL DUCTS require 1 sq./in. of free area per 2,000 Btuh (1,100 mm

Table 2.

2

/kW) of combined input for all gas appliances in the space per Fig. 7 and d. TWO OPENINGS OR VERTICAL DUCTS require 1 sq./in. of free area per 4,000 Btuh (550 mm

2

/kW) for combined input of all gas appliances in the space per

Fig. 7 and Table 2.

3. ONE OUTDOOR OPENING requires: a. 1 square inch of free area per 3,000 Btuh (734 mm2/kW) for combined input of all gas appliances in the space per Table 2 and b. Not less than the sum of the areas of all vent connectors in the space.

The opening shall commence within 12 in. (300 mm) of the ceiling. Appliances in the space shall have clearances of at least 1 in. (25 mm) from the sides and back and 6 in. (150 mm) from the front. The opening shall directly communicate with the outdoors or shall communicate through a vertical or horizontal duct to the outdoors or spaces (crawl or attic) that freely communicate with the outdoors.

Indoor Combustion Air NFPA & AGA

Standard and Known--Air--Infiltration Rate Methods

Indoor air is permitted for combustion, ventilation, and dilution, if the Standard or Known--Air--Infiltration Method is used.

!

WARNING

CARBON MONOXIDE POISONING HAZARD

Failure to follow this warning could result in death and/or personal injury.

Many homes require air to be supplied from outdoors for furnace combustion, ventilation, and dilution of flue gases.

The furnace combustion air supply must be provided in accordance with this instruction manual.

8

Table 2—Minimum Free Area Required for Each Combustion Air Opening of Duct to Outdoors

FURNACE

INPUT

(BTUH)

44,000

66,000

88,000

110,000

132,000

154,000

TWO HORIZONTAL DUCTS

(1 SQ. IN./2,000 BTUH) (1,100 SQ. MM/KW)

Free Area of Opening and Duct

Sq. In. (Sq. mm)

22 (14194)

33 (21290)

Round Duct

Dia.

In. (mm)

6 (152)

7 (178)

44 (28387)

55 (35484)

66 (42580)

77 (49677)

8 (203)

9 (229)

10 (254)

10 (254)

SINGLE DUCT OR OPENING

(1 SQ. IN./3,000 BTUH) (734 SQ. MM/KW)

Free Area of Opening and Duct

Sq. In. (Sq. mm)

14.7 (9484)

22 (14193)

Round Duct

Dia.

In. (mm)

5 (127)

6 (152)

29.3 (18903)

36.7 (23677)

44 (28387)

51.3 (33096)

7 (178)

7 (178)

8 (203)

9 (229)

TWO OPENINGS OR VERTICAL DUCTS

(1 SQ. IN./4,000 BTUH) (550 SQ. MM/KW)

Free Area of Opening and Duct

Sq. In. (Sq. mm)

11 (7096)

16.5 (10645)

Round Duct

Dia.

In. (mm)

4 (102)

5 (127)

22 (14193)

27.5 (17742)

33 (21290)

38.5 (24839)

6 (152)

6 (152)

7 (178)

8 (203)

FURNACE

110,000

66,000

88,000

+

+

+

WATER HEATER

30,000

40,000

30,000

=

=

=

EXAMPLES: Determining Free Area

TOTAL INPUT

(140,000 divided by 4,000)

(106,000 divided by 3,000)

(118,000 divided by 2,000)

=

=

=

35.0 Sq. In. for each two Vertical Ducts or Openings

35.3 Sq. In. for a Single Duct or Opening

59.0 Sq. In. for each of two Horizontal Ducts

Table 3—Minimum Space Volumes for 100% Combustion, Ventilation, and Dilution from Indoors

ACH

OTHER THAN FAN-ASSISTED TOTAL

(1,000’S BTUH GAS INPUT RATE)

30 40 50

0.60

0.50

0.40

0.30

0.20

0.10

0.00

1,050

(29.7)

1,260

(35.6)

1,575

(44.5)

2,100

(59.4)

3,150

(89.1)

6,300

(178.3)

NP

1,400

(39.6)

1,680

(47.5)

2,100

(59.4)

2,800

(79.2)

4,200

(118.9)

8,400

(237.8)

NP

1,750

(49.5)

2,100

(59.4)

2,625

(74.3)

3,500

(99.1)

5,250 (148.6)

10,500

(297.3)

NP

NP = Not Permitted

FAN-ASSISTED TOTAL

(1,000’S BTUH GAS INPUT RATE)

88 110 44

1,100

(31.1)

66

Space Volume Ft

3

1,650

(46.7)

(M

3

)

1,320

(37.3)

1,650

(46.7)

1,980

(56.0)

2,475

(70.0)

2,200

(62.2)

2,640

(74.7)

3,300

(93.4)

2,750

(77.8)

3,300

(93.4)

4,125

(116.8)

132

3,300

(93.4)

3,960

(112.1)

4,950

(140.1)

2,200

(62.2)

3,300

(93.4)

6,600

(186.8)

NP

3,300

(93.4)

4,950

(140.1)

9,900

(280.3)

NP

4,400

(124.5)

6,600

(186.8)

13,200

(373.7)

NP

5,500

(155.7)

8,250

(233.6)

16,500

(467.2)

NP

6,600

(186.8)

9,900

(280.3)

19,800

(560.6)

NP

154

3,850

(109.0)

4,620

(130.8)

5,775

(163.5)

7,700

(218.0)

11,550

(327.0)

23,100

(654.1)

NP

9

1 SQ IN.

PER 4000

BTUH*

CIRCULATING AIR

DUCTS

VENT THROUGH ROOF

DUCTS

TO

O UTDOORS

(305mm)

1 SQ IN.

PER 2000

BTUH*

B

D

VENT

THR OUGH

R OOF

MAX

(305mm)

F

1 SQ IN .

PER

4000

BTUH*

DUCT S

TO

OUTDOORS

1 SQ IN.

PER 2000

BTUH*

(305mm)

A

E

G

1 SQ IN .

PER

4000

BTUH*

MAX

(305mm)

C

(305mm)

CIRCULA TING AIR DUCT S

DUCT

TO

OUTDOORS

1 SQ IN.

PER 4000

BTUH*

*Minimum dimensions of 3--- in. (76 mm).

NOTE: Use any of the following combinations of openings:

A & B C & D D & E F & G

A03174

Fig. 7

--- Air for Combustion, Ventilation, and Dilution for

Outdoors

The Standard Method:

1. The space has no less volume than 50 cu/ft. per 1,000

Btuh of the maximum input ratings for all gas appliances installed in the space and

2. The air infiltration rate is not known to be less than 0.40

air changes per hour (ACH).

The Known Air Infiltration Rate Method shall be used, if the infiltration rate is known to be:

1. Less than 0.40 ACH and

2. Equal to or greater than 0.10 ACH

Infiltration rates greater than 0.60 ACH shall not be used. The minimum required volume of the space varies with the number of

ACH and shall be determined per Table 3 or Equations 1 and 2.

Determine the minimum required volume for each appliance in the space and add the volumes together to get the total minimum required volume for the space.

Table 3--Minimum Space Volumes were determined by using the following equations from the National Fuel Gas Code ANSI

Z223.1--2006/NFPA 54--2006, 9.3.2.2:

1. For other than fan--assisted appliances, such as a draft hood--equipped water heater:

Volume

Other

3

I

other

1000 Btu/hr

A04002

2. For fan--assisted appliances such as this furnace:

Volume

Fan

3

I

fan

1000 Btu/hr

A04003

If:

10

INTERIOR

HEATED

SPACE

12" MAX (305mm)

1 SQ IN.

PER 1000

BTUH* IN DOOR

WALL

UNCONFINED

SPACE

6" MIN (152mm)

(FRONT)

Ü

1 SQ IN.

PER 1000

BTUH* IN DOOR

WALL

12" MA X (305mm)

CIRCULATING AIR DUCTS

* Minimum opening size is 100 sq in. (64516 sq. mm)with minimum dimensions of 3 in. (76 mm)

† Minimum of 3 in. (76 mm) when type-B1 vent is used.

A03175

Fig. 8

--- Air for Combustion, Ventilation, and Dilution from

Indoors

I other = combined input of all other than fan--assisted

appliances in Btuh/hr

I fan = combined input of all fan--assisted appliances in Btuh/hr

ACH = air changes per hour (ACH shall not exceed 0.60.) The following requirements apply to the Standard Method and to the

Known Air Infiltration Rate Method.

1. Adjoining rooms can be considered part of a space if: a. There are no closeable doors between rooms.

b. Combining spaces on same floor level. Each opening shall have free area of at least 1 in.

2

/1,000 Btuh (2,000 mm

2

/kW) of the total input rating of all gas appliances in the space, but not less than 100 in.

2

(0.06 m2). One opening shall commence within 12 in. (300 mm) of the ceiling and the second opening shall commence within 12 in. (300 mm) of the floor. The minimum dimension of air openings shall be at least 3 in. (80 mm). (See Fig. 8.) c. Combining space on different floor levels. The volumes of spaces on different floor levels shall be considered as communicating spaces if connected by one or more permanent openings in doors or floors having free area of at least 2 in.

2

/1,000 Btuh (4,400 mm

2

/kW) of total input rating of all gas appliances.

2. An attic or crawlspace may be considered a space that freely communicates with the outdoors provided there are adequate permanent ventilation openings directly to outdoors having free area of at least 1--in.

2

/4,000 Btuh of total input rating for all gas appliances in the space.

3. In spaces that use the Indoor Combustion Air Method, infiltration should be adequate to provide air for combustion, permanent ventilation and dilution of flue gases.

However, in buildings with unusually tight construction, additional air MUST be provided using the methods described in the Outdoor Combustion Air Method section.

Unusually tight construction is defined as Construction with: a. Walls and ceilings exposed to the outdoors have a continuous, sealed vapor barrier. Openings are gasketed or sealed and b. Doors and openable windows are weatherstripped and c. Other openings are caulked or sealed. These include joints around window and door frames, between sole plates and floors, between wall--ceiling joints, between wall panels, at penetrations for plumbing, electrical and gas lines, etc.

Combination of Indoor and Outdoor Air

1. Indoor openings shall comply with the Indoor Combus-

tion Air Method below and,

2. Outdoor openings shall be located as required in the Out-

door Combustion Air Method mentioned previously and,

3. Outdoor openings shall be sized as follows: a. Calculate the Ratio of all Indoor Space volume divided by required volume for Indoor Combustion Air

Method below.

b. Outdoor opening size reduction Factor is 1 minus the

Ratio in a. above.

c. Minimum size of Outdoor openings shall be the size required in Outdoor Combustion Air Method above multiplied by reduction Factor in b. above. The minimum dimension of air openings shall be not less than

3 in. (80 mm).

INSTALLATION

UPFLOW INSTALLATION

Bottom Return Air Inlet

These furnaces are shipped with bottom closure panel installed in bottom return--air opening. Remove and discard this panel when bottom return air is used. To remove bottom closure panel, perform the following:

1. Tilt or raise furnace and remove 2 screws holding bottom filler panel. (See Fig. 9.)

A02098

Fig. 9

--- Removing Bottom Closure Panel

2. Rotate bottom filler panel downward to release holding tabs.

3. Remove bottom closure panel.

4. Reinstall bottom filler panel and screws.

Side Return Air Inlet

These furnaces are shipped with bottom closure panel installed in bottom return--air opening. This panel MUST be in place when only side return air is used.

NOTE: Side return--air openings can be used in UPFLOW and most HORIZONTAL configurations. Do not use side return--air openings in DOWNFLOW configuration.

In upflow position with side return inlet(s), leveling legs may be used. (See Fig. 10.) Install field--supplied, 5/16 x 1--1/2 in. (8 x

11

38 mm) (max) corrosion--resistant machine bolts, washers and nuts.

NOTE: Bottom closure must be used when leveling legs are used. It may be necessary to remove and reinstall bottom closure panel to install leveling legs. To remove bottom closure panel, see

Item 1. in Bottom Return Air Inlet section.

5/

16

(8mm)

(8mm)

5/

16

1

3

/

(44mm)

1 3 /

(44mm)

(8mm)

5 /

(8mm)

5/

16

(44mm) 1 3/

4

(44mm)

1 3/

4

A89014

Fig. 10

--- Leveling Legs

Leveling Legs (If Desired)

To install leveling legs:

1. Position furnace on its back. Locate and drill a hole in each bottom corner of furnace. (See Fig. 10.)

2. For each leg, install nut on bolt and then install bolt and nut in hole. (Install flat washer if desired.)

3. Install another nut on other side of furnace base. (Install flat washer if desired.)

4. Adjust outside nut to provide desired height, and tighten inside nut to secure arrangement.

5. Reinstall bottom closure panel if removed.

DOWNFLOW INSTALLATION

NOTE: For downflow applications, this furnace is approved for use on combustible flooring when any one of the following 3 accessories are used:

S Special Base, KGASB

S Cased Coil Assembly Part No. CNPV, CNRV, CAR, or CAP

S Coil Box Part No. KCAKC

1. Determine application being installed from Table 4.

2. Construct hole in floor per Table 4 and Fig. 11.

3. Construct plenum to dimensions specified in Table 4 and

Fig. 11.

4. If downflow subbase, KGASB is used, install as shown in

Fig. 12. If Coil Assembly Part No. CNPV, CNRV, CAR, or CAP or Coil Box Part No. KCAKC is used, install as shown in Fig. 13.

B

A

PLENUM

OPENING

D

C

FLOOR

OPENING

FURNACE

APPROVED

COIL ASSEMBLY

OR

COIL BOX

COMBUSTIBLE

FLOORING

SHEET METAL

PLENUM

FLOOR

OPENING

Fig. 11

--- Floor and Plenum Opening Dimensions

A96283

NOTE: It is recommended that the perforated supply--air duct flanges be completely folded over or removed from furnace when installing the furnace on a factory--supplied cased coil or coil box.

To remove the supply--air duct flange, use wide duct pliers or hand seamers to bend flange back and forth until it breaks off. Be careful of sharp edges. (See Fig. 14.)

FURNACE

(OR COIL CASING

WHEN USED)

COMBUSTIBLE

FLOORING

DOWNFLOW

SUBBASE

SHEET METAL

PLENUM

FLOOR

OPENING

A96285

Fig. 12

--- Furnace, Plenum, and Subbase Installed on a

Combustible Floor

12

A08556

Fig. 13

--- Furnace, Plenum, and Coil Assembly or Coil Box

Installed on a Combustible Floor

Bottom Return Air Inlet

These furnaces are shipped with bottom closure panel installed in bottom return--air opening. Remove and discard this panel when bottom return air is used. To remove bottom closure panel, perform the following:

1. Tilt or raise furnace and remove 2 screws holding bottom filler panel. (See Fig. 9.)

2. Rotate bottom filler panel downward to release holding tabs.

3. Remove bottom closure panel.

4. Reinstall bottom filler panel and screws.

HORIZONTAL INSTALLATION

!

WARNING

FIRE, EXPLOSION, AND CARBON MONOXIDE

POISONING HAZARD

Failure to follow this warning could result in personal injury, death, or property damage.

Do not install the furnace on its back or hang furnace with control compartment facing downward. Safety control operation will be adversely affected. Never connect return--air ducts to the back of the furnace.

The furnace can be installed horizontally in an attic or crawl space on either the left--hand (LH) or right--hand (RH) side. The furnace can be hung from floor joists, rafters or trusses or installed on a non--combustible platform, blocks, bricks or pad.

Suspended Furnace Support

The furnace may be supported under each end with threaded rod, angle iron or metal plumber’s strap as shown. (See Fig. 15 and

16.) Secure angle iron to bottom of furnace as shown.

Heavy--gauge sheet metal straps (plumber’s straps) may be used to suspend the furnace from each bottom corner. To prevent screws from pulling out, use 2 #8 x 3/4--in. (19 mm) screws into the side and 2 #8 x 3/4--in. (19 mm) screws in the bottom of the furnace casing for each strap. (See Fig. 15 and 16.)

If the screws are attached to ONLY the furnace sides and not the bottom, the straps must be vertical against the furnace sides and not pull away from the furnace sides, so that the strap attachment screws are not in tension (are loaded in shear) for reliable support.

Platform Furnace Support

Construct working platform at location where all required furnace clearances are met. (See Fig. 2 and 17.) For furnaces with 1--in.

(25 mm) clearance requirement on side, set furnace on non-combustible blocks, bricks or angle iron. For crawl space installations, if the furnace is not suspended from the floor joists, the ground underneath furnace must be level and the furnace set on blocks or bricks.

Roll--Out Protection

Provide a minimum 17--3/4 in. x 22 in. (451 x 559 mm) piece of sheet metal for flame roll--out protection in front of burner area for furnaces closer than 12 inches (305 mm) above the combustible deck or suspended furnaces closer than 12 inches

(305 mm) to joists. The sheet metal MUST extend underneath the furnace casing by 1 in. (25 mm) with the door removed.

The bottom closure panel on furnaces of widths 17--1/2 in. (445 mm) and larger may be used for flame roll--out protection when bottom of furnace is used for return air connection. See Fig. 17 for proper orientation of roll--out shield.

Bottom Return Air Inlet

These furnaces are shipped with bottom closure panel installed in bottom return--air opening. Remove and discard this panel when bottom return air is used. To remove bottom closure panel, perform the following:

1. Tilt or raise furnace and remove 2 screws holding bottom filler panel. (See Fig. 9.)

2. Rotate bottom filler panel downward to release holding tabs.

3. Remove bottom closure panel.

4. Reinstall bottom filler panel and screws.

Side Return Air Inlet

These furnaces are shipped with bottom closure panel installed in bottom return--air opening. This panel MUST be in place when side return air inlet(s) is used without a bottom return air inlet.

Not all horizontal furnaces are approved for side return air connections. (See Fig. 20.)

FILTER ARRANGEMENT

!

WARNING

CARBON MONOXIDE AND POISONING HAZARD

Failure to follow this warning could result in personal injury, death and/or property damage.

Never operate a furnace without a filter or with filter access door removed.

There are no provisions for an internal filter rack in these furnaces.

Refer to the instructions supplied with Media Cabinet for assembly and installation options.

A field--supplied accessory external filter rack is required.

This furnace requires KGAFR030ALL 1 in. (25 mm) external filter rack or a suitable field--supplied substitute, such as the media cabinet.

Refer to the instructions supplied with external filter rack for assembly and installation options.

13

FURNACE

CASING

WIDTH

14–3/16

(360)

17–1/2

(445)

21

(533)

24---1/2

(622)

Table 4—Opening Dimensions -- In. (mm)

APPLICATION

Upflow Applications on Combustible or Noncombustible Flooring (KGASB subbase not required)

Downflow Applications on Noncombustible Flooring (KGASB subbase not required)

Downflow applications on combustible flooring (KGASB subbase required)

Downflow Applications on Combustible Flooring with CNPV,

CNRV, CAR, or CAP Coil Assembly or KCAKC coil box

(KGASB subbase not required)

Upflow Applications on Combustible or Noncombustible Flooring (KGASB subbase not required)

Downflow Applications on Noncombustible Flooring (KGASB subbase not required)

Downflow applications on combustible flooring (KGASB subbase required)

Downflow Applications on Combustible Flooring with CNPV,

CNRV, CAR, or CAP Coil Assembly or KCAKC coil box

(KGASB subbase not required)

Upflow Applications on Combustible or Noncombustible Flooring (KGASB subbase not required)

Downflow Applications on Noncombustible Flooring (KGASB subbase not required)

Downflow applications on combustible flooring (KGASB subbase required)

Downflow Applications on Combustible Flooring with CNPV,

CNRV, CAR, or CAP Coil Assembly or KCAKC coil box

(KGASB subbase not required)

Upflow Applications on Combustible or Noncombustible Flooring (KGASB subbase not required)

Downflow Applications on Noncombustible Flooring (KGASB subbase not required)

Downflow applications on Combustible flooring (KGASB subbase required)

Downflow Applications on Combustible Flooring with CNPV,

CNRV, CAR, or CAP Coil Assembly or KCAKC coil box

(KGASB subbase not required)

19

(483)

23

(584)

22---7/8

(581)

22---1/8

(562)

22---1/2

(572)

16

(406)

15---7/8

(403)

15---1/8

(384)

15---1/2

(394)

19---1/2

(495)

19---3/8

(492)

18---5/8

(473)

PLENUM OPENING

A

12---11/16

(322)

12---9/16

(319)

11---13/16

(284)

12---5/16

(319)

B

21---5/8

(549)

19

(483)

19

(483)

19

(483)

19

(483)

21---1/8

(537)

19

(483)

19

(483)

19

(483)

21---5/8

(549)

19

(483)

19

(483)

19

(483)

21---5/8

(549)

19

(483)

19

(483)

AIR DUCTS

General Requirements

The duct system should be designed and sized according to accepted national standards such as those published by: Air

Conditioning Contractors Association (ACCA), Sheet Metal and

Air Conditioning Contractors National Association (SMACNA) or American Society of Heating, Refrigerating and Air

Conditioning Engineers (ASHRAE) or consult The Air Systems

Design Guidelines reference tables available from your local distributor. The duct system should be sized to handle the required system design CFM at the design external static pressure.

The furnace airflow rates are provided in Table 5--AIR

DELIVERY--CFM (With Filter).

When a furnace is installed so that the supply ducts carry air circulated by the furnace to areas outside the space containing the furnace, the return air shall also be handled by duct(s) sealed to the furnace casing and terminating outside the space containing the furnace.

Secure ductwork with proper fasteners for type of ductwork used.

Seal supply-- and return--duct connections to furnace with code approved tape or duct sealer.

NOTE: Flexible connections should be used between ductwork and furnace to prevent transmission of vibration. Ductwork passing through unconditioned space should be insulated and sealed to enhance system performance. When air conditioning is used, a vapor barrier is recommended.

Maintain a 1--in. (25 mm) clearance from combustible materials to supply air ductwork for a distance of 36 in. (914 mm) horizontally from the furnace. See NFPA 90B or local code for further requirements.

Ductwork Acoustical Treatment

NOTE: Metal duct systems that do not have a 90 degree elbow and 10 ft. (3 M) of main duct to the first branch take--off may require internal acoustical lining. As an alternative, fibrous ductwork may be used if constructed and installed in accordance with the latest edition of SMACNA construction standard on fibrous glass ducts. Both acoustical lining and fibrous ductwork shall comply with NFPA 90B as tested by UL Standard 181 for

Class 1 Rigid air ducts.

Supply Air Connections

For a furnace not equipped with a cooling coil, the outlet duct shall be provided with a removable access panel. This opening shall be accessible when the furnace is installed and shall be of such a size that the heat exchanger can be viewed for possible openings using light assistance or a probe can be inserted for sampling the air stream. The cover attachment shall prevent leaks.

20

(508)

23---5/8

(600)

23---1/2

(597)

23---3/4

(603)

23---1/2

(597)

16---5/8

(422)

16---1/2

(419)

16---3/4

(425)

16---1/2

(419)

20---1/8

(511)

20

(508)

20---1/4

(514)

FLOOR OPENING

C

13---5/16

(338)

13---3/16

(335)

13---7/16

(341)

13---5/16

(338)

D

22---1/4

(565)

19---5/8

(498)

20---5/8

(600)

20

(508)

20

(508)

22---1/4

(565)

19---5/8

(498)

20---5/8

(600)

20

(508)

22---1/4

(565)

19---5/8

(498)

20---5/8

(600)

20

(508)

22---1/4

(565)

19---5/8

(498)

20---5/8

(600)

14

Table 5—Air Delivery -- CFM (with Filter)*

FURNACE

SIZE

045---08 /

024045

045---12 /

036045

070---08 /

024070

070---12 /

036070

070---16 /

048070

090---14 /

042090

090---16 /

048090

090---20 /

060090

110---12 /

036110

110---16 /

048110

RETURN---AIR

INLET

Bottom or

Side(s)

Bottom or

Side(s)

Bottom or

Side(s)

Bottom or

Side(s)

Bottom or

Side(s)

Bottom or

Side(s)

Bottom or

Side(s)

Bottom Only

Both Sides or 1

Side & Bottom

1Side Only

Bottom or

Side(s)

Bottom or

Side(s)

Bottom Only

SPEED

High

Med---High

Med---Low

High

Med---High

Med---Low

High

Med---High

Med---Low

High

Med---High

Med---Low

High

Med---High

Med---Low

High

Med---High

Med---Low

High

Med---High

Med---Low

High

Med---High

Med---Low

High

Med---High

Med---Low

High

Med---High

Med---Low

High

Med---High

Med---Low

High

Med---High

Med---Low

High

Med---High

Med---Low

0.1

1085

920

820

1440

1360

1250

1030

835

725

1425

1320

1200

1805

1630

1460

1650

1515

1385

2060

1790

1505

2405

2225

2020

2530

2285

1995

2475

2260

1950

1625

1510

1360

2035

1745

1530

2530

2230

1920

0.2

1035

875

775

1375

1300

1210

1010

815

700

1375

1280

1175

1740

1585

1420

1600

1485

1360

1985

1765

1505

2310

2155

1955

2450

2215

1945

2395

2190

1910

1575

1470

1335

1965

1710

1515

2470

2205

1900

0.3

975

830

730

1305

1240

1160

980

790

675

1320

1240

1145

1670

1530

1385

1535

1440

1320

1915

1715

1480

2220

2080

1880

2365

2150

1900

2300

2110

1855

1515

1415

1295

1880

1650

1470

2400

2165

1880

EXTERNAL STATIC PRESSURE (IN. WC)

0.4

915

770

680

1240

1175

1100

945

760

645

1265

1205

1105

1600

1470

1325

1465

1380

1260

1820

1645

1440

2130

1995

1805

2270

2075

1840

2200

2035

1795

1445

1355

1250

1790

1560

1400

2320

2110

1845

0.5

845

710

620

1160

1115

1040

900

720

600

1200

1140

1050

1530

1405

1280

1385

1300

1195

1720

1560

1375

2025

1895

1730

2165

1985

1770

2090

1940

1730

1355

1285

1180

1680

1450

1310

2220

2035

1795

0.6

770

640

555

1070

1040

965

845

675

555

1125

1075

990

1445

1330

1220

1285

1220

1120

1610

1470

1300

1920

1785

1630

2065

1890

1685

1985

1845

1650

1260

1185

1100

1495

1340

1215

2115

1950

1730

0.7

675

555

470

975

950

885

775

610

475

1035

995

920

1360

1255

1155

1175

1115

1025

1490

1345

1190

1790

1675

1535

1940

1780

1600

1865

1735

1555

1165

1070

985

1365

1205

1095

2000

1855

1650

0.8

565

440

360

870

850

790

680

490

390

940

905

840

1280

1170

1080

1055

990

915

1340

1195

1045

1660

1565

1420

1805

1660

1480

1730

1620

1445

990

890

810

1215

1090

990

1865

1740

1555

0.9

390

250

190

730

725

670

490

375

300

830

790

725

1180

1080

995

895

830

710

1135

1010

890

1530

1420

1275

1670

1525

1350

1585

1475

1310

785

725

--- ---

1075

955

830

1730

1615

1460

1.0

195

--- ---

--- ---

110---22 /

066110

Bottom Sides or 1 Side & Bottom

1Side Only

High

Med---High

Med---Low

High

Med---High

Med---Low

--- ---

2235

1920

2540

2125

--- ---

--- ---

220

1900

2495

2120

1795

2415

2155

1880

2430

2105

1790

2350

2100

1845

2355

2060

1765

2250

2040

1795

2265

2010

1720

2145

1955

1730

2175

1940

1650

2015

1850

1650

2065

1840

1585

1875

1740

1555

1935

1730

1500

1715

1595

1460

1785

1615

1390

1560

1470

1340

1650

1485

1280

* A filter is required for each return---air inlet. Airflow performance included 3/4---in. (19 mm) washable filter media such as contained in factory---authorized accessory filter rack. To determine airflow performance without this filter, assume an additional 0.1 in. wc available external static pressure.

--- --- Indicates unstable operating conditions.

1425

1325

1150

--- ---

--- ---

--- ---

1350

1260

1135

1505

1360

1180

645

600

565

925

820

740

655

620

555

1075

990

910

560

575

520

335

265

--- ---

875

750

670

1590

1485

1340

15

Table 5Air Delivery -- CFM (with Filter)* (Continued)

FURNACE

SIZE

048135

066135

RETURN---AIR

INLET

Bottom or

Side(s)

Bottom Only

Bottom, Sides or 1 Side & Bottom

1 Side Only

Bottom Only

SPEED

High

Med---High

Med---Low

High

Med---High

Med---Low

High

Med---High

Med---Low

High

Med---High

Med---Low

High

Med---High

Med---Low

0.1

2090

1790

1545

2485

2195

1880

--- ---

“2180

1880

--- ---

2135

1880

2465

2115

1800

0.2

2010

1755

1525

2400

2150

1850

--- ---

2145

1850

--- ---

2085

1850

2430

2105

1790

0.3

1930

1705

1500

2310

2090

1820

2385

2060

1820

2245

2035

1820

2375

2075

1770

EXTERNAL STATIC PRESSURE (IN. WC)

0.4

1835

1640

1450

2215

2000

1780

2305

2010

1780

2155

1975

1780

2305

2030

1735

0.5

1710

1550

1380

2110

1920

1715

2195

1945

1715

2055

1895

1715

2230

1980

1695

0.6

1590

1465

1315

2000

1825

1635

2085

1865

1635

1940

1795

1635

2110

1910

1640

0.7

1470

1360

1215

1880

1720

1540

1960

1765

1540

1825

1685

1540

2000

1830

1570

0.8

1335

1210

1005

1725

1565

1415

1825

1660

1415

1695

1565

1415

1865

1725

1465

0.9

1025

945

855

1535

1405

1290

1670

1515

1290

1555

1445

1290

1725

1590

1345

1.0

835

785

670

060155

Both Sides Or 1

Side & Bottom

1Side Only

High

Med---High

Med---Low

High

Med---High

Med---Low

--- ---

2155

1800

--- ---

2140

1800

--- ---

2135

1790

--- ---

2095

1790

2375

2095

1770

2260

2040

1770

2285

2040

1735

2180

1975

1735

2200

1975

1695

2085

1890

1695

2105

1895

1640

1975

1810

1640

1995

1790

1570

1865

1705

1570

1870

1685

1465

1740

1595

1465

1730

1550

1345

1605

1480

1345

1570

1400

1225

1455

1325

1225

* A filter is required for each return---air inlet. Airflow performance included 3/4---in. (19 mm) washable filter media such as contained in factory---authorized accessory filter rack. To determine airflow performance without this filter, assume an additional 0.1 in. wc available external static pressure.

--- --- Indicates unstable operating conditions.

1355

1255

1160

1465

1325

1160

1385

1265

1160

1545

1425

1225

UPFLOW

90˚

D OWNFLOW

HORIZONTAL

90˚

YES

YES

YES

120˚

MIN

YES

120˚

MIN

YES

120˚

MIN

YES

NOT

RECOMMENDED

NOT

RECOMMENDED

Fig. 14

--- Duct Flanges

NOT

RECOMMENDED

A02329

16

1

/

4

" (6mm) THREADED ROD

4 REQ.

OUTER DOOR

A S SEMBLY

8" (203mm) MIN

FOR DOOR REMOVAL

SECURE ANGLE

IRON TO BOTTOM

OF FURNACE WITH

3 #8 x 3 /

4

" (19mm) SCREWS

TYPICAL FOR 2 SUPPORTS

1” (25mm) SQUARE, 1-1/4”x1-1/4”x1/8” (32x32x3mm)

ANGLE IRON OR UNI-STRUT MAY BE USED

(2) HEX NUTS, (2) WASHERS & (2) LOCK WASHERS

REQ. PER ROD

Fig. 15

--- Horizontal Unit Suspension

A05027

Fig. 16

--- Horizontal Suspension with Straps

17

A02014

LINE CONTACT ONLY PERMISSIBLE BETWEEN

LINES FORMED BY INTERSECTIONS OF

THE TOP AND TWO SIDES OF THE FURNACE

JACKET AND BUILDING JOISTS,

STUDS, OR FRAMING.

GAS

ENTRY

17

3

/

4

-IN. (451 mm)

SHEET

METAL

22-IN. (559 mm)

TYPE-B

VENT

17

4

3

3

/

4-

IN. (451 mm)

/

4

−IN. (121 mm)

OVER ALL

UNDER DOOR

1-IN. (25 mm) UNDER FURNACE

EXTEND OUT 12

−IN. (305 mm)

OUT FROM FACE OF DOOR

WORK AREA

* WHEN USED WITH

SINGLE WALL VENT

CONNECTIONS

MANUAL SHUTOFF

GAS VALVE

SEDIMENT

TRAP

A02164

Fig. 17

--- Typical Attic Installation

Fig. 18

--- Upflow Return Air Configurations and Restrictions

A02075

18

Fig. 19

--- Downflow Return Air Configurations and Restrictions

A02163

A02162

Fig. 20

--- Horizontal Return Air Configurations and Restrictions

Upflow and Horizontal Furnaces

Connect supply--air duct to flanges on furnace supply--air outlet.

Bend flange upward to 90_ with wide duct pliers. (See Fig. 14.)

The supply--air duct must be connected to ONLY the furnace supply--outlet--air duct flanges or air conditioning coil casing

(when used). DO NOT cut main furnace casing side to attach supply air duct, humidifier, or other accessories. All accessories

MUST be connected to duct external to furnace main casing.

NOTE: For horizontal applications, the top--most flange may be bent past 90_ to allow the evaporator coil to hang on the flange temporarily while the remaining attachment and sealing of the coil are performed.

Downflow Furnaces

Connect supply--air duct to supply--air outlet on furnace. Bend flange inward past 90_ with wide duct pliers. (See Fig. 14.) The supply--air duct must be connected to ONLY the furnace supplyoutlet or air conditioning coil casing (when used). When installed on combustible material, supply--air duct must be connected to ONLY the accessory subbase KGASB0201ALL or a factory approved air conditioning coil casing. DO NOT cut main furnace casing to attach supply side air duct, humidifier, or

19

other accessories. All accessories MUST be connected to duct external to furnace casing.

!

WARNING

FIRE HAZARD

A failure to follow this warning could result in personal injury, or death and/or property damage.

Never connect return--air ducts to the back of the furnace. Follow instructions below.

Return Air Connections

Downflow Furnaces

The return--air duct must be connected to return--air opening

(bottom inlet) as shown in Fig. 19. DO NOT cut into casing sides

(left or right). Side opening is permitted for only upflow and most horizontal furnaces. (See Fig. 19.) Bypass humidifier connections should be made at ductwork or coil casing sides exterior to furnace.

Upflow and Horizontal Furnaces

The return--air duct must be connected to bottom, sides (left or right), or a combination of bottom and side(s) of main furnace casing as shown in Fig. 18 and 20. Bypass humidifier may be attached into unused return air side of the furnace casing. (See

Fig. 18 and 20.)

Not all horizontal furnaces are approved for side return air connections. (See Fig. 20.)

GAS PIPING

!

WARNING

FIRE OR EXPLOSION HAZARD

Failure to follow this warning could result in personal injury, death, and/or property damage.

Never purge a gas line into a combustion chamber. Never test for gas leaks with an open flame. Use a commercially available soap solution made specifically for the detection of leaks to check all connections.

!

WARNING

FIRE OR EXPLOSION HAZARD

Failure to follow this warning could result in personal injury, death, and/or property damage.

Use proper length of pipe to avoid stress on gas control manifold and a gas leak.

Gas piping must be installed in accordance with national and local codes. Refer to current edition of NFGC in the U.S., the

CAN/CSA--B149.1--05 in Canada.

Installations must be made in accordance with all authorities having jurisdiction. If possible, the gas supply line should be a separate line running directly from meter to furnace.

NOTE: In the state of Massachusetts:

1. Gas supply connections MUST be performed by a licensed plumber or gas fitter.

2. When flexible connectors are used, the maximum length shall not exceed 36 inches (915 mm).

3. When lever handle type manual equipment shutoff valves are used, they shall be T--handle valves.

4. The use of copper tubing for gas piping is NOT approved by the state of Massachusetts.

Refer to Table 6 for recommended gas pipe sizing. Risers must be used to connect to furnace and to meter. Support all gas piping with appropriate straps, hangers, etc. Use a minimum of 1 hanger every 6 ft. (1.8 M) Joint compound (pipe dope) should be applied sparingly and only to male threads of joints. Pipe dope must be resistant to the action of propane gas.

Table 6—Maximum Capacity of Pipe

NOMINAL

IRON

PIPE SIZE

IN. (MM)

1/2 (12.7)

3/4 (19.0)

1( 25.4)

1-1/4

(31.8)

1-1/2

(38.1)

INTERNA

L

DIA.

IN. (MM)

0.622

(158)

0.824

(20.9)

1.049

(26.6)

1.380

(35.0)

1.610

(40.9)

10

(3.0)

175

360

680

1400

2100

LENGTH OF PIPE --- FT (M)

20

(6.0)

30

(9.1)

40

(12.1)

50

(15.2)

120

250

465

950

1460

97

200

375

770

1180

82

170

320

660

990

73

151

285

580

900

* Cubic ft. of natural gas per hr for gas pressures of 0.5 psig (14---in. wc) or less and a pressure drop of 0.5---in. wc (based on a 0.60 specific gravity gas). Ref: Table 6.2 ANSI Z223---2006/NFPA 54---2006.

!

WARNING

FIRE OR EXPLOSION HAZARD

Failure to follow this warning could result in personal injury, death, and/or property damage.

If local codes allow the use of a flexible gas appliance connector, always use a new listed connector. Do not use a connector which has previously served another gas appliance. Black iron pipe shall be installed at the furnace gas control valve and extend a minimum of 2 in. (51 mm) outside the furnace.

!

CAUTION

FURNACE OVERHEAT HAZARD

Failure to follow this caution may result in unit component damage.

Connect gas pipe to gas valve using a backup wrench to avoid damaging gas controls and burner misalignment.

An accessible manual equipment shutoff valve MUST be installed external to furnace casing and within 6 ft. (1.8 M) of furnace. A 1/8--in. (3 mm) NPT plugged tapping, accessible for test gauge connection, MUST be installed immediately upstream of gas supply connection to furnace and downstream of manual equipment shutoff valve.

NOTE: The furnace gas valve inlet pressure tap connection is suitable to use as test gauge connection providing test pressure

DOES NOT exceed maximum 0.5 psig (14--in. wc) stated on gas control valve. (See Fig. 47.)

20

FACTORY

INSTALLED

LOCATION

TWO

ALTERNATE

FIELD

LOCATIONS

2” (51mm)

Street Elbow

A08551

Fig. 21

--- Burner and Manifold

Some installations require gas entry on right side of furnace (as viewed in upflow.) (See Fig. 21.)

Install a sediment trap in riser leading to furnace as shown in Fig

22. Connect a capped nipple into lower end of tee. Capped nipple should extend below level of furnace gas controls. Place a ground joint union between furnace gas control valve and exterior manual equipment gas shutoff valve. A 1/8--in. (3 mm) NPT plugged tapping, accessible for test gauge connection, MUST be installed immediately upstream of gas supply connection to furnace and downstream of manual equipment shutoff valve.

GAS

SUPPLY

MANUAL

SHUTOFF

VALVE

(REQUIRED)

SEDIMENT

TRAP

UNION

Fig. 23

--- Relocating J--Box

A02099

A02035

Fig. 22

--- Typical Gas Pipe Arrangement

Piping should be pressure and leak tested in accordance with

NFGC in the United States or CAN/CSA--B149.1--05 in Canada, local, and national plumbing and gas codes before the furnace has been connected. After all connections have been made, purge lines and check for leakage at furnace prior to operating furnace.

If pressure exceeds 0.5 psig (14--in. wc), gas supply pipe must be disconnected from furnace and capped before and during supply pipe pressure test. If test pressure is equal to or less than 0.5 psig

(14--in. wc), turn off electric shutoff switch located on furnace gas control valve and accessible manual equipment shutoff valve before and during supply pipe pressure test. After all connections have been made, purge lines and check for leakage at furnace prior to operating furnace.

A03221

Fig. 24

--- Field--Supplied Electrical Box on Furnace Casing

The gas supply pressure shall be within the maximum and minimum inlet supply pressures marked on the rating plate with the furnace burners ON and OFF.

ELECTRICAL CONNECTIONS

!

WARNING

ELECTRICAL SHOCK HAZARD

Failure to follow this warning could result in personal injury or death.

Blower access panel door switch opens 115--v power to control. No component operation can occur. Do not bypass or close switch with panel removed.

See Fig. 26 for field wiring diagram showing typical field 115--v wiring. Check all factory and field electrical connections for tightness.

21

!

WARNING

ELECTRICAL SHOCK AND FIRE HAZARD

Failure to follow this warning could result in personal injury, death, or property damage.

The cabinet MUST have an uninterrupted or unbroken ground according to NEC ANSI/NFPA 70--2008 and

Canadian Electrical Code CSA C22.1 or local codes to minimize personal injury if an electrical fault should occur.

This may consist of electrical wire, conduit approved for electrical ground or a listed, grounded power cord (where permitted by local code) when installed in accordance with existing electrical codes. Refer to the power cord manufacturer’s ratings for proper wire gauge. Do not use gas piping as an electrical ground.

!

CAUTION

FURNACE MAY NOT OPERATE

Failure to follow this caution may result in intermittent furnace operation.

Furnace control must be grounded for proper operation or else control will lock out. Control must remain grounded through green/yellow wire routed to gas valve and manifold bracket screw.

115--V WIRING

Verify that the voltage, frequency, and phase correspond to that specified on unit rating plate. Also, check to be sure that service provided by utility is sufficient to handle load imposed by this equipment. Refer to rating plate or Table 7 for equipment electrical specifications.

U.S. installations: Make all electrical connections in accordance with National Electrical Code (NEC) ANSI/NFPA 70--2008 and any local codes or ordinances that might apply.

Canadian installations: Make all electrical connections in accordance with Canadian Electrical Code CSA C22.1 or authorities having jurisdiction.

!

WARNING

FIRE HAZARD

Failure to follow this warning could result in personal injury, death, or property damage.

Do not connect aluminum wire between disconnect switch and furnace. Use only copper wire.

Use a separate, fused branch electrical circuit with a properly sized fuse or circuit breaker for this furnace. See Table 7 for wire size and fuse specifications. A readily accessible means of electrical disconnect must be located within sight of the furnace.

NOTE: Proper polarity must be maintained for 115--v wiring. If polarity is incorrect, control LED status indicator light will flash rapidly and furnace will NOT operate.

J--BOX RELOCATION

NOTE: If factory location of J--Box is acceptable, go to next section (ELECTRICAL CONNECTION TO J--BOX).

NOTE: On 14--in. (356 mm) wide casing models, the J--Box shall not be relocated to other side of furnace casing when the vent pipe is routed within the casing.

1. Remove and save two screws holding J--Box. (See Fig.

23.)

NOTE: The J--Box cover need not be removed from the J--Box in order to move the J--Box. Do NOT remove green ground

22 screw inside J--Box. The ground screw is not threaded into the casing flange and can be lifted out of the clearance hole in casing while swinging the front edge of the J--Box outboard of the casing.

2. Cut wire tie on loop in furnace wires attached to J--box.

3. Move J--Box to desired location.

4. Fasten J--Box to casing with two screws removed in Step

1.

5. Route J--Box wires within furnace away from sharp edges, rotating parts and hot surfaces.

ELECTRICAL CONNECTION TO J--BOX

Field--Supplied Electrical Box on Furnace J--Box Bracket See

Fig. 24.

1. Remove cover from furnace J--Box.

2. Attach electrical box to furnace J--Box bracket with at least two field--supplied screws through holes in electrical box into holes in bracket. Use blunt--nose screws that will not pierce wire insulation.

3. Route furnace power wires through holes in electrical box and J--Box bracket, and make field--wire connections in electrical box. Use best practices (NEC in U.S. and CSA

C22.1 in Canada) for wire bushings, strain relief, etc.

4. Route and secure field ground wire to green ground screw on J--Box bracket.

5. Connect line voltage leads as shown in Fig. 26.

6. Reinstall cover to J--Box. Do not pinch wires between cover and bracket. Electrical Box on Furnace Casing Side

See Fig. 24.

!

WARNING

FIRE OR ELECTRICAL SHOCK HAZARD

Failure to follow this warning could result in personal injury, death, or property damage.

If field--supplied manual disconnect switch is to be mounted on furnace casing side, select a location where a drill or fastener cannot damage electrical or gas components.

1. Select and remove a hole knockout in the casing where the electrical box is to be installed.

NOTE: Check that duct on side of furnace will not interfere with installed electrical box.

2. Remove the desired electrical box hole knockout and position the hole in the electrical box over the hole in the furnace casing.

3. Fasten the electrical box to casing by driving two field supplied screws from inside electrical box into casing steel.

4. Remove and save two screws holding J--Box. (See Fig.

23.)

5. Pull furnace power wires out of 1/2--inch diameter hole in

J--Box. Do not loosen wires from strain--relief wire--tie on outside of J--Box.

6. Route furnace power wires through holes in casing and electrical box and into electrical box.

7. Pull field power wires into electrical box.

8. Remove cover from furnace J--Box.

9. Route field ground wire through holes in electrical box and casing, and into furnace J--Box.

10. Reattach furnace J--Box to furnace casing with screws removed in Step 4.

11. Secure field ground wire to J--Box green ground screw.

Table 7—Electrical Data

FURNACE SIZE

VOLTS---

HERTZ---

PHASE

OPERATING VOLTAGE

RANGE

MAXIMUM

UNIT

AMPS

UNIT

AMPAC-

ITY#

7.54

9.50

7.06

9.22

12.60

10.83

13.13

17.61

10.75

13.12

18.99

13.27

18.55

19.33

MAXIMUM

WIRE

LENGTH

FT. (M)‡

49 (15)

39 (12)

52 (16)

40 (12)

29 (9)

34 (10)

28 (9)

32 (8)

34 (10)

28 (9)

30 (9)

27 (8)

30 (9)

29 (9)

MAXIMUM

FUSE OR

CKT BKR

AMPS†

15

15

20

15

20

20

15

15

15

20

15

15

15

15

MINIMUM

WIRE

GAUGE

045---08/024045

045---12/036045

070---08/024070

070---12/036070

070---16/048070

090---14/042090

090---16/048090

090---20/060090

115---60---1

115---60---1

115---60---1

115---60---1

115---60---1

115---60---1

115---60---1

115---60---1

Maximum*

127

127

127

127

127

127

127

104

104

104

104

104

104

104

104

5.4

7.0

5.0

6.8

9.5

8.2

10.0

13.6

110---12/036110

110---16/048110

110---22/066110

135---16/048135

115---60---1

115---60---1

115---60---1

115---60---1

127

127

127

127

104

104

104

104

8.2

10.1

14.8

10.2

135---22/066135

155---20/060155

115---60---1

115---60---1

127

127

127 104

14.4

15.0

* Permissible limits of the voltage range at which the unit operates satisfactorily.

# Unit ampacity = 125 percent of largest operating component’s full load amps plus 100 percent of all other potential operating components’ (EAC, humidifier, etc.) full load amps.

{

Time---delay type is recommended.

}

Length shown is as measured 1 way along wire path between unit and service panel for maximum 2 percent voltage drop.

14

14

12

14

12

12

14

14

14

12

14

14

14

14

12. Complete electrical box wiring and installation. Connect line voltage leads as shown in Fig. 26. Use best practices

(NEC in U.S. and CSA C22.1 in Canada) for wire bushings, strain relief, etc.

13. Reinstall cover to J--Box. Do not pinch wires between cover and bracket.

POWER CORD INSTALLATION IN FURNACE J--BOX

NOTE: Power cords must be able to handle the electrical requirements listed in Table 7. Refer to power cord manufacturer’s listings.

1. Remove cover from J--Box.

2. Route listed power cord through 7/8--in. (22 mm) diameter hole in J--Box.

3. Secure power cord to J--Box bracket with a strain relief bushing or a connector approved for the type of cord used.

4. Secure field ground wire to green ground screw on J--Box bracket.

5. Connect line voltage leads as shown in Fig. 26.

6. Reinstall cover to J--Box. Do not pinch wires between cover and bracket.

BX CABLE INSTALLATION IN FURNACE J--BOX

1. Remove cover from J--Box.

2. Route BX cable into 7/8--inch (22 mm) diameter hole in

J--Box.

3. Secure BX cable to J--Box bracket with connectors approved for the type of cable used.

4. Secure field ground wire to green ground screw on J--Box bracket.

5. Connect line voltage leads as shown in Fig. 26.

6. Reinstall cover to J--Box. Do not pinch wires between cover and bracket.

23

BLOWER OFF-DELAY

J2 JUMPER

TWINNING AND/OR

COMPONENT TEST

TERMINAL

BLOWER OFF-DELAY

24-V THERMOSTAT

TERMINALS

3-AMP FUSE

LED OPERATION &

DIAGNOSTIC LIGHT

115-VAC(L2)NEUTRAL

CONNECTIONS

TEST/TWIN

HUM

0.5 AMP@24VAC

FUSE 3-AMP

SEC-2 SEC-1

EAC-2 L2

HUMIDIFIER TERMINAL

(24-VAC 0.5 AMP MAX.)

TRANSFORMER 24-VAC

CONNECTIONS

PL1-LOW VOLTAGE MAIN

HARNESS CONNECTOR

COOL

HEAT

SPARE-1 SPARE-2

BLOWER SPEED

SELECTION TERMINALS

SPARE-1

SPARE-2

1-AMP@

EAC-1

115VAC

PR-1

PL2 1

115 VAC (L1) LINE

VOLTAGE CONNECTION

EAC-1 TERMINAL

(115-VAC 1.0 AMP MAX.)

Fig. 25

--- Furnace Control

PL2-HOT SURFACE

IGNITER & INDUCER

MOTOR CONNECTOR

A02100

FIELD 24-V WIRING

FIELD 115-, 208/230-, 460-V WIRING

FACTORY 24-V WIRING

FACTORY 115-V WIRING

FIVE WIRE

THREE-WIRE

HEATING-ONLY

BLOWER DOOR SWITCH

NOTE 2

W C R G Y

THERMOSTAT

TERMINALS

FIELD-SUPPLIED

DISCONNECT

208/230- OR

460-V

THREE

PHASE

BLK BLK

W

WHT WHT

GND

115-V FIELD-

SUPPLIED

DISCONNECT

GND

AUXILIARY

J-BOX

R

O

L

C

O

N

T

R

G

COM

Y/Y2

NOTES:

1.

2.

3.

GND

208/230-V

SINGLE

PHASE

24-V

TERMINAL

BLOCK

FURNACE

NOTE 1

TWO

WIRE

CONDENSING

UNIT

Connect Y-terminal in furnace as shown for proper blower operation.

Some thermostats require a "C" terminal connection as shown.

If any of the original wire, as supplied, must be replaced, use same type or equivalent wire.

A99440

Fig. 26

--- Heating and Cooling Application Wiring Diagram with Single Stage Thermostat

24

24--V WIRING

Make field 24--v connections at the 24--v terminal strip. (See Fig.

25.) Connect terminal Y as shown in Fig. 26 for proper cooling operation. Use only AWG No. 18, color--coded, copper thermostat wire.

The 24--v circuit contains an automotive--type, 3--amp. fuse located on the control. Any direct shorts during installation, service, or maintenance could cause this fuse to blow. If fuse replacement is required, use ONLY a 3--amp. fuse of identical size.

ACCESSORIES

1. Electronic Air Cleaner (EAC)

Connect an accessory Electronic Air Cleaner (if used) using 1/4--in female quick connect terminals to the two male

1/4--in quick--connect terminals on the control board marked EAC--1 and EAC--2. The terminals are rated for

115 VAC, 1.0 amps maximum and are energized during blower motor operation. (See Fig. 24.)

2. Humidifier (HUM)

Connect an accessory 24 VAC, 0.5 amp. maximum humidifier (if used) to the 1/4--in male quick--connect HUM terminal and COM--24V screw terminal on the control board thermostat strip. The HUM terminal is energized when gas valve relay (GVR) is energized. (See Fig. 24.)

NOTE: A field--supplied, 115--v controlled relay connected to

EAC terminals may be added if humidifier operation is desired during blower operation.

NOTE: DO NOT connect furnace control HUM terminal to

HUM (humidifier) terminal on Thermidistatt, Zone Controller or similar device. See Thermidistatt, Zone Controller, thermostat, or controller manufacturer’s instructions for proper connection.

VENTING

The furnace shall be connected to a listed factory built chimney or vent, or a clay--tile lined masonry or concrete chimney. Venting into an unlined masonry chimney or concrete chimney is prohibited.

When an existing Category I furnace is removed or replaced, the original venting system may no longer be sized to properly vent the attached appliances. An improperly sized Category I venting system could cause the formation of condensate in the furnace and vent, leakage of condensate and combustion products, and spillage of combustion products into the living space.

Vent system or vent connectors may need to be resized. Vent systems or vent connectors, must be sized to approach minimum size as determined using appropriate table found in the NFGC or

CAN/CSA--B149.1--05.

GENERAL VENTING REQUIREMENTS

Follow all safety codes for proper vent sizing and installation requirements, including local building codes, the National Fuel

Gas Code ANSI Z223.1--2006/NFPA 54--2006 (NFGC), Parts 12 and 13 in the United States or the National Standard of Canada,

Natural Gas and Propane Installation Code CSA--B149.1--05

(CAN/CSA--B149.1--05), Section 8 and Appendix C in Canada, the local building codes, and furnace and vent manufacturers’ instructions.

!

WARNING

CARBON MONOXIDE POISONING HAZARD

Failure to follow the steps outlined below for each appliance connected to the venting system being placed into operation could result in carbon monoxide poisoning or death.

The following steps shall be followed for each appliance connected to the venting system being placed into operation, while all other appliances connected to the venting system are not in operation:

1. Seal any unused openings in venting system.

2. Inspect the venting system for proper size and horizontal pitch, as required in the National Fuel Gas Code, ANSI

Z223.1/NFPA 54 or CSA B149.1, Natural Gas and Propane

Installation Code and these instructions. Determine that there is no blockage or restriction, leakage, corrosion and other deficiencies, which could cause an unsafe condition.

3. As far as practical, close all building doors and windows and all doors between the space in which the appliance(s) connected to the venting system are located and other spaces of the building.

4. Close fireplace dampers.

5. Turn on clothes dryers and any appliance not connected to the venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they are operating at maximum speed. Do not operate a summer exhaust fan.

6. Follow the lighting instructions. Place the appliance being inspected into operation. Adjust the thermostat so appliance is operating continuously.

7. Test for spillage from draft hood equipped appliances at the draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle.

8. If improper venting is observed during any of the above tests, the venting system must be corrected in accordance with the National Fuel Gas Code, ANSI Z223.1/NFPA 54 and/or CSA B149.1, Natural Gas and Propane Installation

Code.

9. After it has been determined that each appliance connected to the venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and any other gas--fired burning appliance to their previous conditions of use.

These furnaces are design--certified as Category I furnaces in accordance with ANSI Z21.47--2006/CSA 2.3--2006 and operate with a non--positive vent static pressure to minimize the potential for vent gas leakage. Category I furnaces operate with a flue loss not less than 17 percent to minimize the potential for condensation in the venting system. These furnaces are approved for common venting and multistory venting with other fan assisted or draft hood equipped appliances in accordance with the

NFGC or the CAN/CSA--B149.1--05, the local building codes, and furnace and vent manufacturers’ instructions.

The following information and warning must be considered in addition to the requirements defined in the NFGC and the

CAN/CSA--B149.1--05.

!

WARNING

CARBON MONOXIDE POISONING HAZARD

Failure to follow this warning could result in personal injury or death.

Do not bypass the draft safeguard switch, as an unsafe condition could exist which must be corrected.

25

1. If a vent (common or dedicated) becomes blocked, the furnace will be shut off by the draft safeguard switch located on the vent elbow.

2. Do not connect this Category I furnace into a single--wall dedicated or common vent. The dedicated or common vent is considered to be the vertical portion of the vent system that terminates outdoors.

3. Vent connectors serving Category I furnaces shall not be connected into any portion of a mechanical draft system operating under positive pressure.

4. In the U.S.: Do not vent this appliance with any solid fuel burning appliance. In Canada: Check with the authority having jurisdiction for approval on use with solid fuel burning appliance.

5. Category I furnaces must be vented vertically or nearly vertically unless equipped with a listed power venter.

6. Do not vent this appliance into an unlined masonry chimney. Refer to Chimney Inspection Chart, Fig. 27.

MASONRY CHIMNEY REQUIREMENTS

NOTE: These furnaces are CSA design--certified for use in exterior clay tile--lined masonry chimneys with a factory accessory Chimney Adapter Kit. Refer to the furnace rating plate for correct kit usage. The Chimney Adapter Kits are for use with

ONLY furnaces having a Chimney Adapter Kit numbers marked on the furnace rating plate.

If a clay tile--lined masonry chimney is being used and it is exposed to the outdoors below the roof line, relining might be required. Chimneys shall conform to the Standard for Chimneys,

Fireplaces, Vents, and Solid Fuel Burning Appliances

ANSI/NFPA 211--2006 in the United States and to a Provincial or

Territorial Building Code in Canada (in its absence, the National

Building Code of Canada) and must be in good condition.

U.S.A.--Refer to Sections 13.1.8 and 13.2.20 of the NFGC or the authority having jurisdiction to determine whether relining is required. If relining is required, use a properly sized listed metal liner, Type--B vent, or a listed alternative venting design.

NOTE: See the NFPA 54 / ANSI Z223.1--2006, 13.1.8 and

13.2.20 regarding alternative venting design and the Exception, which cover installations such as the Chimney Adapter Kits

KGACA02014FC and KGACA02015FC, which are listed for use with these furnaces. The Chimney Adapter Kit is listed alternative venting system for these furnaces. See the kit instructions for complete details.

Canada (and U.S.A.)--This furnace is permitted to be vented into a clay tile--lined masonry chimney that is exposed to the outdoors below the roof line, provided:

1. Vent connector is Type--B double--wall, and

2. This furnace is common vented with at least 1 draft hood equipped appliance, and

3. The combined appliance input rating is less than the maximum capacity given in Table A, and

4. The input rating of each space heating appliance is greater than the minimum input rating given in Table B for the local 99% Winter Design Temperature. Chimneys having internal areas greater than 38 in

2

(24516 mm

2) require furnace input ratings greater than the input ratings of these furnaces. See footnote at bottom of Table B, and

5. The authority having jurisdiction approves.

If all of these conditions cannot be met, an alternative venting design shall be used, such as the listed chimney adapter kit with these furnaces, which are listed for use with the kit, a listed chimney--lining system, or a Type--B common vent.

Inspections before the sale and at the time of installation will determine the acceptability of the chimney or the need for repair and/or (re)lining. Refer to the Fig. 27 to perform a chimney inspection. If the inspection of a previously used tile--lined chimney: a. Shows signs of vent gas condensation, the chimney should be relined in accordance with local codes and the authority having jurisdiction. The chimney should be relined with a listed metal liner, Type--B vent, or a listed chimney adapter kit shall be used to reduce condensation. If a condensate drain is required by local code, refer to the NFPA 54 / ANSI Z223.1--2006, Section 12.10 for additional information on condensate drains.

b. Indicates the chimney exceeds the maximum permissible size in the tables, the chimney should be rebuilt or relined to conform to the requirements of the equipment being installed and the authority having jurisdiction.

A chimney without a clay tile liner, which is otherwise in good condition, shall be rebuilt to conform to ANSI/NFPA 211 or be lined with a UL listed (ULC listed in Canada) metal liner or UL listed Type--B vent. Relining with a listed metal liner or Type--B vent is considered to be a vent--in--a--chase.

If a metal liner or Type--B vent is used to line a chimney, no other appliance shall be vented into the annular space between the chimney and the metal liner.

26

CHIMNEY INSPECTION CHART

For additional requirements refer to the National Fuel Gas Code NFPA 54/ANSI Z223.1 and ANSI/NFPA 211

Chimneys, Fireplaces, Vents, and Solid Fuel Burning Appliances in the U.S.A. or to the Canadian

installation Code CSA-B149.1 in Canada.

Crown condition:

Missing mortar or brick?

No

Yes

Rebuild crown.

Is chimney property lined with clay tile liner?

No

Yes

Is liner and top seal in good condition?

Yes

No

Repair liner or top seal or reline chimney as necessary.

Repair

Reline

Debris in cleanout?

Mortar, tile, metal vent, fuel oil residue?

Yes

No

Remove metal vent or liner.

Mortar or tile debris?

No

Clay tile misalignment, missing sections, gaps?

No

Yes

Condensate drainage at bottom of chimney?

No

Chimney exposed to outdoors below roof line?

No

Yes

Yes

Yes

Remove mortar and tile debris

No

Is chimney lined with properly

Consult

Part B of chimney adapter venting instructions for application suitability.

Suitable sized, listed liner or

Type-B vent?

Yes

Yes

Not Suitable

Install chimney adapter per instructions.

Not Suitable

Is chimney to be dedicated to a single furnace?

No

Consult

Part C of chimney adapter venting instructions for application suitability

Line chimney with property sized, listed flexible metal liner or Type-B vent per

NFGC or NSCNGPIC Vent

Sizing Tables and liner or vent manufacturer’s

Installation instructions.

Suitable

Install chimney adapter per instructions.

Chimney is acceptable for use.

Fig. 27

--- Chimney Inspection Chart

27

A03206

APPLIANCE APPLICATION REQUIREMENTS

Appliance operation has a significant impact on the performance of the venting system. If the appliances are sized, installed, adjusted, and operated properly, the venting system and/or the appliances should not suffer from condensation and corrosion.

The venting system and all appliances shall be installed in accordance with applicable listings, standards, and codes.

The furnace should be sized to provide 100 percent of the design heating load requirement plus any margin that occurs because of furnace model size capacity increments. Heating load estimates can be made using approved methods available from Air

Conditioning Contractors of America (Manual J); American

Society of Heating, Refrigerating, and Air--Conditioning

Engineers; or other approved engineering methods. Excessive oversizing of the furnace could cause the furnace and/or vent to fail prematurely.

When a metal vent or metal liner is used, the vent must be in good condition and be installed in accordance with the vent manufacturer’s instructions.

To prevent condensation in the furnace and vent system, the following precautions must be observed:

1. The return--air temperature must be at least 60_F (16_C) db except for brief periods of time during warm--up from setback at no lower than 55_F (13_C) db or during initial start--up from a standby condition.

2. Adjust the gas input rate per the installation instructions.

Low gas input rate causes low vent gas temperatures, causing condensation and corrosion in the furnace and/or venting system. Derating is permitted only for altitudes above

2000 ft. (610 M).

3. Adjust the air temperature rise to the midpoint of the rise range or slightly above. Low air temperature rise can cause low vent gas temperature and potential for condensation problems.

4. Set thermostat heat anticipator or cycle rate to reduce short cycling.

Exterior Masonry Chimney FAN + NAT

Installations with Type--B Double--Wall Vent

Connectors ENFPA & AGA

Table A—Combined Appliance Maximum Input

Rating in Thousands of Btuh per Hour

VENT HEIGHT

FT. (M)

6 (1.8)

8 (2.4)

10 (3.0)

15 (4.5)

20 (6.0)

30 (9.1)

INTERNAL AREA OF CHIMNEY

SQ. IN. (SQ. MM)

12

(7741)

74

80

84

NR

NR

NR

19

(12258)

119

130

138

152

NR

NR

28

(18064)

178

193

207

233

250

NR

38

(24516)

257

279

299

334

368

404

Table B—Minimum Allowable Input Rating of

Space--Heating Appliance in

Thousands of Btuh per Hour

VENT HEIGHT

FT. (M)

INTERNAL AREA OF CHIMNEY

SQ. IN. (SQ. MM)

12

(7741)

19

(12258)

28

18064)

38

(24516)

Local 99% Winter Design Temperature: 17 to 26 degrees F

6 0 55 99 141

8

10

15

20

30

52

NR

NR

NR

NR

74

90

NR

NR

NR

111

125

167

212

NR

Local 99% Winter Design Temperature: 5 to 16 degrees F*

6 NR 78 121 166

8

10

15

NR

NR

NR

94

111

NR

135

149

193

182

198

247

154

169

212

258

362

20

30

NR

NR

NR

NR

NR

NR

293

377

Local 99% Winter Design Temperature: ---10 to 4 degrees F*

6 NR NR 145 196

8 NR NR 159 213

10

15

20

30

NR

NR

NR

NR

NR

NR

NR

NR

175

NR

NR

NR

231

283

333

NR

Local 99% Winter Design Temperature: ---11 lower

_

F (16_C) or

Not recommended for any vent configuration.

*The 99.6% heating db temperatures found in the 1997 or 2001 ASHRAE

Fundamentals Handbook, Climatic Design Information chapter, Table 1A

(United States) and 2A (Canada) or the 2005 ASHRAE Fundamentals handbook, Climatic Design Information chapter, and the CD---ROM included with the 2005 ASHRAE Fundamentals Handbook.

28

Fig. 28

--- Using Tin Snips to Cut Tie Points

Air for combustion must not be contaminated by halogen compounds which include chlorides, fluorides, bromides, and iodides. These compounds are found in many common home products such as detergent, paint, glue, aerosol spray, bleach, cleaning solvent, salt, and air freshener, and can cause corrosion of furnaces and vents. Avoid using such products in the combustion--air supply. Furnace use during construction of the building could cause the furnace to be exposed to halogen compounds, causing premature failure of the furnace or venting system due to corrosion.

Vent dampers on any appliance connected to the common vent can cause condensation and corrosion in the venting system. Do not use vent dampers on appliances common vented with this furnace.

ADDITIONAL VENTING REQUIREMENTS

A 4--in. (102 mm) round vent elbow is supplied with the furnace.

A 5--in. (127 mm) or 6--in. (152 mm) vent connector may be required for some model furnaces. A field--supplied 4--in. (102 mm) to 5--in. (127 mm) or 4--in. (102 mm) to 6--in. (152 mm) sheet metal increaser fitting is required when 5--in. (127 mm) or

6--in. (152 mm) vent connector is used. See Fig. 33--45 Venting

Orientation for approved vent configurations.

NOTE: Vent connector length for connector sizing starts at furnace vent elbow. The 4--in. (102 mm) vent elbow is shipped for upflow configuration and may be rotated for other positions.

Remove the 3 screws that secure vent elbow to furnace, rotate furnace vent elbow to position desired, reinstall screws. The factory--supplied vent elbow does NOT count as part of the number of vent connector elbows.

The vent connector can exit the door through one of 5 locations on the door.

1. Attach the single wall vent connector to the furnace vent elbow, and fasten the vent connector to the vent elbow with at least two field--supplied, corrosion--resistant, sheet metal screws located 180_ apart.

NOTE: An accessory flue extension KGAFE0112UPH is available to extend from the furnace elbow to outside the furnace casing. If flue extension is used, fasten the flue extension to the vent elbow with at least two field--supplied, corrosion--resistant, sheet metal screws located 180_ apart. Fasten the vent connector to the flue extension with at least two field--supplied, corrosion resistant sheet metal screws located 180_ apart.

2. Vent the furnace with the appropriate connector as shown in Fig. 33--45.

!

CAUTION

A04127

CUT HAZARD

Failure to follow this caution may result in personal injury.

Sheet metal parts may have sharp edges or burrs.

Use care and wear appropriate protective clothing, safety glasses and gloves when handling parts and servicing furnaces.

3. Orient the door to determine the correct location of the door cutout to be removed.

4. Use aviation--type tin snips to remove the correct

U--shaped cut--out in door.

NOTE: If this furnace is equipped with knockouts in the door for the vent, a number of techniques can be used to remove these knockouts as seen in Fig. 28 through 32. The knockout in the bottom of the door is unique due to its flanging and is not easily removed by first cutting the two tie points at the edge of the door, using aviation--type tin snips. (See Fig. 28.) A sharp blow to the rounded end of the knockout (See Fig. 29.) will separate more tie points and allow the knockout to be pulled loose. (See Fig. 30.)

Remove all burrs and sharp edges.

29

A04128

Fig. 29

--- Rounded End of Knockout

For the knockouts in the other locations on the door (top and sides), tin snips can also be used along the door edges; however, the preferred method is to use a hammer and screwdriver to strike a sharp blow (See Fig. 31.) directly to the knockout tie points or use a hammer in the upper left corner of the desired knockout.

(See Fig. 32.) Remove all burrs and sharp edges.

!

CAUTION

BURN HAZARD

Failure to follow this caution may cause personal injury.

Hot vent pipe is within reach of small children when installed in downflow position.

See the following instruction.

An accessory Vent Guard Kit, KGAVG0101DFG is REQUIRED for downflow applications for use where the vent exits through the lower portion of the furnace casing door. Refer to the Vent

Guard Kit Instructions for complete details.

The horizontal portion of the venting system shall slope upwards not less than 1/4--in. (6 mm) per linear ft. (21 mm/m) from the furnace to the vent and shall be rigidly supported every 5 ft. (1.5

M) or less with metal hangers or straps to ensure there is no movement after installation.

SIDEWALL VENTING

This furnace is not approved for direct sidewall horizontal venting.

In the U.S.: Per section 12.4.3.1 of the NFPA 54 / ANSI

Z223.1--2006, any listed mechanical venter may be used, when approved by the authority having jurisdiction.

In Canada: Per section 8.24.2 of the CAN/CSA--B149.1--05, any listed venters may be used, when approved by the authority having jurisdiction. Select the listed mechanical venter to match the Btuh input of the furnace being vented. Follow all manufacturer’s installation requirements for venting and termination included with the listed mechanical venter.

30

Fig. 30

--- Knockout Pulled Loose

A04129

A04130

Fig. 31

--- Hammer and Screwdriver Used for Knockout

Fig. 32

--- Remove Knockout with Hammer

A04131

START--UP, ADJUSTMENT, AND SAFETY

CHECK

Step 1

—General

!

WARNING

FIRE HAZARD

Failure to follow this warning could result in personal injury, death and/or property damage.

This furnace is equipped with manual reset limit switches in the gas control area. The switches open and shut off power to the gas valve if a flame rollout or overheating condition occurs in the gas control area. DO NOT bypass the switches. Correct inadequate combustion air supply problem before resetting the switches.

!

CAUTION

CUT HAZARD

Failure to follow this caution may result in personal injury.

Sheet metal parts may have sharp edges or burrs.

Use care and wear appropriate protective clothing, safety glasses, and gloves when handling parts and servicing furnaces.

1. Maintain 115--v wiring and ground. Improper polarity will result in rapid flashing LED and no furnace operation.

2. Make thermostat wire connections at the 24--v terminal block on the furnace control. Failure to make proper connections will result in improper operation. (See Fig. 26.)

3. Gas supply pressure to the furnace must be greater than

4.5--in. wc (0.16 psig ) but not exceed 14--in. wc (0.5

psig).

4. Check all manual--reset switches for continuity.

5. Install blower compartment door. Door must be in place to operate furnace.

6. Replace outer door.

Step 2

—Start--Up Procedures

!

WARNING

FIRE AND EXPLOSION HAZARD

Failure to follow this warning could result in personal injury, death and or property damage.

Never test for gas leaks with an open flame.

Use a commercially available soap solution made specifically for the detection of leaks to check all connections.

1. Purge gas lines after all connections have been made.

2. Check gas lines for leaks.

!

WARNING

ELECTRICAL SHOCK HAZARD

Failure to follow this warning could result in personal injury, or death.

Blower access door switch opens 115--v power to control.

No component operation can occur unless switch is closed.

Caution must be taken when manually closing this switch for service purposes.

3. To Begin Component Self--Test: Remove blower access door. Disconnect the thermostat R lead from the furnace control board. Manually close the blower door switch.

Short (jumper) the COM--24v terminal on control to the

TEST/TWIN 3/16--inch quick connect terminal on control until LED goes out (approximately 2 sec). Gas valve and humidifier will not be turned on. (See Fig. 25.)

NOTE: The furnace control allows all components, except the gas valve, to be run for short period of time. This feature helps diagnose a system problem in case of a component failure.

Component test feature will not operate if any thermostat signal is present at the control.

Component test sequence is as follows:

Refer to service label attached to furnace or see Fig. 50.

a. LED will display previous status code 4 times.

b. Inducer motor starts and continues to run until Step f of component test sequence.

c. Hot surface igniter is energized for 15 sec., then off.

d. Blower motor operates on HEAT speed for 10 sec.

e. Blower motor operates on COOL speed for 10 sec.

f. Inducer motor stops.

g. Reconnect R lead to furnace control board, release blower door switch and re--install blower door.

4. Operate furnace per instruction on door.

5. Verify furnace shut down by lowering thermostat setting below room temperature.

6. Verify furnace restarts by raising thermostat setting above room temperature.

31

SEE NOTES: 1,2,4,7,8,9 on the page following these figures

Fig. 33

--- Upflow Application--Vent Elbow Up

A03208

SEE NOTES: 1,2,4,5,7,8,9 on the page following these figures

Fig. 36

--- Downflow Application--Vent Elbow Up

A03211

SEE NOTES: 1,2,3,4,7,8,9 on the pages following these figures

Fig. 34

--- Upflow Application--Vent Elbow Right

A03209

SEE NOTES: 1,2,4,5,6,7,8,9,10 on the page following these figures

A03207

Fig. 37

--- Downflow Application--Vent Elbow Left then Up

SEE NOTES:1,2,3,4,5,7,8,9 on the page following these figures

A03210

Fig. 35

--- Downflow Application--Vent Elbow Up then Left

SEE NOTES:1,2,3,4,5,7,8,9 on the page following these figures.

32

A03212

Fig. 38

--- Downflow Application--Vent Elbow Up then Right

SEE NOTES: 1,2,4,7,8,9 on the page following these figures

A03213

Fig. 39

--- Horizontal Left Application--Vent Elbow Left

SEE NOTES: 1,2,4,7,8,9 on the page following these figures

A03218

Fig. 43

--- Horizontal Right Application--Vent Elbow Right

SEE NOTES: 1,2,4,5,7,8,9 on the page following these figures

A03214

Fig. 40

--- Horizontal Left Application--Vent Elbow Right then Up

SEE NOTES: 1,2,4,5,7,8,9 on the page following these figures

A03219

Fig. 44

--- Horizontal Right Application--Vent Elbow Left then Up

SEE NOTES: 1,2,4,5,7,8,9 on the page following these figures

A03215

Fig. 41

--- Horizontal Left Application--Vent Elbow Up

SEE NOTES: 1,2,4,5,7,8,9 on the page following these figures

A03216

Fig. 42

--- Horizontal Left Application--Vent Elbow Right

SEE NOTES: 1,2,4,5,7,8,9

A02068

Fig. 45

--- Horizontal Right Application--Vent Elbow Left

1.

For common vent, vent connector sizing and vent material:

United States----Use the NFGC

Canada----use the CAN/CSA--B149.1--05

2.

Immediately increase to 5--in. (127 mm) or 6--in. (152 mm) vent connector outside furnace casing when 5--in. (127 mm) vent connector is required, refer to Note 1 above.

3.

Side outlet vent for upflow and downflow installations must use

Type B vent immediately after exiting the furnace, except when

KGAVG0101DFG, Downflow Vent Guard Kit, is used in the downflow position

4.

Type--B vent where required, refer to the Note 1 above.

5.

A 4--in. (102 mm) single--wall (26 ga. minimum) vent must be used inside furnace casing and when the KGAVG0101DFG

Downflow Vent Guard Kit is used external to the furnace.

6.

Accessory Downflow Vent Guard Kit, KGAVG0101DFG required in downflow installations with lower vent configuration.

7.

Chimney Adapter Kit may be required for exterior masonry chimney applications. Refer to Chimney Adapter Kit,

KGACA02014FC or KGACA02015FC, for sizing and complete application details.

33

FURNACE

ORIENTATION

Caution!! for the following applications, use the minimum vertical vent heights as specified below.

For all other applications, follow exclusively the national fuel gas code.

VENT

ORIENTATION

FURNACE

INPUT (BTUH/HR)

MINIMUM VENT

DIAMETER

IN. (mm)*

MINIMUM VERTICAL VENT

HEIGHT

FT. (M)**

Downflow

Vent elbow left, then up Fig. 36

154,000

132,000

110,000(036/---12 only)

5 (127)

Horizontal Left

Horizontal Left

Horizontal Left

Vent elbow right, then up Fig. 39

Vent Elbow up Fig.

40

Vent elbow right Fig.

41

154,000

132,000

154,000

132,000

154,000

5 (127)

5 (127)

5 (127)

Downflow

Downflow

Vent elbow up then left Fig. 34

Vent elbow up, then right Fig. 37

110,000

(036/---12 only)

110,000

(036/---12 only)

5 (127)

5 (127)

* 4 in. (102 mm) inside casing or vent guard

** Including 4 in. (102 mm) vent section (s)

NOTE: All vent configurations must also meet National Fuel Gas Code venting requirements NFGC

12 (3.6)

7 (.65)

7 (,65)

7 (.65)

10 (3.0)

10 (3.0)

8.

Secure vent connector to furnace elbow with (2) corrosion--resistant sheet metal screws, spaced approximately 180° apart.

9.

Secure all other single wall vent connector joints with (3) corrosion resistant screws spaced approximately 120° apart. Secure

Type--B vent connectors per vent connector manufacturer’s recommendations.

10.

The total height of the vent and connector shall be at least seven ft. (2.1 M) for the 154,000 Btuh gas input rate model when installed in a downflow application with furnace elbow turned to left side with the connector elbow outside furnace casing pointing upward. (See Fig. 36.)

Step 3

—Adjustments

Table 8—Altitude Derate Multiplier for U.S.A.

!

WARNING

FIRE HAZARD

Failure to follow this warning could result in injury, death and/or property damage.

DO NOT bottom out gas valve regulator adjusting screw.

This can result in unregulated manifold pressure and result in excess overfire and heat exchanger failures.

ALTITUDE

FT. (M)

0–2000

(0---610)

2001–3000

(610---914)

3001–4000

(914---1219)

4001–5000

(1219---1524)

5001–6000

1524---1829)

6001–7000

(1829---2134)

7001–8000

(2134---2438)

PERCENT

OF DERATE

0

8–12

12–16

16–20

20–24

24–28

28–32

DERATE MULTIPLIER

FACTOR*

1.00

0.90

0.86

0.82

0.78

0.74

0.70

8001–9000

(2438---2743)

32–36 0.66

9001–10,000

(2743---3048)

36–40 0.62

* Derate multiplier factors are based on midpoint altitude for altitude range.

!

CAUTION

FURNACE DAMAGE HAZARD

Failure to follow this caution may result in reduced furnace life.

DO NOT redrill orifices. Improper drilling (burrs, out--of round holes, etc.) can cause excessive burner noise and misdirection of burner flames. This can result in flame impingement of heat exchangers, causing failures. (See Fig.

48.)

Furnace gas input rate on rating plate is for installations at altitudes up to 2000 ft. (610 M). Furnace input rate must be within +/--2 percent of furnace rating plate input.

1. Determine the correct gas input rate.

In the U.S.A.:

The input rating for altitudes above 2,000 ft. (610 M) must be reduced by 4 percent for each 1,000 ft. (305 M) above sea level. For installations below 2000 ft., refer to the unit rating plate. For installations above 2000 ft. (610 M), multiply the input on the rating plate by the derate multiplier in Table 8 for the correct input rate.

In Canada:

The input rating must be derated by 10 percent for altitudes of 2,000 ft. (610 M) to 4,500 ft. (1372 M) above sea level by an authorized Gas Conversion Station or Dealer.

To determine correct input rate for altitude, see Example 1 and use 0.90 as derate multiplier factor.

34

EXAMPLE 1:

88,000 BTUH INPUT FURNACE INSTALLED AT 4300 FT.

Furnace Input

Rate at Sea Level

X Derate Multiplier

Factor

= Furnace Input

Rate at Installation Altitude

88,000 X 0.90

= 79,200

2. Determine the correct orifice and manifold pressure adjustment. There are two different orifice and manifold adjustment tables. All models in all positions, except Low NOx models in downflow or horizontal positions, use Table 12

(22,000 Btuh/Burner).

Low NOx models in the downflow or horizontal positions must use Table 13 (21,000 Btuh/Burner). See input listed on rating plate.

a. Obtain average yearly gas heat value (at installed altitude) from local gas supplier.

b. Obtain average yearly gas specific gravity from local gas supplier.

c. Find installation altitude in Table 12 or 13.

d. Find closest natural gas heat value and specific gravity in Table 12 or 13.

e. Follow heat value and specific gravity lines to point of intersection to find orifice size and manifold pressure settings for proper operation.

f. Check and verify burner orifice size in furnace.

NEVER ASSUME ORIFICE SIZE. ALWAYS

CHECK AND VERIFY.

g. Replace orifice with correct size if required by Table

12 or 13. Use only factory--supplied orifices. See

EXAMPLE 2.

EXAMPLE 2: (0--2000 ft. (0--610 M) altitude)

For 22,000 Btuh per burner application use Table 12.

Heating value = 1000 Btuh/cu ft.

Specific gravity = 0.62

Therefore: Orifice No. 43*

Manifold pressure: 3.7--in. wc

*Furnace is shipped with No. 43 orifices. In this example all main burner orifices are the correct size and do not need to be changed to obtain proper input rate.

3. Adjust manifold pressure to obtain correct input rate.

a. Turn gas valve ON/OFF switch to OFF.

b. Remove manifold pressure tap plug from gas valve.

(See Fig. 47.) c. Connect a water column manometer or similar device to manifold pressure tap.

d. Turn gas valve ON/OFF switch to ON.

e. Manually close blower door switch.

f. Set thermostat to call for heat.

g. Jumper R and W thermostat connections on furnace control board to start furnace.

h. Remove regulator seal cap and turn regulator adjusting screw counterclockwise (out) to decrease input rate of clockwise (in) to increase input rate.

i. Install regulator seal cap.

j. Leave manometer or similar device connected and proceed to Step 4.

NOTE: DO NOT set manifold pressure less than 3.2--in wc or more than 3.8--in. wc for natural gas at sea level. If manifold pressure is outside this range, change main burner orifices or refer

Table 12 or 13.

NOTE: If orifice hole appears damaged or it is suspected to have been redrilled, check orifice hole with a numbered drill bit of

35 correct size. Never redrill an orifice. A burr--free and squarely aligned orifice hole is essential for proper flame characteristics.

4. Verify natural gas input rate by clocking meter.

NOTE: Gas valve regulator adjustment cap must be in place for proper input to be clocked.

a. Turn off all other gas appliances and pilots served by the meter.

b. Run furnace for 3 minutes in heating operation.

c. Measure time (in sec) for gas meter to complete 1 revolution and note reading. The 2 or 5 cubic feet dial provides a more accurate measurement of gas flow.

d. Refer to Table 10 for cubic ft. of gas per hr.

e. Multiply gas rate (cu ft./hr) by heating value (Btu/cu ft.) to obtain input.

If clocked rate does not match required input from Step 1, increase manifold pressure to increase input or decrease manifold pressure to decrease input. Repeat steps b through e until correct input is achieved. Reinstall regulator seal cap on gas valve.

5. Set temperature rise. The furnace must operate within the temperature rise ranges specified on the furnace rating plate. Do not exceed temperature rise range specified on unit rating plate. Determine the temperature rise as follows:

NOTE: Blower access door must be installed when taking temperature rise reading. Leaving blower access door off will result in incorrect temperature measurements.

a. Place thermometers in return and supply ducts as close to furnace as possible. Be sure thermometers do not see radiant heat from heat exchangers. Radiant heat affects temperature rise readings. This practice is particularly important with straight--run ducts.

b. When thermometer readings stabilize, subtract return-air temperature from supply--air temperature to determine air temperature rise.

NOTE: Blower access door must be installed for proper temperature rise measurement.

NOTE: If the temperature rise is outside this range, first check:

1.) Gas input for heating operation.

2.) Derate for altitude if applicable.

3.) Return and supply ducts for excessive restrictions causing static pressures greater than 0.50--in. wc.

4.) Dirty filter.

!

WARNING

ELECTRICAL SHOCK HAZARD

Failure to follow this warning could result in personal injury or death.

Disconnect 115--v electrical power before changing speed tap.

c. Adjust air temperature rise by adjusting blower speed.

Increase blower speed to reduce temperature rise.

Decrease blower speed to increase temperature rise.

d. Turn thermostat down below room temperature and remove blower access door.

e. To change motor speed selection for heating, remove blower motor lead from control HEAT terminal (See

Fig. 25.) Select desired blower motor speed lead from one of the other terminals and relocate it to the HEAT terminal (See Table 9 for lead color identification).

Reconnect original lead to SPARE terminal.

COLOR

White

Black

Yellow{

Blue*

Red*

Table 9—Speed Selection

SPEED

Common

High

Med---High

Med---Low

Low

AS SHIPPED

BLW

COOL

SPARE

SPARE

HEAT

* 1/5 HP motor models: BLUE to HEAT, RED to SPARE

{

Not available on 1/5 HP motors.

NOTE: Continuous blower is the HEAT speed.

f. Repeat steps a through e.

g. When correct input rate and temperature rise is achieved, turn gas valve ON/OFF switch to OFF.

h. Remove manometer or similar device from gas valve.

i. Reinstall manifold pressure tap plug in gas valve.

!

!

WARNING

FIRE HAZARD

Failure to follow this warning could result in personal injury, death and/or property damage.

Reinstall manifold pressure tap plug in gas valve to prevent gas leak.

j. Reinstall blower access door if removed.

k. Turn gas valve ON/OFF switch to ON.

CAUTION

FURNACE OVERHEATING HAZARD

Failure to follow this caution may result in reduced furnace life.

Recheck temperature rise. It must be within limits specified on the rating plate. Recommended operation is at the midpoint of rise range or slightly above.

6. Set thermostat heat anticipator.

a. Mechanical thermostat -- Set thermostat heat anticipator to match the amp. draw of the electrical components in the R--W circuit. Accurate amp. draw readings can be obtained at the wires normally connected to thermostat subbase terminals, R and W. The thermostat anticipator should NOT be in the circuit while measuring current. (1.) Remove thermostat from subbase or from wall. (2.) Connect an amp. meter as shown in

Fig. 49 across the R and W subbase terminals or R and

W wires at wall.

(3.) Record amp. draw across terminals when furnace is in heating and after blower starts.

(4.) Set heat anticipator on thermostat per thermostat instructions and install on subbase or wall.

b. Electronic thermostat: Set cycle rate for 4 cycles per hr.

7. Adjust blower off delay The blower off delay has 4 adjustable settings from 90 sec to 180 sec. The blower off delay jumpers are located on the furnace control board.

(See Fig. 25.) To change the blower off delay setting, move the jumper from one set of pins on the control to the pins used for the selected blower off delay. Factory off delay setting is 120 sec.

8. Set airflow CFM for cooling Select the desired blower motor speed lead for cooling airflow. See Table 5--Air Delivery--CFM (With Filter). See Table 9 for lead color identification.

36

Fig. 46

--- Wiring Diagram

37

A08411

BURNER

ORIFICE

Fig. 47

--- Gas Control Valve

A06666

THERMOSTAT SUBBASE

TERMINALS WITH

THERMOSTAT REMOVED

(ANITICIPATOR, CLOCK, ETC.,

MUST BE OUT OF CIRCUIT.)

HOOK-AROUND

AMMETER

Fig. 48

--- Orifice Hole

R Y W G

A93059

10 TURNS

FROM UNIT 24-V

CONTROL TERMINALS

= 0.5 AMPS FOR THERMOSTAT

Fig. 49

--- Amp. Draw Check With Ammeter

A96316

38

Step 4

—Check Safety Controls

The flame sensor, gas valve, and pressure switch were all checked in the Start--up procedure section as part of normal operation.

1. Check Main Limit Switch(es)

This control shuts off combustion control system and energizes air--circulating blower motor, if furnace overheats.

By using this method to check limit control, it can be established that limit is functioning properly and will operate if there is a restricted duct system or motor failure. If limit control does not function during this test, cause must be determined and corrected.

a. Run furnace for at least 5 minutes.

b. Gradually block off return air with a piece of cardboard or sheet metal until the limit trips.

c. Unblock return air to permit normal circulation.

d. Burners will re--light when furnace cools down.

2. Check draft safeguard switch.

The purpose of this control is to cause the safe shutdown of the furnace during certain blocked vent conditions.

a. Verify vent pipe is cool to the touch.

b. Disconnect power to furnace and remove vent connector from furnace vent elbow.

c. Restore power to furnace and set room thermostat above room temperature.

d. After normal start--up, allow furnace to operate for 2 minutes, then block vent elbow in furnace 80 percent of vent area with a piece of flat sheet metal.

e. Furnace should cycle off within 2 minutes. If gas does not shut off within 2 minutes, determine reason draft safeguard switch did not function properly and correct condition.

f. Remove blockage from furnace vent elbow.

g. Switch will auto--reset when it cools.

h. Re--install vent connector.

NOTE: Should switch remain open longer than 3 minutes, furnace control board will lockout the furnace for 3 hrs. To reset furnace control board, turn thermostat below room temperature or from HEAT to OFF and turn 115v power OFF, then back ON.

3. Check Pressure Switch This control proves operation of the draft inducer blower.

a. Turn off 115--v power to furnace.

b. Disconnect inducer motor lead wires from wire harness.

c. Turn on 115--v power to furnace.

d. Set thermostat to “call for heat” and wait 1 minute.

When pressure switch is functioning properly, hot surface igniter should NOT glow and control diagnostic light flashes a status code 32. If hot surface igniter glows when inducer motor is disconnected, shut down furnace immediately.

e. Determine reason pressure switch did not function properly and correct condition.

f. Turn off 115--v power to furnace.

g. Reconnect inducer motor wires, replace outer door, and turn on 115--v power.

h. Blower will run for 90 sec before beginning the call for heat again.

i. Furnace should ignite normally.

Step 5

—Checklist

1. Put away tools and instruments. Clean up debris.

2. Verify that blower OFF--DELAY time is selected as desired.

3. Verify that blower and burner access doors are properly installed.

4. Cycle test furnace with room thermostat.

5. Check operation of accessories per manufacturer’s instructions.

6. Review User’s Guide with owner.

7. Attach literature packet to furnace.

39

SECONDS FOR 1

REVOLUTION

38

39

40

41

34

35

36

37

30

31

32

33

26

27

28

29

46

47

48

49

42

43

44

45

22

23

24

25

18

19

20

21

14

15

16

17

10

11

12

13

FURNACE CASING WIDTH

14---1/2 (368)

17---1/2 (445)

21 (533)

24 (610)

* Recommended

** Some furnaces may have 2 filters.

1 Cu Ft

Table 10—Gas Rate (cu ft./hr)

SIZE OF TEST DIAL

2 Cu Ft 5 Cu Ft

SECONDS FOR 1

REVOLUTION

95

92

90

88

106

103

100

97

138

133

129

124

120

116

113

109

78

76

75

73

86

84

82

80

200

189

180

171

164

157

150

144

360

327

300

277

257

240

225

212

212

206

200

195

189

185

180

176

277

267

257

248

240

232

225

218

172

167

164

160

157

153

150

147

400

379

360

343

327

313

300

288

720

655

600

555

514

480

450

424

529

514

500

486

474

462

450

439

692

667

643

621

600

581

563

545

429

419

409

400

391

383

375

367

1000

947

900

857

818

783

750

720

1800

1636

1500

1385

1286

1200

1125

1059

96

98

100

102

88

90

92

94

80

82

84

86

72

74

76

78

104

106

108

110

112

116

120

64

66

68

70

58

59

60

62

54

55

56

57

50

51

52

53

Table 11—Filter Size Information (In. / mm)

FILTER SIZE

SIDE

RETURN

16 x25 x3/4

(406 x635 x19)

16 x25 x3/4

(406 x635 x19)

BOTTOM

RETURN

14 x25 x3/4

(356 x635 x19)

16 x25 x3/4

(406 x635 x19)

16 x25 x3/4

(406 x635 x19)

16 x25 x3/4

(406 x635 x19)

20 x25 x3/4

(508 x635 x19)

24 x25 x3/4

(610 x635 x19)

1 Cu Ft

SIZE OF TEST DIAL

2 Cu Ft 5 Cu Ft

38

37

36

35

41

40

39

38

45

44

43

42

50

48

47

46

35

34

33

33

32

31

30

56

54

53

51

62

61

60

58

67

65

64

63

72

71

69

68

75

74

72

71

82

80

78

76

90

88

86

84

100

97

95

92

69

68

67

65

64

62

60

124

122

120

116

112

109

106

103

144

141

138

136

133

131

129

126

205

200

196

192

188

184

180

178

250

243

237

231

225

220

214

209

173

170

167

164

161

155

150

310

305

300

290

281

273

265

257

360

355

346

340

333

327

321

316

FILTER TYPE

Washable*

Washable*

Washable*

Washable*

40

Table 12—Orifice Size* and Manifold Pressure (In. wc) for Gas Input Rate

(Tabulated data based on 22,000 Btuh per burner, derated 4 percent for each

1000 ft. (305 M) above sea level)

41

A08484

Table 12–Orifice size* and Manifold Pressure (In wc) for Gas Input Rate (Continued)

(Tabulated data based on 22,000 Btuh per burner, derated 4 percent for each 1000 ft. (305 M) above sea level)

A08484a

42

Table 13—Orifice Size* and Manifold Pressure (In. wc) for Gas Input Rate

(Tabulated data based on 22,000 Btuh High Heat / 14,5000 BTUH Low Heat per burner, derated 4 percent for each 1000 ft. (305 M) above sea level)

43

A08485

Table 13 -- Orifice Size* and Manifold Pressure (In. wc) for Gas Input Rate (Continued)

(Tabulated data based on 22,000 Btuh High Heat / 14,500 Btuh Low Heat per burner, derated 4 percent for each 1000 ft. (305 M) above sea level)

A08485a

SERVICE

If status code recall is needed, briefly remove then reconnect one main limit wire to display stored status code. On RED LED boards do not remove power or blower door before initiating status code recall. After status code recall is completed component test will occur.

LED CODE STATUS

CONTINUOUS OFF - Check for 115VAC at L1 and L2, and 24VAC at SEC-1 and SEC-2.

CONTINUOUS ON - Control has 24VAC power.

RAPID FLASHING - Line voltage (115VAC) polarity reversed. If twinned, refer to twinning kit instructions.

EACH OF THE FOLLOWING STATUS CODES IS A TWO DIGIT NUMBER WITH THE FIRST DIGIT DETERMINED BY THE NUMBER OF SHORT FLASHES AND THE SECOND DIGIT BY THE NUMBER OF LONG FLASHES.

11 NO PREVIOUS CODE - Stored status code is erased automatically after 72 hours. On

RED LED boards stored status codes can also be erased when power

(115 VAC or 24 VAC) to control is interrupted.

12 BLOWER ON AFTER POWER UP (115 VAC or 24 VAC) -Blower runs for 90 seconds, if unit is powered up during a call for heat (R-W closed) or R-W opens during blower on-delay.

13 LIMIT CIRCUIT LOCKOUT - Lockout occurs if the limit, draft safeguard, flame rollout, or blocked vent switch (if used) is open longer than 3 minutes.

- Control will auto reset after three hours. - Refer to #33.

14 IGNITION LOCKOUT - Control will auto-reset after three hours. Refer to #34.

21 GAS HEATING LOCKOUT - Control will NOT auto reset.

Check for: - Mis-wired gas valve -Defective control (valve relay)

22 ABNORMAL FLAME-PROVING SIGNAL - Flame is proved while gas valve is deenergized. Inducer will run until fault is cleared. Check for: - Leaky gas valve

- Stuck-open gas valve

23 PRESSURE SWITCH DID NOT OPEN Check for:

- Obstructed pressure tubing. - Pressure switch stuck closed.

24 SECONDARY VOLTAGE FUSE IS OPEN Check for:

- Short circuit in secondary voltage (24VAC) wiring.

COMPONENT TEST

To initiate the component test sequence, shut OFF the room thermostat or disconnect the "R" thermostat lead. Briefly short the TEST/TWIN terminal to the "Com 24V" terminal. Status LED will flash code and then turn ON the inducer motor. The inducer motor will run for the entire component test. The hot surface ignitor, blower motor fan speed (on AMBER LED boards only) blower motor-heat speed, and blower motor-cool speed will be turned ON for 10-15 seconds each. Gas Valve and Humidifier will not be turned on.

327596-101 REV. B

31

PRESSURE SWITCH DID NOT CLOSE OR REOPENED - If open longer than five minutes, inducer shuts off for 15 minutes before retry. Check for: - Excessive wind

- Proper vent sizing - Defective inducer motor

- Low inducer voltage (115VAC) - Defective pressure switch

- Inadequate combustion air supply - Disconnected or obstructed pressure tubing

- Low inlet gas pressure (if LGPS used) - Restricted vent

If it opens during blower on-delay period, blower will come on for the selected blower off-delay.

33 LIMIT CIRCUIT FAULT - Indicates a limit, draft safeguard, flame rollout, or blocked vent switch (if used) is open. Blower will run for 4 minutes or until open switch remakes whichever is longer. If open longer than 3 minutes, code changes to lockout #13.

If open less than 3 minutes status code #33 continues to flash until blower shuts off.

Flame rollout switch and BVSS require manual reset. Check for: - Restricted vent

- Proper vent sizing - Loose blower wheel. - Excessive wind

- Dirty filter or restricted duct system.

- Defective blower motor or capacitor. - Defective switch or connections.

- Inadequate combustion air supply (Flame Roll-out Switch open).

34 IGNITION PROVING FAILURE - Control will try three more times before lockout #14 occurs. If flame signal lost during blower on-delay period, blower will come on for the selected blower off-delay. Check for: - Flame sensor must not be grounded

- Oxide buildup on flame sensor (clean with fine steel wool).

- Proper flame sense microamps (.5 microamps D.C. min., 4.0 - 6.0 nominal).

- Gas valve defective or gas valve turned off - Manual valve shut-off

- Defective Hot Surface Ignitor - Control ground continuity

- Low inlet gas pressure - Inadequate flame carryover or rough ignition

- Green/Yellow wire MUST be connected to furnace sheet metal

45 CONTROL CIRCUITRY LOCKOUT Auto-reset after one hour lockout due to;

- Gas valve relay stuck open - Flame sense circuit failure - Software check error

Reset power to clear lockout. Replace control if status code repeats.

A04223

Fig. 50

--- Service Label

44

SERVICE AND MAINTENANCE

PROCEDURES

!

WARNING

FIRE, EXPLOSION, ELECTRICAL SHOCK

HAZARD

Failure to follow this warning could result in personal injury, death and/or property damage.

The ability to properly perform maintenance on this equipment requires certain knowledge, mechanical skills, tools, and equipment. If you do not possess these, do not attempt to perform any maintenance on this equipment other than those procedures recommended in the User’s Manual.

!

WARNING

ELECTRICAL SHOCK, FIRE OR EXPLOSION

HAZARD

Failure to follow this warning could result in personal injury or death, or property damage.

Before servicing, disconnect all electrical power to furnace.

Verify proper operation after servicing.

!

CAUTION

ELECTRICAL OPERATION HAZARD

Failure to follow this caution may result in improper furnace operation.

Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation.

!

CAUTION

ENVIRONMENTAL HAZARD

Failure to follow this caution may result in environmental pollution.

Remove and recycle all components or materials (i.e. oil, refrigerant, et.) before unit final disposal.

Step 1

—Introduction

GENERAL

These instructions are written as if the furnace is installed in an upflow application. An upflow furnace application is where the blower is located below the combustion and controls section of the furnace, and conditioned air is discharged upward. Since this furnace can be installed in any of the 4 positions shown in Fig. 4, you must revise your orientation to component location accordingly.

ELECTRICAL CONTROLS AND WIRING

!

WARNING

ELECTRICAL SHOCK HAZARD

Failure to follow this warning could result in personal injury or death.

There may be more than one electrical supply to the furnace. Check accessories and cooling unit for additional electrical supplies that must be shut off during furnace servicing.

45

The electrical ground and polarity for 115--v wiring must be properly maintained. Refer to Fig. 26 for field wiring information and to Fig. 46 for furnace wiring information.

NOTE: If the polarity is not correct, the STATUS LED on the control will flash rapidly and prevent the furnace from heating.

The control system also requires an earth ground for proper operation of the control and flame--sensing electrode.

The 24--v circuit contains an automotive--type, 3--amp. fuse located on the control. (See Fig. 25.) Any shorts of the 24--v wiring during installation, service, or maintenance will cause this fuse to blow. If fuse replacement is required, use ONLY a 3--amp.

fuse. The control LED will display status code 24 when fuse needs to be replaced.

Proper instrumentation is required to service electrical controls.

The control in this furnace is equipped with a Status Code LED

(Light--Emitting Diode) to aid in installation, servicing, and troubleshooting. It can be viewed through the sight glass in blower access door. The furnace control LED is either ON continuously, rapid flashing, or a code composed of 2 digits. The first digit is the number of short flashes, the second digit is the number of long flashes.

For an explanation of status codes, refer to service label located on blower access door or Fig. 50 and the troubleshooting guide which can be obtained from your distributor. The furnace control will store 1 status code for 72 hrs.

See Fig. 54, a brief Troubleshooting Guide.

For Controls With a RED LED

The stored status code will be erased from the control memory, if

115-- or 24--v power is interrupted.

1. To retrieve status code, proceed with the following:

NOTE: NO thermostat signal may be present at control, and all blower--OFF delays must be completed.

a. Leave 115--v power to furnace turned on.

b. Remove outer access door.

c. Look into blower access door sight glass for current

LED status. Do not remove blower access door or terminate 115--v power to control or status code will be lost.

d. BRIEFLY remove insulated terminal wire from the draft safeguard (DSS) switch until LED goes out (1 to

2 sec), then reconnect it.

2. When above items have been completed, the LED flashes status code 4 times. Record this status code for further troubleshooting.

3. Component self--test will begin. Refer to component

TEST section for complete test sequence.

4. Check LED status.

5. Refer to SERVICE label on front of the blower access door for more information.

6. Check LED status. If no previous faults in history, control will flash status code 11.

7. If LED status indicates proper operation, RELEASE

BLOWER ACCESS DOOR SWITCH, reattach wire to R

terminal on furnace control board, replace blower access door, and replace burner access door.

Step 2

—Care and Maintenance

!

WARNING

FIRE OR EXPLOSION HAZARD

Failure to follow this warning could result in personal injury, death and/or property damage.

Never store anything on, near, or in contact with the furnace, such as: 1. Spray or aerosol cans, rags, brooms, dust mops, vacuum cleaners, or other cleaning tools.

2. Soap powders, bleaches, waxes or other cleaning compounds, plastic or plastic containers, gasoline, kerosene, cigarette lighter fluid, dry cleaning fluids, or other volatile fluids.

3. Paint thinners and other painting compounds, paper bags, or other paper products.

For continuing high performance and to minimize possible equipment failure, periodic maintenance must be performed on this equipment. Consult your local dealer about proper frequency of maintenance and the availability of a maintenance contract.

!

WARNING

ELECTRICAL SHOCK AND FIRE HAZARD

Failure to follow this warning could result in personal injury, death or property damage.

Turn off the gas and electrical supplies to the unit before performing any maintenance or service. Follow the operating instructions on the label attached to the furnace.

!

WARNING

CARBON MONOXIDE POISONING AND FIRE

HAZARD

Failure to follow this warning could result in personal injury, death and/or property damage.

Never operate unit without a filter or with filter access door removed.

!

CAUTION

CUT HAZARD

Failure to follow this caution may result in personal injury.

Sheet metal parts may have sharp edges or burrs. Use care and wear appropriate protective clothing, safety glasses and gloves when handling parts and servicing furnaces.

The minimum maintenance on this furnace is as follows:

1. Check and clean air filter each month or more frequently if required. Replace if torn.

2. Check blower motor and wheel for cleanliness each heating and cooling season. Clean as necessary.

3. Check electrical connections for tightness and controls for proper operation each heating season. Service as necessary.

4. Inspect burner compartment before each heating season for rust, corrosion, soot or excessive dust. If necessary, have furnace and burner serviced by a qualified service agency.

5. Inspect the vent pipe/vent system before each heating season for rust, corrosion, water leakage, sagging pipes or broken

46 fittings. Have vent pipes/vent system serviced by a qualified service agency.

6. Inspect any accessories attached to the furnace such as a humidifier or electronic air cleaner. Perform any service or maintenance to the accessories as recommended in the accessory instructions.

CLEANING AND/OR REPLACING AIR FILTER

The air filter arrangement will vary depending on the application.

The filter is exterior to the furnace casing.

NOTE: If the filter has an airflow direction arrow, the arrow must point towards the blower.

!

CAUTION

CUT HAZARD

Failure to follow this caution may result in personal injury.

Sheet metal parts may have sharp edges or burrs. Use care and wear appropriate protective clothing, safety glasses and gloves when handling parts and servicing furnaces.

Media cabinet filter procedures:

NOTE: Media cabinet or 3/4--in. (19 mm) filter rack are accessories and are not included from the factory with standard furnace model.

1. Turn off electrical supply to furnace before removing filter access door.

2. Remove filter cabinet door.

3. Slide filter out of cabinet.

4. If equipped with permanent, washable 3/4--in. (19 mm) filter, clean filter by spraying cold tap water through filter in opposite direction of airflow. Rinse filter and let dry. Oiling or coating of the filter is not recommended. See Table 11 for size information.

5. If equipped with factory--specified disposable media filter, replace only with media filter having the same part number and size. For expandable replacement media, refer to the instructions included with the replacement media. If equipped with accessory

KGAFR0301ALL external filter rack, See Table 11.

6. Slide filter into cabinet.

7. Replace filter cabinet door.

8. Turn on electrical supply to furnace.

BLOWER MOTOR AND WHEEL

!

WARNING

ELECTRICAL SHOCK HAZARD

Failure to follow this warning could result in personal injury or death.

Blower access door switch opens 115--v power to control. No component operation can occur unless switch is closed.

Caution must be taken when manually closing this switch for service purposes.

NOTE: The blower wheel should not be dropped or bent as balance will be affected.

The following steps should be performed by a qualified service agency.

To ensure long life and high efficiency, clean accumulated dirt and grease from blower wheel and motor annually.

The inducer and blower motors are pre--lubricated and require no additional lubrication. These motors can be identified by the absence of oil ports on each end of the motor.

Clean blower motor and wheel as follows:

1. Turn off electrical supply to furnace.

2. Loosen the thumbscrew on outer door and remove outer door.

3. For downflow or horizontal furnaces having vent pipes within the furnace that pass in front of the blower access door: a. Disconnect vent connector from furnace vent elbow.

b. Disconnect and remove short piece of vent pipe from within furnace.

4. Remove 2 screws from blower access door and remove blower access door.

5. Disconnect blower leads from furnace control. Record wire color and location for reassembly. All other factory wires can be left connected, but field thermostat connections may need to be disconnected depending on their length and routing.

6. Remove 2 screws holding control box to blower shelf.

7. Hang control box from front of furnace casing and away from blower compartment.

8. Remove 2 screws holding blower assembly to blower deck and slide blower assembly out of furnace.

9. Clean blower wheel and motor using a vacuum with soft brush attachment. Blower wheel blades may be cleaned with a small paint or flux brush. Do not remove or disturb balance weights (clips) on blower wheel blades.

10. Vacuum any loose dust from blower housing, wheel and motor.

11. If a greasy residue is present on blower wheel, remove wheel from the blower housing and wash it with an appropriate degreaser. To remove wheel:

NOTE: Before disassembly, mark blower motor, and blower housing so motor and each arm is positioned at the same location during reassembly.

a. Disconnect capacitor wires and ground wire attached to blower housing.

b. Remove screws securing cutoff plate and remove cutoff plate from housing.

c. Loosen set screw holding blower wheel on motor shaft

(160+/--20 in.--lb. when reassembling).

d. Remove bolts holding motor to blower housing and slide motor out of wheel (40+/--10 in.--lb. when reassembling).

e. Remove blower wheel from housing.

f. Clean wheel and housing.

12. Reassemble motor and blower by reversing steps 11f through 11a, finishing with 11a. Be sure to reattach ground wire to the blower housing.

13. Verify that blower wheel is centered in blower housing and set screw contacts the flat portion of the motor shaft.

Loosen set screw on blower wheel and reposition if necessary.

14. Spin the blower wheel by hand to verify that the wheel does not rub on the housing.

15. Reinstall blower assembly in furnace.

16. Reinstall control box assembly in furnace.

!

CAUTION

UNIT DAMAGE HAZARD

Failure to follow this caution may result in shortened heat exchanger life.

Heating fan speed(s) MUST be adjusted to provide proper air temperature rise as specified on the rating plate.

Recommended operation is at the midpoint of the rise range or slightly above. Refer to SET TEMPERATURE RISE under START--UP, ADJUSTMENT, and SAFETY

CHECK.

NOTE: Refer to Table 9 for motor speed lead relocation if leads were not identified before disconnection.

17. Reconnect blower leads to furnace control. Refer to furnace wiring diagram, and connect thermostat leads if previously disconnected.

18. To check blower for proper rotation: a. Turn on electrical supply.

!

WARNING

ELECTRICAL SHOCK HAZARD

Failure to follow this warning could result in personal injury, or death.

Blower access door switch opens 115--v power to furnace control. No component operation can occur unless switch is closed. Exercise caution to avoid electrical shock from exposed electrical components when manually closing this switch for service purposes.

b. Manually close blower access door switch.

NOTE: If thermostat terminals are jumpered at the time blower access door switch is closed, blower will run for 90 sec before beginning a heating or cooling cycle.

c. Perform component self--test as shown at the bottom of the SERVICE label, located on the front of blower access door.

d. Verify blower is rotating in the correct direction

19. If furnace is operating properly, RELEASE BLOWER

ACCESS DOOR SWITCH. Remove any jumpers or reconnect any disconnected thermostat leads. Replace blower access door.

20. Downflow or horizontal furnaces with vent pipe through furnace only: a. Install and connect short piece of vent pipe inside furnace to existing vent.

b. Connect vent connector to vent elbow.

21. Reinstall casing door.

22. Turn on gas supply and cycle furnace through one complete heating and cooling cycle. Verify the furnace temperature rise as shown in Adjustments Section. Adjust temperature rise as shown in Adjustments Section. If outdoor temperature is below 70_F, (21_C) turn off circuit breaker to outdoor unit before running furnace in the cooling cycle. Turn outdoor circuit breaker on after completing cooling cycle.

47

CLEANING HEAT EXCHANGER

The following steps should be performed by a qualified service agency:

NOTE: If the heat exchangers get a heavy accumulation of soot and carbon, they should be replaced rather than trying to clean them thoroughly. A heavy build--up of soot and carbon indicates that a problem exists which needs to be corrected, such as improper adjustment of manifold pressure, insufficient or poor quality combustion air, incorrect size or damaged manifold orifice( s), improper gas, or a restricted heat exchanger. Action must be taken to correct the problem.

If it becomes necessary to clean the heat exchangers because of dust or corrosion, proceed as follows:

1. Turn OFF gas and electrical power to furnace.

2. Remove outer access door.

3. Disconnect vent connector from furnace vent elbow.

4. For downflow or horizontal furnace having an internal vent pipe, remove internal vent pipe within the casing.

5. Disconnect wires to the following components. Mark wires to aid in reconnection of (be careful when disconnecting wires from switches because damage may occur): a. Draft safeguard switch.

b. Inducer motor.

c. Pressure switch(es).

d. Limit overtemperature switch.

e. Gas valve.

f. Hot surface igniter.

g. Flame--sensing electrode.

h. Flame rollout switches.

i. Remove NOx baffles on low NOx models.

6. Remove screws that fasten the collector box assembly to the cell panel. Be careful not to damage the collector box.

Inducer assembly and elbow need not be removed from collector box.

7. Disconnect gas line from gas manifold.

8. Remove the 5 screws that attach the burner assembly to the cell panel. The gas valve and individual burners need not be removed from support assembly.

NOTE: Be very careful when removing burner assembly to avoid breaking igniter. See Fig. 51 and 52 for correct igniter location.

9. Using field--provided 25--caliber rifle cleaning brush,

36--in. (914 mm) long, 1/4 in. (6 mm) diameter steel spring cable, a variable speed, reversible electric drill, and vacuum cleaner, clean cells as follows: a. Remove metal screw fitting from wire brush to allow insertion into cable.

b. Insert the twisted wire end of brush into end of spring cable, and crimp tight with crimping tool or crimp by striking with ball--peen hammer. TIGHTNESS IS

VERY IMPORTANT.

NOTE: The materials needed in item 9 can usually be purchased at local hardware stores.

(1) Attach variable--speed, reversible drill to the end of spring cable (end opposite brush).

(2) Insert brush end of cable into the outlet opening of cell and slowly rotate with drill. DO NOT force cable. Gradually insert cable into upper pass of cell. (See Fig. 53.)

(3) Work cable in and out of cell 3 or 4 times to obtain sufficient cleaning. DO NOT pull cable with great force. Reverse drill and gradually work cable out.

Fig. 51

Fig. 52

--- Igniter Position--Side View

--- Igniter Position--Top View

A05025

1-7/8

(47.6 mm)

A05026

48

A01050

Fig. 53

--- Cleaning Heat Exchanger Cell

(4) Insert brush end of cable in burner inlet opening of cell, and proceed to clean 2 lower passes of cell in same manner as upper pass.

(5) Repeat foregoing procedures until each cell in furnace has been cleaned.

(6) Using vacuum cleaner, remove residue from each cell.

(7) Using vacuum cleaner with soft brush attachment, clean burner assembly.

(8) Clean flame sensor with fine steel wool.

(9) Install NOx baffles (if removed).

(10) Reinstall burner assembly. Center burners in cell openings.

10. Remove old sealant from cell panel and collector box flange.

11. Spray releasing agent on the heat exchanger cell panel where collector box assembly contacts cell panel.

NOTE: A releasing agent such as cooking spray or equivalent

(must not contain corn or canola oil, aromatic or halogenated hydrocarbons or inadequate seal may occur) and RTV sealant

(G.E. 162, 6702, or Dow--Corning 738) are needed before starting installation. DO NOT substitute any other type of RTV sealant. G.E. 162 (P771--9003) is available through RCD in 3--oz tubes.

12. Apply new sealant to flange of collector box and attach to cell panel using existing screws, making sure all screws are secure.

13. Reconnect wires to the following components. (Use connection diagram on wiring label, if wires were not marked for reconnection locations.): a. Draft safeguard switch.

b. Inducer motor.

c. Pressure switch(es).

d. Limit over--temperature switch.

e. Gas valve.

f. Hot surface igniter.

g. Flame--sensing electrode.

h. Flame rollout switches.

i. Install NOx baffles (if removed).

14. Reinstall internal vent pipe, if applicable.

15. Reinstall vent connector on furnace vent elbow. Securely fasten vent connector to vent elbow with 2 field--supplied, corrosion--resistant, sheet metal screws located 180_ apart.

16. Replace blower access door only, if it was removed.

17. Set thermostat above room temperature and check furnace for proper operation.

18. Verify blower airflow and speed changes between heating and cooling.

!

WARNING

FIRE OR EXPLOSION HAZARD

Failure to follow this warning could result in personal injury, death and/or property damage.

Never use a match or other open flame to check for gas leaks. Use a soap--and--water solution.

19. Check for gas leaks.

20. Replace outer access door.

Step 3

—Sequence of Operation

NOTE: Furnace control must be grounded for proper operation or control will lock out. Control is grounded through green/yellow wire routed to gas valve and manifold bracket screw.

Using the schematic diagram in Fig. 46, follow the sequence of operation through the different modes. Read and follow the wiring diagram very carefully.

NOTE: If a power interruption occurs during a call for heat (W), the control will start a 90--sec blower--only ON period two seconds after power is restored, if the thermostat is still calling for gas heating. The red LED light will flash code 12 during the

90--sec period, after which the LED will be ON continuous, as long as no faults are detected. After the 90--sec period, the furnace will respond to the thermostat normally.

The blower door must be installed for power to be conducted through the blower door interlock switch ILK to the furnace control CPU, transformer TRAN, inducer motor IDM, blower motor BLWM, hot--surface igniter HSI, and gas valve GV.

1. Heating

(See Fig. 26 for thermostat connections.) The wall thermostat “calls for heat,” closing the R--to--W circuit. The furnace control performs a self--check, verifies the pressure

49 switch contacts PRS are open, and starts the inducer motor

IDM.

a. Inducer Prepurge Period-- As the inducer motor

IDM comes up to speed, the pressure switch contacts

PRS close, 24 VAC power is supplied for a field installed humidifier at the HUM terminal and the control begins a 15--sec prepurge period.

b. Igniter Warm--Up-- At the end of the prepurge period, the Hot--Surface igniter HSI is energized for a

17--second igniter warm--up period.

c. Trial--for--Ignition Sequence-- When the igniter warm--up period is completed, the main gas valve relay contacts GVR close to energize the gas valve GV, the gas valve opens, The gas valve GV permits gas flow to the burners where it is ignited by the HSI. Five seconds after the GVR closes, a 2--second flame proving period begins. The HSI igniter will remain energized until the flame is sensed or until the 2--second flame proving period begins.

d. Flame--Proving-- When the burner flame is proved at the flame--proving sensor electrode FSE, the furnace control CPU begins the blower--ON delay period and continues to hold the gas valve GV open. If the burner flame is not proved within two seconds, the control

CPU will close the gas valve GV, and the control CPU will repeat the ignition sequence for up to three more

Trials--For--Ignition before going to Ignition--Lockout.

Lockout will be reset automatically after three hours or by momentarily interrupting 115 vac power to the furnace, or by interrupting 24 vac power at SEC1 or

SEC2 to the furnace control CPU (not at W, G, R, etc.)

If flame is proved when flame should not be present, the furnace control CPU will lock out of Gas--Heating mode and operate the inducer motor IDM until flame is no longer proved.

e. Blower--On Delay-- If the burner flame is proven, the blower motor is energized on HEAT speed 25 sec after the gas valve GV is energized.

Simultaneously, the electronic air cleaner terminal

EAC--1 is energized and remains energized as long as the blower motor BLWM is energized.

f. Blower--Off Delay-- When the thermostat is satisfied, the R--to--W circuit is opened, de--energizing the gas valve GV, stopping gas flow to the burners, and de-energizing the humidifier terminal HUM. The inducer motor IDM will remain energized for a 5--second post--purge period. The blower motor BLWM and air cleaner terminal EAC--1 will remain energized for 90,

120, 150, or 180 seconds (depending on the blower--

OFF delay selection). The furnace control CPU is factory--set for a 120--second blower--OFF delay.

2. Cooling Mode

(See Fig. 26 for thermostat connections.) The thermostat closes the R--to--G--and--Y circuits. The R--to--Y circuit starts the outdoor unit, and the R--to--G and Y circuits start the furnace blower motor BLWM on COOL speed. The electronic air cleaner terminal EAC--1 is energized with

115 vac when the blower motor BLWM is operating.

When the thermostat is satisfied, the R--to--G--and--Y circuits are opened. The outdoor unit will stop, and the furnace blower motor BLWM will continue operating on the

COOL speed for an additional 90 sec. Cut jumper J2 to reduce the cooling off--delay to 5 sec. (See Fig. 25.)

3. Continuous Blower Mode

When the R--to--G circuit is closed by the thermostat, the blower motor BLWM will operate on continuous--blower speed (same as HEAT speed). Terminal EAC--1 is energized as long as the blower motor BLWM is energized.

During a call for heat, the blower BLWM will stop during igniter warm--up (17 sec), ignition, and blower--ON delay

(25 sec), allowing the furnace heat exchangers to heat up more quickly, then restarts at the end of the blower--ON delay period at HEAT speed.

When the thermostat “calls for cooling”, the blower motor

BLWM will operate at COOL speed. When the thermostat is satisfied, the blower motor BLWM will operate an additional 90 sec, on COOL speed before reverting back to continuous blower speed.

When the R--to--G circuit is opened, the blower motor

BLWM will continue operating for an additional 5 sec, if no other function requires blower motor BLWM operation.

4. Heat Pump

When installed with a heat pump, the furnace control automatically changes the timing sequence to avoid long blower off times during demand defrost cycles. When the

R--to--Wand-- Y or R--to--W--and--Y--and--G circuits are energized the furnace control CPU will continue to turn on the blower motor BLWM at HEAT speed, and begin a heating cycle. The blower motor BLWM will remain on until the end of the prepurge period, then shut off for 24 sec then come back on at HEAT speed. When the W input signal disappears, the furnace control begins a normal inducer post--purge period and the blower switches to

COOL speed after a 3 sec delay. If the R--to--W--and--

Y--and--G signals disappear at the same time, the blower motor BLWM will remain on for the selected blower--

OFF delay period. If the R--to--W--and--Y signals disappear, leaving the G signal, the blower motor BLWM will continue running the blower motor at HEAT speed after the selected blower--OFF delay period is completed.

Step 4

—Wiring Diagrams

Refer to Fig. 24 and 45 for wiring diagrams.

Step 5

—Troubleshooting

Refer to the service label. (See Fig. 50–Service Label.)

The Troubleshooting Guide can be a useful tool in isolating furnace operation problems. Beginning with the word Start, answer each question and follow the appropriate arrow to the next item.

The Guide will help to identify the problem or failed component.

After replacing any component, verify correct operation sequence.

50

51

Run system through a heating or cooling cycle to chec

Clean flame sensor with fine steel wool and rechec the control and initiate the component test sequence

NO PREVIOUS CODE Stored codes are erased boards stored status codes can also be erased whene

E

Bryant Heating & Cooling Systems 7310 W. Morris St. Indianapolis, IN 46231 Printed in U.S.A.

Edition Date: 10/08

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

52

Catalog No. II310A---45---10

Replaces: II310A--- 45--- 9

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

Download PDF

advertisement