ECO1200 User Manual
Includes installation, standard operating
procedures and maintenance guide for the
ECO1200
Table of Contents
Safety Warnings .......................................................................................................................................................2
Introduction ...............................................................................................................................................................3
Specifications............................................................................................................................................................4
Installation.................................................................................................................................................................5
Turbine Placement ................................................................................................................................................5
Turbine Assembly..................................................................................................................................................6
Operating Procedure ..............................................................................................................................................19
Safety Brake Operation...................................................................................................................................... 19
Maintenance Procedures .......................................................................................................................................20
Inspection Schedule ........................................................................................................................................... 20
Appendix A: Single Line Wiring Diagram...............................................................................................................21
Appendix B: Load Diagram ....................................................................................................................................22
Appendix C: Windterra Product Warranty .............................................................................................................25
Safety Warnings
For your safety and the safety of your equipment please follow all safety procedures outlined in this manual and do not
attempt installation unless you have read and fully understand the manual.
Follow the proper procedure for shut down of the wind turbine if any of the following situations occur:
„
Any of the parts become damaged or broken or are malfunctioning
„
Electrical repairs are required
„
Before extreme weather conditions arise
Hazardous Voltage Enclosed: Do not attempt electrical installation or repairs while turbine is spinning
Be sure that you always do the following:
„
Read all the installation instructions before assembling the wind turbine
„
Keep this manual for reference purposes and scheduled maintenance
„
Always follow instructions and warnings about the wind turbine
Do not interfere with a spinning wind turbine, it can cause serious injury!
The generator contains permanent magnets which can interfere with a pacemaker
2
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
Introduction
The Windterra ECO1200 converts the movement of air into useful electrical power. The turbine blades harness the
kinetic energy of the wind coming from any direction and transfer it to the generator located under the hub. When
spinning, the generator outputs power to the inverter located inside the house. The inverter converts the wild 3-phase
electricity from the generator into 1-phase power compatible with the electrical grid.
The User Manual describes the operating procedures for the ECO1200 roof mounted Vertical Axis Wind Turbine
(VAWT). This manual is intended for the owner of a Windterra ECO1200, and any individual performing general
maintenance or inspection of the turbine or electrical system.
The Windterra wind turbine is maintenance free. Familiarize yourself with the operation of the wind turbine and perform
general inspections as noted in this guide. Any mechanical or electrical repairs other then what is explained in this
guide must be performed by qualified personnel.
The turbine will automatically start operating in low winds. The blades will start to spin and build speed as the wind
increases. The electrical inverter automatically converts the electricity produced by the generator into usable power.
Changes in wind direction have no effect on the vertical axis design. As the wind speed changes, the turbine and
inverter adjust to maintain the maximum power output.
A passive braking system is incorporated into the design of the blades to govern the maximum speed of rotation. This
brake operates automatically to prevent the turbine from over spinning. Once the wind speed returns to normal
operating conditions the braking stops.
The wind turbine has been designed for installation on the crest of a pitched roof or on a flat roof. Do not attempt
installation on a pole or other external supporting structure.
Only the Windterra ECO1200 Inverter is to be used with the ECO1200 Wind Turbine, use of a different inverter will void
the warranty.
•
An application for connecting to your local electrical utility must be completed and
approved prior to installation of the Windterra ECO1200.
•
Consult with your municipality concerning local bylaws and permit requirements prior to
the installation of the ECO1200.
•
Structural certification of your roof must be completed prior to installation to ensure that it
is suitable to hold the ECO1200.
3
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
Specifications
Wind Turbine Specifications
Blade Height: 2.25m
Cut-in Wind Speed: 3m/s
Rotor Diameter: 2.66m
Generator: Permanent magnet 3-phase
Configuration: 3 Blade Vertical Axis
Roof Mount Weight: 51kg
Frequency: 0-60Hz
Turbine Weight: 183kg
Max Turbine Voltage: 150VAC per phase
Survival wind speed: 53m/s
Max Continuous Current: 4.0A
Over Speed Control: Passive Air Brake
Max Braking Start-up Current: 15A
RPM Range: 0-270
Maximum Power: 1200W
Inverter Specifications
Inverter Type: Grid-Tie
Operating Voltage Range: 105-132 Vrms
Input Power Rating: 1330W
Operating Frequency Range: 59.5-60.5 Hz
Electrical Input: Three-phase
Total Harmonic Distortion: < 3%
Max Input Voltage: 150 Vac peak/phase
Operating Temperature Range: 0° to +40° Celsius
Max Input Current: 3.6 Aac peak/phase
Certifications: CSA 22.2 107.1 and UL 1741
Output Voltage: 120 Vrms True Sine Wave
Enclosure Weight: 5.5kg (12lb)
Max Output Current: 10 Arms True Sine Wave
Enclosure Rating: NEMA Type I
Power Factor at Output: > 0.99
Size: 300mm x 300mm x 100mm
Max Efficiency: > 90%
4
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
Installation
This section describes the installation procedure for the ECO1200. The installation process has been simplified for your
convenience. The only tools required are:
-3/8” Drill Bit and Drill
-9/16” socket and wrench
-Torque wrench
-Roof Sealant
-2ft (at minimum) bubble level
NOTE: Always use a torque wrench to tighten the bolts: 3/8” Bolt Torque = 30 ft-lbs (41 N-m).
Bolt lengths are mentioned throughout the installation manual for your reference. The bolt length is measured from the
underside of the head to the end, ie: the shaft length. See picture below of a measured bolt. Ensure to use the correct
size of bolt when assembling the turbine. All hardware is included with the turbine.
Figure 1 – Hex Bolt Length Measurement
Turbine Placement
Turbine placement is integral for maximum turbine performance. Smooth, undisturbed airflow is the optimum condition
for the turbine. Obstructions in the dominant upwind direction should be avoided.
Place the turbine on the crest of the highest section of the roof directly above a supporting wall. Surrounding trees,
buildings and geographical features can obstruct the airflow. Select an area away from roof obstructions such as
chimneys, ventilation and air conditioning units, lightning rods, antennas and satellite dishes. Small elements on the
roof such as exhaust air hoods, skylights and roof drains should also be avoided. The following diagram shows the
turbine mounted on the highest roof crest at a supporting wall and away from roof obstructions.
Figure 2 – Proper Turbine Roof Placement
5
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
Turbine Assembly
This section describes the step-by-step process for installing the Windterra ECO1200 Wind Turbine. The installation
steps include Roof Mount Assembly, Attaching the Roof Mount, Roof Bracing, Generator Frame Assembly, Electrical
Installation, Hub, Arm and Blade Assembly and Cover Assembly.
1
Roof Mount Assembly
The roof mount securely attaches to the roof and provides a level surface for the generator frame. The figure below
shows the completed assembly.
Figure 3 - Roof Mount Assembly
1. Top Tube
2. Leg Tube
3. Side Plate
4. Left Leg Bracket
5. Right Leg Bracket
6. Rafter Plate
7. Roof Rubber
8. Rafter Rubber
6
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
1.1 First, bolt a Leg Tube to each of the four Leg Brackets. Ensure you are using a Leg Tube; the Leg Tubes have
fewer holes then the Top Tubes. Place a washer on both sides of every bolt. Leave all the bolts loose to allow
adjustment of the plate angle. Next, bolt the other end of the Leg Tubes to the slotted holes in the two Side Plates.
The short ends of the Leg Bracket plates butt together between the two legs. Again, leave the bolts loose. The
slotted holes allow for easy leveling of the top of the roof mount. Lastly, bolt the remaining two Top Tubes in place
between the two Side Plates to complete the assembly. Tighten the nuts on these bolts just enough to prevent the
tubes from shifting. Do not fully torque the nuts, this will occur later. See the figure below for the assembled roof
mount on the roof.
Figure 4 - Assembled Roof Mount on Roof
1.2 The roof mount should be centered over the crest of the roof. Push the Side Plates down and ensure all eight bolts
in the slotted holes are at the top of each slot. The following figure shows the position of the bolts at the top of the
slotted holes.
Figure 5 – Proper Bolt Position at Top of Slotted Holes on Side Plates
7
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
2
Attaching the Roof Mount to the Roof
The roof mount is secured to the roof using the six sets of rafter clamps. Each rafter clamp consists of one Rafter Plate,
two long 3/8” bolts, four washers, two nuts, and one piece of Rafter Rubber. 3/8”-16 threaded rod of required length
may be used if roof uses non standard rafters. Three (3) rafters must be sandwiched if the rafter spacing is
24” on center or less. A rafter will be placed at each end of the Leg Bracket and one will connect the two brackets
together in the center.
Drill Bit
Figure 6 - Drilling of Rafter Placement Hole. Dashed lines shows where the rafter is under the roof
2.1
From underneath the roof, drill a pilot hole up through the roof 1” to the side of a structural rafter as shown
in the picture below. This will mark the position of the rafters for final placement of the roof mount. See the
figure above for drilling of the pilot hole.
2.2
Using the drilled pilot hole, align the three sets of holes in the Roof Brackets to be over the rafters. Place
the Roof Rubber under the Leg Brackets then maneuver the unit as needed to level the top surface. This
will be the final placement of the roof mount. See picture below of leveled roof mount.
Figure 7 - Leveled Roof Mount
2.3
Use the holes in the Roof Brackets for placement and drill through the Roof Rubber and roof with a 3/8”
drill bit as shown in the following picture.
8
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
Figure 8 - Drilling of Roof Plate holes
2.4
Place a washer over the long 3/8” bolts and insert the bolts through the Leg Brackets and through the
drilled holes. Place the Rafter Rubber between the Rafter Plate and the rafter. Place Rafter Plates over
the bolts and add a washer and nut. Tighten the nut by having one person on the roof holding a wrench to
the bolt head while another person under the roof tightens the nut. Tighten all twelve (12) bolts in the
following manner. Move back and forth between the two bolts until the Rafter Rubber is slightly
compressed. See the following figure for a completed rafter clamp.
Figure 9 - View of Rafter Clamp from underneath roof
The six rafter clamps secure the roof mount and the rest of the turbine.
3
Roof Bracing
3.1
The bracing of the roof is for vibration prevention and additional security. Use 2x4 or 2x6 standard lumber
to reinforce the roof. There is no standard roof construction so an exact description cannot be given. Start
at the turbine location and reinforce the rafters that have a rafter clamp. Add planks to secure these key
rafters to each other then add additional bracing from the turbine location down to the supporting walls.
These additional rafters add valuable rigidity to the roof. Brace as much as possible from the turbine
location down to the supporting walls.
9
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
4
Generator Frame Assembly
4.1
Keep the shipping blocks on the bottom of the Generator Frame Assembly and lift the assembly on to the
Roof Mount. Once on the roof mount, tilt the frame and remove the blocks. Note: if using a crane, keep
the blocks on the Generator Frame Assembly until it is right above the Roof Mount. Align the holes on the
generator frame with the matching holes on the roof mount. Insert the 3 ¾” bolts up from under the roof
mount and secure with a washer and nut on the top.
Figure 10 – View of Generator on blocks and View of Mounting Bolts for the Generator
4.2
Level the top plate of the Generator Frame Assembly by shifting the position of the Roof Mount bolts in the
slotted holes (shown in figure 5) and then checking the bubble level. Ensure the Generator Frame
Assembly is completely level by checking the bubble level in two directions perpendicular to each other.
Figure 11 - Leveling of the Generator
4.3
Once level, gradually tighten all bolts to specifications. Do not tighten one side of the roof mount first and
then the other side. Go from side to side and tighten the bolts in increments to ensure that the roof mount
and the generator frame will stay level.
4.4
Check the level again after all the bolts are tightened and adjust if necessary.
10
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
5
Electrical Installation
The electrical installation should be performed by a qualified Electrician and must conform to local electrical code
requirements. The Pictorial Wiring Diagram below shows the order of connection for the electrical installation. Refer to
Appendix A for a single line diagram with electrical ratings.
The electrical installation is performed now to ensure the AC Disconnect / Brake Switch is installed before the
blades are installed. The AC Disconnect / Brake Switch is used to prevent the turbine from spinning which is helpful
during installation. Once the electrical installation is complete, turn the AC Disconnect / Brake Switch to position “2”
to activate the turbine brake. Then test the resistance when spinning the generator. Test that the generator is harder to
spin when the brake is on but still rotates smoothly when forced. If there is no added resistance or if the resistance is
varies significantly throughout the rotation then there is an error in the wiring. Check the wiring in the junction box under
the roof and at the brake switch for disconnected wires.
Electrical code states that the inverter must be placed within 4ft of the breaker panel. Ensure there is room on the wall
near the electrical panel for the inverter.
AC DISCONNECT/BRAKE SWITCH
WINDTERRA ECO1200 INVERTER
From Turbine
To Grid
Figure 12 – Pictorial Wiring Diagram
Drill a 3/4” hole in the roof under the roof mount for the flexible conduit. Run the outdoor wire through the roof
and connect to a junction box mounted under the roof to a rafter. Seal the roof hole with roofing tar. From the
junction box run 3 conductor plus ground wire to the electrical room.
A minimum gauge of 14 should be used for the wiring, however, consult with your electrician to determine if a
lower gauge is required for your particular application (long runs of wire will need a lower – thicker gauge).
A picture of the junction box is shown on the next page.
11
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
Figure 13 - Junction Box Wiring
The next step is to wire the AC Disconnect / Brake Switch. The wires from the generator and the wires to the inverter
are inserted through the cover and then inserted into the correct terminals.
FROM TURBINE
TO INVERTER
Figure 14 - AC Disconnect/Brake Switch Wiring.
The wires from the turbine are wired to the AC DISCONNECT / BRAKE SWITCH. Insert the wires through the
punch-out on the top of the AC DISCONNECT / BRAKE SWITCH and into the terminals labeled 1, 5 and 9. It
does not matter which wire is connected to which terminal for the turbine input.
Complete the switch wiring by connecting the bundled wire from the WINDTERRA ECO1200 INVERTER through
the bottom punch-out to terminals 2, 6 and 10 of the AC DISCONNECT / BRAKE SWITCH. Mount the switch on
the wall and replace the cover.
The bundled wire on the right side of the WINDTERRA ECO1200 INVERTER is wired to an AC DISCONNECT
SWITCH. This switch must be wired as required by your local utility (it may be required to be placed outside
beside your meter). Run 14/2 (or as specified by your electrician) wire from the AC DISCONNECT SWITCH to
the electrical panel.
12
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
Turn the AC DISCONNECT / BRAKE SWITCH to position “2” to activate the brake before installing the rest of
the turbine. Test the brake functionality as described in the introduction of the Electrical Installation.
Hub, Arm and Blade Assembly
5.1
Place the lower arms over the bolts on the top plate of the Generator Frame Assembly. All three arms
must be installed as shown before installing the hub. Ensure leading edges (the rounded edge) of all the
arms face in the direction shown in the following picture.
.
Figure 15 – Lower Arm Placement on the Generator Studs
5.2
Next, place the Hub on top of the arms with the bolts welded to the hub at the top. The hub slides over the
3 studs protruding from the generator. Insert a 2 ¾” bolt with a washer through the remaining holes in the
hub and arms and place a washer and nut on the bottom side and hand tighten. The following figure
shows the installed lower arm and hub.
Figure 16 - Hub and Lower Arm Placement
5.3
Next, attach one arm to the top arm attachment bracket of the blade. To know which attachment bracket
is the “top”, stand the blade up with the attachment brackets facing you with the leading edge (round
13
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
edge) on your right side – the “top” attachment bracket is the upper one. Note that the arm leading edge
(the rounded edge) and the blade leading edge point in the same direction. Use two 3/8” x 1 ¾” bolts and
nuts with a washer on each side. See the figure below of an assembled arm attachment. Torque the bolts
to specifications on the ground because once the blade is mounted there is no way to reach these bolts.
Figure 17 - Upper Arm Attachment
5.4
Next, the upper arm and blade attach to the hub. First place one Top Hub Spacer diagonally on the top
bolt. Next, hang the upper arm and blade on the top of the hub as shown in the following figure.
Figure 18 - Upper Arm Placement on Hub
5.5
Insert the rectangular aluminum arm bracket of the blade into the lower arm as seen in the following figure.
Push the arm completely into the arm bracket to align the holes. Then insert two 3/8” x 1 ¾” bolts with
washers and torque the nut to specification. Mount the other two blades and arms in the same manner.
14
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
Figure 19 - Lower Arm Bracket Mounting
5.6
Next, cap the three upper arms with the additional metal plate aligned through the three welded bolts.
Insert another Top Hub Spacer block under each arm and align with the holes in the arm. Insert the
remaining 3/8” x 3 ½” bolts down from the top through the arm and spacer blocks sandwiched between the
two metal plates and tighten a nut and washer onto each. The following figure shows the upper arm
attachment to the hub. Note that there are two Top Hub Spacers under each arm.
Figure 20 - Bolts on upper arm attachment
15
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
5.7
The arm tightening procedure is as follows:
ƒ
Have a partner stand back from the turbine and align a blade’s leading edge with the hub so that
they are parallel as shown in the following figure. Tighten one nut on the lower arm at the hub.
ƒ
Check the alignment of the blade again and then tighten one nut on the top arm at the hub.
ƒ
Repeat for each blade.
ƒ
Check that each blade is parallel to the hub and then begin tightening the rest of the bolts in a
star-pattern (just as you would for the wheel of a car). Begin with all the lower arm bolts and
torque to specifications, then move to the top arm to hub bolts and tighten to torque specifications
(following the same star-pattern).
ƒ
Once done check that all of the blades are parallel to the hub.
Hub
Blade
Figure 21 – Blade to Hub Alignment. Note that the Hub and Blade are parallel.
16
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
6
Cover Assembly
The Hub Covers and Hub Top Cover are shown in the following schematic.
Figure 22 – Cover Assembly
1. Lower Hub Cover
3. Hub Top Cover
2. Upper Hub Cover
The Lower Hub Cover is the larger of the two similar sets of hub covers. The extra length extends over the
bearing set to prevent rain from entering.
6.1
The three parts that comprise the lower hub cover are all inserted in the same manner. For all three parts
of the lower hub cover, insert the cut-outs around the arm and push towards the steel hub tube. The
following figure shows this insertion process.
Figure 23 - Mounting of the Hub Covers
17
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
6.2
Ensure that the covers overlap with the blind nuts on the inside cover. Now push the covers into their final
position. Once all three covers are in place, screws are driven through the holes of one cover and into the
blind nut of the inside cover. Six screws are used, one above and one below each of the arms as show in
the following figures.
Figure 24 - Fastening of the Hub Covers
6.3
The upper hub covers are installed in the same manner as the lower hub covers. Refer to the following
figure for the completed Upper Hub Covers. Do not install top screws until the Hub Top Cover is in place.
Figure 25 - Mounted Upper Hub Covers and Hub Top Cover
6.4
Insert the three parts of the Upper Hub Cover into position around the arm and ensure correct overlap with
the blind nuts on the inside cover. Push into place as shown in the figure above. Only fasten the three
screws on the lower blind nuts.
6.5
Place the Hub Top Cover over the Upper Hub Covers and align the 3 holes with the Upper Hub Covers.
Fasten the Hub Top Cover through the hub covers to the blind nuts with three screws.
18
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
Operating Procedure
The wind turbine system runs automatically in all wind conditions.
The Windterra ECO1200 will automatically start spinning at very low wind speeds. It will produce and manage electrical
loads, adjust to changing wind speeds and directions, and the inverter will shut down in the event of a power failure. No
intervention with the wind turbine or electrical system is required.
The following section explains the use of the Safety Brake for turbine shutdown.
Safety Brake Operation
Shutting down the turbine is a simple operation that does not require any tools. When the Shutdown procedure is
complete, the turbine may still spin slowly in moderate to high winds. Caution: do not attempt to stop spinning
turbine by hand. It is also not advisable to go on the roof at high wind speeds.
The turbine brake stops the turbine from rotating for safe inspection of the blades and arms. To activate the brake, turn
the AC DISCONNECT / BRAKE SWITCH to the number “2” position. Return the switch to the number “1” position to
resume normal operation.
When to use the Safety Brake:
•
You may use the safety brake anytime during normal wind conditions (see section below on storm
conditions) to slow/stop the turbine.
•
It is recommended that the Safety Brake be applied if extreme storm warnings are in effect, this will
minimize the chance of damage occurring to the wind turbine caused by flying debris (tree branches,
etc.)
•
During storms: You may activate the safety brake during storms (periods of extreme high wind). It is
recommended that you wait for a moment of lower wind speed to activate the brake.
•
Abnormal noise or vibration: Should the wind turbine be damaged (for example from flying debris
during storms), the Safety Brake should be activated and you should contact your Windterra dealer.
19
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
Maintenance Procedures
Regularly check your Windterra VAWT for physical damage which may have occurred due to exposure to the
elements: Heavy winds, flying debris, and freezing rain or hail could cause damage to the turbine. Should there be any
damage, contact your dealer.
Inspection Schedule
Perform the Safety Brake Operation followed by a visual inspection in the following scenarios.
components of the turbine for damage.
•
After the turbine has been subjected to harsh environment hazards.
•
Every 6 months.
20
WINDTERRA SYSTEMS INC.
ECO1200
USER MANUAL
REV K
Check all the
Appendix A: Single Line Wiring Diagram
Windterra –ECO1200
Single Line Diagram
Wind Turbine
Generator Ratings:
0-150 VAC (per phase)
0-4 A (continuous),
3 phase Output
Brake Switch
Switch Ratings:
0-600 VAC
20 Amps AC
Notes:
-Disconnect/Brake switch is supplied by Windterra
-AC disconnect switch between the inverter and electrical panel is not supplied
and is the responsibility of the user and must meet local municipal, utility and
electrical codes.
Windterra
ECO1200
Inverter
Output Ratings:
120 VAC, 0-10 A
Single phase, 60Hz
Electrical
Panel
AC
Disconnect
Switch
Appendix B: Load Diagram
Appendix C: Windterra Product Warranty
A.
Limited Warranty
Windterra Systems Inc. hereby warrants that the Products manufactured, supplied or repaired by Windterra
Systems Inc. shall be free from defects in materials and workmanship for a period of five years after the date of
shipment.
B.
Limitation of Remedies
Windterra Systems Inc. and Windterra’s duly appointed Distributors acknowledge and agree that purchasers of
Windterra products or services have the sole remedy under this Limited Warranty. This warranty is limited to
that value of the products purchased. The company’s sole obligation is to the repair or replacement of the
Products and services or any components thereof which are determined by Windterra Systems Inc. to be
materially defective in material or workmanship or, at the sole option of Windterra Systems Inc., to refund of the
purchase price of the Products or service in question. Windterra Systems Inc. shall not be liable for injury to
property except for the Products themselves. This warranty does not cover loss outside of Windterra’s control
including but not limited to accidental damage, misuse, improper care or alteration, or acts of God, such as
floods, hurricanes, tornados, hail, ice storms and earthquakes. This warranty lasts as long as the original
purchaser owns the product; coverage terminates if the original purchaser sells or otherwise transfers the
product.
C.
Disclaimers from Warranty
THIS LIMITED WARRANTY IS GIVEN IN LIEU OF ALL OTHER WARRANTIES, WHETHER EXPRESS OR
IMPLIED. THERE ARE NO WARRANTIES THAT EXTEND BEYOND THE FACE OF THIS LIMITED
WARRANTY AS TO THE FITNESS OF USE FOR THE PRODUCTS HEREUNDER FOR ANY PARTICULAR
PURPOSE. WINDTERRA SYSTEMS INC. HEREBY DISCLAIMS ANY WARRANTY, WHETHER EXPRESS
OR IMPLIED, THAT THE PRODUCTS HEREUNDER ARE MERCHANTABLE.
D.
Products Covered by This Warranty
This Limited Warranty shall extend to the Products and components thereof manufactured, supplied or repaired
by Windterra Systems Inc., but shall not extend to products, parts or equipment supplied by other
manufacturers, installers or service agencies.
E.
Automatic Termination of Warranty Obligations
Any obligation of Windterra Systems Inc. under this Limited Warranty shall automatically and immediately
terminate, without notice from or any further action by Windterra Systems Inc., and Windterra Systems Inc. shall
have no responsibility for damages of any kind as a result of the occurrence of any of the following:
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
accident, misuse, abuse or negligent use of the Products or any component thereof;
any repair or alteration of the Products or any component thereof made outside Windterra Systems
Inc.’s facility, except by an employee of Windterra Systems Inc. or agent authorized to do so;
improper installation or operation (including both mechanical and electrical) of the products or any
component thereof;
installation in an environment which is not approved by authorized inspection agencies
failure to provide normal maintenance for the Products or any component thereof.
failure to install in a safe environment (Winterra products operate at high speed and can severely injury
people, pets or other living organisms; precaution must be taken to install these devices where contact
from people, pets and other living organisms is not possible).
failure to secure the unit (place the Windterra unit in a secure non-operational/non-moving state) during
installation, maintenance or while working in close proximity to Winterra products will cause serious
injury. Failure to secure the unit during installation, maintenance or while working in close proximity
terminates all warranty obligations.
F.
Limitation on Damages (Consequential Damages Excluded)
Windterra Systems Inc. shall not be responsible for, nor does this Limited Warranty extend to, any
consequential or incidental damages or expenses of any kind or nature, regardless of the cause thereof or any
knowledge which Windterra Systems Inc. may have regarding the probability of the occurrence of such
damages or expenses including, without limitation, injury to persons or property, loss of use of the Products, lost
goodwill, lost resale profits, work stoppage, impairment of other goods, breach of contract, negligence or such
other actions as may be deemed or alleged to be the cause of a loss or damage to the Windterra’s duly
appointed Distributors, its agents, sub-Windterra’s duly appointed Distributors, customers or any other persons.
G.
No Other Warranties, Statements are Opinions
This is the only Warranty provided and no others are expressed or implied warranties of Windterra Systems Inc.
and Windterra Systems Inc. does not assume, nor does it authorize any person to assume on its behalf, any
other obligation or liability, either verbally or in writing. Windterra Systems Inc. and Windterra’s duly appointed
Distributors agree that any statements and representations made by Windterra Systems Inc. outside of this
Limited Warranty are only Windterra Systems Inc.’s opinion, are not a part of the basis of the bargain and are
not warranted to be accurate. Windterra Systems Inc. and Windterra’s duly appointed Distributors further agree
that if any statement by Windterra Systems Inc. in this Limited Warranty or in any agreement or
correspondence, whether oral or written, between Windterra Systems Inc. and Windterra’s duly appointed
Distributors is construed as an affirmation or promise, it shall nevertheless not constitute a warranty that the
Products or any component thereof will conform to such affirmation or promise.
H.
Enforcement of Limited Warranty
Windterra’s duly appointed Distributors will immediately notify Windterra Systems Inc. in writing of any Product
or component thereof to be repaired or replaced pursuant to Paragraph A hereof. Windterra’s duly appointed
Distributors written notice shall specify the Product or component thereof as well as list the facts or reasons
supporting or underlying Windterra’s duly appointed Distributors claim for relief under this Limited Warranty. All
customers shall be required to use Windterra’s claim forms and processes when making all warranty claims.
Allegedly defective Products or components thereof shall be returned to Windterra Systems Inc.’s facility at the
sole cost of Windterra’s duly appointed Distributors. In the event that Windterra Systems Inc. elects to repair or
replace the allegedly defective Product or component thereof, Windterra Systems Inc. shall ship, at Windterra
Systems Inc.’s expense, said replacement or repaired Product or component to Windterra’s duly appointed
Distributors via the lowest priced transportation available to Windterra Systems Inc.; provided, however, that
Windterra Systems Inc. shall be obligated to ship and pay for deliveries only within 30 days from the point of a
claim.
I.
Strict Construction Rule Waived
Windterra’s duly appointed Distributors hereby waives the benefit of any rule that disclaimers of warranty shall be
construed against Windterra Systems Inc. and agrees that the disclaimers in this Limited Warranty and in the
Agreement shall be construed liberally in favour of Windterra Systems Inc..
J.
Other Rights
This Limited Warranty gives Windterra’s duly appointed Distributors specific legal rights, and Windterra’s duly
appointed Distributors may also have other rights which may vary from state/province to state/province.
K.
Product or Component Substitution
Windterra reserves the right to substitute any product or component repaired or replaced under warranty as it
sees fit and is not obligated to provide exactly the same.