Bradford White JVS Installation And Operation Instructions Manual

Below you will find brief information for Gas-Fired Hydronic Boiler JVH, Gas-Fired Hydronic Boiler JVS. These instructions guide you through installation, operation, and maintenance of the Bradford White Model JV low pressure, copper tube hydronic boilers. The JVH has a hot surface pilot ignition system, while the JVS utilizes an electronic intermittent ignition device. Ensure proper installation and follow the provided instructions to guarantee safe and efficient operation.

PDF Download
Document
Bradford White JVS Installation And Operation Instructions Manual | Manualzz

Advertisement

Advertisement

Advertisement

Key features

  • Low-pressure, copper tube construction
  • Hot surface pilot ignition (JVH) or electronic intermittent ignition device (JVS)
  • Natural gas or LP gas compatibility
  • Available in sizes 50-225
  • Vertical venting (Category I) or horizontal venting (Category III) for JVH
  • Built-in draft diverter for natural draft operation (JVS)
  • ASME pressure relief valve
  • Drain valve for system maintenance

Frequently asked questions

The boilers are designed for either natural gas or LP gas. Check the rating plate to confirm the type of gas supported by your specific model.

JVH models can be vented vertically using a Category I system or horizontally in a Category III setup. Follow the instructions in the manual for proper venting procedures.

Consult Table 2JVH and Figure 2JVH for minimum clearance requirements for Brute Mini JVH models in closet installations.

Refer to Section 5B for instructions on adjusting the bypass piping for proper system operation.

See Section 8C for detailed operating instructions for the JVH boiler model.
Preparing document for printing…
0%