American Bicycle Security Company Dero Decker Specifications and Assembly Instructions
Advertisement
Advertisement
Dero Decker
Sturdy red handle grips
Lift-assist trays
Dampers for safe lowering of trays
Spring loaded levers hold bikes firmly in place
U-lock compatible
Smallest footprint
Smooth and silent operation
Simple installation
Low maintenance
Specially designed fat bike trays available
Adjustable downward resting position to accommodate different floor clearances
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865 www.ameribike.com
Email: [email protected]
Dero Decker
Height Requirement: 108”
Product
Capacity
Materials
Finishes
RAL 9005
RAL 6016
RAL 7011
RAL 3003
Installation
Methods
Space Use
& Setbacks
Dero Decker™
Modular 2-Tiered System. ONLY available in quantities of 4.
One bike per tray.
Uprights: 4” 11g square tube
Upright base: 1/4” plate
Cantilevers: 11g plate
Cantilever base: 1/4” plate
Trays: 11g plate
Standard options: Galvanized
Or
Powder Coated
Flat Black RAL 9003 RAL 2004
RAL 6018
RAL 7042
RAL 6005
RAL 9007
RAL 5005
RAL 1001
RAL 1023
RAL 5015
RAL 8014
Bright Yellow
Purple
Bronze
RAL 3005
Each upright has two ¼” plate feet that accept 3/8” wedge anchors.
Space Use:
See diagrams on following page
Example of rack in use
Page 1 of 5
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865 www.ameribike.com
Email: [email protected]
Dero Decker
Single Sided
Setback Configurations
Page 2 of 5
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865 www.ameribike.com
Email: [email protected]
Dero Decker
Setback Configurations
Double Sided
Page 3 of 5
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865 www.ameribike.com
Email: [email protected]
Dero Decker
Installation Instructions
Single Sided
1. Refer to setback diagrams before installation to ensure sufficient space.
Installation surface must be concrete of suitable strength. If surface is not level, contact ABS representative for workable solution.
2. Place the Uprights in position and secure with (4) ½” x 3.75” wedge anchors. At least
1.25” of wedge anchor threads should remain above the concrete. The Lower Tray Mount should be placed on the front side of the
Upright and secured with the existing wedge anchors.
Tools Needed:
Hammer drill
Masonry bit, 3/8”, 1/2”
Hammer
Socket wrench
Sockets, 9/16”, 3/4”
Socket extension, 4-6”
Hex wrench, 3/16”
Tape measure
Chalk line
Marker
Level
3. Place the lower Cantilever Assembly on the lower
Upright position and secure with (4) ½” x 1.25” carriage bolts, ½” washers, and ½” nylock nuts.
4. Do the same for the upper Cantilever Assembly.
Page 4 of 5
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865 www.ameribike.com
Email: [email protected]
Installation Steps:
Dero Decker
5. Place the bottom Lower and Upper Trays in position and secure at the rear with (1) 3/8” x 1” carriage bolt,
3/8” washer, and 3/8” nut each. Secure at the front with
(1) 3/8” x 3” wedge anchor each.
6. Continue to the next section and repeat the previous steps
7. After all sections are installed; pull the upper trays out one at a time to ensure smooth operation. If some trays lower too far and hit the ground, two set screws at the end of the cantilever can be tightened to stop the tray sooner.
Page 5 of 5
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865 www.ameribike.com
Email: [email protected]
Advertisement