American Bicycle Security Company Vizor™ Shelter Specifications and Assembly Instructions
Advertisement
Advertisement
Vizor Shelter
The Vizor™ is a beautiful cantilever designed shelter that is able to accommodate any bike rack system, including two-tiered models. This innovative, attractive, and functional bike shelter is a perfect addition to your facility, especially for smaller spaces.
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865 www.ameribike.com
Email: [email protected]
Vizor Shelter
Product
Capacity
Materials
Finishes
RAL 9005
RAL 6016
RAL 7011
RAL 3003
Vizor™ Shelter
See diagrams below and to left
Uprights: 4”x5/16” square tube
Purlins: 4”x2”x3/16” rectangular tube
Feet: 5/8” plate
Rafter: 4”x2”x3/16” rectangular tube
Roof Panels: Type S deck, 26g galvanized steel
Standard options: Galvanized
Powder Coated
Flat Black RAL 9003 RAL 2004 RAL 1023
RAL 6018
RAL 7042
RAL 3005
RAL 6005
RAL 9007
RAL 5005
RAL 1001
RAL 5015
RAL 8014
Bright Yellow
Purple
Bronze
Installation
Methods
Surface Mount. It is the responsibility of the installer to ensure that all base materials into which the shelter will be installed can support the rack and will not be damaged by any required installation procedures. See structural drawings for details..
Overall dimensions: Space Use
& Setbacks L 90”, W 144”, H 114”
Load Data Dead load = self weight of structure
Live load = 40 psf
Wind load = 90 mph exposure B
Seismic load = Moderate
Footing: see page 4
Anchor bolt = .75” diameter x 14.625” Simpson Torq-Cut anchor
*The Vizor Shelter can be used in a modular fashion (shared uprights) however, when used in this manner, please call for layout, as the rack spacing and bike capacity can change!
Page 1 of 6
Solar light available upon request.
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865 www.ameribike.com
Email: [email protected]
Vizor Shelter
Tools needed for Installation:
Tape Measure
Marker or chalk
Level
Sledge Hammer
Rubber Mallet
Large Hammer Drill
Standard Drill
3 /
8
” Socket with drill attachment
Parts List
1.25” Diameter Masonry Bit
5 /
8
1
” Diameter Masonry Bit
¾” Wrench/Socket
15 /
1
16
/
8
” Wrench/Socket (2)
” Wrench/Socket
1 ¼” Wrench
Spud Wrench
Page 2 of 6
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865 www.ameribike.com
Email: [email protected]
Vizor Shelter
Footing Details
Page 3 of 6
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865 www.ameribike.com
Email: [email protected]
Installation Steps:
Vizor Shelter Installation Instructions
1.
Place Uprights based on footing diagram and drill (4) diameter pilot holes in concrete 14” deep for each Upright.
Upright and install washers and nuts finger-tight.
5 /
8
”
Remove Upright and use pilot holes to drill 1.25” diameter holes 14” deep. Drive in Simpson Torq-Cut Anchor, place
3.
Place the first Truss and secure with (4)
½” x 3.5” carriage bolts, (4) ½” lock washers, and (4) ½” nuts on both sides.
4.
Continue securing the remaining Purlins.
Leave nuts finger tight if a Campus Rack will be added. Tighten if no Campus Rack will be added.
2.
Lift Truss over the Upright and secure with (4) 5 /
8
” x 6” bolts, (8) 5 /
8
” lock washers, and (4) 5 /
8
” nuts.
Page 4 of 6
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865 www.ameribike.com
Email: [email protected]
Vizor Shelter
5.
If using a Campus Rack, secure with (4)
5.5” bolts, (8) 5/8” lock washers, and (4) nuts on both sides.
5 /
5
8
/
” x
8
”
Installation Instructions
7.
Secure the upper Tension Bars with (4) ¾” nuts and (4) ¾” lock washers each.
6.
Completely tighten truss bolts and Campus Rack bolts if applicable. Completely tighten anchors to
240 ft-lbs.
Page 5 of 6
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865 www.ameribike.com
Email: [email protected]
Vizor Shelter
Installation Instructions
8.
Secure the lower Tension Bars with (4) ¾” nuts and (4) ¾” lock washers each.
10.
Place the next section of Type S Deck and secure with (6) self-drilling screws. The first (3) selfdrilling screws will go through both Type S Deck sections. Continue securing the remaining (3) Type
S Deck sections.
9.
Place the first section of Type S Deck and secure with (6) self-drilling screws.
Page 6 of 6
11.
If building a modular run of shelters, continue adding shelters until complete.
American Bicycle Security Company
P.O. Box 7359
Ventura, CA 93006
Ph: (800) 245-3723 or (805) 933-3688
Fax: (805) 933-1865 www.ameribike.com
Email: [email protected]
Advertisement