Schneider Electric Actassi Instruction Sheet

CABLING INSTRUCTIONS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Front View * Important: Install the cable terminated RJ45 modules to panel before mounting the panel to Rack. 1. Finish cable termination on each RJ45 modules. 2. Place the cable assembled RJ45 modules from back of panel. 1 2 2 Cable Tie(If provided) 1 Solid Cable Grounding Wire 23 3. Snap in the RJ45 modules into the panel until all RJ45 modules are installed. Port designation paper with clear cover provides clean and clear port identification. 21 22 46 45 20 18 17 41 19 43 44 42 16 14 13 15 39 40 38 37 10 9 11 35 12 36 34 33 8 32 7 31 6 30 5 29 4 3 2 1 28 Write on description label protected by clear plastic cover. 27 26 25 Clear Plastic Cover Creation Printed on 2020/06/17 47 24 48 4. Expand the Foldable Wire Management Grip, hook the grips on fixture at both ends of the patch panel. Wire Management Bar Fixture Foldable Wire Management Grip 5. Fix the Solid Cables on wire Management Bar by Cable Ties. Cable Tie 2 Dismounting 3 1 3 2 1 Creation Printed on 2020/06/17 3 1 2
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
Download PDF
advertisement