Advertisement
Advertisement
KEEPING NZ SAFE SENTRY MEDIAN BARRIER Longitudinal Median Barrier Product and Installation Manual Please call CSP® on 0800 655 200 or visit www.csppacific.co.nz for more information KEEPING NZ SAFE November 2020 Roadwork Ph Roadside 0800 655 200 or visit Workplace www.csppacific.co.nz Pedestrian Seeing Environment November 2020 Telecoms | Page 1 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Table of contents Introduction 4 System Overview 5 Limitations and Warnings 5 Training 5 Health and Safety 6 Before Installation 6 Safety statements 6 General Safety 6 Sentry Barrier Safety Statements 6 Limited Warranty 7 System Design and Design Considerations 8 Product Orientation 8 Kerbs 8 Horizontal and Vertical Curves 8 Slopes 8 Undulating Ground Conditions 9 Clear Zone / Hazard Free Zone 9 Terminal Ends 9 Soil Condition 10 Length of Need 10 System Deflection 11 Transitions 11 Parts Identification 12 Bill of Materials 13 Installation 14 Getting Started 14 Preparation 14 Soil Conditions 14 Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 2 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Tools Required 15 Installation Tolerances 16 Installation Instructions 17 Site Preparation 17 Post driver machine - Impact head 17 18 Construction of Terminal End Installation Procedure (Posts and W-Beam) 18 Installation Checklist 22 Inspection and Maintenance 22 Requirement after a Bushfire or Flooding 23 Frequently Asked Questions 24 Appendices 25 Appendix A – Sentry Median Barrier 26 Appendix B – Sentry Median Post 27 Appendix C – Sentry Washer 28 Appendix D – F1640 (M16X50 Bolt and Nut) 29 Appendix E – Sentry Tolerance 30 Appendix F – Sentry Median Barrier Transition to X350M Median Terminal 31 Appendix G – Sentry Median Barrier Installation Checklist 32 Appendix H - Sentry Median Barrier Inspection Checklist 33 Appendix I – Acceptable Post Deformation Measures & Tolerances 35 Test 1: Nut Pass-through 35 Test 2: Washer Fitment 35 Test 3: Post deformation bending and cracking tolerance 35 Appendix J – Sentry Median Post Orientation & Rail Overlapping Detail 36 CSP® may make changes to this Product Manual from time to time. Please check the CSP® website prior to using this Product Manual to ensure that you have the latest version. Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 3 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Introduction System Overview The Sentry Median Barrier is a W-Beam guardrail system suitable for containing, redirecting and shielding vehicles from opposing traffic or dual carriageways. The barrier has been designed and tested to meet the evaluation criteria of MASH Test Level 3 for a longitudinal median barrier configuration. MASH TL-3 is the latest testing standard and it has significantly higher impact conditions than the out-dated NCHRP 350 standard. The Sentry Median Barrier is designed to provide acceptable structural adequacy, minimal occupant risk and safe vehicle trajectory as required by the latest in safety standards, AASHTO MASH Test Level 3 (TL-3). This system was independently evaluated under full impact conditions of 100 km/hr and impact angles of 25 degrees. The Sentry Median Barrier has an initial installation height of 790 mm (31”) to the top of the guardrail, providing the system with the ability to withstand numerous road surface overlays without the need to relevel of lifting of the barrier. The Sentry Median Barrier must be installed with an approved Median Terminal End on the approach and departure ends. The rounded edges to the Sentry Barrier Post and closed shape on the approach direction provide increased protection for vulnerable road users. The compact Sentry Barrier Posts are easy to drive into all soil types and provide increased resistance to rotation in the soil when impacted. Unlike other systems on the market, any damage caused to the top of the posts or to the rail mounting points during installation will not affect the performance of the system. The connection system between the rail and posts is formed using conventional fasteners providing it with the greatest tolerance of any system on the market. If the connection is damaged in any way it can be easily replaced without replacing the posts allowing for simpler installations and repairs. The Sentry Median Barrier is installed quickly using conventional installation tools and equipment. It does not require the use of blockouts, making it one of the narrowest systems on the market. Ph 0800 655 200 or visit www.csppacific.co.nz When impacted by an errant vehicle, the Sentry Median Barrier will redirect the vehicle along the face of the barrier system, bringing it to a controlled stop. The system has been developed to produce minimal debris during an impact, with all posts designed to remain firmly located in the soil and the connection details to remain attached to the rail. Repair of the system is completed by removing and replacing any bent or damaged W-Beam and posts impacted accordingly. Any posts with damaged connections can be repaired by replacing the connection hardware only, reducing the need to remove posts and repair damaged ground. Key specifications for the Sentry Median Barrier are: System width 283 mm Height to top of rail 800 mm Height to top of post 790 mm Post weight 13.6 kg Post length 1.64 m Post spacing 1.905 m MASH TL3.10 dynamic deflection 1.10 m MASH TL3.11 dynamic deflection 1.59 m November 2020 | Page 4 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier The minimum Length of Need (LoN) of the Sentry Median Barrier is dependent on the posted speed limit. Please refer to roading authority approval letters for local minimum length requirements. However, a minimum length of need for a two-way road with a posted speed limit of 100 km/hr with a clear zone of approaching traffic is recommend as 30 m, excluding terminal ends. The Sentry Median Barrier systems rails and posts are manufactured from hot-rolled steel flat products in accordance with Standard AS/ NZS 1594 and hot-dip galvanised in accordance with Standard AS/NZS 4680 with an average minimum coating thickness of 35 microns. All galvanising is undertaken after fabrication is completed to ensure no surfaces are left untreated. The Sentry Median Barrier has been designed for strength and resilience. Limitations and Warnings The Sentry Median Barrier forms part of an approved roadside protection system and it must be installed in conjunction with an approved terminal end system on both the approach and trailing ends. When installed in accordance with the manufacturer’s instruction the barrier system allows an impacting vehicle to be re-directed in a safe and predictable manner under the MASH impact conditions. Vehicle impacts that vary from the MASH impact conditions for longitudinal barriers may result in significantly different outcomes from those obtained in the experimental testing and may not meet the MASH evaluation criteria. The selection and placement of the Sentry Median Barrier must be in accordance with the Roading Controlling Authorities guidelines and the details shown in the construction drawings. Installation must be within strict accordance with the installation instructions for the product. Alternative installation techniques will be required if the soil conditions on site do not meet the minimum requirements stated in this manual. Training All Installers must undergo formal training on the installation of the Sentry Median Barrier by an approved trainer. At the completion of the training, installers will be able to identify each component of the Sentry Median Barrier, knowledge of the correct methods to handle the equipment and have the knowledge to safely install the barrier as per the Installation Manual and Specifications required. The training will also include the correct Personal Protective Equipment (PPE) required to be worn during installation and maintenance. Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 5 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Health and Safety Safety statements Installers should comply with all necessary health and safety legislation in the local jurisdiction, including all safe work and lifting practices. General Safety > All appropriate traffic safety precautions must be adopted. All workers must wear the required safety clothing, including but not limited to, high visibility vests, steel capped footwear, gloves and protective glasses etc. All required traffic safety precautions should be complied with. All workers should wear required safety clothing (examples, but not limited to, include: high visibility vests, steel capped footwear, gloves etc). > Before undertaking any earth works, including drilling or driving of posts, always check with the appropriate service providers that the area is clear of underground services Only authorised trained personnel should operate any machinery. Where overhead machinery is used, care must be taken to avoid any overhead hazards. > Before drilling or excavation always ensure that the area is clear of underground services. The appropriate service providers may need to be contacted. All installers must be well clear of machinery when posts are being driven. Before Installation Design and placement of the Sentry Median Barrier shall be in accordance with the local Road Controlling Authority’s guidelines and as per the details shown in the construction drawings. Installation shall be in accordance with the Product and Installation Manual instructions supplied for this product. The Sentry Median Barrier is an engineered safety device. Before starting installation ensure familiarity with all components of the system. IF SOIL CONDITIONS ON SITE DO NOT MEET OR EXCEED THE REQUIRED STRENGTH, SITE SPECIFIC CONDITIONS, REFER TO A LOCAL GEOTECHNICAL ENGINEER FOR FURTHER ADVICE. Ph 0800 655 200 or visit www.csppacific.co.nz Sentry Median Barrier Safety Statements > All installers must be a safe distance from all drilling or excavating machinery operating. > The components are not heavy enough to require specialised lifting equipment, but due to the dimensions and bulky nature, care should be taken when lifting the larger components into position. > Avoid placing hands or fingers in and around moving machine parts when components are being lifted and manoeuvred into place. November 2020 | Page 6 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Limited Warranty CSP Pacific (CSP) has tested the impact performance of its barrier systems and crash cushion systems, and other highway safety hardware under controlled conditions, however, CSP does not represent nor warrant that the results of those controlled conditions would necessarily avoid injury to persons or property. TO THE MAXIMUM EXTENT PERMITTED BY LAW, CSP EXPRESSLY DISCLAIMS ANY WARRANTY OR LIABILITY FOR CLAIMS ARISING BY REASONS OF DEATH OR PERSONAL INJURY OR DAMAGE TO PROPERTY RESULTING FROM ANY IMPACT, COLLISION OR HARMFUL CONTACT WITH THE PRODUCTS OR NEARBY HAZARDS OR OBJECTS BY ANY VEHICLE, OBJECTS OR PERSONS. CSP warrants that any product or component part manufactured by CSP will be free from defects in material or workmanship. CSP will replace free of cost any product or component part manufactured by CSP that contains such a defect. TO THE MAXIMUM EXTENT PERMITTED BY LAW, CSP EXPRESSLY DISCLAIMS THE FOREGOING WARRANTY IS IN LIEU OF AND EXCLUDES ALL OTHER WARRANTIES NOT EXPRESSLY SET FORTH HEREIN, WHETHER EXPRESS OR IMPLIED BY OPERATION OF LAW OR OTHERWISE, INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. CSP’S LIABILITY UNDER THIS WARRANTY IS EXPRESSLY LIMITED TO REPLACEMENT FREE OF COST OF PARTS SUPPLIED BY CSP ONLY (IN THE FORM AND UNDER THE TERMS ORIGINALLY SHIPPED), OR TO REPAIR OR TO MANUFACTURE BY CSP, PRODUCTS OR PARTS NOT COMPLYING WITH CSP Ph 0800 655 200 or visit www.csppacific.co.nz SPECIFICATIONS, OR, AT CSP’S ELECTION, TO THE REPAYMENT OF AN AMOUNT EQUAL TO THE PURCHASE PRICE OF SUCH PRODUCTS OR PARTS, WHETHER SUCH CLAIMS ARE FOR BREACH OF WARRANTY OR NEGLIGENCE. CSP SHALL NOT BE LIABLE FOR ANY INCIDENTAL, CONSEQUENTIAL OR SPECIAL LOSSES, DAMAGES OR EXPENSES OF ANY KIND, INCLUDING, WITHOUT LIMITATION, ANY SUCH LOSSES, DAMAGES OR EXPENSES ARISING DIRECTLY OR INDIRECTLY FROM THE SALE, HANDLING OR USE OF THE PRODUCTS FROM ANY OTHER CAUSE RELATING THERETO, OR FROM PERSONAL INJURY OR LOSS OF PROFIT. Any claim by the Buyer with reference to Products sold hereunder for any cause shall be deemed waived by the Buyer unless CSP is notified in writing, in the case of defects apparent on visual inspection, within ninety (90) days from the delivery date, or, in the case of defects not apparent on visual inspection, within twelve (12) months from the said delivery date. Products claimed to be defective may be returned prepaid to CSP’s plant for inspection in accordance with return shipping instructions that CSP shall furnish to the Buyer forthwith upon receipt of the Buyer’s notice of claim. If the claim is established, CSP will reimburse that Buyer for all carriage costs incurred hereunder. The forgoing warranty benefits shall not apply to (i) any Products that have been subject to improper storage, accident, misuse or unauthorised alterations, or that have not been installed, operated and maintained in accordance with approved procedures and (ii) any components manufactured by the Buyer. The customer acknowledges that it has acquired the Goods for the purposes of a business and that the Consumer Guarantees Act 1993 will not apply to the supply of the Goods by CSP to it. November 2020 | Page 7 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier System Design and Design Considerations Product Orientation Horizontal and Vertical Curves The Sentry Median Barrier can be installed between lanes or roads travelling in a single or opposing direction. The installation will remain the same with the exception of the overlapping of the W-beam (“guardrail”) as stated by Standard AS/NZS 3845.1:2015. The Sentry Barrier can accommodate both horizontally and vertically curved guardrail panels if required by site conditions. For radii less than 25 m the system must be anchored with an approved intermediate anchor or terminal end. Please refer to approved details of the local Road Controlling Authority where necessary. Concave corner Single traffic direction Convex corner Opposing traffic direction Slopes Kerbs As with all road side safety hardware, the Sentry Median Barrier has been designed and tested so that the centre of gravity of the impacting vehicle is at a constant height in relation to the system. For this reason, it is preferred that kerbs or channels are not in front or directly behind the Sentry Median Barrier as they may result in altering the height of the vehicle at impact. If interaction with a kerb cannot be avoided consult the local Road Controlling Authority guidelines regarding allowable kerb heights, kerb shapes, and barrier offset distance. Ph 0800 655 200 or visit www.csppacific.co.nz The Sentry Median Barrier can be installed on ground with a maximum cross fall of 6H:1V. For steeper slopes it is recommended that the system is installed no closer than 300 mm to the batter hinge point of the slope. If an installation with clearance less than 300 mm is required, please contact CSP®. Note: Installations in close proximity to a batter hinge must be considered within the requirements of the road controlling authority. November 2020 | Page 8 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Undulating Ground Conditions Terminal Ends Site specific grading may be necessary to ensure that there are no ‘humps’ or ‘hollows’ that may significantly alter the impacting vehicles stability or substantially alter the W-Beam heights in relation to the ground. The Sentry Median Barrier is required to be installed level and centred on the barrier line as stated in the Installation Procedure. The Sentry Median Barrier is designed to be compatible with the MAX-Tension™ Terminal End. For an alternative Terminal End, refer to Appendix F – Sentry Median Barrier Transition to X-350 Median Terminal End. Care must be taken to ensure all posts in the Sentry Median Barrier are installed to the correct height, alignment and orientation. It is strongly recommended that smoothing of uneven ground conditions be completed along the length of the Sentry Median Barrier. The purpose of the W-Beam guardrail terminals ends or crash cushions is to provide a soft impact and to prevent the end rail from spearing or impacting the errant vehicle. The terminals ends and crash cushions also provide tensile and deflection strength necessary to ensure the errant vehicle is redirected for the length-ofneed required. > Care must be taken to ensure the correct post spacing is ALWAYS used during the installation. > Care must be taken to ensure the posts are orientated correctly during installation and to ensure all W-Beams bolts are inserted and tightened accordingly. > Care must be taken to ensure the line posts are installed at the correct height. Clear Zone / Hazard Free Zone Clear Zones are areas adjacent to traffic lanes that provide errant vehicles the opportunity to slow down or recover. The clear zone must be kept clear from roadside features that could be hazardous to an errant vehicles, such as but not limited to trees, poles and culverts. Although it is desirable to maximize the available clear zone, please refer to your local Road Controlling Authority for confirmation of the minimum width requirements. Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 9 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Soil Condition Length of Need The Sentry Median Barrier is a soil-mounted system driven directly into the soil. To meet the barriers performance requires the soil to meet AASHTO Grade B standard and requirements set out by Standard AS/NZS 3845.1:2015 and TNZ Specification M/4 2006. The minimum Length of Need (LoN) of the Sentry Median Barrier is dependent on the specific hazard being protected and the posted speed limit. Please refer to Roading Control Authority approval letters for local minimum length requirements. Soil conditions on site that do not meet these requirements will require alternative installation. Contact CSP® for details. It is strongly recommended that soil tests be completed at the location where the Sentry Median Barrier is to be installed. The minimum LoN for a two-way road with a posted speed limit of 100 km/hr with a clear zone of approaching traffic is recommend as 30 metres plus the length of the terminal end on either end of the barrier system. We recommend Installers contact their local Roading Control Authority for further information or guidance. Note: All technical information required to assist in designing a site specific foundation is available from CSP®. IF SOIL CONDITIONS ON SITE DO NOT MEET OR EXCEED THE REQUIRED STRENGTH, SITE SPECIFIC CONDITIONS, REFER TO A LOCAL GEOTECHNICAL ENGINEER FOR FURTHER ADVICE. Ph 0800 655 200 or visit www.csppacific.co.nz Note: As per the LoN design section of the Roading Control Authorities guidelines, care must be taken when calculating the actual length of a barrier required verses the theoretical length of need. November 2020 | Page 10 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier System Deflection Transitions The transverse deflection of a barrier during a crash is dependent upon the mass, speed, and impact angle of the errant vehicle. The dynamic deflection of the Sentry Median Barrier is derived from physical testing completed on the Sentry Barrier System in both roadside configuration (single sided) and median configuration (double sided). A transition zone may be required to connect the Sentry Median Barrier to other types of barriers or non-approved terminal ends. Please contact CSP® for guidance on acceptable transition systems, advice may differ across different state roading jurisdictions. The maximum measured dynamic deflection (2270 kg vehicle) of the system was recorded as 1.59 m. Refer to Appendix F – Sentry Median Barrier Transition to X-350 Median Terminal End in this manual for guidance on installation. A review of the proposed barrier location can be undertaken to assess the following variables influence on the likely maximum system deflection; > Maximum attainable impact angle; > Design speed; and > Design vehicle. Please refer to CSP® for assistance on determining site specific deflections based on these parameters. Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 11 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Parts Identification Sentry Median Barrier Post (2 views) Splice, Bolt & Nut Sentry Barrier Bolt, Washer & Nut W-Beam ALL STEEL COMPONENTS USED IN THE SENTRY MEDIAN BARRIER ARE HOT DIPPED GALVANISED IN ACCORDANCE WITH STANDARD AS/NZS 4680:2006 (AVERAGE MINIMUM COASTING THICKNESS SHOULD BE 35 MICRONS) WITH THE EXCEPTION OF THE SENTRY BARRIER WASHER BEING SPUN GALVANISED. Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 12 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Bill of Materials Checklist per panel (3.81 m of barrier) installed Yes 2x Sentry Median Barrier Posts 2x Sentry Barrier Bolt, Washer and Nut (two per post) 2x W-Beam 16x Splice Bolts and Nuts (at the end of W-Beam and overlapping the prior W-Beam) General equipment required Drilling or compactor suitable for foundation String line and pegs Measuring tape Level 32 mm Wrench 32 mm Ring Spanner Automatic drill (with 10mm allen key hex bit) Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 13 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Installation Getting Started Soil Conditions The Sentry Median Barrier is a W-Beam barrier designed to run the length of need required and is attached to a compatible terminal end. The minimum Length of Need (LoN) allowed is dependent on the post speed limit. For a 100 km/hr zone a minimum LoN of 30 metres is recommended, excluding the proposed terminal end. The Sentry Median Barrier has been designed to withstand a constant static load, thermal loading, and dynamic impact load that can be applied from the impact of an errant vehicle. To perform, the Sentry Median Barrier must be attached to a MAX-Tension™ Median Terminal End to provide the necessary safety benefits. It is recommended that the soil tests are carried out at the location the Sentry Median Barrier prior to being installed. Preparation Before installing an Sentry Median Barrier, ensure that all components required for the system are on site and have been identified. The Sentry Median Barrier is an engineered safety device. Before starting installation ensure familiarity with the makeup of the system. Refer to the Bill of Materials and Parts Identification sections in this manual for more information. IF SOIL CONDITIONS ON SITE DO NOT MEET OR EXCEED THE REQUIRED STRENGTH DETAILED IN THIS MANUAL, SITE SPECIFIC FOUNDATIONS MUST BE DESIGNED BY A LOCAL GEOTECHNICAL ENGINEER. Ensure that the area where the Sentry Median Barrier is to be installed is sufficiently flat so that the posts and W-Beam can be installed within the allowable tolerance and aligned to the terminal ends. Minor site grading may be required. Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 14 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Tools Required The tools required to install the Sentry Median Barrier are similar to other W-Beam barriers. It requires: Level Appropriate personal protective equipment 32mm Socket wrench or Ratchet Drilling or compactor machinery (suitable for soil conditions and with a driving head to avoid damage to posts during installation) 32mm Ring spanner String line Automatic drill (with 10 mm allen key hex bit) Measuring tape Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 15 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Installation Tolerances The Sentry Median Barrier is an engineered safety device. To obtain optimal performance it is important to install all components of the system to within the allowable tolerances stated below (also in Appendix E). Particular care must be taken to ensure; > Suitable horizontal alignment and verticality of the line posts. > Consistency in the vertical height of the line posts. > Orientation and height of the terminal end. Sentry Median Barrier has to be installed at 780mm to the top of the post. A vertical height tolerance of +25mm is acceptable for the Sentry Barrier Post. The top of the W-Beam is to be positioned 10mm above the top of the Sentry Barrier Post with an additional tolerance of ±5mm. The Sentry Barrier Post laterally is constrained to ±15mm tolerance. It is of upmost importance for these tolerances to be adhered to in order to ensure safe function of the Sentry Median Barrier. Ph 0800 655 200 or visit www.csppacific.co.nz Once installed, the relative height of the Sentry Median Barrier to the surrounding road surface may alter due to road surface overlays. Experience has shown that the overlays may be acceptable until the relative height from the top of the rail to the road surface falls below 715 mm. Please contact CSP® should the installation fall outside this tolerance. November 2020 | Page 16 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Installation Instructions Before installing the Sentry Median Barrier, ensure that all components required for the system are on site and have been identified. The Sentry Median Barrier is an engineered safety device made up of relatively small number of parts. Please ensure familiarity with the makeup of the system and the installation process prior to commencing. If required, refer to the Bill of Materials and Parts Identification sections in this manual for more information. Post driver machine - Impact head Ensure a suitable post driver impact head that has been designed to drive Sentry posts is used in order to avoid damage to posts during installation. Below are examples of suitably designed impact heads. Contact CSP® for assistance if required. Site Preparation It is preferred that the Sentry Median Barrier be installed on flat, level ground and connected to an approved terminal end. The positioning of the Sentry Median Barrier commences from the last post connected to the terminal end, working upstream to the prior terminal end. It is recommended that a string line be used to obtain the correct orientation and placement of the posts and are aligned to the terminal end. BEFORE DRILLING OR EXCAVATION ALWAYS ENSURE THAT THE AREA IS CLEAR OF UNDERGROUND SERVICES. Post Orientation The preferred orientation of the Sentry Barrier roadside post, is to have traffic facing the closed side of the post. However, for a median system with traffic flow in both directions, the open side of the post will face one of the traffic directions by default. The orientation of the post must be consistent for the entire length of the barrier. In cases where very hard ground conditions are encountered, minor deformation may occur near the top of the post. If it occurs, please refer to Appendix I – ACCEPTABLE POST DEFORMATION MEASURES & TOLERANCES, to determine if the deformation is acceptable for the continuation of installation. Please refer to Appendix J – SENTRY MEDIAN POST ORIENTATION & RAIL OVERLAPPING DETAIL for preferred post orientation in different median applications. Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 17 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Construction of Terminal End Step 2 The Sentry Median Barrier is compatible with the MAX-Tension™ Median Terminal End which provides optimal performance. Please refer to the relevant MAX-Tension™ Median Terminal End installation Manual for guidance to the construction and installation procedure. Place a string line from the centre of the downstream terminal end or crash cushion to required location of the upstream terminal end. The string line should pass over the centre of each post location and be marked accordingly as the required location for drilling or driving each post. Also refer to Appendix F – Sentry Median Barrier Transition to X-350 Median Terminal End in this manual for guidance on installation. Installation Procedure (Posts and W-Beam) Step 1 Review the site location and identify possible hazards prior to commencing the installation of the Sentry Median Barrier. Any concerns, please refer to the local Roading Authority. Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 18 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Step 3 Step 4 Identify the correct orientation of the post. Supporting the W-Beam in the desire location. The post must be vertically aligned and within the tolerance level stated in the Installation tolerance drawings. The driving of the post should not incur any damage to the post. If a post is damaged it must be inspected and removed if deemed appropriate. It is vital that each W-Beam must overlap the prior W-Beam positioned downstream as stated in Standard AS/NZS 3845.1:2015. Failure to correctly overlap the W-Beam may cause snagging, poor barrier performance or risk injury or death to the driver of the errant vehicle. Drive the posts to a depth of 850mm (790 mm protruding above ground) as stipulated in the drawings. Install the Sentry Median Barrier Bolt, Washer and Nut to the Sentry post. Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 19 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Step 5 Step 6 Once supported by the Sentry Median Barrier Bolt, insert the 8 Splice Bolts and Nuts joining the upstream and downstream together. Snug tighten all bolts once installed. Repeat Step 4 and Step 5 on the opposing side of the barrier. Continue working downstream from the first installed W-Beam, connected to the terminal end. Once the first row of W-Beam has been installed, continue on the reverse side until all W-Beams have been attached. CAUTION: Please ensure the correct overlapping of the W-Beam in accordance to the direction of the traffic flow and as stated by Standard AS/NZS 3845.1:2015. Single traffic direction Ph 0800 655 200 or visit www.csppacific.co.nz Opposing traffic direction November 2020 | Page 20 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Step 7 Once the barrier is installed, a detailed visual inspection should be completed to ensure all components are installed as stated in the Product and Installation Manual. Ph 0800 655 200 or visit www.csppacific.co.nz Any questions or concerns regarding the Sentry Median Barrier, please contact CSP® . November 2020 | Page 21 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Installation Checklist Periodically, and at the completion of the installation, an inspection by a qualified inspector is required to ensure the Sentry Median Barrier has been installed as stated in the Installation Manual. Failure to complete the Installation checklist (See Appendix G – SENTRY MEDIAN BARRIER INSTALLATION CHECKLIST) may render the installation as being incomplete. Any item identified as notifiable, must be highlighted to the local roading authority immediately. Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 22 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Inspection and Maintenance The Sentry Median Barrier is maintenance free. To allow the Sentry Median Barrier to perform as designed, regular inspections and maintenance (where required) should be conducted. These inspections should follow the Road Safety Barrier Systems and Devices Standard (AS/NZS 3845.1:2015) maintenance suggestions of: > System documentation > Operating environment > Traffic volumes and composition > Risks at the site Requirement after a Bushfire or Flooding Following a bushfire or flooding, an inspection of the Sentry Median Barrier should be undertaken. This inspection will follow the standard inspection and maintenance process as documented in Appendix H - Sentry Median Barrier Inspection Checklist. Special attention should be applied to the galvanising of the components when impacted by a bushfire and special attention to the soil conditions after flooding. Any concerns, please refer to the Sentry Median Barrier Product Manual or contact CSP® for recommendations or inspections of the Sentry Median Barrier itself. Local Roading Authorities may follow their own inspection process. Please contact your local Roading Authority, in the first instance, to confirm the correct processes or documentation required. This may include a specific response time for repairs, require spare parts to be carried by the inspector or the visual inspection by a qualified inspector. In the case of no local roading authority process or documentation, please refer to the Appendix H - Sentry Median Barrier Inspection Checklist included within this installation manual. Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 23 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier Frequently Asked Questions 1. What type of equipment is required to install the Sentry Median Barrier? Standard tools required include a wrench, automatic drill, measuring tape, string line and machinery suitable for drilling or compacting the post into soil. 2. Does your company provide spare parts? What is the lead-time for supply? It is important to fix a damaged W-Beam barrier as soon possible because it most probably won’t perform as designed when damaged. For this reason it is recommended that spares are held by Maintenance Contractors. The lead time for parts will generally be next day delivery or collection from one of our distribution centres. 3. On average, how long does it take to install the Sentry Median Barrier? 5. How easily can the Sentry Median Barrier be restored after impact? Sentry Median Barrier is easily repaired following an impact. Damaged posts can be removed using a crow bar and new posts installed before replacement W-Beam and splice bolts are positioned. The connection detail used between the post and the rail of the Sentry Median Barrier is designed to limit damage to the post outside of the immediate zone of impact. When the connection is damaged, the washer detail can be easily replaced without needing to replace the post. 6. What maintenance does the Sentry Median Barrier require? The Sentry Median Barrier is maintenance free. However it is recommended that all W-Beam barrier systems are checked after impacts to ensure that the integrity of the barrier is maintained. Depending on circumstances at the site, installation and assembly of the system should take a three person crew less than 20 mins per W-Beam panel (3.81 m length) when using automatic post driving equipment. Installation time will vary depending on ground conditions when hand digging and re-compacting posts. 4. What about vandalism, can the Sentry Median Barrier be damaged easily? No, once the system has been fully installed it becomes a rigid system unlikely to be damaged or weaken the performance of the system. Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 24 KEEPING NZ SAFE Product & Installation Manual: Sentry Median Barrier APPENDICES Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 25 Ph 0800 655 200 or visit www.csppacific.co.nz NOTES: 1650 (TOP OF RAIL) 6 4 3 2 1 790 POST HEIGHT ITEM NO. 2080128 A REVISION CHANGES MADE BNW SPLICE BOLT & NUT HT M16x32 2082791 REV.DATE FL WASHER SENTRY 58 O.D x 2.5mm GALV 2082800SEN 2 BNW MUSHROOM HEAD BOLT & OVERSIZED NUT M16x50 2080022 CL 1905 FL 12G 3810 GALV 2082792 A DESCRIPTION CSP SENTRY BARRIER MEDIAN POST 1.64m PART NO. 2 1 4 304 Neilson Street, Onehunga SCALE A3 Auckland, New Zealand Telephone: 09 634 1239 ASSEMBLY NO. www.csppacific.co.nz 5 FX140 FX742-3 FX742-2 FX33 FX743-1 DWG NO. SECTION B-B SCALE 1 : 2 3 G.L CL 1905 0.01 0.04 0.12 41.38 13.63 WEIGHT EA. UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN WEIGHT(Kg) MILLIMETRES. TOLERANCES 1mm AND 0.5 16 4 4 2 2 QTY. 126.15 2082807SEN 1:20 800 TOP OF RAIL DATE DRW NO. DRAWN 8/09/2020 FX743 SANDIP KERAI SECTION A-A SCALE 1 : 5 CSP SENTRY MEDIAN BARRIER W BEAM SYSTEM DESCRIPTION B REVISION 0 DESTROY ALL PREVIOUS ISSUES B Appendix A – Sentry Median Barrier November 2020 | Page 26 Ph 0800 655 200 or visit www.csppacific.co.nz NOTES: 72 SEE DETAIL A FOR UNFORMED APERTURE DIMENSIONS 72 ±1 REVISION REV.DATE CHANGES MADE 1640 18 THRU 50 CL 100 A 2x B SCALE A3 1:5 170 13.64 GALVANIZED STEEL MATERIAL UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN WEIGHT(Kg) MILLIMETRES. TOLERANCES 1mm AND 0.5 304 Neilson Street, Onehunga Auckland, New Zealand Telephone: 09 634 1239 www.csppacific.co.nz DETAIL A UN-FORMED APERTURE SCALE 1 : 1.5 41 24 78 115 ±1.5 PART NO. 2082792 CSP SENTRY BARRIER MEDIAN POST DESCRIPTION DETAIL B SCALE 1 : 1.5 18 ±1.5 6mm MINIMUM TYP R4 DRAWN DATE DRW NO. 8/09/2020 FX743-1 SANDIP KERAI REVISION 0 DESTROY ALL PREVIOUS ISSUES Appendix B – Sentry Median Post November 2020 | Page 27 NOTES: REVISION REV.DATE Ph 0800 655 200 or visit www.csppacific.co.nz 8 HOLES 32 PCD A 8 ON CHANGES MADE 8 HOLES 40 PCD 5 ON 2.5 DETAIL A SCALE 4 : 1 R2 R4 306 Neilson Street SCALE A3 DESCRIPTION 2:1 Onehunga, Auckland FL WASHER SENTRY 58 O.D X 2.5mm GALV P O Box 12949, Penrose MATERIAL GALVANIZED STEEL Auckland, New Zealand Telephone: 09 634 1239 WEIGHT(Kg) PART NO. 2082791 0.04 Facsimile: 09 634 4525 R2 .5 DRW NO. DATE DRAWN FX742-3 14/10/2019 S KERAI REVISION 0 DESTROY ALL PREVIOUS ISSUES Appendix C – Sentry Washer November 2020 | Page 28 16.5 32 40 58 Appendix D – M16X50 Bolt and Nut REVISION REV.DATE CHANGES MADE 32 18 120° B TAP M16 0.4 O/S 15 B -3 0° SECTION B-B SCALE 1.8 : 1 M16 OVERSIZED HEX NUT TAPPED TO SUIT GALVANISED THREADS WITH PHYSICAL PROPERTIES AS/NZS 1252 CLASS 8.8 REFER TO FX140 FOR ADDITIONAL DETAILS HEAD MARKING 7mm LETTERS EMBOSSED 0.7 HIGH ON 22 P.C.D 36 ±1 40 36.4 16.8 MAX 11.8 36 6 +0.2 10 +0.03 9 M16 MUSHROOM HEAD POST GALVANISED BOLT WITH PHYSICAL PROPERTIES AS/NZS 1111 GRADE 4.6 NOTES: Ph 0800 655 200 or visit www.csppacific.co.nz SCALE A3 306 Neilson Street VARIOUS Onehunga, Auckland P O Box 12949, Penrose MATERIAL GALVANIZED STEEL Auckland, New Zealand Telephone: 09 634 1239 WEIGHT(Kg) 0.12 Facsimile: 09 634 4525 DRAWN DESCRIPTION 1.M16 OVERSIZED HEX NUT TAPPED 2.M16 MUSHROOM HEAD POST BOLT PART NO. 2082800SEN DATE DRW NO. S KERAI DESTROY ALL PREVIOUS ISSUES 15/07/2020 0 FX742-2 REVISION November 2020 | Page 29 NOTES: REVISION REV.DATE CHANGES MADE G.L 15mm Ph 0800 655 200 or visit www.csppacific.co.nz +25 790 0 POST HEIGHT 306 Neilson Street SCALE A3 Onehunga, Auckland P O Box 12949, Penrose ASSEMBLY NO. Auckland, New Zealand Telephone: 09 634 1239 WEIGHT(Kg) Facsimile: 09 634 4525 10 ±5 1:10 CSP SENTRY MEDIAN BARRIER W BEAM SYSTEM ACROSS BARRIER TOLERANCE DESCRIPTION DATE DRW NO. DRAWN 8/09/2020 FX743-2 S KERAI REVISION 0 DESTROY ALL PREVIOUS ISSUES Appendix E – Sentry Tolerance November 2020 | Page 30 306 Neilson Street, Onehunga, Auckland PO Box 12 949, Penrose Auckland, New Zealand Telephone 09-634 1239 Facsimile 09-634 4525 www.csppacific.co.nz Appendix F – Sentry Median Barrier Transition to X350M Median Terminal Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 31 Appendix G - Sentry Median Barrier Installation Checklist Item Acceptable Notifiable* Ensure the posts are orientated in the correct direction and consistent with the terminal ends. The height of the finished rail should be 800 mm (±25 mm) above the finished ground level. The height to the top of the posts should be 790 mm (±25 mm) above finished ground level. The posts are free from damage. The correct Sentry Median Barrier Washers are installed and seated correctly in the back of the post. All bolts are tightened snug. The W-Beam must be level and aligned to the terminal end. Ensure posts are free of debris prior to installing the W-Beam. The top edge of the W-Beam must align, both vertically and horizontally, between the Sentry Median Barrier and the nominated terminal end. *Any component or system identified as notifiable, must be highlighted to the local Roading Authority immediately. A notifiable item is defined as having the potential to interfere or hinder the Sentry Median Barrier performance. Comments: Job Number: Location: Client/Asset Owner: Principal Contractor: Installer: Installed by: Date Inspected by: Date Contact CSP® for more information on this or other road safety products. Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 32 Appendix H – Sentry Median Barrier Inspection Checklist To allow the Sentry Median Barrier to perform as designed, regular inspections and maintenance (where required) should be conducted within a timely manner. Local Roading Authorities may follow their own inspection process. Please contact your local Roading Authority, in the first instance, to confirm the correct processes or documentation required. This may include a specific response time for repairs, require spare parts to be carried by the inspector or the visual inspection by a qualified inspector. Below are the tools that are required to inspect the Sentry Median Barrier. String line 32mm Socket wrench or Ratchet Measuring tape 32mm Ring spanner Level Automatic drill (with 10 mm allen key hex bit) Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 33 Below is the Inspection Checklist required when inspecting the Sentry Median Barrier. Once inspected, please forward a signed copy to the local roading authority. Item Acceptable Notifiable* Are there any signs of impact, scraping or snagging of the Sentry Median Barrier? Are there any signs of fire damage to any of the Sentry Median Barrier components? Are there any signs of damage of the Sentry Median Barrier post, post footing and surrounding soil? Are all the Bolts, Washers and Nuts fitted are tightened accordingly? Caution: Over tightening of the nut can cause the washer to deform. Are all posts, as stated in the Installation Manual, 790 mm (+25 mm) above ground level and no damage. Is the barrier clear of debris or anything that may cause interaction of an errant vehicle? All components meet the Technical Specification stated in the Installation Manual. That is, no components have been switched out for alternate products. *Any component or system identified as notifiable, must be highlighted to the local Roading Authority immediately. A notifiable item is defined as having the potential to interfere or hinder the Sentry Median Barrier performance. Comments: Job Number: Location: Client/Asset Owner: Principal Contractor: Installer: Installed by: Date Inspected by: Date Contact CSP® for more information on this or other road safety products. Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 34 Appendix I – Acceptable Post Deformation Measures & Tolerances Test 1: Nut Pass-through Ensure the nut can adequately pass through the slot at all locations along the slots length. This can be confirmed by physically checking fitment of the nut or alternatively measuring the width of the slot to ensure it is greater than that of the widest part of the bolt, typically 36.0 mm. Any posts where the nut cannot pass through the slot should be rejected, and the deformation considered excessive. Test 3: Post deformation bending and cracking tolerance If the bending deformation on any part of the post is less than 20 mm then the post shall be considered suitable for use. The deformation shall be measured by running a straight rule over the element to be measured and the peak off-set measured with a suitable rule or tape. See figure below to the left. For cracking deformations, the maximum allowable deformation on the open side of the post will be limited to 15 mm. This limit is increased to 25 mm on the closed side of the post section due to the increased structural capacity of the web. See figure below. Test 2: Washer Fitment Ensure the washer can adequately fit into the required location to ensure the deformation is not excessive. This can be confirmed by physically placing the washer in the correct location and checking if it fits, even if tightly. For any post where the washer cannot be physically installed even if the fitment is tight, shall be rejected and the deformation considered excessive. Ph 0800 655 200 or visit www.csppacific.co.nz November 2020 | Page 35 Appendix J - Sentry Median Post Orientation & Rail Overlapping Detail REVISION REV.DATE CHANGES MADE TRAFFIC DIRECTION SENTRY MEDIAN BARRIER TRAFFIC IN BOTH DIRECTION TRAFFIC DIRECTION TRAFFIC DIRECTION SENTRY MEDIAN BARRIER TRAFFIC IN ONE DIRECTION TRAFFIC DIRECTION TRAFFIC DIRECTION SENTRY BARRIER (WIDE MEDIAN) TRAFFIC IN BOTH DIRECTION TRAFFIC DIRECTION 304 Neilson Street, Onehunga SCALE A3 1:20 Auckland, New Zealand Telephone: 09 634 1239 ASSEMBLY NO. 2082807SEN www.csppacific.co.nz NOTES: UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN WEIGHT(Kg) 291.83 MILLIMETRES. TOLERANCES 1mm AND 0.5 Ph 0800 655 200 or visit www.csppacific.co.nz DESCRIPTION CSP SENTRY MEDIAN BARRIER W BEAM SYSTEM POST ORIENTATION & RAIL LAPPING DETAILS DRAWN SANDIP KERAI DRW NO. DATE FX743-3 8/10/2020 DESTROY ALL PREVIOUS ISSUES 0 REVISION November 2020 | Page 36 ">
Advertisement