NuAire MRXBOX-ECO2, MRXBOXAB-ECO2B-SW Installation Manual
Nuaire MRXBOXAB-ECO2B-SW is a wall-mounted mechanical ventilation unit with heat recovery, designed for homes with multiple rooms requiring ventilation. It features two independent fans for supply and extract air, with adjustable speeds for different ventilation needs. The unit recovers up to 95% of waste heat, improving energy efficiency and comfort. It includes a condensate drain and frost protection for reliable operation.
PDF
Download
Document
Advertisement
Advertisement
MRXBOXAB-ECO2B-SW (Standard Unit) MRXBOXAB-ECO2B-OHSW (Opposite Hand Unit) Mechanical Ventilation Units with Heat Recovery for Wall Mounting Installation Manual 1.0 SAFETY INFORMATION • The provision of the electrical supply and the connection of the unit to the mains must be carried out by a qualified electrician. • Isolate from power supply before removing any covers. During installation / maintenance ensure all covers are fitted before switching on the mains supply. • All-pole disconnection from the mains as shown in the wiring diagram must be incorporated within the fixed wiring and shall have a minimum contact separation of 3mm in accordance with latest edition of the wiring regulations. • • This unit must be earthed. • If the supply cord is damaged, it must be replaced by the manufacturer, its service agent or similarly qualified persons in order to avoid a hazard. • Precautions must be taken to avoid the back-flow of gases into the room from the open flue of gas or other fuel-burning appliances. • This appliance should not be used by children or persons with reduced physical, sensory or mental capabilities or lack of experience and knowledge, unless they have been given supervision or instruction concerning the safe use of the appliance by a person responsible for their safety. Children shall not play with the appliance. Cleaning and user maintenance shall not be carried out by children. Ducting must be securely fixed with screws to the spigot to prevent access to live parts. Duct runs terminating close to the fan must be adequately protected by suitable guards. 1.1 Hazard Symbols REFER TO INSTRUCTION MANUAL Read and understand the installation and maintenance manual before installing, operating or maintaining this product. 1.2 Important Information 1.3 Personal Protective Equipment This manual contains important information on the safe and appropriate assembly, transport, commissioning, operation, maintenance, disassembly and simple troubleshooting of the product. The following minimum Personal Protective Equipment (PPE) is recommended when interacting with Nuaire product: While the product has been manufactured according to the accepted rules of current technology, there is still a danger of personal injury or damage to equipment if the following general safety instructions and the warnings contained in these instructions are not complied with. •Read these instructions completely and thoroughly before working with the product. •Keep these instructions in a location where they are accessible to all users at all times. •Always include the operating instructions when you pass the product on to third parties. •Protective Steel Toed Shoes - when handling heavy objects. •Full Finger Gloves (Marigold PU800 or equivalent) - when handling sheet metal components. •Semi Fingerless Gloves (Marigold PU3000 3DO or equivalent) - when conducting light work on the unit requiring tactile dexterity. •Safety Glasses - when conducting any cleaning/cutting operation or exchanging filters. •Reusable Half Mask Respirators - when replacing filters which have been in contact with normal room or environmental air. Nuaire would always recommend a site specific risk assessment by a competent person to determine if any additional PPE is required. Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk 10. 11. 21. Document Number 672001 1 MRXBOXAB-ECO2B-(OH)SW Installation Manual 2.0 INTRODUCTION 3.1 Wall Mounting The ECO2 wall mounted range of units is designed to provide mechanical supply and extract ventilation with heat recovery. If fitting the MVHR in conjunction with a MRXBOX-AV2 the hanging brackets supplied with the MVHR are redundant and should not be used. The installation instructions supplied with MRXBOX-AV2 should be followed. The unit is fitted with two independent fans. Each fan has full speed control for background and boost ventilation rates. To recover heat from the extract air the heat exchanger block is utilised. The heat exchanger can recover up to 95% of the normally wasted heat. Bypass operation can be disabled via a manual switch in colder months so the unit recovers heat continually. 3.0 MECHANICAL INSTALLATION Installation must be carried out by competent personnel in accordance with the appropriate authority and conforming to all statutory governing regulations. All mains wiring must be in accordance with the current I.E.E. Regulations, or the appropriate standards. Ensure that the mains supply (Voltage, Frequency and Phase) complies with the rating label. Please note a clear working space is required around the installed unit to allow the cover to be removed and provide sufficient access for maintenance such as filter change. The unit is designed for wall mounting, only on a solid wall. A gypsum block or stud/plasterboard wall will not suffice. 1. One part of the mounting bracket (supplied) should be offered up to the wall, ensuring it’s located horizontally. Mark the fixing points through the pre drilled holes in the bracket and install with screws (by others), whilst ensuring the interlock side is at the top (Figure 3). 2. Install the unit on the wall by ensuring the bracket fixed to the rear of the unit interlocks over the wall mounted bracket (Figure 4). Care must be taken to ensure the unit is installed true in all 3 dimensions. Failure to do so may result in overflow from the internal condensation drip tray. 3 Wall Mounting Bracket Allow a minimum of 350mm in front of an MRXBOXAB-ECO2 unit. The fan must be installed indoors, on a suitable wall away from direct sources of frost, heat and water spray or moisture generation. For a vibration-free result the unit must be mounted to a solid wall. The unit must remain switched on at all times to maintain ventilation within the dwelling. Turning the unit off will cause long term damage to the unit and building fabric. 4 Mounting Unit Onto Bracket 1 Airflow Through unit (Standard Unit) Intake air from outside Exhaust air from house to outside Supply air to house Extract air from house 3.1.1 Option 1 - Solid Wall The MVHR unit fixed to a solid wall construction using the mounting bracket provided. 2 Airflow Through OH unit (Opposite Hand Unit) Extract air from house Supply air to house 5 Solid Wall Mounted Unit Installation Exhaust air from house to outside Intake air from outside Ducting in the ceiling void. Valve in ceiling. Side view of unit mounted on the block wall in a cupboard. MVHR-DRAIN Condensate drain, uninsulated drain pipe with min 5 o fall running to SVP. Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk 10. 11. 21. Document Number 672001 2 MRXBOXAB-ECO2B-(OH)SW Installation Manual 3.1.2 Option 2 - Non-Solid Wall 3.2.2 Option 2 - Angled Brackets If it is not practical to use a solid wall, the MVHR unit should be fixed to a stud partition with a 25mm minimum thickness MDF panel solidly fixed behind the plasterboard. The MVHR unit should be positioned on a 25mm minimum thickness MDF panel that is vertically fixed across the roof trusses to form a solid false wall. If fixing to a stud wall the MDF panel should extend, width wise, over a minimum of 3 vertical studs with centres of no more than 400mm. Add additional vertical supports if necessary. Add additional vertical supports if necessary. Use the Anti-vibration tray assembly (MRXBOX-AV2) including the angle brackets, to be purchased separately. Height wise, ideally, the MDF panel should extend from floor to ceiling but as a minimum should be a least 2m high. 8 Angled Brackets Loft Mounted Installation Fix the mounting bracket to the wall (Figure 3) and use the wall mounted bracket to mount the unit on (Figure 4). 6 Non-Solid Wall Mounted Unit Installation Ducting in the ceiling void. Valve in ceiling. Side view of unit mounted in a cupboard fixed to a stud partition with the 25mm MDF fixed behind the plasterboard. MVHR-DRAIN Condensate drain, uninsulated drain pipe with min 5 o fall running to SVP. 3.2 Loft Mounting 3.2.1 Option 1 - Tank Stand 3.3 Off-Site Cupboard Construction For off-site constructed cupboards adequate support must be included in the steel frame to support the weight of the units in operation and to allow for dynamic loads in transit to site. The MVHR unit should be positioned on a tank stand using the Anti-vibration tray assembly discarding the angle brackets. If the unit is to be bolted to a plywood or MDF backboard then this must be of sufficient thickness to support the unit’s weight and through-bolted with washers fitted to spread the load. Anti-vibration tray assembly (MRXBOX-AV2) is to be purchased separately. 7 Tank Stand Loft Mounted Unit Installation The cupboard manufacturer should satisfy themselves that the method of mounting is sufficient to support the weight of the unit in operation and transit to site. The top of the unit is to be suitably braced within the cupboard for transport. 3.4 Condensate Drain The condensate must be discharged under a water level in a U-trap drainpipe or an alternative drain method which acts as an airlock. This condensate discharge connection is suitable for 21.5mm Ø overflow pipe. Solvent cement should be used to make the joint. If using a U-trap please ensure the U-trap has been filled to a suitable level of water to avoid any air locks. If the condensation pipe is fitted in an unheated space the pipe should be in insulated to prevent freezing. An MVHR-DRAIN is recommended for use as the primary condensate take-off (Figures 10 and 11). Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk 10. 11. 21. Document Number 672001 3 MRXBOXAB-ECO2B-(OH)SW Installation Manual To prevent condensation on the outside of the outside air inlet duct and the air outlet duct from the unit, these ducts should be insulated. 9 Condensate Trap Installation Ducting must be installed in such a way that resistance to airflow is minimised. Bends should be kept to a minimum. A minimum distance of 300mm between the appliance and any bends in ductwork is recommended. Min 5 o Drop Ideally 150mm diameter or 204 x 60mm rectangular ducting should be used (Figures 13 & 14). Condensate pipe connection to unit and a typical example of a “U” trap drainpipe (Standard configuration only). Ducting joints must be sealed with silicone type sealant and shall be adequately and reliably fixed to the appliance. 3.7 Ventilation Flow Rates 10 MVHR-DRAIN Installation ADF 2010 - Extract Ventilation Rates Room Collar Condensate drain, uninsulated drain pipe with min 5° fall running to SVP. Minimum High rate Kitchen 13 l/s Utility Room 8 l/s Bathroom 8 l/s Sanitary Accommodation 6 l/s Minimum Low Rate Total extract rate should be at least the whole dwelling ventilation rate given in table 2. Whole Dwelling Ventilation Rates 11 "T" Piece CONTRAP & MVHR Drain Connection Number Of Bedrooms In Dwelling MVHR Drain To CONTRAP To unit To SVP “T” piece When using a “T” Piece to connect the CONTRAP drainage and the MVHR drain pipework the MVHR drain must always be fitted before the “T” Piece to prevent condensate from feeding back into the MVHR system. 3.5 Extract / Input Areas The unit is designed to extract air from all wet rooms e.g. bathroom, kitchen, en-suite, utility room (with sink). WC’s do not need to be ventilated if openable windows are fitted. Whole dwelling ventilation rate (l/s)1,2 1 2 3 4 5 13 17 21 25 29 Notes: 1. In addition, the minimum ventilation rate should be no less than 0.3 l/s per m² of internal floor area. (This includes all floors, e.g. for a twostory building add the ground and first floor areas). 2. This is based on two occupants in the main bedroom and a single occupant in all other bedrooms. This should be used as the default value. If a greater level of occupancy is expected add 4 l/s per occupant. Any air intake terminal must be installed in accordance with the appropriate regulation. As a guide, the BS5440 series of British Standards deals with this issue and currently states that an air intake must be at a minimum distance of 300mm from a gas boiler balanced flue. Installers are advised to be aware of the requirements of this standard when installing ‘through the wall’ supply air ducting. Supply air should be to all habitable rooms e.g. bedrooms and lounge. Extract / input grilles should be adjustable valve types (not supplied). External grilles are to have a minimum free area of 12,250 sq. mm. 3.6 Ducting Before commencing ducting installation reference should be made to building regulations document “Domestic ventilation compliance guide”. This document supports ADF2010 and details installation, testing and commissioning of all ventilation systems. It is recommended that rigid ducting be used at all times. Flexible ducting has a very high resistance and it is impossible to calculate how much resistance will be on a system if used. If used the flexible ducting must be kept to a minimum and should always be pulled taut. A maximum of 300mm should be used on each leg. Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk 10. 11. 21. Document Number 672001 4 MRXBOXAB-ECO2B-(OH)SW Installation Manual •The minimum air supply rate should be at least the whole building ventilation rate found in step 1. 3.8 ADF 2010 Ventilation Calculations Design of MVHR Systems The MVHR system has been sized for the winter period. Additional ventilation may be required during the warmer months and it has been assumed that the provisions for purge ventilation (e.g. openable windows) could be used. For Scotland refer to BRE Digest 398. Step 1: For any design air permeability, determine the whole dwelling ventilation supply rate from Whole Dwelling Ventilation Rates table. 3.8.1 Pre Commissioning MRXBOX MVHR Units As an alternative where the design air permeability is intended to be more than (>) 5m3/(h.m2) 50 Pa, allow for infiltration for all dwelling types by subtracting from the whole dwelling ventilation supply rate from Whole Dwelling Ventilation Rates table; 0.04 x gross internal volume of the dwelling heated space (m3). MRXBOX units are designed to ventilate the whole dwelling and must not be used during site construction or the clean-up period. Cement and plaster dust can be abrasive and can affect fan performance and reliability. Please ensure that the filters are checked prior to commissioning to ensure there is no build-up of dust or debris. Step 2: Calculate the whole dwelling extract ventilation rate by summing the individual room rates for ‘minimum high rate’ from ADF 2010 - Extract Ventilation Rates table. While the property is drying out, very high moisture levels are likely to occur. Therefore it is advisable that if the installation and building works are complete the unit is left running. If the building works are not complete please close the air valves or cover up the air valves to prevent condensation forming in the ductwork and the MRXBOX unit due to natural migration of warm air. (For sanitary accommodation only, as an alternative, the purge ventilation provisions given in ADF 2010 can be used where security is not an issue. In this case ‘minimum high extract rate’ for the sanitary accommodation should be omitted from the step 2 calculation). For further information refer to “Domestic Ventilation Compliance Guide” www.planningportal.gov.uk/buildingregulations/approved documents/partl/compliance Step 3: The required airflow rates are as follows: •The maximum whole dwelling extract ventilation rate (e.g. boost) should be at least the greater of step 1 and step 2. Note that the maximum individual room extract rate should be at least those given in ADF 2010 - Extract Ventilation Rates table. 3.9 Dimensions 12 Unit Dimensions Front View Side view 507 Mounting Bracket (not to be used when unit is fitted in conjunction with MRXBOX-AV2) 356 607 Unit Weight = 20Kg 16 Top View 172 172 90 416 Spigots 4 x 125mm dia. Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk 10. 11. 21. Document Number 672001 5 MRXBOXAB-ECO2B-(OH)SW Installation Manual 3.10 Ducting Arrangements - Standard Unit Configuration 3.10.1 Circular Ducting 13 Typical Circular Ducting Arrangement For Wall Mounted Units Exhaust air from kitchen/bathroom to outside via louvre grille. Minimum distance as specified in building regulations. *Insulated extract duct. Top of ceiling void. Air supply to lounge via Air Valve in ceilings. Intake air from outside via louvre grille. All duct between MVHR unit and atmosphere to be insulated*. *Insulated supply duct. Extract air from kitchen/ bathroom via Air Valve in ceilings. Air supply to bedrooms via Air Valve in ceilings. Nuaire wall mounted unit. MVHR-DRAIN Condensate drain, uninsulated drain pipe with min 5o fall running to SVP. 3.10.2 Rectangular Ducting 14 Typical Rectangular Ducting Arrangement For Wall Mounted Units *Insulated extract duct. Exhaust air from kitchen/bathroom to outside via air brick. Minimum distance as specified in building regulations. Top of ceiling void. Air supply to lounge via Air Valve in ceilings. Intake air from outside via air brick. All duct between MVHR unit and atmosphere to be insulated*. Air supply to bedrooms via Air Valve in ceilings. Extract air from kitchen/ bathroom via Air Valve in ceilings. *Insulated supply duct. Nuaire wall mounted unit. MVHR-DRAIN Condensate drain, uninsulated drain pipe with min 5o fall running to SVP. ALSO FROM NUAIRE New range of thermal ducting, an all-in-one insulated ducting system (see installation document 671780) Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk 10. 11. 21. Document Number 672001 6 MRXBOXAB-ECO2B-(OH)SW Installation Manual 4.0 ELECTRICAL INSTALLATION 15 PCB Details For good EMC engineering practice, any sensor cables or switched live cables should not be placed within 50mm of other cables or on the same metal cable tray as other cables. EXTRA EXTRA CTCT FANF The electrical connection of the unit must be carried out by a qualified electrician. The unit is supplied with a flexible cord for connection to the mains supply. Wiring is for reference purposes only. 4.1 Electrical Information Voltage: 240V 1ph 50Hz Consumption: 1.2 Amp This unit must be earthed. The cable from the mains power supply should be connected to a fixed wiring installation, via a fused isolator, in accordance with current IEE wiring regulations. The unit is pre-wired with a 2 metre fly lead. Supply Extract Supply Extract Supply Extract SPEED 1 SPEED 2 SPEED 3 4.2 Wiring Diagrams 4.2.1 Unit Serving Kitchen And Bathroom 16 Wiring Diagram - Unit Serving Kitchen And Bathroom Supply Cord From Unit Green / Yellow MAINS 230V 50Hz Blue N L Brown 3A Fuse (BS 1362) Room Light Black 3 Pole Isolator Light Switch (Double Pole) Grey Optional 3 Speed Switch Kitchen Switch 4.2.2 Unit Serving Kitchen And Two Bathrooms 17 Wiring Diagram - Unit Serving Kitchen And Two Bathrooms Supply Cord From Unit Green / Yellow MAINS 230V 50Hz Blue N L Brown 3A Fuse (BS 1362) Room Lights Black 3 Pole Isolator Light Switches (Double Pole) Grey Optional 3 Speed Switch Kitchen Switch 4.2.3 Summer / Winter Switch 18 Wiring Diagram - Summer / Winter Switch 2 core cable from unit Red Black Volt free Summer / Winter Switch (supplied with unit) Polarity is inconsequential Warning! - Do not connect to mains! Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk 10. 11. 21. Document Number 672001 7 MRXBOXAB-ECO2B-(OH)SW Installation Manual 5.0 COMMISSIONING 5.2 Status Indication The filters fitted inside the unit are protected with a plastic film. Prior to commissioning remove the covers (Figures 20 & 21), take off the film and replace. The status of the unit is indicated by a series of LED’s on the front cover. The variants are listed below. 1. For the required air flow rates please refer to the design specification for the property, follow 2.4, or refer to building regulations ADF 2010. 2. The unit is supplied with independent control for both normal and boost airflows (Figure 19). 3. Correct commissioning is essential to ensure the ventilation air flow rates are met. It also ensures the unit is not over ventilating and causing excessive power consumption. 4. Commissioning should be carried out in accordance with building regulations document “Domestic ventilation compliance guide”. www.planningportal.gov.uk/building regulations/approved documents/partf/associated. A calibrated moving vane anemometer and hood will be required to carry out commissioning. 5. Adjustment valves should be locked in place to prevent further adjustment. 6. Once commissioned the home owner / tenant should be informed that the unit should not be adjusted as it will have a detrimental effect on the indoor air quality and could result in condensation and mould growth. The clear panel covering the control has an adhesive panel which should be exposed and sealed post commissioning to prevent tampering. 7. Speed 1 is limited to never exceed speed 2, when commissioning speed 2 should always be set first. 19 Unit Control On Front Panel (Standard Configuration Only) The display on the unit control panel will not indicate when a higher speed setting has been triggered by an external source. 20 Unit Control On Front Panel (Standard Configuration Only) Speed 1 Speed 2 Speed 3 Supply Fan Fault Extract Fan Fault Frost Protection Filter Change HX Bypass (AB units only) 5.3 Integral Automatic HX Bypass Intake and extract temperatures are monitored at the point the airflows enter the unit, if the range falls within the set parameters the bypass damper is opened automatically to target an indoor comfort temperature all year round. 5.4 Summer / Winter Switch When the switch position is set to Summer the integral automatic summer bypass is fully operational, in the alternative Winter position the HX bypass is disabled to ensure the unit is constantly in heat recovery mode. 5.5 Speed 3 Operation (SW Units Only) Speed 3 will be non-operational if the intake temperature is greater than the extract temperature. 5.6 Frost Protection Post commissioning remove adhesive backing and seal Ventilation Controls Speed 1 + - + Speed 2 - + - + Speed 3 - + - + - Supply Extract Supply Extract Supply Extract Power Fan Failure Humidity adjustment situated behind front panel, panel must be removed for access. This should only be carried out by a qualified person. In the event of the intake air temperature at the unit dropping below the predetermined set point (-5°C as standard) the supply fan will reduce to minimum speed, once the temperature rises above the set point the fan will return to its commissioned speed. Frost protection will only activate after ten days of continuous run time. If commissioning of the unit is outside of this time frame please notify the after sales department prior to site visit. 5.1 Humidity Adjustment This product contains an internal humidity sensor fitted into the airflow extracting from the wet rooms. When the unit senses that the humidity exceeds the set point the unit will boost to that set by the commissioned boost speed. The set point can be found behind the front of the unit (Figure 19) and is at its least sensitive when turned fully clockwise. Note that the sensor is measuring humidity from all the wet rooms at the same time and should not be relied on to solely boost the unit. Additional switch should be used local to the wet rooms (Section 4.2.3). Adjustment only to be carried out by qualified person, isolate power before removing cover. Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk 10. 11. 21. Document Number 672001 8 Installation Manual MRXBOXAB-ECO2B-(OH)SW 6.0 MAINTENANCE 8.0 END-OF-LIFE AND RECYCLING It is important that maintenance checks are recorded and that the schedule is always adhered to, in all cases, the previous report should be referred to. Where possible Nuaire use components which can be largely recycled when the product reaches its end-of-life: 6.1 Filters Filters are to be inspected every 6 months and replaced every 12 months (or sooner if required). Failure to do so may impair the performance and energy efficiency of this unit. A flashing LED (Section 5.2) will indicate that a filter change is required. This indication repeats every 12 months and will turn off automatically after 5 Days. Remove the filter covers on the front panel of the unit by gripping the two circular tabs either end of the filter covers and pulling away from the unit. The filter can now be extracted by pulling the black removal loop on the front edge of the filter. Once the filters have been inspected return or replace them as necessary. 21 Removing Filter Covers •Fans, motors, controls, actuators, cabling and other electrical components can be segregated into WEEE recycling streams. •Sheet metal parts, aluminium extrusion, heating/cooling coils and other metallic items can be segregated and fully recycled. •EPP, plastic ducting, nylon corner pieces, plastic heat exchangers, packaging material and other plastic components can be segregated into mixed plastic and widely recycled. •Cardboard packaging, wood, and other paper components can be largely recycled or fully processed in energy from waste centres. •Filter Disposal: Cardboard framed filters should be fully processed in energy from waste centres, contact your local civic amenity site / household waste recycling centre regarding metal / wire framed filters. •Remaining Items can be further segregated and processed in accordance with the zero waste hierarchy. Please call After Sales Support for further information on items not listed above. Filter covers Ensure that Nuaire product is made safe from any electrical / water / refrigerant supplies before dismantling commences. This work should only be undertaken by a qualified person in accordance with local authority regulations and guidelines, taking into account all site based risks. 9.0 AFTER SALES AND REPLACEMENT PARTS 22 Removing Filters For technical assistance or further product information, including spare parts and replacement components, please contact the After Sales Department. If ordering spares please quote the serial number of the unit together with the part number, if the part number is not known please give a full description of the part required. The serial number will be found on the identification plate attached to the unit casing. Filter being removed Filter cover 7.0 WARRANTY The 5 year warranty starts from the day of delivery and includes parts and labour for the first year. The remaining period covers replacement parts only. Telephone 02920 858 400 [email protected] Technical or commercial considerations may, from time to time, make it necessary to alter the design, performance and dimensions of equipment and the right is reserved to make such changes without prior notice. This warranty is void if the equipment is modified without authorisation, is incorrectly applied, misused, disassembled, or not installed, commissioned and maintained in accordance with the details contained in this manual and general good practice. The product warranty applies to the UK mainland and in accordance with Clause 14 of our Conditions of Sale. Customers purchasing from outside of the UK should contact Nuaire International Sales office for further details. Failure to maintain the unit as recommended will invalidate the warranty. Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk 10. 11. 21. Document Number 672001 9 Installation Manual MRXBOXAB-ECO2B-(OH)SW NOTES Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk 10. 11. 21. Document Number 672001 10 Installation Manual MRXBOXAB-ECO2B-(OH)SW NOTES Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk 10. 11. 21. Document Number 672001 11 Installation Manual MRXBOXAB-ECO2B-(OH)SW NOTES Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk 10. 11. 21. Document Number 672001 12 ">
Advertisement
Key Features
- Wall-mounted
- Heat recovery
- Two independent fans
- Adjustable speed control
- Condensate drain
- Frost protection
- Summer/winter switch
Frequently Answers and Questions
How do I install the MRXBOXAB-ECO2B-SW?
Installation must be carried out by qualified personnel and in accordance with building regulations. Refer to the installation manual for detailed instructions.
What are the ventilation flow rates for the MRXBOXAB-ECO2B-SW?
The unit is designed for whole-dwelling ventilation. Refer to ADF 2010 - Extract Ventilation Rates in the manual for specific room ventilation rates.
How often do I need to change the filters?
Filters should be inspected every 6 months and replaced every 12 months (or sooner if needed). A flashing LED on the unit indicates a filter change is required.
What are the dimensions of the MRXBOXAB-ECO2B-SW unit?
Refer to the dimensions diagram in the manual for precise measurements.