Aerial Assault Wakeboard Tower Installation manual

Add to my manuals
13 Pages

advertisement

Aerial Assault Wakeboard Tower Installation manual | Manualzz

assault WaKeBoaRd toWeR

installation guide

1

installation suPPoRt

GUIDE#: pwb-ASSAULT-004

2

IMPORTANT INFORMATION

This Aerial wakeboard tower fits motor boats with 76-108 inch wide beam widths.

This measurement is taken from the Port to Starboard mounting points.

Do not fold the tower without having the top section securely fastened to the side sections with the fasteners provided.

Lubricate the telescopic side section tubes that slide in and out of the top section during installation. We recommend using a light grease to help the tubes slide together without binding.

Do not fold the tower by yourself.

Do not assemble tower on the ground and then try to install it on the boat.

Do not use impact drivers to install any hardware.

Torque set screws to 35ft-lbs

Torque shoulder bolts 50 ft-lbs

Torque tower foot all-thread to 65 ft-lbs

We recommend using red Loctite threadlocker on the threads of all fasteners that will not be adjusted while lowering or raising the tower.

Check the top section for burr’s before installing side sections to prevent the scratching and

marking of tubes. Aerial does not cover damage caused by burr’s during installation.

If the area of the deck where the tower will be mounted has a fiberglass thickness of less than

¼ inch, a backing plate kit must be purchased and installed to provide adequate support.

Please leave the foam wrap on the tower until the installing is complete.

Please note that when towing your boat you may notice what appears to be movement in your tower. It is important to understand that the boat is also moving on the trailer and that this movement can be visually deceiving.

cleaning

Frequently wash your tower with soap and water.

As required, use Mothers Mag & Aluminum polish to restore your tower to its original finish.

WaRning

BE CAREFUL when assembling this product

. We CANNOT be liable for any burring or scratching that may occur when sliding sections in and out of each other.

NEVER modify this product in any way.

NEVER climb, stand or ride on this product.

NEVER tow watersport tubes or inflatable’s with this or any other Aerial Wakeboard Tower.

ALWAYS use caution with approaching bridges or overpasses.

ALWAYS inspect this product for loose bolts, fittings or damage before each use.

Always carefully CONSULT the user manual for proper installation, maintenance and usage.

Aerial is not liable for personal injury or property damage from the use of this or any other

Aerial product.

GUIDE#: pwb-ASSAULT-004

eXPloded VieW

3

tools ReQuiRed

GUIDE#: pwb-ASSAULT-004

4

PaRts list

ITEM #

1

2

3

4

5

DESCRIPTION

TOWER PACKAGE

2.25" TOWER JOINT - THREADED (INCL. M6 X 12mm BOLT)

2.25" TOWER JOINT - THRU HOLE (INCL. M6 X 12mm BOLT)

DECK MOUNT

M12 X 40mm BOLT

M12 X 45mm BOLT

8

9

6

7

M12 X & 75mm BOLT

M12 SPRING LOCK WASHER

M10 X 75mm BUTTON HEAD BOLT

M10 NYLON LOCK NUT

10 M12 NYLON LOCK NUT

QTY

4

4

COMMENTS

4

12 FOR USE WITH ITEMS - 1, 2, 15

8 FOR USE WITH ITEMS - 3, 30

4

4

4 FOR USE WITH ITEMS - 3

24 FOR USE WITH ITEMS - 4, 5, 6

4

FOR USE WITH ITEMS - 27

FOR USE WITH ITEMS - 8

FOR USE WITH ITEMS - 6

FOR USE WITH ITEMS - 6

FOR USE WITH ITEMS - 3

FOR USE WITH ITEMS - 3

FOR USE WITH ITEMS - 3

11 M12 FLAT WASHER

12 LARGE FLAT WASHER (OD = 70mm)

13 CURVED RUBBER WASHER (OD = 70mm)

14 BIG FLAT WASHER (OD = 70mm)

15 FRONT HINGE (TWO PARTS CONNECTED BY M12 X 40mm BOLT)

16 2.5" CLAMP

17 2.25" RUBBER COLLAR

18 2.375" RUBBER COLLAR

19 CLAMP JOINT WITH SLANT (INCL. M6 X 12mm BOLT)

20 M10 X 25mm BOLT

21 LARGE WASHER FOR SIDE BLADE

22 M12 ALLEN KEY

23 M10 ALLEN KEY

24 M8 ALLEN KEY

25 M6 ALLEN KEY

26 THREADLOCKER

27 TOP SECTION TUBE

28 LOWER SIDE RAILS

29 FRONT LEGS

30 SIDE BLADES

1

1

1

1

1

2

4

2

2

1

2

2

2

2

2

2

4

4

4

4

FOR USE WITH ITEMS - 16

FOR USE WITH ITEMS - 16

FOR USE WITH ITEMS - 19

FOR USE WITH ITEMS - 30

1 PORT & 1 STARBOARD

ITEM #

1

2

3

4

BOARD RACK PACKAGE

- PER PACKAGE - 2 PACKAGES ARE GENERALY INSTALLED PER TOWER.

DESCRIPTION

FORKS

LOGO PLATE WITH BUNGEE CORD

M6 X 20mm BOLT

M8 X 16mm BOLT

QTY

2

1

4

4

COMMENTS

FOR USE WITH ITEMS - 1, 2

USED TO ATTACH RACK ASSEMBLY TO TOWER

GUIDE#: pwb-ASSAULT-004

STEP 1

m12 SpLIT

Lock wAShErS m12 x 45mm m12 x 40mm

steP 2

LowEr SIDE rAIL fITTInG

The mounting feet will need to be assembled to the side rail fittings, followed by attaching them to the side rails.

moUnT

Tape off all the areas that may potentially come into contact with the side rails.

STEP 3

5

Once the feet are connected to the side rails, hold the side rail up to your boat. Once the rail is aligned with your windshield use a small piece of tape to mark the position of the mounting feet.

GUIDE#: pwb-ASSAULT-004

steP 4

6

STEP 5 steP 2

Once the desired position is achieved, place one of the nylon mount washers over the piece of tape and trace around it with a permanent marker.

Transferring marks from the other side.

This step is very important! After taping the second side of the boat in approximately the same areas as the first side you will need to measure the distance that you marked on the first side of the boat

It is best to take measurements from the back of the boat and mark with blue tape. Be sure to measure from the same point on both sides.

GUIDE#: pwb-ASSAULT-004

STEP 6

Drilling

Once you have marked your 4 holes, check the underside of the deck for wires.

If necessary, you should move the wires out of the way while you drill. We recommend drilling a small pilot hole which will keep the 17/32” drill bit from walking (moving). A small rat tail file can be used to ease the edge and keep the gel coat from chipping.

Be careful of wires!

steP 2

7

SMALL

DAIMETER

Pilot Hole

Gelcoat

Fibreglass

A

17/32” DRILL BIT

B counteRsinK

(tHRougH gelcoat)

C

GUIDE#: pwb-ASSAULT-004

8

STEP 7

Install the tower mounts to the boat deck in the order shown in the diagram.

Note: in the case where the deck of your boat is less than 1/4” thick, a reinforcing kit is required to thicken and reinforce the deck in the mounting locations.

FLAT DECK - MOUNT ASSEMBLY

CURVED DECK - MOUNT ASSEMBLY

m12 x 75mm bLAck nYLon wAShEr moUnT nYLon wAShEr fLAT DEck m12 x 75mm bLAck nYLon wAShEr moUnT nYLon wAShEr cUrVED rUbbEr wAShEr cUrVED DEck rEInforcEmEnT rUbbEr wAShEr

ALUmInUm bAckInG pLATE

SpLIT Lock wAShEr nYLon Lock nUT rEInforcEmEnT rUbbEr wAShEr

ALUmInUm bAckInG pLATE

SpLIT Lock wAShEr nYLon Lock nUT

STEP 8

Measuring from your windshield, check the distance to the side rail to make sure both sides are symmetric.

GUIDE#: pwb-ASSAULT-004

STEP 8 - CONTINUED...

The side rails need to be mounted straight up and down. If they are leaning in or out, this will cause a problem with the tower when you want to fold it.

bLAck nYLon wAShEr moUnT nYLon wAShEr cUrVED rUbbEr wAShEr cUrVED DEck

steP 9

SpLIT Lock wAShEr rEInforcEmEnT rUbbEr wAShEr

ALUmInUm bAckInG pLATE

SpLIT Lock wAShEr nYLon Lock nUT

SpLIT Lock wAShEr

STEP 10

m6 x 12mm

ThrEADED LAp joInT

SpLIT Lock wAShEr m12 x 40mm m12 x 45mm m12 x 40mm

SpLIT Lock wAShEr

ThrEADED LAp joInT m10 x 25mm

Assembling the Switch Blade (Rear Leg)

Start at the top of the switch blade and attach the trim washer, shoulder bolt and threaded lap joint.

We recommend assemblying all the blade components before installing the blade on the tower.

You will then need to attach the lower base to the threaded lap joint. This is then followed by attaching the clamp to the lower base (using the stainless steel socket head cap screw.)

9

GUIDE#: pwb-ASSAULT-004

STEP 11

The lower section of the switch blade can now be assembled to the lower fittings and clamp using the trim washer, M12 X 45mm socket head cap bolt and threaded lap joint.

STEP 12

STEP 13

10

Insert the front leg hinge joint into the lower section of the front arm

(repeat for the other side). Its important not to completely tighten the fittings as some adjustment will necessary before the installation is complete.

Before inserting the top-section, make sure there are no burrs in the top-section. Someone will need to hold the top-section for you as you insert the front arm into the top-section and fit the hinge into the side rail.

*** IMPORTANT NOTES ***

- Lubricate telescopic parts with a light grease before sliding together.

- Grease will not prevent the smaller diameter tube from being scratched by the top section tube during insertion so be very careful not insert the side section tube any further than the final installation width.

Once the sides and top section are assembled the fittings that connect to the ends of the front legs can now be firmly tightened so that they do not rotate.

The rear switch blades can now be installed by attaching the top switch blade fitting to the fitting located on the upper section of the front leg. The clamp located on the base of the switch blade will be connected to the lower side rail. We recommend making sure that the clamps on both sides of the tower are located the same distance from the end of the side rail so that your tower looks symmetrical.

During the clamp installation, don’t forget to install the rubber clamp collar’s between the clamp and the lower side rail. These will be required to allow the clamps to firmly fasten in place.

GUIDE#: pwb-ASSAULT-004

STEP 14

STEP 15

STEP 16

11

Drilling the top section.

The X measurement is a great way to make sure that your tow point is in the center of your boat. To do this, measure from the tow point to your rear foot, then to your other foot. Cover your boat with an old sheet or old cover to make removing the metal shavings easy. Someone should hold the top section while you drill.

Using the pre-drilled holes in the top section tube, mark the drilling positions on the front leg tubes.

Before making your marks, check to ensure that the tow point is aligned correctly and positioned vertically. The tow point should also be positioned on the rear of the top section tube so that the logo plate is facing towards the bow of the boat.

We then recomend drilling the holes with a smaller drill bit

(smaller than the 27/64” drill bit) to make a pilot hole.

Following the pilot holes you just drilled, use a 27/64” drill bit to create the clearance hole for the joining bolts.

As each hole is drilled we recommend inserting each bolt so that it keeps the parts aligned while drilling the next hole.

GUIDE#: pwb-ASSAULT-004

STEP 17

STEP 18

Once all the holes are drilled and all the fasteners are inserted

(M10 x 75mm - Button Head Socket Bolt) the nylon lock nuts can be installed and all of the fasteners and nuts can be firmly tightened.

You may need to vacuum up the debris and aluminum shavings.

Note: We recommend using Red Loctite Threadlocker when installing these fasteners and any other fasteners that will not require loosening once installed.

To install the board rack fingers, use the socket head cap screws provided and attach the fingers to the diamond shaped plate. This diamond plate will then be installed to the rear switch blade legs.

STEP 19 - LOCKING ThE ROTATING FITTINGS

Once you are happy with your tower installation and all of the fittings are lined up to allow the tower to fold and function correctly it will then be important to firmly lock the fittings in place to prevent any unwanted rotation or loosening. We recommend using threadlocker during this step.

m6 x 12mm

12

GUIDE#: pwb-ASSAULT-004

STEP 20 - LOWERING ThE TOWER

Lowering the tower requires at least 2 people.

Never trailer your boat with the tower in the lowered position.

Always check to make sure all fasteners are tight and secure before using the tower again.

opTIon A

DISconnEcT

LooSEn

opTIon b

DISconnEcT

LooSEn

STEP 21 - INSTALLING ThE NAVIGATION LIGhT

The navigation light is shipped separately.

It is designed to be installed on the top of the tow point.

For a clean wiring installation the wires supplied can be passed through the center of the tow point, along the inside of the top-section and down inside the front leg tube. The wires will need to exit the front leg tube just above the fittings and then be passed over the fittings before entering back into the side rail front tube. Finally the wires will exit the side rail front tube just above the mounting foot and then enter the deck of the boat (through a hole that will need to be drilled) so that they can be connected to a switch and power source.

nAVIGATIon LIGhT

(SHIppeD SepArATeLY)

Note: The tower is not supplied with pre-drilled wiring holes as each customer may have a different wiring requirement depending on how they fold their tower or the accessories that they will mount to the tower.

Questions?

www.aerialwakeboarding.com

13

GUIDE#: pwb-ASSAULT-004

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

Download PDF

advertisement