Installation and operation manual


Add to my manuals
32 Pages

advertisement

Installation and operation manual | Manualzz

Installation and operation manual

Drying cabinet TS 62

Thank you for choosing this drying cabinet TS 62 from PODAB.

We hope that it will be of great use for you and ask you kindly to read the instructions carefully.

IMPORTANT!

FOR YOUR SAFETY, the information in this manual must be followed to prevent property damage and personal injury.

NOTE: The paragraphs marked “WARNING” and “CAUTION” appearing in this manual are not meant to cover all possible conditions and situations that may occur. It is very important that water and electricity are handled with great care and respect, by both installation technicians and end users.

©PODAB 2011 2

Contents

Safety regulations

Important safety instructions

Specification

Dimensions

Technical information

Assembly instructions

Installation of the cabinet

Step 1: Put the cabinet in place

Step 2: Fasten the cabinet to the wall

Step 3: Connect the cabinet to the ventilation channel

Step 4: Connect the drying cabinet to the main switch

Step 5: Control that the heating relay is working

Turn the hanging frame

Requirements for ventilation

Ventilation channel – choice of material

Requirements for incoming air

Ventilation channel – design

Evacuated amount of air and pressure fall

User manual

Manual programme mode

Automatic programme mode

Maintenance

Notes

27

27

27

29

25

25

25

25

26

30

20

20

21

21

22

22

23

6

6

7

4

5

8

3

©PODAB 2011

Safety regulations

Throughout this manual you will find text warnings in text boxes: “WARNING” and “CAUTION”. In these boxes you’ll find the safety measurements you’ll have to take; end user, service staff or installation staff.

CAUTION

Indicates hazardous situation that, if not avoided, could cause minor personal injury or property damage.

WARNING

Indicates hazardous situation that, if not avoided, could cause severe personal injury.

You will also find precautions marked: IMPORTANT and NOTE.

These are followed by information of what should be considered.

IMPORTANT: to inform the reader of special steps that must be taken in order to prevent injuries on the cabinet.

NOTE: to inform what is important to know, but it cannot cause personal injuries or injury on the cabinet.

©PODAB 2011 4

Important safety instructions

WARNING

To minimize the risk of fire, electrical shock, personal injuries or death when the cabinet is in use the following precautions must be followed:

1.

2.

3.

4.

5.

6.

7.

Read the instruction before using the drying cabinet.

Follow the instructions in step 4 for proper grounding.

Never dry textiles that have been washed, dipped or exposed to fire dangerous substances or fluids.

Never add fire dangerous or explosives substances in the cabinet.

The cabinet is not a toy. Look after the children who are around the cabinet.

Never connect the cabinet with an extension cable.

Only use the cabinet for what it is designed for: drying clothes.

8.

9.

Always turn off the main switch before performing any service on the cabinet. Only authorized service technicians should perform service.

Always follow the installation manual. The electrical connections must be done by authorized personnel.

10. Keep after the cabinet. If it is exposed for violence there is a risk that certain security functions will stop working.

Please contact your nearest service partner if you are unsure of the cabinet’s status.

11. If the electrical cable is damaged, it must immediately be changed by a person with electrical authorization.

12. The doors shall always be shut when the cabinet is in use.

Don’t try to manipulate the lock of the doors. It can lead to personal injuries. If the cabinet doesn’t stop when the doors are opened during the drying phase, call for service.

The cabinet shall not be used if the drying program is active when the doors are open!

13. Look after the area around the evacuating pipe so it is clean from dust and dirt.

14. To get the best drying result, follow the garments washing

& drying advice.

15. Never use the cabinet if any panel is broken or removed.

16. Never use the cabinet if any parts are broken or if the inside is broken.

17. Never try to manipulate or connect past any safety functions.

18. If the cabinet isn’t assembled after the manufacturer’s instructions, there is a risk that the cabinet can cause personal injuries or injuries on property.

5

©PODAB 2011

Specification

Dimensions

1200

A

B

469

640

A = Electrical connection

B= Exhaust

©PODAB 2011

1855

6

Technical information

Loading capacity, kg (lb)

Drying capacity, g/min (oz/min)*

Hanging length, m (ft)

Drying time, min*

Evacuated air, max, m³/h (ft³/h)

Exhaust

ø, mm (in)

Heating effect, kW

Total effect, kW up to 8 (17,6)

91 (3,2)

16 (52,5)

35

340 (12007)

125 (4,92)

6,0

6,3

Energy consumption, kWh/kg (kWh/lb)*

Part No

0,55 (0,48)

131025

*Drying of 6 kg (13,2 lb) cotton (dry weight), washed and high-spinned to 53% residual moisture. The cabinet works another 15 minutes with cool-down after the textiles are dry.

7

©PODAB 2011

Assembly instructions

Tools

You need the following tools to easily install the drying cabinet:

(If the cabinet is already assembled please go to page 20)

• Cordless screwdriver

• Wrench

• Hex key 3 and 5 mm

• Level

• Torx screwdriver bit no. 25

1

4x

2

©PODAB 2011 8

4x

3

4

5

3x

9

4x

©PODAB 2011

6

7

Note!

Only for cabinets with hanging frame.

©PODAB 2011 10

7x

10x

8

9

2x

10

Note! Only for cabinets with hanging frame

MAX

11

3x

4x

1x

1x

©PODAB 2011

11

24x

12

©PODAB 2011 12

4x

13

14

Note! Only for cabinets with hanging frame

1x

1x

1x

1x

4x

13

©PODAB 2011

15

16

17

©PODAB 2011 14

4x

18

1x

19

1x

20

15

8x

©PODAB 2011

21

Connect the cables

22

LCD

23

Keypad

The side with hole pattern to the left.

Lights

Door switch

4x

©PODAB 2011 16

24

2x

25

Note! Only for cabinets with hanging frame

B

C

A

D

17

©PODAB 2011

26

Note! Only for cabinets with hanging frame

A

B

A

A

B

B

27

Note! Only for cabinets with single rack bar

8x

28

Note! Only for cabinets with single rack bar

4x

©PODAB 2011 18

29

Note! Only for cabinets with single rack bar

4x

30

19

©PODAB 2011

Installation of the cabinet

Step 1: Put the cabinet in place

Place the cabinet with enough space in front of the cabinet and on the sides to be able to open the doors.

The feet of the cabinet can be adjusted from the inside with the help of a Hex key. The feet must stand free on the floor and have an even weight distribution. Use a leveler and control that the cabinet is leveled; horizontally and vertically.

NOTE: We recommend that the cabinet is installed on a firm and leveled floor.

Please observe that the front panel (on the top) must have at least 175 mm free space above, in order to take off the top to perform service.

Narrow spaces

If the cabinet must be transported through narrow spaces, we recommend that you take off the doors first. It will simplify the handling and reduces the risk for damages on the doors.

Demounting of the top

To simplify the transport of the cabinet, the top can be demounted, see the instructions below.

1. Loosen the two screws which hold the front panel of the top.

3.

4.

Disconnect the cables (connected to the LCD and maneuver panel) from the mother board. Loosen the bulb’s connection plinth marked “Light”.

From the inside of the cabinet, loosen the protection plate (8 screws).

5. Loosen both service hatches which cover the fans. 1 screw on each service hatch.

2. Push the panel upwards.

6. Lift the top off.

CAUTION

There must be two persons to lift the top in a safe way. Don’t try to do it on your own, the weight is 30 kg!

©PODAB 2011 20

Step 2: Fasten the cabinet to the wall

Use the stoppers, screws and washers to secure the cabinet through the back plates. Fastening holes are pre-drilled in the back plates.

Step 3: Connect the cabinet to the ventilation channel

For further instructions, se page 25: Requirements for ventilation.

• Do not use ventilation channels made of plastic or foil.

• Place the cabinet so that the ventilation channel is as short

• as possible.

Make sure that the ventilation channel is cleaned when a

• new cabinet is installed.

Use a 125 mm rigid or flexible metal duct to the evacuation

• connection.

If you use rigid ducts, it is important that the male connector of the ventilation tube on each section follows the air direction.

• The construction shall be as straight as possible.

• Always isolate ducts that go through non-isolated areas.

The condensation makes dust and dirt get stuck in the channel.

NOTE: If the cabinet is not connected according to these recommendations, the warranty is no longer valid.

NOTE: Please control that the cabinet is leveled and cannot be tilted.

21

©PODAB 2011

Step 4: Connect the drying cabinet to the main switch

To prevent that fire and electric shock appear, the cabinet MUST be connected according to the color codes on the cables. Only an authorized electrician is allowed to install the electrical connection. The cabinet is prepared for one of the following electrical connections depending on specification:

• 400 V, 3-N, 50 Hz (standard)

• 208-240 V, 3~N, 60 Hz

• 220 V, 3~N, 50 Hz

Step 5: Control that the heating relay is working

Shut the doors and start the cabinet, after about 3 seconds you can hear when the heat relays hit. Wait a couple of minutes and control that the outgoing air channel becomes warm.

If the outgoing air channel does not get warm, go back to step 4 and control that the electrical connection is installed correctly.

WARNING

It is always the buyer that has the responsibility to check that an authorized electrician makes the electrical connections of the cabinet.

WARNING

To prevent personal injuries, the cabinet shall always be connected permanently through an all pole main switch. Always ground the cabinet.

Also check that the connecting cable has a strain relief bushing. If not, there is a risk that the cabinet will be live.

©PODAB 2011 22

Turn the hanging frame

The hanging frame can be turned. Follow the steps below.

1. Loosen the upper Hex Key bolt, which holds the upper hanging level.

Support plate

2.

3.

Lift up the hanging frame and hook it off the tap below.

Put aside.

Loosen and push the panel on the top.

5.

6.

7.

8.

9.

10.

11.

12.

Unconnect the two cables which go from the keypad and

LCD to the main control board.

Lift up the plate and remove the cables. Connect the cables to the board again.

Before the support-plate is assembled on the other side of the cabinet; loosen the five torx screws on the left hand side.

Put the support-plate on the side to which the hanging frame will be moved.

Re-assemble the torx screws. Thereafter, fasten the bolts, upper stearing tap and the stop plate.

Put the front panel back on again.

Loosen and move also the lower tap to the opposite side.

To get the arms on the frame on the same level, each hanging level must be turned “upside down”. Loosen the upper hanging level from the frame.

4. Loosen the three bolts, the upper stearing tap and nut and the five torx screws which hold the plate and which support the stop plate. The drawings below shows where these parts are.

Stop plate

Stearing tap

23

©PODAB 2011

13. Rotate the hanging level 180 ° and fasten it again. Leave the upper bolt on the pole, unmounted.

14.

15.

16.

17.

Repeat the same moment with the three remaining hanging levels. Fasten both bolts.

Put the hanging frame back in and put the pole on the upper tap. Lower the pole so that it fits to the lower stearing tap.

Fasten the Hex Key bolt on the upper hanging level.

Control that the frame can be turned and that the stop function works properly also in the outer positions.

©PODAB 2011 24

Requirements for ventilation

WARNING

A drying cabinet produces inflammable dust. To minimize the risk for fire, the evacuation of the cabinet must be connected to a ventilation channel that evacuates the air.

Never let the evacuated air into a room or a surrounding where there is a risk for ignition.

Do not use ventilation channels in plastic or fire dangerous material.

Ventilation channel – choice of material

Ventilation channel, ducts, connections etc are not included.

The ventilation channels shall be at least 125 mm in diameter and should not have channels or similar on the inside.

We recommend that the ventilation system is built with rigid metal ducts for best result. Flexible evacuating ducts for drying cabinets can also be used.

NOTE: Never use flexible ducts through walls or other covered areas.

NOTE: Do not screw or nit the ventilation channel, so that the screws will come through the inside of the pipe. This construction will gather dust and impaire the cabinet’s performance.

The channel shall always be separated from the other ventiltion in the house.

Requirements for incoming air

In order to make the cabinet work properly, it is very important that there is enough incoming air in the room. If he cabinet is installed according to this manual the air flow from the exhaust will be about 230 m³/h. Incoming air must be at least equal to the outgoing flow. We recomend the incoming air flow to the room to be greater than the evacuated amount.

If the cabinet is placed in a room where the incoming air is not enough, we recommend that you install an air exchanger.

Ventilation channel – design

IMPORTANT: Always make the channels as short as possible.

NOTE: If a drying cabinet is installed in an old ventilation channel, please clean the channel properly.

In order to make the cabinet work properly, the incoming airflow must be enough. The amount of evacuated air per hour is depending on how high the pressure fall in the ventilation channel is.

25

Material, the design and the length of the channel have a large impact on the air flow. In order to get the best possible performance, the pressure fall shall be as low as possible.

When the air is transported through the channel, it is exposed to different kind of resistance. Factors that give a low pressure fall:

Smooth inner walls on the pipe

Large diameter on the pipe

Short length on the pipe

Few curves

Few angels (90 degrees)

©PODAB 2011

Evacuated amount of air and pressure fall

In order to get the cabinet to work properly, the ventilation channel shall be designed to get an out coming air flow from the cabinet of about 230 m³/h. When the cabinet is installed to an existing channel system, the cabinet can be calibrated to optimize the air flow.

In order to gain this air flow, the pressure fall must not exceed

70 Pa. By an airflow of 230 m³/h and a diameter of the pipe of 125 mm, this corresponds to a straight, smooth ventilation channel of 23 m.

Pressure fall estimation

The counter pressure in the ventilation channel can be measured with a pressure meter. The measuring point shall be placed by the cabinets evacuating outlet.

In order to estimate the pressure fall without meter equipment we recommend the following:

• Identify the ventilation channel’s incoming components in the

• air flow direction.

Check the part pressure fall for each component in the ta-

• ble.

Calculate the total amount of pressure fall by adding each parts pressure fall.

The table shows the most common components in a ventilation system. The information shall be considered as approximate data. For more information, contact the manufacturer of the parts of the system. Please note that the data in the table is for an air flow of 230 m³/h.

Decrease the outgoing air flow

The cabinets function and automatic programmes are optimized for the recommended air flow of 230 m³/h. If the design of the ventilation is made so that evacuated air flow exceeds 230 m³/h, the evacuation can be throttled with help of a damper.

Contact a ventilation expert in order to find a proper solution for your ventilation.

Component

Circular channel

Pipe bends 90 º r r

Ø

Ø

Ø

Ø

Ø

Ø r

Reduction

ø, mm

125

160

ø, mm

125

160 r, mm

125

160

Pressure fall

Pa/m

3,1

1,0

Pa/bend

6,5

2,5

Transition, mm

125 till 160

160 till 125

Pa/reduction

3,5

5,5

Example: 10 m long 125 mm channel with 3 pipe curves which gives an estimated pressure fall of (10 x 3,1) + (3 x 6,5) = 50,5 Pa.

NOTE: If the highest allowed level of air pressure is exceeded an external fan could be needed. Otherwise the drying result is effected negatively. TS 62 is prepared for an external fan. Contact your local dealer or PODAB for more information.

©PODAB 2011 26

User manual

Fill the cabinet

To get the best drying result: try to dry the same type of material with the same thickness at the same time. Distribute the clothing evenly in the cabinet. Never fill the cabinet with more than 8 kg laundry (dry weight). The most heat sensitive garment decides how high temperature that can be chosen.

Close the doors

The drying cabinet won’t start until the doors are completely closed.

Keypad

1 2

There are three levels:

Minimum (MIN) = 40ºC

Medium (MED) = 60ºC

Maximum (MAX) = 80ºC

The degrees stated above, show the maximum temperature of the warm air stream.

Set time

Increase or reduce the drying time with the arrow buttons 6 and

7. The drying time can be increased to maximum 3 h. Lower temperature requires longer drying time.

Start

Push button 5 to start the cabinet.

8

3 4 5 6 7

1.

2.

3.

4.

5.

6.

7.

8.

Manual programme mode

Automatic programme mode*

Reduce the temperature

Increase the temperature

Start/stop the programme

Reduce the time

Increase the time*

LCD-display

*Will also change programme when you’re in the automatic programme mode.

Pause programme

To pause a working programme, open the doors. The drying time is paused. Close the doors and push start button to continue drying. If the doors are left open longer than 10 minutes, the programme is interrupted.

Change temperature or time during drying

Temperature and time can be adjusted during the drying process and the programme is in the heating phase. When the cabinet switches to cool down, neither time nor temperature can be changed.

Interrupt a programme

To interrupt a working programme, push the START/STOP button.

Manual programme mode

In order to set the time and temperature, push key no 1. LCD shows the settings for manual programmes. The cabinet is preset on average temperature 60ºC and 45 minutes drying time.

Automatic programme mode

The drying cabinet is equipped with the function HTS –

Humidity Tracking System. This function is activated in the automatic programme mode. The drying time adjusts to the laundry in the cabinet and is controlled by a humidity sensor.

To choose automatic programme mode

Choose automatic programme mode by pushing button 2.

Set the temperature

Increase or reduce the temperature with the arrow buttons 3 and 4.

27

The cabinet has two automatic programmes; wardrobe dry and iron dry. By choosing either of those programmes, the drying time is adjusted automatically.

©PODAB 2011

Programme wardrobe dry

When automatic mode is activated, the programme “wardrobe dry” is set as first choice. Wardrobe dry means that the clothes are completely dry when the programme is finished.

Programme iron dry

To change automatic programme, push button no 2 once more.

Programme “iron dry” dries the clothes until about 15% residual moisture is left in the textiles. Use this programme when you have clothes that shall be ironed or mangled directly after the drying.

Automatic programmes; temperature

Automatic programme uses the maximum temperature of 80ºC.

Use manual programme mode for clothes that shall be dried in lower temperatures.

Start programme

Push button 5 to start the cabinet.

Pause programme

To pause a working programme, open the doors. The drying time is paused. The cabinet will start again when the doors are closed and the start button is pushed. If the doors are left open longer than 10 minutes, the programme is interrupted.

Interrupt a programme

To interrupt a working programme, push the START/STOP button.

Cool down

All programmes, both manual and automatic ones, have a cool down phase of 15 minutes. This time is in the chosen time when you chose the manual programmes. During cool down the clothes are reconditioned and the drying cabinet is cooled downed.

CAUTION

If a program is interrupted before the cool down has finished, the ceiling of the cabinet could be very hot.

©PODAB 2011 28

Maintenance

Take good care of the cabinet

Only use a damp cloth with a mild detergent when cleaning the cabinet. Never use solvent to clean the display.

Ventilation system

Loosen the ventilation pipe on the cabinet every year and clean if necessary around the evacuating channel.

IMPORTANT: Always switch off the electricity before starting to work with the cabinet.

Inspect with set intervals the complete ventilation channel; don’t forget the outer wall. There can easily be leafs and other rubbish that chokes.

We recommend that you once a year, take down the service doors and vacuum clean around the fans and elements.

Keep your cabinet efficient and economical

• The ventilation channels shall be as short as possible.

• If possible, dry the same type of textiles at the same time.

• Do not dry with maximum temperature if you do not need to.

29

©PODAB 2011

Notes

©PODAB 2011 30

31

©PODAB 2011

SERVICE/SUPPORT

Phone +46 31-752 01 00

Fax +46 31-752 01 50

E-mail [email protected] www.podab.com

AB PODAB, Ekonomivägen 9, 436 33 Askim, SWEDEN

Tel +46 (0)31-752 01 00, Fax +46 (0) 31-752 01 50 E-mail: [email protected], www.podab.com

©PODAB 2011-01-21

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

advertisement