Sleipner SEP50/140S-12IP PRO™ IP tunnel bow thruster 12V Installation Manual

Add to My manuals
32 Pages

advertisement

Sleipner SEP50/140S-12IP PRO™ IP tunnel bow thruster 12V Installation Manual | Manualzz

Installation Guide

For Pro Ignition Protected DC Thruster Models

SEP-IP50

SLEIPNER MOTOR AS

P.O. Box 519

N-1612 Fredrikstad

Norway www.sleipnergroup.com

DOCUMENT ID: 4527

REVISION: 15

DATE: 2023

LANGUAGE: EN

Contents

Installation Manual

Responsibility of the installer ..................................................................................................................................................................... 3

General Installation Considerations and Precautions Guidelines ............................................................................................................ 3

Product Dimensions ................................................................................................................................................................................... 5

Product Clearance Requirements .............................................................................................................................................................. 6

Product Specifications ................................................................................................................................................................................ 6

Proportional Technical Specifications ........................................................................................................................................................ 6

Positioning of the tunnel / thruster ............................................................................................................................................................ 7

Tunnel Length ............................................................................................................................................................................................. 8

Tunnel installation in sail boats .................................................................................................................................................................. 9

Water Deflection ...................................................................................................................................................................................... 10

Tunnel ends ............................................................................................................................................................................................. 11

Tunnel installation .................................................................................................................................................................................... 12

Stern tunnel installation .......................................................................................................................................................................... 14

Gear Leg & Motor Bracket Installation .................................................................................................................................................... 15

Propeller Installation ............................................................................................................................................................................... 18

Motor Installation .................................................................................................................................................................................... 19

Electrical Installation .............................................................................................................................................................................. 20

Product Lug Connection Configuration .................................................................................................................................................. 21

Electrical Reference Guide ....................................................................................................................................................................... 21

Manual Main Switch Wiring Diagram 12V S-Link IP Thruster ................................................................................................................ 22

Automatic Main Switch Wiring Diagram 12V S-Link IP Thruster ............................................................................................................ 23

Manual Main Switch Wiring Diagram 24V S-Link IP Thruster ................................................................................................................ 24

Automatic Main Switch Wiring Diagram 24V S-Link IP Thruster ............................................................................................................ 25

S-Link System Description ....................................................................................................................................................................... 26

Control Panel Installation ....................................................................................................................................................................... 27

Pre-delivery Checklist ........................................................................................................................................................... 29

Service and Support ............................................................................................................................................................... 29

Product Spare Parts and Additional Resources ....................................................................................................................... 29

Warranty Statement ............................................................................................................................................................... 29

2

Sleipner Motor AS

P.O. Box 519, Arne Svendsensgt. 6-8

N-1612 Fredrikstad, Norway

SEP IP 50 4527 15

MC_0020

2023

Sleipner Motor AS

P.O. Box 519, Arne Svendsensgt. 6-8

N-1612 Fredrikstad, Norway

Contents

MC_0020

Failure to follow the considerations and precautions can cause serious injury, damage and will render all warranties given by Sleipner Motor as VOID.

MC_0411

Responsibility of the Installer

MC_0038

The installer must read this document to ensure necessary familiarity with the product before installation.

Instructions in this document cannot be guaranteed to comply with all international and national regulations. It is the responsibility of the installer to follow all applicable international and national regulations when installing Sleipner products.

The recommendations given in this document are guidelines ONLY, and Sleipner strongly recommends that advice is obtained from a person familiar with the particular vessel and applicable regulations.

This document contains general installation instructions intended to support experienced installers. If you are not skilled in this type of work, please contact professional installers for assistance.

If required by local regulation, electrical work must be done by a licensed professional.

Appropriate health and safety procedures must be followed during installation.

Faulty installation of Sleipner products will render all warranties given by Sleipner Motor AS.

Ensure appropriate access to Sleipner products during installation planning for service, inspection and component replacement.

General Installation Consideration and Precaution Guidelines

MC_0440

For thruster systems

MC_0425

• Do not install the thruster in a position where you need to cut a stiffener/ stringer/ support that may jeopardise the hull integrity without checking

with the boat builder this can be done safely.

• Paint the gear leg and propellers with anti-fouling. (NB: Do not paint the anodes, sealing, rubber fi ttings or propeller shafts)

• There is only room for a thin coat of primer and two layers of anti-fouling between the tunnel and the props.

• Never run the thruster out of water without load. Operated at no load, the motor will reach extremely high speed, damaging the system.

For electric motor thrusters

MC_0031

• The thruster must NOT be installed in compartments that require ignition proof electric equipment. If necessary, make a separate compartment.

(NB: Sleipner Ignition Protected systems are tested and rated accordance with ISO 8846 and can be installed in areas with possible explosive

gases.)

• When installing the thruster electric motor in small compartments, ensure the compartment is dry and well ventilated to allow for cooling of the

electric motor.

• If the height of the room you are installing the thruster is limited, the thruster can be installed horizontally or at any angle in-between.

- If the electro motor is positioned more than 30 degrees off vertical, it must be supported separately.

- Beware of keeping installation within advised measurements. No part of the propeller or gear leg must be outside the tunnel.

• The electric motor, components and cables must be mounted so they remain dry at all times.

• Do not fi nish the inside of the tunnel with a layer of gel-coat/ topcoat or similar. There is only room for a thin coat of primer and two layers of anti-

fouling between the tunnel and the props.

• Don’t install the electric motor close to easily flammable objects or equipment as it will reach over 100°C before the temperature switch is

activated.

• Do not store items close to the thruster motor. Any loose items near the thruster motor is a potential fi re hazard and can cause undesired short-

circuiting.

• Do not lift it by internal cable connections, main terminals.

• The thruster power supply circuit must include the recommended sized fuse and a battery isolation switch.

• The electric/ hydraulic motor must be handled with care. Do not rest the thruster motor on its drive shaft as its weight can damage the shaft.

For DC electric motors

MC_0426

• The electro motor will generate some carbon dust so any storage compartments must be separated from the thruster to prevent nearby items

becoming dusty/ dirty. (NB: IP version motors generate dust but are enclosed.)

Lithium Batteries for on/off thrusters models

• High capacity lithium batteries are capable of supplying a higher operating voltage to the motor than the on/off thrusters are rated for.

Running thrusters at higher than rated voltage will reduce operating time, increase wear and damage the thruster. Operating the thruster

outside specifi ed ratings will void warranty.

MC_0501

SEP IP 50 4527 15 2023 3

General Installation Consideration and Precaution Guidelines

MC_0440

Lithium Batteries for proportional thrusters models MC_0502

• If a lithium battery system is installed for supply of proportional thrusters, ensure the battery is designed for continuous supply of the required

thruster current. Under-rated battery management system can suddenly disconnect the load which may lead to dangerous situations. The

fi rmware version of Proportional Power Controller (PPC) must be of version 1.033 or later if the PPC is to be connected to a lithium battery.

Operating the thruster outside specifi ed ratings will void warranty.

When installing an S-Link™ system connect ONLY original Sleipner S-Link™ products or other authorized control equipment directly to the S-Link™ bus.

Connecting non-authorized third-party equipment, it must always be connected through a Sleipner supplied interface product.

Any attempt to directly control or connect into the S-Link™ control system without a designated and approved interface will render all warranties and responsibilities of all of the connected Sleipner products. If you are interfacing the S-Link™ bus by agreement with Sleipner through a designated

Sleipner supplied interface, you are still required to install at least one original Sleipner control panel to enable efficient troubleshooting if necessary.

MC_0105

NEVER Disassemble any part of the Ignition Protected assembly. Tampering with the Ignition Protected assembly will cause it to lose this safety feature. If there is a problem with your Ignition Protected motor, please contact your dealer.

MC_0007

L W

H

ID

T

The gear leg/ propeller(s) must never extend out of the tunnel

Single Propeller

Tunnel centre line

TL

WD

Propeller position will vary with each thruster model

MG_0311

4 SEP IP 50 4527 15 2023

Measurement code

ID

H

W

L

WD

TL

TL (recommended)

T (min)

T (max)

Measurement description

Internal tunnel diameter

Motor Height

Width

Length

Water Depth

Minimum tunnel length

Recommended tunnel length

Minimum tunnel wall thickness

Maximum tunnel wall thickness

*Valid for SE IP & SEP IP

Product Dimensions

SE IP 50

12v

SE IP 50

24v mm inch mm inch

124

152

5

7

140

323

5,51

12,72

232 9,13

272 10,71

140 5,51

4,88

5,98

0,20

0,28

124

152

5

7

140

323

5,51

12,72

232 9,13

272 10,71

140 5,51

4,88

5,98

0,20

0,28

L W

H

ID

T

TL

MC_0129

WD

Propeller position will vary with each thruster model

Single Propeller

The gear leg/ propeller(s) must never extend out of the tunnel

Tunnel centre line

MG_0311

SEP IP 50 4527 15 2023 5

Product Clearance Requirements

MC_0672

IMPORTANT

This product has clearance considerations extending the base product footprint. Follow the clearance requirements when planning your installation.

A minimum clearance of 90mm above the thruster is required for the control cable

Product Specifi cations

Product

SEP50 12V

SEP50 24V

Maximum Supply Voltage *

15.5V

31V

Thrust at

12V or 24V

62 kg / 136 lbs

62 kg / 136 lbs

Thrust at

10.5V

(12V) or 21V (24V)

40 kg / 110 lbs

40 kg / 110 lbs

Power Output

(kw / Hp)

2.4kw / 3.2hp

2.4kw / 3.2hp

* SEP and SEP-IP are measured at PPC supply terminals for proportional thrusters

Weight

(kg / lbs)

15kg / 33lbs

15kg / 33lbs

Maximum Operation Time

S2 motor at 2 - 3 min.

Duty cycle at 20°c (Ambient temperature)

MG_0592

MC_0505

6 SEP IP 50 4527 15 2023

A minimum clearance of 90mm above the thruster is required for the control cable

Product Specifi cations

Product

SEP50 12V

SEP50 24V

Maximum Supply Voltage *

15.5V

31V

Thrust at

12V or 24V

62 kg / 136 lbs

62 kg / 136 lbs

Thrust at

10.5V

(12V) or 21V (24V)

40 kg / 110 lbs

40 kg / 110 lbs

Power Output

(kw / Hp)

2.4kw / 3.2hp

2.4kw / 3.2hp

* SEP and SEP-IP are measured at PPC supply terminals for proportional thrusters

Weight

(kg / lbs)

15kg / 33lbs

15kg / 33lbs

Maximum Operation Time

S2 motor at 2 - 3 min.

Duty cycle at 20°c (Ambient temperature)

MG_0592

MC_0505

Positioning of the tunnel / thruster

MC_0003

Aim to install the thruster as far forward as possible (1)

Due to the leverage effect around the boats’ pivot point. The distance difference from the boat pivots’ point to the thruster will determine the amount of real rotation power for the boat.

Aim to install the thruster as deep as possible under the waterline (2)

Deeper installations prevent air from being sucked into the tunnel from the surface, resulting in reduced thrust performance and increase noise levels during operation. Deeper installations increase water pressure for maximum effi ciency from the thruster.

The centre of the tunnel should be as a general rule minimum of 1 x the tunnel diameter below the waterline. (NB: Refer to product measurements to defi ne your products recommended depth below the waterline.) The installer must make evaluations based on thruster performance, boat type and operating conditions. As a general recommendation, the position of the tunnel should not be a minimum of 1/4 of the diameter of the tunnel from the boat keel. (NB: This can be overlooked depending on the installation methods defi ned in this manual.)

1

Pivot point

A

Lowered rotation power performance

Stronger rotation power performance

2

WD

Ø min 1/4

Ø

(Recommended)

Water line min 1/4

Ø

(Recommended)

MG_0001

SEP IP 50 4527 15 2023 7

Tunnel Length

MC_0003

Optimal tunnel length

Achieving the correct tunnel length depends on many factors from the hull type, operation and environmental conditions.

Tunnels should avoid being longer than 4 x the tunnel diameter as this will reduce thruster performance. (NB: Installing long length tunnels can flex/ bend over time and may require additional support. Consult with a naval architect.)

1. Do not allow the variable length of the tunnel walls to vary in length excessively.

EG. The top tunnel wall is x 4 longer than the bottom wall.

2. If the tunnel is too long, the friction inside will reduce the water speed and thereby the thrust.

3. If the tunnel is too short (typically only in the bottom section of the tunnel) cavitation problems can occur as water flow will not be able to

“straighten” itself before reaching the propeller. This cavitation will reduce performance and increase noise during operation.

Thruster within the tunnel

It is important the propellers and the lower unit/ gear leg must be entirely inside the thruster tunnel. Propellers that protrude from the tunnel will not perform as intended.

4. Standard Use

Tunnel length must be long enough to ensure the propellers are not extruding the tunnel. ( NB: Refer to product measurements to defi ne your

products recommended tunnel length.)

5. Flat Bottom Hull

Tunnel lengths must be longer than the standard measurement outlined within the manual to ensure a circular vacuum is not created between the

thruster and the bottom of the boat.

6. High-Speed Boats

Tunnel lengths must be increased to protect the propeller from damage when crashing against the water surface during high-speed cruising. (NB:

This can include the length of a spoiler)

1

 

3  

Do not allow the variable length of the tunnel walls to vary in length excessively.

EG. the top tunnel wall is x 4 longer than the bottom wall.

2

 

4 5 STANDARD USE FLAT BOTTOM HULL

Cavitation

Water flow must have space to "straighten" itself for best performance.

6 HIGH-SPEED OPERATION

8

The gear leg/ propeller(s) must never extend out of the tunnel

Increase tunnel length to prevent a circular water vacuum cavity between the propeller and the hull of the boat.

Water

Forces

Increase tunnel length to protect the propeller from water forces when high-speed cruising.

MG_0048

SEP IP 50 4527 15 2023

Tunnel Length

MC_0003

Optimal tunnel length

Achieving the correct tunnel length depends on many factors from the hull type, operation and environmental conditions.

Tunnels should avoid being longer than 4 x the tunnel diameter as this will reduce thruster performance. (NB: Installing long length tunnels can flex/ bend over time and may require additional support. Consult with a naval architect.)

1. Do not allow the variable length of the tunnel walls to vary in length excessively.

EG. The top tunnel wall is x 4 longer than the bottom wall.

2. If the tunnel is too long, the friction inside will reduce the water speed and thereby the thrust.

3. If the tunnel is too short (typically only in the bottom section of the tunnel) cavitation problems can occur as water flow will not be able to

“straighten” itself before reaching the propeller. This cavitation will reduce performance and increase noise during operation.

Thruster within the tunnel

It is important the propellers and the lower unit/ gear leg must be entirely inside the thruster tunnel. Propellers that protrude from the tunnel will not perform as intended.

4. Standard Use

Tunnel length must be long enough to ensure the propellers are not extruding the tunnel. ( NB: Refer to product measurements to defi ne your

products recommended tunnel length.)

5. Flat Bottom Hull

Tunnel lengths must be longer than the standard measurement outlined within the manual to ensure a circular vacuum is not created between the

thruster and the bottom of the boat.

6. High-Speed Boats

Tunnel lengths must be increased to protect the propeller from damage when crashing against the water surface during high-speed cruising. (NB:

This can include the length of a spoiler)

Tunnel installation in Sailboats

MC_0003

Some sail boats have a flat bottom and shallow draft in the bow section. This can make installing the thruster as far forward from the boats main pivot point diffi cult. (Fig. 1) .

However, it is possible to install a tunnel thruster in most sail boats, even when the hull does not directly support the fi tting of a tunnel.

Instead fi t the tunnel halfway into the underneath section of the existing hull. Strengthen it with a deflector/ spoiler directing the water flow around the tunnel. This will allow installation of the thruster in the proper position on the boat, maintaining the reliability and space advantages of the tunnel thruster.

This installation is being used by some of the world’s largest sail boat builders and has proven to give little to no speed loss during normal cruising.

This can also be an installation method for flat bottomed barges to avoid extremely long tunnels and large oval tunnel openings in the hull.

 1 

Pos. A Pos. B

Do not allow the variable length of the tunnel walls to vary in length excessively.

EG. the top tunnel wall is x 4 longer than the bottom wall.

Water flow must have space to "straighten" itself for best performance.

MG_0004

The gear leg/ propeller(s) must never extend out of the tunnel

Increase tunnel length to prevent a circular water vacuum cavity between the propeller and the hull of the boat.

Water

Forces

Increase tunnel length to protect the propeller from water forces when high-speed cruising.

SEP IP 50 4527 15 2023 9

Water Deflection

MC_0003

1. A possible problem in sail boats or fast powerboats is that a non-rounded surface can generate drag from the back face of the tunnel, as it creates a “flat” area facing the flow of water.

This problem can be solved in two different ways, depending on what is possible or easier to perform.

2. The best solution which generally reduces the most drag is to make a recess in the hull at the back of the tunnel. As the back face is removed water can flow freely past the tunnel entry. The depth and shape of this recess will depend on the boat and the angle facing up/ down aft of the tunnel insert. Normally it is angled slightly down because of the water flow on this area.

3. Making a deflector/ spoiler in front and underneath the tunnel can also reduce damage to the thruster and drag. The deflector/ spoiler will push the water flow out from the hull so water can pass by the back face of the tunnel. The shape and size of this deflector/ spoiler will depend on the hull shape. The easiest way of making the deflector/ spoiler is to retain a part of the lower forward area of the tunnel while installing the tube. Use this area as support to mould a soft curve/spoiler shape from the hull.

4. The thruster propeller can spin (passively) producing noise while sailing or cruising as water is forced through the tunnel. Water-flow directed through the tunnel at high speeds, during turning or as the boat bumps waves while underway can also damage the thruster.

(NB: As a rule, you should not see the back face of the tunnel when standing directly in front of the boat looking aft.)

1 2

3

10

4

High water force while underway

High water force while underway from wave contact

To protect the propeller from water entering into the tunnel at high speeds (25 knots +) the extended deflector/ spoiler must provide protection from the front and the bottom. In the event when the boat is traveling at high speeds it will commonly pound upon the water surface.

MG_0003

SEP IP 50 4527 15 2023

1

4

High water force while underway

High water force while underway from wave contact

2

3

Tunnel Ends

MC_0003

Rounded tunnel ends will maximise thrust and minimise noise and cavitation.

For best performance round the tunnel connection to the hull-side as much as possible. The minimum rounding has a radius of 10% of the diameter of the tunnel.

Signifi cant advantages of a rounded tunnel over a sharp tunnel to hull connections are:

1. A rounded tunnel end will prevent the creation of turbulence/ cavitation created from a sharp tunnel end when water passes by the tunnel.

- The turbulence/ cavitation will block the outer area of the tunnel and thereby reduces the effective tunnel diameter and thrust.

- Turbulence/ cavitation on the propeller will lessen the thrusters performance and create excess noise.

2. For steel/ aluminium hulls angled tunnel ends also offer similar performance as a rounded connection.

3. A rounded tunnel end makes the thruster draw water from along the hull-side, creating a vacuum that will suck the boat sideways and thereby give additional thrust.

- With a sharp tunnel end, the thruster will be unable to take water from along the hull-side, and you will not gain the desired vacuum and

additional thrust. This “free” extra thrust in optimal installations be 30 - 40% of the total thrust.

(NB: A Sleipner thruster propeller does not produce cavitation at working speed. Therefore, any cavitation and cavitation noise in the tunnel will be caused during improper tunnel installation.)

Cavitation

1

 

R = 0,1 x D (10%)

D

2

Angled tunnel ends for steel/ aluminium hulls

To protect the propeller from water entering into the tunnel at high speeds (25 knots +) the extended deflector/ spoiler must provide protection from the front and the bottom. In the event when the boat is traveling at high speeds it will commonly pound upon the water surface.

MG_0003

3

MG_0002

SEP IP 50 4527 15 2023 11

Tunnel Installation

MC_0003

IMPORTANT

We recommend that a professional does the fi breglass, steel or aluminium fi tting of the tunnel. These instructions are only general instructions and do not explain in any way the details of fi breglass work. Problems caused by faulty installation of the tunnel, are the installers full responsibility.

1. Find the position in the boat considering the information earlier in this manual and the applicable measurements for the thruster model you are installing. Mark the centre of the tunnel on both sides of the hull. Drill a hole horizontally at these marks.

2. Mark the circle for the tunnel opening (outside diameter of the tunnel) and cut the hole.

3. Grind off the gel coat to the “real fi breglass” area 12cm around the hole on both inside and outside the hull to cast the tunnel to the hull (Fig. 3) .

4. Insert the tunnel and mark its shape to fi t the hull. (NB: if you are installing with a deflector/ spoiler, leave a part of the tunnel in the front and underside of the tunnel that will cover the back face.)

5. Cut the tunnel ends to the desired shape and lightly sand its surface. Clean the area with acetone or similar where you are going to apply fi breglass. (NB: Do not cast or add fi breglass to the area were the thruster will be placed.)

6. Cast the tunnel to the inside of the hull, use at least eight layers of 300g fi breglass and resin, preferably alternating mat and rowing types of fi breglass. To round the tunnel ends to a 10% radius make further layers inside to preserve the desired hull thickness.

(NB: Ensure gaps between the tunnel and the hull are completely fi lled with resin/ fi breglass. In areas where you can not access to make layers of resin/ fi breglass, a resin/ fi breglass mixture must be used in that area.)

1

D

2

R

3

4

5

6

8 x layers of fiberglass and resin

8 x layers of fiberglass and resin

MG_0005

12 SEP IP 50 4527 15 2023

Additional Layers of fiberglass and resin

4

1

2

Hull

Layers of fiberglass and resin

3

Hull

Layers of fiberglass and resin

Additional Layers of fiberglass and resin

Tunnel

Hull

Welding

Hull

Tunnel

Layers of fiberglass and resin

Tunnel

*Steel/

Aluminium

Hull

D x

0,1

-0,1

5

D x

0,1

-0,

15

*Fiberglass

Hull

D

R = D x 0,1

R = D x 0,1

MG_0006

3

1

4

D

6

8 x layers of fiberglass and resin

8 x layers of fiberglass and resin

2

R

5

MG_0005

Tunnel Installation

With tunnel installed and cast.

1. Round the edges with a radius of 10% of the tunnel diameter.

2. For steel/ aluminium hulls make a slope with a length of 10-15% of the tunnel diameter.

(NB: If this is not possible, round the tunnel end as much as possible.)

MC_0003

3. Additionally cast two layers on the outside of the tunnel/ hull in a 10cm area

4. Follow the same method if making the deflector/ spoiler.

You must apply gel coat to areas you have grounded/ moulded to make waterproof. These areas allow water access to the hull which is typically not waterproof without these applications outside. (NB: All original Sleipner tunnels are fully waterproof when delivered except in the areas where you have cut and bonded it to the hull.)

IMPORTANT

Avoid all casting where the motor-bracket is to be placed, as this will cause misfi t and possible failure to the gear house.

1

Hull

Layers of fiberglass and resin

3

Hull

Layers of fiberglass and resin

Additional Layers of fiberglass and resin

Tunnel

2

Hull

Welding

Additional Layers of fiberglass and resin

4 Hull

Tunnel

Layers of fiberglass and resin

Tunnel

*Steel/

Aluminium

Hull

D x

0,1

-0,1

5

D x

0,1

-0,

15

*Fiberglass

Hull

D

R = D x 0,1

R = D x 0,1

MG_0006

SEP IP 50 4527 15 2023 13

Stern Tunnel Installation

For Stern Thruster installation please refer to the supplied manual in your Sleipner product delivery

Installation Guide

For DC Electric Thruster Models

SE80, SE100, SE120, SE130, SE150

Stern Thruster

MC_0003

SLEIPNER AS

P.O. Box 519

N-1612 Fredrikstad

Norway www.sleipnergroup.com

DOCUMENT ID: 222222

REVISION: 1

DATE: 2018

LANGUAGE: EN

For supporting stern tunnel installation documentation, we advise you to visit our website www.sleipnergroup.com and fi nd your Sleipner stern tunnel model.

14 SEP IP 50 4527 15 2023

Stern Tunnel Installation

For Stern Thruster installation please refer to the supplied manual in your Sleipner product delivery

Installation Guide

For DC Electric Thruster Models

SE80, SE100, SE120, SE130, SE150

Stern Thruster

MC_0003

SLEIPNER AS

P.O. Box 519

N-1612 Fredrikstad

Norway www.sleipnergroup.com

DOCUMENT ID: 222222

REVISION: 1

DATE: 2018

LANGUAGE: EN

For supporting stern tunnel installation documentation, we advise you to visit our website www.sleipnergroup.com and fi nd your Sleipner stern tunnel model.

Gear Leg & Motor Bracket Installation

MC_0258

!

Please refer to the graphic for special considerations relating to your model !

1. Mark the tunnel centreline and the boat’s centreline. (NB: Install the gear leg and propeller as shown for the thrust direction to correspond with the control panel.)

2. Use the gasket or template (recommended) to mark the hole centres and double-check the measurements. One hole MUST be placed using the boat centreline as shown above. (NB: All holes must be in-line with the tunnels’ centreline for correct installation, clearance between the propeller and the tunnel is minimal.)

3. Drill the main centre hole followed by the two screw-holes.

4. Smooth the surface of the tunnel. A rough surface will cause possible failure/ movement of the gear leg. The motor bracket must rest steadily on the tunnel.

1

Bow

Boats centre line

Stern

Tunnel centre line

2

Boats centre line

ØC

Tunnel centre line

B

ØA

Models

Measurements

ØA B ØC mm inch mm inch mm inch

28 1,1 20 0,8 7 0,3

SE20/110S

SE25/110S

SE/SEP/SE IP/SEP IP 30/125S2

SE/SEP/SE IP/SEP IP 40/125S2

SE/SEP/SE IP/SEP IP 30/140S

SE/SEP/SE IP/SEP IP 40/140S

SE/SEP/SE IP/SEP IP 50/140S

SE/SEP/SE IP/SEP IP 60/185S2

28 1,1 21 0,8 8,5 0,3

29 11 23 0,9 8,5 0,3

STARBOARD

3

Drill centre hole first

4

Smooth surface area

MG_0612

SEP IP 50 4527 15 2023 15

Gear Leg & Motor Bracket Installation

!

Please refer to the graphic for special considerations relating to your model !

5. Place the gear leg (without the propeller) with the gasket on inside the tunnel.

MC_0258

6. Place the propeller on the gear leg (NB: Do not secure the propeller with securing parts) to ensure it is centred and rotates freely with the same clearance from each blade to the tunnel wall.

7. Place top motor bracket and bolt plate to measure the drive shaft has come through the motor bracket at the correct height. Remove the gear leg and propeller for fi nal installation.

5

BOW

6

Gasket

Gear leg

7

Bolt plate

Bracket

Gasket

Test the propeller turns without obstruction with tunnel wall

BOW

Measure the drive shaft has come through the motor bracket at the correct height with the template supplied.

MAX

MIN

Bolt plate

Bolt plate

Motor bracket

The template must sit on the bracket surface with the bolt plate within the measurement cutout

MAX

MIN

MG_0616

16 SEP IP 50 4527 15 2023

Gear Leg & Motor Bracket Installation

!

Please refer to the graphic for special considerations relating to your model !

5. Place the gear leg (without the propeller) with the gasket on inside the tunnel.

MC_0258

6. Place the propeller on the gear leg (NB: Do not secure the propeller with securing parts) to ensure it is centred and rotates freely with the same clearance from each blade to the tunnel wall.

7. Place top motor bracket and bolt plate to measure the drive shaft has come through the motor bracket at the correct height. Remove the gear leg and propeller for fi nal installation.

Gear Leg & Motor Bracket Installation

MC_0258

!

Please refer to the graphic for special considerations relating to your model !

8. Apply appropriate sealant to both sides of the gasket and place on the gear leg. Place the gear leg in the tunnel (without the propeller). Use appropriate sealant to ensure that no leakages occur. (NB: See your sealant data sheet for the correct application process.)

9. Install the top motor bracket and gear leg gently together.

10. Fasten the gear leg and the motor bracket with the bolts provided. Tighten to torque as shown.

5

BOW

Gasket

6

9

Gear leg

8

IMPORTANT

Do not apply sealant to the bolt holes.

Apply MS Polymer sealant or equal to both sides of the gasket

BOW

Motor bracket

7

Bolt plate

Bracket

Gasket

Test the propeller turns without obstruction with tunnel wall

BOW

Measure the drive shaft has come through the motor bracket at the correct height with the template supplied.

MAX

MIN

Bolt plate

Bolt plate

Motor bracket

The template must sit on the bracket surface with the bolt plate within the measurement cutout

MAX

MIN

MG_0616

10

Tunnel Diameter

Fasten

/140mm

/185mm

Nm lb/ft

18 13,3

BOW

MG_0617

SEP IP 50 4527 15 2023 17

Propeller Installation

MC_0016

1. Centre the drive pin and Insert the propeller onto the shaft spine. Rotate the propeller until the drive pin aligns with the internal slot in the propeller.

2. Insert the washer to the end of the shaft spline. Tighten with the propeller lock-nut.

3. Apply anti fouling to the gear leg and propeller. Do not apply anti fouling to any rubber elements of the gear leg or anodes if applicable.

(NB: Ensure to paint under plastic covers.)

WARNING

Do not use abrasive tools damaging the existing Epoxy coating when preparing for antifouling paint.

18

Washer

Lock nut

FASTEN

19Nm

14.014 lb/ft

Propeller

Drive pin

Anti-fouling

SEP IP 50 4527 15 2023

MG_0054

1

Drive Pin

3

> 30°

Motor support

2

Coupling

Gasket

Turn gear leg shaft so the motor coupling fits into the slots.

4

FASTEN

(18 Nm)

(13.28 lb/ft)

MG_0069

Motor Installation

!

Please refer to the graphic for special considerations relating to your model !

1. Insert the drive pin to the motor drive shaft. Insert the coupling to align with the drive pin in the motor shaft.

MC_0043

2. Install the motor onto the motor bracket ensuring the couplings are engaged together correctly (top and bottom). (NB: The motor can be placed in all directions on the motor bracket. However, ensure the cable terminals are accessible for electrical installation later.)

3. If you are installing the motor at an angle of more than 30 degrees off vertical, the motor will require separate/ additional support. (NB: Do not position supports on the motors top cap.)

4. Fasten the bolts holding the motor to the motor bracket with the below torque.

5. Check the drive shafts are engaged by rotating the propeller. (NB: Rotating the propellers can be hard due to the gear reduction and the motor, however the propeller must be able to rotate via hand power.)

IMPORTANT

The thruster motor assembly must be protected using suitable covering to avoid dust/debris ingress from fabrication/maintenance/shipbuilding operations. On completion of operations, the cover must be removed before operating the thruster.

1 2

Drive Pin

Coupling

Turn gear leg shaft so the motor coupling fits into the slots.

Gasket

3

> 30°

4

Motor support

SEP IP 50

FASTEN

(18 Nm)

(13.28 lb/ft)

MG_0069

4527 15 2023 19

Electrical Installation

MC_0035

1. Plan the location of electrical components before starting with the electrical installation. Main electrical components will typically consist of battery, fuse, main switch, Proportional Power Controller (PPC) and thruster motor, see Wiring Diagram chapter for an overview.

Sleipner offers both manual main switches and Automatic Main Switches (AMS). Sleipner AMS is controlled by the control panel in addition to the option of manual operation. Turning on the control panel also turn on the automatic main switch. When the control panel is turned off the automatic main switch is turned off. This ensures that the control electronics and motor are only energized when the control panel is turned on.

Sleipner offers AMS supporting either S-Link or ON/OFF control panels. Note that the AMS requires a separate power supply which should be protected by a dedicated fuse. Ensure to select an AMS with a voltage rating according to the chosen motor- and battery voltage.

Electrical products installed in gasoline engine spaces or other areas potentially exposed for explosive gases must be Ignition Protected.

Products installed in such locations should conform to the ISO 8846, SAE J1171 or UL 1500 standard.

2. Estimate the total length of the power cables to determine the recommended cross-section. The total power cable length is defi ned as the distance from the positive battery terminal, via fuse, main switch, PPC, and thruster motor, and all the way back to the negative battery terminal.

3. Find the recommended power cable cross-section for the installation by using the estimated total power cable length and the table shown in the chapter Electrical Reference Guide.

4. Select the recommended fuse size by using the table shown in the chapter Electrical Reference Guide.

5. Use an appropriate dimensioned battery with Cold Cranking Amps (CCA) according to recommendations given in the Electrical Reference Guide chapter. Battery voltage must be compliant with the voltage rating of the thruster motor and control circuitry. The capacity and rated discharge current of the battery should be according to the rated nominal current drawn and the typical duty cycle for thruster operation. The nominal current drawn is listed in the Electrical Reference Guide chapter.

The actual voltage at the motor while running the thruster determines the motor RPM and thrust. Using a smaller cross-section than recommended or a low-capacity battery could reduce performance.

Installing a battery close to the thruster reduces the length of the power cables and potentially increases the performance, due to lower voltage drop in the power cables. For installations on large vessels with bow and stern thrusters or catamarans a dedicated battery for each thruster should be considered.

6. Install and connect the electrical components according to the applicable Wiring Diagram chapter.

For safety reasons it is always recommended to install a fuse and a main switch on the power cables and as close as possible to the positive battery terminal. The main switch must be installed such that it is easily accessible so that the thruster can be electrically disconnected to a safe state when not on-board or in the case of an emergency.

For dual thruster systems using only one battery bank a dedicated fuse and main switch should be installed for each thruster. These should be installed close to the battery bank.

Follow the instructions in the Motor Lug Connection chapter when fastening the power cables to the motor.

7. For detailed instructions on PPC installation consult the PPC Installation Guide included with the PPC.

8. Fuse and main switch should be installed according to the installation manual accompanying the products.

9. Install the control panel according to the instructions in the Installation Guide included with the control panel.

10. See the S-Link System Description chapter for detailed information on the installation of the S-Link Power cable and additional S-Link components.

WARNING

After all electrical connections have been completed, turn off main switch and check the following with an ohmmeter:

1. There is no electrical connection between electro-motor flange and the positive terminal on the motor.

2. There is no electrical connection between electro-motor flange and the negative terminal on the motor.

If unsure contact skilled personnel.

20 SEP IP 50 4527 15 2023

Electrical Installation

MC_0035

1. Plan the location of electrical components before starting with the electrical installation. Main electrical components will typically consist of battery, fuse, main switch, Proportional Power Controller (PPC) and thruster motor, see Wiring Diagram chapter for an overview.

Sleipner offers both manual main switches and Automatic Main Switches (AMS). Sleipner AMS is controlled by the control panel in addition to the option of manual operation. Turning on the control panel also turn on the automatic main switch. When the control panel is turned off the automatic main switch is turned off. This ensures that the control electronics and motor are only energized when the control panel is turned on.

Sleipner offers AMS supporting either S-Link or ON/OFF control panels. Note that the AMS requires a separate power supply which should be protected by a dedicated fuse. Ensure to select an AMS with a voltage rating according to the chosen motor- and battery voltage.

Electrical products installed in gasoline engine spaces or other areas potentially exposed for explosive gases must be Ignition Protected.

Products installed in such locations should conform to the ISO 8846, SAE J1171 or UL 1500 standard.

2. Estimate the total length of the power cables to determine the recommended cross-section. The total power cable length is defi ned as the distance from the positive battery terminal, via fuse, main switch, PPC, and thruster motor, and all the way back to the negative battery terminal.

3. Find the recommended power cable cross-section for the installation by using the estimated total power cable length and the table shown in the chapter Electrical Reference Guide.

4. Select the recommended fuse size by using the table shown in the chapter Electrical Reference Guide.

5. Use an appropriate dimensioned battery with Cold Cranking Amps (CCA) according to recommendations given in the Electrical Reference Guide chapter. Battery voltage must be compliant with the voltage rating of the thruster motor and control circuitry. The capacity and rated discharge current of the battery should be according to the rated nominal current drawn and the typical duty cycle for thruster operation. The nominal current drawn is listed in the Electrical Reference Guide chapter.

The actual voltage at the motor while running the thruster determines the motor RPM and thrust. Using a smaller cross-section than recommended or a low-capacity battery could reduce performance.

Installing a battery close to the thruster reduces the length of the power cables and potentially increases the performance, due to lower voltage drop in the power cables. For installations on large vessels with bow and stern thrusters or catamarans a dedicated battery for each thruster should be considered.

6. Install and connect the electrical components according to the applicable Wiring Diagram chapter.

For safety reasons it is always recommended to install a fuse and a main switch on the power cables and as close as possible to the positive battery terminal. The main switch must be installed such that it is easily accessible so that the thruster can be electrically disconnected to a safe state when not on-board or in the case of an emergency.

For dual thruster systems using only one battery bank a dedicated fuse and main switch should be installed for each thruster. These should be installed close to the battery bank.

Follow the instructions in the Motor Lug Connection chapter when fastening the power cables to the motor.

7. For detailed instructions on PPC installation consult the PPC Installation Guide included with the PPC.

8. Fuse and main switch should be installed according to the installation manual accompanying the products.

9. Install the control panel according to the instructions in the Installation Guide included with the control panel.

10. See the S-Link System Description chapter for detailed information on the installation of the S-Link Power cable and additional S-Link components.

WARNING

After all electrical connections have been completed, turn off main switch and check the following with an ohmmeter:

1. There is no electrical connection between electro-motor flange and the positive terminal on the motor.

2. There is no electrical connection between electro-motor flange and the negative terminal on the motor.

If unsure contact skilled personnel.

Product Lug Connection Configuration

Nut

Tighten to

18Nm (13.8lb/ft)

Washer

Hold in place for securing the end nut.

Isolation Cap

Lug

IMPORTANT

Do NOT use washers between lugs, this causes overheating and fire. Spring washers must be placed in the outer position before tightening nut.

Nut

Lugs Spring washer

Nut

Multi-lug configuration

Ensure lug faces are back to back.

MG_0535

Model Size

System

Voltage

Nominal current

*Min. battery

CCA

Rec. fuse

Unit

50/140S

12V

24V

370 A

170 A

DIN: 350

SAE: 665

EN: 600

ANL 325

DIN: 175

SAE: 332

EN: 280

ANL 150 mm²

AWG mm²

AWG

Min.

50

1/0

25

3

Electrical Reference Guide

<7m total + & -

7-14m total + & -

Cross Section Guide for Power Cables

15-21m total + & -

22-28m total + & -

Rec.

50

1/0

25

3

Min.

70

2/0

25

3

Rec.

95

3/0

35

2

Min.

120

4/0

35

2

Rec.

2 x 70

2 x 2/0

50

1/0

Min.

2 x 70

2 x 2/0

35

2

Rec.

2 x 95

2 x 3/0

50

1/0

MC_0616

28-35m total + & -

Min.

2 x 95

2 x 3/0

50

1/0

Rec.

2 x 120

2 x 4/0

70

2/0

36-45m total + & -

Min.

2 x 120

2 x 4/0

70

2/0

Rec.

2 x 120

2 x 4/0

70

2/0

SEP IP 50 4527 15 2023 21

++

12V

BATTERY

Manual Main Switch Wiring Diagram 12V S-Link IP Thruster

The Top wiring setup is for a single bow OR stern thruster system

Refer to the User and Installation Manual of the control panel to be installed for detailed installation instructions.

See S-Link System Description chapter for detailed information on installation of S-Link Power cable and additional S-Link components.

S-Link Backbone cable

Control panel

ANL Fuse

Manual Main

Switch

S-Link Spur cable

Proportional Power

Controller (PPC)

PPC

B+ M- B-

8-lead cable

IP Thruster

The top and bottom wiring setup is for a dual thruster system, For example bow and stern.

S-Link Backbone cable

Fuse 10A

ANL Fuse

Manual Main

Switch

S-Link Spur cable

PPC

Proportional Power

Controller (PPC)

B+ M- B-

8-lead cable

++

12V

BATTERY

IP Thruster

MG_0597

Automatic Main Switch Wiring Diagram 12V S-Link IP Thruster

The Top wiring setup is for a single bow OR stern thruster system

Refer to the User and Installation Manual of the control panel to be installed for detailed installation instructions.

See S-Link System Description chapter for detailed information on installation of S-Link Power cable and additional S-Link components.

S-Link Backbone cable

Control panel

Automatic Main Switch

S-Link Spur cable

Proportional Power

Controller (PPC)

PPC

ANL Fuse

++

12V

BATTERY

Fuse 5A

B+ M- B-

8-lead cable

IP Thruster

Fuse 10A

The top and bottom wiring setup is for a dual thruster system, For example bow and stern.

S-Link Backbone cable

Automatic Main Switch

S-Link Spur cable

PPC

Proportional Power

Controller (PPC)

ANL Fuse

++

12V

BATTERY

Fuse 5A

B+ M- B-

8-lead cable

IP Thruster

MG_0560

22 SEP IP 50 4527 15 2023

Automatic Main Switch Wiring Diagram 12V S-Link IP Thruster

The Top wiring setup is for a single bow OR stern thruster system

Refer to the User and Installation Manual of the control panel to be installed for detailed installation instructions.

See S-Link System Description chapter for detailed information on installation of S-Link Power cable and additional S-Link components.

S-Link Backbone cable

Control panel

Automatic Main Switch

S-Link Spur cable

Proportional Power

Controller (PPC)

PPC

ANL Fuse

++

12V

BATTERY

Fuse 5A

B+ M- B-

8-lead cable

IP Thruster

Fuse 10A

The top and bottom wiring setup is for a dual thruster system, For example bow and stern.

S-Link Backbone cable

Automatic Main Switch

S-Link Spur cable

PPC

Proportional Power

Controller (PPC)

ANL Fuse

++

12V

BATTERY

Fuse 5A

B+ M- B-

8-lead cable

IP Thruster

MG_0560

SEP IP 50 4527 15 2023 23

Manual Main Switch Wiring Diagram 24V S-Link IP Thruster

The Top wiring setup is for a single bow OR stern thruster system

Refer to the User and Installation Manual of the control panel to be installed for detailed installation instructions.

See S-Link System Description chapter for detailed information on installation of S-Link Power cable and additional S-Link components.

S-Link Backbone cable

ANL Fuse

Manual Main

Switch

S-Link Spur cable

Proportional Power

Controller (PPC)

PPC

Control panel

++

12V

BATTERY

B+ M- B-

8-lead cable

IP Thruster

++

12V

BATTERY

The top and bottom wiring setup is for a dual thruster system, For example bow and stern.

S-Link Backbone cable

S-Link Spur cable Proportional Power

Controller (PPC) Fuse 10A

ANL Fuse

++

12V

BATTERY

Manual Main

Switch

PPC

B+ M- B-

8-lead cable

++

12V

BATTERY

IP Thruster

24 SEP IP 50 4527 15 2023

MG_0598

++

12V

BATTERY

Automatic Main Switch Wiring Diagram 24V S-Link IP Thruster

The Top wiring setup is for a single bow OR stern thruster system

Refer to the User and Installation Manual of the control panel to be installed for detailed installation instructions.

See S-Link System Description chapter for detailed information on installation of S-Link Power cable and additional S-Link components.

S-Link Backbone cable

Control panel

Automatic Main Switch

S-Link Spur cable

PPC

Proportional Power

Controller (PPC)

ANL Fuse

B+ M- B-

8-lead cable

Fuse 5A

IP Thruster

++

12V

BATTERY

Fuse 10A

The top and bottom wiring setup is for a dual thruster system, For example bow and stern.

S-Link Backbone cable

Automatic Main Switch

S-Link Spur cable

PPC

Proportional Power

Controller (PPC)

ANL Fuse

++

12V

BATTERY

B+ M- B-

8-lead cable

Fuse 5A

IP Thruster

++

12V

BATTERY

SEP IP 50 4527 15

MG_0599

2023 25

S-Link System Description

MC_0120

S-Link is a CAN-based control system used for communication between Sleipner products installed on a vessel. The system uses BACKBONE Cables as a common power and communication bus with separate SPUR Cables to each connected unit. Only one S-Link POWER cable shall be connected to the BACKBONE Cable. Units with low power consumption are powered directly from the S-Link bus.

Main advantages of S-Link system:

- Compact and waterproof plugs.

- BACKBONE and SPUR Cables have different colour coding and keying to ensure correct and easy installation. BACKBONE Cables have blue

connectors and SPUR Cables have green connectors.

- Different cable lengths and BACKBONE Extenders make the system scalable and flexible to install.

Installation of S-Link cables:

Select appropriate cables to keep the length of BACKBONE- and SPUR Cables to a minimum. In case of planned installation with total BACKBONE

Cable length exceeding 100 meters please consult your local distributor. The S-Link cables should be properly fastened when installed to avoid sharp bend radius, cable chafi ng and undesired strain on connectors. Locking mechanism on connectors must be fully closed. To ensure long lifetime, cables, T-Connectors and Extenders should not be located so that they are permanently immersed in water or other fluids. It is also recommended to install cables such that water and condensation do not run along the cables and into the connectors.

The POWER Cable should ideally be connected around the middle of the BACKBONE bus to ensure an equal voltage drop at each end of the

BACKBONE Cable. The yellow and black wire in the POWER Cable shall be connected to GND and the red wire connected to +12VDC or +24VDC.

To reduce the risk of interference, avoid routing the S-Link cables close to equipment such as radio transmitters, antennas or high voltage cables. The backbone must be terminated at each end with the END Terminator.

SPUR cables can be left unterminated to prepare for the installation of future additional equipment. In such cases, ensure to protect open connectors from water and moisture to avoid corrosion in the connectors.

*Blue ends

*Green ends

BACKBONE Cable

Forms the communication and power bus throughout a vessel. Available in different standard lengths.

*Blue ends

*Green ends

SPUR Cable

Used to connect S-Link compliant products to the backbone cable. One SPUR Cable must be used for each connected component, with no exceptions.

Recommended to be as short as practically possible.

Available in different standard lengths.

*Blue ends *Blue ends

*Green ends

T-Connector

Used for connection of SPUR or POWER Cable to the

BACKBONE Cable. One

T-Connector for each connected cable.

*Blue ends *Blue ends BACKBONE Extender

Connects two BACKBONE

Cables to extend the length.

*Green ends

*Blue ends

POWER Cable

Required in all installations for connection of BACKBONE

Cable to a power supply and should be protected with a

2A fuse.

*Blue ends END Terminator

Must be one at each end of the BACKBONE bus.

*Blue ends

4-Port T-Connector

The 4-PORT T-connector allows multiple SPUR Cables to be connected. The 4-PORT T-connector comes with two sealing caps to protect unused ports.

*Green ends

S-Link installation example

Control Panel

Control Panel

Spur

Spur

End

Terminator

4 Port T-Connector

Backbone

4 Port T-Connector

Backbone

Backbone Extender

Backbone

T-Connector

End

Terminator

Power

Spur

Stern Thruster

Automatic

Main switch

Spur

*For DC system

Black

Yellow

Red

Switch

Optional

GND

S-Link

Power Supply

Fuse

2A

12/24V

Spur

Bow Thruster

MG_0159

26 SEP IP 50 4527 15 2023

Control Panel Installation

For Control Panel installation please refer to the Installation Guide accompanying the control panel to be installed.

MC_0398

Installation Guide

Control Panel

SLEIPNER MOTOR AS

P.O. Box 519

N-1612 Fredrikstad

Norway www.sleipnergroup.com

DOCUMENT ID:

REVISION:

DATE:

LANGUAGE:

*Blue ends

*Green ends

BACKBONE Cable

Forms the communication and power bus throughout a vessel. Available in different standard lengths.

*Blue ends

*Green ends

SPUR Cable

Used to connect S-Link compliant products to the backbone cable. One SPUR Cable must be used for each connected component, with no exceptions.

Recommended to be as short as practically possible.

Available in different standard lengths.

*Blue ends *Blue ends

*Green ends

T-Connector

Used for connection of SPUR or POWER Cable to the

BACKBONE Cable. One

T-Connector for each connected cable.

*Blue ends *Blue ends BACKBONE Extender

Connects two BACKBONE

Cables to extend the length.

*Green ends

*Blue ends

POWER Cable

Required in all installations for connection of BACKBONE

Cable to a power supply and should be protected with a

2A fuse.

*Blue ends END Terminator

Must be one at each end of the BACKBONE bus.

*Blue ends

4-Port T-Connector

The 4-PORT T-connector allows multiple SPUR Cables to be connected. The 4-PORT T-connector comes with two sealing caps to protect unused ports.

*Green ends

S-Link installation example

Control Panel

Control Panel

Spur

Spur

End

Terminator

4 Port T-Connector

Backbone

4 Port T-Connector

Backbone

Backbone Extender

Backbone

T-Connector

End

Terminator

Power

Spur

Stern Thruster

Automatic

Main switch

Spur

*For DC system

Black

Yellow

Red

Switch

Optional

GND

S-Link

Power Supply

Fuse

2A

12/24V

Spur

Bow Thruster

MG_0159

Control Panel Installation

For Control Panel installation please refer to the Installation Guide accompanying the control panel to be installed.

MC_0398

Installation Guide

Control Panel

SLEIPNER MOTOR AS

P.O. Box 519

N-1612 Fredrikstad

Norway www.sleipnergroup.com

DOCUMENT ID:

REVISION:

DATE:

LANGUAGE:

SEP IP 50 4527 15 2023 27

Post Installation Checklist

[].......... The bolts holding the gear leg and main bracket together are tightened correctly.

[].......... The bolts holding the motor to its bracket are tightened correctly.

MC_0033

[].......... All electrical connections are clean, dry and tight, and the correct cable, fuse and main

switch size.

[].......... Check that there is no electrical connection between the electro motor body and positive

terminal on the motor, and between the electro motor body and the negative terminal

on the motor with an ohm meter.

[].......... Anti-fouling has been applied to the gear leg and propeller but NOT anodes, sealing/

rubber fi ttings or propeller shafts.

[].......... Propeller is fastened correctly to the shaft.

[].......... Propeller turns freely in tunnel.

[].......... The anode and/ or holding screw is tightened well with thread glue.

[].......... Check the boat for potential water leakage around installation areas.

[].......... Correct drive direction as per control panel.

[].......... User Manual is supplied to the owner.

The thruster has been installed as per the instructions in this manual and all points in checklist above have been controlled.

Signed: .........................................................................................

Date: .............................................................................................

Thruster type: ................................................................................................................................................................................................

Serial number:...............................................................................................................................................................................................

Date of delivery:.............................................................................................................................................................................................

Correct drive direction as per control panel: ..................................................................................................................................................

The compartment for the thruster has been isolated from general bilge water and has no obvious or suspected risks for flooding:

......................................................................................................................................................................................................................

......................................................................................................................................................................................................................

......................................................................................................................................................................................................................

Other comments by installer: ........................................................................................................................................................................

.......................................................................................................................................................................................................................

.......................................................................................................................................................................................................................

28 SEP IP 50 4527 15 2023

Post Installation Checklist

[].......... The bolts holding the gear leg and main bracket together are tightened correctly.

[].......... The bolts holding the motor to its bracket are tightened correctly.

MC_0033

[].......... All electrical connections are clean, dry and tight, and the correct cable, fuse and main

switch size.

[].......... Check that there is no electrical connection between the electro motor body and positive

terminal on the motor, and between the electro motor body and the negative terminal

on the motor with an ohm meter.

[].......... Anti-fouling has been applied to the gear leg and propeller but NOT anodes, sealing/

rubber fi ttings or propeller shafts.

[].......... Propeller is fastened correctly to the shaft.

[].......... Propeller turns freely in tunnel.

[].......... The anode and/ or holding screw is tightened well with thread glue.

[].......... Check the boat for potential water leakage around installation areas.

[].......... Correct drive direction as per control panel.

[].......... User Manual is supplied to the owner.

The thruster has been installed as per the instructions in this manual and all points in checklist above have been controlled.

Signed: .........................................................................................

Date: .............................................................................................

Thruster type: ................................................................................................................................................................................................

Serial number:...............................................................................................................................................................................................

Date of delivery:.............................................................................................................................................................................................

Correct drive direction as per control panel: ..................................................................................................................................................

The compartment for the thruster has been isolated from general bilge water and has no obvious or suspected risks for flooding:

......................................................................................................................................................................................................................

......................................................................................................................................................................................................................

......................................................................................................................................................................................................................

Other comments by installer: ........................................................................................................................................................................

.......................................................................................................................................................................................................................

.......................................................................................................................................................................................................................

Service and Support

Find your local professional dealer from our certifi ed worldwide network for expert service and support. visit our website www.sleipnergroup.com/support

Product Spare Parts and Additional Resources

For additional supporting documentation, we advise you to visit our website www.sleipnergroup.com and fi nd your

Sleipner product.

MC_0024

MC_0024

MC_0024

Warranty statement

MC_0024

1. Sleipner Motor AS (The “Warrantor”) warrants that the equipment (parts, materials, and embedded software of products) manufactured by the Warrantor is free from defects in workmanship and materials for purpose for which the equipment is intended and under normal use and maintenance service (the “Warranty”).

2. This Warranty is in effect for two years (Leisure Use) or one year (Commercial and other Non-leisure Use) from the date of delivery/purchase by the end user, with the following exceptions;

(a) For demonstration vessels, or vessels kept on the water, the dealer is considered as the end user from 6 months after their launch of the vessel;

(b) The warranty period starts no later than 18 months after the fi rst launch of the vessel.

Please note that the boat manufacturer and dealer must pay particular attention to correct maintenance and service both by the products manuals as well as general good practice for the location the boat is kept in the period the boat is in their care. In cases where the 6 and 18 months grace periods for boat builders and dealers are passed, it is possible to obtain a full warranty upon inspection and approval of the warrantor or such representative.

3. Certain parts, classifi ed as wearable or service parts, are not covered by the warranty. A failure to follow the required maintenance and service work as described in the product manual render all warranty on parts or components directly or indirectly affected by this void. Please also note that for some parts, time is also a factor separately from actual operational hours.

4. This Warranty is transferable and covers the equipment for the specified warranty period.

5. The warranty does not apply to defects or damages caused by faulty installation or hook-up, abuse or misuse of the equipment including exposure to excessive heat, salt or fresh water spray, or water immersion except for equipment specifically designed as waterproof.

6. In case the equipment seems to be defective, the warranty holder (the “Claimant”) must do the following to make a claim:

(a) Contact the dealer or service centre where the equipment was purchased and make the claim. Alternatively, the Claimant can make the claim to a dealer or service centre found at www.sleipnergroup.com. The Claimant must present a detailed written statement of the nature and circumstances of the defect, to the best of the Claimant’s knowledge, including product identifi cation and serial nbr., the date and place of purchase and the name and address of the installer. Proof of purchase date should be included with the claim, to verify that the warranty period has not expired;

(b) Make the equipment available for troubleshooting and repair, with direct and workable access, including dismantling of furnishings or similar, if any, either at the premises of the Warrantor or an authorised service representative approved by the Warrantor. Equipment can only be returned to the Warrantor or an authorised service representative for repair following a pre-approval by the Warrantor’s Help Desk and if so, with the

Return Authorisation Number visible postage/shipping prepaid and at the expense of the Claimant.

7. Examination and handling of the warranty claim:

(a) If upon the Warrantor’s or authorised service Representative’s examination, the defect is determined to result from defective material or workmanship in the warranty period, the equipment will be repaired or replaced at the Warrantor’s option without charge, and returned to the

Purchaser at the Warrantor’s expense. If, on the other hand, the claim is determined to result from circumstances such as described in section

4 above or a result of wear and tear exceeding that for which the equipment is intended (e.g. commercial use of equipment intended for leisure use), the costs for the troubleshooting and repair shall be borne by the Claimant;

(b) No refund of the purchase price will be granted to the Claimant, unless the Warrantor is unable to remedy the defect after having a reasonable number of opportunities to do so. In the event that attempts to remedy the defect have failed, the Claimant may claim a refund of the purchase price, provided that the Claimant submits a statement in writing from a professional boating equipment supplier that the installation instructions of the Installation and Operation Manual have been complied with and that the defect remains.

8. Warranty service shall be performed only by the Warrantor, or an authorised service representative, and any attempt to remedy the defect by anyone else shall render this warranty void.

9. No other warranty is given beyond those described above, implied or otherwise, including any implied warranty of merchantability, fitness for a particular purpose other than the purpose for which the equipment is intended, and any other obligations on the part of the Warrantor or its employees and representatives.

10. There shall be no responsibility or liability whatsoever on the part of the Warrantor or its employees and representatives based on this Warranty for injury to any person or persons, or damage to property, loss of income or profit, or any other incidental, consequential or resulting damage or cost claimed to have been incurred through the use or sale of the equipment, including any possible failure or malfunction of the equipment or damages arising from collision with other vessels or objects.

11. This warranty gives you specific legal rights, and you may also have other rights which vary from country to country.

Patents

MC_0024

At Sleipner we continually reinvest to develop and offer the latest technology in marine advancements. To see the many unique designs we have patented visit our website www.sleipnergroup.com/patents

SEP IP 50 4527 15 2023 29

Notes

MC_0037

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

30 SEP IP 50 4527 15 2023

Notes

MC_0037

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

Notes

MC_0037

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

Notes

MC_0037

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

..................................................................................................................................................................................................................................................

SEP IP 50 4527 15 2023 31

© Sleipner Group, All rights reserved

The information given in the document was right at the time it was published.

However, Sleipner Group cannot accept liability for any inaccuracies or omissions it may contain. Continuous product improvement may change the product specifi cations without notice.

Therefore, Sleipner Group cannot accept liability for any possible differences between product and document.

Learn more about our products at www.sleipnergroup.com

SLEIPNER GROUP

P.O. Box 519

N-1612 Fredrikstad

Norway www.sleipnergroup.com

MC_0030

Made in Norway

advertisement

Related manuals