Peak Genius XE SCI 2 User Manual
PEAK Genius XE SCI 2 is a nitrogen gas generator designed for indoor use and specifically to minimize operator involvement. It automatically produces the factory set flow and pressure, cycling its compressors based on the application's gas demand. The generator can be connected to various applications like mass spectrometers, providing high-purity nitrogen for optimal performance. The intuitive service indication system alerts the user when maintenance is required, minimizing downtime and ensuring continuous operation.
PDF
Download
Document
Advertisement
Advertisement
Genius XE SCI 2 User Manual Genius XE SCI 2 User Manual Rev 11 RSID 3607 EN November 2021 Contents Change History How to use this Manual Warranties and Liabilities Safety Notices Symbols Safety Notice to Users EU Declaration of Conformity UK Declaration of Conformity WEEE Compliance Statement CSA Compliance Statement Technical Specification Unpacking Fittings Kit Contents Installation Generator Environment Generator Overview General Dimensions Genius XE SCI 2 Rear Connections Unit Controls Drain Connection Electrical Connection Start-Up Sequence Connecting to the application Tubing Lengths Normal Operation On Demand Gas Generator Cycling Unusual Operation Service Requirements Service Schedule Service Indication Stage 1 Stage 2 Service Indication Reset Peak Protected Cleaning Troubleshooting Page 2 3 3 4 5 5 5 6 7 8 9 10 11 12 13 13 14 14 15 15 16 17 18 19 19 20 20 20 20 21 21 22 22 22 22 23 24 25 Change History Rev 5 6 Comment Fittings Kit Update Name L. Couttie Date 27/08/2020 7 Heat Output Update Typo Correction L. Couttie L. Couttie 20/11/2020 26/11/2020 8 Curtain Flow Update L. Couttie 26/02/2021 9 Declarations Update L. Couttie 10/08/2021 10 SCIEX Updates L. Couttie 12/08/2021 11 Declarations Update L. Couttie 18/11/2021 How to use this Manual This manual is intended for end users and has been written as a reference document where you can skip to the relevant information. Users can refer to the contents page to find the relevant information. Review each of the following sections carefully. Thank you for selecting Peak Scientific to meet your gas generation needs, and should you require any further assistance or support do not hesitate to contact Peak Scientific or the Peak Partner from which you purchased your generator. Page 3 Warranties and Liabilities 1. The Company warrants that it has title to the Goods. 2. Subject to the provisions of this clause the Company warrants that the Goods shall comply in all material respects with any specification referred to in the Order Confirmation (as the same may be amended) and shall, subject thereto, be free from defects in material and workmanship for the lesser of a period of twelve months from the date of delivery or thirteen months from the date of dispatch from the factory. 3. Save as provided in this clause and except where the Goods are sold to a person dealing as a consumer (within the meaning of the Unfair Contract Terms Act 1977) all warranties, conditions or other terms implied by statute or common law are hereby expressly excluded save to the extent they may not be lawfully excluded. When the Goods are sold to a consumer within the meaning of the Unfair Contract Terms Act 1977 their statutory rights are not affected by the provisions of this clause. 4. In the event of the Customer making a claim in respect of any defect in terms of clause 2 hereof the Customer must. 1. Reasonably satisfy the Company that the Goods have been properly installed, commissioned, stored, serviced and used and without prejudice to the generality of the foregoing that any defect is not the direct or indirect result of lack of repair and/or servicing, incorrect repair and/or servicing, use of wrong materials and/or incorrect spare parts 2. Allow the company to inspect the Goods and/or any installation and any relevant packaging as and when reasonably required by the Company. 5. Subject to the Company being notified of any defect as is referred to in sub- clause 2 hereof within a reasonable time of it becoming apparent and subject always to the terms of sub-clause 4 hereof, the Company shall, in its option, replace or repair the defective Goods or refund a proportionate part of the Price. The Company shall have no further liability to the Customer (save as mentioned in sub-clause 6 hereof). 6. The Company shall be liable to indemnify the Customer in respect of any claim for death or personal injury to any person in so far as such is attributable to the negligence or breach of duty of the Company or any failure by the Company to comply with the provisions of sub-clause 2 hereof. 7. Save as provided in sub-clause 2 hereof the Company shall not be liable in respect of any claim by the Customer for costs, damages, loss or expenses (whether direct, indirect, consequential or otherwise) or indemnity in any respect howsoever arising including, but not by way of limitation, liability arising in negligence (other than pursuant to clause 6 above) that may be suffered by the Customer or any third party. Page 4 Safety Notices Peak Scientific Instruments cannot anticipate every possible circumstance which may represent a potential hazard. The warnings detailed within this manual refer to the most likely potential hazards, but by definition cannot be all inclusive. If the user employs an operating procedure, item of equipment or a method of working which is not specifically recommended by Peak Scientific, the user must ensure that the equipment will not be damaged or become hazardous to persons or property. Symbols This manual uses the following symbols to highlight specific areas important to the safe and proper use of the generator. WARNING A WARNING notice denotes a hazard. It calls attention to an operating procedure, process or similar, which if not correctly performed or adhered to, could cause personal injury or in the worst case death. Do not proceed beyond a WARNING notice until the indicated conditions are fully understood or met. CAUTION A CAUTION notice denotes a hazard. It calls attention to an operating procedure, process or similar, which if not correctly performed or adhered to, could cause damage to the generator or the application. Do not proceed beyond a CAUTION notice until the indicated conditions are fully understood or met. Caution, risk of electric shock. Ensure power to the generator has been removed before proceeding. Safety Notice to Users WARNING WARNING These instructions must be read thoroughly and understood before installation and operation of your Peak Generator. Use of the generator in a manner not specified by Peak Scientific MAY impair the SAFETY provided by the equipment. When handling, operating or carrying out any maintenance, personnel must employ safe engineering practices and observe all relevant local health and safety requirements and regulations. The attention of UK users is drawn to the Health and Safety at Work Act 1974, and the Institute of Electrical Engineers regulations. If the equipment is used in a manner not specified by the manufacturer, the protection provided by the equipment maybe impaired. WARNING Page 5 EU Declaration of Conformity We Peak Scientific Instruments Ltd. Of Fountain Crescent, Inchinnan, Renfrewshire, PA4 9RE Hereby declare that, this declaration of conformity is issued under the sole responsibility of the manufacturer. Equipment Type: Nitrogen Gas Generator Model Designator: Genius XE SCI 2 To which this declaration relates, is in conformity with the following applicable EU Directives, harmonized standards, and other normative requirements. • Low Voltage Directive 2014/35/EU EN 61010-1: 2010 Safety Requirements for Electrical Equipment for Measurement, Control and Laboratory Use. • Electromagnetic Compatibility Directive 2014/30/EU EN 61326-1: 2013 Electrical Equipment for Measurement, Control and Laboratory Use – EMC Requirements. (Class A) • Restriction on the use of certain hazardous substances in electronic equipment (RoHS) Directive 2011/65/EU as amended by EU 2015/863. • FCC 47 CFR Part 15 class A Unintentional radiators; Conducted and Radiated emissions limits. Signed for and on behalf of Peak Scientific by Signed: Name: Fraser Dunn Position: Design Engineering Manager Peak Scientific Instruments ltd, Inchinnan, Renfrew, Scotland, PA4 9RE, UK. Date: 10th August 2021 Page 6 UK Declaration of Conformity We Peak Scientific Instruments Ltd. Of Fountain Crescent, Inchinnan, Renfrewshire, PA4 9RE Hereby declare that, this declaration of conformity is issued under the sole responsibility of the manufacturer. Equipment Type: Nitrogen Gas Generator Model Designator: Genius XE SCI 2 To which this declaration relates, is in conformity with the following applicable UK Statutory Instruments, Standards and other normative requirements. • The Electrical Equipment (Safety) Regulations 2016 (SI 2016 / 1101) as amended. BS61010-1:2010 Safety Requirements for Electrical Equipment for Measurement Control and Laboratory Use. • The Electromagnetic Compatibility Regulations 2016 (SI 2016 / 1091) as amended. BS61326-1:2013 Electrical Equipment for Measurement , Control and Laboratory Use – EMC Requirements. • The Restriction of the Use of Certain Hazardous Substances in Electrical and Electronic Equipment Regulations 2012 (SI 2012 / 3032) as amended. Signed for and on behalf of Peak Scientific by Signed: Name: Fraser Dunn Position: Design Engineering Manager Peak Scientific Instruments ltd, Inchinnan, Renfrew, Scotland, PA4 9RE, UK. Date: 10th August 2021 Page 7 WEEE Compliance Statement The Waste Electrical and Electronic Equipment (WEEE) Regulations SI 2013 No 3113 and or the Waste Electrical and Electronic Equipment (WEEE) Directive 2012/19/EU apply to all electrical and electronic equipment placed on the market in the UK and EU covered by the scope of regulations which can be found in the Government Guidance Notes (PDF) produced by the Department for Business Innovation and skills for the UK and here for Europe. All PEAK products that are subject to the WEEE directive are compliant with the WEEE marking requirement. Such products are marked with the “crossed-out wheelie bin” symbol (shown below) in accordance with European standard EN50419. All old electrical equipment can be recycled. Please do not dispose of any electrical equipment (including those marked with this symbol) in general rubbish bins. Please contact your dealer or distributor for clarity. Page 8 CSA Compliance Statement CSA Group (Canadian Standards Authority) is a Nationally Recognised Testing Laboratory (NRTL), headquartered in Toronto Canada. They are authorised to evaluate product to both their own and Underwriters Laboratory (UL) standards and certify the product to be in compliance to the relevant standards. Peak products are certified to the current in force revision of the following standards in order to cover both Canadian and United States requirements for “Safety Requirements for Electrical Equipment for Measurement, Control and Laboratory use, Part 1: general Requirements”. Canada: CAN/CSA C22.2 No 61010-1-12 United States: UL 61010-1 As a result the products covered by this statement are certified and listed by CSA accordingly and are entitled to carry the CSA mark with both Canadian and United States subscripts , as shown below on the product rating label. Page 9 Technical Specification Environment Genius XE SCI 2 Minimum Operating Ambient Temperature 5°C (41°F) Maximum Operating Ambient Temperature 30°C (86°F) Maximum Altitude Maximum Relative Humidity 2000 m 80% Non-Condensing Minimum Storage Temperature* −20°C (−4°F) Maximum Storage Temperature* 60°C (140°F) *NOTE – Storage below 5°C (41°F) for long periods is not recommended. When taken out of storage the Generator should be allowed to acclimatize at room temperature for a minimum of 3 hours before operation. Generator Outlets Curtain Maximum Flow^ Up to 26L/min @ 4.14bar (0.91cfm @ 60psi) Source Maximum Flow^ Up to 32L/min @ 7.24bar (1.13cfm @ 105psi) Exhaust Maximum Flow^ Up to 25L/min @ 4.83bar (0.88cfm @ 70psi) Particles Phthalates Suspended Liquids Gas Outlets Drain Outlet <0.01µm NONE NONE 1 × 5/16" (nitrogen) 2 × ¼” BSPP (air) 1 × ¼” BSPP ^NOTE – These performance characteristics are valid only when paired with an SCIEX approved application. Refer to the appropriate application matrix for a list of supported products. Electrical Requirements Voltage Frequency Current Input Connection Power Cord Pollution Degree Installation / Over Voltage Category 220 - 240v ±10% 50/60 Hz 9A C20 Plug C19 socket to local connection (10A minimum) 2 II General Dimensions cm (inches) W × D × H Generator Weight Kg (lbs) Shipping Weight Kg (lbs) Maximum Heat Output Page 10 57 × 89.7 × 70 (22.4 × 35.3 × 27.6) 103 Kg (227 lbs) 150 Kg (331 lbs) 5545 BTU/hr Unpacking Although Peak Scientific takes every precaution with safe transit and packaging, it is advisable to fully inspect the unit for any sign of transit damage. Check ‘SHOCKWATCH’ and ‘TIP-N-TELL’ labels for signs of rough handling prior to unpacking. Any damage should be reported immediately to the carrier and Peak Scientific or the Peak Partner from where the unit was purchased. Follow the unpacking instructions posted on the side of the crate. It will require two people to remove the unit from the shipping crate and to manoeuvre the generator to the desired location. Save the product packaging for storage or future shipment of the generator. Note: Included with the generator is a “Fittings Kit” containing mains power leads for UK, EU & US and also all the required fittings and warranty registration card. Be careful not to discard these with the packaging. Page 11 Fittings Kit Contents Supplied in the Fittings Kit are all the fittings required to connect the generator to the application. The contents of the Fittings Kit are as follows: 1. 1/4” Teflon Tubing × 3m ×3 2. 5/16" Teflon Tubing × 3m ×1 3. 6mm PE Tubing × 3m× 1 4. 1/4” Compression Fitting× 3 5. 5/16” Compression Fitting× 1 6. 6mm Push-Fit Fitting × 1 7. Flow Control Silencer× 3 8. UK Mains Power Cable 230v ×1 9. EU Mains Power Cable 230v ×1 10. US Mains Power Cable 230v ×1 11. 9.4mm Hex Key× 1 All of the generators output ports are located on the output panel at the rear of the unit. Page 12 Installation Generator Environment The generator is designed for indoor use only. It should be installed adjacent to the application it is supplying. If this is not convenient then the unit can be sited elsewhere, however, consideration should be made of the lengths of pipe runs as pressure drops can result from extended runs of pipe. Performance of the generator is affected by ambient conditions. Note should also be taken to the proximity of Air Conditioning outlets. These can sometimes give rise to “pockets” of air with high relative humidity. Operation of the unit within such a pocket could adversely affect its performance. Consideration should also be given to the air flow around the unit. We recommended that an air gap of 100mm (3.9”) should be maintained down both sides and at the rear of the unit. Refer to the drawing on the following page for the general dimensions of the unit. Ensure Generator is situated in a well vetilated environment and is positioned to allow easy disconnection from the mains supply if required Minimum Operating Ambient Temperature: 5 °C (41 °F) Maximum Operating Ambient Temperature: 30 °C (86 °F) Page 13 Generator Overview General Dimensions 570 mm / 22.4” 897 mm / 35.3” 700 mm / 27.6" WARNING Page 14 The generator must always be placed on a flat, level surface. Failure to do so will affect the performance of the generator. Genius XE SCI 2 Rear Connections 1 2 3 4 5 6 1. IEC Power Inlet 2. Power Switch 3. Curtain Outlet 4. Source Outlet 5. Exhaust Outlet 6. Drain Outlet Ensure all inlets and outlets are connected to correct sources and applications WARNING All connections should only be carried out by trained personnel WARNING WARNING Unit Controls Page 15 Generator must be switched off and unplugged prior to any cleaning or maintenance operations Service LED (Yellow) Drain Connection Fit the 6mm push fit fitting to the drain port located on the output panel. Tighten using a 16mm or 5/8” spanner. Use the 6mm tubing to connect this to a suitable drain connection or container. It should be noted that the Generator can expel a considerable amount of water from this (dependant on ambient humidity). CAUTION Page 16 If a container is used it should be emptied at regular intervals. The container must NOT have an air tight seal as water and air are expelled at pressure. Electrical Connection Connect the generator to an appropriate single-phase supply, refer to the generator serial plate for input specification and ensure your supply matches the requirements. If an appropriate mains power cords is not supplied or a substitute one is used then ensure that all components of it the plug, cord and connector have adequate ratings for the generator and appropriate approvals for the country of use. Failure to do so could cause damage to the generator or risk overloading of the power cord WARNING This unit is classified as SAFETY CLASS 1. THIS UNIT MUST BE EARTHED. Before connecting the unit to the mains supply, check the information on the serial plate. The mains supply must be of the stated AC voltage and frequency. EARTH/GROUND (E):- Green & Yellow or Green LIVE (L):- Brown or Black Neutral (N):- Blue or White Electrical requirements are 220 - 240v ±10%. Running at voltages outwith this is not recommended. Extended periods at extremes can have a detrimental effect on the operation and life of the generator. If the equipment is used in a manner not specified by the manufacturer, the protection provided by the equipment maybe impaired. WARNING Page 17 Start-Up Sequence CAUTION Before the Generator is connected to the application, the Generator should be operated in isolation (i.e. not connected to the application) for thirty minutes. This is to ensure any impurities present are purged from the system. Failure to do this may harm the application. Once this is done, the Generator can be re-connected to the mains and switched on. Pressure will start to build in the internal storage tanks. Once this pressure is reached, the compressors will continue to run until the internal tank upper pressure limit is reached and the compressor has run for a period of at least two minutes. The compressors will then rest until the internal tank lower pressure limits is reached. Once this limit is reached the compressors will switch back on again. This compressor cycling is normal and will continue throughout the operation of the Generator. When the system has been operated for a period of 45 minutes, all the internal pipework and storage tanks will have been purged with nitrogen. The Generator is now purged and the tubes can be connected at the rear of the unit. Page 18 Connecting to the application Once the initial purge run of 45 minutes has completed, and the generator has been running for 15 mins, (required to reach purity for the application) it is ready to be connected to the application(s) The pressure in the internal storage tanks must be allowed to dissipate before connecting the generator to the application(s) CAUTION Attach the ¼” compression fittings to the outlets of the generator. Using the ¼” tubing supplied, connect the outlets of the generator to the inlets on the application. If you require more tubing than is supplied refer to the Tubing Lengths section. CAUTION Once the tubing is connected to the application, ensure that it is thoroughly checked for being leak-tight. Even the slightest leak in the gas supply between the generator and the application can lead to a reduction in efficiency. Tubing Lengths CAUTION The diameter of the tubing which will be connected to the gas outlets is important and is determined by the length of tubing required. Failure to follow these recommendations could lead to pressure between generator and application. < 10 meters: Use minimum ¼”/3⁄16” (¼” O/D, 3⁄16” I/D) P.T.F.E. tubing. > 10 - 40 meters: Use 3⁄8”/ 5⁄16” (3⁄8” O/D, 5⁄16” I/D). Tubing and fittings not supplied in the fittings kit. > 40 metres: Contact Peak Scientific with the relevant distance and we will calculate the flow resistance and the tubing size required. A combination of ¼”/3⁄16” and 3⁄8”/5⁄16” tubing may be used to ensure that there is no large diameter tubing within the lab (i.e. for the first 20 meters from the generator use 3⁄8”/5⁄16” and the final 10 meters to the application use ¼”/3⁄16” tubing). Keep the connections and bends to a minimum. Page 19 Normal Operation The generator is designed specifically to minimize operator involvement. Given that the system is installed as described in earlier sections and is serviced in accordance with the specified maintenance recommendations (refer to Service Requirements), then it should simply be a matter of turning the generator on when it is required. The generator will automatically produce the factory set flow and pressure as detailed in the Technical Specifications. On Demand Gas When the application requires a gas flow, the generator will produce gas on demand. The generator will continue to supply gas whilst the application is in a ‘Standby’ mode. As soon as a demand is detected from the application, the generator will match the applications requirements. Generator Cycling The generator is designed to operate in either a cyclic mode or run continuously, this will be dependent on the output flow. The cyclic rate of the compressors will depend on the gas demand of the application; the generator will cycle when the upper tank pressure set limits are achieved within a 3-minute time period. When the application demands increase, the compressor duty will be higher and the rest period of the compressor cycle will be shorter. If operated at maximum flow, the generator will run continuously to maintain the upper tank pressures. Another cause for continuous operation would be if the generator is installed at high altitude, in an extreme environment or subjected to low voltage supply. The compressors will undergo periods where they do not cycle. Unusual Operation If at any time the generator begins to emit excessive noise or vibration, then it should be switched off and you should contact Peak Scientific or the Peak Partner from which the generator has been purchased. Page 20 Service Requirements Service Schedule Purchase Interval Component Visit 12 Months Genius XE SCI 2 Annual Maintenance Kit* www.peakscientific.com/ordering 4 Years Genius XE SCI 2 Year 4 Service Kit* www.peakscientific.com/ordering * Quote your generator serial number when ordering your Maintenance Kit to ensure selection of the appropriate kit for your generator. Page 21 Service Indication The generator has the following Service Indication Stages:- Stage 1 Once either compressor requires a service the LED indicator (yellow) on the front of the generator will illuminate. This is to make the user aware that a service of the generator is due and should be planned at the earliest convenience. The generator will continue to operate as normal with the LED on. Stage 2 If the service is not completed the generator will continue to run. After 4 weeks, the service LED indicator (yellow) will start to flash. This is to make the user aware that the service of the generator is now overdue and must be completed immediately to ensure the continuous trouble free operation of the generator. Service Indication Reset Once the service has been completed the Service Indication LED can be reset in the main control PCB. This will be performed by the Peak Service Engineer or trained service representative that completes the service operation. Page 22 Peak Protected With Peak Scientific you invest in not only a product but peace of mind. With a network of certified Peak engineers stationed throughout the globe, Peak’s rapid response team are never far away and our commitment is to keep your generator running day in, day out, protecting your laboratory workflow. [Peak Protected] can provide… Installation A dedicated Peak engineer will visit your lab to install and setup your generator IQ/OQ Certified assurance for applications requiring documented qualification Complete plan Swift response by a Peak Service Engineer within 72 hours & planned preventative maintenance Spares Genuine Peak parts with express delivery, ensuring optimal performance and lifetime Premium Protected Guaranteed rapid on-site response within 24 hours & planned preventative maintenance Technical Support Hotline Around the clock support by phone or online with our global technical helpdesk To find out more about protecting your investment visit: www.peakscientific.com/protected Page 23 Cleaning Clean the outside of the generator only using warm soapy water and a clean damp cloth. Ensure all excess fluid is thoroughly removed from the cloth prior to use. Cleaning should only be undertaken with the power switched off and the power cord removed from the rear of the generator. CAUTION Under no circumstances should any solvents or abrasive cleaning solutions be used as these can contain fumes that could be harmful to the generator. Care should be taken with Leak Detections Liquids. CAUTION Page 24 Troubleshooting Problem Possible Solution • Ensure power cord is plugged into the Generator and that the power socket is turned on. • Check the fuse in the power cord plug. • Contact your service provider. Compressors are running but pressure is not building. • Contact your service provider. The mass spec is reporting low pressure. • Contact your service provider. • A compressor(s) due for service. Contact your service provider. • Refer to Service Indication section of this manual for further information. • The generator is due for service. Contact your service provider. • A compressor(s) has not cycled for 8 hours. • Ensure ambient temperatures are within the specification. The Generator will not switch on and the power switch does not illuminate. Yellow “SERVICE” LED on front panel is on constantly. Yellow “SERVICE” LED on front panel is flashing. Page 25 Go Online or Complete and Return We know that registering any of your recently purchased products is not the first thing on your mind- but it is very important to both of us. Not all warranties are alike and Peak Scientific stand out against other gas suppliers as we offer a comprehensive, quick response, on-site warranty. This means that in the very unlikely case that your gas generator develops a fault we have rapid support teams on-hand around the world who are able to come to your lab and get you back up and running in no time. Register for your comprehensive 12 month on-site warranty with ease online at www.peakscientific.com/protected. Alternatively, you can send the completed form to Peak Scientific by post or email at [email protected]. Go Online or Complete and Return You can register for your FREE 12 month Warranty with ease online at www.peakscientific/protected. Alternatively, you can send the completed form to Peak Scientific by post or email at [email protected]. Product Warranty Registration Contact name Email address Company Address City/town Postcode Country Telephone Generator serial # Model type Installation date Do you still use an alternative gas solution i.e. cylinders or bulk liquid? Yes What gas requirements do you have in your lab? Hydrogen No Nitrogen Zero Air Extend your cover with Peak Scientific offer comprehensive gas generator after sales support packages. Peak [Protected] aftercare support can guarantee an on-site response within 72 hours*, genuine parts from our ISO9001 approved factory and a 95% first-time fix rate. See our enclosed Peak [Protected] leaflet for further information. Important! You have 1 month to register your Peak Scientific product from the date of installation. Once registered the warranty will be honoured for a period of 12 months. If you wish to defer the installation of your generator, you must notify Peak Scientific immediately by emailing [email protected]. For generators that remain unregistered after 1 month from the shipment date, the warranty will be considered active from the date of factory dispatch. * Complete Plan only Important! You have 1 month to register your Peak Scientific product from the date of installation. Once registered the warranty will be honoured for a period of 12 months. If you wish to defer the installation of your generator, you must notify Peak Scientific immediately by emailing [email protected]. For generators that remain unregistered after 1 month from the shipment date, the warranty will be considered active from the date of factory dispatch. Page 26 Page 27 Page 28 Peak Scientific has highly trained, fully certified Field Service Engineers located in over 20 countries across every continent around the world. This allows us to provide an industry-leading rapid response service to our customers. With [Peak Protected], your laboratory’s productivity becomes our top priority. To discuss Peak Protected generator cover and payment options speak to your local Peak Representative or for further information contact: [email protected] Peak Scientific Fountain Crescent Inchinnan Business Park Inchinnan PA4 9RE Scotland, UK Tel: +44 141 812 8100 Fax: +44 141 812 8200 For further information on any of our generator products please contact [email protected] Genius XE SCI 2 User Manual Rev 11 RSID 3607 EN November 2021 ">
Advertisement
Key features
- Automatic operation
- On-demand gas production
- High-purity nitrogen
- Service indication system
- Low maintenance
- Compact design
- Easy installation
- Various outputs
- Compressor cycling
Frequently asked questions
Once the generator is purged, connect the ¼” compression fittings on the generator outlets to the application inlets using the ¼” tubing supplied. Ensure the connections are leak-tight.
For distances less than 10 meters, use ¼”/3⁄16” P.T.F.E. tubing. For 10-40 meters, use 3⁄8”/ 5⁄16” tubing. For distances over 40 meters, contact Peak Scientific for assistance.
This indicates that the generator requires immediate service. Contact your service provider for assistance.