SolaX Power X1-Fit-5.0C is a versatile hybrid inverter that can be used in various setups, maximizing your energy independence. With its ability to handle up to 5kW of solar power, store excess energy in batteries, and seamlessly switch to backup power during grid outages, the X1-Fit-5.0C ensures reliable and efficient energy management for your home or business.
Advertisement
Advertisement
Mounting Steps
Mark position of four holes.
Drill holes with φ 10 drill. Depth : at least 60mm .
Tighten the expansion tubes. Screw the expansion screws .
375.0mm
Match the inverter with the bracket.
Quick Installation Guide
X1 Retro Fit 3.7KW-5.0KW
- Screw the set screw on the left-bottom
of inverter tightly.
- If necessary, costomer can install an anti-theft lock on the left-bottom of the inverter.
Overview of Mounting
Packing List
Inverter x1 Bracket x1
Expansion tubes x4
Expansion screws x4
Battery connectors
(positive x1, negative x1)
Version I Version E&C
AC terminal x8 *
Ring terminal (external) x1
Ring terminal (internal) x1
Gasket x1
Grounding nut x1
Set screw(for mounting) x1
User manual x1
Warranty card x1
Quick installation guide x1
Meter x1
Wifi module(optional) x1 Smart Plug(optional) x1
AC terminal x8 *: 4 6AWG AC terminals and 4 10AWG AC terminals for Version I
4 10AWG AC terminals and 4 8AWG AC terminals for Version E and Version C
I
EPS Connection(for I version and E version )
EPS wiring diagram
I Version inverter : EPS function can be only be achieved automatically .
Do not required for Changeover Switch.
I Version Auto Do not required for Changeover Switch
I Version
RCMB wired by manufactor required for installation
+
Battery
L I I L
-
EPS AC
EPS breaker: ≥ 32A
RCD: type A RCD
L
EPS Load
RCD
Load
L
N
PE
N BAR
E BAR
EPS connection steps:
1. Make wires( EPS cable size: refer to the table below)
12mm
60mm
12mm
I Version
60mm
E Version
Model
EPS Cable
EPS breaker
X1-Fit-3.7E
X1-Fit-3.7I
X1-Fit-3.7C
≥ 5mm ²
25A
X1-Fit-4.6E
X1-Fit-4.6I
X1-Fit-4.6C
≥ 5mm ²
32A
X1-Fit-5.0E
X1-Fit-5.0I
X1-Fit-5.0C
≥ 5mm ²
32A table. Cable and Micro-breaker recommended
E Version inverter : EPS function can be achieved manually or automatically.
E Version Manual Required for Changeover Switch
EPS
E Version
RCMB
L PE
EPS breaker:
≥
32A changeover device( DPDT )
RCD: type A RCD
L
EPS Load
L
+
-
AC
RCD
Load wired by manufactor required for installation
Battery
L
N
PE
E BAR
2. Insert EPS cable into EPS port through screw cap.
E Version Auto Required for Changeover Switch
EPS
E Version
RCMB
L PE L
+
-
AC wired by manufactor required for installation
Battery
EPS breaker: ≥ 32A
Contactor Device
RCD: type A
Contactor
RCD
L
EPS Load
RCD
Load
L
N
PE
E BAR
Please contact our sales for any compatible contactor purchase requirement .
L N I
L N
PE
I Version E Version
Note: The black cable( the I
port ) has been wired
during the manufactory.
Note: Connect PE wire into
PE port .
AC Connection
AC connection steps( AC cable size : refer to table1&table2):
12mm
60mm
1.Remove the top down cover.
2. Make AC wires.
X N
L
Note: wire
N on o enduser!
need the X to connect port by
E Version
I N
L
Note: I port has been wired during the manufactory.
3 .
Insert AC cable into AC port
through screw cap .
4. Connect the wire to the AC terminal in the inverter.
Model
Cable
Micro-breaker
X1-Fit-3.7-E
X1-Fit-3.7-C
4-5mm ²
X1-Fit-4.6-E
X1-Fit-4.6-C
5-6mm ²
20A 32A table1. E Version & C Version
X1-Fit-5.0-E
X1-Fit-5.0-C
5-6mm ²
32A
Model
Cable
Micro-breaker
X1-Fit-3.7-I
8-10mm ²
50A
X1-Fit-4.6-I
10-13mm ²
63A table2. I Version
X1-Fit-5.0-I
10-13mm ²
63A
I Version a .
L-wire,N-wire connection b .
PE wire connection
Battery Connection
Battery connection diagram
OFF
ON
+
PV1
-
+
-
PV2 BAT
+
current of
b reaker > 32A
Nonpolarized
DC breaker
Power connection
Communication connection
Battery breaker
Before connecting to battey, please install a nonpolarized DC breaker to make sure inverter can be securely disconnected during maintanance.
Model
Voltage
Current[A]
X1-Fit-3.7E
X1-Fit-3.7I
X1-Fit-3.7C
X1-Fit-4.6E
X1-Fit-4.6I
X1-Fit-4.6C
X1-Fit-5.0E
X1-Fit-5.0I
X1-Fit-5.0C
Nominal voltage of DC breaker should be larger than maximum voltage of battery.
32A
-
+
CAN/ RS485 high-voltage lithium battery
BMS PIN De nition
Communication interface bewteen inverter and battery is RS485 or CAN with a RJ45 connector.
1
PIN 1
CAN Definition X
8 Rs485 Definition X
2
GND
X
3
X BMS_CANH BMS_CANL
X
4
X
5
X
6
X
7
X
8
X
GND BMS_485A BMS_485B
When using RS485 protocol, please note that PIN2 must be disconnected.
A :Power Connection Steps:
Press down spring until it clicks audibly into place
wire strands
The ne wire strands must be seen in the champer
B :Communication Connection Steps:
Step1: Disassemble the BMS/Meter cable gland.
The seal is used for waterproof. Please make sure it has been kept back.
Step2: Prepare a communication cable(without sheath)and insert the communication cable through the cable nut.
Step3: Assemble the cable gland and
screw the cable nut.
Step 4 : Insert one Rj45 side of the cable into
BMS port inside of inverter and the other side into R S 485 or Can port of the battery.
Earth Connection & Start Inverter
Earth Connection Steps( mandatory ):
Cable size: 12AWG.
OFF
ON
+
PV1
-
+
PV2
-
BAT
+
ring terminal
Start inverter
Inverter
+ -
SolaX meter
Main switch
PE
Battery
DPDT
RCD RCD
E BAR
EPS
Load
Check the inverter is fixed well on the wall.
Make sure all the AC wirings are completed.
Make sure the meter is connected well.
Make sure the battery is connected well.
Make sure the external EPS contactor is connected well. (if needed)
Turn on the AC switch, EPS switch and battery switch.
Press the “Enter” key for five seconds to exit Off Mode.(The mode is factory defaulted as Off Mode)
Inverter will start up automatically when the battery is dicharging.
Check the status of indicators and LCD screen. The left indicator should be blue and the indicator screen should display the main interface.
Meter connection diagram
OFF
ON
-
+
PV1
+
-
PV2 BAT
+
-
Electrical grid
Home Electric meter,
L
Single phase
meter
N
Meter connection
Load
Meter PIN Definition
Communication interface bewteen inverter and meter is
RS485 with a RJ45 connector.
1
8
1
X
2
X
3
X
4
485A
5
485B
6
X
7
X
8
X
Meter Connection
Meter connection steps:
Step1. Disassemble the BMS/Meter cable gland.
Step2. Prepare a communication cable(without sheath) and insert the communication cable through the cable nut.
Step3. Assemble the cable gland and screw the cable nut.
The seal is used for waterproof. Please make sure it has been kept back.
Step4 . Insert one side of
Rj45 cable into Meter port inside of the inverter and the other side into RS485 port of the meter.
Meter
Meter Port: The first RJ45 port from right side
Firmware Upgrading
Preparation
Please ensure the inverter is steadily powered on.
Inverter must connect PV panels and keep the battery on through whole procedure of upgrading.
Please prepare a PC and an U-disk.
Warning!
Make sure the PV input power is more than 150V (operate the upgrade on a sunny day) , otherwise it may result in serious failing during upgrading.If the upgrading is broken off during operation, please ensure the inverter is steadily powered on and reinsert the U-disk.
Upgrading Steps:
Step1. Please contact our service support to get the update les, and extract it into your U-disk as follow:
“update\ARM\618.00050.00_Hybrid_X1G3_Manager_VX.XX_XX-XX.usb”;
“update\DSP\618.00084.00_Hybrid_X1G3_Master_VX.XX_XXXXXXXX”;
(Note: Vx.xx is version number, xxxxxxxx is le complation date. Don’t modify the program le name, or it may cause that the inverter can’t work anymore!)
Step2.
Press the “Enter” key for 5 seconds to enter Off Mode. Then unscrew the waterproof lid and insert U-disk into the “upgrade” port at the bottom of the inverter.
Step3.
The LCD will be shown as the picture below. Then press up and down to select the one that you want to upgrade and press “OK” to confirm to upgrade.
Update Update(DSP)
>ARM
DSP
Updating---------25%
Step4.
After the upgrade is finished, the LCD will display “succeed”(only for DSP upgrades), please remember to pull off the U-disk, screw the waterproof lid and press the “Esc” to return to the Main interface. Then press the “Enter” key to exit Off Mode.
1.Set language
Language
English
Deutsch
Italian
Start Guide
2.Set date time
Date time
2017 ->06 <-06
10:19
3.Set the safety standard
Safety
Country
VDE0126
4.Set export control
Use Value:
10000W
This function allows the inverter able to control energy exported to the grid.
There are user value and factory value. The factory value is default which can not be charged by user. The user value setting by installer must be less than the factory value.
5.Set work mode
There are 5 work modes for choice.
· Self use/
· Remote Contol/
· Back Up Mode/
· Feed in Priority/
· Force Time Use/
Work Mode
>Mode Select
self use
Parameter
Self Use
(default)
Remote Contol
Comment
The external generator generated power will be used to supply the local loads firstly, then to charge the battery. The redundant power will export to the public grid.
When there is no external generator supplied, battery will discharge for local loads firstly, and grid will supply power when the battery capacity is not enough.
It allows external control device to make the inverters remote cluster control through LAN port on the inverter in this work mode.
Back Up Mode
Battery will stop discharing to keep higher capacity when the grid is on. Only when the gird is off and the power generated is not enough, battery will start to discharge to keep the emergency load working normally.
This work mode applies to the area where suffering from blackout regularly.
Feed in Priority
Force Time Use
The priority of inverter output power is: feeding to the grid supplying the load charging the battery.
This work mode applies to the area with high feed-in tariff.
In this work mode the charging and discharging time can be set flexibly, and it also allows to choose whether charge from the grid or not.
6.Set EPS system(For E & I Version only)
EPS system
> Mute: No
Frequency: 50Hz
X1-Retro Fit inverter with E Version and I Version can work on the EPS mode.
EPS parameters can be set as below.
- “Mute”means you can set the warning of system which has entered EPS mode.
- ”No”means there will be a buzzing and it is the default value.
- ”Yes”means you choose to shut down the warning function.
Besides ,if the buzzing is sharp, it means EPS output is over loads.
“Frequency “here can be set 50Hz or 60Hz please based on correlative loads.
7.Set relay control(This function is being developed)
Relay Control
>Relay1 Setting
>Relay2 Setting
Relay Control is an optional function which can control designated load intelligently by consuming the surplus energy when feed in power reaches certain value.
This function can only be achieved with solax product “Smart Plug”.
For specific operation, please refer to “ Smart Plug user manual”.
Monitoring Operation
Solax provides two ways for users to choose: WiFi(optinal) and Ethernet(LAN)
WiFi(optinal)
Inverter provides a Wifi port which can collect data from inverter and transmit it to monitoring-website via a Pocket WiFi.
(Purchase the product from supplier if needed)
Diagram
Could
Router
WiFi Connection Steps:
Step1.
Plug Pocket Wifi into “WiFi” port at the bottom of the inverter.
Step2. Build the connection between the inverter and router.
Step3. Create an user account online.( Please check the Pocket WiFi user
manual for more details.)
Ethernet(LAN)
LAN communication is the standard communication interface. It can transmit the data between the router and inverter via the local network.
Application Occasion
This function is appliable for the below situation:
When the wifi signal is too weak to transmit data,user can
use LAN port for the monitoring with a data cable.
Note: The wifi module still needs to be connected
when using LAN connection.
LAN PIN Definition
Communication interface bewteen inverter and router is RS485
with a RJ45 connector.
Could 1 1
8
TX+
2 3
TXRX+
4
X
5
X
6
RX-
7
X
8
X data cable
Router
LAN Connection Steps:
Please refer to BMS connection steps (for user manual page32) for LAN connection. Please kindly noted the PIN definition and port position will be slightly different.
LAN
LAN/DRM Port LAN Port: The Fourth RJ45 port from right side
614 .