LIGHTNING PROTECTION INTERNATIONAL PTY LTD
www.lpi.com.au
ABN 11 099 190 897
STORMASTER ESE INSTALLATION MANUAL
As a result of continuing research and product development in the area of lightning and lightning protection, LPI reserves the right to alter any detail contained within at any time without notice.
Prior to installation of the Stormaster ESE system, installers should check with LPI or an authorised distributor to confirm they have the most recent version of the Stormaster
ESE Installation manual.
It should be noted that 100% (100 percent) protection level for direct lightning strikes is not possible and cannot be provided due to the lightning discharge process being a natural atmospheric event.
Stormaster ESE Lightning Protection System
System Owner:_____________________________________________________
Date Installed:_____________________________________________________
Installation Contractor:______________________________________________
Supplied by:_______________________________________________________
Location of Installation
:____________________________________
________
Lightning Protection International Pty Ltd
ABN 11 099 190 897
PO Box 379 Kingston, Tasmania, Australia 7051
Phone: +61 3 62271955
Fax: +61 3 62291900
Email: [email protected]
Web: www.lpi.com.au
Lightning Protection International Pty Ltd
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
1
Contents
Protection Performance
Warranty
Lightning Protection
General Safety Guidelines
Recommended Installation Method
Checking Lightning Protection
Components Supplied
3
4
4
5
5
13
LPI Stormaster ESE Installation 13
Installation of the Lightning Earth 14
Ground Resistance Lowering Compounds 16
Bonding the Lightning Earth
Labelling
16
16
Installation of the HVSC Downconductor 16
Hauling the HVSC Downconductor 17
HVSC Downconductor clearance holes 18
Routing 19
21 Fixing the HVSC Downconductor
Installation of Conventional
Downconductors 21
Installation of Stormaster GI Terminal to threaded pipe 23
Termination of the HVSC Lower End
Lower Termination of Conventional
Downconductor to the Lightning Earth
25
28
Termination of the HVSC Upper End 29
Connection of Factory Pre-Terminated HVSC
(Upper End) to Stormaster Terminal 35
Labelling 35
Masts
Types of Mast Configurations
Mast Bases
Mast Couplings and Guying Points
Guying
Preparation for raising the Mast into position
Raising of the Mast
Lightning Strike Recorder (LSR1)
Certification
Operation and Maintenance
Testing the Stormaster Terminal
Testing the Lightning Earth and the
HVSC Downconductor
44
44
45
40
40
42
36
36
37
38
39
45
2
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
h = height of Stormaster terminal above area to be protected (m)
Protection Level 1 (High Protection)
Stormaster 15
Stormaster 30
Stormaster 50
Stormaster 60
Protection Level 2 (Medium Protection)
Stormaster 15
Stormaster 30
Stormaster 50
Stormaster 60
Protection Level 3 (Standard Protection)
Stormaster 15
Stormaster 30
Stormaster 50
Stormaster 60
PROTECTION RADIUS (M) - (Rp)
2 4 5 6 10 15 20 45 60
13 25 32
19 28 48
28 55 68
32 64 79
18 36 45
25 50 63
35 69 86
40 78 97
32 33
48 49
69 69
79 79
46 49
64 66
87 88
97 99
34 35 35 35
50 50 50 50
70 70 70 70
80 80 80 80
52 55 60 60
68 71 75 75
90 92 95 95
101 102 105 105
20 41 51
28 57 71
52 56
72 75
60 63 73 75
77 81 89 90
38 76 95 96 98 100 102 110 110
44 87 107 107 109 111 113 120 120
Protection Performance
The protection radius (Rp) of a Stormaster ESE terminal is calculated using the following formula as defined by the French National Standard
NF C 17-102 (July 1995).
Rp = √ h(2D-h) + ∆ T(2D + ∆ T) for ≥ 5m where:
The following key parameters determine the calculation of RP.
• ∆ T as established during the test.
Stormaster-ESE-15 = ∆ T (µs) 15
Stormaster-ESE-30 = ∆ T (µs) 30
Stormaster-ESE-50 = ∆ T (µs) 50
Stormaster-ESE-60 = ∆ T (µs) 60
• h = actual height of Stormaster terminal above the area to be protected (m).
• D (in m) depends on the selected level of protection, protection levels are specified in annex B of the standard NF C 17-102.
D = 20m for protection level 1 (High Protection)
D = 45m for protection level 2 (Medium protection)
D = 60m for protection level 3 (Standard protection)
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
3
Warranty
LPI’s Stormaster ESE terminals are guaranteed against defects in materials and workmanship for a period of 5 years from the original sales date when it was purchased from LPI or one of its authorised distributors.
The warranty is limited to the ex factory cost of replacement of equipment providing it has been installed and or certified by LPI or its distributor. All other costs such as freight, re-installation, loss of profit, insurance premiums are not included.
Responsibility for other direct or indirect damages or death is also specifically excluded from the warranty.
The range of Stormaster ESE terminals (or to our knowledge any other lightning protection system) cannot provide 100% protection and therefore it is not inferred.
As confirmation of the above paragraph we refer to French Standard NF C 17-102.
Lightning Protection
Comments on the French Standard NF C 17-102.
We refer to the section in the standard titled “foreward” where it states the following:
“As in the case with anything related to the natural elements, a lightning protection system designed and installed in accordance with the standard, cannot guarantee absolute protection to structures, persons or objects: however , applying this standard will significantly reduce the risk of protected structures being damaged by lightning.”
The LPI Stormaster ESE Terminal should only be installed during storm free periods.
Figure 1.
4
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
General Safety Guidelines
• Ensure safe working environments and practices to local codes.
• Use of personal protective equipment during installation.
• Use mechanical methods of raising and installing masts over 6m.
• Cordon off area below installation point.
• Check for overhead powerlines or any other obstructions before lifting or raising.
• Ensure enough man power to safely conduct all aspects of installation.
• The installation must conform to all relevant local standards and regulations.
Recommended Installation Method
To assist in the installation of the Stormaster ESE terminal and accessories, refer to drawings
STA-01, STA-02, STA-03, STA-04, STA-05, STA-06 and HVS-1 as illustrated on pages 6 to 12.
1. Installation of the lightning earth.
2. Installation of the HVSC Downconductor.
3. Lower termination of the HVSC Downconductor and connection to the lightning earth.
4. Upper termination of the HVSC Downconductor and connection to the Stormaster ESE terminal.
5. Preparation and raising of the mast into position.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
5
IMPORTANT:
Stormaster ESE terminal to be a minimum of 2 metres above the highest point of the building.
Recommended clearance height = 5 metres.
BUILDING
LPI STORMASTER ESE TERMINAL
STORMASTER-ESE-50
STORMASTER-ESE-60
LPI UPPER TERMINATION KIT ORDERING CODE: UTERMKIT-Mk2
LPI FRP SUPPORT MAST
LPI INLINE COUPLING ORDERING CODE:ILCOUPLING
LPI GUY KIT ORDERING CODE: GUYKIT-4M
GUYKIT-4M-SS
GUYKIT-7M
GUYKIT-7M-SS
LPI CABLE TIES
LPI HIGH VOLTAGE SHIELDED CABLE ORDERING CODE: HVSC-PM
LPI LOWER MAST ASSEMBLY WITH BASE ORDERING CODE: ALUMB-3M
ALUMB-4M
ALUMB-5M
ALUMB-6M
LPI SADDLES AND FIXINGS ORDERING CODE: SAD/FIX
LPI HIGH VOLTAGE SHIELDED CABLE
LPI GROUND RESISTANCE
IMPROVEMENT POWDER
ORDERING CODE: GRIP-10
Figure 2.
6
Drawn
John Davey
Date
9/4/2008
Scale
NTS
Version
V1.00
LPI LIGHTNING STRIKE RECORDER ORDERING CODE: LSR1
LPI LOWER TERMINATION KIT ORDERING CODE: LTERMKIT
LPI INSPECTION PIT
LPI EARTHING SYSTEM
TYPICAL PRODUCTS REQUIRED FOR RADIAL
LP EARTH
4 X CBER458
4 X RTC1625A
1 X EPIT-P
1 X GRIP-10
30 X CT253
Lightning Protection International Pty Ltd
Title Stormaster ESE terminal assembly component details
File
ESE Installation Type 1.dwg
STA-01
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
LPI UPPER TERMINATION KIT ORDERING CODE: UTERMKIT-Mk2
LPI FRP SUPPORT MAST ORDERING CODE: FRP-2M
FRP-3M
LPI INLINE COUPLING ORDERING CODE: ILCOUPLING
IMPORTANT:
One third of the mast height must be securely fixed to the structure.
Stormaster ESE terminal to be a minimum of 2 metres above the highest point of the building.
Recommended clearance height = 5 metres.
LPI CABLE TIES
LPI HIGH VOLTAGE SHIELDED CABLE ORDERING CODE: HVSC-PM
LPI LOWER MAST ASSEMBLY ORDERING CODE: ALUM-3M
ALUM-4M
ALUM-5M
ALUM-6M
LPI SADDLES FOR CANTILEVERING MAST
(3 PER SET)
ORDERING CODE:CANTSAD
EXISTING STRUCTURE
LPI SADDLES AND FIXINGS ORDERING CODE: SAD/FIX
LPI LIGHTNING STRIKE RECORDER ORDERING CODE: LSR1
LPI HIGH VOLTAGE SHIELDED CABLE
Drawn
Date
Scale
TYPICAL PRODUCTS REQUIRED FOR
RADIAL LP EARTH
4 X CBER458
4 X RTC1625A
1 X EPIT-P
1 X GRIP-10
30 X CT253
John Davey
9/4/2008
NTS
Version
V1.00
LPI LOWER
TERMINATION KIT
LPI INSPECTION PIT
ORDERING CODE: LTERMKIT
LPI EARTHING SYSTEM
LPI GROUND RESISTANCE IMPROVEMENT COMPOUND ORDERING CODE: GRIP-10
Lightning Protection International Pty Ltd
Title Stormaster ESE terminal assembly component details
File
ESE Installation Type 2.dwg
STA-02
Figure 3.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
7
LPI STORMASTER ESE TERMINAL
LPI UPPER TERMINATION KIT ORDERING CODE:
STORMASTER-ESE-60
UTERMKIT-Mk2
LPI FRP SUPPORT MAST
LPI INLINE COUPLING ORDERING CODE: ILCOUPLING
IMPORTANT:
One third of the mast height must be securely fixed to the structure.
Stormaster ESE terminal to be a minimum of 2 metres above the highest point of the building.
Recommended clearance height = 5 metres.
LPI CABLE TIES
LPI HIGH VOLTAGE SHIELDED CABLE ORDERING CODE:HVSC-PM
LPI LOWER MAST ASSEMBLY
ALUM-4M
ALUM-5M
ALUM-6M
LPI U-BOLT
(2 PER SET)
ORDERING CODE: U-BOLT
TYPICAL TOWER
Figure 4.
8
TYPICAL PRODUCTS REQUIRED FOR
RADIAL LP EARTH
4 X CBER458
4 X RTC1625A
1 X EPIT-P
1 X GRIP-10
30 X CT253
Drawn
John Davey
Date
9/4/2008
Scale
NTS
Version
V1.00
LPI BEAM AND CLAMP SUPPORT ORDERING CODE:BEAM CLAMP/CABLE
SUPPORT-HVSC
LPI LIGHTNING STRIKE RECORDER ORDERING CODE: LSR1
LPI HIGH VOLTAGE SHIELDED CABLE
LPI LOWER
TERMINATION KIT ORDERING CODE:LTERMKIT
LPI INSPECTION PIT ORDERING CODE: EPIT-P
EPIT-C
LPI EARTHING SYSTEM
LPI GROUND RESISTANCE IMPROVEMENT POWDER ORDERING CODE: GRIP-10
Lightning Protection International Pty Ltd
Title Stormaster ESE terminal assembly component details
File
ESE Installation Type 3.dwg
STA-03
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
GUY WHERE
NECESSARY
LPI STORMASTER ESE TERMINAL
STORMASTER-ESE-30
STORMASTER-ESE-50
STORMASTER-ESE-60
LPI UPPER TERMINATION KIT ORDERING CODE: UTERMKIT-Mk2
LPI GUY RING ORDERING CODE:GUY RING
LPI FRP SUPPORT MAST ORDERING CODE:FRP-2M
FRP-3M
FRP-4M
FRP-4.6M
LPI INLINE COUPLING ORDERING CODE:ILCOUPLING
IMPORTANT:
Stormaster ESE terminal to be a minimum of 2 metres above the highest point of the building.
Recommended clearance height = 5 metres.
LPI CABLE TIES ORDERING CODE: S/S-CABTIES-STD
S/S-CABTIES-LONG
LPI GUY KIT
GUYKIT-7M
GUYKIT-7M-SS
DO NOT OVER TENSION GUY WIRES
(SLIGHTLY SAGGING)
LPI HIGH VOLTAGE SHIELDED CABLE ORDERING CODE:HVSC-PM
LPI LIGHTNING STRIKE RECORDER ORDERING CODE:LSR1
PREFERRED ANGLE
60-45 DEGREES
60
-45
LPI LOWER MAST ASSEMBLY
WITH BASE
ORDERING CODE: ALUMB-3M
ALUMB-4M
ALUMB-5M
ALUMB-6M
Drawn
John Davey
Date
9/4/2008
Scale
NTS
LPI GROUND RESISTANCE
IMPROVEMENT POWDER
ORDERING CODE:GRIP-10
LPI LOWER
TERMINATION KIT ORDERING CODE: LTERMKIT
LPI INSPECTION PIT ORDERING CODE:EPIT-P
EPIT-C
LPI EARTHING SYSTEM
TYPICAL PRODUCTS REQUIRED FOR
RADIAL LP EARTH
4 X CBER458
4 X RTC1625A
1 X EPIT-P
1 X GRIP-10
30 X CT253
Version
V1.00
Figure 5.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Lightning Protection International Pty Ltd
Title
File
Stormaster ESE terminal assembly component details
ESE Installation Type 4.dwg
STA-04
9
EXISTING
STRUCTURE
LPI STORMASTER ESE TERMINAL
ORDERING CODE: STORMASTER-ESE-15-GI
STORMASTER-ESE-30-GI
STORMASTER-ESE-50-GI
STORMASTER-ESE-60-GI
THREADED GI ADAPTOR
(FEMALE THREAD 2 INCH BSP) ORDERING CODE: CATGI-ADPT
MAST ASSEMBLY WITH GI
ADAPTOR
ORDERING CODE: ALUM3M-MGI
ALUM4M-MGI
ALUM5M-MGI
ALUM6M-MGI
IMPORTANT:
One third of the mast height must be securely fixed to the structure.
Stormaster ESE terminal to be a minimum of 2 metres above the highest point of the building.
Recommended clearance height = 5 metres.
LPI SADDLES FOR
CANTILEVERING MAST ORDERING CODE: CANTSAD (3 PER SET)
MOUNTING BOLTS &
STAINLESS STEEL WASHERS
BASE OF MAST PIPE
COMPRESSION LUG
COPPER CABLE
Figure 6.
10
Drawn
John Davey
Date
28/7/2008
Scale
NTS
Version
V1.01
SUITABLE MOUNTING SADDLES
COPPER CABLE (OR COPPER TAPE)
Lightning Protection International Pty Ltd
Title Stormaster ESE terminal assembly component details
File
ESE Installation Type 5.dwg
STA-05
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
IMPORTANT:
Stormaster ESE terminal to be a minimum of 2 metres above the highest point of the building.
Recommended clearance height = 5 metres.
LPI STORMASTER ESE TERMINAL
ORDERING CODE:STORMASTER-ESE-15-GI
STORMASTER-ESE-30-GI
STORMASTER-ESE-50-GI
STORMASTER-ESE-60-GI
THREADED GI ADAPTOR
(FEMALE THREAD 2 INCH BSP) ORDERING CODE:CATGI-ADPT
LPI GUY KIT ORDERING CODE:
GUYKIT-4M
GUYKIT-4M-SS
GUYKIT-7M
GUYKIT-7M-SS
MAST ASSEMBLY AND BASE
WITH GI ADAPTOR ORDERING CODE: ALUMB3M-MGI
ALUMB4M-MGI
ALUMB5M-MGI
ALUMB6M-MGI
BASE OF MAST PIPE
MOUNTING BOLTS &
STAINLESS STEEL
WASHERS
COPPER TAPE
COPPER TAPE (OR COPPER CABLE)
EXISTING
STRUCTURE
DC TAPE CLIPS
Drawn
John Davey
Date
28/7/2008
Scale
NTS
Version
V1.01
Figure 7.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Lightning Protection International Pty Ltd
Title Stormaster ESE terminal assembly component details
File
ESE Installation Type 6.dwg
STA-06
11
Figure 8.
12
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Checking Lightning Protection Components
Supplied
The LPI Stormaster ESE components received should be checked against the “Bill of materials” for loss during shipping and for damage.
Check the following:
Terminal(s)
• Terminals have not been dented or damaged in any way during transit.
• Instructions, warning labels, warranty, test certificate and relevant mast base components are supplied
Downconductor(s)
• The HVSC cable drum (if supplied) is not damaged.
• The correct HVSC length(s) have been supplied.
• No obvious damage to the HVSC cable.
• If a factory completed upper termination is supplied, check to see that the termination is not damaged and confirm inside or outside termination(s).
• Order of lengths and quantities of HVSC (if multiple lengths on one drum), will be shown on the side of the Cable Drum(s).
LPI Stormaster ESE Installation
All site and safety requirements must be followed during the installation of the LPI Stormaster
ESE.
The correct order of installation is as follows:
1. Installation of the lightning earth.
2. Installation of the HVSC downconductor.
3. Lower termination of the HVSC downconductor and connection to the lightning earth.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
13
4. Upper termination the HVSC downconductor and connection to the Stormaster ESE terminal.
5. Preparation and raising of the mast into position.
LPI Stormaster ESE should only be installed during storm-free periods.
If the Stormaster ESE terminal needs to be raised prior to connection to the lightning earth or immediate connection is not possible then connect the lower end of the downconductor to structural steel reinforcing or other suitable earth point.
Installation of the Lightning Earth
Before installation of the lightning protection earth, consult site drawings of underground services so that these are not damaged during installation of the earthing system.
Figure 9.
14
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Earth DC resistance (typically ‹10 ohms) and impedance (typically ‹30 ohms) is required for successful operation of LPI Stormaster ESE.
LPI recommends the installation of a radial lightning earth as shown in figure 9.
• Recommended to install a 3 x 10 metre length radial trench.
• Each radial should consist of a trench (Approx: 500mm Deep x 200mm wide x 10m length).
• An earth rod should be driven at the end of each trench.
• All rods should be interconnected through the use of 25mm x 3mm copper tape. The use of earth rod clamps to fix the tape to rods is recommended.
• Use waterproofing mastic on all mechanical connections.
• The application of earth enhancing compounds such as LPI RESLO and GRIP assists to reduce soil resistivity to the recommended level of less than 10 ohms.
• An earth pit should be installed where the end of the downconductor terminates to the lightning earth as shown in figure 9. This gives an access point for disconnection and future testing.
• Do not lower terminate (connect) the downconductor to the earthing system at this point in time.
Note: If due to space constraints it is not possible to install a radial earth as recommended, consult with LPI or an authorised distributor for further advice.
When using earth rods:
• Use driving heads to prevent mushrooming on top of rod.
• Use driving heads when using coupled rods.
• Use a post or picket driver.
Recommendations for bonding the earthing system components are listed below:
• The use of the EXOWELD exothermic welding process is a safe and efficient way of providing a permanent connection between conductors. EXOWELD connections will not corrode or rust with age.
• DO NOT use aluminium lugs or couplings.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
15
Ground Resistance Lowering Compounds
• Ground resistance lowering compounds (such as LPI RESLO and GRIP) are supplied when the existing soil mass has a high resistivity.
• Using the compounds can lower earth resistance/impedance.
• Compounds will require water and a mixing container.
• Follow all installation and safety instructions as supplied with products when applying the compounds.
Bonding The Lightning Earth
Where separate earths exist eg. Structure, Power, Communications and Lightning Protection, they need to be bonded to form an equipotential ground plane. This will stop ground loops and potential differences arising under transient conditions.
Before bonding of these earths takes place, make sure proper authorisation is gained.
Bonding cable must be 70mm 2 (2/0 AWG) minimum depending on local standards. It may be necessary to use a Transient Earth Clamp (TEC 100) which bonds all earths to the same potential under transient conditions.
For further information, it is advisable that local applicable standards are used, ie. IEC 61024-
1, BS 6551, AS1768-2007, NFPA 780, C22.1-98 and NEC.
Labelling
It is the responsibility of the customer/installer to label earth pits or earthing systems to local requirements.
Installation of the HVSC Downconductor
If installing LPI HVSC, the HVSC downconductors(s) may have had the upper terminations completed at a pre-specified end of the cable by the LPI factory before being shipped.
When removing HVSC downconductor packaging, do not use a knife or cut in any way as this can damage the outer layer of termination.
LPI’s HVSC has an outer layer which is approximately 2mm (1/16in.) thick. Be careful not to damage this layer.
16
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Hauling the HVSC Downconductor
Place the HVSC downconductor cable drum close to where it is to be installed.
Figure 10.
• Make sure that the cable drum is in a servicable condition.
• Check that the correct length of HVSC downconductor has been supplied. The length of
HVSC will be marked on the drum.
• If the HVSC downconductor has been upper terminated on the outside of the drum, then the HVSC downconductor will need to be hauled up the structure with the drum staying on the ground.
• If the HVSC downconductor has been upper terminated on the inside of the drum, then the drum has to be taken to the top or near the top of the structure, then the HVSC downconductor can be hauled downwards from the drum to the ground.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
17
• Any lifting slings or ropes must be securely attached.
• DO NOT haul the HVSC downconductor from the termination, see Figure 11.
• Protect the HVSC downconductor at all times when it is being moved.
Figure 11.
HVSC Downconductor clearance holes
Before running the HVSC downconductor through any clearance holes, ensure that:
• A minimum hole diameter of 60mm (2 3/8”) is used.
18
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
• Enough protection is provided so that the HVSC downconductor is not damaged during or after installation.
• A waterproofing sealant or sealing gland should be used if the hole needs to be weatherproof.
Routing
The routing of the HVSC downconductor needs to follow these guidelines:
• The route of the HVSC downconductor should be as set out in the original design. Ensure no structural changes such as new antenna or mast installations, air conditioning towers or ducting has been installed.
• DO NOT double the HVSC downconductor back against itself after changes of direction, ie. 180°.
• The HVSC downconductor may be installed internally or externally on the structure.
• The HVSC downconductor should be installed as close (flush) as possible to the structure.
• Minimise the number of bends and use the most direct route to ground.
• Minimise strain on the HVSC downconductor.
• Ensure minimum bend radius maintained ›500mm (20in.).
• Parallel routing with other services – Minimum separation = 2m. See Figure 12 on page 20.
• If the HVSC downconductor has to cross other services make sure it crosses at right angles using a conduit that extends at least 1m past either side of the existing service.
• The lower end of the HVSC downconductor must terminate close to the initial injection point of the lightning earth.
• Be sure to allow for enough slack in the HVSC at the top end for connection to the
Stormaster ESE Terminal and the raising of the mast.
• If it is necessary to isolate the HVSC downconductor from the structure, run the cable in an insulating conduit with a minimum wall thickness of 3mm (1/8in.). The maximum
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
19
length isolated from the structure should be 2.5m (9ft). The entire length of the HVSC downconductor cannot be run in insulated conduit.
• HVSC downconductor should be protected from damage at the lower end by installing a
“Top Hat” surface mount cover of no more than 2m from ground level.
The HVSC downconductor must be checked by an LPI representative if it is damaged during installation to see if the damage will affect performance
.
Radius <500mm
<2m
INCORRECT
Radius >500mm
2m Max.
2m
Figure 12.
20
CORRECT
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Fixing the HVSC Downconductor
Using non LPI saddles can damage the downconductor outer sheath.
• The HVSC downconductor should be fixed to the structure every 2m for the entire length of the run. (Use LPI supplied or recommended saddles, fixing and cable ties).
• For masonry walls or roofs, use the LPI saddles provided. These can be used with masonry anchors, suitable fastenings for wood, fibreglass and metallic surfaces or self tapping screws.
• The most direct path to ground is recommended, avoid sharp bends (see HVS-1 on page
12).
• Use cable ties when fixing to round sections, such as pipes, tower legs, masts, etc.
• If the HVSC downconductor is to be routed above a false ceiling, ensure that it is fixed to the underside of the concrete floor slab.
• Do not use explosive fastening methods on LPI saddles or HVSC downconductors.
Installation of Conventional Downconductors
In some installations the use of copper tape or insulated stranded copper cable may be installed as the downconductor. In such cases it may be necessary to install multiple downconductors in compliance with local standards and/or international standards. (NFC 17-102, AS1768-2007,
BS6651, IEC 62305). See the following dot points for further information.
The Stormaster ESE Terminal provides a bolt for the lug connection to the lower finial connector of the mast butt adaptor. All conventional downconductors should be lugged and fixed to the terminal as per figure 13 on page 22.
The following are recommendations and points that should be considered when installing conventional downconductors.
• Downconductors should be installed at each external corner of the building and additional downconductors installed at spacing not exceeding 20m.
• The most direct path to ground is recommended, avoid sharp bends.
• Downconductors should be installed around the outside walls of the structure. It is not recommended to install downconductors internally to the structure.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
21
MAST BUTT ADAPTER MAST BUTT ADAPTER
MOUNTING BOLT & WASHER
CRIMP LUG
10mm HOLE DRILLED
THROUGH COPPER TAPE
13mm FROM END
INSULATED STRANDED
COPPER CONDUCTOR
25mm X 3mm
COPPER TAPE
Figure 13.
Drawn
Date
Scale
John Davey
15/7/2008
NTS
Version
V1.00
Title
CONNECTION OF CONVENTIONAL DOWNCONDUCTORS
TO LPI TERMINALS
File
Lightning Protection International Pty Ltd
BC-2.dwg
BC-2
• It is not recommended to locate downconductors in areas where personnel are liable to congregate.
• Any extended metal running vertically through the structure should be bonded to the lightning downconductor at the top and bottom of the structure.
• Each downconductor should be connected to the earthing system.
• Where practical, all structural steel and metallic reinforcement in the structure should be bonded to the downconductor system at recommended intervals as per international standards.
22
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
• The use of copper conductors are recommended and should have a cross sectional area
of not less than 35mm 2 . In addition, the use of PVC copper, bare aluminium and stainless
steel as downconductors is permitted in compliance to most international standards.
• Recommended copper conductor size is 25mm x 3mm.
• The copper should be of a grade normally used for commercial electrical work.
• Suitable fasteners should be installed to adequately secure all downconductors.
• Downconductors should be fastened at spacings not exceeding 1.0m on horizontal runs
and not exceeding 2m on vertical runs.
Installation of
Stormaster
GI Terminal to threaded pipe
LPI offers within its range of Stormaster terminals a GI version which is designed for a threaded connection to a 2 inch
BSP GI pipe. Please refer to drawings STA-05 and
STA-06 on pages 10 and
11 along with figure 14 for further details.
The Stormaster GI terminal is supplied with a threaded coupler
(female thread) fixed to the terminal and designed for connection to a 2 inch pipe (Male thread).
Figure 14.
Drawn
Date
Scale
John Davey
15/7/2008
NTS
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
STORMASTER ESE GI TERMINAL
Version
V1.00
THREADED GI ADAPTOR (FEMALE THREAD 2" BSP)
THREADED PIPE WITH MALE THREAD (2" BSP)
1.
2.
3.
4.
INSTALLATION STEPS FOR STORMASTER ESE GI TERMINAL
ENSURE THAT THE THREADED GI ADAPTOR IS FIRMLY SCREWED
INTO THE BASE OF THE STORMASTER TERMINAL.
ENSURE THAT BOTH THE MALE AND FEMALE THREADS ARE FREE
FROM PAINT, GREASE AND DIRT AND THAT THE MALE THREAD IS
NOT DAMAGED.
SCREW THE FEMALE THREAD OF THE GI ADAPTOR ONTO
THE 2" BSP MALE THREAD OF THE PIPE.
ENSURE THAT THE GI ADAPTOR IS FIRMLY SCREWED INTO
PLACE ON THE PIPE, AND THAT THE CONNECTION BETWEEN
THE GI ADAPTOR AND THE TERMINAL IS STILL SECURELY FIXED.
Title
STORMASTER ESE GI TERMINAL ASSEMBLY
File
Lightning Protection International Pty Ltd
SA-1.dwg
SA-1
23
Figure 15.
• Following installation of the Stormaster GI terminal to the threaded pipe as per drawing STA-05 and figure 14 it will be necessary to connect the metallic pipe to a conventional downconductor in order to convey the lightning energy to the earthing system.
• Ideally the connection between the metallic pipe and the conventional downconductor should be completed by lugging or exothermically welding (LPI EXOWELD) the down- conductor at a practical point somewhere along the length of the pipe.
• Particular care should be taken to ensure that compatible metals are used when connecting the downconductor to the metallic pipe.
• For installation details of the conventional downconductor please review instructions and comments as detailed under the heading Installation of Conventional Downconductors on page 21.
24
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Termination of the HVSC Lower End
Tools required for the completion of the HVSC Lower Termination include:
• Compression or Mechanical Crimping Tool (for 95mm 2 crimping lug).
• Sharp Knife.
• 2 x screwdrivers (used as friction cutting tool handles).
• Shifting Spanner.
• Tape Measure (cm)
.
Lower Termination Kit Consists of
1 x Roll Waterproofing Tape.
1 x 95mm Crimp Lug.
2 x Warning Stickers.
1 x Earth Clamp.
1 x Insulation Friction Cutting Tool.
The following steps outline the termination of the lower end of the High Voltage Shielded
Cable to the lightning earth.
The inner screen copper conductors and the outer screen copper conductors should be connected to the earthing system.
Figure 16.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
25
1. Remove the outer sheath for a length of 15cm from the lower end of the HVSC by cutting radially around HVSC cable with the supplied insulation friction cutting tool. (This is less likely to damage individual copper conductors than by cutting radially with a knife).
The lengthwise cut can be completed with a knife.
2. Remove the clear binder tape (2nd layer) for a length of 15cm from the end of the HVSC, this will expose the outer screen copper conductors as shown in Figure 17.
Figure 17.
3. Bend outer screen conductors back without damaging them. For a length of 5cm from the end of the HVSC, remove XLPE insulation (4th layer) and inner binding tape (5th layer) to expose inner screen copper conductors. Be sure not to remove outer screen conductors in this step. It is recommended to use the insulation friction cutting tool in this step.
4. Bend inner screen conductors back without damaging them. For a length of 5cm from the end of the HVSC, remove the inner PVC filler core under the inner screen copper conductor leaving the inner screen copper conductor in place.
Figure 18.
26
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
5. Bunch together both inner and outer screen conductors. If connecting directly to the earth system as per figure 21, the bunched conductors should be connected to the earth rod clamp and the clamp tightened holding the conductors firmly in place. To avoid oxidisation of this connection, seal it using the waterproofing tape as provided in the kit.
Figure 19.
6. If terminating the lower end of the HVSC to a bus bar, bunch together both inner and outer screen conductors, crimp them together in the 95m 2 crimp lug provided using a compression or mechanical crimping tool and connect the bus bar as per
Figure 20.
HVSC
LSR1
Compression
Lug
Copper
Bus Bar
Figure 20.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
To Earthing System
27
STEP 1.
HVSC
Downconductor
STEP 2.
Ground Level
HVSC
Downconductor
Waterproofing
Tape
Earth Rod Clamp
Earth Rod Earth Rod
Figure 21.
Lower Termination of Conventional
Downconductor to the Lightning Earth
• If installing stranded copper cable as a downconductor then the lower end should be connected to the lightning earth through the use of an earth rod clamp and then wrapped with waterproofing tape to avoid oxidisation.
• If installing copper tape (25mm x 3mm) as a downconductor then the lower end should be directly connected to the lightning earth through the use of a suitable earth rod clamp and then wrapped with waterproofing tape to avoid oxidisation.
28
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Termination of the HVSC Upper End
Tools and parts required for the completion of the HVSC Upper Termination include:
• Compression or mechanical crimping tool (for 50mm 2 crimp lug).
• Sharp knife.
• Phillips Head Screwdriver.
• Shifting spanner (or 14mm spanner/socket).
• 2 x screwdrivers (used as friction cutting tool handles).
• Heat gun or Gas Torch (LPG).
• Tape measure (cm).
• Marker or pen.
• Combination Pliers/Cutters.
• Terminal Base Assembly (supplied with the Stormaster Terminal).
Upper Termination Kit consists of:
• Instructions.
• 1 x roll of Semi-Conductive Tape.
• 1 x 50mm 2 Crimp Lug.
• 1.5 x Heatshrink Tubes (1 x 1200 & 1 x 600mm lengths).
• Insulation Friction Cutting Tool.
• Insulation Tape (1 x roll).
Upper Termination Instructions For UTERMKIT-Mk2
(Heatshrink)
The diagram on the following page (Figure 22) shows the different layers of the HVSC cable and indicates their names as referred to in the following instructions:
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
29
Figure 22.
1. First, remove the Black PVC Outer Sheath for a length of 165cm by cutting radially round the HVSC cable with the supplied insulation friction cutting tool (this is less likely to damage individual copper conductors than by cutting with a knife). The lengthwise cut can be completed with a knife, but take great care not to score the White XLPE Insulation.
Also remove the clear plastic lining over the copper.
2. Measure and mark the outer copper screen wires at 3 cm above the end of the Black PVC
Outer Sheath. (Figure 23) With the cutters, carefully cut and remove the wires, again without damaging the White XLPE Insulation below.
Figure 23.
3. Using the insulation friction cutting tool, remove the White XLPE Insulation to expose the Inner Copper Conductors for a length of 5cm from the top end of the HVSC (Fig 24).
Also remove the clear plastic lining over the copper conductors.
4. Remove the Black Inner PVC Filler core under the Inner Copper Conductors by folding back the Inner Copper Conductors to expose the Filler core, then cut and remove with a knife. Return the Inner Copper Conductors to their original position. (Figure 24)
Figure 24.
30
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
5. Straighten the cable back to the Black PVC Outer Sheath as much as possible then crimp the Inner Copper Conductors into the supplied 50mm 2 crimp lug using a suitable compression or mechanical crimping tool. (Figure 25)
Figure 25.
6. Connect the crimp lug to the Stormaster Terminal Base Assembly using the bolt and washers as supplied with the assembly. Ensure the connection is aligned correctly and tightly secured using a 14mm spanner, socket or shifting spanner. (Figure 26)
Figure 26.
7. Use a marker or pen to mark 30cm intervals on the White XLPE Insulation between the end of the Outer Copper Screen Wires and the Crimp - this will act as a guide to wrapping the semi-conductive tape towards the Crimp in a coarse spiral. (Figure 27)
Figure 27.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
31
8. Using the Semi-Conductive Tape provided, starting 2cm in front of the end of the Outer
Copper Screen Wires (or 5cm in front of the Black PVC Outer Sheath), stretch and wrap the tape back over the wires and 3cm over the Black PVC with 50% overlap, securing the
Outer Copper Screen Wires in place. This should use approx 50cm of the tape. (Figure 28)
Note: DO NOT cut the tape at this stage.
Figure 28.
9. Over wrap back towards the Crimp end of the cable, again stretching the tape and with
50% overlap, leaving 5cm covering the Outer Copper Screen Wires and White XLPE
Insulation and 3cm covering the Black PVC Outer Sheath. This should use approx another
50cm of the tape. Again, do not cut the tape. (Figure 29)
Figure 29.
10. Using the 30cm markings as a guide, continue to wrap the tape around the White XLPE
Insulation in a coarse spiral, (5 Turns from the outer-Copper screen wires to crimp), with only slight tension, ensuring that the tape is not too loose. Note: The spiral needs to be applied with even pitch to achieve best performance. (Figure 30)
Figure 30.
32
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
11. Once the tape has reached the crimp, start to stretch the remaining tape and using
50% overlap, cover the last 3cm of the White XLPE Insulation, over the brass lower connector and up to the black plastic section of the Terminal Base Assembly in multiple layers, completely covering the crimp and achieving as smooth and level a surface as possible, removing all sharp edges. (Figure 31)
Figure 31.
12. Using the supplied Insulation Tape (or 50mm packing tape), cover the coarse spiral section of the Semi-Conductive Tape to ensure that it stays in place during the application of the Heatshrink tubes. Do this first by covering the left half of the tape, then using a second length to cover the right half of the tape for the full length of the spiral. (Figure 32)
Figure 32.
13. Remove the plastic Mast Butt Adaptor section of the Terminal Base Assembly by unscrewing the M6 Phillips head screw on the side. Again, straighten the cable as much as possible and carefully slip the first 1.2m length of Heatshrink over the cable ensuring that the Semi-Conducting Tape is not effected, until the end of the Heatshrink tube covers and overlaps the Semi-Conductive Tape (over the Black PVC Outer Sheath) by 3cm.
(Figure 33) Using a Gas torch or heat gun, shrink the lower end into the correct position and gradually work up towards the top of the Heatshrink.
Note: Ensure that the Heat gun or Gas torch is not pointed in the same area for too long as this will burn the Heatshrink, also be careful around the ends of the tube as too much heat will damage the Black PVC Outer Sheath, Semi-Conductive Tape and White XLPE Insulation.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
33
Figure 33.
14. Place the 2 nd 600mm Heatshrink tube into place over the cable, again ensuring that the
Semi-Conductive tape is not damaged, overlapping the previous Heatshrink tube by at least 3cm. Shrink about 7cm of the upper end of the Heatshrink into place so that it will sit flush with the base of the Plastic Mast Butt Adaptor when fitted back into place.
Shrink the rest of the Heatshrink, ensuring that it overlaps the previous piece of
Heatshrink by at Least 3cm. (Figure 34) Ensure the rest of the Heatshrink has a smooth overall finish. Note; If required, feed the cable through the mast sections & guying ring.
Replace the plastic Mast Butt Adaptor section of the Terminal Base Assembly back onto the brass connector and ensure that the M6 Phillips Head screw is tight and secure.
Figure 34.
15. The lugged HVSC is now ready to be connected to the base of the Stormaster terminal.
Screw the terminal onto the completed Terminal Base Assembly and secure with the supplied M6 locking grub screw.
34
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Connection of Factory Pre-Terminated HVSC (Upper
End) to Stormaster ESE Terminal
Tools required for the installation of the factory completed upper termination include:
• Sharp Knife.
• Medium size Phillips head screw driver.
1. Firstly remove the protective packaging from the cable and upper terminated end section taking care not to cut cable or associated upper termination parts in the process.
2. Using a Phillips Head screwdriver, remove the M6 Phillips Head screw holding the mast butt adaptor (if fitted) to the lower connector and retain both screw and mast butt adaptor.
3. Feed the HVSC cable through the FRP support mast.
4. Slide the black plastic mast butt adaptor back onto the brass lower connector, line up holes and screw the Phillips Head screw into position tightly. Now screw the mast butt adaptor into the Stormaster ESE terminal and tighten the M6 Grub screw at the base of the terminal to lock the assembly.
Figure 35.
Labelling
Warning Labels are supplied with all Stormaster ESE terminals and should be installed as per the following.
• In locations where personnel may be in close proximity to the HVSC Downconductor.
• Where the HVSC downconductor connects to the earthing system.
• At the base of the support mast.
There are 2 Warning Labels supplied in the front cover of this manual and also 2 supplied in the lower termination kit. If more labels are required, contact your nearest LPI supplier or
Distributor.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
35
Masts
The mast chosen for the application must:
• Raise the terminal to a height of at least 2 metres (81 in.) higher than the structure.
(Minimum accepted).
• Have an FRP mast section of at least 2 metres (81 in.) used below the air terminal if using
LPI HVSC.
• Be suitable for local weather conditions. Seek guidance from a local civil engineer.
• Be guyed and securely attached to the dedicated mounting points (if required).
Types of Mast Configurations
When mounting a Stormaster ESE terminal, there are generally three types of mast configurations that can be used.
Cantilevered
Typically used for mounting to a tower or the side wall of a plant room when a mast and base are not suitable. See drawings STA-02, STA-03, STA-05 and Figure 36.
• 1/3 of the overall mast height must be fixed to the
structure for adequate mechanical strength.
• Cantilevered masts can be guyed for additional
strength. If guying, the use of a guy ring and/or the
eyelets provided on the inline coupling can be utilized
.
36
Figure 36.
Cantilevered Mast
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Guyed
When mounting a Stormaster ESE terminal, a typical guyed configuration would involve the following. See drawing
STA-04 and Figure 37.
• Two sections of mast (Aluminium mast & FRP mast)
coupled together with an inline coupling. Securing of
guy wires is completed at the eyelets as provided on the
inline coupling.
• Alternatively or in addition, a guy ring can be supplied
which is installed at the neck of the mast in between the
Stormaster terminal and the top section of the FRP. The
guy ring provides eyelets for connection of the guy
wires.
Figure 37. Guyed Mast
Freestanding
A freestanding mast configuration is typically used in situations where protection by isolation is required. For example a Stormaster ESE terminal is installed 5 metres or more away from a fuel storage tank.
Prior to installing the freestanding mast, ensure that:
• A spigot has been supplied with the freestanding mast
which allows for external or internal mounting of the
FRP mast.
• The downconductor can exit through the base of the
freestanding mast if run internally.
• Adequate information is provided for mast foundation
requirements.
Mast Bases
LPI supplies a mast base welded directly onto the required length of aluminium mast.
Figure 38.
Freestanding Mast
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
37
Mast Couplings and Guying Points
There are two methods of coupling two sections of mast:
1. The U-Bolt set uses two stainless steel U-Bolts to clamp the two masts together.
(Figure 39)
2. The inline coupling fixes the upper and lower mast sections together and provides guying points and an exit point for the HVSC downconductor.
U-Bolts and Inline Couplings nuts must be tightened to no more than 55kg/cm (45in.lb).
A Guying Ring is supplied for guy points for any two piece masts that require double guying.
This fits on the terminals mast butt adaptor between the Stormaster ESE terminal and the top of the mast. See Figure 40
Figure 39.
38
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Guying
LPI offers a standard 4m (13 ft) and 7m (22.75 ft) guy kit made up of light weight plastic coated fibreglass, non-conductive cable. The LPI GUYKIT-4M and GUYKIT-7M are both nonconductive guying kits. They are designed to be installed with the use of a Guy Ring at the top section of the FRP Mast as illustrated in figure 40. When guying from the LPI Inline Coupling, the use of stainless steel guy wire kits (GUYKIT-4M-SS, GUYKIT-7M-SS) is recommended.
Important Recommendations:
• The guying angle must be no
greater than 60° from
horizontal.
• The inline coupling couples the
upper and lower mast sections
and provides guying points
and an exit point for the HVSC
downconductor.
• Minimum of 3 guying grips per
guy end.
• Guying grips spaced at a
minimum of 25mm (1 in.).
• Grips are correctly orientated
–saddle on the longer length
side of the guy and U-bolt
over the tail side of the guy.
• Tighten grips to no more than
60cN.m (5Ibf.in) of torque.
• Customised guy kits can be
supplied upon request.
Figure 40.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
39
Preparation for raising the Mast into position
With the upper termination of the HVSC completed and the FRP mast in position it is now time to finalise the mounting arrangement so that the mast can be raised and secured into position.
• If using the recommended installation methods as per drawings STA-01, STA-02, STA-03 and STA-04 (on pages 6, 7, 8 and 9) fit the inline coupling to the lower mast material.
• If required, fit the HVSC downconductor through the side entry of the inline coupling and through the FRP mast. Refer to Figure 42 on page 42.
• Feed the Upper Termination through the guying ring if required.
• Carefully fit the mast adaptor of the Stormaster terminal into the top of the FRP.
• It may be necessary to pull back any slack of HVSC downconductor through the FRP support mast to achieve a tight fit for the Stormaster terminal. This should be completed carefully so as to not damage the upper termination.
• Fix the FRP support mast firmly into the inline coupling and tighten the coupling so that the FRP mast and lower mast material are secured firmly into position with no more than 55kg/cm (45in/lb).
• If a guy kit is to be installed, the guys should be securely fixed to the eyelets as provided on the inline coupling and or the guy ring. See text and graphics as detailed under the heading Guying for more information.
Raising of the Mast
When raising the mast, ensure:
• Guys to inline coupling and/or guy ring are properly secured.
• Guys are not twisted, kinked or damaged.
• Guys are able to be easily secured at the lower guy anchoring points when the mast has been raised.
Turnbuckles or Rigging Screws are recommended at the base anchor points of the guys.
Other guying methods such as conductive stainless steel can be used only on aluminium masts or inline couplings below an FRP section.
40
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Using a crane is recommended (or other suitable equipment) for anything over 6 metres
(20ft.) in height, or for hazardous areas or high areas.
• It is very important to keep the mast straight during the lift to avoid damaging the mast.
• The Stormaster ESE terminal must NOT be used as a slinging point.
• When lifting the mast, ensure that the slings or ropes cannot damage the Stormaster ESE terminal, see Figure 41.
Figure 41.
• When lifting the mast, the HVSC downconductor must be tied off to the mast to remove any strain on the HVSC downconductor termination to the Stormaster ESE terminal.
• Protect the HVSC downconductor at the base of the mast when lifting, maintain a minimum bending radius of 500mm (20 in.) and ensure it does not drag over rough or sharp surfaces.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
41
Figure 42.
Lightning Strike Recorder (LSR1)
The Lightning Strike Recorder (LSR1) should be installed at a position along the downconductor length where it can be accessed easily for inspection. Typically the LSR1 should be installed approximately 1.5m from ground level or alternatively within the earth pit at the lower termination point of the HVSC.
When installing the LSR1 the following should be considered:
• The LSR1 should be mounted away from areas where damage may occur due to theft, vandalism or nearby operations.
• The LSR1 can be enclosed in a security enclosure but the display should be kept visible to allow for the checking of recorded strikes.
42
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Figure 43.
Lightning Strike Recorder installed on HVSC
Downconductor
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Figure 44.
Lightning Strike Recorder installed on Rod.
43
Certification
The certification of the LPI Stormaster ESE installation should be performed by an authorised
LPI representative.
A certificate of compliance and warranty registration is provided with the installation manual.
This certificate should be completed in full following the successful inspection and certification of the installation.
The following should be checked for quality of workmanship and compliance to recommended installation instructions.
Certification checklist
• Correct mast and any associated brackets and fastenings have been used for installation.
• Guying, anchor points and fastenings.
• HVSC Downconductor routing, fixing and weatherproofing.
• Lower termination of HVSC Downconductor.
• Earthing System.
• Labelling.
Operation and Maintenance
The LPI Stormaster ESE Lightning Protection System is designed to react to the rise in electric field which is present in approaching thunder storms. The Stormaster ESE Terminal becomes active only during storm activity.
• The system operates without the need for external power supply or spare parts for standard operation.
• To keep the LPI Stormaster ESE Lightning Protection System operating at optimum levels it needs to be regularly checked.
Maintenance checks must be done:
• After each known lightning strike to the terminal.
• Once every twelve months.
• If changes have been made to the structure.
44
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Checks to be conducted in standard maintenance inspection:
• Is there any damage to Stormaster ESE system?
• Has the structure to be protected been modified since the last maintenance check?
• Check finial tip for excessive pitting.
• Check all rigging, mast mounts, saddles and conductor fixings are secure and tight.
• Ensure that no dirt or other matter is sitting in the air gap between the finial tip and the surrounding panel edges.
• If conventional downconductors are used, check that all conductors are securely fixed and not damaged.
• Check for damage to the LPI HVSC. The downconductor should not be able to be accessed by non authorised people or machinery.
• All warning labels must still be in place.
• Check LSR1 for secure installation and record number of strikes.
Testing the Stormaster Terminal
LPI manufactures and supplies a terminal spark-over tester suitable for testing the
Stormaster ESE range of terminals. Contact your local distributor for further details.
Testing the Lightning Earth and the HVSC
Downconductor
Use the table on page 47 to record the results following completion of the following steps.
1. Remove the waterproofing tape from the lower termination.
2. Disconnect the HVSC downconductor from the lightning earth.
3. Disconnect the structure earth bonding cable from the earth system.
4. Measure the earth resistance of the lightning earth system and record in column 3 under the heading Earth Resistance Readings in the table provided on page 47.
5. Measure the earth resistance of the structure and record in column 4.
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
45
6. Reconnect the structure earth bonding cable to the lightning earth and measure and record in column 5 the earth resistance reading.
7. Use a multimeter to measure the continuity between the inner and outer conductors of the HVSC downconductor. The measurement should exceed 10,000 ohms.
8. Reconnect the HVSC lower termination to the lightning earth and re-seal the termination using waterproofing tape to ensure that it is waterproof.
9. Report any problems arising from the above tests to your local LPI distributor for further advice.
Ground Resistance
Meter
HVSC Downconductor
(Disconnected from
LP Earth)
Figure 33.
Figure 45.
46
LP Earthing System
Structure Earth Cable
(Disconnected from
LP Earth)
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Date of Inspected
Inspection by:
Earth Earth Earth LSR
Resistance Resistance Resistance Reading
Reading #1 Reading #2 Reading #3
Comments
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
47
Installation Notes
48
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Inside Back Cover
(Blank)
Lightning Protection International Pty Ltd
ABN 11 099 190 897
PO Box 379 Kingston, Tasmania, Australia, 7051
Phone: +61 3 62271955 Email: [email protected]
Fax: +61 3 62291900 Web: www.lpi.com.au
![](http://s1.manualzz.com/store/data/073514900_1-5e4949502c7be9bf9758cc5b271bd126-210x147.png)
Advertisement