Installation Instructions
Thermal Block Entrance Installation Manual
Thermal Entrances
Installation
Instructions
2010
05/21/14
Tubelite Inc.
Page 0 of 20
Thermal Block Entrance Installation Manual
TABLE OF CONTENTS
PAGE NO.
INSTALLATION NOTES
........................................
2
PARTS LIST
........................................
3
FRAME ASSEMBLY
Butt Hinge
Offset Pivot
Threshold
Weather Inhibitor
........................................
........................................
.........................................
.......................................
5
6
7
9
DOOR INSTALLATION
Butt Hinge
.........................................
Offset Pivot
.........................................
Transom Glass Size . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Glazing
..........................................
HARDWARE INSTALLATION
Push/Pull Bar
...........................................
Back to Back Push Bar. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Back to Back Pulls. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Panics Strike
............................................
10
11
12
13
14
15
16
17
Adjustable Astragal for Pair of Doors. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Door Sweep
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
05/21/14
Tubelite Inc.
Page 1 of 20
Thermal Block Entrance Installation Manual
INSTALLATION NOTES
- Allow 1/4" shim and sealant space at sides and top of door frame.
- Door opening must be plumb, square, level and true.
- Aluminum to be placed in direct contact with uncured masonry or
incompatible materials should be isolated with a heavy coat of zinc
chromate or bituminous paint.
- System to structure fasteners are not supplied by Wausau.
Tubelite. Due to the
varying perimeter conditions and performance requirements perimeter anchors
Wausau. Fasteners
fasteners are not specified in these instructions or by Tubelite.
called out on shop drawings are to indicate minimum sizes for design
loading.
- Install backer rod between frame and building opening then seal.
- Wausau
Tubelite recommends snap in backs for added support and
stability.
- Sealants must be compatible will all materials with which they have contact,
including other sealant surfaces. Consult with sealant manufacturer.
- Ensure that the threshold is supported the entire length of threshold, if not shim
as required.
- Protect erected frame. Cement, plaster, terrazzo, other alkaline solutions
and acid based materials used to clean masonry are harmful to the finish.
Final cleaning of exposed aluminum surfaces should be done in accordance
with AAMA 609.1 for anodized aluminum and 610.1 for painted aluminum.
- Due to the diversity in state/provincial local and federal laws and codes that
govern the design and application of architectural products it is the
responsibility of the individual architect owner and installer to assure that
products selected for use on projects comply with all applicable building
codes and laws. Wausau
Tubelite exercises no control over the use or application
of its products, glazing materials and operating hardware and assumes no
responsibility thereof.
- Check our website, www.tubeliteinc.com,
wausauwindow.com, for the latest installation manual update
prior to commencing work.
05/21/14
Tubelite Inc.
Page 2 of 20
PARTS LIST
05/21/14
Tubelite Inc.
Thermal Block Entrance Installation Manual
Page 3 of 20
PARTS LIST
Thermal Block Entrance Installation Manual
P797
Pocket Filler
05/21/14
Tubelite Inc.
P-503-0R
Page 4 of 20
Thermal Block Entrance Installation Manual
BUTT HINGE FRAME INSTALLATION
- Attached threshold clips with provided screws (S070 - #12-24 x 1/2"). See Figure 2
and View A. Assemble frame as shown.
Install the frame into the opening:
- Shim and anchor frame so that it is plumb, square, level and true.
- Attached the threshold . (See Threshold Installation section for details.)
- Install vertical door stops and header door stops. (P503 filler can be installed at
this time.)
- Use backer rods and caulk the perimeter of frame.
Anchor
at center
of glass
pocket
#12-24x1/2"
S070
(2 per side)
#12-24x3/8"
(2 per side)
S420
#12-24 x 3/8"
(2 per side)
S420
05/21/14
Tubelite Inc.
Page 5 of 20
Thermal Block Entrance Installation Manual
OFFSET PIVOT FRAME INSTALLATION
- Attached threshold clips and offset frame portion with provided screws. See
Figure 2 and View A.
- Assemble frame as shown.
Install the frame into the opening:
- Shim and anchor frame so that it is plumb, square, level and true.
- Attached the threshold . (See Threshold Installation section for details.)
- Install vertical door stops and header door stops. (P503 filler can be installed at
this time.)
- Use backer rods and caulk the perimeter of frame.
#12-24 x 5/8"
(3)
Anchor
at center
of glass
pocket
#12-24 x 1/2"
(2 per side)
#12-24x3/8"
(2 per side)
S420
#12-24 x 3/8"
(2 per side)
S420
05/21/14
Tubelite Inc.
Page 6 of 20
Thermal Block Entrance Installation Manual
THRESHOLD INSTALLATION
- 1) Drill pilot holes in floor through
pre drilled holes in threshold.
- 2) Threshold needs to be leveled.
Shim threshold if needed.
- 3) Be sure all surface are cleaned.
Apply a liberal mount of sealant
around the perimeter of jamb.
Seal entire bottom perimeter of jamb and hardware.
See Detail 1.
- 4) Caulk ends of threshold, and under full
length of legs. See Detail 2
TA2550
- 5) Set threshold on a bed of sealant.
Support N.B.T
VERIFY THAT THRESHOLD IS LEVEL.
Sealant
DETAIL 2
- 6) Attached anchor screws (#14 and plastic anchor)
and threshold clip screws
(#12-24 x 3/8").
- 7) Cap and seal anchor screws.
05/21/14
Tubelite Inc.
Page 7 of 20
Thermal Block Entrance Installation Manual
THRESHOLD INSTALLATION
- 8) Install weather piling to door stops.
- 9) Place a bead of silicone in the riglet prior to snap in place
P503 filler and door stop. See detail 4.
Door stop sit on top of the threshold.
- 10) Reseal around jambs and
threshold if needed.
silicone
bead
DETAIL 4
05/21/14
Tubelite Inc.
Page 8 of 20
Thermal Block Entrance Installation Manual
Weather Inhibitor Installation
Notch
P6240
- Recommend to install weather inhibitor
prior to attaching door to frame.
- Notch weather inhibitor P6240, around the
vertical stiles at both ends of the door. See
Figure 1.
- Run a bead of sealant along the length of the
weather inhibitor. See Figure 2.
FIGURE 1
- Install P6240 as shown below (w/o sweep):
Sealant
Interior leg
Sealant
- If bottom door sweep is used. Install
P6240 on top door rail as shown
above. Install bottom door rail
as shown below.
Interior leg
FIGURE 2
- Snap weather inhibitor into place on the
top and bottom of the door rail. See Figure 3.
FIGURE 3
05/21/14
Tubelite Inc.
Page 9 of 20
Thermal Block Entrance Installation Manual
BUTT HINGE DOOR INSTALLATION
- Support door and line up butt hinge mounting holes and screw into place.
- See Figure 6.
- Check the alignment of the door to frame. Alignment can be adjusted
by adjusting cross-blocking of glazed door. See Glazing section
for more details.
#12-24x1/2"
(4 per hinge)
S070
05/21/14
Tubelite Inc.
Page 10 of 20
Thermal Block Entrance Installation Manual
OFFSET PIVOT DOOR INSTALLATION
- If pivot is not supported by the finished floor, grout or block under it as
required. If door will be hung and operated prior to finished floor
installation. Block under pivot and anchor to floor.
- Set bottom pivot on door over the pin on bottom
frame pivot. See Figure 6.
- Compress the retractable pivot pin in the top
pivot and set door up into position so the
pivot pin engages the frame
pivot. See Figure 8 & 7.
-Align the pivot stile by adjusting
the screw in the bottom pivot.
-Unscrew top dress cap and
adjust the screw inside
the pivot with an
allen wrench. See
Detail A.
-Remove top dress cap, Fig. 6.
-Clockwise to raise the corner.
-Counter-clockwise to lower.
- Door should swing freely.
05/21/14
Tubelite Inc.
Page 11 of 20
Thermal Block Entrance Installation Manual
TRANSOM GLASS INFORMATION
- Removable stop at header.
See Detail 1.
- Recessed pocket at transom
header. See Detail 2.
- Snap in stops at jambs. See
Detail 3.
- Glass size = D.L.O. + 3/4" max.
DETAIL 1 - Header
DETAIL 3 - Jamb
05/21/14
DETAIL 2 - Transom
Header
Tubelite Inc.
Page 12 of 20
Thermal Block Entrance Installation Manual
GLAZING DOOR INSTALLATION
Slide Anti-Walking
Block, after glass is
installed.
Wedge
Blocks
3"
- Install top & bottom interior glass stops
with gasket P2183.
- Place self adhesive setting blocks in 2 locations.
1) One setting block at Bottom Horizontal rail.
3-4" from hinge stile.
2) Two setting block at Hinge stile 3-4" up from
bottom bottom horizontal rail. See Figure 1.
- Install 1" I.G. glass in door (see website for glass
calculator). Placing the glass into the lock side pocket
first. Then sliding it back to rest up against the adhesive
setting blocks on hinge side.
(2)Setting
blocks
3"
(1)Setting
block
- Stretch the "W" anti walking block. Place the wide
width of the block flat up against the glass and slide it
between glass and intergrated glass stop into top lock
side. Push W anti walking block all the way until it
clears glass and locks into place. See Figure 1.
Make sure anti-block is not twisted
when installed.
- Square up door as desired.
- Place 2 sets of wedge plastic blocks as shown in
picture below. When together properly the wedge
blocks will interlock and form two flat surfaces.
3"
FIGURE 1
- Place set of wedge blocks on top of glass 3-4" from hinge side. See Figure 1.
- With the wedge blocks in place, push them together increasing the thickness. Push
together until they press tightly again the glass.
- Install all exterior glass stop and interior vertical intergrated glass stop with wedge
gasket P1112. Install top and bottom exterior glass stop.
- To square up the door. Remove top horizontal glass stop and adjust wedge blocks.
05/21/14
Tubelite Inc.
Page 13 of 20
Thermal Block Entrance Installation Manual
PUSH/PULL INSTALLATION
- Attached 2 1/4" cone head screw for push bar and bottom pull handle
mounting location. Attached pull handle. See Figure 13.
- Attached push bar at the hinge stile. See Figure 15.
- Set push bar onto the conehead fastener. Insert set screw and tighten.
See Figure 14.
- As completed. See Figure 16.
05/21/14
Tubelite Inc.
Page 14 of 20
Thermal Block Entrance Installation Manual
BACK TO BACK PUSH BAR INSTALLATION
- Install onto lock stile S234 conehead screw in door stile. See Figure 13.
- Attached push bar into the hinge stile. See Figure 15.
- Set push bar onto the conehead fastener. Insert set screw and tighten.
See Figure 14.
- Repeat above steps for the other side push bar.
05/21/14
Tubelite Inc.
Page 15 of 20
Thermal Block Entrance Installation Manual
BACK TO BACK PULL INSTALLATION
- Install onto lock stile S234 conehead screw in door stile and attached
pull P1564. (Hardware kit: P1554).
- Set pull P1567 onto the conehead fastener. Insert set screw and tighten.
See Figure 14.
P1564
P1567
S 230
05/21/14
Tubelite Inc.
Page 16 of 20
Thermal Block Entrance Installation Manual
RIM PANIC STRIKE
PANIC STRIKES
- Snap on lower door stop and P503
filler.
- Screw on the strike plate See View A.
- Close door and ensure that panic
latches into strike. If not, adjust strike
by loosening screws and readjusting
strike then re-tighten screws.
- Once adjustment is made, interior
side holes will have to be drilled.
- Screw into holes that were drilled and tighten.
- Ensure that door open and closes securely.
VIEW "A"
CVR TOP STRIKE:
- Install top strike plate into prepunch holes. See View B.
- Install vertical door stop then
header stops and P503 filler.
- Open and close door to ensure
proper secure engagement of
concealed vertical panic device. If
panic does not engage properly
refer to panic manufacture
installation instructions.
05/21/14
Tubelite Inc.
Page 17 of 20
Thermal Block Entrance Installation Manual
ADJUSTABLE ASTRAGAL FOR PAIR OF DOORS
- Adjust the weather astragal by turning the adjustment screws
located along the meeting stile of the active leaf.
- Clockwise to increase the distance between leafs.
- Counter clockwise to reduce the clearance between leafs.
See detail below:
Adjustment Screw
05/21/14
Tubelite Inc.
Page 18 of 20
Thermal Block Entrance Installation Manual
DOOR SWEEP INSTALLATION
- Sweeps are designed to be attached to the interior face of the bottom
rail.
- Transfer the pre drill hole locations in the door sweep to the interior
surface of the bottom rail. See Figure 1.
- Center sweep to rail.
- Align the bottom edge of door sweep to threshold. The door sweep
blade must make full contact with the threshold to obtain the full
benefit of the door sweep.
- Mark the center of hole locations to the bottom rail.
- Attached door sweep to bottom rail.
- Slide gasket back into the door sweep. See Figure 2.
Removable
Gasket
Figure 1
`
3/16"
TA2550
1/2"
Figure 2
05/21/14
Tubelite Inc.
Page 19 of 20
Thermal Block Entrance Installation Manual
Wausau Window and Wall Systems
7800 International Drive
Wausau, WI 54401
Tubelite
Inc.
Phone:
715.845.2161
3056 Walker RidgeToll
Drive
NW,
Suite G
Free:
877.678.2983
Walker, Michigan
49544
Fax: 715.843.4055
Phone 800.866.2227
www.wausauwindow.com
Fax 877.299.2414
www.tubeliteinc.com
05/21/14
Tubelite Inc.
Page 20 of 20