FADINI COMBI 740 Gate Operator Installation Manual
Below you will find brief information for Gate Operator COMBI 740. The COMBI 740 is a below ground, oil-hydraulic operator for swinging gates, designed to be installed at the foot of the gate. It features a built-in motor pump unit with a quiet-running steel lobe pump and a choice of 110° or 175° rotation angles. You can choose between locking or non-locking versions, as well as braking and non-braking options. The COMBI 740 is designed to provide a safe and reliable solution for securing your property.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
COMBI 740
Oil-hydraulic operator for swinging gates
Below ground
Version with two-way locking device
Version with brake in open/close cycles
Version with 110° and 175° shaft rotation
Instruction manual
GB
COMBI 740
ELECTRIC MOTOR
CUTAWAY GENERAL VIEW
HYDRAULIC JACK
LEFT-HAND
JACK END CAP
DAMPENING
ADJUSTMENT
LEFT-HAND
DAMPENING
DEVICE
1 st
PISTON
CYLINDER
LINER
VALVE
COVER
SAFETY
PRESSURE
VALVE
“OPEN”
TWO-WAY
LOCKING
VALVE
ASSEMBLY
SAFETY
PRESSURE
VALVE
“CLOSE”
TWO-WAY
LOCKING
VALVE ASSEMBLY
RELEASING
DEVICE
PIC. 1
2
®
OIL RESERVOIR
SUCTION
FILTER
MOTOR
BASE FLANGE
HYDRAULIC LOBE PUMP
PUMP
SHAFT
MOTOR
END PART
STATOR
ELECTRIC MOTOR
ROTOR
MOTOR
END PART
MOTOR-PUMP ASSEMBLY WITH CONTROL VALVE
JACK ASSEMBLY AND MOVEMENT SYSTEM
RACK
CENTRAL
BLOCK COVER
2 nd
PISTON
BEARING
TOOTHED
MAIN SHAFT
TIE ROD
MOTOR PUMP JACK
JOINING PART
CYLINDER LINER RIGHT-HAND JACK
END CAP
DAMPENING
ADJUSTMENT
ELBOW JOINT
WIRE
CONNECTORS
OIL RESERVOIR
PLUG
CABLE
CONNECTOR
HYDRAULIC OIL
ARNICA A 15 BY AGIP
OIL RESERVOIR
END CAP
PHASE
COMMON
PHASE
EARTH
ELECTRICAL CABLE
3
®
INSTRUCTIONS FOR THE INSTALLATION OF COMBI 740, ELECTRO-HYDRAULIC, BELOW GROUND, ALL-IN-ONE,
WITH ANTI-CRUSH SYSTEM.
It is recommended to keep to these instructions to install the equipment in the correct way to get a perfect working system. Electrohydraulic operator consisting of a jack combined to a motor pump unit for the operation of swinging gates. All-in-one in a specially designed enclosure to be sunk in the ground under the gates as shown in picture No. 2.
748 L
H
748 R
H
745 L
H
745 R
H
741 L
H
741
745
746
MOTOR-PUMP/JACK. HYDRAULIC
110° ROTATION, NON LOCKING
ENCLOSURE
GATE FIXING PLATE WITH SHAFT
747
748
FITTING COLLAR
GATE SPACER HINGE
EMERGENCY LOCKING SHOE WITH
COLLAR AND RELEASE SPANNER
VIEW FROM INSIDE THE PROPERTY
741 R
H
LEFT-HANDED
PIC. 2
RIGHT-HANDED
Pre-arrangements are possible in the case that the mechanism is installed at a later stage after mounting the gate and finishing the pavement. You will have to set the enclosure and fit the special gate spacer hinge which is designed to temporary replace the mechanism.
Picture No. 3.
The two enclosures must be perfectly aligned one opposite the other. The simple operation described below will ensure this: a nylon wire must pass through the centres of the holes which are factory made in the enclosures to this purpose. Picture No. 3.
GATE SPACER HINGES
=
L
H
=
R
H
746 L
H
746 R
H
WASHER
747 L
H
HOLE
LEFT-HANDED
HOLE
746
747
GATE FIXING PLATE WITH SHAFT
FITTING COLLAR
GATE SPACER HINGE
4
®
NYLON WIRE
747 R
H
HOLE
746
747
GATE FIXING PLATE WITH SHAFT
FITTING COLLAR
GATE SPACER HINGE
HOLE
RIGHT-HANDED
PIC. 3
DISTANCE 0,00
125
PIC. 4
PIC. 5
GRAVEL
TOP HINGE
FIXING SCREWS
350
HOLE
500
CABLE OUTLET
SOAKAWAY PIPE
GATE HINGE
CENTRE LINE PERPENDICULAR
TO THE REFERENCE MARK
THE CENTRE OF THIS
HOLE TO COINCIDE
WITH THE HINGE
CENTRE LINE
PAVEMENT FINISH
BRICKWORK
TOP HINGE PERPENDICULAR
TO THE CENTRE MARK HOLE
LEVEL
CENTRE MARK HOLE
PAVEMENT FINISH
40
100
PAVEMENT
UNDERNEATH LAYER
200
CONCRETE TO SUPPORT
THE ENCLOSURE
SOIL
CONCRETE TO PROVIDE
A LEVEL BASE AT
A SET DISTANCE
LAYER OF GRAVEL
FOR WATER TO
SOAK AWAY
SOAKAWAY PIPE TO BE
CONNECTED TO THE STORM DRAIN
BRICKWORK FOUNDATIONS
First of all make sure that the gates are adequate to take the mechanism inspect all the critical parts and see if they need reinforcement or adjustment, specially those parts which are most subject to friction such as the upper hinge. Picture 4.
Dig a hole in the ground close to the gate post
(dimensions as indicated in picture No. 5) and lay the enclosure in it perfectly horizontal with the help of a level. The upper edge of the enclosure must be levelled with the pavement finish. Picture No. 7.
Important: the centre line of the gate hinges must coincide with the centre of the hole in the bottom of the enclosure to provide a reference mark for alignment. Suitable holes are also provided in the enclosure for the electric cable and soak away tube.
The distance from the top edge of the enclosure to the pavement level (after finishing all works) must be zero. Picture 6.
It is important that the full weight of the gates is directly on the gate operator. Also that only a top hinge is used.
45
MINIMUM DISTANCE ALLOWED
SHAFT FITTING COLLAR 702/5
COMBI 740
DISTANCE
A
CONCRETE
DISTANCE A ITEM No.
DESCRIPTION
30 mm
42 mm
70 mm
702/5
746
748
Ferrule with square hole
Shaft fitting collar welded to the gate fixing plate
Emergency locking shoe complete with collar and release spanner
PIC. 6
PIC. 7
WEDGE THE ENCLOSURE FOR ALIGNMENT AND
BRING THE UPPER EDGE TO THE REQUIRED LEVEL
5
®
Once the concrete has set, put the combined unit in the enclosure and screw it down by means of the two long bolts supplied with the equipment, see picture No. 10.
Attention: follow the wiring and connecting procedure on page 9 and picture 18. Allow the operators to run full movement 3 times before hanging the gates. Weld the fixing plate to the gate, either the non-locking type or locking type, which can be released for emergency.
Picture 8 or 9.
WELDING
PIC. 8
LOCKING SHOE IN
RELEASED POSITION
OR: NON LOCKING GATE
FIXING PLATE WITH
SHAFT FITTING COLLAR
PIC. 9
BOX SPANNER
LONG BOLTS COMBI 740
Once satisfied that everything has been done as described so far, make sure that the two units are mounted on the correct side of the gate, view from inside the property: the unit marked “D” on the righthand side and “S” on the left-hand side. The COMBIs are designed as handed operators, the correct position is essential to the performance of the system. Picture 11.
SB
RELEASE
PIC. 10
L
HAND RELEASE
R
HAND RELEASE
6
PIC. 11
“S”
JACK/PUMP
LEFT-HAND SIDE
®
GATE STOP
SB
HYDRAULIC RELEASE
FOR THE FIRST OPERATIONS
VIEW FROM INSIDE THE PROPERTY
SB
HYDRAULIC RELEASE
FOR THE FIRST OPERATIONS
“D”
JACK/PUMP
RIGHT-HAND SIDE
Anti-crush safety is ensured by the pressure valves which allow for a very fine adjustment of the required pushing power depending on the gate size and weight; after setting no further adjustment is required thanks to their precise design. Also they are adequately protected to prevent misuse. See pictures No. 12-13.
THRUST ADJUSTMENT:
DO THIS OPERATION
WITH BOTH UNITS
MORE THRUST/PUSHING POWER
LESS THRUST/PUSHING POWER
VALVE COVER
MORE THRUST/PUSHING
POWER
LESS THRUST/PUSHING
POWER
VALVE COVER
RED
BLUE
RED
YELLOW/GREEN
RELEASE
LEVER
SB
LID
745
HYDRAULIC RELEASE - LEVER S
TO RELEASE THE UNIT TURN THE LEVER S
WHICH IS FITTED ON THE HYDRAULIC MOTOR PUMP
PIC. 12
LEFT-HANDED
RED
BLUE
RED
YELLOW/GREEN
RIGHT-HANDED
PIC. 13
With single gates the electric lock is to be installed horizontally in the most suitable way to meet the application requirements. Double gates can be fitted with an electric lock at a height as indicated in the picture and with a mechanical latch for a better hold of the gates in the close position. See picture No. 14.
PLEASE NOTE: it is compulsory to fit gate stops in open gate position so that both gates stop 5° before the end of the permitted piston
stroke.
GATE STOP
LOCK KEY
LH
GATE
GATE
RH
GATE STOP.
5°
MORE OPEN
THAN THE OTHER GATE
PIC. 14
95°
GATE HOLDING
LATCH
90°
GATE STOP
The hydraulic jacks are designed right-handed and left-handed. Their correct application on the respective gate side will allow the gates to move out of phase by 5 degrees. See the picture: the gate with the lock keep will reach the close gate stop position earlier than the other one and will be ready to take the lock when the second gate reaches the closed position.
7
®
Should the model with the dampening device be required to install adjustment in the open and close cycles is by means of a screw on the top of the jack end cap: with a screwdriver give one turn clockwise. The dampening device is now in service and the gate will "brake", ie. slow down speed over the last 40 cm of its angular motion. One turn anti-clockwise will re-set to the standard operating mode. Picture No. 15.
DAMPENING DEVICE
OUT OF SERVICE
DAMPENING
IN SERVICE
OIL FILLER CAP
PIC. 15
Now commence the electrical work. Connect the control panel
ELPRO 13 exp as per pictures 16 and 18.
Important: Should N.C. contacts eg. Photocells, Stop Button and safety contact not exist, link out individually. If the operators run in wrong direction reverse 17, 18 or 20, 21 respectively.
Once the connections have been made, set the dip-switch "B" as required but with No. 3 "ON" automatic, pulse the radio transmitter or short out terminals 7 - 8 momentarily and make sure that the operating run and dwell times are as required, adjust through the rotary timers
7-8-9. See diagram ELPRO 13 exp. Picture 18.
The electrical equipment must be properly earthed.
Picture 17 shows an exemplary complete installation.
N.W.: CARRY OUT A RISK ANALYSIS IN COMPLIANCE WITH EN 12445
AND EN 12453 NORMS AND FIT ANY SAFETY DEVICE WHERE
REQUIRED.
DIP-SWITCH B
JUNCTION BOX
CUT OUT BRICKWORK
TO PROVIDE PROTECTION
FOR THE CONTROL BOX
ELECTRIC P.C. BOARD
PIC. 16
8
11
12
13
14
10
1
2
3
n°4x1,5
16
6
n°4x1
PIC. 17
NOTE WELL: EARTH CONNECT THE WHOLE SYSTEM
4
®
5
n°4x1,5
9
8
16
7
n°2x1
15
1 - MAINS SWITCH 230V - 50Hz
MAGNETIC-THERMAL DIFFERENTIAL 0.03A
(CABLES LONGER THAN 100 m ø 2,5 mm)
2 - JUNCTION BOX
3 - COMBINED JACK/MOTOR PUMP LEFT-HANDED
4 - CLOSED GATE STOP REQUIRED
5 - COMBINED JACK/MOTOR PUMP
RIGHT-HANDED
6 - POST WITH PHOTOCELL RECEIVER POLO 44
7 - POST WITH PHOTOCELL PROJECTOR POLO 44
8 - KEYSWITCH PRIT 19
9 - PHOTOCELL RECEIVER POLO 44
10 - PHOTOCELL TRANSMITTER POLO 44
11 - FLASHING LAMP MIRI 4
12 - AERIAL BIRIO A8
13 - RADIO RECEIVER ASTRO 43/1 R
14 - CONTROL BOX ELPRO 13 exp
15 - RADIO TRANSMITTER ASTRO 43/2 TR SMALL
16 - OPEN GATE STOP REQUIRED
GB
13
exp
CONNECTION DIAGRAM FOR SWING GATES
RADIO CONTROL
PLUG-IN CARD SUPPORT
26
27
28
TERMINAL FOR
CONNECTIONS TO
PUSH BUTTONS PULIN 3
1 st
ON TO “0” THE DELAY
IS OUT OF SERVICE
7 0
–
8
MICROPROCESSOR
9
DIP-SWITCH
ON
ON
1 2 3 4 5 6 7 8
OFF
+
TIMER SWITCHES
LEAF DELAY
TIMER CLOSE
FUSE
630 mA
FLASHING LAMP
630 mA FUSE
+
DWELL TIME
+
MOTOR RUN
OPEN & CLOSE TIME
1 AMP. FUSE
24 V OUTPUT
TERMINALS 12-13
CAPACITORS
FUSE 5 AMPS
12,5µF 12,5µF
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
16 17 18 19 20 21 22 23 24 25
M1 M2
ELECTRIC MOTORS
SINGLE-PHASE
3 4
PEDESTRIAN MODE
ONE PULSE OPENS
ONE GATE LEAF ONLY
PULSE TWICE CONSECUTIVELY
TO OPEN BOTH GATE LEAFS
LED No. 1 - It switches on when voltage is supplied
3 4 5 6
N.O.
N.C.
N.O.
26 27 28 3
CONNECTION TO THE “PULIN 3” PUSH
BUTTONS WITH STATUS INDICATION LEDS.
OPEN STOP CLOSE
PIC. 18
ELECTRICAL CONNECTIONS
KEYSWITCH PRIT 19
1 2 3 4 5 6 7 8 9 10 11 12 13
TERMINAL BOARD
STOP
OPEN
CLOSE
COMMON
TERMINAL BOARD
PRIT 19
I
7 8
ALL OPERATIONS
OPEN, CLOSE AND
REVERSE
RADIO CONTACT
NOTE WELL: For special applications, ie. to switch on lights -
CCTV etc., SOLID STATE RELAYS are recommended to be used only. Standard relays would affect the micro-processor.
NOTE WELL: THIS PANEL IS TESTED TO OPERATE GATES ONLY
THROUGH FADINI ACCESSORIES. NO WARRANTY IS
ACKNOWLEDGED BY THE MANUFACTURER IN CASE THAT
OTHER ACCESSORIES ARE USED OR NON CONFORMING
APPLICATIONS ARE MADE WITHOUT THE MANUFACTURER’S
APPROVAL.
ELECTRICAL WIRING DIAGRAM OF THE ELECTRONIC
PROGRAMMER
Once the connections have been made, do the first switching test through the control panel. Set the motor run timer so that the motor is allowed to run 4 - 5 seconds more than the gates.
Set the other timers to meet the site requirements. Set DIP switch B No. 3 to automatic (ON): on pulsing to 4 - 8 the gates must be operated as pre-set, ie. opening and only after the dwell time, closing. Adjust the times through the respective timers. (See No. 07, 08 and 09 drwg. No. 1643).
With DIP switch "B" No. 3 to semiautomatic (OFF) one pulse opens the gates, a second pulse to 5 - 9 is needed to close the gates. Any one pulse to 7 - 8 will open, close or reverse the gates independently from the operation being performed.
It is recommended to carefully read the instructions in the control box to have all the functions performed correctly.
The 6 LEDs on the P.C. board indicate the following:
Led No. 1 It switches on when voltage is supplied
Led No. 2 Photocells - Normally on. It switches off when the photocells are obstructed
Led No. 3 Open - It switches on when the respective switch is activated
Led No. 4 Close - It switches on when the respective switch it activated
Led No. 5 Stop - Normally on. It switches off when the respective switch is activated
Led No. 6 Radio - It switches on whenever a pulse is given, either from remote control, keyswitch or push buttons.
PIC. 19
Drwg. No.
1643
P.C. BOARD
9
®
MANUAL TEST FOR COMBI 740
230 V 50 Hz
CONNECTION TWO MOVES TO
POSITION THREE. THIS SHOULD
REVERSE GATE OPERATION
FIXED CONNECTION
CONDENSER
12,5 µF
RED
2 1
BLUE
3
RED
YELLOW/GREEN
PIC. 20
SPECIAL VERSIONS
FLOW REGULATORS FOR COMBI 740
CONNECT THE
ENCLOSURE EARTH WIRE
ADJUSTMENT SCREW
FLOW REGULATOR
PIC. 21
ADJUSTMENT SCREW
FLOW REGULATOR
10
®
IMPORTANT
LET THE ELECTRIC
CABLE BE FULL LENGTH
DO NOT CUT IT
COMBI 740 TECHNICAL SPECIFICATIONS
C
190
50
190
50
B
ø 12
A The combined motor and jack of the COMBI 740 employs the latest technology with a quiet-running steel lobe pump at its heart, creating and holding greater pressures for hydraulic locking and drive than most other underground gate operators.
B Gate fixing device (locking version) is welded or screwed to gate foot. Lock can be released by special key.
C Gate fixing device (non locking version) is welded to gate foot.
D Fix to the ground proper gate stops both in the open and closed gate position. See page 7 in the installation manual.
Left-handed unit.
View from inside property.
Suitable for gate width from 2 up to 3.5 m max. with or without locking/dampening depending on gate size and site requirements.
45
300
PIC. 22
235
470
235
A
®
®
s.n.c.
Via Mantova, 177/A - 37053 Cerea (VR) Italy - Tel. 0442 330422 r.a. - Fax 0442 331054
MOTOR
W
VOLTS
r.p.m.
2 PHASE
250
230
1˙350
HP
A
Hz
0.25
1.2
50
Nm 235 µF 12.5
Shaft ro. 110° - 23 sec. - P3 - 0.85 l/min.
Shaft ro. 175° - 28 sec. - P3 - 0.85 l/min.
Temperature –20°C +80°C
Degree of protection IP 673
Working pressure max. 3 MPa (30 Bars)
OIL FADINI A15 BY AGIP
MADE IN ITALY
STICKER WITH ELECTRIC MOTOR SPECIFICATIONS
DOUBLE STROKE JACK AND OIL-HYDRAULIC PUMP
Pump flow rate - P3..............................................................0.85 l/min.
Working pressure.......................................................1 MPa (10 bars)
Max. pressure .............................................................3 MPa (30 bars)
Working temperature ......................................................–20°C +80°C
Rotation time (110°).........................................................................23 s
Oil type ................................................................A 15 FADINI by AGIP
Shaft rotation angle........................................................................110°
Rated torque ..............................................................................235 Nm
Cylinder bore ...............................................................................75 mm
Stroke............................................................................................52 mm
Weight with accessories.............................................................27 Kg
Static gate weight ......................................................................700 Kg
IP Standards .................................................................................IP 673
Overall dimensions ...................................................470x300x150 mm
DAMPENING
Pump flow rate - P3..............................................................0.85 l/min.
Rotation time (175°).........................................................................28 s
CLASS H, TWO-PHASE, ELECTRIC MOTOR
Power output ...........................................................0.18 KW (0.25 HP)
Supply voltage ..................................................................230 V - 50 Hz
Absorbed current ..........................................................................1.2 A
Absorbed power ..........................................................................250 W
Capacitor .....................................................................................12.5 µF
Motor rotation speed .........................................................1˙350 r.p.m.
Intermittent service ..........................................................................S 3
Duty cycle..........23 sec. Open - 30 sec. Dwell - 23 sec. Close - 30 sec. Dwell
Time of one complete cycle.........................................................106 s
No. of complete cycles Open - Dwell - Close ......................34/hour
No. cycles a year, 8 hours a day...............................................99˙000
11
®
COMBI 740
PRODUCT FEATURES
• Pre-oiled and pre-set for immediate installation.
• Close proximity of pump and jack gives fast response.
• Close pivot point (45 mm) to gate pier.
• Manual release from inside and outside of property.
• Choice of 110° or 175° rotation angle.
• Braking or non-braking versions available.
• Locking or non-locking versions available.
• Conforming to EN 12453, EN 12445 safety standards.
• All-in-one pump and jack unit, contained in a single enclosure, is sunk into the ground at the foot of the left-hand and right-hand gate to achieve synchronised operation. The unit should be piped into a soak-away to allow for water drainage.
WARNINGS
- Before installing the equipment carry out a Risk
Analysis and fit any required device in compliance with EN 12445 and EN 12453 Safety Norms.
- Should the combined unit jack/hydraulic motor pump be removed for maintenance, servicing or repair, disconnect the electric motor cable from the junction box.
- Never cut off the cable from the electric motor.
- Make sure that the oil plug is properly tightened.
- Do not throw away oil from repaired or serviced units, waste oil must be disposed of properly through a specialised company.
- Do not throw away packaging such as cardboard, polystyrene and nylon, which must be disposed of properly through a specialised company.
- The electrical equipment must be properly earthed.
* Best performance can only be achieved by keeping to these instructions.
Meccanica Fadini recommends the control panel ELPRO 13 CEI to achieve an installation that is in conformity to the existing safety standards as illustrated in our chart.
The electronic programmer ELPRO 13 incorporates and can provide all the functions which are required by the most demanding applications with swinging gates.
In addition to the standard features of ELPRO 9 (Drwg. No. 1310) the following requirements can be provided: “stroke reversing pulse”, pedestrian mode, stop in any gate position by holding down the remote control button. Among the added features and improvements of ELPRO 13 in conformity to the European safety standards, there is the mains rotary switch: it is fitted to the box cover and switches off the mains voltage whenever the cover is removed.
l’apricancello
13
CEI
SINGLE-PHASE
CUT OFF MAINS SWITCH
CHECKING AND MAINTENANCE:
To achieve an optimum performance and longer life of the equipment and in observance of the safety regulations, it is recommended that inspections and proper maintenance are made by qualified technicians to the whole installation ie. both the mechanical and electronic parts, as well as wiring.
- Mechanical parts: maintenance every 6 months approx.
- Electronic apparatus and safety equipment: maintenance inspection monthly.
The “CE” mark certifies that the operator conforms to the essential requirements of the European Directive art. 10 EEC 73/23, in relation to the manufacturer’s declaration for the supplied items, in compliance with the body of the regulations ISO 9000=UNI EN 29000.
Automation in conformity to EN 12453, EN 12445 safety standard.
• DECLARATION OF CONFORMITY
• SAFETY NORMS
• EN 12453, EN 12445 STANDARDS
• CEI EN 60204-1 STANDARDS
• WARRANTY CERTIFICATE ON THE CUSTOMER’S REQUEST
GB
2003/108/CE Directive for waste electrical and electronic equipments
DISPOSE OF PROPERLY
ENVIRONMENT-NOXIOUS MATERIALS
EUROPEAN MARK CERTIFYING CONFORMITY TO
THE ESSENTIAL REQUIREMENTS OF THE
STANDARDS 98/37/EC
The growth of MECCANICA FADINI has always been based on the development of guaranteed products thanks to our
“TOTAL QUALITY CONTROL” system which ensures constant quality standards, updated knowledge of the European
Standards and compliance with their requirements, in view of an ever increasing process of improvement.
®
s.n.c.
AUTOMATIC GATE MANUFACTURERS
Via Mantova, 177/A - 37053 Cerea (Verona) Italy
Tel. +39 0442 330422 r.a. - Fax +39 0442 331054
e-mail: [email protected] - www.fadini.net
Distributor’s box
The manufacturers reserve the right to change the products without any previous notice
advertisement
Key Features
- Below ground installation
- Oil-hydraulic operator
- 110° or 175° rotation angles
- Locking or non-locking versions
- Braking or non-braking options
- Quiet-running steel lobe pump
- Pre-oiled and pre-set for immediate installation
- Close proximity of pump and jack gives fast response
- Close pivot point (45 mm) to gate pier
- Manual release from inside and outside of property