Below you will find brief information for Plate Heat Exchanger RX146A, Plate Heat Exchanger UX146A, Plate Heat Exchanger LX146A, Plate Heat Exchanger SX146A, Plate Heat Exchanger J R245, Plate Heat Exchanger J R246, Plate Heat Exchanger P R245, Plate Heat Exchanger P R246, Plate Heat Exchanger BP2CL. HISAKA Plate Heat Exchanger is a high-performance heat exchanger designed for a variety of applications. It is ideal for use in industrial processes where efficient and reliable heat transfer is essential. The unit is easy to operate and maintain, ensuring long-term performance for various applications, including heating, cooling, and process fluids. This document will provide guidance on operating, maintaining, and troubleshooting the equipment.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
Plate Heat Exchanger
2 Operation and Maintenance Manual
Thank you for purchasing a Hisaka Plate Heat Exchanger.
Manuals for the HISAKA Plate Heat Exchanger consist of the following six related documents.
1. Installation Manual, 2. Operation and Maintenance Manual, 3. Gasketting Manual (Total 10 Models), 4. Plate
Cleaning Manual, 5. "Slit-In" Type Gasketting Manual, and 6. Mixed Gasket Materials Manual.
These documents are available at our website ( http://www.hisaka.co.jp/english ).
Drawings (Plate Arrangement Drawing and Assembly Drawing) of supplied model are to be supplied with the equipment.
Use as directed in these Manuals for safe and proper operation and maintenance.
Keep these Manuals in hand.
Introduction
<Plate Heat Exchanger>
Plate Heat Exchanger (hereinafter “PHE”) performs heat exchanging by transferring heat between hot and cold fluids flowing alternately through heat transfer plates, which are thin metal sheets having fine corrugated patterns.
<Use of Equipment>
To prevent injury to persons, do not use the equipment for anything other than its intended purpose and specification. Also, installation and maintenance shall be carried out according to these Manuals.
<Trained Operators>
Operation, maintenance/inspection, or installation of the equipment shall be performed by personnel/operators who have undergone training regarding safety and danger prevention drills.
Work in high places shall be performed by personnel/operators who have undergone training regarding safety and danger prevention drills.
<Export Regulations on the Equipment>
According to the Export Control released by Japanese Government (METI), export of the equipment may be subject to export regulation under the Foreign Exchange and Foreign Trade Act. In case of exporting the equipment or component parts of equipment from Japan, reselling, relocating or re-exporting from an original installation site out of Japan, please contact our company in advance.
<Disposal of the Equipment>
At the end of use, the equipment shall be disposed or recycled according to relevant, local regulations. Besides the equipment itself, any hazardous residues from the process liquid must be considered and dealt with in a proper manner.
<Use of this Installation Manual>
Read this manual thoroughly and understand the precautions regarding the safety of the equipment and its functions before handling the equipment.
This manual is created for a person who fully understands the language it is written in. If a person, who is not able to understand the language written herein, will handle the equipment, please provide safety instructions to the personnel/operators.
PHE supplied may differ from the drawings and pictures in these Manuals depending on the optional parts if any. Also, for the purpose of explanation, the drawings and pictures in these Manuals may omit the details, accessories, or the like.
Changing the contents of these Manuals, in part or in whole, or using them for anything other than its intended purpose is prohibited.
<Disclaimer>
HISAKA accepts no liability for any failures in the function or performance of the equipment caused by use of any other than genuine parts.
HISAKA accepts no liability for any injuries or damage borne by the user, caused by use of any other than genuine parts..
HISAKA Plate Heat Exchanger
Operation and Maintenance Manual
Table of Contents
1 Safety Precautions
2 Names of Components
3 Components Details
4 Nameplate
5 Accessories
6 Consumables
7 Model Description
8 Tests Before Commissioning Operation
9 Operation
10 Shutdown
11 Long-term Storage/Preservation
12 Maintenance
13 Troubleshooting
14 Plate Arrangement Drawing
15 Assembly Drawing
16 Exploded View
17 Inquiries
P7
P7
P8
P8 ~
P15, 16
P18
P19
P20 ~
P25
P5
P6
P5
P5
P5
P1, 2
P3
P4
1 Safety Precautions
Read through this manual carefully before use, and use PHE properly.
If you have any questions, please inquire with our company.
Precautions are categorized using the following symbols.
WARNING
This symbol indicates content where mishandling could result in death or severe injury.
CAUTION
NOTE
This symbol indicates content where mishandling could result in injury or property damage.
This symbol indicates important matters and/or useful information.
Meanings of Symbols
Indicates items that are "prohibited (something that you must
NOT do)".
Indicates items that are "mandatory (something that you must do)".
WARNING
Do NOT use a piping gasket to the rubber covering nozzle of PHE.
Sealing performance could be decreased and it could be a cause of leaking. In case of metal covering nozzle, piping gasket is required.
In general, do NOT perform pneumatic test for medium and large size PHE. For small size PHE, do not perform pneumatic test at
the same pressure as hydrostatic test pressure.
When compressed air or nitrogen for pneumatic test is leaked, it is very dangerous since there would be an impact caused by volume expansion in addition to such test pressure.
In general, do NOT perform pneumatic test in excess of 0.75 MPaG.
Do NOT loosen the thermometer, pressure gauge, tightening bolts and nuts, and/or any other accessories during operation and/or
PHE pressurized.
It may cause burns or injury if fluid is blown out from PHE/pipes.
Keep fire-fighting equipment when handling flammable media.
If the flammable media ignites during operation or maintenance, it can lead to a major accident.
Install a protective cover on PHE when handling dangerous media, which is high temperature, high pressure, strong acid, or a strong alkaline.
If a dangerous media leaks and is splashed, it may lead to a serious accident.
Do NOT use damaged tightening bolts, such as improper rust or cracks.
When the tightening bolts breaks during operation or disassembly, it is dangerous not only broken pieces are scattered, but also fluid may splash from PHE.
Do NOT use tightening bolts with loosed bolt head.
If the swaged bolt head loosens and comes off the bolt, it could burst at high speed. It may cause a serious accident for any person or property.
Do NOT incinerate the gasket.
Incinerating gaskets releases a toxic gas and is very dangerous.
Any unnecessary gaskets should be disposed as industrial waste in accordance with international, national, prefectural, and municipal regulations.
Also, gaskets should be disposed under the local jurisdiction.
Do NOT handle the heat transfer plates in any place with strong wind.
Under strong wind, the heat transfer plates it could fly, cut, injury, and bruise.
Make sure that the operation is stopped, the internal pressure is
"0", and the fluid temperature has sufficiently dropped before disassembling the PHE
If fluid splashes from the PHE during disassembly, it may cause burns or lacerations.
When removing gasket, carry out in proper location with good ventilation.
The gasket should be adhered with Hisaka’s “S-1", "F-2" contains an organic solvent. Breathing the volatile ingredients for a long time may cause symptoms such as headache, dizziness, and nausea. If these symptoms occur, remove person to fresh air. If signs/symptoms develop, get medical attention.
Wear protective equipment such as protective goggles, a mask, rubber gloves, and protective clothing if handling a dangerous fluid such as a strong acid or strong alkaline.
Eye Contact: Flush eyes with large amounts of water. If signs/symptoms persist, get medical attention.
Skin Contact: Remove contaminated clothing and shoes. Immediately flush skin with large amounts of water. Get medical attention. Wash contaminated clothing and clean shoes before reuse.
Inhalation: Remove person to fresh air. If signs/symptoms develop, get medical attention.
If Swallowed: Do not induce vomiting unless instructed to do so by medical personnel. Give victim two glasses of water. Never give anything by mouth to an unconscious person. Get medical attention.
P1
Do NOT touch the side of plate pack and heat transfer plate edge.
The edge of a heat transfer plate is very sharp and may cut you.
Be sure to wear cut-resistant gloves whenever touching heat transfer plate.
Do NOT place objects on plate pack.
It may cause deformation of heat transfer plate.
Falling object may cause injury during operation.
Do NOT make heat transfer plate edge deform by contacting with surrounding object.
Deformation of the heat transfer plate may cause damage on plate gasket and result in leakage.
Do NOT shorten guide bar by cutting.
It makes disassembling of the PHE impossible.
In general, do NOT remove stud bolt of connection.
It may cause damage on the threads.
Stud bolt is to be removed very carefully not to make any damage on the threads of both stud bolt and its hole at your own risk, only when it is absolutely necessary.
Do NOT weld or attach any piping support onto the frame, guide bar, and/or guide bar support.
Welding causes thermal damage on plate gaskets and attached parts may interrupt handling when disassembling.
Do NOT enter debris or foreign materials into PHE.
Install a strainer on upstream to prevent clogging in PHE.
When flushing pipes for commissioning operation, install a temporary strainer or provide bypass on upstream PHE in order to prevent debris or foreign materials into PHE.
Do NOT start and stop the pump frequently (in a short time).
During commissioning, pay attention to time duration of pump start/stop, or there would be leakage due to difficulty of gasket restoration caused by temperature and pressure variation. After stopping, min. 3 minutes is recommended to restart.
Open and close the valve slowly so as not to create a sudden pressure fluctuation.
Do NOT operate in excess of the design conditions (temperature, flow rate, pressure, etc.).
It may cause deformation of the heat transfer plates or leakage. Also, the required performance may not be achieved.
Do NOT apply impact pressure.
Do not apply impact pressure to PHE, such as from starting-up of pump, sudden close of valve, or by steam hammer occurred. Deformation, cracks, or leaks in the heat transfer plates are possible if long time repeated pressure pulsation within few seconds
Do NOT apply instantaneous negative pressure.
Drawdown may occur if instantaneous negative pressure is applied to the PHE by pump stop or valve closing, or heat transfer plates deformation may also.
Do NOT freeze.
If freezing occurs in PHE, the heat transfer plates may be damaged.
Drain out completely to avoid freezing in case of preservation in cold areas. In warm areas, if storing the equipment for a long time, store it with liquid at full capacity.
CAUTION
If using a pump with specifications in excess of the PHE's design pressure, install a safety device on the pump's delivery side or the
PHE's inlet or outlet.
Even if not required by applicable code and regulation, a safety device is necessary to protect the equipment.
Secure working space around PHE.
Adequate piping design is required, taking into account the working space for disassembly and tightening device.
Perform maintenance of PHE that handle dangerous fluids, such as a strong acid or strong alkaline, in an environment that has drain water treatment equipment.
Waste media in accordance with laws, codes and regulations. Be careful not to drain liquid into a river or ocean area.
If untreated liquid leaks, take measures in accordance with the "Material
Safety Data Sheet (MSDS)" for the treatment liquid you used.
P2
2 Names of Components
PHE consists of the following parts.
[NOTE]
Refer to the "
Plate Arrangement Drawing
" for equipment specifications.
Tightening bolts and nuts
E-Frame
Upper guide bar
Upper guide bar
E-Frame
S-Frame
Stud bolt and nut
S-nozzle
S-nozzle
S-Frame
Stud bolt and nut
S-nozzle
S-nozzle
Tightening bolts and nuts
Name plate
Name plate
S-nozzle
S-nozzle
Lower guide bar
Frame support
Heat transfer plates
S-nozzle
S-nozzle
Fig. 2-1 J Type Heat Exchanger
Guide bar support
Lower guide bar
Heat transfer plates
Fig. 2-2 P Type Heat Exchanger
Upper guide bar
E-nozzle
E-Frame
C-nozzle
Guide bar support
L-Frame
S-Frame
Tightening bolts and nuts
S-nozzle
S-nozzle
<SectionⅠ>
● ●
<SectionⅣ>
<SectionⅢ>
●
Nameplate
<SectionⅡ>
●
S-nozzle
S-nozzle
Lower guide bar
E-nozzle
C-Frame
C-nozzle
Heat transfer plates
Fig. 2-3 BP2CL Type Heat Exchanger
P3
3 Components Details
3-1 Heat Transfer Plate
The heat transfer plates comprise of the following three types.
D-Plate (First heat transfer plate between the S, L, C, and E-Frames)
E-Plate (Last heat transfer plate between the S, L, C, and E-Frames)
Channel plates (Heat transfer plates except for the D-Plate and E-Plate between the S, L, C, and E-Frames)
A-Plates are turned upside down to be used as B-Plates.
The opposite is the same.
(Excluding some models)
We have a lineup of the following materials for heat transfer plates.
Stainless steel, Titanium, Titanium alloy, Nickel alloy, and so on
3-2 Plate Gasket
The plate gaskets comprise of the following four types.
D-Gasket (Installed to the D-Plate port hole)
E-Gasket (Installed to the E-Plate port hole)
Channel gaskets (Gaskets installed to the front surfaces of heat transfer plates other than the D-Plate)
Distance piece (String gasket that fills the gasket groove on the D-Plate or
E-Plate)
[NOTE]
These are not mounted on some types depending on the heat transfer plate model and whether the plate is with or without passage holes.
In the same way as the heat transfer plates, "A-Plate channel gaskets" are turned upside down to be used as "B-Plate channel gaskets". The opposite is the same.
We have a lineup of the following materials for gaskets.
NBR, EPDM, Silicon, FPM, PTFE encapsulated, and so on
"A-", "AG-", or "AN-" in front of the gasket material indicates "Slit-In" type.
3-3 Connection
Following figures are standard products for connection.
Other types of connections are available as you want.
N TN
B-Plate A-Plate
B-Plate gasket
A-Plate gasket
KN
Fig. 3-1. Rubber covering type
Fig. 3-2. Metal covering type
(Bended product)
Fig. 3-3. Metal covering type
(Welded product)
P4
4 Nameplate
The figure on the right is manufacturer’s standard nameplate installed on a
Hisaka PHE.
When inquiring, notify us of the "MFG. NO." and "MODEL (TYPE)" described on the nameplate.
TIGHTENING LENGTH Max. on the nameplate may differ from that of
Assembly Drawing. The former is the actual dimension at delivery, while the later is only the design dimension. When reassembling after replacing plate gaskets or cleaning, follow the values on the nameplate.
Fig. 4-1. Nameplate (sample)
5 Accessories
Any accessories, like a ratchet spanner, anchor bolt, thermometer, pressure gauge, etc., for HISAKA PHE are to be supplied as option upon request.
6 Consumables
Not all heat transfer plates are durable parts. Heat transfer plates to be used under corrosive and/or erosive environment shall be considered as consumables. (Refer to: "12-3-1. Heat Transfer Plate Replacement")
Plate gaskets are consumables. Replace them periodically. (Refer to: "12-3-2. Replacement of Plate Gasket")
7 Model Description
The model description for HISAKA PHE indicates the following details.
4 6 A
-
TN RX
-
Heat transfer plate model
- UX
- LX
- SX
- RX
Etc.
1
Size of heat transfer plate
- 0 (small) to 16 (large)
Chevron angle of heat transfer pattern
- 1 to 6: Mono arrangement
- 7 to 9: Mixed arrangement
Plate thickness
- 5: 0.5mm
- 6: 0.6mm
- 8: 0.8mm
- 0: 1.0mm
B A
Method for channel gasket installation
- None: Glued
- A: Slit-in (Glueless)
- B: Glued Slit-in gasket
* Either of the left figures is applicable except for some models.
H J R
-
24
Indicates the number of heat transfer plates.
Indicates special specifications.
- R: Saturated steam heating
- L: With a divider
- C: With a channel frame
Etc.
Indicates the frame model.
- J: Exclusive for small size / less plates
- P: Universal except for the above
Indicates the class of the frame's resistance to pressure
- None or E: For low pressure
- U: For high pressure
- H: For middle pressure
- S: For ultra-high pressure
Etc.
Connection
- None: Projected nozzle with flange, ferrule, etc.
- N: Rubber covering
- TN: Bended metal covering
- KN: Welded metal covering
Stainless steel covers
- B: Exclusive for food machinery use
P5
8 Tests Before Commissioning Operation
After installation, commissioning operation of the PHE is to follow the conditions below.
8-1 System Test, Piping Test, Equipment Test
Check the following nine items.
If all of the items are not satisfied, do not operate the equipment and inform your supervisor or safety manager.
Install safety apparatus compliant with various standards or regulations to the PHE installed line.
Confirm that the nozzle orientation in the "Plate Arrangement Drawing" and "Assembly Drawing".
Provide vending on both side of the PHE to facilitate the removal of air from the system.
Do not apply valve and piping loads to the nozzles. Use pipe supports not to load on the S-, C-, and E-Frames.
However, support structures are not installed in the maintenance space, or a removable support structure is used.
Ensure that flushing is completed in order to prevent welding spatter, debris and/or foreign materials into PHE.
Confirm that the tightening length is correct.
Tightening length on the Assembly Drawing may differ from actual length. Refer the tightening length in the nameplate which describes the actual dimension at the delivery and after maintenance.
Confirm that all nuts for tightening bolt are not loose.
Fulfill the fluid for both hot and cold side. Confirm all air is out and liquid will flow out of the vent. Ensure that start the operation with fulfilled condition, when non-fulfilled condition of PHE, it may result the following;
- pump overload
- heat transfer plates may be deformed and cracked, leaked due to impact pressure
There is no leak between the heat transfer plates, piping connections, or other locations.
8-2 Pressure/Leak Test for PHE and System Pressure Test
PHE has been performed pressure-leak test before delivery. In case of retest at site, follow below instructions.
Also, in case of pressure /leak test for whole system including up/down stream equipment, follow below instructions.
In case of hydrostatic test
Pressurize hot and cold side independently and/or both sides at the same time. Actual test pressure shall not exceed the specified test pressure. Over test pressure could result in heat transfer plate/frame deformation and/or leaking. The test pressure is referred to Plate Arrangement Drawing.
In case of pneumatic test
Pressurize hot and cold side independently and/or both sides at the same time. Keep distance from PHE during the test.
When compressed air or nitrogen for pneumatic test is leaked, it is very dangerous since there would be an impact caused by volume expansion in addition to such test pressure. The test pressure is referred to Plate Arrangement Drawing.
8-3 Initial Flushing for Piping
Initial flushing for piping shall be performed after piping before operation in order to prevent welding slag and/or leavings, such as tool or dust cloth, come into PHE chamber. Generally, the methods of flushing are;
- Removing PHE from the piping
- Applying the temporary strainer for the upstream piping
In case of removing PHE from the piping, do not remove studded bolt on PHE frame. In case of applying temporary straighter, refer to “1 Installation Manual, Table 8-1 Recommended strainer hole size” and select the adequate strainer hole size. Apply the strainer with external reinforcement such as punching metal because screen without reinforcement can be damaged easily.
P6
9 Operation
The procedure for start-up depends on your use. Reconfirm your use and follow its procedure.
General Starting Operation (No burnt or No frozen fluid)
- Fullfill PHE chamber with media after all air is expelled for both sides.
- Flow heating side media.
- Flow heated side media.
Starting operation in case of possibility of burn by using hot water
- Fullfill PHE chamber with media after all air is expelled for both sides.
- Flow heated side media.
Starting operation in case of possibility of burn by using saturation vapor.
- Fullfill PHE chamber with media after all air is expelled for heated sides.
- Drain media from heating side.
- Flow heated side media.
- Flow heating side media.
- Flow heating side media.
Starting operation in case of freezing by using chilled water
- Fullfill PHE chamber with media after all air is expelled for both sides.
- Flow cooled side media.
- Flow cooling side media.
[CAUTION]: Do NOT apply impact pressure.
Do not apply impact pressure to PHE, such as from starting-up of pump, sudden close of valve, or by steam hammer occurred. Deformation, cracks, or leaks in the heat transfer plates are possible if long time repeated pressure pulsation within few seconds
10 Shutdown
The procedure for shutdown depends on your use. Reconfirm your use and follow its procedure.
General shutting down (No burnt or No frozen fluid)
- Shut off heated side media.
- Shut off heating side media.
Shutting down in case of possibility of burn by using hot water
- Shut off heating side media.
- Shut off heated side media after being less than burning temperature of the media.
Shutting down in case of possibility of burn by using saturation vapor.
- Shut off heating side media.
- Shut off heated side media.
- Hold until next start-up.
- Hold until next start-up.
- Discharge drain steam completely after shutting down.
[CAUTION]: Check the NO steam leaking.
Surely check that NO steam is leaking after shutdown of PHE.
Steam might leaks slightly, even if steam valve may seem to be firmly closed.
Shutting down in case of freezing by using chilled water
- Shut off cooling side media.
- Shut off cooled side media.
- Control the system to prevent freezing at shutting down.
- Drain at least one medium if there is a risk of freezing after shutting down.
[CAUTION]: Do NOT operate vacuum pressure to PHE.
Provide safety device such as vacuum breaker to prevent deformation/cracking/leaking of heat transfer plate.
Media could contract the volume due to temperature decrease of media as a result PHE chamber could work into vacuum pressure after shutting down of high temperature operation.
P7
11 Long-term Storage/Preservation
If the unit has been used and long-term storage is required, PHE is to be placed in storage as below table. The storage conditions are depending on your application and the environment.
Environment/Application
General use
Seawater use
Cold area use
Low temperature media use
Storage Procedure
It must be completely drained and storage with empty condition to avoid failures such as alteration of any remaining liquid, corrosion in heat transfer plates, and damage to components from freezing.
It must be completely fulfilled and storage.
It is recommended to replace the seawater with clean water to prevent decay.
In case of long term storage with empty and dry condition, dried scale on the heat transfer plates might not be able to cleaned.
It must be completely drained and storage with empty condition If freezing occurs in PHE, the heat transfer plates may be damaged.
Take care following four items when storing a spare gasket long term.
Do not place any items on it to avoid gasket deformation.
Store it in a black plastic bag or cardboard box to avoid ultraviolet exposure.
Store in a cool place avoiding direct sunlight and high temperature, high humidity.
Storage lifetime of new plate gasket is 3 years after the purchase. .
Take care following three items when storing a spare adhesive long term.
Store in a cool place avoiding direct sunlight and high temperature, high humidity.
Storage lifetime of new adhesive is 2 years after the purchase in case of general application “S-1” and food application
“F-2”.
Mix it well before use because the solvent and solids may separate due to long-term storage.
12 Maintenance
Periodic maintenance is recommended for long life use of PHE.
[NOTE]
The maintenance cycle is depending on your usage conditions. It is recommended to perform maintenance once per year for brand-new PHE and estimate appropriate maintenance cycle based on the result thereof.
Do not hesitate to contact us for PHE total support, the "MARUGOTO PACK" maintenance.
Our excellent staffs, well-trained, carry out maintenance with their professional skills and techniques.
If the customer carries out maintenance by yourself, the below explanations: "12-1. Disassembly", "12-2. Cleaning", "12-3.
Maintenance", "12-4. Inspection", "12-5. Assembly", and "12-6. Leakage Detection" to be followed.
12-1 Disassembly
Disassembly preparation
(1) Record the tightening dimensions before disassembly in case of reusing plate gaskets.
Record of the tightening length is not required when using brand-new plate gaskets.
(2) Drain out media completely and make sure that no media and pressure is remaining from the both chambers.
(3) For PHE with E-Nozzle and/or C-Nozzle, remove the primary and secondary connection and ensure to keep maintenance space and moving space for E-Frame, C-Frame, and heat transfer plates.
Maintenance
space
Maintenance space
Maintenance space
P8
(4) Grease up the tightening bolts after cleaning all tightening bolt threads.
(5) Prepare the ratchet spanner or the automatic tightening device.
Disassembly work
Remove the tightening bolts and nuts as following steps by using a ratchet spanner or automatic tightening device.
The following procedures shows an example of PHE with 14 tightening bolts and nuts.
(6) Slowly loosen the tightening bolts in order from 1-2 to 13-14.
[NOTE]
If you have two sets of ratchet spanners and/or automatic tightening device, slowly loosen two tightening bolts that are located diagonal, in order, 1 and
2, 3 and 4, to 11 and 12, 13 and 14,
simultaneously
(7) After loosing tightening bolts/nuts, where the tightening bolt/nut can easily loose by using bolts only 3,4,11 and 12, then remove all tightening bolts and nuts except for 3, 4, 11 and
12.
[NOTE]
Generally leave four tightening bolts and nuts, below the upper nozzles and above the lower nozzles.
(These four tightening bolts generally are longer than the other tightening bolts.)
(8) Slowly loosen the tightening bolts in order from 3 - 4 - 11 - 12 - 3 and so on.
[NOTE]
If you have two sets of ratchet spanners and/or automatic tightening device, slowly loosen two tightening bolts that are located diagonal, in order, 3 and
4, 11 and 12, simultaneously.
(9) After loosening the 3, 4, 11, 12 tightening bolts, remove them.
(10) Move the E-Frame to the guide bar support.
[NOTE]
If the E-Plate and E-Frame are sticking each other, move back the E-Frame slightly to separate E-Plate and E-Frame, and then move E-Frame to the back end.
P9
12-2 Cleaning
12-2-1 Manual Cleaning
Cleaning preparation
Prepare a high-pressure washer or a soft brush, cleaning water, and dust cloths before cleaning the heat transfer plates.
Prepare a work/step platform for large PHE because heat transfer plate can clean with suspending on the upper guide bar.
Cover PHE with protective sheet to prevent the scattering of cleaning water.
Install a dust filter on the drain port to prevent clogging of the port by scale or dirt from heat transfer plates.
Cleaning method
Two method of cleaning the heat transfer plates are available.
Select a cleaning method depending on the PHE's installation condition and the capacity of effluent disposal.
Cleaning by heat transfer plates Removed
Remove the heat transfer plates from the PHE frame to clean. Place or pile the heat transfer plates and clean both the front and back surfaces using a high pressure washer or a soft brush, such as nylon.
Cleaning by heat transfer plates Suspended
Clean the heat transfer plates while they are still suspended from the upper guide bar. Move the heat transfer plates one at a time to the S-Frame or
E-Frame direction and clean both the front and back surfaces of the heat transfer plates using a high pressure washer or a soft brush, such as nylon.
Fig. 12-1 Removal cleaning
Fig. 12-2 Suspended cleaning
[CAUTION] Do NOT use the heat transfer plates with a steel brush or steel wool.
If heat transfer plates are damaged by using a steel brush or steel wool, sealing performance could be decreased and it could cause corrosion. Therefore, use a soft brush, such as nylon, so as not to damage the heat transfer plates.
[CAUTION] Do NOT have the nozzle of the high pressure washer close to the PHE components.
High pressure water may peel the frame's coating or damage the heat transfer plate and plate gasket surfaces.
Therefore, keep the nozzle of the high pressure washer at least 100 mm away from the object being cleaned.
[CAUTION] Precaution for using a high pressure washer
Discharge pressure is 1 to 15 MPaG for the cleaning. Use water and a soft brush, such as nylon, for the scale which is difficult to remove.
12-2-2 CIP - Cleaning In Place
Cleaning in place is the preferred cleaning method when especially cleaning liquid are processed in PHE unit. Appropriate cleaning liquid could achieve a sufficient cleaning effect.
Please refer to "Plate Cleaning Manual" to select cleaning liquids and agents for PHE.
P10
12-3 Maintenance
12-3-1 Heat Transfer Plate Replacement
(1) Removing heat transfer plates
Replace any heat transfer plate with deformation, corrosion, or erosion to a brand-new one.
Please refer to “Plate Arrangement Drawing” and “Gasketting Manual” for heat transfer plate arrangement.
Rail type of upper guide bar (not round type)
- Slightly bend the bottom of the heat transfer plate.
- Slightly turn the heat transfer plate to the removing direction.
- Remove the lower hanger from the lower guide bar.
- Lift the heat transfer plate.
- Turn the heat transfer plate to the removing direction with a pivot point of upper hanger.
- Remove the heat transfer plate from the upper guide bar rail.
Round type of upper guide bar (not rail type)
- Lift the heat transfer plate.
- Remove the hanger from the heat transfer plate.
- Turn the heat transfer plate to removing direction with a pivot point of upper guide bar and remove.
3
1
[NOTE]
Following PHE models use round type guide bar and don’t have hangers.
Those models are held by upper and lower guide bars; UX-005, UX-01, RX-00, and CX-10.
2
(2) Hanging heat transfer plates
Rail type of upper guide bar (not round type)
- Hang the heat transfer plate's upper hanger on the upper guide bar rail.
- Turn the heat transfer plate to the inside direction with a pivot point of upper hanger and install the lower hanger to the lower guide bar.
Round type of upper guide bar (not rail type)
- Install the upper hanger of the heat transfer plate on the upper guide bar.
- Turn the heat transfer plate to the inside direction with a pivot point of upper hanger
and install the lower hanger to the lower guide bar.
- Lift the heat transfer plate and hook the hanger.
- Hang the heat transfer plate on the upper guide bar.
4
2
1
3
[NOTE]
Following PHE models use round type guide bar and don’t have hangers.
Those models are held by upper and lower guide bars; UX-005, UX-01,
RX-00, and CX-10.
This type of hanger is set on front (gasketted) side.
(Except for YX mode)
This type of hanger is set on back (non-gasketted) side.
P11
12-3-2 Replacement of Plate Gasket
Replace a plate gasket if it has any wearing, cracks, swelling, carbonization, adhesion, or foaming.
For types of plate gaskets, refer to each model's "Gasketting Manual".
(1) Removing the plate gasket
1) Remove the used gasket.
Remove the used gasket with moderate force not to deform the heat transfer plate.
At this time, be careful not to damage the heat transfer plate.
2) Clean the plate gasket groove of heat transfer plate.
Use solvent on the market to wipe away any adhesive remaining in the heat transfer plate's gasket groove.
Remove dirt, dust, which is stuck on the heat transfer plate's gasket groove.
(2) Preparing to replace the plate gasket
1) If replacing plate gaskets, check and prepare the number of required gasket.
Visually check that there is no dirt, dust, which is stuck on the plate gasket's front and back surfaces. If there is any visible scale on the front or back surface of the plate gasket, wipe it off using a clean dust cloth.
2) Prepare appropriate adhesive for the plate gasket material.
There are the following four types of adhesive. Use the adhesive HISAKA specified.
Types of adhesive Purpose of use
S-1
F-2
Silicon type
Double-sided tape
General use
For food products
For silicon gaskets
PTFE encapsulated gaskets, etc.
(3) Gasket adhesion.....Glued gaskets
1) Applying adhesive
Uniformly apply the specified adhesive to heat transfer plate's gasket groove.
Adhesion work should be done at a well-ventilated location because "S-1" and
"F-2" adhesives contain organic solvents. Work in
improperly vented
room is prohibited.
Adjust the quantity of adhesive applied not to overflow the adhesive from the heat transfer surface when the plate gasket is set on heat transfer plate.
2) Gasketting on heat transfer plate
Set plate gasket on heat transfer plate gasket groove.
At this time, be careful to prevent the gasket from run on to gasket groove wall.
The gasket expands during hot season and shrinks during cold season. When gasketting, put the gasket in tight and or extend it.
3) Curing and pressing (Refer to P5 only if the plate gasket is type "B" or "None".)
Pile up gasketted heat transfer plate, place a weight (approx. 5kg) and a board for curing. Perform curing time is 15 minutes and over.
Be careful not to fall over piled plates.
As recommendation, piled height is up to max. 1,000 mm.
NG
5kg
P12
(4) Gasketting....."Slit-In" type plate gasket
1) Gasketting
Attach the plugging part of the gasket into the slit on the outside of plate gasket groove.
Be careful not to run on to gasket groove wall.
2) Gasket Bonding
Gaskets of D-Plate front side and E-Plate back side are not “slit-in” type. Apply adhesive to the gasket groove and set D-Gasket(s) or E-Gasket(s).
Note: For only models which require gaskets of E-plate back side
[CAUTION]
Plate gasket has two sides. It is correct when stamp and color marking can be seen. (Some models are exception.) Before gasketting, fix any twisting of gasket and check the front and back surfaces.
12-4 Inspection
Be sure to perform the following inspections before assembling a Hisaka PHE.
Checking of heat transfer plate arrangement
– While moving all the heat transfer plates toward the S-Frame side or E-Frame side one by one, check the heat transfer plate arrangement.
– For heat transfer plate arrangement, refer to the "Plate Arrangement Drawing” and each model's "Gasketting Manual".
Furthermore, look at the arranged heat transfer plates from the side of PHE. If the arrangement is incorrect, heat transfer plates with the same configuration will be lined up.
GOOD or
NG or
Heat transfer plate patterns
Inspection of defects on the heat transfer plate two sides and plate gasket surface
– While moving the heat transfer plates toward the S-Frame side or E-Frame side one by one, visually check for foreign material on the two sides of the heat transfer plate gasket groove and the plate gasket surface, and for defects such as damage and/or corrosion.
If there is any foreign material on the two sides of the heat transfer plate gasket groove and/or the plate gasket surface, remove it using a soft cloth such as a dust cloth.
If there is any visible damage, corrosion on the two sides of heat transfer plate or the plate gasket surface, replace it with a brand-new one.
– At the same time, check that the plate gasket is free from peeling off the heat transfer plate.
If the gasket is peeling from plate groove, re-bonding only the peeling part.
– In case of “slit-in” type (plate gasket type "A"), only D-Plate front side and E-Plate back side are to be adhered. Use
Hisaka specified adhesive.
Damage inspection for the tightening bolts and nuts
– Visually inspect the surface of tightening bolts and nuts, and if there is any damage that may interfere with tightening, such as scratches, dents, or rust, replace it with a brand-new one.
P13
12-5 Assembly
Assembly preparation
(1) Prepare the ratchet spanner or the automatic tightening device.
(2) Grease up the tightening bolts after cleaning all tightening bolt threads.
Assembly work
(1) Move all heat transfer plates that have been checked/inspected plate arrangement to the S-Frame side, and move the E-Frame to the S-Frame side.
(2) Place the tightening bolts for position 3, 4, 11, and 12.
[NOTE]
Place the tightening bolts and nuts in four positions, below the upper nozzles and above the lower nozzles. (If there are long bolts and short bolts, place the long bolts first.)
(3) Tighten the bolts to ensure the dimension in position 3, 4, 11 and 12 should be equal.
(4) Slowly tighten the bolts in order of 3411123 and so on.
[NOTE]
If you have two sets of ratchet spanners and/or automatic tightening device, slowly tighten two tightening bolts that are located diagonal, in order, 3 and
4, 11 and 12, simultaneously.
(5) Where 3, 4, 11, and 12 become hard to tight, place all tightening bolts and nuts in position 1 to 14.
(6) Tightening length of 1 to 14 should be equal.
(7) Slowly tighten the tightening bolts in order of 1, 2, to 13, 14, to 1.
[NOTE]
If you have two sets of ratchet spanners and/or automatic tightening device, slowly tighten two tightening bolts that are located diagonal, in order, 1 and 2
-> 13 and 14 -> 3 and 4 -> 11 and 12 -> … -> 5 and 6 -> 7 and 8, simultaneously.
The difference between each tightening length shall be within 10mm.
Further, the difference shall decrease to 5mm, 3mm and 1mm from 10mm when it gets harder to tighten up in order to prevent galling of the tightening bolts and nuts.
(8) Repeat step (7) until the tightening below-specified lengths.
In case that plate gaskets are not to be replaced: Tightening lengths recorded before disassembly
In case that plate gaskets are to be replaced: Tightening Length Max. on the nameplate
Tightening length
Tightening length
Tightening length
Tightening length
Tightening length
Tightening length
Tightening length
[NOTE]
Tightening for the HISAKA PHE shall be managed by tightening lengths but not by torque counting by millimeters.
It is not a problem if there might be some different tightening torque between each tightening bolt position.
P14
12-6 Leakage Detection
(1) Leakage detection shall be performed once assembly of PHE has been completed.
Check if any leakages appear at top, bottom and both sides of plate pack by carrying out hydrostatic test.
Testing pressure shall not exceed the design pressure.
(2) Maintain pressure for 10 minutes or longer. All works can be completed if no leakage.
In case of any leakage detected, mark on the leaking part and disassemble PHE again for visual check on the heat transfer plate and gasket surface.
13 Troubleshooting
Symptom Possible cause(s) Remedy/ Solution
Heat transfer performance has decreased.
The differential pressure increases or the flow rate decreases.
Fluid is leaking to the outside from between heat transfer plates.
The heat transfer surfaces get fouled.
Fouling on the heat transfer surface is making the plate gap narrow.
The port holes and/or the heat transfer surfaces are clogging.
Disassemble the Heat Exchanger and make the heat transfer plates clean.
Be sure to check if any pipes connected to the inlet and outlet of PHE are clean.
Sealing performance has decreased due to insufficient tightening.
Sealing performance has decreased due to plate gasket deterioration.
After PHE internal pressure shall be
atmospheric pressure
and tighten the plate pack sufficiently.
However, do not tight shorter than the minimum length.
Disassemble PHE and replace any damaged plate gaskets to brand-new one.
Foreign material exists on the sealing surface of plate gasket.
Disassemble PHE and wipe off the foreign materials on the sealing surface of plate gasket by using a dust cloth.
Gasket runs on to gasket groove wall. Disassemble PHE and reset the plate gasket.
Fluid is leaking to the outside from between S-Frame and the D-Plate.
The heat transfer plate arrangement is incorrect.
Disassemble PHE and heat transfer plate arrangement shall be corrected.
Heat transfer plate has crack and/or pin-hole due to corrosion etc.
Disassemble PHE and replace any damaged heat transfer plate to brand-new one.
Heat transfer plate deforms.
Sealing performance has decreased due to insufficient tightening.
Sealing performance has decreased due to D-plate gasket deterioration.
Foreign material exists on the sealing surface of D-plate gasket.
D-plate gasket runs on to gasket groove wall.
After PHE internal pressure shall be
atmospheric pressure
and tighten the plate pack sufficiently.
However, do not tight shorter than the minimum length.
Disassemble PHE and replace any damaged
D-plate gaskets to brand-new one.
Disassemble PHE and wipe off the foreign materials on the sealing surface of D-plate gasket by using a dust cloth.
Disassemble PHE and reset the D-plate gasket.
Heat transfer plate has crack and/or pin-hole due to corrosion etc.
Disassemble PHE and replace damaged
D-plate to brand-new one.
P15
Symptom
(Continued from the previous page)
Fluid is leaking to the outside from between S-Frame and the D-Plate.
Possible cause(s)
Metal covering nozzle has crack and/or pin-hole due to corrosion etc.
Welding part of metal covering nozzle has crack and/or pin-hole.
Rubber covering nozzle has crack.
Remedy/ Solution
Replace a set of the S-Frames with a brand-new one.
Inquire with our company whether the welding part can be repaired/changed or not.
Fluid is leaking to the outside from between E-Frame and the E-Plate.
The mixture of hot side media and cold side media has occurred.
Sealing performance has decreased due to insufficient tightening.
Sealing performance has decreased due to E-plate gasket deterioration.
(If equipment has E-Nozzle)
Foreign material exists on the sealing surface of E-plate gasket.
(If equipment has E-Nozzle)
After PHE internal pressure shall be
atmospheric pressure
and tighten the plate pack sufficiently.
However, do not tight shorter than the minimum length.
Disassemble PHE and replace any damaged E-plate gaskets to brand-new one.
Disassemble PHE and wipe off the foreign materials on the sealing surface of E-plate gasket by using a dust cloth.
E-plate gasket runs on to gasket groove wall.
(If equipment has E-Nozzle)
Disassemble PHE and reset the E-plate gasket.
Heat transfer plate has crack and/or pin-hole due to corrosion etc.
Metal covering nozzle has crack and/or pin-hole due to corrosion etc.
(If equipment has E-Nozzle)
Welding part of metal covering nozzle has crack and/or pin-hole.
(If equipment has E-Nozzle)
Rubber covering nozzle has crack.
(If equipment has E-Nozzle)
Disassemble PHE and replace damaged E-plate to brand-new one.
Replace a set of the E-Frames with a brand-new one.
Inquire with our company whether the welding part can be repaired/changed or not.
Heat transfer plate has crack and/or pin-hole due to corrosion etc.
Disassemble PHE and replace any damaged heat transfer plate to brand-new one.
P16
P17
MEMO
14 Plate Arrangement Drawing
<Sample>
- Plate arrangement of heat transfer plates is indicated.
- Summary for plate arrangement of heat transfer plate including plate hole specification / number of plates is indicated.
- Revision history.
- The hole symbols and names for heat transfer plates are indicated.
- The equipment number, applicable code etc. are indicated.
- Equipment specification is indicated. such as:
Operating conditions, design pressure, test pressure, design temperature etc.
- Plate arrangement and nozzle connection size are
- Material components and painting color.
- Customer information.
- MFG number, Model, and Quantity.
P18
15 Assembly Drawing
This is one example of the Assembly Drawing of a Hisaka Plate Heat Exchanger. The following information is described in the Assembly Drawing.
- Tightening length for the heat transfer plates and full length of the PHE are illustrated.
- The PHE’s external dimensions and connect position of piping are illustrated.
P19
- This is the a drawing of the equipment's foundation dimensions.
- Some also include a detailed drawing of the nozzle.
- Describes this drawing's revision history.
- Describes the position, standard, and diameter for piping to be mounted.
- Describes this equipment's weight.
- Describes accessories.
- Describes the equipment number, applicable regulations, and the like.
- Describes the names, materials, required quantity, and specifications of components in simple terms.
- Describes customer information.
- Describes the serial number, model, and number of equipment units.
16 Exploded View [e.g.: J-Type Heat Exchanger]
2
1
4
3-2-2
3-2-1
3-2-2
3-2-1
3-3-1
3-2-2
3-2-1
3-2-2
3-1-1
Back
3-3-2
1-1
8
10
12
9
11
5
6
3-1-2
7
*1. Note: D/E plate gasket types with holes are different from the one without holes.
6
5
4
3-3-2
3-3-1
3-2-2
3-2-1
9
8
7
12
11
10
3-1-2
3-1-1
3
2
1-1
1
Part number
Nameplate
S4-Nozzle
S3-Nozzle
S2-Nozzle
S1-Nozzle
Tightening bolt and nut
Frame support
Lower guide bar (Square pipe)
Upper guide bar (Rail)
E-Plate gasket
E-Plate
Channel gasket
Channel plate
*1
D-Plate gasket
D-Plate
*1
Heat transfer plates with plate gaskets
E-Frame
Stud bolt and nut
S-Frame
Part name
P20
16 Exploded View [e.g.: P-Type Heat Exchanger]
12
2
14
1-1
8
10
16
9
11
1
4
3-3-1
3-2-2
3-2-1
3-2-2
3-2-1
3-2-2
3-2-1
3-2-2
3-1-1
Back
13
15
3-3-2
3-1-2 5
7
6
*1. Note: D/E plate gasket types with holes are different from the one without holes.
P21
9
8
7
6
5
4
3-3-2
3-3-1
13
12
11
10
16
15
14
3-2-2
3-2-1
3-1-2
3-1-1
3
2
1-1
1
Part number
Nameplate
E4-Nozzle
E3-Nozzle
E2-Nozzle
E1-Nozzle
S4-Nozzle
S3-Nozzle
S2-Nozzle
S1-Nozzle
Tightening bolt and nut
Guide bar support
Lower guide bar
Upper guide bar
E-Plate gasket
E-Plate
*1
Channel gasket
Channel plate
D-Plate gasket *1
D-Plate
Heat transfer plates with plate gaskets
E-Frame
Stud bolt and nut
S-Frame
Part name
16 Exploded View [e.g.: Welded P-Type Heat Exchanger]
1-1
8
10
16
9
11
1
12
2
4
3-2-2
3-2-1
3-2-2
3-1-1
3-3-1
3-2-2
3-2-1
3-2-2
3-2-1
Back
13
14
15
3-3-2
3-1-2
5
7
6
*2. When number of plates is an odd, the end of the heat transfer plate is a single plate, not a cassette.
*1. Note: D/E plate gasket types with holes are different from the one without holes.
9
8
7
6
5
4
3-3-2
3-3-1
13
12
11
10
16
15
14
3-2-2
3-2-1
3-1-2
3-1-1
3
2
1-1
1
Part number
Nameplate
E4-Nozzle
E3-Nozzle
E2-Nozzle
E1-Nozzle
S4-Nozzle
S3-Nozzle
S2-Nozzle
S1-Nozzle
Tightening bolt and nut
Guide bar support
Lower guide bar
Upper guide bar
E-Plate gasket
E-Plate (Cassette)
*1
*2
Channel gasket
Channel plate (Cassette)
D-Plate gasket *1
D-Plate (Cassette)
Heat transfer plates with plate gaskets
E-Frame
Stud bolt and nut
S-Frame
Part name
P22
16 Exploded View [e.g.: BP2CL Type Heat Exchanger]
8
10
27
1
9
11
16
12 2
14
4
17
18
20
22
23
25
24
26
19
21
5
13
15
*2. S, E, and C nozzle arrangements will be changed depending on heat transfer plate hole types.
*1. Note: D/E plate gasket types with holes are different from the one without holes.
7 6
3-3-2
3-3-1
3-2-2
3-2-1
3-1-2
6
5
8
7
4
3-1-1
3
2
1
13
12
11
10
9
18
17
16
15
14
23
22
21
20
19
27
26
25
24
Part number
Nameplate
C24-Nozzle
C23-Nozzle
C22-Nozzle
C21-Nozzle
C2-Frame
C14-Nozzle
C13-Nozzle
C12-Nozzle
*2
*2
*2
*2
*2
*2
*2
*2 C11-Nozzle
C1-Frame
L-Frame
E4-Nozzle
E3-Nozzle
E2-Nozzle
E1-Nozzle
S4-Nozzle
S3-Nozzle
S2-Nozzle
S1-Nozzle
Tightening bolt and nut
Guide bar support
Lower guide bar
Upper guide bar
E-Plate gasket
E-Plate
Channel gasket
Channel plate
D-Plate gasket
*1
*1
D-Plate
Heat transfer plates with plate gaskets
E-Frame
S-Frame
*2
*2
*2
*2
*2
*2
*2
*2
Part name
P23
17 Inquiries
Contact info for inquiries
HISAKA WORKS, LTD., Heat Exchanger Div., Sales Department
Osaka: 2-1-48, Higashi-Konoike-cho, Higashi-Osaka, Osaka, 578-0973, Japan
Tokyo: KYOBASHI OM BLDG. 1-19-8, Kyobashi, Chuo-Ku, Tokyo, 104-0031, Japan
Nagoya: Fujifilm Nagoya Bldg. 12th Floor, 1-12-17, Sakae, Naka-Ku, Nagoya,
Aichi 460-0008, Japan
URL : http://www.hisaka.co.jp/english/
Global Network
HisakaWorks S.E.A. Sdn. Bhd. (MALAYSIA)
No.2, Jalan TP2. Taman Perindustrian SIME UEP, 47600 Subang Jaya, Selangor
E-mail : [email protected]
Hisaka Works (Thailand) Co., Ltd. (THAILAND)
16 Soi Onnut 62 Kwang Suanluang, Khet Suanluang, Bangkok 10250, Thailand
E-mail : [email protected]
Hisaka Works (Singapore) Pte Ltd. (SINGAPORE)
No.18, Boon Lay Way, #02-118, Trade Hub 21 Singapre 609966
E-mail : [email protected]
Hisakindo (Sales Representative Office) (INDONESIA)
Kompleks Intercon Plaza block D8-9, Jl. Meruya Ilir Raya, Taman Kebon Jeruk,
Jakarta 11630, Indonesia
E-mail : [email protected]
Hisapino (Hisakaworks S.E.A. Philippines Sales Representative Office) (PHILIPPINES)
Suite 22C Level 2 Towet One Ayala Triangle, Ayala Ave., Makati City,
1226 Manila, Philippines
E-mail : [email protected]
Hisavina (Hisakaworks S.E.A. Vietnam Sales Representative Office) (VIETNAM)
Horizon Tower, No.304 214 Tran Quang Khai St., Ward, Tan Dinh, Dist. 1,
Ho Chi Minh, Vietnam
E-mail : [email protected]
Hisaka Works (China) Co., Ltd. (CHINA)
No.1 Xiangyuan Road, Changshu Southeast Economic Development Zone,
Changshu City, Jiangsu Province 215542, China
Hisaka Works (China) Co., Ltd. Shanghai Branch (CHINA)
Room 1603 Shanghai Orientalcenter, 699 West Nanjin Road,
Shanghai 200041, China
E-mail : [email protected]
Tel : +81-(0)72-966-9601
Fax : +81-(0)72-966-8923
Tel : +81-(0)3-5250-0760
Fax : +81-(0)3-3562-2759
Tel : +81-(0)52-217-2491
Fax : +81-(0)52-217-2494
Tel : +603-58804185
Fax : +603-80817185
Tel : +66-2704-6038~9
Fax : +66-2704-6037
Tel : +65-6897-8489
Fax : +65-6686-4579
Tel : +62-021-58901302
+62-021-5860158
Fax : +62-021-5304380
+62-021-5304885
Tel : +632-368-5676
Fax : +632 368 5757
Tel : +84 (8) 3910 7355
Fax : +84 (8) 39107356
Tel : +86-512-5213-3000
Fax : +86-512-5213-3008
Tel : +86-21-5211-0701
Fax : +86-21-5211-0720
P24
Hisaka (China) Co., Ltd. Beijing Branch (CHINA)
Room 1705 Block B Lucky Tower, 3 DongSanHuan Beilu Chaoyang District,
Beijing 100027, China
Tel : +86-10-6461-2411
Fax : +86-10-6461-2571
Hisaka (China) Co., Ltd. Guangzhou Branch (CHINA)
Room 1208 R&F Tianhe Commercial Bldg., 4 Huanting Rd. Tianhe,
Guangzhou, Guangdong, China
Tel : +86-20-3810-5515
Fax : +86-20-3847-7539
Hisaka Middle East Co., Ltd.
P.O. Box 8221, 5017 King Saud Rd, Al-Hosan Bldg. 5th floor, Dammam 31482, Kingdom of Saudi Arabia
Email : [email protected]
URL : www.hisaka-me.com
Tel : +966-3-8331473
Fax : +966-3-8331471
Hisaka Korea Co., Ltd.
Gwanghwamun Bldg. 15F, 149 Sejong-daero, Jongno-gu, Seoul, 110-730, Korea
Email : [email protected]
Tel : +82-(0)2-739-8861~3
Fax : +82-(0)2-739-8864
[NOTE]
Please inform us the "MFG. Number" and "Model" described on the nameplate or Plate Arrangement Drawing and Assembly Drawing.
For more information
Hisaka Works, Ltd. official homepage ( http://www.hisaka.co.jp/english/ ).
Customer's memo
Please fill in the table below with PHE information.
Company name
Contact personnel
Contact
Information
Post code
Address
Tel/Fax e-mail
Item
Number
MFG. Number
Model
Date MFG.
Maintenance
Records
P25
Inquiry Details
Please describe the symptoms of your PHE to lead the better solution.
Location(s) of failure
Symptom(s)
P26
HE-ME001302
2015.06. AIBS
advertisement
Key Features
- High-performance heat transfer
- Reliable and efficient operation
- Easy to operate and maintain
- Long-term performance
- Variety of applications
- Heating, cooling, and process fluids
- Detailed instructions for operation and maintenance
- Troubleshooting guide
- Plate arrangement and gasketting details
- Safety precautions