Shay Murtagh Septech 2000 Installation Instructions
Septech 2000 is a Domestic Waste Water Treatment system. It provides a safe and environmentally friendly way to treat wastewater. The Septech 2000 system is designed to be easy to install and maintain. It is also highly efficient, reducing the amount of water and energy that is used. In order to install the system, you will need to have an excavator on site for the day of delivery.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
Raharney, Mullingar, Co. Westmeath
TEL: (044) 74108 FAX: (044) 74552 email: [email protected]
www.shaymurtagh.ie
ELECTRICAL WIRING DETAILS
Fig 4
Client's Fuse Board
M
C
B
Septech 2000
Control Panel
Power Supply
7 Core Cable to Treatment Plant
An MCB from the client’s fuse board will supply the power to the Septech 2000 Control
Panel. If an RCBO is installed in the fuse board the MCB should receive the power from the Primary side of the RCBO, not power from the secondary side of the RCBO.
ELECTRICAL WIRING DIAGRAM FOR
SEPTECH 2000 CONTROL PANEL
Mains Switch
MCB 1
MCB 2
Aeration Hour Counter
24hr Timer
Fig 5
Transformer
Buzzer
Alarm Mute
Switch
Neutral
Bar (2,4)
Earth
Bar (7)
Mains Supply
Mains (L)
Aeration Pump (L) (3)
Percolation Pump (L) (1)
Design & Print by Mind’s I • 044 32926 • www.mindsi.ie
Float Switch 2 (6)
Float Switch 1 (5)
no.
no.
slope
Fig 2
EXCAVATION DETAIL
Fig 3
PERCOLATION DETAIL
Section through
Percolation Trench
Plan View of Trench
Septech 2000
– Domestic Waste Water Treatment system
Minimum Separation Distances in Metres
Watercours e Stream
Wells
Springs
Lake
Any
Dwelling
Site
Boundary
Road
Treatment
Plant
Percolation
Area
10m
10m
10m
30m
50m
50m
Installation:
1. The excavator must be on site on morning of delivery. The client must indicate the level of the inlet pipe at the hole. If ground conditions are dry, the hole can be dug before our installation personnel arrive.
Where the conditions are wet, the hole should only be excavated through the dry material and not below until the installer arrives. The level of rock on the site (if any) should be noted during the percolation test trial hole excavation. The client must have adequately sized rock breaking equipment where required. All excavation is the responsibility of the client.
7m
10m
3m
3m
4m
4m
Percolation Area:
1. For the percolation the following items are required.
Approx. 50m of normal gauge hydradare pipe
Minimum 1 no. 1_” Philmac Tee.
Minimum 20 tonnes 20-30mm clean round stone.
2. Check the planning guidelines for the required length of percolation pipe and whether the percolation is sub-surface or a raised bed.
2. The installer will explain the levels for the bottom of the hole as per Fig. 2
3. The outlet pipe of the Septech ends in a connector for the 1_” pipe. The percolation installer joins onto this pipe but only starts the stone when the percolation area is reached. Do not start the stone at the outlet from the Septech.
3. The truck arrives and the installer places the tanks in the hole with the truck mounted crane. The installer will assemble the interconnecting pipework and carry out the wiring of the tanks. The excavator may be required for backfilling at this stage. The excavation must be backfilled on the day of installation.
4. The percolation trenches should be constructed similar to Fig. 1 & Figure 3. The two inspection pots at the end of the pipe will arrive with the Septech.
Notes:
The inlet pipe into the Septech must be connected by the builder/owner.
4. The installer will leave the required amount of cable to run back into the house/garage.
The control panel will be left with the most senior person on site and this should be kept for the electrician for fixing and wiring.
When the lids are on the tanks and the backfilling is complete, the installer is finished.
Note :
Please have a mobile number for the excavator driver the evening before the installation.
Please indicate before the day of installation the level from the top of the finished ground to the invert of the inlet pipe. This is important to allow enough risers to be placed on the tanks.
Commissioning:
Normal use in a house will take 1-2 weeks for the tanks to fill up. When the tanks are nearly full the system is ready to be commissioned.
This involves the Service Engineer checking the installation and turning on the power. The
Septech warranty commences at the time of commissioning.
If you have any queries about Septech
Treatment Plants please contact us at the address on back page.