YKK AP YES 45 TU Front Set Storefront System Installation Manual
The YES 45 TU Front Set Storefront System is a versatile and durable storefront system designed for use in a variety of commercial applications. The system features a variety of framing members, accessories, and glazing options to meet the specific needs of your project. This manual will provide you with detailed instructions on how to install this system.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
YES 45 TU Front Set Storefront System
Installation Manual
02-4014-08 | ©2015 YKK AP America Inc. is a subsidiary of YKK Corporation of America.
YES 45 TU Front Set Storefront System
TABLE OF CONTENTS
Installation Notes ................................................................................. Page ii
PARTS DESCRIPTION
YES 45 TU Front Set Framing Members ............................................ Page 1 & 2
YES 45 TU Front Set Door Framing Members ................................... Page 3
YES 45 TU Front Set Accessories ...................................................... Page 4
FRAME FABRICATION
Determine Frame Size ......................................................................... Page 5
Fabricate Two Piece Mullions for Screw Spline Assembly ................. Page 6
Fabricate Tubular Mullions for Shear Block Assembly ........................ Page 7
Fabricate Corner Mullions for Screw Spline Assembly ....................... Page 8
Fabricate Corner Mullions for Shear Block Assembly ......................... Page 9
Fabricate Head, Horizontal & Sill Members ........................................ Page 10 to 12
Fabricate Glass Stops & Glazing Adaptors ......................................... Page 11
Fabricate Sill Flashing ......................................................................... Page 13 to 16
FRAME ASSEMBLY
Assemble Frames For Screw Spline Assembly .................................. Page 17 & 18
Assemble Frames For Shear Block Assembly .................................... Page 19 & 20
FRAME INSTALLATION
Install Sill Flashing End Dams ............................................................. Page 21
Install Sill Flashing ............................................................................... Page 22
Install Sill Flashing Splice Sleeve ........................................................ Page 23 & 24
Install Frames ...................................................................................... Page 25 to 27
Apply Perimeter Sealant ...................................................................... Page 28
Install Water Deflectors ....................................................................... Page 29
Apply Internal Sealant ......................................................................... Page 30
Install Glazing Adaptors ....................................................................... Page 31
GLAZING
Install Interior Glazing Gaskets ........................................................... Page 32
Install Glass ......................................................................................... Page 33
Install Anti-Walk Blocks ....................................................................... Page 34
Install Exterior Glass Stops & Gaskets ............................................... Page 35
Effective Date: November 9, 2015 | 02-4014-08
Page-i
YES 45 TU Front Set Storefront System
Installation Notes
1. Do not drop, roll or drag boxes of aluminum framing. Move and stack boxes with proper support to prevent distortion. If fork lifts are used be especially careful about striking the boxes when lifting or moving.
2. Store in a dry, out of the way area. If rain exposure, condensation or any water contact is likely, then all packaging material should be removed. Wet packaging materials will discolor and may stain aluminum finishes and paints.
3. All materials should be checked for quality and quantity upon receipt, YKK AP must be notified immediately of any discrepancies in shipment. Check to make sure that you have the required shims, sealants, supplies and tools necessary for the installation.
4. Carefully check the openings and surrounding conditions that will receive your material.
Remember, if the construction is not per the construction documents, it is your responsibility to notify the general contractor in writing. Any discrepancies must be brought to the general contractor’s attention before you proceed with the installation.
5. Gather your shop drawings, materials, packing list, and this installation manual. Carefully review parts location, the sequence it goes therein, when you glaze it and how you seal it. Installation instructions are of a general nature and may not cover every condition you will encounter. The shop drawings and/or installation manuals were prepared specifically for the product.
6. Any material substitutions must be of equal or greater quality.
7. Make certain that material samples have been sent for compatibility testing for all manufacturer’s sealants involved. Make certain sealants have been installed in strict accordance with the manufacturer’s recommendations and specifications.
8. Remember to isolate, in an approved manner, all aluminum from uncured masonry or other incompatible materials.
9. System-to-structure fasteners are not supplied by YKK AP. Fasteners called out on shop drawings are to indicate minimum sizes for design loading.
10. Entrances are to be installed plumb, square, level, and true.
11. If any questions arise concerning YKK AP products or their installation, contact YKK AP for clarification before proceeding.
12. YKK AP storefront and/or curtain wall framing is typically completed before drywall, flooring and other products which may still be in process. Take the extra time to wrap and protect the installed material.
13. Cutting tolerances are plus zero (0”), minus one thirty second (-1/32”) unless otherwise noted.
14. Check our website, www.ykkap.com, for the latest installation manual update prior to commencing work.
Page-ii
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
Head
FRAMING MEMBERS (2" x 4-1/2")
FOR OUTSIDE GLAZING
BE9-2514 Flush Filler
Head Receptor BE9-2562
Head Receptor Stop
Use with BE9-2562
Horizontal
Screw Spline Assembly
E9-1033
BE9-2515
Horizontal
Shear Block Assembly
Glass Stop
Use with BE9-2514
BE9-2515 & BE9-2517
Sill/Jamb
Screw Spline Assembly
BE9-2517
E9-2519
BE9-2513
Sill
Shear Block Assembly
BE9-2518
Thermal Sill Flashing
Snap-in Filler
Use with E9-0490 at Jamb Conditions
One Piece Mullion
Shear Block Assembly
Two Piece Mullion
Screw Spline Assembly
BE9-2578
E9-0491
BE9-2516
BE9-2511
E9-2512
Expansion Mullion
(Male)
Expansion Mullion
(Female)
E9-2526
E9-2525
90° Outside
Corner Mullion
90° Inside
Corner Mullion
135° Outside
Corner Mullion
E9-2507
E9-2506
BE9-2504
135° Inside
Corner Mullion
BE9-2505
0°–12.5° Hinged Inside
Corner Mullion
(Male)
BE9-2524
0°–15° Hinged Outside
Corner Mullion
(Male)
BE9-2527
Hinged Corner Mullion
(Female) Use with
BE9-2524 or BE9-2527
BE9-2528
Effective Date: November 9, 2015 | 02-4014-08
Page-1
YES 45 TU Front Set Storefront System
Head
FRAMING MEMBERS (2" x 4-1/2")
FOR INSIDE GLAZING
BE9-2521
Expansion Mullion
(Male)
Head Receptor BE9-2562
Expansion Mullion
(Female)
Head Receptor Stop
Use with BE9-2562
E9-1033
Horizontal
Screw Spline Assembly
Glass Stop
Use with BE9-2521
& BE9-2522
Sill/Jamb
Screw Spline Assembly
Sill
Shear Block Assembly
Thermal Sill Flashing BE9-2578
One Piece Mullion
Shear Block Assembly
BE9-2522
E9-2523
BE9-2513
BE9-2518
BE9-2516
E9-2526
E9-2525
90° Outside
Corner Mullion
90° Inside
Corner Mullion
E9-2507
E9-2506
135° Outside
Corner Mullion
BE9-2504
135° Inside
Corner Mullion
BE9-2505
0°–12.5° Hinged Inside
Corner Mullion
(Male)
BE9-2524
0°–15° Hinged Outside
Corner Mullion
(Male)
BE9-2527
Hinged Corner Mullion
(Female) Use with
BE9-2524 or BE9-2527
BE9-2528
Two Piece Mullion
Screw Spline Assembly
BE9-2511
Flush Filler E9-2512
Page-2
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
THERMAL
DOOR FRAMING MEMBERS
STANDARD
Door Jamb
E2-0051 Elastomer
Included
AS-2539
Door Jamb
Use with AS-0409
Slotted Pocket Filler
Use with AS-2539 or
BE9-2539
BE9-2537 Snap-in Pocket Filler
Snap-in Filler
Use with BE9-2537 at
Jamb Conditions
E9-1020
Interior Transom
Glass Stop
Applied Exterior
Transom Glass Stop
BE9-2542
E9-2541
Snap-in Filler
Use With E9-0490 at Jamb Conditions
Intermediate Door
Jamb
Use with AS-0409
Applied Door Stop
E2-0052 Elastomer
Weathering Included
Transom Bar
E2-0051 & E2-0062
Included
AS-2503
Transom Jamb
Pocket Adaptor
Exterior Transom Head
Glass Stop
E9-2425
Transom Bar
E2-0051 Elastomer
Included
Interior Transom Head
Glass Stop
E9-2536 OHCC Transom Bar
Threshold
1/2" x 4"
BE9-1535
OHCC Door Stop
E2-0051 Elastomer
Included
Exterior Transom
Head Glass Stop
Interior Transom
Head Glass Stop
Threshold
1/2" x 4"
E9-0490
E9-2546
E9-0491
E9-9312
AS-0409
E9-2543
AS-0488
E9-0489
AS-0718
E9-2425
E9-2540
E9-0407
Effective Date: November 9, 2015 | 02-4014-08
Page-3
Page-4
Glazing Adaptor
For 1/4" Glazing
Glazing Adaptor
For 1/2" & 3/4" IGU, 1/2"
Laminated Monolithic
Glazing Gasket
Elastomer Weathering
Pile Weathering
Weathering Gasket
Use with Expansion
Mullions
Shear Block
All Members - Inside Glazing
Sill Only - Outside Glazing
Shear Block
For Inside Glazing at Head and Intermediate Horizontal
Setting Block
For Intermediate
Horizontal
Side Block
For Intermediate Vertical
Shallow Pocket
Setting Block
For 1" Glazing
Transom Head
E2-0065
E1-1145
E1-1144
E2-0611
E2-0166
E2-0104
Setting Block
For Sill
E2-0177
Setting Block Chair
Use with E2-0177
Setting Block at Sill
End Dam
For Sill Flashing
YES 45 TU Front Set Storefront System
ACCESSORIES
E9-1040
Snap-in Filler
Use with AS-2539 at
Jamb Conditions
E1-1148
E9-1039
E2-0052
E2-0051
E2-0062
E1-1080
E1-0199
Water Defl ector E2-0047
1/2" “W” Side Block
For Intermediate Vertical
Deep Pocket
1-1/2" “W” Side Block
For Jamb
E2-0154
E2-0520
3/4" “W” Side Block
Only at Thermal Transom
Jamb Pocket
3/8" “W” Side Block
Only at Standard Transom
Jamb Pocket
Splice Sleeve
For Sill Flashing
BE9-2520
E2-0519
E2-0533
E2-0070
#8 x 3/8” PHSMS
For Hinged Mullions
PC-0806
#10-24 x 3/8” PHMS
For Attachment of Sill to Sill Flashing
#12 x 5/8" PHSMS
Type AB
For Attachment of end dam to sill fl ashing, and horizontals to shear blocks
#12 x 1-1/4" PHSMS
Type AB For Screw
Spline Attachment
#12 x 1-3/4" PHSMS
Type AB For Attachment of Shear Block to Vertical
#8 x 1/2" FHSMS
Type AB For Attachment of E9-2541 to Transom
Jamb
#10-32 x 2" FHSMS
For Attachment of OHCC
Door Stop
PM-1006
PC-1210
PC-1220
PC-1228
FC-0808
FN-1032
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
FRAME FABRICATION
STEP 1
DETERMINE FRAME SIZE
Determine Frame Width:
Measure
Measure
Measure
Note: Check the opening for squareness and plumb at both ends. Units must be installed in a true rectangle.
Frame Width
3/8"
Min.
Masonry Opening
3/8"
Min.
-Measure the width of the masonry opening at the top, middle and bottom.
-Select the smallest dimension measured and subtract 3/4" to the determine
the frame width to be used.
See Detail 1.
Detail 1
NOTE: Frame widths over 24’-0” require expansion mullions every 12 to 15 feet.
Determine Frame Height:
-Measure the height of the masonry opening in several places along
the entire length of the opening.
-Select the smallest dimension measured and subtract 1-3/16" to determine
the frame height to be used:
Minimum 3/8" shim/caulk joint at the head.
7/16" for sill flashing.
Minimum 3/8" shim/caulk joint below the sill flashing.
See Detail 2.
Effective Date: November 9, 2015 | 02-4014-08
Detail 2
Page-5
YES 45 TU Front Set Storefront System
FRAME FABRICATION
STEP 2
FABRICATE TWO PIECE MULLIONS
FOR SCREW SPLINE ASSEMBLY
-Cut the two piece mullion and jamb members to the frame height determined in Step 1.
-Fabricate holes in mullions for screw spline attachment using one of the
methods below:
1. Layout the hole locations as shown in Detail 3 and drill a 0.236” dia. (#B drill bit)
clearance hole at each location marked.
2. Use punch press with appropriate die set.
See Detail 3.
Exterior
Page-6
Outside Glazed
0.234" Dia.
Typical
Interior
Two Piece
Mullion
Top of
Horizontal
V-Grooves or
Screw Splines
Exterior
Detail 3
1-3/8" 5/8"
0.234" Dia.
Typical
Interior
Two Piece
Mullion
Top of
Horizontal
V-Grooves or
Screw Splines
Inside Glazed
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
FRAME FABRICATION
STEP 2 (Continued)
FABRICATE TUBULAR MULLIONS FOR SHEAR BLOCK ASSEMBLY
-Cut the vertical and jamb members to the frame height determined in Step 1.
-Tubular verticals require shear blocks for the attachment of head, horizontal and sill members:
Note: Open back horizontals, BE9-2517, must be used when using shear blocks.
-Mark the location for each shear block using one of the methods below:
1. Layout the shear blocks as shown in Detail 4.
-Drill a 0.188" diameter hole (#12 or 3/16" drill bit) at each location marked.
-Attach the shear blocks to the verticals using three (3) PC-1228 fasteners.
1-3/8" 5/8" 1-3/8" 5/8"
Tubular Mullion
0.188" Dia.
Typical
Top of
Horizontal
Exterior
Outside Glazed
Effective Date: November 9, 2015 | 02-4014-08
V-Grooves or
Screw Splines
Interior
Detail 4
Exterior
Inside Glazed
Tubular Mullion
0.188" Dia.
Typical
Top of
Horizontal
V-Grooves or
Screw Splines
Interior
Page-7
YES 45 TU Front Set Storefront System
FRAME FABRICATION
STEP 2 (Continued)
FABRICATE SNAP-IN FILLER FOR STANDARD AND CORNER MULLIONS
– SCREW SPLINE ASSEMBLY
-Cut the E9-2515 snap in fillers to the frame height determined in Step 1.
-Fabricate holes in vertical mullions for screw spline attachment using one of the
methods below:
1. Layout the hole locations as shown in Detail 3 and drill a 0.236” dia. (#B drill bit)
clearance hole at each location marked.
2. Use punch press with appropriate die set.
See Detail 5.
Exterior
E9-2512
1-3/8"
E9-2512
5/8"
0.234" Dia.
Typical
Interior
Top of
Horizontal
V-Grooves or
Screw Splines
Exterior
E9-2512
1-3/8"
E9-2512
5/8"
0.234" Dia.
Typical
Interior
Top of
Horizontal
V-Grooves or
Screw Splines
Detail 5
Page-8
Outside Glazed Inside Glazed
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
FRAME FABRICATION
STEP 2 (Continued)
FABRICATE CORNER MULLIONS FOR SHEAR BLOCK ASSEMBLY
-Cut the E9-2515 snap in fillers to the frame height determined in Step 1.
-Tubular mullions require shear blocks for the attachment of head, horizontal and sill members:
Note: Open back horizontals, BE9-2517, must be used when using shear blocks.
-Mark the location for each shear block using one of the methods below:
1. Layout the shear blocks as shown in Detail 6.
-Drill a 0.188" diameter hole (#12 or 3/16" drill bit) at each location marked.
-Attach the shear blocks to the verticals using three (3) PC-1228 fasteners.
1-3/8"
E2-2512
5/8"
1-3/8"
E2-2512
5/8"
0.188" Dia.
Typical
Top of
Horizontal
Exterior
V-Grooves or
Screw Splines
Interior
Detail 6
Exterior
Outside Glazed
Effective Date: November 9, 2015 | 02-4014-08
Inside Glazed
0.188" Dia.
Typical
Top of
Horizontal
V-Grooves or
Screw Splines
Interior
Page-9
YES 45 TU Front Set Storefront System
FRAME FABRICATION
STEP 3
FABRICATE HEAD, INTERMEDIATE HORIZONTAL MEMBERS FOR INSIDE GLAZING
-Cut head, intermediate horizontal, and sill members to the daylight opening (D.L.O.) as
indicated on the shop drawings.
-Intermediate horizontal members that will be attached to shear blocks require
additional fabrication:
BE9-2521 Head Members:
-Mark hole location at each end, 7/8" from the ends and centered along the “V”-groove.
-Drill a 0.234" diameter hole (15/64" drill bit) at each location marked for a #12 (PC-1210) fastener.
BE9-2522 Intermediate Horizontal Members:
-Mark a hole location at each end, 7/8" from the ends centered along the “V”-groove.
-Drill a 0.234" diameter hole (15/64" drill bit) at each location marked.
V-Grooves
7/8"
7/8"
Detail 8
HEAD
Detail 9
HORIZONTAL
STEP 4
FABRICATE GLASS STOPS & GLAZING ADAPTORS
-Cut glass stops to the same dimensions as their respective horizontals minus(–) 1/32”.
-Cut glazing adaptors to the daylight opening minus(–) 1/32”.
Page-10
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
FRAME FABRICATION
STEP 3 (Continued)
FABRICATE HEAD, INTERMEDIATE HORIZONTAL MEMBERS FOR OUTSIDE GLAZING
-Cut head, horizontal, and sill members to the daylight opening (D.L.O.) as
indicated on the shop drawings.
-Intermediate horizontal members that will be attached to shear blocks require
additional fabrication:
BE9-2514 Head Members:
-Mark hole location at each end, 7/8" from the ends and centered along the “V”-groove.
-Drill a 0.234" diameter hole (15/64" drill bit) at each location marked for a #12 (PC-1210) fastener.
BE9-2515 (BE9-2517 at End Bay) Intermediate Horizontal Members:
-Mark a hole location at each end, 7/8" from the ends centered along the “V”-groove.
-Drill a 0.234" diameter hole (15/64" drill bit) at each location marked.
7/8"
V-Groove
Detail 10
HEAD
7/8"
Detail 11
HORIZONTAL
STEP 4
FABRICATE GLASS STOPS & GLAZING ADAPTORS
-Cut glass stops to the same dimensions as their respective horizontals minus(–) 1/32”.
-Cut glazing adaptors to the daylight opening minus(–) 1/32”.
Effective Date: November 9, 2015 | 02-4014-08
Page-11
YES 45 TU Front Set Storefront System
FRAME FABRICATION
STEP 5
FABRICATE SILL FLASHING
For elevations without door framing:
-Cut sill flashing, BE9-2578 to the end of the frame plus (+) 1/4”.
For elevations with door framing:
-Cut the sill flashing from the end of the frame to the door jamb plus (+) 1/8”.
(See approved shop drawings for this dimension)
See Detail 12.
Jamb
Intermediate
Two Piece Mullion
BE9-2578
Sill Flashing
Jamb
Page-12
Jamb
Sill Flashing Cut Length =
(Frame Width) + 1/4"
Intermediate
One Piece Mullion
BE9-2578
Sill Flashing
Jamb
Sill Flashing Cut Length =
(Frame Width) + 1/8"
Detail 12
Door
Framing
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
FRAME FABRICATION
STEP 5 (Continued)
FABRICATE SILL FLASHING
-For openings longer than 24’-0” the sill flashing needs to be
spliced every twelve to fifteen feet.
-Allow for a 3/8” joint for expansion between sill flashing members.
-Mark the quarter points between vertical mullions on the sill flashing.
See Detail 13.
BE9-2578
Sill Flashing
3/8"
DETAIL 13
Effective Date: November 9, 2015 | 02-4014-08
Page-13
YES 45 TU Front Set Storefront System
FRAME FABRICATION
STEP 6
FABRICATE SILL MEMBERS
-Cut sill members to the daylight opening dimension between verticals.
-For end reactions over 500 lbs., fabricate sill members for anchoring to sill flashing:
-Measure in 6" from each end of the sill member and mark hole locations along the
“V”-groove located on bottom of profile as shown in Detail 14.
-Mark additional hole locations a maximum of 24" on center (O.C.).
-Drill a 0.213" diameter (#3 drill bit) hole at each location marked. See Detail 14.
7/8" 7/8"
0.189" Dia.
For Shear Block
E1-1144
BE9-2513
Screw Spline
Assembly
BE9-2518
Shear Block
Assembly
0.213" Dia.
Typical
“V”-Groove
6" Max.
24" Max.
24" Max.
Daylight Opening (D.L.O.)
STEP 6A
FABRICATE WEEP HOLES FOR SILL FLASHING
6" Max.
DETAIL 14
-Mark and drill a 5/16” diameter weep hole in the front of the sill flashing
at each D.L.O. quarter point.
See Detail 15.
Weep
Holes
DETAIL 15
1/4"
3/8"
1/8"
2" Daylight Opening (D.L.O.) 2" Daylight Opening (D.L.O.)
BE9-2578
2"
Page-14
1/4
Points
1/4
Points
1/4
Points
1/4
Points
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
FRAME ASSEMBLY
STEP 6A (Continued)
FABRICATE SILL FLASHING FOR CORNERS
Install sill flashing at corners:
-Cut two 12" long pieces of sill flashing BE9-2578 and miter (45° for 90°corners and
67.5° for 135° corners).
-Align the two pieces at the corner condition with the mitered ends pushed together tight and anchor
the sill flashing as called out on shop drawings.
-Apply and tool sealant to the mitered joint and anchor heads.
See Detail 16.
-Continue installing the rest of the sill flashing providing a 3/8" expansion joint at splices as shown in
Step 10 on Page 23.
Detail 16
90° Outside Corner Shown
Others Similar
3/8" BE9-2578
E2-0700
Seal All
Screw Heads
12"
Effective Date: November 9, 2015 | 02-4014-08
Page-15
YES 45 TU Front Set Storefront System
STEP 7 (Continued)
INSTALL CORNER ASSEMBLIES
FRAME ASSEMBLY
-Attach horizontal members to standard mullions as shown before in Step 2.
-Attach the other end of the horizontals to the corner mullions, hinged mullions, or flat fillers, or using
the same technique.
-Snap the corner framing members together to form the corner assemblies.
-Hinged mullions must be fastened through the ball joint 6" from each end and no more than 18"on
center with PC-0806 fasteners.
-Carefully move the corner assembly into place and snap it into the rest of the frame one
side at a time.
See Detail 17.
BE9-2512
BE9-2507
Detail 17
90° Outside Corner
(Inside Corner Similar)
PC-1228
(Shear Block Assembly)
BE9-2527
PC-1220
(Screw Spline Assembly)
BE9-2528
135° Outside Corner
(Inside Corner Similar)
BE9-2504
PC-0806
0°–15° Outside Corner
(Inside Corner Similar)
Page-16
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
FRAME ASSEMBLY
STEP 7 (Continued)
ASSEMBLE FRAMES
Inside Glazed Screw Spline Assembly:
-Clean all joint surfaces using cleaner approved by sealant manufacturer.
-Apply sealant to both ends of head, intermediate horizontal, and sill members
just prior to assembly.
-Attach head, intermediate horizontal and sill members to vertical members with two
PC-1220 fasteners at each end as shown below.
-Tool the sealant into the joints and wipe away any excess sealant.
See Detail 18.
PC-1220
Snap-in Filler
BE9-2521
Head
Head
Intermediate
Horizontal
Glass Stop
BE9-2522
Sealant
Sill
Sill
BE9-2513
Detail 18
Apply sealant to the shaded areas at each end.
CAUTION: Always assemble frames such that each lite of glass will have a minimum of one deep vertical glazing pocket.
Effective Date: November 9, 2015 | 02-4014-08
Page-17
YES 45 TU Front Set Storefront System
FRAME ASSEMBLY
STEP 7 (Continued)
ASSEMBLE FRAMES
Outside Glazed Screw Spline Assembly:
-Clean all joint surfaces using cleaner approved by sealant manufacturer.
-Apply sealant to both ends of head, intermediate horizontal, and sill members
just prior to assembly.
-Attach head, intermediate horizontal, and sill members to vertical members with two
PC-1220 fasteners at each end as shown below.
-Tool the sealant into the joints and wipe away any excess sealant.
See Detail 19.
BE9-2514
Head
PC-1220
Snap-in Filler
Head
BE9-2515
Sealant
Glass Stop
Intermediate
Horizontal
Sill
BE9-2517
(End Bay)
Sill
Detail 19
BE9-2513
Apply sealant to the shaded areas at each end.
Page-18
CAUTION: Always assemble frames such that each lite of glass will have a minimum of one deep vertical glazing pocket.
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
FRAME ASSEMBLY
STEP 7 (Continued)
ASSEMBLE FRAMES
Inside Glazed Shear Block Assembly:
-Clean all joint surfaces using cleaner approved by sealant manufacturer.
-Apply sealant to both ends of head, intermediate horizontal, and sill members.
-Apply sealant to the shear blocks as shown.
-Attach shear blocks to verticals with PC-1228 fasteners as shown.
-Attach head members to shear blocks at each end with one (1) PC-1210 fastener.
-Attach horizontal and sill members to shear blocks at each end with one (1) PC-1210 fastener.
Note: Open back horizontals must be used with shear blocks at end bays.
See Detail 20.
Tubular Vertical
PC-1228
Head
Head
BE9-2521
Sealant
Glass Stop
Intermediate
Horizontal
BE9-2522
Sill
PC-1210
BE9-2518
Detail 20
Sill
Apply sealant to the shaded areas at each end.
CAUTION: Always assemble frames such that each lite of glass will have a minimum of one deep vertical glazing pocket.
Effective Date: November 9, 2015 | 02-4014-08
Page-19
YES 45 TU Front Set Storefront System
FRAME ASSEMBLY
STEP 7 (Continued)
ASSEMBLE FRAMES
Outside Glazed Shear Block Assembly:
-Clean all joint surfaces using cleaner approved by sealant manufacturer.
-Apply sealant to both ends of head, intermediate horizontal, and sill members.
-Apply sealant to the shear blocks as shown.
-Attach shear blocks to verticals with PC-1228 fasteners as shown.
-Match drill shear block with 3/16" (#12 drill bit) hole for PC-1210 fastener.
-Attach head members to shear blocks at each end with one (1) PC-1210 fastener.
-Attach horizontal and sill members to shear blocks at each end with one (1) PC-1210 fastener.
Note: Open back horizontals must be used with shear blocks at end bays.
See Detail 21.
Tubular Vertical
PC-1228
Head
Head
BE9-2514
PC-1210
Glass Stop
Sealant
BE9-2517
Sill
Flat Filler
Intermediate
Horizontal
BE9-2518
Detail 21
Sill
Apply sealant to the shaded areas at each end.
CAUTION: Always assemble frames such that each lite of glass will have a minimum of one deep vertical glazing pocket.
Page-20
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
FRAME INSTALLATION
STEP 8
INSTALL SILL FLASHING END DAMS
-Hold the end dam with one hand and grab the tab with a
pair of pliers.
-Bend the end dam tab left or right 90 degrees in order to
“hand” the end dam for the left or right end of the flashing.
See Detail 22.
-Clean all joint surfaces using cleaner approved by sealant
manufacturer.
-Apply sealant to the end dam as shown in Detail 23.
-Slide the tab into the top portion of the sill flashing.
-Tap the tab into place with a small tool until the end dam is
snug against the end cut of the flashing.
-Fasten the end dam to the sill flashing with two PC-1210
screws, starting at the back, followed by the front as shown in
Detail 24.
-Tool sealant along the joint between the end dam and the sill
flashing as shown in Detail 25.
-Seal over any exposed screw threads.
E1-0199
Detail 22
Detail 23
Sealant
PC-1210
Detail 24
Effective Date: November 9, 2015 | 02-4014-08
Sealant
Detail 25
Page-21
YES 45 TU Front Set Storefront System
FRAME INSTALLATION
STEP 9
INSTALL SILL FLASHING
-Install the sill flashing with a minimum of 3/8" shim underneath. Sill flashing must
be installed level.
-Anchor the sill flashing to the structure a maximum of 4" from each end and then
18" to 24" on center.
-Apply and tool sealant to cover the heads of all anchors.
STEP 10
INSTALL SILL FLASHING SPLICE SLEEVE
-Remove the nub with a chisel or pliers 1-1/2" on both sides of splice joint
as shown in Detail 26 .
-After the sill flashing has been shimmed and installed to
the building structure, insert a small backer rod under the
sill flashing as shown in Detail 27.
-Position the Silicone Splice Sleeve against the back
wall below the groove.
-Bend the Silicone Splice Sleeve into the front on
1-1/
2”
the channel as shown. Mark and cut the sleeve
at this position.
-Clean Sill Flashing and Silicone Splice Sleeve with
isopropyl alcohol at the splice location
-Seal the flashing at the splice location as shown in
Detail 27, before positioning the flashing. Set the
Silicone Splice Sleeve into the Silicone Splice Sleeve.
-Tool sealant tight as shown in Detail 28, squeezing
the sheet flat with a seam roller.
-Thoroughly seal the small joint directly in front of the
Silicone Splice Sleeve as shown in Detail 28.
Detail 26
Nub
When using E2-0070, a compatible
Silicone Sealant must be used at the splice. Compatible Silicone Sealants include Tremco
®
Spectrem 2
®
and
Dow Corning
®
795.
E2-0070
Splice Sleeve
(Trim to Fit)
Sealant
Sealant
E2-0070
Splice Sleeve
Page-22
Backer Rod Length
Detail 27
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
FRAME INSTALLATION
End Dam
E1-0199
Seal Joint
With Sealant
Tape
3/8"
Detail 28
STEP 11
SILL FABRICATION
At every splice condition, apply bond breaker tape to the back of the sill member before the joint is sealed between the sill and sill flashing.
See Detail 29.
Bond Breaker Tape
Shear Block Assembly
Bond Breaker Tape
Detail 29
Screw Spline Assembly
Effective Date: November 9, 2015 | 02-4014-08
Page-23
YES 45 TU Front Set Storefront System
FRAME INSTALLATION
STEP 12
INSTALL FRAMES
-Snap assembled frames together if using screw spline assembly.
-Apply sealant continuously to the front of the back leg of the sill flashing and immediately set the
frame into the opening.
See Detail 30.
-Shim jamb and head members with a minimum of 3/8" shim.
-Anchor the frame to the structure at the sill*, head, and jamb: 3" from the ends and then
18" to 24" on center, or as required by P. E. calculations.
-Always install a shim at all anchor locations.
-Seal all screw heads.
Note: Use only flat head fasteners at head and jamb conditions.
Outside Glazed Inside Glazed
PM-1006
Page-24
Sealant
3/8"
Seal All
Screw Heads
Detail 30
PM-1006
Sealant
3/8"
Seal All
Screw Heads
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
FRAME INSTALLATION
STEP 12 (Continued)
INSTALL FRAMES
-For mullion end load reactions over 500 lbs., attach the sill to the sill flashing
using PM-1006-SS screws.*
-Also, add one (1) PM-1006-SS fastener 2" in both directions from the
center line of the splice.
See Detail 31.
*To determine end load reactions, consult YKK AP DirecTech or refer to approved shop drawings or P. E. stamped calculations.
PM-1006-SS
Detail 31
18" to 24" O.C.
2"
2"
18" to 24" O.C.
Effective Date: November 9, 2015 | 02-4014-08
Page-25
YES 45 TU Front Set Storefront System
FRAME INSTALLATION
STEP 12 (Continued)
INSTALL FRAMES
-Tape edges of sill flashing splice joint.
-Apply and tool sealant.
-Carefully remove tape before sealant skins over.
See Detail 32.
3/8"
Tape
3/8"
Sealant
Detail 32
Page-26
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
FRAME INSTALLATION
STEP 12 (Continued)
INSTALL FRAMES
Prior to snapping the assembled frames into the door jamb, the end of the sill flashing needs to be sealed to the door jamb.
-Apply and tool sealant to all sill flashing to door jamb joints.
-Apply sealant to completely fill the door jamb cavity and ramp the sealant
down onto the sill flashing.
See Detail 33.
Refer to the Entrances Installation Manual for door installation instructions.
2"
2-1/4"
E9-0490
Door Jamb
Seal Jamb
To Sill Flashing
BE9-2539
Thermal Door Jamb
Seal Jamb
To Sill Flashing
Ramp Sealant
Down Onto
Sill Flashing
BE9-2578
Sill Flashing
Detail 33
Effective Date: November 9, 2015 | 02-4014-08
Page-27
YES 45 TU Front Set Storefront System
STEP 13
APPLY PERIMETER SEALANT
FRAME INSTALLATION
-Perimeter seal required at interior and exterior.
-Install backer rod around the perimeter of the frame.
-Apply sealant to the joint between the frame and the structure.
-Do not block the weep holes with sealant.
-Make sure all screw and anchor heads are sealed.
See Detail 34.
Inside Glazed Outside Glazed
3/8"
Detail 34
Do Not Seal
This Area!
BE9-2513
Jamb
Do Not Seal
This Area!
Page-28
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
STEP 14
INSTALL WATER DEFLECTORS
FRAME INSTALLATION
YES 45 TU requires the installation of a water deflector, E2-0047, at the ends of every intermediate horizontal to keep water off of the insulating glass units.
-Peel away the protective paper from the bottom
of the water deflector, E2-0047, and install the
water deflector by rotating it over each end of
the horizontal.
-Position the vertical leg of the water deflector
against the end of the horizontal.
Note: For best adhesion, make sure that the horizontal is clean and dry.
See Detail 35.
Detail 35
1" Glazing Shown
Apply and Tool Sealant
Ramp
Detail 36
1" Glazing Shown
-Apply and tool sealant along the edges of the water deflector and down
onto the horizontal.
See Detail 36.
-Seal the ramp of the water deflector to the sides of the vertical gasket reglets.
See Detail 37.
Detail 37
1" Glazing Shown
Effective Date: November 9, 2015 | 02-4014-08
Page-29
YES 45 TU Front Set Storefront System
FRAME INSTALLATION
STEP 15
APPLY INTERNAL SEALANT
-Apply sealant to the vertical intersection of the horizontal and
vertical members.
-Tool all of the sealant to ensure a water tight joint.
-Make sure all exposed screw heads are sealed.
See Detail 38.
Inside Glazed Outside Glazed
Apply and
Tool Sealant
Apply and
Tool Sealant
Detail 38
Page-30
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
FRAME INSTALLATION
STEP 16 (Optional)
INSTALL GLAZING ADAPTORS
Glazing adaptors, E9-1039 and E9-1040, allow for glazing infills other than the standard 1".
Please refer to the glazing table below for possible adaptor/gasket combinations.
-Snap glazing adaptors into the interior gasket reglets of the verticals.
-Snap glazing adaptors into the interior gasket reglets of the horizontals.
-Apply and tool sealant to the joint between vertical and horizontal glazing adaptors.
See Detail 39.
Glazing Table - YES 45 TU
Glass
Thickness
3/16"
1/4"
5/16"
3/8"
1/2"
5/8"
3/4"
7/8"
1"
Adaptor
E9-1040
E9-1040
E9-1040
E9-1040
E9-1039
E9-1039
E9-1039
—
—
Exterior
E2-0052
E2-0052
E2-0053
E2-0053
E2-0064
E2-0052
E2-0053
E2-0064
E2-0052
Interior
E2-0064
E2-0052
E2-0052
E2-0053
E2-0064
E2-0052
E2-0053
E2-0064
E2-0052
E9-1039
Seal Corners of
Glazing Adaptors
E9-1040
Detail 39
Outside Glazed Shear Block Assembly
Shown, others similar.
Horizontal
Effective Date: November 9, 2015 | 02-4014-08
Vertical
Page-31
YES 45 TU Front Set Storefront System
GLAZING
STEP 17
INSTALL INTERIOR GLAZING GASKETS (Outside Glazing Shown, Inside Glazing Similar)
The interior glazing gaskets must be installed prior to the glazing process.
-Using a small brush clean out any dirt that may have accumulated in the gasket reglets.
Vertical glazing gaskets must be installed first:
-Cut vertical glazing gaskets to Daylight Opening plus(+) 1/4" for each foot of length.
-Insert the gasket into the reglet at each end first, and then insert the gasket at the
midpoint of the opening.
-Push the gasket into the reglet starting at the midpoint and work towards each end.
Apply Sealant
To Horizontal
Gasket Ends
Glazing Gasket Glazing Gasket
Tool Sealant at
Gasket Corners
Detail 40
Install horizontal glazing gaskets next:
-Cut horizontal glazing gaskets to Daylight Opening plus(+) 1/4” for each foot of length.
-Apply sealant to each end of the horizontal glazing gasket prior to inserting into the reglet.
-Insert the gasket into the reglet at each end first and push each end tight against the
vertical gasket.
-Then insert the gasket at the midpoint of the opening and push the gasket into the reglet
starting at the midpoint and work towards each end.
-Tool the excess sealant at the gasket corners to ensure a watertight seal.
See Detail 40.
Page-32
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
GLAZING
STEP 18
INSTALL GLASS (Outside Glazing Shown, Inside
Glazing Similar)
Determine the glass size:
Horizontal Glass Size = D.L.O. plus(+) 3/4"
Vertical Glass Size = D.L.O. plus(+) 3/4"
-Install E2-0166 side block into the shallow pocket.
-Carefully install the glass into the opening: insert the
leading edge of the lite up and into the deep pocket
first and then rotate the trailing edge in place.
-Carefully lift lite of glass, install setting blocks at
quarter points of horizontal D.L.O. or according to
engineering calculations.
-Make sure the glass is properly positioned on
all setting blocks.
E2-0611
Setting Block
See Detail 41.
E2-0177
Setting Block
E1-1080
Setting Block Chair
Detail 41
Outside Glazed Shown
Inside Glazed Similar
3/8"
Daylight Opening (D.L.O)
E2-0052
3/8"
E2-0166
Side Block
1/4 Points 1/4 Points
Setting
Block
Effective Date: November 9, 2015 | 02-4014-08
Page-33
YES 45 TU Front Set Storefront System
GLAZING
STEP 19
INSTALL ANTI-WALK BLOCKS
YES 45 TU frames require the installation of an anti-walk block E2-0154, in the mullion deep glazing pocket of each lite centered on the daylight opening, and anti-walk block E2-0520 in glazing pocket at jamb conditions.
-Flatten the anti-walk block against the exterior surface of the glass and push it
into the opening between the glass and the mullion until it is released into the
glazing pocket.
See Detail 42.
Deep Pocket
Daylight Opening (D.L.O.)
Anti-Walk Block
E2-0154
Deep Pocket
E2-0154
(Intermediate)
E2-0520
(Jamb)
C L
1/4 Points
E2-0166
Side Block
E2-0611
Setting Blocks
Detail 42
Page-34
02-4014-08 | Effective Date: November 9, 2015
YES 45 TU Front Set Storefront System
GLAZING
STEP 20
INSTALL INTERIOR GLASS STOPS
& GLAZING GASKETS (INSIDE GLAZING)
-Snap the interior glass stops into place as shown in
Detail 43.
-Install the interior glazing gaskets using the same
technique described in Step 17 on Page-30.
Always install the vertical glazing gasket first.
Repeat Steps 18 through 20 until all lites are installed.
Inside Glazed
Glazing Gasket
E2-0052
Detail 43
1" Glazing Shown
1/4" Glazing Similar
Interior Glass
Stop
STEP 20A
INSTALL EXTERIOR GLASS STOPS
& GLAZING GASKETS (OUTSIDE GLAZING)
-Snap the exterior glass stops into place as shown in
Detail 43A.
-Install the exterior glazing gaskets using the same
technique described in Step 17 on Page-30.
Always install the vertical glazing gasket first.
Repeat Steps 18 through 20 until all lites are installed.
Detail 43A
1" Glazing Shown
1/4" Glazing Similar
Exterior Glass
Stop
Outside Glazed
Glazing Gasket
E2-0052
Effective Date: November 9, 2015 | 02-4014-08
Page-35
YKK AP America Inc.
270 Riverside Parkway
Suite
Austell, Georgia 30168
www.ykkap.com
advertisement
Key Features
- Versatile Framing Members
- Durable Construction
- Variety of Glazing Options
- Easy Installation
- Watertight Design
Frequently Answers and Questions
What is the minimum shim requirement for the sill flashing?
What is the maximum fastener spacing for anchoring the sill flashing to the structure?
What type of sealant should be used to seal the flashing at the splice location?
What is the minimum glass size required for the system?
What is the purpose of the anti-walk block?
Related manuals
advertisement
Table of contents
- - YES 45 TU Front Set Framing Members ............................................ Page
- - Assemble Frames For Screw Spline Assembly .................................. Page
- - Assemble Frames For Shear Block Assembly .................................... Page
- - Install Sill Flashing Splice Sleeve ........................................................ Page
- 4 Effective Date: November