- Home
- Domestic appliances
- Sanitary ware
- Kitchen sinks
- Sloan Valve
- AER-DEC 81000/82000/83000/84000
- Installation guide
- 13 Pages
Sloan Valve AER-DEC 81000/82000/83000/84000 Integrated Sink System Installation Instruction
The AER-DEC 81000/82000/83000/84000 Integrated Sink System is a single, double, triple, or quadruple station lavatory system. The system is designed to be installed in a variety of applications, including commercial and residential restrooms. The system is made from high-quality materials, including Corian and quartz, and is designed for durability and easy maintenance. It is backed by a 3-year warranty.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
AER-DEC™-81000/82000/83000/84000
Integrated Sink System
Single/Double/Triple/Quadruple Station Corian® or Quartz Lavatory Systems
Installation
Instruction
Code No. 0816672
Rev.2 (04-15)
AD-81000
Deck Sink Lavatory System
Corian/Quartz (Pages 2-3)
AD-82000
Deck Sink Lavatory System
Corian/Quartz (Pages 4-5)
IMPORTANT
Read this entire installation manual to ensure proper installation.
When finished with the installation, file this manual with the owner or maintenance department. Compliance and conformity to local codes and ordinances is the responsibility of the installers.
Separate parts from packaging and make sure all parts are accounted for before discarding any packaging material. If any parts are missing, do not begin installation until you obtain the missing parts.
Make sure that all water supply lines have been flushed and then completely turned off before beginning installation. Debris in supply lines can cause valves to malfunction.
AD-83000
Deck Sink Lavatory System
Corian/Quartz (Pages 6-7)
AD-84000
Deck Sink Lavatory System
Corian/Quartz (Pages 8-9)
Turn OFF electrical power to the electrical outlets, then unplug all electrical units prior to installation. Electrical power MUST remain off until installation is complete.
Installer’s hardware must be appropriate for wall construction. Wall anchors must have a minimum pull-out rating of 1,000 lbs.
For standard height mounting, do not exceed the recommended
34” distance from the top of the lav deck to the finished floor. To meet ADA requirements, the lav deck cannot exceed the
34” maximum height dimension.
Wear all proper safety equipment prior to installation.
PRIOR TO INSTALLATION
Important:
• Adequate structural support in or behind the wall is required. Refer to the appropriate rough-in diagram for dry weight of sink.
Refer to pages 10 and 11 for sink and stud support requirements.
•
All plumbing should be installed in accordance with applicable codes and regulations.
• Before connecting flex hoses to supply stops, flush all water lines until water is clear.
• Hot and cold water supply lines/tempered supply line & drain lines.
SUPPLIES REQUIRED FOR INSTALLATION OF SINKS
• 3/8” x 2 1/2” lag screws, wall anchors, bolts (minimum pull-out rating of
1000 Ibs./450 kg). See Frame Mounting Support drawing for required lag screws for your specific lavatory system.
• 1/2” NPT hot/cold or tempered supply piping
• 1 1/2” NPT drain piping
• Adhesive: Loctite ® PL Premium ® FAST GRAB Polyurethane Construction
Adhesive
• 110 volt GFCI protected electrical outlet for 100-120 VAC plug-in transformer
• Screen filter(s) included with faucet(s)
• Backing supplied by others to meet local codes
LIMITED WARRANTY
Unless otherwise noted, Sloan Valve Company warrants its Products to be made of first class materials, free from defects of material or workmanship under normal use and to perform the service for which they are intended in a thoroughly reliable and efficient manner when properly installed and serviced, for a period of three years (1 year for SF Faucets, special finishes and PWT electronics and 30 days on PWT software) from date of purchase. During this period, Sloan Valve Company will, at its option, repair or replace any part or parts which prove to be thus defective if returned to Sloan Valve Company, at customer’s cost, and this shall be the sole remedy available under this warranty. No claims will be allowed for labor, transportation or other incidental costs. This warranty extends only to persons or organizations who purchase Sloan Valve Company’s products directly from Sloan Valve Company for purpose of resale. This warranty does not cover the life of the batteries.
THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION ON THE FACE HEREOF. IN NO EVENT IS SLOAN VALVE COMPANY RESPONSIBLE FOR
ANY CONSEQUENTIAL DAMAGES OF ANY MEASURE WHATSOEVER.
1
2
LAVATORY SYSTEM ROUGH-IN DIMENSIONS FRONT VIEW SINGLE STATION
LAVATORY SYSTEM ROUGH-IN PLUMBING & ELECTRICAL DIMENSIONS FRONT VIEW SINGLE STATION
LAVATORY SYSTEM ROUGH-IN DIMENSIONS SIDE VIEW SINGLE STATION
LAVATORY SYSTEM ROUGH-IN DIMENSIONS TOP VIEW SINGLE STATION
Hidden drain w/clean-out
out as required
1/2” Backing
DRAIN ASSEMBLY AND FRAME ENCLOSURE MOUNTING SUPPORT SINGLE STATION
2”x10” wood reinforcement between studs
Wood Stud per schedule
GFI 4 gang outlet
Drywall
Backing supplied by others to meet local codes
Hand Dryer Blower Motor w/ Muffler Attachment
Lag Bolts
1.
Measure outside of frame.
Cut-out drywall window
2.
Remove drywall window.
3. Replace with backing supplied by others (per local code).
Frame Enclosure
4. Using mounting template, mount blower motor, soap dispenser pump
(optional) and electrical outlets to backing.
5.
Mount top of frame at 33” above finished floor.
6.
Securely fasten with 1,000 Lb
pull out lag bolts.
12” 12”
33"
6”
6”
Soap Dispenser
*Hole Location for
Mounting Frame
*Due to manufacturing tolerances, all dimensions are for reference only.
12”
MOUNTING FAUCETS, SOAP DISPENSERS & HAND DRYERS / ATTACHING DECK TO FRAME ENCLOSURE SINGLE STATION
12”
MOUNTING FAUCETS
For ease of installation, leave the deck laying on its back.
Install faucets, optional soap dispensers and hand dryers according to manufacturers instructions.
Adhesive
1. For ease of installation, leave the deck laying on its back. Install faucets, optional soap dispensers and hand dryers according to manufacturers instructions.
2. Hook-up air hose to blowers. Do not connect power until air spout is completely installed.
3.
Install all water connections, drain lines and components.
BASYS DRYER SPOUT
SUBASSEMBLY
EHD-510
BASYS SOAP SPOUT
SUBASSEMBLY
ESD-400
FRAME SUPPORT
1. Back edge of Deck may require scribing to finished wall.
2. Shim all gaps between frame and deck,
especialy under trough area.
HOLDING NUT
ASSEMBLY
BAYONET TURN
TO SPOUT
CABLE. LEAVE
UNATTACHED
HOSE & MUFFLER
ASSEMBLY
HOLDING NUT
ASSEMBLY
SOAP DISPENSER
LINES
POWER ADAPTOR
TO LOCK HOSE TO
BLOWER
WALL UNIT BLOWER
MOTOR ASSEMBLY
HAND DRYER
Refer to installation instructions with component.
SOAP DISPENSER
MOTOR ASSEMBLY
SOAP DISPENSER
Refer to installation instructions with component.
3
LAVATORY SYSTEM ROUGH-IN DIMENSIONS FRONT VIEW DOUBLE STATION
Notes:
1. Mount Blower and Soap Dispenser to spec. location.
2. Slip frame over mounted components and properly fasten frame to
backed wall.
3. Hot and Cold water supply lines location subject
LAVATORY SYSTEM ROUGH-IN PLUMBING & ELECTRICAL DIMENSIONS FRONT VIEW DOUBLE STATION
LAVATORY SYSTEM ROUGH-IN DIMENSIONS SIDE VIEW DOUBLE STATION
4
LAVATORY SYSTEM ROUGH-IN DIMENSIONS TOP VIEW DOUBLE STATION
Hidden drain w/clean-out
Grid strainer to be cleaned out as required
1/2” Backing
DRAIN ASSEMBLY AND FRAME MOUNTING SUPPORT DOUBLE STATION
Drywall
2”x10” wood reinforcement between studs
Wood Stud per schedule
Backing supplied by others to meet local codes
GFI 4 gang outlet
Soap Dispenser
Motor
Hand Dryer Blower Motor w/ Muffler Attachment
1.
Measure outside of frame.
Cut-out drywall window
2.
Remove drywall window.
3. Replace with backing supplied by others (per local code).
Wood Screws
Lag Bolts
Frame Enclosure
4. Using mounting template, mount blower motor, soap dispenser pump
(optional) and electrical outlets to backing.
5.
Mount top of frame at 33” above finished floor.
6.
Securely fasten with 1,000 Lb
pull out lag bolts.
33"
12” 12”
12”
12”
6”
6”
*Hole Location for
Mounting Frame
*Due to manufacturing tolerances, all dimensions are for reference only.
MOUNTING FAUCETS / ATTACHING DECK TO FRAME DOUBLE STATION
12”
12”
1. For ease of installation, leave the deck laying on its back. Install faucets, optional soap dispensers and hand dryers according to manufacturers instructions.
2. Hook-up air hose to blowers. Do not connect power until air spout is completely installed.
3.
Install all water connections, drain lines and components.
Adhesive
Adhesive
MOUNTING FAUCET,SOAP DISPENSER & HAND DRYER SPOUTS
For ease of installation, leave the deck laying on its back.
Install faucets, optional soap dispensers and hand dryers according to manufacturers instructions.
FRAME SUPPORT
1. Back edge of Deck may require scribing to finished wall.
2. Shim all gaps between frame and deck,
especially under trough area.
BASYS DRYER SPOUT
SUBASSEMBLY
EHD-510
HOLDING NUT
ASSEMBLY
CONNECT CONTROL
CABLE TO BLOWER
BAYONET TURN
TO LOCK HOSE
TO SPOUT
PROGRAMING
CABLE. LEAVE
UNATTACHED
CONNECT GROUND
WIRE TO BLOWER
HOSE & MUFFLER
ASSEMBLY
BASYS SOAP SPOUT
SUBASSEMBLY
ESD-400
HOLDING NUT
ASSEMBLY
SOAP DISPENSER
LINES
POWER ADAPTOR
BAYONET TURN
TO LOCK HOSE TO
BLOWER
WALL UNIT BLOWER
MOTOR ASSEMBLY
HAND DRYER
Refer to installation instructions with component.
SOAP DISPENSER
MOTOR ASSEMBLY
SOAP DISPENSER
Refer to installation instructions with component.
5
6
LAVATORY SYSTEM ROUGH-IN DIMENSIONS FRONT VIEW TRIPLE STATION
Backing
Notes:
1. Mount Blower and Soap Dispenser to spec. location.
2. Slip frame over mounted components and properly fasten frame to
backed wall.
3. Hot and Cold water supply lines location subject
to local code.
LAVATORY SYSTEM ROUGH-IN PLUMBING & ELECTRICAL DIMENSIONS FRONT VIEW TRIPLE STATION
Backing
LAVATORY SYSTEM ROUGH-IN DIMENSIONS SIDE VIEW TRIPLE STATION
LAVATORY SYSTEM ROUGH-IN DIMENSIONS TOP VIEW TRIPLE STATION
Hidden drain w/clean-out
Grid strainer to be cleaned out as required
81”
1/2” Backing
DRAIN ASSEMBLY AND FRAME MOUNTING SUPPORT TRIPLE STATION
2”x10” Wood
Reinforcement in between studs
(See page 10 for steel stud installation requirements)
Steel/Wood Stud
2”x4” or 2”x6”
(See page 10 for steel stud installation requirements)
Drywall
Backing supplied by others to meet local codes
Hand Dryer Blower Motor w/ Muffler Attachment
Soap Dispenser
Motor
Lag Bolts
Frame Enclosure
1.
Measure outside of frame.
Cut-out drywall window
2.
Remove drywall window.
3. Replace with backing supplied by others (per local code).
4. Using mounting template, mount blower motor, soap dispenser pump
(optional) and electrical outlets to backing.
5.
Mount top of frame at 33” above finished floor.
6.
Securely fasten with 1,000 Lb
pull out lag bolts.
12”
12”
12” 12”
12” 12” 12”
33”
6”
6”
*Hole Location for
Mounting Frame
*Due to manufacturing tolerances, all dimensions are for reference only.
12”
12”
12”
MOUNTING FAUCETS / ATTACHING DECK TO FRAME TRIPLE STATION
Adhesive
1. For ease of installation, leave the deck laying on its back. Install faucets, optional soap dispensers and hand dryers according to manufacturers instructions.
2. Hook-up air hose to blowers. Do not connect power until air spout is completely installed.
3.
Install all water connections, drain lines and components.
Adhesive
MOUNTING FAUCET,SOAP DISPENSER & HAND DRYER SPOUTS
For ease of installation, leave the deck laying on its back.
Install faucets and optional soap dispensers according to manufacturers instructions.
BASYS SOAP SPOUT
SUBASSEMBLY
ESD-400
FRAME SUPPORT
1. Back edge of Deck may require scribing to finished wall.
2. Shim all gaps between frame and deck,
especially under trough area.
BASYS DRYER SPOUT
SUBASSEMBLY
EHD-510
HOLDING NUT
ASSEMBLY
CONNECT CONTROL
CABLE TO BLOWER
BAYONET TURN
TO SPOUT
HOSE & MUFFLER
ASSEMBLY
HOLDING NUT
ASSEMBLY
SOAP DISPENSER
LINES
POWER ADAPTOR
BAYONET TURN
BLOWER
WALL UNIT BLOWER
MOTOR ASSEMBLY
HAND DRYER
Refer to installation instructions with component.
SOAP DISPENSER
MOTOR ASSEMBLY
SOAP DISPENSER
Refer to installation instructions with component.
7
8
LAVATORY SYSTEM ROUGH-IN DIMENSIONS FRONT VIEW FOUR STATION
Notes:
1. Mount Blower and Soap Dispenser to spec. location.
2. Slip frame over mounted components and properly fasten frame to
backed wall.
3. Hot and Cold water supply lines location subject
to local code.
LAVATORY SYSTEM ROUGH-IN PLUMBING & ELECTRICAL DIMENSIONS FRONT VIEW FOUR STATION
LAVATORY SYSTEM ROUGH-IN DIMENSIONS SIDE VIEW FOUR STATION
LAVATORY SYSTEM ROUGH-IN DIMENSIONS TOP VIEW FOUR STATION
31”
31”
7”
31”
6 1/2”
7”
23 1/2”
Hidden drain w/clean-out
Grid strainer to be cleaned out as required
Hidden drain w/clean-out
Grid strainer to be cleaned out as required
Backing
DRAIN ASSEMBLY AND FRAME MOUNTING SUPPORT FOUR STATION
2”x10” Wood
Reinforcement in between studs
(See page 10 for steel stud installation requirements)
Steel/Wood Stud
2”x4” or 2”x6”
(See page 10 for steel stud installation requirements)
Drywall
Backing supplied by others to meet local codes
Lag Bolts
1.
Measure outside of frame.
Cut-out drywall window
2.
Remove drywall window.
3. Replace with backing supplied by others (per local code).
Frame Enclosure
4. Using mounting template, mount blower motor, soap dispenser pump
(optional) and electrical outlets to backing.
5.
Mount top of frame at 33” above finished floor.
6.
Securely fasten with 1,000 Lb
pull out lag bolts.
12” 12”
12”
12” 12”
12”
12”
12”
33”
6”
6”
*Hole Location for
Mounting Frame
*Due to manufacturing tolerances, all dimensions are for reference only.
12” 12” 12”
12”
12” 12”
MOUNTING FAUCETS / ATTACHING DECK TO FRAME FOUR STATION
Adhesive
1. For ease of installation, leave the deck laying on its back. Install faucets, optional soap dispensers and hand dryers according to manufacturers instructions.
2. Hook-up air hose to blowers. Do not connect power until air spout is completely installed.
3.
Install all water connections, drain lines and components.
Adhesive
For ease of installation, leave the deck laying on its back.
Install faucets and optional soap dispensers according to manufacturers instructions.
FRAME SUPPORT
1. Back edge of Deck may require scribing
2. Shim all gaps between frame and deck,
especially under trough area
.
BASYS DRYER SPOUT
SUBASSEMBLY
EHD-510
HOLDING NUT
ASSEMBLY
CONNECT CONTROL
CABLE TO BLOWER
BAYONET TURN
TO LOCK HOSE
TO SPOUT
HOSE & MUFFLER
ASSEMBLY
BASYS SOAP SPOUT
SUBASSEMBLY
ESD-400
HOLDING NUT
ASSEMBLY
SOAP DISPENSER
LINES
POWER ADAPTOR
TO LOCK HOSE TO
BLOWER
HAND DRYER
WALL UNIT BLOWER
MOTOR ASSEMBLY
Refer to installation instructions with component.
SOAP DISPENSER
MOTOR ASSEMBLY
SOAP DISPENSER
Refer to installation instructions with component.
9
SINK BRACKET STUD SUPPORT
COLD FORMED STEEL FRAME MOUNTING SUPPORT
Corian Sink Design Requirements:
Max. sink deck depth = 25”
Max. sink dead weight (including stone and fixture = 10 psf
Max. concentrated live load at edge of sink = 500lbs.
Provide anchor spacing noted within product drawings
Metal Stud per schedule
5” - 18 gauge stud reinforcement between studs
2”x10” wood reinforcement between studs
42"
42"
WOOD FRAME MOUNTING SUPPORT
35"
35"
2'
2'
Wood Stud per schedule
Backing supplied by others to meet local codes
Sink Length
Drywall
Drywall
Sink Length
Drywall
Drywall
Sink System
Enclosure
Backing supplied by others to meet local codes
Sink System
Enclosure
Cold Formed Steel Framing for AD
Series Corian Sinks
Wall/Stud
Height
10”
12”
14”
16”
18”
20”
Depth
3-5/8”
6”
3-5/8”
6”
3-5/8”
6”
3-5/8”
6”
3-5/8”
6”
3-5/8”
6”
Flange
Min.
Gauge
2-1/2” 18
3” 16
1-3/8” 12
1-5/8” 16
2” 16
2-1/2” 16
1-3/8” 16
1-5/8” 18
2” 18
2-1/2” 18
3” 16
1-5/8” 14
2” 16
2-1/2” 16
1-3/8” 14
1-5/8” 16
1-3/8” 14
1-5/8” 16
2” 16
2-1/2” 18
1-3/8” 18
1-5/8” 18
2” 18
2-1/2” 18
3” 16
1-3/8” 14
1-5/8” 16
2” 16
2-1/2” 16
1-3/8” 16
1-5/8” 18
2” 18
2” 18
2-1/2” 18
3” 16
1-5/8” 12
2” 16
2-1/2” 16
1-3/8” 12
1-5/8” 16
2” 18
2-1/2” 18
3” 16
1-5/8” 12
2” 14
2-1/2” 16
1-5/8” 14
2” 18
2-1/2” 18
3” 16
Wood Framing for AD Series Corian
Sinks
Wall/
Stud
Height
Stud
Studs Req.
@16” o.c.
(See Note 1)
Species Grade
10’
12’
14’
16’
2x4
2x6
2x4
2x6
2x4
2x6
2x4
2x6
2
1
3
1
3
1
3
1
SPF No. 2
18’
20’
2x4
2x6
2x4
2x6
3
1
3
2
Note 1: Where mutiple studs are listed, bunch multiple studs and space multiple studs @16” o.c. across width of sink
10
Quartz Sink Design Requirements:
Max. sink deck depth = 25”
Max. sink dead weight (including stone and fixture = 20 psf
Max. concentrated live load at edge of sink = 500lbs.
Provide anchor spacing noted within product drawings
Cold Formed Steel Framing for AD
Series Quartz Sinks
WALL/STUD
HEIGHT
10”
12”
14”
16”
18”
20”
DEPTH
3-5/8”
6”
3-5/8”
6”
3-5/8”
6”
3-5/8”
6”
3-5/8”
6”
3-5/8”
6”
FLANGE
MIN.
GAUGE
2-1/2” 18
3” 16
1-3/8” 12
1-5/8” 14
2” 16
2-1/2” 16
1-3/8” 14
1-5/8” 16
2” 18
2-1/2” 18
3” 16
1-5/8” 12
2” 16
2-1/2” 16
1-3/8” 12
1-5/8” 16
1-3/8” 14
1-5/8” 16
2” 16
2-1/2” 16
1-3/8” 16
1-5/8” 18
2” 18
2-1/2” 18
3” 16
1-3/8” 12
1-5/8” 16
2” 16
2-1/2” 16
1-3/8” 16
1-5/8” 18
2” 18
2” 18
2-1/2” 18
3” 16
1-5/8” 12
2” 14
2-1/2” 16
1-3/8” 12
1-5/8” 16
2” 18
2-1/2” 18
3” 16
1-5/8” 12
2” 14
2-1/2” 14
1-5/8” 14
2” 16
2-1/2” 18
3” 16
Wood Framing for AD Series
Quartz Sinks
Wall/
Stud
Height
Stud
Studs Req.
@16” o.c.
(See Note 1)
Species Grade
10’
12’
14’
16’
2x4
2x6
2x4
2x6
2x4
2x6
2x4
2x6
3
1
3
1
3
1
3
2
SPF No. 2
18’
20’
2x4
2x6
2x4
2x6
3
2
3
2
Note 1: Where mutiple studs are listed, bunch multiple studs and space multiple studs @16” o.c. across width of sink
CLEANING AND MAINTENANCE
Material Description: Corian Material is made from a blend of acrylic modified bio-based polyester resin. Engineered Stone is 90% natural quartz and polyester resin and is resistant to chemicals, stains, burns and impact.
Surface damage can be easily repaired with everyday cleansers or fine grit abrasives.
Routine Cleaning: For regular cleaning, use standard commercial or household products such as Simple Green ® , Creamy Cleanser brand,
Formula 409
®
or Windex
®
.
Stubborn Stains: Remove tough stains, with non abrasive cleaners and pads such as a white Scotch Brite
®
pad and Lysol
®
. Special Situations for
Corian and Engineered Stone
Hard Water Deposits: Remove hard water deposits with a mild solution of vinegar and water. Always rinse the unit thoroughly after cleaning.
Restoring the surface: Refresh and restore the rich surface with one of the following:
Geo Series: Color enhancer such as Tenax
®
Ager
Pearl Series: Impregnating sealer such as DryTreat Stain - Proof Original™ or Miracle Sealants 511 Impregnator Do not use strong acid or alkaline chemicals and cleansers to clean Engineered Stone. If these chemicals come in contact with the surface, wipe them off immediately and rinse with soapy water. Avoid contact with harsh chemicals such as paint remover, bleach, acetone, etc. Avoid contact with hot pans and objects.
Repair Kits: Corian repair kits are available. Contact your Sloan Stone Sink
Systems representative or distributor for part numbers and pricing. Repair kits are made to order and have a shelf life of 30 days. Engineered Stone shades of color can vary from product to product.
PERIODIC CLEANING OF DRAIN BOX REQUIRED.
BRAND NAMES
Use of brand names is intended only to indicate a type of cleaner. This does not constitute an endorsement, nor does the omission of any brand name cleaner imply inadequacy. Many products named are regional in distribution, and can be found in local supermarkets, department and hardware stores, or through your cleaning service. It is emphasized that all products should be used in strict accordance with package instructions.
11
COMPONENTS SINGLE STATION
Deck
Enclosure
Grid Strainer
Assembly
DS-57
Optional
Not Provided
Chrome or
Plastic P-Trap
Rubber Gasket
Slip Washer
Flange Nut
Sloan Optional
Water Temperature Mixing Valves
Mix-60-A Mix-135-A
Shims
FAUCET OPTIONS
Mid Basys High Faucet (EFX Series)
COMPONENTS DOUBLE STATION
Basys Mid Faucet (EFX Series) Basys Low Pedestal Faucet (EFX Series) Basys Low Integrated Faucet (EFX Series) Basys Wall Mount Faucet (EFX Series)
Sloan Optional
Water Temperature Mixing Valves
Deck
Shims
Grid Strainer
Assembly
DS-57
Optional
Not Provided
Chrome or
Plastic P-Trap
Rubber Gasket
Slip Washer
Flange Nut
Mix-60-A Mix-135-A
Enclosure
FAUCET OPTIONS
COMPONENTS TRIPLE STATION
Mid Basys High Faucet (EFX Series)
Basys Mid Faucet (EFX Series) Basys Low Pedestal Faucet (EFX Series)
Basys Low Integrated Faucet (EFX Series) Basys Wall Mount Faucet (EFX Series)
Sloan Optional
Water Temperature Mixing Valves
Deck
Grid Strainer
Assembly
DS-57
Optional
Not Provided
Chrome or
Plastic P-Trap
Rubber Gasket
Slip Washer
Flange Nut
Mix-60-A Mix-135-A
Shims
Enclosure
FAUCET OPTIONS
COMPONENTS FOUR STATION
Deck
Mid Basys High Faucet (EFX Series) Basys Mid Faucet (EFX Series) Basys Low Pedestal Faucet (EFX Series) Basys Low Integrated Faucet (EFX Series) Basys Wall Mount Faucet (EFX Series)
Grid Strainer
Assembly
DS-57
Optional
Not Provided
Chrome or
Plastic P-Trap
Rubber Gasket
Slip Washer
Flange Nut
Sloan Optional
Water Temperature Mixing Valves
Mix-60-A
Shims
Mix-135-A
FAUCET OPTIONS
Enclosure
Mid Basys High Faucet (EFX Series)
Basys Mid Faucet (EFX Series)
Basys Low Pedestal Faucet (EFX Series) Basys Low Integrated Faucet (EFX Series) Basys Wall Mount Faucet (EFX Series)
12
Sloan Valve Company
10500 Seymour Avenue
Franklin Park, IL 60131 [email protected]
www.sloanvalve.com
Tel. 800.982.5839
The information contained in this document is subject to change without notice.
Copyright © 2015 Sloan Valve Company CODE NO. 0816672– Rev. 2 (04/15)
advertisement
Key Features
- Single, double, triple, or quadruple station
- Corian and quartz construction
- Durable and easy to maintain
- 3-year warranty
- Designed for both commercial and residential restrooms