- Home
- Domestic appliances
- Bath appliances
- AMERICH
- Freestanding Bathtub
- Installation instructions
- 4 Pages
AMERICH freestanding bathtub Installation instructions
Below you will find brief information for freestanding bathtub. This user manual will guide you through preparing for the installation of your new freestanding bathtub, as well as the installation process of the drain, surround, and overflow hardware. Learn how to properly level and install your tub safely and effectively.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
2 PIECE FREESTANDING INSTALLATION INSTRUCTIONS
READ AND SAVE THESE INSTRUCTIONS
Baths are assembled complete and ready for installation. Immediately upon receiving the bath and removal of packing, INSPECT the unit for freight damage. Any claims for damage, whether apparent or hidden, must be made to freight carrier immediately, in order for them to assume all associated costs. Should inspection reveal any defect in the finish, DO NOT INSTALL THE BATH. Claims of damage or defect to the finish after the bath is installed is excluded from the warranty. The warranty DOES NOT cover labor or materials to remove or re-install the bath.
1. Prior to Installation:
• Remove protective plastic and packaging and carefully inspect for any damage.
• Check tub for correct model name, size, color and trim finish.
• The tub MUST be tested while pump, electrical systems, and piping
(plumbing) are accessible.
• If there are any issues, do not install and report the issues immediately to our factory or the authorized dealer.
CARE AND MAINTENANCE
Soap residues and mineral deposits are the enemies of your bathtub, particularly in areas where there is hard water. Cleaning your bathtub at regular intervals and using proper cleaning agents, can help your bathtub retain its original sparkling look. DO NOT USE abrasive cleaners, as these products will damage the bathtub surface and metallic finishes. A non-abrasive cleaner is recommended.
Your bathtub does not require the use of special cleaning agents or chemicals.
Normal cleaning is simple and easy. Just use warm water, a soft sponge and mild liquid detergent or non-abrasive cleaner to wipe the surfaces clean, then rinse thoroughly.
To preserve the surface finish, annual waxing is recommended. Use a high-grade paste-type automotive wax.
TECHNICAL SERVICE
1. Locate the product identification tag (located on bathtub near pump or overflow). This tag includes all pertinent information specific to your product, including the model, size, color, date of manufacture and ID number.
2. Write down all information and have it available when contacting the manufacturer.
The manufacturer maintains strict guidelines for field service and will require this information in order to facilitate your request and determine if a field service representative is required.
Warning: The unit does not contain any user serviceable parts. Any servicing should be performed by a qualified licensed service agent.
LEVELING THE UNIT
1. Inspect, clean, level, and prepare the floor for installation. (figure 1)
2. Set unit upside down on blanket or cardboard and level the legs by using a 2x4 or a level to adjust legs to level position. (figure 2)
(Make sure all legs are in contact with the ground, the bathtub
MUST NOT be supported by the the surround.)
Note: Drain and waste locations will vary by model.
3. Place the unit in the exact position on the floor, lining up the drain in the bathtub with drain pipe in the floor.
(figure 3)
4. Separate the unit, leaving the surround of the tub in place. (figure 4)
5. Trace the outline of the interior and exterior of the surround with a
pencil or erasable marker. (figure 5)
6. Turn the bathtub on its side using a blanket, cardboard or other clean protective surface to insure that the bathtub is properly supported and protected during the drain installation
.
of installing the drain body.
figure 1
PRIOR TO INSTALLATION (figure 1)
Check to ensure that:
1. The installation will conform with all applicable Federal, State and Local
Building Codes & Regulations;
2. The unit is the correct model and color;
3. There has been no shipping damage;
4. The “notice” or “warning” tags on the bathtub have been read and thoroughly understood;
5. The interior of the tub will be protected during installation;
6. Make sure sub floor is level.
figure 2
1
INSTALL DRAIN & TAIL PIECE HARDWARE
All parts involved in tail piece installation are provided by the installer.
(figure 6).
7. Apply a bead of clear silicone or plumbers putty around the Drain
Body and pass it through the drain hole (figure 3).
8. Apply plumbers putty to the gasket and slide it over the bottom of the Drain Body (figure 3).
9. Slide the paper washer over the drain body.
10. Attach the Drain Body Nut on the Drain Body and tighten until
11. Insert 1 1/2” rubber slip gasket into the drain waste vent.
12. Cut tail piece to desired length aprrox 2 to 3 inches pass the
rubber gasket (will vary for each installation).
13. Connect tail piece assembly to drain body (figure 7).
figure 3
installation instructions
figure 6
(Integral Drain Hardware Shown) figure 4 figure 5
2
figure 7 figure 9
freestanding installation
figure 8
INSTALL BATHTUB SURROUND
14. Drill four holes and secure surround to the floor as needed
(figure 8).
15. Carefully set bathtub into surround and align the tail piece and drain with rubber slip gasket in the floor (figure 9).
16. Slowly set bathtub down onto the surround and into the rubber slip gasket and floor drain pipe (figure 9).
CO M P L E T E B AT H T U B I N S TA L L AT I O N
17. Fill the bathtub with water to the overflow and then drain the bathtub while inspecting the waste connections below the floor for leaks. Access from below may be necessary for this step.
18. Run a bead of tub and tile caulk around the bottom edge of the
surround where it meets the floor. Wipe off any excess caulk with a wet cloth (figure 10).
INSTALL OVERFLOW HARDWARE
19. Place the Back Plate over the screw of the overflow cover
(figure 12).
20. Align the Overflow Cover with the Bar (installed at the factory) in the overflow hole (figure 13).
21. Carefully hand tighten the Overflow Cover until it stops. DO NOT
OVER TIGHTEN figure 11 figure 12 figure 10 figure 13
3
freestanding installation
figure 14 figure 15
FAUCET INSTALLATION
Always follow the faucet manufacturer installation
instructions.
1. Water supply must be installed in the intended 12” cut out
area (figure 14).
2. Installing water supplies use (figure 15) for reference.
Faucet must be attached to a 30” x 1/2 hose for easy access.
3. Locate the position of the escutcheon before drilling to
ensure that they will line up properly on the deck. Check to
see if the valve body nut and washer will fit under the deck.
4. Carefully drill through the finish side of the tub deck.
5. After completion of the faucet installation turn the water on
and check for leaks (figure 17).
6. Install bathtub, refer to page 5 of this installation booklet.
TUB DECK figure 17
FINISHED
FLOOR figure 16
in compliance with
ANSI Z124.1 - 1995
ANSI A112.19.8 - 1987
ANSI A112.19.7 - 1987
l i s t e d by
4
©10/15
advertisement
Key Features
- Freestanding installation
- Drain and tail piece hardware
- Bathtub surround
- Overflow hardware
- Faucet installation