- Industrial & lab equipment
- Measuring, testing & control
- Tokheim
- TCS/262-A TCS 200-1A
- Installation manual
- 26 Pages
Tokheim TCS/262-A TCS 200-1A, TCS 200-2A, TCS 200-2T, TCS 200-3T, TCS 200-4T Automatic Temperature Compensation system Installation Manual
Below you will find brief information for TCS/262-A TCS 200-1A, TCS/262-A TCS 200-2A, TCS TCS 200-2T. This installation manual will guide you through the installation and operation of your new system. The KRAUS Automatic Temperature Compensation system provides accurate fuel dispensing volume readings by automatically adjusting for variations in fuel temperature. The system incorporates temperature probes, an I.S. Barrier, and an ATC board to ensure precise and reliable fuel dispensing.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
1.0
INFORMATION
2.0
INSTALLATION
3.0
TECHNICAL DATA
ATC Installation Manual
Table of Contents
1.1
Introduction
1.1.1 About This Manual
1.1.2
Helpful Hints and Warnings
1.1.3
Service and Product Support
1.2
Product Information
1.2.1
System Components
Contents
2.1
Pre-Installation
2.1.1
Site Preparation
2.1.2
Installation Requirements
2.1.3
Unit Configuration
2.2
Component Installation
2.2.1
Test Well and Temperature Probes
2.2.1.1 Single Product 262A Dispenser
2.2.1.2 Dual Product 262A Dispenser
2.2.1.3 TCS Dispenser
2.2.1.4 TCS Suction Unit
2.2.2
I.S. Barrier Installation
2.2.2.1 In a 262A Dispenser
2.2.2.2 In a TCS Dispenser
2.2.3
ATC Board Installation
2.2.3.1 For 262A Models
2.2.3.2 For TCS Models
2.2.3.3 ATC Board Connection Diagrams
2.3
Post Installation
2.3.1
Probe Connection Verification
2.3.2
Enabling ATC Function
2.3.3
Meter Calibration
3.1
Components
3.1.1
List of Components
Tokheim “A” Series TCS/262-A
1.1
Introduction
2
Information
1.1.1
About This Manual
This manual introduces the installation and operation procedures for the KRAUS Automatic Temperature Compensation system.
In an effort to help our customers take full advantage of our state-of-the-art products, we have provided this handbook to aid in initial set up and later to be used as a reference guide should the need arise.
The three divided sections are:
1. INFORMATION
Gives general information on system functions as well as cautionary advice.
2. INSTALLATION
Gives all information needed to successfully install and operate the system, as well as technical illustrations to aid in understanding text.
3. TECHNICAL DATA
Gives information on products that make up the system, in the form of drawings, manufacturer’s literature, and references to related systems and products.
These three sections are set up in such a way that information is easily understood and instantly available to those who need it, whether they are an engineer, technician or supply manager.
Due to different environmental conditions this manual may be subject to, it has been designed to fit neatly in a protective three holed binder. This also serves the function of containing information from other related products in one convenient package.
ATC Installation Manual
2
Tokheim “A” Series TCS/262-A
1.1
Introduction
3
Information
1.1.2
Helpful Hints and Warnings
Throughout this manual, in the left hand margin, there will be indicators, with text, to give various hints and warnings. The following are examples of what you will see, and their meanings:
!
SUGGESTION
Gives a hint on how to best use the equipment or advice on proper procedures.
!
ATTENTION
Gives notice to an important aspect of system operation.
!
CAUTION
Gives a warning to prevent damage to equipment or cause human injury.
Kraus Industries Ltd. assumes no responsibility for personal injury or equipment damage caused by non-observance of the safety warnings.
ATC Installation Manual
3
Tokheim “A” Series TCS/262-A
1.1
Introduction
4
1.1.3
Service and Product Support
Information
Should you experience any difficulties in system operation, customer assistance is available.
The procedure to receive such assistance is as follows:
1. Document the following information:
•
System Disfunctions
•
Corrective Measures Taken
•
System Model Number
•
System Serial Number
•
Purchase Order Information
•
Date of Installation
•
Equipment Location (i.e. City, Address etc...)
2. Call or Fax our Product Service line at:
Company Service number
Company Fax number
1 204 988 1234
1 204 654 2881
One of our qualified personnel will provide assistance in getting your system operational.
ATC Installation Manual
4
Tokheim “A” Series TCS/262-A
1.2
Product
Information
5
1.2.1
System Components
Information
The following is a list of operating components used in this installation, along with a brief explanation of their function:
ATC Board
Takes the signals from the temperature probe and flow meter, compensates for temperature deviation from 15 o
C (60 o
F), then sends the compensated signal back to the main processor board.
Intrinsic Safety (I.S.) Barrier
Energy limits the temperature probe signal, then sends the same signal on to the ATC board.
Temperature Probes
Converts temperature of the product to a corresponding voltage signal that is sent to the ATC board, via the I.S. Barrier.
Thermal Test Well
Provides a mechanical-thermal connection to accommodate a remote temperature probe, for calibration purposes, to give a true reading of product temperature.
Probe Connector Assembly
Provides secure electrical connection between the temperature probe(s) and I.S. Barrier.
ATC Installation Manual
5
Tokheim “A” Series TCS/262-A
Installation
2.1
Pre-Installation 2.1.1
Site Preparation
!
CAUTION
The following is a list of precautions that should be followed before installation of this product. Failure to do so could result in serious personal injury!
•
Extreme caution should be used to ensure that no ignition sources exist.
•
The dispensing area should be roped off or isolated from public use.
•
Dispenser station operator should be made aware of the work that needs to be completed to prevent accidental “turn on” of the pump.
•
Any main electrical disconnection should be labeled or locked to prevent accidental power up.
2.1.2
Installation Requirements
!
ATTENTION
The following points should be taken into consideration before installing this product:
•
Any electrical installation should be carried out by a registered electrician.
•
Any fuel dispensing connections should be made by qualified and experienced personnel.
•
Installation must be performed in accordance with the relevant standards, laws and by-laws governing the type of application.
ATC Installation Manual
6
Tokheim “A” Series TCS/262-A
Installation
2.1
Pre-Installation 2.1.3
Unit Configuration
Before the ATC board can be installed, it must be configured for the particular application. This is accomplished by positioning the jumper plugs, located on the upper right hand corner of the circuit board.
Options for configuration can be set in accordance with the table below (UP is closest to the edge of the board. See
Figure 1 for jumper location).
ATC Board Jumper Settings TCS 200
JUMPER#
JP1
JP2
JP3
JP4
JP5
JP6
OPTION
Selects whether ATC is enabled or disabled
Selects whether product 4 is gasoline or diesel
Selects whether product 3 is gasoline or diesel
Selects whether product 2 or side B is gasoline or diesel
Selects whether product 1 or side A is gasoline or diesel
Selects whether or not the pump is a 2 probe 262A
JUMPER POSITION
UP = ENABLED
UP = DIESEL
UP = DIESEL
UP = DIESEL
UP = DIESEL
DOWN = 2 PROBE
262A
Figure 1
P33
P22
ATC Board Layout
P30
Configuration
Jumpers
P2
P1
P23
P3
ATC Installation Manual
7
P31A
P31
Tokheim “A” Series TCS/262-A
2.2 Component
Installation
2.2.1
Test Well and Temperature Probes
2.2.1.1 In a Single Product 262A Dispenser
Installation
Figure 2
!
CAUTION
Test Well
Single Product
Manifold
Temperature Probe and Extension Fitting
!
CAUTION
Before components can be installed, power MUST be shut off to the dispenser.
1. Remove the lower panels.
2. Locate the single product supply manifold.
(See Figure 2).
3. Remove manifold from pump assembly.
Single Product Supply Manifold
Due to the presence of combustible gasses, DO
NOT drill holes or solder fittings to parts directly connected to any piping.
ATC Installation Manual
8
Tokheim “A” Series TCS/262-A
2.2 Component
Installation
ATTENTION
!
!
ATTENTION
!
ATTENTION
2.2 Component
ATC Installation Manual
Installation
2.2.1
Test Well and Temperature Probes
2.2.1.1 In a Single Product 262A Dispenser (Cont’d)
4. With the manifold mounted securely, drill two holes of size Q (0.332”) and tap for 1/8” NPT, male thread.
Holes should be located near the center of the manifold.
The following guidelines should also be followed for installing the test well:
•
The hole should be drilled so that the extension will be at an angle within 45 o
of vertical when the extension is installed and manifold is reconnected. This is so that it will hold thermally conductive fluid for measuring purposes.
•
The fitting should provide easy access for insertion of a thermometer.
•
The fitting should be placed in an appropriate position so as not to hinder reinstallation of the assembly.
If a probe is for two hoses, the probe and test well must be in a portion of the flow which is common to both hoses.
5. Install temperature probe and extension fitting.
Any connections must be made using thread sealing compound suitable for use with gasoline.
Any connections having less than five (5) threads should be soldered.
6. Install test well into the manifold and, after tightening, cover with the thermal well plug.
7. Re-connect manifold to pump assembly.
Make sure manifold is cleaned thoroughly before connecting manifold to pump assembly. This is to prevent drill cuttings from entering the dispensing system.
2.2.1
Test Well and Temperature Probes
9
Tokheim “A” Series TCS/262-A
Installation
CAUTION
!
!
CAUTION
Installation
2.2.1.2 In a Dual Product 262A Dispenser
Before components can be installed, power MUST be shut off to the dispenser.
1. Remove lower panels.
2. Locate the product supply lines. The supply lines should be similar to that of the single product 262A dispenser (See previous section).
3. Remove the section of pipe, from each product supply line, that is most suitable for installation of the temperature probes and thermal test wells.
Due to the presence of combustible gasses, DO NOT drill holes or solder fittings to parts directly connected to any piping.
4. With the pipe section mounted securely, drill two holes of size Q (0.332”) and tap for 1/8” NPT. The following guidelines should also be followed for installing the test well and probe fittings:
•
The hole should be drilled so that the well will be at an angle within 45 o
of vertical when installed. This is so that it will hold thermally conductive fluid for measuring purposes.
•
The fittings should provide easy access for insertion of a thermometer.
•
The fitting should be placed so as not to hinder reinstallation of the assembly.
ATC Installation Manual
10
Tokheim “A” Series TCS/262-A
2.2 Component
Installation
ATTENTION
!
!
ATTENTION
Installation
2.2.1
Test Well and Temperature Probes
2.2.1.2 In a Dual Product 262A Dispenser (Cont’d)
Any connections must be made using thread sealing compound suitable for use with gasoline. Any connections having less than five (5) threads should be soldered.
5. Install the temperature probe and extension fitting.
6. Install the test well into the pipe section and, after tightening, cover with the supplied plug.
7. Reconnect pipe section to pump assembly.
Before reconnecting, make sure pipe section is thoroughly cleaned to prevent drill cuttings from entering the dispensing system.
ATC Installation Manual
11
Tokheim “A” Series TCS/262-A
Installation
2.2 Component
Installation
2.2.1
Test Well and Temperature Probes
2.2.1.3 In a TCS Dispenser
1. Remove the lower panels.
2. Locate and remove the check valve adapter casting for each product. (See Figure 3)
3. Drill and tap (0.332”, tap NPT) the casting to receive the test well and probe extension fitting as shown in
Figure 3. (Drill the test well hole at a 45 degree angle as shown).
4. Install the probe extension fitting, and tighten.
5. Install the temperature probe.
Figure 3 Probe and Test Well Installation
!
ATTENTION
ATC Installation Manual
Any connections must be made using thread sealing compound suitable for use with gasoline.
Any connections with less than five (5) threads require soldering.
5. Install the test well and tighten. Cover test well with the thermal well plug.
6.
Re-connect check valve adapter assembly to pump.
12
Tokheim “A” Series TCS/262-A
2.2 Component
Installation
!
ATTENTION
Figure 4
Remove 1” NPT plug and replace with the integral test well
Installation
2.2.1
Test Well and Temperature Probes
2.2.1.4 In a TCS Suction Unit
1. Remove the lower panels.
2. Remove the 1" NPT plug from the pumping unit, next to the discharge outlet. (See Figure 4)
Any connections must be made using thread sealing compound suitable for use with gasoline.
3. Replace the 1” NPT plug attached to the suction unit with the integral test well and 1/8" NPT threaded hole.
4. Install the probe into the plug, and tighten.
Probe Installation for TCS Suction Unit
TCS Suction Pump
ATC Installation Manual
13
Tokheim “A” Series TCS/262-A
2.2 Component
Installation
Figure 5
To I.S. Ground
To ATC Board via harness (W17X)
I.S. Barrier
Wire Connections
Pillar Cover
Probe Connector
Assembly
!
ATTENTION
ATC Installation Manual
Installation
2.2.2
I.S. Barrier Installation
2.2.2.1 In a 262A Dispenser
1. Remove the cover from the pillars on the front side of the dispenser.
2. Open the front display panel.
3. Install the I.S. Barrier by removing the mounting bolt and attach as shown in Figure 5 below.
I.S. Barrier Installation
4. Connect the intrinsic safety barrier ground (20 AWG green wire), coming out of the top of the barrier (epoxy side), to the grounding stud beside the card cage.
5. Connect the other wires to the like coloured ones on the W17X harness, using crimp on wire nuts or butt
connectors only.
Connections made using crimp on wire nuts or butt connectors is a Weights and Measures requirement to make the connection tamper resistant.
14
Tokheim “A” Series TCS/262-A
2.2
Component
Installation
Figure 6
!
ATTENTION
Installation
2.2.2
I.S. Barrier Installation
2.2.2.1 In a 262A Dispenser (Cont’d)
6. Remove the covers from the lower enclosure.
7. Mount the probe connector assembly bracket on the pump, below the pillar, inside the vapour barrier. (See
Figure 6)
8. Connect the wires from the probe connector assembly to the like coloured wires of the I.S. barrier using crimp on wire nuts or butt connectors only.
9. Plug the temperature probes into the connector assembly.
Connections made using crimp on wire nuts or butt connectors is a Weights and Measures requirement to make the connection tamper resistant.
Probe Connector Assembly Installation
Probe Connector
Assembly
Probe Connection
ATC Installation Manual
15
Tokheim “A” Series TCS/262-A
2.2 Component
Installation
Figure 7
Installation
2.2.2
I.S. Barrier Installation
2.2.2.2 In a TCS Dispenser
1. Open the front display panel.
2. In a three or four product unit, drill two 5/16" holes through the vapor barrier over pulser assemblies A1 and B3 as shown in Figure 7.
I.S. Barrier Installation for TCS Dispenser
!
ATTENTION
Vapor Barrier
3. In a one or two product unit, only the hole over pulser assembly A1 is needed.
It is recommended that an angle air drill be used if there is concern that hazardous atmospheres
may be present. Use grease on the tip of the bit to
prevent sparking and increase bit life.
ATC Installation Manual Tokheim “A” Series TCS/262-A
16
2.2 Component
Installation
!
ATTENTION
Installation
2.2.2
I.S. Barrier Installation
2.2.2.2 In a TCS Dispenser (Cont’d)
4. Install the barriers in the holes, and tighten with the washers and hex nuts provided.
5. Connect the green 20 AWG wires coming out of the tops of the barriers (epoxy side), to the grounding stud beside the card cage.
6. Connect the yellow and green wires from the dual barrier, for products one and two, to the wires from the
W17X harness with the colours matched, using crimp
on wire nuts or butt connectors only. Red wires from the I.S. barrier are common, and should be connected to the red wire on the harness.
Connections made using crimp on wire nuts or butt connectors is a Weights and Measures requirement to make the connection tamper resistant.
7. In a three product kit, connect the yellow wire from the second barrier to the blue wire of the harness (W17X).
Note: the green wire is unused.
8. In a four product kit, connect the yellow wire from the second barrier to the blue wire, and the green wire to the purple wire of the harness.
9. The temperature probes can now be plugged into the connectors under the I.S. barrier.
ATC Installation Manual
17
Tokheim “A” Series TCS/262-A
2.2 Component
Installation
Figure 8
Installation
2.2.3
ATC Board Installation
2.2.3.1 For 262A Models (Refer to Figures 8 & 9)
1. Remove the plugs from J23, 30, 31, and 33 on the mother board and plug them into P23 through P33 respectively on the ATC board.
2. Connect the W106, 8 wire harness from P2 on the ATC board to J30 and 33 on the motherboard. The 7 pin plug with one wire goes to J30.
3. Connect the W105, 18 wire harness from P3 on the
ATC board to J23 on the motherboard.
4. Connect the W88, 20 wire ribbon cable between P31A on the ATC board and J31 on the motherboard.
5. Plug the 5 pin plug from the I.S. barriers onto P1.
6. Replace the keyswitch with the one provided.
7. Plug the 4 pin plug with 1 wire from the keyswitch onto
P22 of the ATC board. Connect the remaining plugs to the mother board, as per the original keyswitch.
8. The ATC board unit may now be fastened under the bolt head or nut as shown in Figure 8.
ATC Board Assembly Connection
I.S. Barrier
TCS200 ATC
Board
Vapour Barrier
ATC Installation Manual
18
Tokheim “A” Series TCS/262-A
2.2 Component
Installation
Installation
2.2.3
ATC Board Installation
2.2.3.2 For TCS Models (Refer to Figure 10)
1. Remove the plugs from J23 and 31 on the mother board. Plug them into P23 and 31 respectively on the
ATC board.
2. Connect the W107, 8 wire harness from P2 on the ATC board to J9 on each of the dial interconnect boards on the dial panels. The 7 pin plug with one wire goes to the "B" side.
3. Replace, on each side, the wire harness which was connected between the money-volume display and J9 on the dial interconnect board with the longer W108 harnesses supplied.
•
Connect one between J9 on the "A" side dial interconnect board and P33 on the ATC board.
•
Connect the other from P30 on the ATC to the "B" side (J9)
4. Connect the W105, 18 wire harness from P3 on the
ATC board to J23 on the motherboard.
5. Connect the W88, 20 wire ribbon cable between P31A on the ATC board and J31 on the motherboard.
6. Plug the 5 pin plug from the I.S. barriers onto P1 on the
ATC board.
7. Replace the keyswitch with the one provided.
8. Plug the 4 pin plug with 1 wire from the keyswitch onto
P22 of the ATC board. Connect the remaining plugs to the mother board, as per the original keyswitch.
9. The ATC board unit may now be fastened under the bolt head or nut as shown in Figure 8.
ATC Installation Manual
19
Tokheim “A” Series TCS/262-A
2.2 Component
Installation
Figure 9
Installation
2.2.3
ATC Board Installation
2.2.3.3 ATC Board Connection Diagrams
The following diagrams (Figures 9 & 10) show the wiring connections for the TCS 200 ATC board for 262A and TCS units:
ATC Board Connections for 262A Units
J29
J22
WHT WHT
BUTTON SWITCH
W166
KEY SWITCH
ATC Installation Manual
20
Tokheim “A” Series TCS/262-A
Figure 10
Installation
ATC Board Connections for TCS Units
J29
J22
3
2
W167
KEY SWITCH
ATC Installation Manual
21
Tokheim “A” Series TCS/262-A
Installation
2.3
Post Installation 2.3.1 Probe Connection Verification
With the dispenser ready to be tested:
1. Apply power to the unit, and initialize the system as per the Tokheim instructions.
2. To display the temperature, uncorrected volume, flowrate, and compensation type (gas or diesel), turn the keyswitch to the ATC display position (i.e. to the left).
3. Run a delivery into a test can.
The ratio of the net volume on the normal dispenser display to the gross volume on the ATC display should be the correct VCF for the temperature displayed and the product selected.
4. Unplug the probe for the product being tested.
The pump should stop, and the ATC display should read “Probe” in the ppu readout to indicate temperature probe failure.
5. Repeat the test procedure for each hose. Always ensure that the correct probe is being used to compensate each product.
If you are testing with product one and unplug probe one, the pump should stop and the ATC display will indicate "Probe". If the pump, for example, does not stop when probe one is unplugged but does when probe two is unplugged, then the probes are mixed up.
ATC Installation Manual
22
Tokheim “A” Series TCS/262-A
Installation
2.3
Post Installation
!
ATTENTION
2.3.2
Enabling ATC Function
The ATC function must be disabled with the appropriate jumper plug (See table: Section 2.1.3) until the pump is inspected and the nameplate with the AV number must be applied to the side of the dispenser.
Before the dispenser can be used in trade, in the
ATC mode, it must be inspected by Weights and
Measures Canada
Once the inspector approves the pump, the seal plate may be installed over the ATC board so that the inspector can seal the unit.
The BC256B "VOLUME CORRECTED TO 15
°
C" labels must also be applied to the faceplates adjacent to the volume displays.
2.3.3
Meter Calibration
When the meters are calibrated in a pump with an ATC, it will be necessary to use either the gross volume reading from the ATC display or the mechanical counter. The temperature compensated volume on the pump display can not be used for this purpose.
ATC Installation Manual
23
Tokheim “A” Series TCS/262-A
Technical Data
3.1
Components 3.1.1
List of Components
1
4
6
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
TOKHEIM “A” Series TCS 200-1A SINGLE PRODUCT 262A -
ATC
QTY PART # DESCRIPTION
028AY00
218AY00
212AY04
W171
W199
BC407
BC546
235-C
122-B
103-B
BC256A
W88
W105
W106
BC819
W166
028AY00.INS R01
ATC BOARD AND BRACKET ASSEMBLY
DUAL INTRINSIC SAFETY BARRIER
SINGLE PROBE CONNECTOR ASSEMBLY
5 PIN, 2 WIRE HARNESS FOR I.S. BARRIER
TEMPERATURE PROBE
THERMOWELL
120-B, 1/8” NPT ADAPTER DRILLED TO 17/64” I.D.
THERMOWELL PLUG
1/8” NPT x 1” HEX NIPPLE
1/8” NPT COUPLING
WHITE “VOLUME CORRECTED TO 15 C” LABELS
18-22 AWG CRIMP SPLICE
20 PIN RIBBON CABLE
18 WIRE HARNESS
8 WIRE HARNESS
SERIALIZED AV-2238 NAMEPLATE
KEYSWITCH ASSEMBLY
5/6” HEX NUT
5/16” FLAT WASHER
TCS/262-A ATC INSTALLATION MANUAL
TOKHEIM “A” Series TCS 200-2A TWO PRODUCT 262A -
ATC
1
1
1
1
1
1
2
2
4
10
1
1
2
2
2
1
1
2
QTY
1
1
PART #
028AY00
218AY00
212AY05
W172
W199
BC407
BC546
235-C
122-B
103-B
BC256A
W88
W105
W106
BC819
W166
028AY00.INS R01
DESCRIPTION
ATC BOARD AND BRACKET ASSEMBLY
DUAL INTRINSIC SAFETY BARRIER
DUAL PROBE CONNECTOR ASSEMBLY
5 PIN, 3 WIRE HARNESS FOR I.S. BARRIER
TEMPERATURE PROBES
THERMOWELLS
120-B, 1/8” NPT ADAPTER DRILLED TO 17/64” I.D.
THERMOWELL PLUG
1/8” NPT x 1” HEX NIPPLES
1/8” NPT COUPLINGS
WHITE “VOLUME CORRECTED TO 15 C” LABELS
18-22 AWG CRIMP SPLICES
20 PIN RIBBON CABLE
18 WIRE HARNESS
8 WIRE HARNESS
SERIALIZED AV-2238 NAMEPLATE
KEYSWITCH ASSEMBLY
5/6” HEX NUT
5/16” FLAT WASHER
TCS/262-A ATC INSTALLATION MANUAL
ATC Installation Manual
24
Tokheim “A” Series TCS/262-A
Technical Data
3.1
Components 3.1.1
List of Components
5
1
1
2
2
2
1
2
2
1
1
1
1
1
1
1
2
1
1
TOKHEIM “A” Series TCS 200-2T TWO PRODUCT TCS -
ATC
QTY PART # DESCRIPTION
028AY00
218AY00
212AY05
W172
W199
BC407
120-B
235-C
BC256B
W88
W105
W107
W108
BC819
W167
028AY00.INS R01
ATC BOARD AND BRACKET ASSEMBLY
DUAL INTRINSIC SAFETY BARRIER
DUAL PROBE CONNECTOR ASSEMBLY
5 PIN, 3 WIRE HARNESS FOR I.S. BARRIER
TEMPERATURE PROBES
THERMOWELLS
1/8” NPT ADAPTER
THERMOWELL PLUG
BLACK “VOLUME CORRECTED TO 15 C” LABELS
18-22 AWG CRIMP SPLICES
20 PIN RIBBON CABLE
18 WIRE HARNESS
8 WIRE HARNESS
7 WIRE DISPLAY HARNESS
SERIALIZED AV-2238 NAMEPLATE
KEYSWITCH ASSEMBLY
5/6” HEX NUT
5/16” FLAT WASHER
TCS/262-A ATC INSTALLATION MANUAL
TOKHEIM “A” Series TCS 200-3T THREE PRODUCT TCS -
ATC
1
2
2
1
2
1
7
1
1
3
3
2
1
3
3
2
1
1
QTY
1
PART #
028AY00
218AY00
212AY04
212AY05
W173
W199
BC407
120-B
235-C
BC256B
W88
W105
W107
W108
BC819
W167
DESCRIPTION
ATC BOARD AND BRACKET ASSEMBLY
DUAL INTRINSIC SAFETY BARRIER
SINGLE PROBE CONNECTOR ASSEMBLY
DUAL PROBE CONNECTOR ASSEMBLY
5 PIN, 4 WIRE HARNESS FOR I.S. BARRIER
TEMPERATURE PROBES
THERMOWELLS
1/8” NPT ADAPTER
THERMOWELL PLUG
BLACK “VOLUME CORRECTED TO 15 C” LABELS
18-22 AWG CRIMP SPLICES
20 PIN RIBBON CABLE
18 WIRE HARNESS
8 WIRE HARNESS
7 WIRE DISPLAY HARNESS
SERIALIZED AV-2238 NAMEPLATE
KEYSWITCH ASSEMBLY
5/6” HEX NUT
5/16” FLAT WASHER
1 028AY00.INS
TCS/262-A ATC INSTALLATION MANUAL
ATC Installation Manual
25
Tokheim “A” Series TCS/262-A
Technical Data
3.1
Components 3.1.1
List of Components
TOKHEIM “A” Series TCS 200-4T FOUR PRODUCT TCS -
ATC
2
2
1
2
1
1
1
1
1
4
2
8
4
4
4
2
2
1
QTY
1
PART #
028AY00
218AY00
212AY05
W174
W199
BC407
120-B
235-C
BC256B
W88
W105
W107
W108
BC819
W167
028AY00.INS
DESCRIPTION
ATC BOARD AND BRACKET ASSEMBLY
DUAL INTRINSIC SAFETY BARRIER
DUAL PROBE CONNECTOR ASSEMBLY
5 PIN, 5 WIRE HARNESS FOR I.S. BARRIER
TEMPERATURE PROBES
THERMOWELLS
1/8” NPT ADAPTER
THERMOWELL PLUG
BLACK “VOLUME CORRECTED TO 15 C” LABELS
18-22 AWG CRIMP SPLICES
20 PIN RIBBON CABLE
18 WIRE HARNESS
8 WIRE HARNESS
7 WIRE DISPLAY HARNESS
SERIALIZED AV-2238 NAMEPLATE
KEYSWITCH ASSEMBLY
5/6” HEX NUT
5/16” FLAT WASHER
TCS/262-A ATC INSTALLATION MANUAL
ATC Installation Manual
26
Tokheim “A” Series TCS/262-A
advertisement
Key Features
- Automatic temperature compensation
- Precise fuel dispensing
- Temperature probe installation
- I.S. Barrier installation
- ATC board installation
- Probe verification
- Enabling ATC function
- Meter calibration