Addendum 4 - the City of Stillwater

Addendum 4 - the City of Stillwater
DOCUMENT 009103 - ADDENDUM NO. 4
Issued to all Bidders:
Date: May 26, 2015
Contract Name: C8320 – Mechanical Installation
SUA Bid No.: #38-14/15
This addendum forms a part of the Bid described above. The original Contract documents and any prior
addenda remain in full force and effect except as modified by the following which shall take precedence
over any contrary provisions in the prior documents.
Each Bidder shall acknowledge receipt of this addendum by affixing signature below, by noting this
addendum on Bidder’s Bid Form, and by attaching this addendum to the Bid.
ACKNOWLEDGEMENT
The undersigned acknowledges receipt of this addendum and the Bid submitted is in accordance with
information, instructions, and stipulations set forth herein.
Bidder: ___________________________
By: ______________________________
Date: _____________________________
75644.8320
009103-1
DOCUMENT 009103 - ADDENDUM NO. 4: continued
BID INSTRUCTIONS
1. The deadline
to submit bids (bid opening date) has been extended
to 6/10/2015 at 3:00 pm, CST. Bids received more than ninety-six hours
(excluding Saturdays, Sundays, and holidays) before the time set for opening of Bids, as
well as Bids received after the time set for opening of Bids, will not be considered and
shall be returned unopened. All other requirements for submitting bids outlined in the
bid documents shall remain unchanged.
BIDDER QUESTIONS AND ANSWERS:
2. See the document included with this addendum “SUA Bid 38-1415 Bidders
Correspondence Log.”
SPECIFICATIONS:
1. 485715 Appendix A REV 1
009103-2
75644.8320
Issued for: Addendum 4
Issue Date: 5/26/2015
Stillwater Utilities Authority
Item
Category
1
Question
2
Question
Technical Exception, Clarification or Question
Resp.
Initials
Specifications
Could you please provide us the manual valve list, instrument
list, and actuated valve list in an excel format?
CJG
Excel files have been provided for Contractors convenience.
Contractor shall be liable for any errors that arise from the use
of these native files.
7-May-2015
Specifications
In section 011100- Summary of work part 1.03 number C6
states Furnish, install and commission the low temp circ pumps.
We see the data sheet for the low temp circ pump Item No.
01/02/03CWM-PMP-001 please clarify that this data sheet is
intended for us to furnish the low tem circ pump.
MRS
Yes, spec Section 485422 Appendix A - Pump Datasheet is for
the low temp circ pump.
7-May-2015
MRS
Contractor is responsible for furnishing, installing and
commissioning water treatment skid. See spec Section 485140 Engine Water Treatment System for specs.
7-May-2015
MRS
See spec Section 485715 Appendix A - Piping Specials for specs.
7-May-2015
Date Rcv'd RFP Section
5-May-2015
6-May-2015
SUA Bid #38-14/15 - C8320 - Mechanical Installation
Bidder's Correspondence Log
SUA Response
Response
Date
3
Question
6-May-2015
Specifications
In section 011100- Summary of work part 1.03 number C7
states Furnish, install and commission water treatment skid. We
do not have any information on the skid in order to furnish it.
C7a states the commission of the water treatment skid shall be
by manufacturer or certified representative. Does this mean we
only need to install the water treatment skid? Please clarify if we
are required to furnish the water treatment skid and the
commissioning.
4
Question
6-May-2015
Specifications
In section 011100- Summary of work part 1.03 number C8
states Furnish and install lube oil filters. No information is
provided on the lube oil filters; please clarify if we are required
to furnish the lube oil filters.
6-May-2015
In section 011100- Summary of work part 1.03 number C9
states Furnish and install and commission eye wash and
emergency showers in engine hall and at tank containment area.
Specifications
No information is provided on the eye wash and emergency
showers; please clarify if we are require to furnish the eye wash
and emergency showers.
MRS
See spec Section 485715 Appendix A - Piping Specials for specs.
7-May-2015
6-May-2015
Specifications
In section 011100- Summary of work part 1.03 number C10
states Furnish and install suction and discharge air ductwork for
each instrument air compressor. No information is provided on
the suction and discharge air ductwork; please clarify if we are
required to furnish the suction and discharge air ductwork.
MRS
See drawing MP211 for details.
7-May-2015
MRS
Installation Contract should be 5.8220. As a note, supply and
installation of all below grade fuel gas piping is part of Contract
5.8220 scope.
7-May-2015
5
6
Question
Question
7
Question
6-May-2015
Specifications
On P & ID MMFGS-004 Rev 1 it shows a section of line No.
00FGS-007-10”-01CSS01-0” below grade. The breaks show the
material being supplied by Contract 5.8220 but the installation
by Contract 5.8320. There are no drawings showing this section
of pipe. Drawing MP-201 show above ground pipe from Heater
going to underground and drawing MP-313 shows pipe at
building tying into underground. Do we install U/G portion of
system, or is the P & ID in error? If it is in our scope, client to
provide coordinates for U/G stub ups.
8
Question
7-May-2015
Bid
Instructions
On page 16 of the Summary Bid Form section under "Data
required with Bid", are Contracting Licenses for electrical and
plumbing required for this bid?
CJG
Electrical and Plumbing licenses are NOT required.
7-May-2015
9
Question
7-May-2015
Specifications
Are we supposed to supply the Pulsation Dampeners; Specialty
Item S-74?
MRS
Disregard. This will not be required.
21-May-2015
10
Question
7-May-2015
Specifications
On the Device List’s; is there a way to tell which items come
“loose”?
MRS
Wartsila does not indicate what components are shipped loose
on the device list. Please refer to installation manual and/or
outline drawings provided for reference for details.
14-May-2015
11
Question
7-May-2015
Reference
Drawings
In looking at the mechanical equipment I noticed that there
were not any weights shown. May we be provided with the
equipment weights?
MRS
Please clarify which equipment you would like weights for.
14-May-2015
12
13
Question
Question
11-May-2015
11-May-2015
1. Please advise what the desired motor voltage is for 00ACI-MOV060 & 00FGS-SSV-056
2. Are these needing to be explosion proof or just weatherproof?
Specifications 3. Can the valves be reduced port?
4. Note: 1 second operating time for a 10” valve is virtually
impossible. Please advise if that is a typo. “Normal” is 2 – 5
seconds per inch of valve diameter.
MRS
Section 011100, Summary of Work, 1.03.C.12 states that steel
erection is by C8320 but the drawings are listed in Attachment B as
Specifications Reference Drawings. Please clarify.
MRS
1. Please refer to spec Section 485925-2.03.E for details.
2. Please refer to spec Section 485925-2.03.E for details.
3. Full port per PM Spec.
4. 2 seconds per inch of valve diameter shall be acceptable for
these valves.
14-May-2015
Steel shall be installed by C8320.
14-May-2015
Page 1 of 5
Bidder Reply
Response
Date
SUA Response
Response
Date
Issued for: Addendum 4
Issue Date: 5/26/2015
Stillwater Utilities Authority
Item
14
Category
Question
Date Rcv'd RFP Section
11-May-2015
Technical Exception, Clarification or Question
Resp.
Initials
Section 011100, Summary of Work, 1.03.C.12.j states that PreEngineered Metal Building frame steel and auxiliary steel is erected
Specifications “By Others”. Does this include both the Engine Hall Building as well
as the Admin/Warehouse Building?
CJG
CJG
SUA Bid #38-14/15 - C8320 - Mechanical Installation
Bidder's Correspondence Log
SUA Response
Yes, structural steel for both buildings is supplied and installed
by Others.
Response
Date
Section 011100, Summary of Work, 1.04H should ready "Supply
of Air Compressors…" instead of "Supply and Install". All
equipment in 1.04 H will be supplied by Others and installed
under this contract except ventilation fans and AHUs which are
installed under the C4310 contract. Refer to 485790 for list of
Owner supplied equipment installed under this contract.
15
Question
11-May-2015
Question
11-May-2015
Section 011100, Summary of Work, 1.03.C.15 states “Furnish,
Specifications install and calibrate instrumentation …”. Does this include wiring
to a panel, junction box, etc.?
CJG
16
Fire Protection drawings FA-101 and 102 reference the following
drawings which were not included as part of the RFP. Please
issue these drawings.
• AE-003 & 004
Drawings
• AE-132,138 & 139
• AE-501
• MH-101,102, 105, 130, 131 & 132
• CS-250
On the Special Data Sheet, Safety Valves, 00FGS-SRV-001 calls
Specifications out to be BW on the 4” end. Can a flanged PSV be substituted
for this valve?
MRS
01/02/03-CWM-014-2”-01CSS03 (Eng Skid Drains) We need
Specifications Spec 01CSS03. Was not in package.
MRS
See addendum 3.
MRS
Quantities and locations will not be provided. Pipe support design
is the responsibility of the Contractor. Pipe support details have
14-May-2015
been provided for reference in the "MD" series drawings.
Spec 03CSG01 shows the eccentric reducer as ASTM A53665/45/12 Galvanized. This is the only call out on this spec that
Specifications references Galvanizing. Does this system require galvanizing? Is
there a coating requirement?
MRS
All carbon steel piping and fittings that are to be installed
outdoors shall be hot dipped galvanized. Field coating repairs
and welded connections of galvanized components shall be coldgalvanized.
The Valve List shows many of the ½” valves in the CWM
(01CSG01)system as flanged ends. Many of these valves are
Specifications drain valves. On the P & ID it shows the drain valve with a plug.
In the specification 01CSG01 the 1./2” Ball valve default is SW
ends. Which is correct?
MRS
In section 011100- Summary of work part 1.04 (work by other)
letter H states Mechanical Equipment: Supply and Install of Air
Compressors, Fuel Gas Filter/ coalesce, Fuel Gas Heater, Fire
Water Pumps, Steel Lube Oil Tanks, Urea Tank, Air Receivers, Air
Handling Units, Ventilation Fans, above ground structural steel
Specifications
by others. This information contradicts the information on the
equipment as well as under each items specific contract in
section 485790. Air Handling Units and Ventilation Fans are not
listed on the equipment list. Please clarify which equipment is
required for us to install.
On the Manual Vale List under Spec 01CSG01 the 8” & 3” Check
Specifications Valves are shown as MGE end type. But the pipe spec shows
150# RF swing checks. Which end type is correct?
MRS
The Manual Valve List shows Valves 01-SCR-V-300, 02-SCR-V300 & 03-SCR-V-300 as 2” Ball Valves RF 150# ASTM A182 Gr
Specifications F316. The Piping Spec 01SAS01 does not show ball valves as an
option. Please clarify. If Ball Valves provide spec.
MRS
The Manual Valve List shows Valve No. 00-ACS-V-003 as a bevel
end valve. The piping Spec CBS04 does not show a Buttweld Ball
Specifications valve as acceptable. Only 300# Flanged ends. Which is correct?
MRS
Question
11-May-2015
18
Question
11-May-2015
19
Question
12-May-2015
20
Question
12-May-2015
21
22
Question
Question
12-May-2015
12-May-2015
23
Question
12-May-2015
24
Question
12-May-2015
25
26
Question
Question
12-May-2015
12-May-2015
Drawings
Please provide quantities of pipe supports or drawing showing
locations of each.
Response
Date
SUA Response
Response
Date
14-May-2015
Section 011100, Summary of Work, Work By Others, 1.04.H lists
numerous pieces of equipment as well as “above ground structural
steel” to be installed by others. However Section 485790 lists this
Specifications equipment to be installed by C8320. Please clarify if Sect. 485790
is to be followed to delineate the scope of work. Also what “above
ground structural steel” other than the building steel will be installed
by others?
17
Bidder Reply
No. The only wiring under this contract is in the fire protection
and heat trace systems.
14-May-2015
14-May-2015
See addendum 2.
14-May-2015
MRS
Yes.
14-May-2015
14-May-2015
All carbon steel piping and fittings that are to be installed
outdoors shall be hot dipped galvanized”. Does this statement
14-May-2015 include the fuel gas piping?
Please provide flanged end valves and cap with a blind flange.
14-May-2015
See response to item 15.
14-May-2015
MRS
MGE per valve list.
14-May-2015
Valve shall be revised to Class 800 globe valve.
14-May-2015
Flanged valve.
14-May-2015
Page 2 of 5
No.
26-May-2015
26-May-2015
Issued for: Addendum 4
Issue Date: 5/26/2015
Stillwater Utilities Authority
Item
Category
Date Rcv'd RFP Section
27
Question
12-May-2015
28
Question
12-May-2015
Technical Exception, Clarification or Question
Spec 485935 Power Piping Welding and Fabrication 3.06.B.1.b
Cleaning and Painting references coating requirements in
Specifications SECTION 099000 – PROTECTIVE COATINGS. Was this section
provided in the bid documents? If so where, if not can it be
provided?
Drawings
What can we conclude when you have a line number on the
P&ID (01CWM-003-150) which doesn’t appear on the line list?.
Resp.
Initials
MRS
SUA Bid #38-14/15 - C8320 - Mechanical Installation
Bidder's Correspondence Log
Response
Date
SUA Response
See addendum 3.
21-May-2015
MRS
Please clarify which P&ID drawing this is on.
14-May-2015
Spec. 01CSG01 is titled “Carbon Steel Pipe with Grooved Ends”,
however the fittings called out within the spec. itself are butt
Specifications weld. Please clarify if this is a grooved system or a welded
system.
MRS
Grooved system. Fittings are called out as MGE - Male Grooved
End.
We appear to be missing pipe specification 01CSS03, this spec is
Specifications called out in the CWM system for some 2” piping.
MRS
See addendum 3.
14-May-2015
29
Question
12-May-2015
30
Question
12-May-2015
31
Question
12-May-2015
Drawings
Is there any information available on the Electric Water Heater
called out on WSW002?
MRS
Heater shall be Haws model 9325 or Engineer-approved equal.
32
Question
12-May-2015
Drawings
What material (if any) shown on the “SS” series drawings to we
furnish?
MRS
Contractor is also responsible to furnish all post installed anchor
bolts for the steel.
14-May-2015
Question
12-May-2015
Drawings
Regarding P&ID MMDOC001; is there any work other than the
Engines 01-03 trench drains, in this project?
MRS
33
Contractor is also responsible for supplying and installing the
above ground drains from all other drain off-page connectors
shown. Contractor is also responsible for supplying and
installing transmitter (LIT-150) on tank 00DOC-TNK-001.
14-May-2015
Question
12-May-2015
Drawings
Regarding line number 00FGS-008; the P&ID shows it running as
8” thru the engine hall, drawing MP212 shows it reducing to 6”
between Gensets 2& 3, which is correct?
MRS
34
35
Question
13-May-2015
Drawings
Who supplies the bolts and gaskets for bolting the Charge Air
duct to the Charge Air Filter and to the EGM? MRS
Supplied by Others (Wartsila).
This was the question for Stillwater Heat Trace:
Are the design temps to be followed for potential exposure
temperatures that the heat trace cable could see? There is
Specifications concern on some of the SCR lines which show a design temp of
900 Deg. F (see attached line list) which will need special
attention and considerations on the design and cable selections.
MRS
Later.
Under specification 485935 Section 3.06.B.2.a is calls for the
blasting of the interior surfaces of fabricated piping and
Specifications references an Appendix 485990 that was not included. Can you
please supply the missing appendix or let us know if the blasting
is not to be included.
MRS
In the call today you mentioned a fuel gas specification. I do not
find that in any of the documentation that was provided. Are we
Specifications missing a section or were you referencing the sections of the
material specifications that are applicable to fuel gas service?
CJG
In regards to the pressure regulating valves on Equipment Data
Sheet S-51 – since there are no model numbers provided for the
Specifications regulators, our vendor will have to size. Could you please
provide the inlet pressures for all of the items so they can be
sized properly?
MRS
Can you please supply the weight for the EGM support structure?
MRS
36
37
38
Question
Question
Question
13-May-2015
13-May-2015
13-May-2015
39
Question
8-May-2015
40
Question
8-May-2015
Drawings
41
Question
8-May-2015
Bid
Instructions
42
Question
14-May-2015
Drawings
43
Question
14-May-2015
Drawings
Please explain what exactly you are wanting us to include on the
Pricing Basis for Changes Utilizing Unit Prices sheet in the bid
documents.
14-May-2015
Pipe shall be reduced to 6" between gensets 2 & 3 and reduced
to 4" between gensets 1 & 2.
14-May-2015
14-May-2015
14-May-2015
26-May-2015
See addendum 2.
14-May-2015
This was misstated in the pre bid meeting. Fuel gas piping is
governed by specification 485935. Contractor should be familiar
with requirements of this spec, specifically sections 1.04, 3.02
and 3.03.
14-May-2015
See addendum 4.
26-May-2015
CJG
Please refer to associated reference drawings for steel members
sizes. Weight of structure will be requested from Wartsila
Page 15 of the bid instruction "Pricing Basis for Changes Utilizing
Unit Prices" is no longer required to be submit with the bid.
Do the ladders shown on drawing SS223 have cages?
BOB
No.
Regarding Drawing SS226; Note 7 states that the contractor is
to supply a mating flange. This would seem to contradict the
notes in SCR Exhaust Duct Plan view. Please confirm that we are
to supply 9 flanges as shown on the details on drawing SS227.
MRS
Later.
14-May-2015
14-May-2015
21-May-2015
Page 3 of 5
Bidder Reply
Response
Date
SUA Response
Response
Date
Issued for: Addendum 4
Issue Date: 5/26/2015
Stillwater Utilities Authority
Item
Category
44
Question
14-May-2015
Drawings
45
Question
14-May-2015
Drawings
46
Question
14-May-2015
Drawings
47
Question
15-May-2015
48
Question
Date Rcv'd RFP Section
15-May-2015
Technical Exception, Clarification or Question
Who furnishes the duct support saddles as shown on Drawing
SS228?
Drawings
Supplied by Others.
Will the Charge Air Unit Stands come fully fabricated?
BOB
For bid purposes, assume this will come fully fabricated.
Who will furnish the steel for the Pipe/Cable Tray Supports
shown on drawing SS260?
CJG
Others (contract 4520). These stands will be shipped
prefabricated.
MRS
60 gpm each.
Who furnishes the Unit Heaters? The P&ID indicates furnish and
install by 5.4310 please confirm.
There doesn’t appear to be any WPO - Potable Water, WRW Raw Water, or WTW - Treated Water on the P&ID’s or on the line
list. However, it is listed as Work Covered by Contract; please
comment.
CJG
Question
15-May-2015
50
Question
15-May-2015
What pipe spec. should we use for the 3” vents off the Unit
Heaters? Also how far above the roof should we go? Can a detail
Specifications be provided similar to the details shown on drawing AE800?
51
Question
18-May-2015
Specifications
CJG
CJG
Who erects the stack and silencer?
52
Question
18-May-2015
Can we get a copy of the Stillwater Utilities Authority Safety
Attachment C Form C-8 “Orientation Training”, we cannot open it from the
Safety Document that we have.
53
Question
18-May-2015
We can’t open any of the safety forms embedded in the Site
Attachment C Specific Safety and Health Plan. Can these documents be
provided?
54
Question
19-May-2015
Specifications
Section 485935 references a coating specification section,
099000 – PROTECTIVE COATINGS, that was not provided in the
bid package. Can you please supply a copy.
CJG
Question
19-May-2015
Drawings
What is the intention of the “HOLD” on the de-piction of the fire
pump on drawing MP315?
56
Question
19-May-2015
Drawings
Gas unit heaters, including thermostat and vent ducting, are
supplied and installed by Others (4310 contract). This contract
is responsible for all gas piping up to the heater including
regulators, flexible connections and gas cocks.
Potable Water for the admin building is by Others (4310). Refer
to P&IDs for the Service Water System (WSW) for scope covered
under this contract.
21-May-2015
21-May-2015
21-May-2015
This vent, including vent cap, is supplied and installed by Others.
CJG
CJG
21-May-2015
This contract is responsible for silencer and stack erection
including all structural support steel.
21-May-2015
See attached word version of the Safety Plan
21-May-2015
See attached word version of the Safety Plan
21-May-2015
See addendum 3.
MRS
21-May-2015
1. There shall be separate systems for each zone defined.
2. This is depicting the fire supression system for the Power
Block Building.
3. Fire pump only serves the fire hose risers. Sprinkler piping
and hydrants will be fed directly from the City water main.
Drawing MMFPW001 (04/29/2015), notes the design density of
0.30 GPM/SqFt over the remote 2,500 SqFt for the South Engine
Hall from drawing FA101. This raises the following questions:
1) The Power Block Building is only approximately 22,000 SqFt,
yet the schematic depicts the fire sprinkler system broken up into
four systems where one system would be adequate to comply with
NFPA-13, NFPA-37 and their Annexes. May the Power Block
Building be protected with one automatic sprinkler system and one
Class-II Standpipe system?
2) If multiple systems are required, what does the block labeled
“To PB Sprinklers” that is supplied prior to the fire pump represent?
3) The stated design density for the South Engine Hall (FA101) is
750 GPM plus 500 hose allowance for a total of 1250 GPM. The
fire pump is specified to be rated for 100 GPM / 5HP. This demand
exceeds 150% of the fire pump rating. The 2 ½” and 3” discharge
piping would exceed the 20 ft/sec limitation specified as well.
Please provide the correct ratings for the fire pump.
21-May-2015
21-May-2015
49
55
Response
Date
SUA Response
BOB
The spec sheet supplied for the Lube Oil filters does not have the
Specifications design flow rates listed. Can you please supply a spec sheet
that has the flow rates noted.
Drawings
Resp.
Initials
SUA Bid #38-14/15 - C8320 - Mechanical Installation
Bidder's Correspondence Log
MRS
26-May-2015
MRS
Piping and equipment are on HOLD since fire pumps are
currently out for bid under contract C2820. As a result, we do
not yet have final vendor drawings of this equipment. Please bid
21-May-2015
as shown.
Page 4 of 5
Bidder Reply
Response
Date
SUA Response
Response
Date
Issued for: Addendum 4
Issue Date: 5/26/2015
Stillwater Utilities Authority
Item
57
Category
Change
Date Rcv'd RFP Section
Bid
Instructions
Technical Exception, Clarification or Question
Resp.
Initials
SUA Bid #38-14/15 - C8320 - Mechanical Installation
Bidder's Correspondence Log
SUA Response
The deadline to submit bids (bid opening date) has been
extended to 6/10/2015 at 3:00 pm, CST. Bids received
more than ninety-six hours (excluding Saturdays, Sundays, and
holidays) before the time set for opening of Bids, as well as Bids
received after the time set for opening of Bids, will not be
considered and shall be returned unopened. All other
requirements for submitting bids outlined in the bid documents
shall remain unchanged.
Page 5 of 5
Response
Date
26-May-2015
Bidder Reply
Response
Date
SUA Response
Response
Date
SPECIALS DATA SHEETS
Table of Contents
S-1
S-4
S-5
S-7
S-11
S-13
S-14
S-31
S-32
S-34
S-44
S-51
S-71
S-72
S-74
S-75
S-78
Revision
Y-Type Strainers
Cartridge Filters
Air Coalescing Filters
Air Traps
Expansion Joints (Metal) Stainless Bellows
Flexible Metal Hoses
Flexible Rubber Hoses
Air Cocks
Water Hose Bibbs
Emergency Eyewash and Safety Shower Stations
Safety Valve or Relief Valve or Emergency Vent (Pressure)
Pressure - Regulating Valves
Weather Covers
Rupture Disk
Pulsation Dampeners
Quick Connects
Electric Heaters
Stillwater Energy Center
Project # 75644
1
1
0
1
1
1
1
1
1
1
1
1
0
0
VOID
0
0
Page 1 of 23
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-1
Y-Type Strainers
Rev
Date
0
1
Description
By
Checked
04/29/15
SMK
MRS
ISSUED FOR BID
05/26/15
MRS
VFR
UPDATED BLOWDOWN CONN SIZE; ISSUED FOR ADDENDUM 4
1. Acceptable Manufacturers:
A. Zurn (Wilkins).
B. Armstrong.
C. Tyco (Yarway).
D. Mueller.
E. Leslie.
F. Tate Andale.
G. Approved Equal
2. Special Features Required:
A. Body rating shall be as listed in the table below. Flow arrow shall be cast in the body.
B. Baskets shall be stainless steel with the mesh as specified below.
C. Provide two baskets per strainer.
E. Provide blowdown connection with valves and piping the same size. Provide valve as specified in SECTION 485925.
F. Provide 1 inch plugged drain connection for basket strainers unless noted otherwise.
3. Installation Requirements:
A. Install as indicated and per manufacturer's recommendations.
B. Strainers shall be installed with blowdown valves piped to a safe discharge point.
4. Design Parameters:
A. Design and furnish in accordance with the following schedules:
Body
Design Conditions
Rev
Tag No.
0
00FGS-STN-001
1
00FPW-STN-001
1
00FPW-STN-002
NOTES:
Stillwater Energy Center
Project # 75644
Type or
Description
Y-Type
Y-Type
Y-Type
Nominal Pipe
Design
Size (in)
Pressure (psig)
8
300
4
150
4
150
Design
Design Flow
Temp. (°F) Rate (gpm)
Fluid
120
13500 SCFM Fuel Gas
Fire Water
120
200
Fire Water
120
200
ASTM Body
Material
A216-WCB
A216-WCB
A216-WCB
Pressure
Class (lbs) Conn Type
300
Flanged
150
Flanged
150
Flanged
Page 2 of 23
Basket Element
Nominal
Blowdown
Conn. Size
(in)
2
1-1/2
1-1/2
ASTM
Material
304 SS
304 SS
304 SS
Mesh
Opening
Size (in)
0.045
0.045
0.045
P&ID No.
MMFGS002
MMFPW001
MMFPW001
Remarks
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-4
Cartridge Filters
Rev
Date
By
Checked
0
1
04/29/15
5/26/2015
SMK
MRS
MRS
VFR
Description
ISSUED FOR BID
MOVED AIR FILTER TO S-5; ADDED FLOW RATES AND DP; ISSUED FOR ADDENDUM 4
1. Acceptable Manufacturers:
A. Pall (Series 2618).
B. 3L Filters.
C. Allen Filter, Inc.
D. Keene Corporation.
E. Approved Equal.
2. Special Features Required:
A. Filter shall be single cartridge.
B. Each filter shall include, as a package, the following:
1. Full flow filter cartridges with a particle retention size rating of 5 microns.
2. Automatic air vent in upper compartment.
4. Cover lifting device.
5. One internal pressure relief valve for each compartment.
6. Two 1/2 inch NPT drains, one for inlet compartment and one for outlet compartment. Provide nipples and caps for drain connections.
7. One 2/3 inch NPT vent
C. The duplex arrangement shall include:
1. 3 inch crossover lines for inlet and outlet.
D. Filter housings shall be stamped and rated per ASME code.
E. Provide three sets of replacment filtering cartridges for each filter.
3. Installation Requirements:
A. Install as indicated and per manufacturer's recommendations.
Pipeline Conditions
Filter Element
Rev.
Tag No.
No. Req'd
Nominal Pipe
Size (in)
0
00ACI-FLT-001
1
2
1
00LOT-FTR-001
1
3
145
210
-
60 gpm
Lube Oil
00LOT-FTR-002
1
NOTES:
1
3
145
210
-
60 gpm
Lube Oil
Stillwater Energy Center
Project # 75644
Design Pressure
(psig)
Design Temp.
(°F)
Mesh
Size
Design Flow
Rate
Fluid
145
165
-
-
Instrument Air
Clean Filter Maximum
DP (psid)
DP (psid) Conn Type
5
Line No.
Supply By Const. By
P&ID No.
10
Flanged
00ACI-151-2"-01SAS02-0"
5.8320
5.8320
MMACS001
5
10
Flanged
00LOT-030-3"-01SAS02-2"
5.8320
5.8320
MMLOT002
5
10
Flanged
00LOT-030-3"-01SAS02-2"
5.8320
5.8320
MMLOT002
Page 3 of 23
Remarks
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-5
Air Coalescing Filters
Rev
Date
By
Checked
0
05/26/15
GTS
VFR
Description
ISSUED FOR BID
1. Acceptable Manufacturers:
A. Hankison Aerolescer Filters.
B. Engineer-approved equal.
2. Special Features Required:
A. Air coalescing filters shall have 1/2-inch NPT connections on inlet and outlet for pressure gauge connections. Connections shall be plugged.
B. Provide 1-inch NPT plugged drain connection.
C. Furnish with sufficient spare filter to refill each filter three times.
D. 5 psi maximum pressure drop at the rated capacity.
E. Air discharged from filter in normal operation shall contain a maximum of 0.1 ppm of oil by weight.
3. Installation Requirements:
A. Install as indicated and per manufacturer's recommendations.
Pipeline Conditions
Rev.
Tag No.
0
00ACI-FLT-001
NOTES:
Stillwater Energy Center
Project # 75644
No. Req'd
1
Nominal Pipe
Size (in)
2"
Design Pressure
(psig)
145
Design Temp.
(°F)
165
Filter Element
Design Flow
Rate (scfm)
350
Fluid
Instrument Air
Clean Filter DP
(psid)
2
Page 4 of 23
Maximum DP
(psid)
Conn Type
5
150# Flanged
Line No.
00ACI-151-2"-01SAS02-0"
P&ID No.
Remarks
MMACS001
Emergency
ACS to ACI
backup.
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-7
Air Traps
Rev
0
1
Date
4/29/2015
5/26/2015
By
SMK
MRS
Checked
MRS
VFR
Description
ISSUED FOR BID
REVISED PIPE SCHEDULE; ISSUED FOR ADDENDUM 4
1. Acceptable Manufacturers:
A. Armstrong.
B. Sarco
C. Nicholson.
D. Engineer-Approved Equal
2. Special Features Required:
A. Air Traps
1. Body shall be of the material and rating listed in the respective Piping Material Specification.
2. Trap shall be constructed so that the entire operating element may be removed and replaced without removing the body from the line.
3. Trap shall have integral strainer. If integral strainer is not available, provide independent strainer of same body material and pressure class as strainer.
4. Trap shall be capable of discharging the capacity listed below at a pressure differential of one-half the maximum differential listed in the table below.
5. The trap shall be supplied with an external indicator that shows whether or not the trap is functioning.
6. Trap shall be capable of discharging two times the actual maximum condensate load listed below.
7. Valve and seat shall be hardened stainless steel.
3. Installation Requirements:
A. Install traps with inlet and outlet shutoff valves as shown on the drawings and as specified in this Section and Section 485925.
B. Piping shall provide easy access to trap, allow repair or replacement with removal of a small amount of pipe, and provide adequate flexibility.
Rev
Tag No.
1
00ACI-TRP-001
1
00ACI-TRP-002
0
00ACS-TRP-001
NOTES:
Stillwater Energy Center
Project # 75644
No. Req'd
1
1
1
Type or
Description
Inverted Bucket
Inverted Bucket
Inverted Bucket
Line
Nominal
Line
Size (in) Sch
1/2
1/2
1/2
Fluid
80 Condensate / Air
80 Condensate / Air
STD Condensate / Air
Body
ASTM
Material
PM Spec
A216-WCB 00SAL01
A216-WCB 00SAL01
A216-WCB 03CBS04
Conn.
Type
Design
Pressure
(psig)
Flanged
Flanged
Flanged
145
145
480
Page 5 of 23
Design Conditions
Design
Design
Design
Temp
Pressure
Capacity
(°F)
Differential (psi) (lb/hr)
165
165
165
45
45
220
-
P&ID No. Supply By Constr. By
MMACI001
5.8320
5.8320
MMACI002
5.8320
5.8320
MMACS002
5.8320
5.8320
Remarks
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-11
Expansion Joints (Metal) Stainless Bellows
Rev
Date
0
1
Description
By
Checked
4/29/2015
SMK
MRS
ISSUED FOR BID
5/26/2015
MRS
VFR
REVISED FLUID CODES; ISSUED FOR ADDENDUM 4
1. Acceptable Manufacturers:
A. Marquette Coppersmithing Co., Inc. - Marflex - Omega
B. Adsco-Corruflex.
C. Flexonics.
D. Pathway.
E. Atlantic.
F. Sola-Flex.
G. Ametek.
2. Special Features Required:
A. Control units where piping cannot be properly anchored. Units shall be complete with all required hardware to assure maximum axial movements are not exceeded.
B. Weld end preparations shall be machined and flanges shall be sized and drilled as required by corresponding Piping Material Specifications.
C. ASTM A312 Gr 304 stainless steel corrugations with stainless steel liners.
D. Provide single-ply double bellows.
3. Installation Requirements:
A. Length of space in pipeline must equal design installation length of expansion joint.
B. The two sections of pipe which attach to either end of the expansion joint must be in alignment with each other.
C. Install as shown on the Drawings with all mating piping properly anchored and guided in accordance with the manufacturer's recommendations.
D. Install in accordance with Installation Manual WDAAA116758 - Installation of Flexible Bellows and Hoses.
Rev
0
0
0
0
0
0
0
0
0
Comp End
Prep
Flow Rate
(scfm)
Axial
Compress
(in)
Axial
Expand (in)
Lateral
Deflection
(in)
Design
Pressure
(psig)
Design
Temp
(°F)
Reference
Drawing
Reference
Drawing
POS/Item No.
Supply By
Construct
By
P&ID No.
Tag Number
Fluid
Nominal
Diameter
01BAG-EJ-001
Combustion Air
DN600
Flanged
LATER
LATER
LATER
LATER
15
167
4V60B0082-2
0060B008202
5.1210
5.8320
MMSCR001
01BAG-EJ-002
Combustion Air
DN600
Flanged
LATER
LATER
LATER
LATER
15
167
4V60B0082-2
0060B008202
5.1210
5.8320
MMSCR001
01SCR-EJ-001
Exhaust Gas
DN800
Flanged
LATER
LATER
LATER
LATER
7
900
4V60B0133
0060B013303
5.1210
5.8320
MMSCR001
01SCR-EJ-002
Exhaust Gas
DN800
Flanged
LATER
LATER
LATER
LATER
7
900
4V60B0133
0060B013303
5.1210
5.8320
MMSCR001
01SCR-EJ-003
Exhaust Gas
DN1200
Flanged
LATER
LATER
LATER
LATER
7
900
DAAE067768
PAAE132512
5.1210
5.8320
MMSCR001
01SCR-EJ-004
Exhaust Gas
DN1800
Flanged
LATER
LATER
LATER
LATER
7
900
DAAE067768
PAAE141856
5.1210
5.8320
MMSCR001
01SCR-EJ-005
Exhaust Gas
DN1600
Flanged
LATER
LATER
LATER
LATER
7
900
DAAE067768
PAAE132512
5.1210
5.8320
MMSCR001
01SCR-EJ-006
Exhaust Gas
DN1600
Flanged
LATER
LATER
LATER
LATER
7
900
DAAE067768
PAAE132512
5.1210
5.8320
MMSCR001
02BAG-EJ-001
Combustion Air
DN600
Flanged
LATER
LATER
LATER
LATER
15
167
4V60B0082-2
0060B008202
5.1210
5.8320
MMSCR001
Stillwater Energy Center
Project # 75644
Page 6 of 23
Remarks
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
Rev
0
0
0
0
0
0
0
0
1
0
0
0
0
0
1
Comp End
Prep
Flow Rate
(scfm)
Axial
Compress
(in)
Axial
Expand (in)
Lateral
Deflection
(in)
Design
Pressure
(psig)
Design
Temp
(°F)
Reference
Drawing
Reference
Drawing
POS/Item No.
Supply By
Construct
By
P&ID No.
Tag Number
Fluid
Nominal
Diameter
02BAG-EJ-002
Combustion Air
DN600
Flanged
LATER
LATER
LATER
LATER
15
167
4V60B0082-2
0060B008202
5.1210
5.8320
MMSCR001
02SCR-EJ-001
Exhaust Gas
DN800
Flanged
LATER
LATER
LATER
LATER
7
900
4V60B0133
0060B013303
5.1210
5.8320
MMSCR001
02SCR-EJ-002
Exhaust Gas
DN800
Flanged
LATER
LATER
LATER
LATER
7
900
4V60B0133
0060B013303
5.1210
5.8320
MMSCR001
02SCR-EJ-003
Exhaust Gas
DN1200
Flanged
LATER
LATER
LATER
LATER
7
900
DAAE067768
PAAE132512
5.1210
5.8320
MMSCR001
02SCR-EJ-004
Exhaust Gas
DN1800
Flanged
LATER
LATER
LATER
LATER
7
900
DAAE067768
PAAE141856
5.1210
5.8320
MMSCR001
02SCR-EJ-005
Exhaust Gas
DN1600
Flanged
LATER
LATER
LATER
LATER
7
900
DAAE067768
PAAE132512
5.1210
5.8320
MMSCR001
02SCR-EJ-006
Exhaust Gas
DN1600
Flanged
LATER
LATER
LATER
LATER
7
900
DAAE067768
PAAE132512
5.1210
5.8320
MMSCR001
03BAG-EJ-001
Combustion Air
DN600
Flanged
LATER
LATER
LATER
LATER
15
167
4V60B0082-2
0060B008202
5.1210
5.8320
MMSCR002
03BAG-EJ-002
Combustion Air
DN600
Flanged
LATER
LATER
LATER
LATER
15
167
4V60B0082-2
0060B008202
5.1210
5.8320
MMSCR002
03SCR-EJ-001
Exhaust Gas
DN800
Flanged
LATER
LATER
LATER
LATER
7
900
4V60B0133
0060B013303
5.1210
5.8320
MMSCR002
03SCR-EJ-002
Exhaust Gas
DN1800
Flanged
LATER
LATER
LATER
LATER
7
900
4V60B0133
0060B013303
5.1210
5.8320
MMSCR002
03SCR-EJ-003
Exhaust Gas
DN1600
Flanged
LATER
LATER
LATER
LATER
7
900
DAAE067768
PAAE132512
5.1210
5.8320
MMSCR002
03SCR-EJ-004
Exhaust Gas
DN1800
Flanged
LATER
LATER
LATER
LATER
7
900
DAAE067768
PAAE141856
5.1210
5.8320
MMSCR002
03SCR-EJ-005
Exhaust Gas
DN1600
Flanged
LATER
LATER
LATER
LATER
7
900
DAAE067768
PAAE132512
5.1210
5.8320
MMSCR002
03SCR-EJ-006
Exhaust Gas
DN1600
Flanged
LATER
LATER
LATER
LATER
7
120
DAAE067768
PAAE132512
5.1210
5.8320
MMSCR002
Stillwater Energy Center
Project # 75644
Page 7 of 23
Remarks
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-13
Rev
0
1
Date
4/29/2015
5/26/2015
By
SMK
MRS
Checked
MRS
VFR
Flexible Metal Hose
Description
ISSUED FOR BID
UPDATED HOSE LENGTHS; MOVED RADIATOR AND AIR FLEX HOSES OVER FROM S-14; ISSUED FOR ADDENDUM 4
1. Acceptable Manufacturers:
A. US Hose Corporation
B. Hyspan Precision Products, Inc.
C. Metraflex
D. Marquett Coppersmithing Co.
2. Special Features Required:
A. Flexible hose shall be annular 304 stainless steel corrugated metal hose with braided stainless steel wire covering.
B. Hose shall meet the pressure and temperature ratings listed in the table below.
C. Screwed end connections shall have one swivel end and floating flange connections shall be provided with one fixed and one floating flange.
3. Installation Requirements
A. Install metal hose with piping anchored and guided according to the manufacturer's recommendations.
B. Installing in a tight bend is discouraged.
4. Design Parameters:
A. Design and furnish in accordance with the following schedules:
B. All DIN style flanges shall be manufacturered to PN40.
Pipeline Conditions
Rev
0
0
0
1
1
0
0
0
0
0
0
1
1
0
0
0
0
0
0
1
1
1
1
Tag No.
Comp. End
Prep
Movement
Design
Pressure
(psig)
Design
Temp.
(°F)
Reference Drawing
Reference Drawing
POS/Material No.
Overall Length
of Hose
Supply By
Construction
By
Straight
Intermittent
145
120
Later
Later
Later
5.1210
5.8320
Fluid
Nominal
Diameter
Installation
Urea
3/8"
P&ID No.
01AAU-FXH-101
02AAU-FXH-101
03AAU-FXH-101
Mech. Grip
Mech. Grip
Mech. Grip
Urea
Urea
3/8"
3/8"
Straight
Straight
Intermittent
Intermittent
145
145
120
120
Later
Later
Later
Later
Later
Later
5.1210
5.1210
5.8320
5.8320
MMSCR001
MMSCR001
MMSCR002
00ACI-FXH-001
Flng / Thrd
Instrument Air
2"
Straight
Intermittent
145
165
N/A
N/A
9"
5.8320
5.8320
MMACI001
00ACI-FXH-002
Flng / Thrd
Instrument Air
2"
Straight
Intermittent
145
165
N/A
N/A
9"
5.8320
5.8320
MMACI001
01ACI-FXH-001
Threaded
Instrument Air
DN28
Straight
Intermittent
145
165
4V60B0009
009460976
360 mm
5.1210
5.8320
MMACA001
02ACI-FXH-001
Threaded
Instrument Air
DN28
Straight
Intermittent
145
165
4V60B0009
009460976
360 mm
5.1210
5.8320
MMACA001
03ACI-FXH-001
Threaded
Instrument Air
DN28
Straight
Intermittent
145
165
4V60B0009
009460976
360 mm
5.1210
5.8320
MMACA001
01ACI-FXH-110
Mech. Grip
Instrument Air
1/2"
Straight
Intermittent
145
165
Later
Later
Later
5.1210
5.8320
MMSCR001
02ACI-FXH-110
Mech. Grip
Instrument Air
1/2"
Straight
Intermittent
145
165
Later
Later
Later
5.1210
5.8320
MMSCR001
03ACI-FXH-110
Mech. Grip
Instrument Air
1/2"
Straight
Intermittent
145
165
Later
Later
Later
5.1210
5.8320
MMSCR002
00ACS-FXH-001
Flng / Thrd
Starting Air
1-1/2"
Straight
Intermittent
480
165
N/A
N/A
9"
5.8320
5.8320
MMACS001
00ACS-FXH-002
Flng / Thrd
Starting Air
1-1/2"
Straight
Intermittent
480
165
N/A
N/A
9"
5.8320
5.8320
MMACS001
01ACS-FXH-001
Flanged
Starting Air
DN65
Straight
Intermittent
480
165
4V60B0097
PAAF026869
700 mm
5.1210
5.8320
MMACA001
02ACS-FXH-001
Flanged
Starting Air
DN65
Straight
Intermittent
480
165
4V60B0097
PAAF026869
700 mm
5.1210
5.8320
MMACA001
03ACS-FXH-001
Flanged
Starting Air
DN65
Straight
Intermittent
480
165
4V60B0097
PAAF026869
700 mm
5.1210
5.8320
MMACA001
01BAG-FXH-300
Flanged
Condensate
DN22
Straight
Intermittent
15
167
4V60B0009-5
009460409
Later
5.1210
5.8320
MMSCR001
02BAG-FXH-300
Flanged
Condensate
DN22
Straight
Intermittent
15
167
4V60B0009-5
009460409
Later
5.1210
5.8320
MMSCR001
03BAG-FXH-300
Flanged
Condensate
DN22
Straight
Intermittent
15
167
4V60B0009-5
009460409
Later
5.1210
5.8320
MMSCR002
01CWM-FXH-111
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
01CWM-FXH-112
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
01CWM-FXH-113
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
01CWM-FXH-114
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
Stillwater Energy Center
Project # 75644
Page 8 of 23
Remarks
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
Pipeline Conditions
Fluid
Nominal
Diameter
Installation
Movement
Design
Pressure
(psig)
Design
Temp.
(°F)
Reference Drawing
Reference Drawing
POS/Material No.
Overall Length
of Hose
Supply By
Construction
By
P&ID No.
Rev
Tag No.
Comp. End
Prep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
01CWM-FXH-115
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
01CWM-FXH-121
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
01CWM-FXH-122
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
01CWM-FXH-123
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
01CWM-FXH-124
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
01CWM-FXH-125
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
02CWM-FXH-111
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
02CWM-FXH-112
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
02CWM-FXH-113
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
02CWM-FXH-114
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
02CWM-FXH-115
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
02CWM-FXH-121
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
02CWM-FXH-122
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
02CWM-FXH-123
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
02CWM-FXH-124
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
02CWM-FXH-125
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM001
03CWM-FXH-111
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM002
03CWM-FXH-112
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM002
03CWM-FXH-113
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM002
03CWM-FXH-114
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM002
03CWM-FXH-115
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM002
03CWM-FXH-121
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM002
03CWM-FXH-122
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM002
03CWM-FXH-123
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM002
03CWM-FXH-124
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM002
03CWM-FXH-125
Flanged
Cooling Water
2"
Straight
Intermittent
145
230
N/A
N/A
9"
5.8320
5.8320
MMCWM002
01FGS-FXH-001 Floating Flng.
Fuel Gas
DN100
Straight
Intermittent
150
120
DBAC840071
PAAF194424
Later
5.1210
5.8320
MMFGS005
01FGS-FXH-002 Floating Flng.
Fuel Gas
DN32
Straight
Intermittent
150
120
DBAC779116
PAAF193734
Later
5.1210
5.8320
MMFGS005
01FGS-FXH-300 Floating Flng.
Fuel Gas
DN48
Straight
Intermittent
150
120
4V35A1224
PAAF008734
1000mm
5.1210
5.8320
MMFGS005
01FGS-FXH-401 Floating Flng.
Fuel Gas
DN50
Straight
Intermittent
150
120
V60B0092
PAAF026865
900mm
5.1210
5.8320
MMFGS005
01FGS-FXH-402
Flanged
Fuel Gas
DN50
Straight
Intermittent
150
120
V60B0092
PAAF026865
900mm
5.1210
5.8320
MMFGS005
02FGS-FXH-001
Flanged
Fuel Gas
DN100
Straight
Intermittent
150
120
DBAC840071
PAAF194424
Later
5.1210
5.8320
MMFGS005
02FGS-FXH-002
Flanged
Fuel Gas
DN32
Straight
Intermittent
150
120
DBAC779116
PAAF193734
Later
5.1210
5.8320
MMFGS005
02FGS-FXH-300
Flanged
Fuel Gas
DN48
Straight
Intermittent
150
120
4V35A1224
PAAF008734
1000mm
5.1210
5.8320
MMFGS005
02FGS-FXH-401
Flanged
Fuel Gas
DN50
Straight
Intermittent
150
120
V60B0092
PAAF026865
900mm
5.1210
5.8320
MMFGS005
02FGS-FXH-402
Flanged
Fuel Gas
DN50
Straight
Intermittent
150
120
V60B0092
PAAF026865
900mm
5.1210
5.8320
MMFGS005
03FGS-FXH-001
Flanged
Fuel Gas
DN100
Straight
Intermittent
150
120
DBAC840071
PAAF194424
Later
5.1210
5.8320
MMFGS005
03FGS-FXH-002
Flanged
Fuel Gas
DN32
Straight
Intermittent
150
120
DBAC779116
PAAF193734
Later
5.1210
5.8320
MMFGS005
03FGS-FXH-300
Flanged
Fuel Gas
DN48
Straight
Intermittent
150
120
4V35A1224
PAAF008734
1000mm
5.1210
5.8320
MMFGS005
03FGS-FXH-401
Flanged
Fuel Gas
DN50
Straight
Intermittent
150
120
V60B0092
PAAF026865
900mm
5.1210
5.8320
MMFGS005
03FGS-FXH-402
Flanged
Fuel Gas
DN50
Straight
Intermittent
150
120
V60B0092
PAAF026865
900mm
5.1210
5.8320
MMFGS005
Stillwater Energy Center
Project # 75644
Page 9 of 23
Remarks
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
Pipeline Conditions
Fluid
Nominal
Diameter
Installation
Movement
Design
Pressure
(psig)
Design
Temp.
(°F)
Reference Drawing
Reference Drawing
POS/Material No.
Overall Length
of Hose
Supply By
Construction
By
P&ID No.
Rev
Tag No.
Comp. End
Prep
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
00FGS-FXH-101
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-102
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-103
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-104
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-105
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-106
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-107
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-108
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-109
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-110
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-111
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-112
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-113
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-114
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-115
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-116
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-151
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-152
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-153
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-154
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
00FGS-FXH-155
Flanged
Fuel Gas
1/2"
Straight
Intermittent
150
120
N/A
N/A
9"
5.8320
5.8320
MMFGS006
01WSW-FXH-100
LATER
Service Water
DN18
Straight
Intermittent
150
120
4V60B0095
PAAE039298
1300 mm
5.1210
5.8320
MMWSW002
02WSW-FXH-100
LATER
Service Water
DN18
Straight
Intermittent
150
120
4V60B0095
PAAE039298
1300 mm
5.1210
5.8320
MMWSW002
03WSW-FXH-100
LATER
Service Water
DN18
Straight
Intermittent
150
120
4V60B0095
PAAE039298
1300 mm
5.1210
5.8320
MMWSW002
DN22
Straight
Intermittent
150
120
4V60B0009-5
009460409
Later
5.1210
5.8320
DN22
Straight
Intermittent
150
120
4V60B0009-5
009460409
Later
5.1210
5.8320
4"
Straight
Intermittent
80
230
N/A
N/A
9"
5.8320
5.8320
DN22
Straight
Intermittent
150
120
4V60B0009-5
009460409
Later
5.1210
5.8320
DN22
Straight
Intermittent
150
120
4V60B0009-5
009460409
Later
5.1210
5.8320
4"
Straight
Intermittent
80
230
N/A
N/A
9"
5.8320
5.8320
DN22
Straight
Intermittent
150
120
4V60B0009-5
009460409
Later
5.1210
5.8320
DN22
Straight
Intermittent
150
120
4V60B0009-5
009460409
Later
5.1210
5.8320
4"
Straight
Intermittent
80
230
N/A
N/A
9"
5.8320
5.8320
0
0
0
0
01WSW-FXH-301
01WSW-FXH-301
01WSW-FXH-302
02WSW-FXH-301
LATER
LATER
LATER
LATER
0
02WSW-FXH-301
LATER
0
02WSW-FXH-302
LATER
0
03WSW-FXH-301
LATER
0
0
03WSW-FXH-301
03WSW-FXH-302
LATER
LATER
Condensate/Servic
e Water
Condensate/Servic
e Water
Condensate/Servic
e Water
Condensate/Servic
e Water
Condensate/Servic
e Water
Condensate/Servic
e Water
Condensate/Servic
e Water
Condensate/Servic
e Water
Condensate/Servic
e Water
Remarks
MMWSW002
MMWSW002
MMWSW002
MMWSW002
MMWSW002
MMWSW002
MMWSW002
MMWSW002
MMWSW002
NOTES:
Stillwater Energy Center
Project # 75644
Page 10 of 23
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-14
Rev
0
1
Date
4/29/2015
05/26/15
By
SMK
MRS
Checked
MRS
VFR
Flexible Rubber Hose
Description
ISSUED FOR BID
MOVED RADIATOR AND AIR FLEX HOSES TO S-13; ISSUED FOR ADDENDUM 4
1. Acceptible Manufacturers:
A. All Flexible Rubber Hose to be supplied by Wartsila.
3. Installation Requirements:
A. Install hose as detailed on Drawing.
B. Install hose with piping anchored and guided according to the manufacturer's recommendations.
Pipeline Conditions
Rev
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Tag No.
01CWM-FXH-001
01CWM-FXH-002
01CWM-FXH-003
01CWM-FXH-004
01CWM-FXH-005
01CWM-FXH-006
01CWM-FXH-007
01CWM-FXH-008
01CWM-FXH-009
01CWM-FXH-010
01CWM-FXH-011
01CWM-FXH-012
01CWM-FXH-013
01CWM-FXH-014
01CWM-FXH-111
01CWM-FXH-112
01CWM-FXH-113
01CWM-FXH-114
01CWM-FXH-115
01CWM-FXH-121
01CWM-FXH-122
01CWM-FXH-123
01CWM-FXH-124
01CWM-FXH-125
02CWM-FXH-001
02CWM-FXH-002
02CWM-FXH-003
02CWM-FXH-004
02CWM-FXH-005
02CWM-FXH-006
02CWM-FXH-007
02CWM-FXH-008
02CWM-FXH-009
02CWM-FXH-010
02CWM-FXH-011
02CWM-FXH-012
02CWM-FXH-013
02CWM-FXH-014
02CWM-FXH-111
02CWM-FXH-112
02CWM-FXH-113
Stillwater Energy Center
Project # 75644
Comp. End
Prep
Fluid
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Mech. Grip
Mech. Grip
Mech. Grip
Mech. Grip
Mech. Grip
Mech. Grip
Hose Clamps
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Mech. Grip
Mech. Grip
Mech. Grip
Mech. Grip
Mech. Grip
Mech. Grip
Hose Clamps
Flanged
Flanged
Flanged
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Nominal Diameter
Design
Pressure
(psig)
Design
Temp.
°F
Reference Drawing
Reference Drawing
POS/Material No.
Supply By
Construction
By
DN50
DN200
DN200
DN200
DN150
DN200
DN150
DN12
DN12
DN12
DN12
DN12
DN12
DN48
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
DN50
DN200
DN200
DN200
DN150
DN200
DN150
DN12
DN12
DN12
DN12
DN12
DN12
DN48
4"
4"
4"
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
3V60D0025
3V60D0025
3V60D0025
3V60D0025
V60D0025
3V60D0025
V60D0025
DBAA197884
DBAA197884
DBAA197884
DBAA197884
DBAA197884
DBAA197884
4V35A1224-2
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
3V60D0025
3V60D0025
3V60D0025
3V60D0025
V60D0025
3V60D0025
V60D0025
DBAA197884
DBAA197884
DBAA197884
DBAA197884
DBAA197884
DBAA197884
4V35A1224-2
N/A
N/A
N/A
006190043
006190268
006190268
006190268
006190122
006190268
006190122
PAAE095802
PAAE095802
PAAE095802
PAAE095802
PAAE095802
PAAE095802
0035A122402
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
006190043
006190268
006190268
006190268
006190122
006190268
006190122
PAAE095802
PAAE095802
PAAE095802
PAAE095802
PAAE095802
PAAE095802
0035A122402
N/A
N/A
N/A
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
Page 11 of 23
P&ID No.
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM001
MMCWM003
MMCWM003
MMCWM003
Remarks
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
Pipeline Conditions
Rev
Tag No.
0
02CWM-FXH-114
0
02CWM-FXH-115
0
02CWM-FXH-121
0
02CWM-FXH-122
0
02CWM-FXH-123
0
02CWM-FXH-124
0
02CWM-FXH-125
0
03CWM-FXH-001
0
03CWM-FXH-002
0
03CWM-FXH-003
0
03CWM-FXH-004
0
03CWM-FXH-005
0
03CWM-FXH-006
0
03CWM-FXH-007
0
03CWM-FXH-008
0
03CWM-FXH-009
0
03CWM-FXH-010
0
03CWM-FXH-011
0
03CWM-FXH-012
0
03CWM-FXH-013
0
03CWM-FXH-014
0
03CWM-FXH-111
0
03CWM-FXH-112
0
03CWM-FXH-113
0
03CWM-FXH-114
0
03CWM-FXH-115
0
03CWM-FXH-121
0
03CWM-FXH-122
0
03CWM-FXH-123
0
03CWM-FXH-124
0
03CWM-FXH-125
0
01LOT-FXH-001
0
01LOT-FXH-002
0
01LOT-FXH-003
0
01LOT-FXH-004
0
01LOT-FXH-301
0
01LOT-FXH-302
0
02LOT-FXH-001
0
02LOT-FXH-002
0
02LOT-FXH-003
0
02LOT-FXH-004
0
02LOT-FXH-301
0
02LOT-FXH-302
0
03LOT-FXH-001
0
03LOT-FXH-002
0
03LOT-FXH-003
0
03LOT-FXH-004
0
03LOT-FXH-301
0
03LOT-FXH-302
0
00ACS-FHX-001
0
00ACS-FHX-002
NOTES:
Stillwater Energy Center
Project # 75644
Comp. End
Prep
Fluid
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Mech. Grip
Mech. Grip
Mech. Grip
Mech. Grip
Mech. Grip
Mech. Grip
Hose Clamps
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Flanged
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Cooling Water
Lube Oil
Lube Oil
Lube Oil
Lube Oil
Lube Oil
Lube Oil
Lube Oil
Lube Oil
Lube Oil
Lube Oil
Lube Oil
Lube Oil
Lube Oil
Lube Oil
Lube Oil
Lube Oil
Lube Oil
Lube Oil
Starting Air
Starting Air
Nominal Diameter
Design
Pressure
(psig)
Design
Temp.
°F
Reference Drawing
Reference Drawing
POS/Material No.
Supply By
Construction
By
P&ID No.
4"
4"
4"
4"
4"
4"
4"
DN50
DN200
DN200
DN200
DN150
DN200
DN150
DN12
DN12
DN12
DN12
DN12
DN12
DN48
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
DN200
DN150
DN200
DN50
DN140/157
DN140/157
DN200
DN150
DN200
DN50
DN140/157
DN140/157
DN200
DN150
DN200
DN50
DN140/157
DN140/157
1"
1"
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
145
145
145
145
145
145
145
145
145
145
145
145
145
145
145
145
145
145
480
480
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
230
210
210
210
210
210
210
210
210
210
210
210
210
210
210
210
210
210
210
165
165
N/A
N/A
N/A
N/A
N/A
N/A
N/A
3V60D0025
3V60D0025
3V60D0025
3V60D0025
V60D0025
3V60D0025
V60D0025
DBAA197884
DBAA197884
DBAA197884
DBAA197884
DBAA197884
DBAA197884
4V35A1224-2
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
3V60B0081
3V60B0081
3V60B0081
3V60B0081
4V60B0029
4V60B0029
3V60B0081
3V60B0081
3V60B0081
3V60B0081
4V60B0029
4V60B0029
3V60B0081
3V60B0081
3V60B0081
3V60B0081
4V60B0029
4V60B0029
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
006190043
006190268
006190268
006190268
006190122
006190268
006190122
PAAE095802
PAAE095802
PAAE095802
PAAE095802
PAAE095802
PAAE095802
0035A122402
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
006190277
006190276
006190277
006190271
PAAE060214
PAAE060214
006190277
006190276
006190277
006190271
PAAE060214
PAAE060214
006190277
006190276
006190277
006190271
PAAE060214
PAAE060214
N/A
N/A
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.1210
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
5.8320
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM002
MMCWM002
MMCWM002
MMCWM002
MMCWM002
MMCWM002
MMCWM002
MMCWM002
MMCWM002
MMCWM002
MMCWM002
MMCWM002
MMCWM002
MMCWM002
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMCWM003
MMLOT003
MMLOT003
MMLOT003
MMLOT003
MMLOT003
MMLOT003
MMLOT003
MMLOT003
MMLOT003
MMLOT003
MMLOT003
MMLOT003
MMLOT003
MMLOT003
MMLOT003
MMLOT003
MMLOT003
MMLOT003
MMACS001
MMACS001
Page 12 of 23
Remarks
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-31
Air Cocks
Rev
Date
0
1
Description
By
Checked
4/29/2015
SMK
MRS
ISSUED FOR BID
05/26/15
MRS
VFR
ADDED COLUMN LOCATIONS; ISSUED FOR ADDENDUM 4
1. Acceptable Manufacturers:
A. Coupling:
1. Dixon Valve (Model AB-7)
2. McMaster-Carr
3. Approved Equal
B. Cock Valve:
1. Crane (Model 9200 series)
2. Apollo
3. Approved equal.
2. Special Features Required:
A. Provide coupling half on each valve.
B. Air cocks shall be 3/4-inch quick-change coupling with intergral 3/4" bronze shufoff valve which automatically closes when coupling is not in use.
C. Coupling shall have nipple with 3/4-inch male pipe threads.
3. Installation Requirements:
A. Furnish air cocks to be installed per standard detail at building column locations indicated.
B. Furnish 2 additional air cocks to be turned over to Owner.
4. Design Parameters:
A. Design and furnish in accordance with the following schedules:
Pipeline Conditions
Rev
Tag No.
No. Req'd
PM Spec
Line Size
(in.)
Pressure Class
(lbs)
Design Press
(psig)
Design Temp (°F)
Line No.
P&ID No.
Supply By
1
00ACI-HB-101
1
00SAL01
3/4
150
145
165
00ACI-101-3/4"-00SAL01-0"
MMACI001
5.8320
5.8320
E9
MECH
1
00ACI-HB-102
1
00SAL01
3/4
150
145
165
00ACI-102-3/4"-00SAL01-0"
MMACI001
5.8320
5.8320
E8
MECH
1
00ACI-HB-103
1
00SAL01
3/4
150
145
165
00ACI-103-3/4"-00SAL01-0"
MMACI001
5.8320
5.8320
E7
MECH
1
00ACI-HB-104
1
00SAL01
3/4
150
145
165
00ACI-104-3/4"-00SAL01-0"
MMACI001
5.8320
5.8320
E5
SEH
1
00ACI-HB-105
1
00SAL01
3/4
150
145
165
00ACI-105-3/4"-00SAL01-0"
MMACI001
5.8320
5.8320
E4
SEH
1
00ACI-HB-106
1
00SAL01
3/4
150
145
165
00ACI-106-3/4"-00SAL01-0"
MMACI001
5.8320
5.8320
E3
SEH
Construction Building Column
Locations
By
Remarks
NOTES:
Stillwater Energy Center
Project # 75644
Page 13 of 23
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-31
Water Hose Bibbs
Rev
Date
0
1
Description
By
Checked
4/29/2015
SMK
MRS
ISSUED FOR BID
05/26/15
MRS
VFR
ADDED COLUMN LOCATIONS; ISSUED FOR ADDENDUM 4
1. Acceptable Manufacturers:
A. Coupling:
1. Dixon Valve (Model AB-7)
2. McMaster-Carr
3. Febco Hose Bib Vacuum Breaker (Model 765)
4. Approved Equal
B. Cock Valve:
1. Crane (Model 9200 series)
2. Apollo
3. Approved equal.
2. Special Features Required:
A. Hose bibb shall be 3/4" malleable iron coupling attached to 3/4" bronze valve.
B. Hose bibb shall be 3/4" hose bibb vacuum breaker attached to 3/4" valve with hose threads.
3. Installation Requirements:
A. Furnish hose bibbs listed below to be installed per standard detail at locations indicated.
B. Furnish 2 additional hose bibbs to be turned over to Owner.
4. Design Parameters:
A. Design and furnish in accordance with the following schedules:
Pipeline Conditions
Rev
Tag No.
No. Req'd
PM Spec
Adapter Size
(in.)
Pressure Class
(lbs)
Design Press
(psig)
Design Temp (°F)
Line No.
P&ID No.
Supply By
Construction
By
Building Column
Locations
1
00WSW-HB-111
1
00SAL01
3/4
150
150
120
00WSW-111-3/4"-00SAL01-0"
MMWSW002
5.8320
5.8320
E9
Remarks
MECH
1
00WSW-HB-112
1
00SAL01
3/4
150
150
120
00WSW-112-3/4"-00SAL01-0"
MMWSW002
5.8320
5.8320
E8
MECH
1
00WSW-HB-113
1
00SAL01
3/4
150
150
120
00WSW-113-3/4"-00SAL01-0"
MMWSW002
5.8320
5.8320
E5
SEH
1
00WSW-HB-114
1
00SAL01
3/4
150
150
120
00WSW-114-3/4"-00SAL01-0"
MMWSW002
5.8320
5.8320
E4
SEH
1
00WSW-HB-115
1
00SAL01
3/4
150
150
120
00WSW-115-3/4"-00SAL01-0"
MMWSW002
5.8320
5.8320
E3
SEH
NOTES:
Stillwater Energy Center
Project # 75644
Page 14 of 23
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-34
Emergency Eyewash and Safety Shower Stations
Rev
Date
0
1
By
Checked
4/29/2015
SMK
MRS
ISSUED FOR BID
05/26/15
MRS
VFR
ADDED WATER HEATER MODEL NO.; ISSUED FOR ADDENDUM 4
Description
1. Acceptable Manufacturers:
A. Bradley
B. Haws
C. Speakman Co.
D. Engineer-Approved Equal
2. Special Features Required:
A. Eyewash shall be equipped with a stay open hand- and foot-operated ball valve and stainless steel bowl.
B. Shower head shall be 10-inch deluge type with hand-open stay-open ball valve.
C. Provide flow control to assure safe, steady and adequate flow to the eyewash spray.
D. Equip the unit with an identification sign.
E. Each station shall be equipped with an internal flow switch.
3. Installation Requirements
A. Install as indicated and per manufacturer's recommendations.
B. Tie into water supply with galvanized pipe.
Pipeline Conditions
Rev
Tag No.
No. Req'd
Piping
Connection
Size (in)
(in.)
Fluid Type
Design Press Design Temp
(psig)
(°F)
Line No.
P&ID No.
Supply By
Construction
By
Remarks
1
00WSW-ESW001
1
1-1/4
Water
150
120
00WSW-115-1 1/4"-00SAL01-0"
MMWSW002
5.8320
5.8320
Supply with electric water heater (Haws
Model 9325); Haws Model 8330 Eyewash &
Safety Shower
0
00WSW-ESW002
1
1-1/4
Water
150
120
00WSW-106-1-1/4"-00SAL01-2"
MMWSW002
5.8320
5.8320
Haws Model 8710 Enclosed Eyewash &
Safety Shower
1
003
1
N/A
Water
150
120
N/A
MMWSW002
5.8320
5.8320
Haws Model 7500EB Portable Eyewash
NOTES:
Stillwater Energy Center
Project # 75644
Page 15 of 23
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-44
SAFETY VALVE OR RELIEF VALVE OR EMERGENCY VENT (Pressure)
Rev
Date
0
1
Description
By
Checked
4/29/2015
SMK
MRS
ISSUED FOR BID
05/26/15
MRS
VFR
REVISED AS NOTED; ISSUED FOR ADDENDUM 4
1. Acceptable Manufacturers:
A. Consolidated (1900, 1982, 1990, 19000 Series)
B. Farris
C. Crosby
D. Shand & Jurs
D. Approved Equal
2. Special Features Required:
A. Drill and face flanges to match the pipeline connection size and class listed.
B. Provide adaptors if required.
C. Valves shall pass full flow at 25% overpresure for liquid service and 10% overpressure for steam, air, and gas service.
D. Provide valves with closed bonnets to completely enclose spring.
E. Provide drain connections.
F. Provide internal bonnet vents or external vent to exhaust line.
H. Provide all valves with operating lifting gear.
I. Valves designated as "O"-Ring Seat Seal Valves shall be provided with PTFE "O-ring" seats for steam and water service between 40 and 500F (4
o
C - 260 oC).
J. Balance bellows valves shall be provided whenever backpressure excceds 40% of the design inlet pressure setpoint.
3. Installation Requirements
A. Install as indicated and per manufacturer's recommendations.
4. Design Parameters:
A. Design and furnish in accordance with the following schedules:
Body
Rev
Tag No.
Fluid
ASTM
Material
Valve
Outlet
Connectio
n
Valve Inlet Connection
Pipeline Conditions
O-Ring
Maximum
Operatin Desig
Constant Variable
Seat
Flow
Set Over-pressure Design
g
n
Operating Relieving
BackBackNom
Valves
Rate Press
(% of Set
Pressure Pressure Temp
Temp
Temp
pressure pressure
Size
(Yes/No) (SCFM) (psig)
Pressure)
(psig)
(psig)
(°F)
(°F)
(°F)
(psig)
(psig) Class (in)
End
Conn
Preferred
Nominal
Size (in)
P&ID No.
Supply By
Const.
By
MNPT
2
MMACI001
5.8320
5.8320
0
00ACI-SRV-001 Instrument Air
A351-CF8M
Yes
1000
135
10
145
125
165
100
100
0.5
0
150
1-1/2
0
00ACI-SRV-002 Instrument Air
A351-CF8M
Yes
1000
135
10
145
125
165
100
100
0.5
0
150
1-1/2
MNPT
2
MMACI002
5.8320
5.8320
1
00ACI-SRV-003 Instrument Air
A351-CF8M
Yes
350
145
10
145
125
165
100
100
0.5
0
150
1-1/2
Flanged
2
MMACS001
5.8320
5.8320
0
00ACS-SRV-001
Starting Air
A216 WCC
Yes
150
450
10
480
435
165
100
100
0.5
0
300
1
MNPT
1-1/2
MMACS002
5.8320
5.8320
1
00FGS-SRV-001
Fuel Gas
A216 WCC
Yes
13500
150
10
150
115
120
100
100
0.5
0
300
4
Flanged
6
MMFGS003
5.8320
5.8320
1
00FGS-SRV-455
Fuel Gas
A216 WCC
Yes
500
5
10
150
0.2
120
100
100
0.5
0
150
1
Flanged
2
MMFGS006
5.8320
5.8320
1
00FGS-SRV-457
Fuel Gas
A216 WCC
Yes
500
5
10
150
0.2
120
100
100
0.5
0
150
1
Flanged
2
MMFGS006
5.8320
5.8320
1
00LOT-EV-001
Lube Oil
316 SS
No
-
0.5
10
1
0
150
100
100
0.5
0
150
8
Flanged
8
MMLOT001
5.2980
5.8320
1
00LOT-EV-002
Lube Oil
316 SS
No
-
0.5
10
1
0
150
100
100
0.5
0
150
8
Flanged
8
MMLOT002
5.2980
5.8320
Stillwater Energy Center
Project # 75644
Page 16 of 23
Remarks/Model No.
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
Body
Rev
Tag No.
Fluid
ASTM
Material
1
00LOT-EV-003
Lube Oil
316 SS
Valve
Outlet
Connectio
n
Valve Inlet Connection
Pipeline Conditions
Constant Variable
Operatin Desig
Maximum
O-Ring
Nom
BackBackn
Operating Relieving
Set Over-pressure Design
g
Flow
Seat
Size
Temp
Temp
pressure pressure
Rate Press
(% of Set
Pressure Pressure Temp
Valves
(psig)
(psig) Class (in)
(°F)
(°F)
(°F)
(psig)
(psig)
(Yes/No) (SCFM) (psig)
Pressure)
No
-
0.5
10
1
0
150
100
100
0.5
0
150
8
End
Conn
Preferred
Nominal
Size (in)
P&ID No.
Supply By
Const.
By
Flanged
8
MMLOT002
5.2980
5.8320
Remarks/Model No.
NOTES:
Stillwater Energy Center
Project # 75644
Page 17 of 23
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-51
Pressure-Regulating Valves
Rev
Date
0
1
Description
By
Checked
4/29/2015
SMK
MRS
ISSUED FOR BID
05/26/15
MRS
VFR
REVISED AS NOTED; ISSUED FOR ADDENDUM 4
1. Acceptable Manufacturers:
A. Fisher Company.
B. Cla-Val.
C. Approved equal.
2. Special Features Required:
A. Valve shall be designed to conform with the Piping Material Specification in which it is to be installed and per SECTION 485925.
B. Pressure regulating valves shall be pilot-operated type.
C. Valves shall have replaceable seats and disc with adjustable handwheel or screw.
3. Installation Requirements:
A. Install valves as indicated and per manufacturer's recommendations.
4. Design Parameters:
A. Design and furnish in accordance with the following schedules:
Body
Pressure
Valve
Class (lbs) Size (in)
Rev
Tag No.
Qty.
End Prep
1
00ACI-BPRV-001
1
Flanged
150
3/4
1
00ACI-PRV-002
1
Flanged
150
2
1
00ACS-PRV-101
1
Flanged
300
1
1
00FGS-PRV-012
1
Flanged
150
4
1
00FGS-PRV-054
1
Flanged
150
1-1/4
1
00FGS-PRV-056
1
Flanged
150
1-1/4
1
00FGS-PRV-101
1
Flanged
150
1/2
1
00FGS-PRV-102
1
Flanged
150
1/2
1
00FGS-PRV-103
1
Flanged
150
1/2
1
00FGS-PRV-104
1
Flanged
150
1/2
1
00FGS-PRV-105
1
Flanged
150
1/2
1
00FGS-PRV-106
1
Flanged
150
1/2
1
00FGS-PRV-107
1
Flanged
150
1/2
1
00FGS-PRV-108
1
Flanged
150
1/2
Stillwater Energy Center
Project # 75644
Pipeline Conditions
Body
Material
A351CF8M
A351CF8M
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
Fluid
Instrument
Air
Instrument
Air
Design
Pressure Design
(psig)
Temp (°F)
Inlet
Pressure
Range
(psig)
Design Parameters
Outlet
Pressure
Design
Range
Setpoint Flow
Diaph
(psig)
(psig)
(scfm) Material
Line No.
P&ID No.
Supply By
Construct
By
145
165
90-125
80-100
85
1000
EPDM
00ACI-100-3/4"-00SAL01-0"
MMACI001
5.8320
5.8320
145
165
90-125
80-100
85
1000
EPDM
00ACI-060-3"-01SAS02-0"
MMACI002
5.8320
5.8320
Starting Air
480
165
390-480
115-135
125
350
EPDM 00ACS-151-1-1/2"-03CBS04-0" MMACS001
5.8320
5.8320
Fuel Gas
150
120
200-300
85-150
90
13500
Nitrile
00FGS-007-8"-01CSS01-0"
MMFGS004
5.8320
5.8320
Fuel Gas
150
120
110-150
1-3
2
500
Nitrile
00FGS-054-2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
110-150
1-3
2
500
Nitrile
00FGS-056-2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-101-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-102-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-103-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-104-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-105-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-106-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-107-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-108-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Page 18 of 23
Remarks
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
1
00FGS-PRV-109
1
Flanged
150
1/2
1
00FGS-PRV-110
1
Flanged
150
1/2
1
00FGS-PRV-111
1
Flanged
150
1/2
1
00FGS-PRV-112
1
Flanged
150
1/2
1
00FGS-PRV-113
1
Flanged
150
1/2
1
00FGS-PRV-114
1
Flanged
150
1/2
1
00FGS-PRV-115
1
Flanged
150
1/2
1
00FGS-PRV-116
1
Flanged
150
1/2
1
00FGS-PRV-151
1
Flanged
150
1/2
1
00FGS-PRV-152
1
Flanged
150
1/2
1
00FGS-PRV-153
1
Flanged
150
1/2
1
00FGS-PRV-154
1
Flanged
150
1/2
1
00FGS-PRV-155
1
Flanged
150
1/2
1
00FGS-PRV-161
1
Flanged
150
1/2
1
00FGS-PRV-171
1
Flanged
150
1/2
1
00FGS-PRV-172
1
Flanged
150
1/2
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
A216WCB
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-109-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-110-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-111-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-112-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-113-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-114-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-115-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-116-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-151-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-152-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-153-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-154-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
0.6
Nitrile
00FGS-155-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
1.2
Nitrile
00FGS-161-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
5
Nitrile
00FGS-171-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
Fuel Gas
150
120
1-3
0.25-1
0.5
5
Nitrile
00FGS-172-1/2"-01CSS01-0"
MMFGS006
5.8320
5.8320
NOTES:
1) As required for service intended.
Stillwater Energy Center
Project # 75644
Page 19 of 23
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-71
Weather Covers
Rev
Date
By
Checked
0
4/29/2015
SMK
MRS
Description
ISSUED FOR BID
1. Acceptable Manufacturers:
A. N/A
2. Installation Requirements:
A. Install one cover per Rupture Disk as indicated on drawing MD410.
3. Design Parameters:
A. Design and furnish in accordance with the following schedules.
Pipeline Conditions
Design
Pressure
(psig)
Design Temp (°F)
Rev
Tag No.
Fluid
P&ID No.
Supply By
Construction By
0
01SCR-WC-001
Exhaust Gas
7
900
MMSCR001
5.8320
5.8320
0
01SCR-WC-002
Exhaust Gas
7
900
MMSCR001
5.8320
5.8320
0
01SCR-WC-003
Exhaust Gas
7
900
MMSCR001
5.8320
5.8320
0
02SCR-WC-001
Exhaust Gas
7
900
MMSCR001
5.8320
5.8320
0
02SCR-WC-002
Exhaust Gas
7
900
MMSCR001
5.8320
5.8320
0
02SCR-WC-003
Exhaust Gas
7
900
MMSCR001
5.8320
5.8320
0
03SCR-WC-001
Exhaust Gas
7
900
MMSCR002
5.8320
5.8320
0
03SCR-WC-002
Exhaust Gas
7
900
MMSCR002
5.8320
5.8320
0
03SCR-WC-003
Exhaust Gas
7
900
MMSCR002
5.8320
5.8320
Remarks
NOTES:
Stillwater Energy Center
Project # 75644
Page 20 of 23
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-72
Rupture Disks
Rev
Date
By
Checked
0
4/29/2015
SMK
MRS
Description
ISSUED FOR BID
1. Acceptable Manufacturers:
A. Fike Europe
2. Installation Requirements:
A. Install as indicated on drawings and per manufacturer's recommendations.
B. Supply each with a weather cover per Drawing MD410.
3. Design Parameters:
A. Design and furnish in accordance with the following schedules:
Pipeline Conditions
Rev
Tag No.
End Conn.
Fluid
Design Pressure
(psig)
Reference Dwg
P&ID No.
Supply By
Construction By
0
01SCR-RD-001
Flanged
Exhaust Gas
7
900
DN1400
DBAC864755
MMSCR001
5.1210
5.8320
0
01SCR-RD-002
Flanged
Exhaust Gas
7
900
DN1200
WDAAA27348
MMSCR001
5.1210
5.8320
0
01SCR-RD-003
Flanged
Exhaust Gas
7
900
DN1200
WDAAA27348
MMSCR001
5.1210
5.8320
0
02SCR-RD-001
Flanged
Exhaust Gas
7
900
DN1400
DBAC864755
MMSCR001
5.1210
5.8320
0
02SCR-RD-002
Flanged
Exhaust Gas
7
900
DN1200
WDAAA27348
MMSCR001
5.1210
5.8320
0
02SCR-RD-003
Flanged
Exhaust Gas
7
900
DN1200
WDAAA27348
MMSCR001
5.1210
5.8320
0
03SCR-RD-001
Flanged
Exhaust Gas
7
900
DN1400
DBAC864755
MMSCR002
5.1210
5.8320
0
03SCR-RD-002
Flanged
Exhaust Gas
7
900
DN1200
WDAAA27348
MMSCR002
5.1210
5.8320
0
03SCR-RD-003
Flanged
Exhaust Gas
7
900
DN1200
WDAAA27348
MMSCR002
5.1210
5.8320
Design Temp (°F) Nominal Diameter
Remarks
NOTES:
Stillwater Energy Center
Project # 75644
Page 21 of 23
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-75
Quick Connects
Rev
Date
By
Checked
0
4/29/2015
SMK
MRS
Description
ISSUED FOR BID
1. Acceptible Manufacturers:
A. Kamlok
B. Approved Equal
2. Special Features Required:
A. Use seal materials acceptable for service and approved by Engineer.
B. Shall not couple if the valve is open to prevent accidental spills.
C. Valve opens to flow when locked in place & closes securely when unlocked.
D. Provide caps for each male fitting.
E. Caps shall be stainless steel with rubber gasket & shall be attached to connection via chain.
3. Installation Requirements:
A. Male end to be mounted on installed piping.
4. Design Parameters:
A. Design and furnish in accordance with the following schedules:
Pipeline Conditions
Rev
0
Tag No.
00AAU-QC-001
No. Req'd
1
PM Spec
Line Size (in)
Fluid
Line Number
Design Pressure
(psig)
Design Temp (⁰F)
01SAS02
3
Urea
00AAU-001-3"-01SAS02-2"
145
120
P&ID No.
MMAAU001
Supply By
5.8320
Construction By
Remarks
5.8320
Supply Male End Only
0
00LOT-QC-001
1
01SAS02
3
Lube Oil
00LOT-030-3"-01SAS02-2"
145
210
MMLOT002
5.8320
5.8320
Supply Male End Only
0
00LOT-QC-002
1
01CSS01
3
Lube Oil
00LOT-025-3"-01CSS01-0"
145
210
MMLOT002
5.8320
5.8320
Supply Male End Only
0
01LOT-QC-100
1
N/A
1-1/2
Lube Oil
N/A
145
210
MMLOT002
5.1210
5.8320
Supply Male End Only
0
01LOT-QC-101
1
N/A
1-1/2
Lube Oil
N/A
145
210
MMLOT002
5.1210
5.8320
Supply Male End Only
0
01LOT-QC-200
1
N/A
1-1/2
Lube Oil
N/A
145
210
MMLOT002
5.1210
5.8320
Supply Male End Only
0
01LOT-QC-300
1
01CSS01
1-1/2
Lube Oil
01LOT-300-1-1/2"-01CSS01-0"
145
210
MMLOT002
5.8320
5.8320
Supply Male End Only
0
01LOT-QC-100
1
N/A
1-1/2
Lube Oil
N/A
145
210
MMLOT002
5.1210
5.8320
Supply Male End Only
0
01LOT-QC-101
1
N/A
1-1/2
Lube Oil
N/A
145
210
MMLOT002
5.1210
5.8320
Supply Male End Only
0
01LOT-QC-200
1
N/A
1-1/2
Lube Oil
N/A
145
210
MMLOT002
5.1210
5.8320
Supply Male End Only
0
01LOT-QC-300
1
01CSS01
1-1/2
Lube Oil
02LOT-300-1-1/2"-01CSS01-0"
145
210
MMLOT002
5.8320
5.8320
Supply Male End Only
0
01LOT-QC-100
1
N/A
1-1/2
Lube Oil
N/A
145
210
MMLOT002
5.1210
5.8320
Supply Male End Only
0
01LOT-QC-101
1
N/A
1-1/2
Lube Oil
N/A
145
210
MMLOT002
5.1210
5.8320
Supply Male End Only
0
01LOT-QC-200
1
N/A
1-1/2
Lube Oil
N/A
145
210
MMLOT002
5.1210
5.8320
Supply Male End Only
0
01LOT-QC-300
1
01CSS01
1-1/2
Lube Oil
03LOT-300-1-1/2"-01CSS01-0"
145
210
MMLOT002
5.8320
5.8320
Supply Male End Only
NOTES:
Stillwater Energy Center
Project # 75644
Page 22 of 23
Burns & McDonnell Engineering Company, Inc.
SPECIALS DATA SHEETS
EQUIPMENT DATA SHEET S-78
Electric Heaters
Rev
Date
By
Checked
0
04/29/15
SMK
MRS
Description
ISSUED FOR BID
1. Acceptable Manufacturers:
A. Chromalox
B. Watlow
C. Gaumer
D. CCI Thermal
E. Engineer-approved equal
2. Special Features Required:
A. Heater shall be designed such that it shall maintain the temperature of the fluid inside tank at the required setpoint. Heater sizing shall be based on tank design conditions listed below.
B. Heater power supply shall be 3-phase, 480 VAC, 60 Hz. If an alternative power supply is required, the heater supplier shall furnish appropriate transformer.
C. Heater shall be furnished with complete control system, including on-off switch, heater run indication, ground fault indication, element high temp alarm, and element high high temp shutdown.
D. Heater shall be furnished with dual RTD for element temperature sensing. All required RTD cable for connecting the RTD to the overtemperature controller shall be included with the heater.
E. Heater control panel enclosure shall be NEMA 4X Stainless Steel.
F. Heater terminal housing and control panel shall each be furnished with anti-condensation heater.
3. Installation Requirements:
A. Install as indicated and per manufacturer's recommendations.
B. If required, heater shall be installed with seller-supplied supports inside the tank.
4. Design Parameters:
A. Design and furnish in accordance with the following schedules:
Tank Design Conditions
Rev
Tag No.
0
00LOT-HTR-001
0
00LOT-HTR-002
NOTES:
Stillwater Energy Center
Project # 75644
Type or
Description
Electric
Immersion
Electric
Immersion
Orientatio
Capacity (gal) Diameter/Height
n
10000 net
10'-4" / 18'
Vertical
6000 net
8'-5" / 16'
Vertical
Fluid
SAE
Motor Oil
SAE
Motor Oil
Heater Design
Min. Dry
Insulation Shell Thk. Bulb Temp.
Thk. (in)
(in)
(F)
2" (R = 3.4
per in)
1/4
5.4
2" (R = 3.4
per in)
1/4
5.4
Heater
Design
Setpoint
(F)
Conn Type
Page 23 of 23
Connection
Size (in)
ASTM
Material
Rating
P&ID No.
Remarks
70
Flanged
3
CS
150#
MMLOT001
For New Lube Oil Tank
70
Flanged
3
CS
150#
MMLOT002
For Service Lube Oil Tank
Burns & McDonnell Engineering Company, Inc.