Edelbrock E-Force Supercharger Installation Instructions

Edelbrock E-Force Supercharger Installation Instructions

The Edelbrock E-Force is a front drive, front inlet, blow down supercharger system using Eaton’s TVS1320 rotor group. The supercharger housing is mated to a lower manifold assembly which houses a dual pass intercooler measuring in at 11” long by 3.5” wide and 1.5” thick. The supercharger is 50-State emissions legal (pending), and includes a 3-year 36,000 mile warranty, where applicable.

advertisement

Assistant Bot

Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.

Edelbrock E-Force Supercharger Installation Instructions | Manualzz

Edelbrock E-Force Supercharger

2012-15* JEEP WRANGLER JK 3.6L V6

Part #1527 and 15270

*1527 not yet compatible with 2015 Model Years

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

INTRODUCTION

Thank you for purchasing the Edelbrock Supercharger System for the Jeep Wrangler with 3.6L V6 Pentastar. This is a front drive, front inlet, blow down supercharger system using Eaton’s TVS1320 rotor group. The supercharger housing is mated to a lower manifold assembly which houses a dual pass intercooler measuring in at 11” long by 3.5” wide and 1.5” thick.

The supercharger is 50-State emissions legal (pending), and includes a 3-year 36,000 mile warranty, where applicable, so there are no worries when installing on a brand new vehicle.

TOOLS AND SUPPLIES REQUIRED z Jack and Jack Stands or Service Lift z Ratchet and Socket Set including but not limited to:

1/4 Drive: 8mm, 10mm and Universal Joint

3/8 Drive: 8mm, 10mm,13mm, 15mm, 16mm, 24mm,

Deep: 9mm, 19mm

1/2 Drive: 24mm z Wrench Set including but not limited to: 8mm, 10mm,

17mm z Breaker Bar: 1/2” z Right Angle Drill and 1/4” Drill Bit z Utility Knife

z Radiator Cooling System Vacuum Purge and Refill

Kit or

Spill-Free Funnel z Compressed Air/Vacuum z Panel Puller z Flat Blade & Phillips Screwdrivers z 50/50 Coolant Mixture z Side Cutters z 5/16” Fuel Line Removal Tools z Torque Wrench z Pliers OR Hose Clamp Removal Tool z Blue Thread Retaining Compound z O-ring Lube z Masking Tape z Shop Rags z Wire Ties

IMPORTANT WARNINGS

Before beginning the installation, use the enclosed checklist to verify that all components are present in the box then inspect each component for damage that may have occurred in transit. If any parts are missing or damaged, contact Edelbrock

Technical Support (800-416-8628), not your parts distributor.

WARNING: If your PCM has been programmed with anything other than an SCT programmer, please contact Edelbrock Tech Support at (800) 416-8628 before flashing your PCM. FAILURE TO DO SO

COULD RENDER THE PCM INOPERABLE! Edelbrock is not liable for any recovery fees, including but not limited to, replacement of PCM, programmer and/or PCM flashing fees.

Due to the complexity of the Edelbrock E-Force Supercharging system, it is recommended that this system only be installed by a qualified professional with access to a service lift, pneumatic tools, and a strong familiarity with automotive service procedures. To qualify for the Powertrain Warranty, the E-Force supercharger system must be installed by a

Certified ASE Technician at a licensed business, Chrysler/Jeep Dealership, or an Authorized Edelbrock E-Force installer.

Failure to do so will void and/or disqualify any and all warranties offered with this system. Please contact the Edelbrock

Technical Support department if you have any questions regarding this system and/or how your installer of choice will affect any warranty coverage for which your vehicle may qualify.

©2015 Edelbrock LLC

Part #1527, 15270 Page 1

Brochure #63-1527

Rev. 9/15/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

IMPORTANT WARNINGS CONT’D

Proper installation is the responsibility of the installer. Improper installation will void all manufacture’s standard warranties and may result in poor performance and engine or vehicle damage.

Inspect all components for damage that may have occurred in transit before beginning installation. If any parts are missing or damaged, contact Edelbrock Technical Support, not your parts distributor.

Any previously installed aftermarket tuning equipment must be removed and the vehicle returned to an as stock condition before installing the supercharger.

Any equipment that directly modifies the fuel mixture or ignition timing of the engine can cause severe engine damage if used in conjunction with the Edelbrock E-Force Supercharger System. This includes, but is not limited to: OBDII programmers, MAF sensors, adapters and any other device that modifies signals to and/or from the ECU. Aftermarket bolt-on equipment such as underdrive pulleys or air intake kits will also conflict with the operation of the supercharger and must be removed prior to installation. Use of any of these products with the E-Force Supercharger could result in severe engine damage.

91 octane or higher gasoline is required at all times. If your vehicle has been filled with anything less, it must be run until almost dry and refilled with 91 or higher octane gasoline twice prior to installation.

Any failures associated with not using premium 91 octane gasoline or higher, will be ineligible for warranty repairs.

WARNING: Installation of this supercharger will result in a significant change to the performance characteristics of your vehicle. It is highly recommended that you take some time to familiarize yourself with the added power, and how it is delivered. This must be done in a controlled environment.

Take extra care on wet and slippery roads as the rear tires will be more likely to lose traction with the added power. It is never recommended to turn off your vehicles traction control system.

It is recommended that you check the Edelbrock Tech Center Website for any updates to this installation manual. Please refer to the lower right hand corner to verify that you have the latest revision of this installation manual before beginning the installation.

Tech Center: http://www.edelbrock.com/automotive_new/misc/tech_center/install/index.php

Edelbrock Authorized Installer Disclaimer

Authorized installers of Edelbrock products are independent companies over which Edelbrock has no right of control. Edelbrock LLC makes no claims regarding the abilities, expertise or competency of individual employees of any authorized installer. Each authorized installer is an independent company and makes its own independent judgments. Edelbrock LLC specifically disclaims any responsibility to any party including third parties for the actions, or the failure to act, of individuals, agents or a company authorized in the installation of Edelbrock LLC products.

©2015 Edelbrock LLC

Part #1527, 15270 Page 2

Brochure #63-1527

Rev. 9/15/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

INSTALLATION HARDWARE IDENTIFICATION GUIDE

(Parts Are Not To Scale)

Bag #1

(1) - Bolt, Hex Flange, M10 x 1.5 x 130mm (1) - Bolt, Hex Flange, M10 x 1.5 x 110mm

(1) - Bolt, Hex Flange, M8 x 1.25 x 120mm

(1) - Bolt, Hex Flange,

M8 x 1.25 x 75mm

(1) - Bolt, Hex Flange,

M8 x 1.25 x 40mm

(2) - Bolt, Hex Flange,

M8 x 1.25 x 30mm

(1) - Bolt, Hex Flange,

M8 x 1.25 x 20mm

(1) - Bolt, Countersink,

M10 x 1.5 x 55mm

(1) - M8 Washer

(1) - M10

Hex Nut

(1) - Spacer,

FEAD Bracket

(8) - 3/4” Hose Clamp

(1) - Spacer,

Alternator Support

(1) - Worm

Clamp

(1) - Bracket, Alternator Support

(1) - Drill Bit, Countersink

Bag #2

(2) - Thread-Forming

Screw

(2) - M6 Nut

(2) - M8

Washer

(2) - Bolt, Hex Flange,

M8 x 1.25 x 20mm

(4) - Bolt, Hex Flange,

M6 x 1.00 x 12mm

(1) - 20A Fuse

(6) - Bolt, Hex Flange,

M6 x 1.00 x 10mm

Bag #3

(1) - Bolt, SHCS, M6 x 1.00 x 65mm (6) - Bolt, SHCS, M6 x 1.00 x 60mm (10) - Bolt, SHCS,

M8 x 1.25 x 22mm

©2015 Edelbrock LLC

Part #1527, 15270

(3) - Bolt, Hex Flange,

M6 x 1.00 x 50mm

(2) - Bolt, Hex Flange,

M6 x 1.00 x 12mm

(4) - Bolt, Hex Flange,

M6 x 1.00 x 40mm

(8) - Bolt, Hex Flange,

M6 x 1.00 x 30mm

(4) - Bolt, SHCS, Low Profile

Head, M5 x 0.8 x 14mm

Page 3

Brochure #63-1527

Rev. 9/15/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

BRACKET AND FEAD IDENTIFICATION GUIDE

(Parts Are Not To Scale)

FEAD Bracket

LTR Upper Passenger Bracket

(2) 70mm Idler Pulley 54mm Idler Pulley

LTR Upper Driver

Bracket

Surge Tank w/ Cap

LTR Lower Driver

Bracket LTR Lower Passenger

Bracket

Water Pump

Bracket

Water Pump

Isolator

Engine Harness

Support Bracket

©2015 Edelbrock LLC

Part #1527, 15270 Page 4

Surge Tank

Bracket

Brochure #63-1527

Rev. 9/15/15 - QT

Water Pump to LTR

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

HOSE IDENTIFICATION GUIDE

(Parts Are Not To Scale)

Oil Cooler

Surge Tank to

Water Pump

Manifold To

Surge Tank

LTR to Manifold

Driver Side PCV

(9”) 1/4” Actuator Hose

Passenger Side PCV

EVAP Hose

Assembly

(3’) 3/8” Hose

Fuel Crossover Line

Fuel Input Line

©2015 Edelbrock LLC

Part #1527, 15270 Page 5

Brochure #63-1527

Rev. 9/15/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

HOSE ROUTING DIAGRAM

Supercharger

Intercooler Surge

Tank

Water Pump

©2015 Edelbrock LLC

Part #1527, 15270 Page 6

Heat Exchanger (LTR)

Brochure #63-1527

Rev. 9/15/15 - QT

Relay

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

WIRE HARNESS GUIDE

(Parts Are Not To Scale)

Constant +12v

Power Wire

Fuse

Ground Strap Intercooler

Water Pump

WATER PUMP

HARNESS

Power Tap

IAT EXTENSION HARNESS

©2015 Edelbrock LLC

Part #1527, 15270

MAP ADAPTER/EXTENSION

HARNESS

Page 7

Brochure #63-1527

Rev. 9/15/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

WARNING: If your PCM has been programmed with anything other than an SCT programmer, please contact Edelbrock Tech Support at (800) 416-8628 before flashing your PCM. FAILURE TO DO SO

COULD RENDER THE PCM INOPERABLE! Edelbrock is not liable for any recovery fees, including but not limited to, replacement of PCM, programmer and/or PCM flashing fees.

PLEASE COMPLETE THIS PROCEDURE PRIOR to starting the installation of your E-Force supercharger system. This will allow our calibration team to complete your calibration file while the installation of your supercharger system is being completed. Manufacturers regularly update the factory calibration, as a result, there is the possibility for delays due to not having access to your current calibration file. This can normally be resolved in 1 business day.

Please e-mail the requested information below to [email protected] with the E-mail Subject as “ Calibration Update”. We will complete your calibration and e-mail it back to you as soon as possible. MOST calibration updates will be sent back the same business day. In rare cases, it could take up to 1-2 business days to complete. Please contact our Tech Hot Line at (800)416-8628 if you have any questions or if you need assistance with this procedure.

INFORMATION NEEDED:

E-Mail Address:

Vehicle Year:

Vehicle Make:

Vehicle Model (Specify if Z06, Z51, SRT8, RT, Boss 302, etc..):

Engine Size:

Transmission:

Fuel Octane (91 or 93 ONLY):

Supercharger System Part Number:

Supercharger Serial Number:

Programmer Serial Number:

ECU OS Part Number:

ECU OS Part Type:

INSTRUCTIONS FOR GETTING THE ECU OS PART NUMBER & TYPE:

With the ignition OFF, connect the supplied SCT X4 Programmer to the OBDII port of the vehicle using the cable included with the

SCT programmer.

Follow the on-screen instructions. When prompted to do so, turn the vehicle’s ignition ON but do not start the engine. Press the round center button to accept. The ECU OS Part Number and

Type will be displayed on the following screen.

Once the SCT programmer powers on, it will take you to the Main

Menu. Press the down arrow to highlight the “Vehicle Info” option and press the round center button to accept.

FAILURE TO PROVIDE ALL OF THE INFORMATION BELOW WILL DELAY THE COMPLETION OF THE CALIBRATION FILE FOR

YOUR VEHICLE. TO LIMIT VEHICLE DOWN TIME, PLEASE SEND US THE REQUESTED INFORMATION BEFORE STARTING

THE SUPERCHARGER INSTALL.

©2015 Edelbrock LLC

Part #1527, 15270 Page 8

Brochure #63-1527

Rev. 9/15/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

WARNING: If your PCM has been programmed with anything other than an SCT programmer, please contact Edelbrock Tech Support at (800) 416-8628 before flashing your PCM. FAILURE TO DO SO

COULD RENDER THE PCM INOPERABLE! Edelbrock is not liable for any recovery fees, including but not limited to, replacement of PCM, programmer and/or PCM flashing fees.

SUPERCHARGER INSTALLATION

WARNING: Battery must be sufficiently charged before starting the PCM flashing procedure.

9. Depending on your specific drivetrain configuration, several separate operations may take place during this step. Completion of each operation will cause the progress bar to reset to zero.

Only begin the PCM flashing procedure when you are ready to install the supercharger. Once the PCM is flashed, DO NOT START the engine until the installation of the E-Force supercharger is complete.

10. DO NOT unplug the programmer until prompted.

1. Put the car into ACC mode, but don’t start the vehicle.

2. Connect the supplied PCM cable on the handheld programmer to the OBD-II connector located below the steering wheel, and to the left of your knee.

3. Use the directional pad to highlight the Program

Vehicle option and press the Select button.

11. Turn the vehicle off when prompted to do so by the handheld programmer.

12. Carefully rest the hood onto the window frame using a fender cover or equivalent.

13. Using a 10mm socket, remove the negative battery terminal.

4. Use the directional pad to highlight the Pre-programmed

Tune option and press the Select button.

5. Read the disclaimer then press Select to continue.

6. Verify that the ignition is in the ‘Key On’ position and that the engine is not running, then press Select.

7. Use the directional pad to highlight your vehicle and transmission combination then press Select.

8. Use the directional pad to highlight the Begin Program option then press Select.

©2015 Edelbrock LLC

Part #1527, 15270 Page 9

Brochure #63-1527

Rev. 11/9/15 - QT

14. Gently lift up the engine cover and remove.

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

17. Remove the airbox assembly by removing the lid, the air filter and then the lower air box assembly.

15. Using a 10mm socket, remove two bolts securing the air inlet tube. Using a flat head screwdriver, loosen the worm clamps securing the air inlet tube to the airbox and throttle body. Carefully remove the inlet tube and unplug the IAT sensor from underneath the air inlet tube.

18. Remove the passenger side PCV hose and the EVAP hose from the manifold assembly. Unplug the MAP sensor and remove the tree clips securing the harness to the manifold and the manifold support bracket.

16. Remove the PCV hose from the airbox lid.

19. Disconnect the brake booster hose from the manifold.

©2015 Edelbrock LLC

Part #1527, 15270 Page 10

Brochure #63-1527

Rev. 11/9/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

20. Unplug the electronic throttle body connector and remove the tree clip securing the harness to the manifold.

24. Remove two (2) additional nuts securing the support bracket to the passenger side valve cover. Carefully remove the passenger side manifold support bracket.

21. Using a 10mm socket, remove four (4) nuts from the front and rear manifold support brackets.

25. Using a 1/2” breaker bar, rotate the belt tensioner clockwise and remove the belt. TIP: Tensioner is hydraulic and will require constant pressure to rotate.

22. Using a panel puller, remove the engine harness from the passenger side manifold support bracket. Using a

10mm socket, remove two bolts securing the manifold to the support bracket.

26. Unplug the alternator voltage control connector and remove the alternator power cable using a 13mm socket.

23. Using a 10mm socket, remove two (2) nuts securing the coolant lines to the manifold support bracket.

©2015 Edelbrock LLC

Part #1527, 15270 Page 11

Brochure #63-1527

Rev. 11/9/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

27. Using a 15mm socket, remove two (2) upper bolts securing the alternator to the engine. Remove two (2) lower bolts securing the alternator to the alternator bracket using a 13mm socket.

30. Carefully lift up the upper manifold assembly and move it towards the front of the vehicle. Disconnect two (2) tree clips located on the rear of the manifold, then remove the manifold and set aside.

28. Remove the insulator from the manifold using a panel puller.

31. With a shop vac, clean the area around the lower manifold assembly as needed. This will prevent debris from getting into the intake ports.

32. Cover the port openings on the lower intake manifold with protective tape. Remove the insulator right of the intake manifold and set aside.

29. Using an 8mm socket, remove seven (7) bolts securing the upper manifold to the lower manifold.

33. Disengage the blue locking clip on the fuel input line fitting and remove the fuel input line from the fuel rail.

©2015 Edelbrock LLC

Part #1527, 15270 Page 12

Brochure #63-1527

Rev. 11/9/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

34. Lift up the red locking clips on the six (6) injector plugs and disconnect them from the fuel injectors.

38. Using side cutters, remove the center wire tie securing the engine harness to the chassis. This is required as the wire tie will make contact with the supercharger housing.

35. Using an 8mm socket, remove eight (8) bolts securing the lower manifold to the cylinder heads.

39. Using a 5/16” fuel line removal tool, remove the fuel input line from the factory hard line located behind the cylinder heads.

36. Carefully remove the lower manifold and set aside.

40. Install the 90° end of the supplied fuel feed line to the factory hard line.

37. Using a shop vac or clean shop rag, clean the cylinder head flanges and cover the ports with protective tape.

41. Drain about two quarts of coolant to avoid excess spillage during the next step. This can be done by removing the lower radiator hose or removing the petcock located towards the front, passenger side, of the radiator.

©2015 Edelbrock LLC

Part #1527, 15270 Page 13

Brochure #63-1527

Rev. 11/9/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

42. Unplug the oil cooler sensor connector located in between the cylinder head flanges. Using a 19mm deep socket, remove the oil cooler sensor.

45. Apply Hi-Temp Thread Sealer to the sensor and reinstall the oil cooler sensor using a 19mm deep socket.

Reconnect the oil sensor connector.

46. Remove the alternator bracket by removing the upper bolt with a 16mm socket and the lower bolt with a 13mm socket.

43. Using pliers, carefully remove the factory oil cooler hose from the hard line and oil cooler. This hose must be replaced with the supplied hose to provide additional supercharger clearance.

47. Using a vise, a 1/2” 24mm socket and a 3/8” 9mm deep socket, carefully remove two bushings from the factory alternator bracket. Tip: Channellock pliers can be used if you don’t have access to a vise.

44. Remove the sleeve from the factory oil cooler hose and install it onto the supplied oil cooler hose. Using the factory hose clamp, install the straight end of the hose onto the hard line. Using the supplied worm clamp from Bag #2, install the other end of the hose onto the oil cooler. Clean any coolant spillage before proceeding.

48. Carefully install the bushings into the supplied FEAD bracket using a vise or equivalent. WARNING: DO NOT use a hammer as it may damage the bushings and/or FEAD bracket.

©2015 Edelbrock LLC

Part #1527, 15270

Worm Clamp

Page 14

Brochure #63-1527

Rev. 11/9/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

49. Install the supplied 54mm idler pulley onto the FEAD bracket using an M8 x 20mm bolt and an M8 washer from

Bag #1. Clamp the bracket to a vise. Apply blue thread locker to the threads of the bolt and torque to 18 ft-lbs (24

Nm). Set FEAD bracket aside for now.

52. Apply blue thread locker onto the threads of the M10 x

55mm countersink bolt from Bag #1 and install it to the water pump using a M6 Allen wrench. Torque the bolt to 18 ft-lbs (24 Nm).

50. The water pump mounting location below must be drilled to accept the supplied countersunk bolt. This procedure is required to properly install the FEAD bracket.

53. Using a 13mm socket, remove the left and right idler pulleys. Retain the bolt from the right idler pulley (longer of the two) as it will be reused on the next step.

51. Using a right angle drill and the countersink drill bit from Bag #1, clearance the water pump mounting location as needed to properly install the countersunk bolt.

54. Apply blue thread locker to the threads of the bolt from the right idler pulley and install the supplied 70mm pulley to the right pulley provision. Torque the bolt to 18 ft-lbs (24

Nm).

©2015 Edelbrock LLC

Part #1527, 15270 Page 15

Brochure #63-1527

Rev. 11/9/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

55. Feed the drive belt down towards the crank. Using the belt routing diagram, route the belt around the P/S, tensioner, crank, water pump and A/C.

57. Using two M8 x 30mm hex flange bolts from Bag #1, install the alternator onto the FEAD bracket. Using one of the longer factory alternator bolts, secure the alternator to the lower-left factory provision. Torque M8 bolts to 22 ft-lbs (30 Nm) and the stock bolt to 41 ft-lbs (55 Nm).

Stock Bolt

56. Install the bracket to the provisions shown below using the hardware found in Bag #1. The lower-left hole will use the M8 x 75mm bolt. The lower-middle hole will use the M8 x 120mm bolt and the straight spacer. The upper-right bolt hole will use the M10 x 130mm bolt. Apply blue thread locker on each bolt and torque them all to 22 ft-lbs (30

Nm).

58. Position the alternator support bracket spacer, support bracket, and a M8 x 40mm hex flange bolt from Bag #1 onto the supplied 70mm pulley as shown. Apply blue thread locker to the threads of the bolt and loosely install it onto the upper FEAD provision as shown.

Alt. Provision

Idler Provision

W/P Provision

75mm

130mm

120mm & Spacer

59. Position the drive belt in between the support bracket and pulley as shown. Using the M10 nut and M10 x 110mm bolt from Bag #1, secure the support bracket to the alternator. Torque the bolt to 41 ft-lbs (55 Nm). Fasten the idler pulley bolt and torque to 18 ft-lbs (24 Nm). Reconnect the alternator voltage control connector and the alternator power cable.

©2015 Edelbrock LLC

Part #1527, 15270 Page 16

Brochure #63-1527

Rev. 11/9/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

60. Connect the IAT extension harness to the IAT sensor located on the rear of the lower manifold.

63. Apply o-ring lube to the supplied fuel fittings and install them onto the E-force fuel rails. The straight fittings are positioned on the rear of the fuel rails. The 180° fitting will go onto the passenger side rail and the plug on the driver side rail. Remove the metal retaining clips on the supplied fuel injectors. Gently lube the o-rings on the supplied fuel injectors and install them into the fuel rail provisions with the connector facing outwards.

Passenger

61. Remove the lower manifold gaskets from the factory lower manifold. Ensure the gasket are clean and dry of any oil residue. Inspect the o-rings for damage and replace as necessary (Jeep PN 05184331AC). Install the gaskets onto the supercharger lower manifold. Driver

64. Install the 90° fitting on the supplied fuel crossover onto the rear driver side fuel rail fitting. Install the other end of the crossover onto the passenger side rail fitting.

90°

Passenger Driver

62. Remove the protective tape from the cylinder heads.

Carefully lower the lower manifold assembly onto the cylinder heads. Apply blue thread locker onto the threads of the eight (8) M6 x 30mm hex bolts from Bag #3. Using a

10mm socket, secure the lower manifold to the cylinder heads with the M6 bolts. Use a circular torque sequence starting with the inner bolts and working outwards. Torque the bolts to 9 ft-lbs.

65. Apply o-ring lube to the lower injector o-rings. Align the fuel injectors with their provisions on the lower manifold and push down firmly to seat the injectors. Apply blue thread locker onto the threads of the M5 x 14mm bolts from

Bag #3. Using the M5 bolts, secure the fuel rails to the lower manifold. Torque the bolts to 4 ft-lbs (5.42 Nm).

Crossover

M5 x14

©2015 Edelbrock LLC

Part #1527, 15270 Page 17

180°

Plug

Brochure #63-1527

Rev. 11/9/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

66. Connect the injector connectors to the proper injectors.

Position the fuel feed line around the passenger side fuel rail and connect it to the 180° fuel fitting.

70. Apply o-ring lube to the o-ring on the supplied MAP sensor and carefully install it into the front provision on the intercooler adapter. Apply blue thread locker onto the threads of the M4 x 16mm bolts and secure the MAP sensor to the intercooler adapter using a 3mm Hex Key. Torque the bolts to 1.5 ft-lbs. DO NOT OVERTIGHTEN.

67. Route the previously installed IAT extension towards the front of the vehicle, along the driver side valve cover, and connect it to the factory IAT connector.

68. Remove the passenger side PCV hose from the back of the passenger valve cover.

71. Using the hose clamps from Bag #2, secure the

Manifold to Surge Tank hose to the inner intercooler barb and the Manifold to LTR hose to the outer intercooler barb.

Manifold to

Surge Tank

Manifold to LTR

69. Install the supplied passenger side PCV hose to the rear of the passenger valve cover. Route hose around A/C lines. Hose will connect to supercharger later.

72. Position the Lower to Upper Manifold Gasket onto the lower manifold with the offset provision facing the front of the vehicle.

Front

©2015 Edelbrock LLC

Part #1527, 15270 Page 18

Brochure #63-1527

Rev. 11/9/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

73. Carefully route the hoses around the engine harness and position the upper manifold onto the lower manifold.

77. Connect the MAP extension harness to the MAP sensor located on the front of the upper manifold.

74. Verify the lower to upper manifold gasket is properly aligned before proceeding.

75. Secure the upper manifold to the lower manifold using the hardware from Bag #3. Apply blue thread locker onto the threads of the bolts and fasten using a circular sequence starting with the inner bolts and working outwards. The front manifold provision will use the M6 x 65mm SHCS.

Blue arrows represent M6 x 50mm hex flange bolts while

Red arrows represent M6 x 60mm SHCS bolts. Torque all bolts to 8 ft-lbs.

78. Install the supplied engine harness support bracket to the factory location using the hardware from Bag #2.

Secure the bracket to the upper manifold with two (2) M6 x

10mm hex flange bolts. Secure the bracket to the valve cover studs with two (2) M6 nuts from Bag #2. Do not secure the coolant lines to the support bracket at this time.

65mm

SHCS

76. Connect the supplied MAP extension harness to the factory MAP connector as shown. Note the orientation of the connectors. DO NOT force connectors together.

79. Place the surge tank bracket under the coolant lines’ rear mounting point. Secure the coolant lines and surge tank bracket to the harness support bracket with two (2) M6 x 12mm bolts from Bag #2.

Surge Tank Bracket

Extension

©2015 Edelbrock LLC

Part #1527, 15270

Stock

Page 19

Brochure #63-1527

Rev. 11/9/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

80. Connect the supplied bypass actuator hose to the barb located on the rear of the upper manifold. This will connect to the bypass actuator once the supercharger housing is installed.

83. Secure the supercharger nose to the factory manifold support bracket using two (2) M6 x 12mm hex bolts from

Bag #3. TIP: Loosen the 2 bolts securing the bracket to the cylinder head if the holes do not line up properly.

81. Place the Upper Manifold to Supercharger gasket onto the upper manifold.

84. Using a 1/2” breaker bar, rotate the hydraulic tensioner clockwise and finalize the installation of the drive belt.

82. Carefully lower the supercharger onto the upper manifold and verify that the gasket is properly aligned.

Apply blue thread locker onto the threads of the ten (10) M8 x 22 SHCS bolts from Bag #3. Install the bolts and fasten using a circular sequence starting with the inner bolts and working outwards. Torque the bolts to 8 ft-lbs.

85. Connect the previously installed actuator hose to the actuator barb.

©2015 Edelbrock LLC

Part #1527, 15270 Page 20

Brochure #63-1527

Rev. 11/9/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

86. Remove the factory throttle body from the manifold using an 8mm socket.

90. Carefully detach the grill and unplug the left and right signal lamp connectors. Remove the grill.

87. Remove the factory throttle body gasket from the manifold and clean using a shop rag. Install the gasket onto the supercharger throttle body flange as shown.

91. Remove the passenger side radiator shroud using a panel puller to remove two (2) tree clips securing the shroud. NOTE: Some cutting may be required to fully remove the shroud.

88. Secure the throttle body to the supercharger nose using four (4) M6 x 40mm hex flange bolts from Bag #3.

Reconnect the throttle body electronic connector.

92. Loosely secure the upper driver side LTR bracket to the upper driver side condenser mounting location.

89. Remove four (4) push pins securing the grill using a panel puller.

©2015 Edelbrock LLC

Part #1527, 15270 Page 21

Brochure #63-1527

Rev. 11/9/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

93. Loosely secure the lower driver LTR bracket to the lower driver side condenser mounting location.

96. Position the LTR onto the LTR brackets with the fittings facing the passenger side of the vehicle. Loosely secure the

LTR using four (4) M6 x 10mm hex bolts from Bag #2. Align the LTR as needed and fasten all LTR and condenser bolts.

94. Loosely secure the lower passenger LTR bracket to the lower passenger side condenser mounting location. 97. Route the previously installed Manifold to LTR hose towards the front of the vehicle.

95. Loosely secure the upper passenger side LTR bracket to the upper passenger auxiliary cooler mounting location.

NOTE: Some vehicles are not equipped with auxiliary coolers but will have the mounting location. In this case, use the supplied thread-forming screw from Bag #2 to secure the LTR bracket.

98. Route the hose through the opening of the radiator shroud and secure it to the lower LTR fitting using a hose clamp from Bag #2. See Page 6 for intercooler hose orientation.

©2015 Edelbrock LLC

Part #1527, 15270 Page 22

Brochure #63-1527

Rev. 11/9/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

99. Position the surge tank with the purge fitting facing the front of the vehicle. Secure the previously installed Surge

Tank to Manifold hose to the surge tank using a hose clamp from Bag #2. Using two M6 x 10mm bolts from Bag #2, secure the surge tank to the surge tank bracket.

102. Using a hose clamp from Bag #2, secure the straight end of the Water Pump to Surge Tank hose to the surge tank. Route the other end down towards the water pump and secure it to the inlet barb.

100. Install the water pump and water pump bracket onto the isolator. Clock the water pump so the outlet is pointing towards the water pump bracket.

Inlet

Outlet

103. Using a hose clamp from bag #2, secure the straight end of the Water Pump to LTR hose to the outlet barb on the water pump. Route the other end towards the LTR and secure to the upper LTR fitting with a hose clamp.

Isolator

101. Using two (2) M8 washers and two (2) M8 x 20mm hex bolts from Bag #3, secure the water pump assembly to the inside of the passenger side chassis. Location is under the air box, in front of the engine mount. TIP: Bolts and washers will go through two opening adjacent to the strut tower. Be careful not to drop the bolts and washers in the frame

104. Install the supplied 3/8” hose to the 3/8” purge barb of the surge tank. Route the hose down towards the airbox cavity and secure the hose to existing hoses with wire ties.

©2015 Edelbrock LLC

Part #1527, 15270 Page 23

Brochure #63-1527

Rev. 11/9/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

105. Reinstall the front grill using the factory push pins.

106. Using the thread-forming screw from Bag #2, secure the water pump harness relay to the provision below the radiator fan bolt.

109. Using the factory fuse removal tool, remove the 20A fuse from the M6 slot (Outlet Power - Acc).

107. Connect the Constant (+12V) wire to the +12V terminal located inside the fuse box.

110. Install the factory 20A fuse into the fuse tap located on the water pump harness. Install the supplied 20A fuse into the other slot on the fuse tap. Insert the fuse tap into the

M6 slot. Trim the fuse box as needed to prevent the wires from pinching when closing the fuse box lid.

108. Using a 10mm socket, connect the Ground (-) wire on the water pump harness to the chassis ground adjacent to the power steering reservoir.

111. Route the water pump power connector down towards the water pump and install it onto the water pump. Secure the water pump harness to existing harnesses as needed.

112. Remove the EVAP hose from the EVAP solenoid.

©2015 Edelbrock LLC

Part #1527, 15270 Page 24

Brochure #63-1527

Rev. 11/9/15 - QT

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

113. Connect the supplied EVAP hose to the EVAP solenoid.

Route the hose under the A/C lines and connect it to the

8mm fitting towards the front of the supercharger.

117. Remove the rubber hose end attached to the molded plastic portion of the driver side PCV hose. Install the straight end of the supplied driver PCV hose onto the molded plastic tube.

114. Connect the previously installed passenger side PCV hose to the rear barb on the supercharger nose.

118. Secure the driver side PCV hose to the factory airbox lid.

115. Using a 1/4” drill bit, drill out the two rivets securing the air duct to the lower air box assembly. Remove the air duct. NOTE: We found the air duct to be very restrictive during testing. Removal is not required but is highly recommended.

119. Reinstall the factory air intake tube using the factory hardware. Re-position the factory coolant over-flow hose onto the molded clamps on the intake tube.

116. Reinstall the airbox assembly using the supplied green filter.

©2015 Edelbrock LLC

Part #1527, 15270 Page 25

Brochure #63-1527

Rev. 11/9/15 - QT

120. Connect the brake booster hose to the barb on the supercharger inlet as shown.

Edelbrock E-Force Supercharger System

2012-15 Jeep Wrangler JK 3.6L V6

Installation Instructions

121. Reconnect the battery terminals if not already done so.

122. Fill the supercharger surge tank with a 50/50 coolant and water mixture. NOTE: Please see “How to Prime the

Edelbrock E-Force Intercooler Systems” at the end of these instructions for detailed instructions.

123. Turn the ignition on but do not start the vehicle. Check for any fuel or coolant leaks. If leaks are present, shut the ignition off immediately and repair leaks before continuing.

124. This concludes the supercharger installation procedure.

If you have not flashed the PCM do so by following Steps

1-13 at the beginning of these instructions; otherwise proceed to Step 125. DO NOT proceed if the PCM has not been flashed.

125. Start the engine and let it come up to operating temperature, then shut it off. Recheck and top off all fluid levels as necessary.

Maintenance Section: When replacing or servicing the belt, simply remove the straight spacer on the FEAD bracket installed in Step 56. Also remove the alternator support bracket installed in Step 58. Then feed the belt through the open gaps in the bracket to replace the belt as necessary.

©2015 Edelbrock LLC

Part #1527, 15270 Page 26

Brochure #63-1527

Rev. 11/9/15 - QT

How to Prime the Edelbrock E-Force Intercooler Systems.

The electric water pump used on this Edelbrock E-Force Supercharger System has a built-in micro-processor that will vary pump cycle speed when air bubbles are present in the system. If a significant amount of air is trapped in the system, the pump may cycle at a slower speed and pulsations are likely to occur resulting in poor cooling performance.

For the best result, it is highly recommended to use a Radiator Cooling System Vacuum Purge and Refill Kit to properly evacuate the air from the intercooler system before filling with a 50/50 mixture of coolant and distilled water. If one is not available, the following procedure will be adequate.

1. Using the Lisle 24680 Spill-Free Funnel, or equivalent, secure the appropriate filler neck adapter to the surge tank.

2. Attach the funnel and fill with a 50/50 mixture of coolant and distilled water until the funnel is half full.

3. Turn the ignition to the ON position and listen for the pump’s electric motor to cycle. Air bubbles will begin to purge from the system as the coolant level drops. Add coolant to the funnel as necessary. NOTE: Do NOT let the coolant level in the funnel run empty as this may introduce air into the system.

4. To build more pressure in the intercooler system, try squeezing the intercooler hoses while the pump is cycling. Building pressure in the system will help purge the trapped air from the intercooler system.

5. Cycle the ignition OFF and wait a few seconds for the pump to come to a stop.

6. Cycle the ignition ON again and repeat until the sound of the electric pump is continuous without any pulsation. NOTE:

During water pump start-up, it is normal for a slight pulsation to occur. Once the pump has reached its maximum cycle speed, no pulsations should be present.

7. Periodically inspect the water pump flow after a few drive cycles and re-fill the intercooler system as necessary.

8. Several drive cycles may be required to completely purge the air from the intercooler system. During a drive cycle, the intercooler system will build up pressure as the supercharger temperature increases. Any residual air trapped in the system will gradually bleed out of the surge tank as the system reaches a pressure above 5psi.

WARNING: Always avoid removing the surge tank cap when the engine is hot. The hot coolant is under pressure and may spray out causing burns.

advertisement

Key Features

  • Front drive, front inlet, blow down supercharger system
  • Eaton’s TVS1320 rotor group
  • Dual pass intercooler
  • 50-State emissions legal (pending)
  • 3-year 36,000 mile warranty

Frequently Answers and Questions

What tools and supplies are required to install the Edelbrock E-Force supercharger?
A jack, jack stands or service lift, a ratchet and socket set, a wrench set, a breaker bar, a right angle drill, a drill bit, a utility knife, a radiator cooling system vacuum purge and refill kit or spill-free funnel, compressed air/vacuum, a panel puller, flat blade & Phillips screwdrivers, 50/50 coolant mixture, side cutters, 5/16” fuel line removal tools, a torque wrench, pliers or a hose clamp removal tool, blue thread retaining compound, o-ring lube, masking tape, shop rags and wire ties.
What octane gasoline is required for the Edelbrock E-Force supercharger?
91 octane or higher gasoline is required at all times.
What is the procedure for flashing the PCM?
Connect the supplied PCM cable on the handheld programmer to the OBD-II connector located below the steering wheel, and to the left of your knee. Use the directional pad to highlight the Program Vehicle option and press the Select button. Use the directional pad to highlight the Pre-programmed Tune option and press the Select button. Read the disclaimer then press Select to continue. Verify that the ignition is in the ‘Key On’ position and that the engine is not running, then press Select. Use the directional pad to highlight your vehicle and transmission combination then press Select. Use the directional pad to highlight the Begin Program option then press Select. Depending on your specific drivetrain configuration, several separate operations may take place during this step. Completion of each operation will cause the progress bar to reset to zero. DO NOT unplug the programmer until prompted. Turn the vehicle off when prompted to do so by the handheld programmer.

Related manuals

Download PDF

advertisement