SCOPE OF ELECTRICAL WORK

GENERAL INSTRUCTION

MATERIALS AND EQUIPMENT REQUIREMENT

3-a) HIGH TENSION CABLE

3-b) LOW TENSION CABLE

3-c) 11KV SWITCH BOARD

3-d) LT SWITCH GEAR

3-e) POWER TRANSFORMERS

3-f) BUSTlE DUCT

3-g) CONDUITES PIPES

&

ACCESSORIES

3-h) WIRING ACCESSORIES

3-i) LIGHTING FIXTURES

3-j) EARTHING

3-k) LIGHTING PROTECTION SYSTEM

3-1) POLE, TOWER

&

BRACKET

INSTALLATION INSTRUCTIONS

4-a) CABLE INSTALLATION

4-b) SWITCH GEAR INSTALLATION

4-c) POWER TRANSFORMERS INSTALLATION

4-d) BUSTlE DUCT INSTALLATION

SP-3-47

SP-3-49

SP-3-51

SP-3-52

SP-3-54

SP-3-56

SP-3-57

4-e) CONDUtlr, PIPES & ACCESSORIES INSTALLATION SP-3-58

4-f) WIRING ACCESSORIES INSTALLATION SP-3-62

4-g) LIGHT FIXTURE INSTALLATION

4-h) EARTHING INSTALLATION

4-i) POLE & POLE ACCESSORIES INSTALLATION

4-j) LIGHTING PROTECTION SYSTEM INSTALLATION

TESTING

SP-3-63

SP-3-65

SP-3-67

SP-3-68

SP-3-70

SP-3-70

1- GENERAL

2- INSTALLATION

RESISTANCE TESTS

3- EARTH

RESISTANCE TEST

4- TRANSFORMER

5- SWITCHGEARS

6- PROTECTIVE RELAYS

7- COMPLETED

TESTS

SP-3-70

SP-3-71

SP-3-71

SP-3-72

SP-3-72

SP-3-72

PAGE NO

SP3-1

SP-3-2

SP-3-5

SP-3-5

SP-3-10

SP-3-11

SP-3-19

SP-3-28

SP-3-33

SP-3-34

SP-3-37

SP-3-42

SP-3-46

SP-3-1

SPECIFICATIONS

Section No.3

Electrical works.

1.

SCOPE:-

The woks covered by this section of the specifications consists of furnishing all labor, equipment, tools and materials and in performing all running Repair/

.Maintenance contract work with providing installing, testing, completion and commissioning of Electrical installation and equipments, complete in strict accordance with this section of specifications and the drawing and subject to the terms

& conditions of the contract of the following major works of repair / maintenance ofHT/LT Operational installation / equipment in PQA area.

• HT Distribution System.

LT Distribution System.

• Earthling System.

Fault Locating ofHT/LT Cable Network.

Panting of Steel Structures.

• Lighting Protection System.

Internal and External Illumination.

Internal Power Distribution Network.

2.2

GENERAL INSTRUCTIONS a).

The entire electrical installation works shall be carried out by licensed workmen, authorized to undertake such work under the provisions of the Electricity Act 1910 and Pakistan Electricity rules

1937 is adopted and modified uptodate by Government of Pakistan.

b).

The contractor shall be fully familiar with the latest edition of the

Regulations of the Electrical Equipment of Buildings,

14th edltion

1966, issued by Institute of Electrical Engineers, London,

Standard code of Practices, Electricity Rules 1937, by-laws that are in force from time to time, and all works shall be carried out in accordance with the Regulations mentioned above. Any discrepancy between the specifications in the contract and above Regulations all be brought to the notice of Engineer for his instructions.

c).

The Contractor shall be responsible for submitting the test certificates and having the installation passed by Government

Electrical Inspector for that Region. All requirements of the Electric

Inspector shall be complied with.

,

d) Climatic Conditions

All equipment supplied shall with stand, without developing' any defect, the following climatic conditions :

Maximum ambient temperature

Maximum ambient temperature

Maximum humidity c

45 C

ScC

90 c

C

e).

Standards

The latest relevant B.B.S. Codes VDF and l.F.C and LE.E

recommendation shall be applicable and followed by for the equipment specified herein.

f).

Substitute Materials

For items differing from the type and make specified, herein or for items specified as 'approve or equivalent' or for any item which requires the approved by the Engineer, the contract shall submit in duplicate completed data within 45 days after the award of

Contracts. If the Contractor fails to submit the required approval data within specifled 45 days, it shall be entertatned to mean that

'the contractor shall furnish equipment as specified request for approval of substitute materials after 45 days shall be considered by the Engineer, only if he is satisfied that due to circumstances beyond the control of Contractor the specified material is not available and can not be obtained in time to prevent unnecessary delay of construction.

The data supplied shall include apart from technical detatls, all changes which may be required in ducts, piping, structure and all.

portion of project affected by substitution.

g).

Manufacturer's Instructions

The contractor shall supply to the Engineer eight (S) copies of manufacturer's instruction manuals, where applicable, for installation, operating and maintenance of equipment supplied.

h).

Marking!

The Contractor shall provide "Danger Board" and "Shock Charts" whenever required to comply with the requirements of local

Electricity Rulesand accordingto normal practice.

i).

Guarantee

The Contractor shall furnish written guarantee of the manufacturer or supplier against performanceof each equipment which shall be for replacement and repair of or part or whole-equipment which

- may be found defective in material or workmanship.

The guarantee shall cover a minimum period of 12 months, after commissioning of the equipment. The guarantee of manufacturer shall not relieve the contractor of his obligations and shall be fully responsiblefor the repair or replacementof any defective material in time so as not to cause any undue delay in repairs and replacements.

j).

factory Tests

All type and routine test on the electrical installed equipment/ material and all other equipment shall be performed at the manufacturers works in the presence of Engineer or his representative.Types tests may be waived off in case the certified test certificates are produced,issuedby some standard laboratories of international repute, but nearly producing certificate will not be sufficient in caseof routine tests.

The contractor shall inform the Engineer about the date and time of the tests on each equipment atleast two weeks in advance.All

test results shall be supplied in duplicate for the Engineers and

Authorities record. The Witnessingof test by the Engineer or his representative shall not absorb the contractor from his responsibility for the proper functioning of the equipment and for furnishing the guarantee referred to para (i) above.

k).

_(:ontractor's

Camps

The space for establishment for site office/camp area will be provided by PQA till completion of work free of charge. The contractor has to establish the facilities required for completion of the job at his own expenses.

\ t~)

Facilities for the Engineer

The contractor shall provide the following for the Engineer: a. Computer latest model with LED monitor, laser printer (branded) b. Computer table

&

Chair c. Fax Machine latest model (branded) with relevant accessories

01 Set

01 Set

01 Set

After completion of contract above said equipments/accessories shall be the property of the Authority.

Payment of work

No separate payment shall be made for above works involved within the scope of this section "Specification". The cost thereof shall be deemed to have been included in the quoted unit rate of other items of the Bill of Quantity.

~-

---------------

I

]

1

]

]

J

,.J

\1

, l

-~

, I

SP-3-5

3.

MATERIALS AND roUI PHFNl'

...

_-----

3 a

HIGH T

ENSleN CABL E

(1)

General

The high tension underground c~ble shall be suitahle for normal service voltage of 11 KV.

The cable shall copper conductor three core, cross linked polythene insulated shielded, armoured and sheathed with a PVC jacket, suitable for indoor and outdoor use in transmission and distributiollof electrical energy.

The cable shall be capable of operating contingously at a conductor temperature of not more than 90 C and shall be rated upto and includinq l5,UOO Volts in a

50 cycles, 3 phase ungrounded neutral system.

(2) Construction

(a) Insulated Conductors

(i)

Conductor

The conductor shall be of copper concentric, stranded in accordance with ei t r.e r I

Ie or

European or Japanese Standard specifications.

The nominal area of conductor aha lL be 1B5 sq.nun.

L~2.~O

~i) Conductor Shield

The stranded conductors shal~.be shielded with an extruded sehli-conducting .ayer before insulating.

(iii)

InsulatiOl:

T he insulation shall be

c

.~·)fls-linked

The insulation shall conform to the minimum characteristics laid do~n by either lEe or

European or Japanese st1ndards and sh~ll be easy to strip from conductors and individual conductorE of multi-core cable and shall be easy to separate for termination purposes.

The contractor shall furnish separate specification details of the insulation offered.

~hese shall include :

Fhysical properties (Tensile strength, elongation at rupture, aging requirements, cold bend and ozone resistance).

Electrical properties

(A.C.

voltage test, insulation resistance,

D.C.

voltage test, corona level, dielectric constant power factor and the IU' bend test).

Arroloratc water absorption.

-Inl\ 1(':lllltH.

,

,

J

~

I 1 r;

, r;

(

,

1

I

i

!

SP-3-7 in the cost of relative iterns of c i rcu i t breaker panels, load break switch panels or power transrormer where the kits are required to be installed.

The termination kits shall be complete with all ~aterial and compound.

A bill of quanti ty of material included ,11.:-\ 11 be furnished by the tenderer a Loriqw i lit] and de t a i led descriptive splicing instructions.

(5) Straight through Toint B~xes

Ca) The straight through joint ~oxes fo! the above cable shall be manufacturer

IS re co.nmendec

boxes for indoor or outdoor and underground use .

(b) The joint boxes shall be horizontai, straight through split type of cast iron coateJ wit~ bituminous coating inside and outside.

These shall be suitable for direct burial,: underground and shall be proofed against ingress t u re .

Atleast t\1I0 plugs shall be provided for compound filling and inspection.

Cc) The boxes shall have external armour clamps to hold cable assembly.

Cd) Ground straps will be furnished for grounding wire armour on the inside of joint box.

Ce) Tinned copper sheilding braid shall be 25 mm wide and the grounding braid 13 mm wide.

(f) Grip type jointing sleeve shall be provided for jointillq the conductor.

The split sides of the sleeves shall be made open 'wide enough to be put over the conductor to be joined~ The sleeves shall have weak backs to facilitate closing round the conductors.

The sleeves shall be me chan ically strong wi th adcquat;e con t ac t and cross-sectional nrc.:-t and service.

(g) A bill of qtiantity of all splicing material e.g.

copper connectors, solder, sealing compound, abrasive cloth, ground clamps, tapes (insulating, friction, cotton, plastic and semi-conducting), shielding and grounding braids shall be furnished by the tenderer alongwith a sectional dimensioned drawing and detailed descriptiv~ splicing instructions.

::

,

.

,

.

,

f- ii',

.,

2

~ r~ r:.

!

r: r; r:

"

. I r;

,

r.

i

1: i

I r

/

I

I

-J

,'" sn-

3-8.-

(6 )

Data to be supplied by

~r

The tenderer shall fill in all dati r~lled for in the Table i where blank spaces are provided thus:

All units shall be provided in metric units.

The tenderer shall furnish all deviations from the specifications.

TABLE.

1

(a)

Copper conductor crosssectional area area (sq.mrn) strands (No./mm)

(b)

Conductor shield

Material

Thickness (mm)

(c)

Insulation

Material

Thickness (mm)

(d) Insul,ationshield

Material

Thickness (mm)

(e)

Bare copper shielding tape rhickness

(mm) .

--

.-.

__

.

(f)

Cable tape binder

Material

Thickness

(mm)

----

(g)

Inner jacket

Material

Thickness

(mm)

(h)

,

-

J ute bedding

Thickness (mm)

~1

J

]

]

I

~i'

"]

.

..,

_J

~

I' tJII'I

,

,

"-'

, I",

i

, l'

/

i

1

(i) Armour'

Type

Number

Oia of steel wire (mm)

(j) Overall jacket

Material r hickness (mm)

(k) Current carrying C capacities (assume

45 C and single cable installation) in Air (Amps) in duct(Amps) burried directly in ground (Amps)

(1) Resistance par 100 metres at 32 C

(ohms).

(m)

Weight per 100 m

(kgs)

(n) Overall diameter (mm)

(0)

Bending radius (metre)

(p)

Variation in current carrying capacity due to temp. rise

(furnish tabular data)

(q)

Any other technical data

SP-3..;..-9

_

1

i f

!

,.

,I

:(

SP-3-l0 -

3b LOW TENSION CABLE

(1) General

(2 )

All cables for power distribution, distribution boards, external distribution, d.c. power supply, light, al.arm, communication and L.T. circuits wiring shall be PVC insulated complying with BS 6746: 1969 of specified voltage grade and having stranded or solid, high conductivity soft annealed copper conductor complying with BS 6360-1969. "Copper conductors in insulated cables and cords". All cables shall be as manufactured by Pakistan Cables Ltd. or approved equivalent.

Power and Lighting Cables

Cables for various buildings from Main L.T. Switchboar~, for underground installation shall be 600/1000 volt grade

PVC insulated, PVC sheathed, unarmoured in protective pipes.

Cables for external illumination shall be 600/1000 volt grade and shall be insulated, PVC steathed, un-

~rmoured in protective pipes, es deEcribed above or PVC lnsulat~d, PVC tapped and bedded, single galvanized steel Wlre armoured and extruded 01ack PVC sheathed overall.

All other cables for Power Distri~ution shall be 600/1000 volt grade and shall be either s~ngle core or multicore as required.

All cables for light, socket ar.d

sing)e phase circuits wi ri.nqin conduit shall be s i.n

j le corc , 2r::O/44C volt grade; PVC insulated.

(3) Miscellaneous Cables

\

All control cables in conduit to d.c. distribution shall shall be single core, 25()/440 volt grade PVC insulated;

Pakistan Cable

Ltd., type

0413lX.

(4) Phase Identification Colours

All cables shall have phase id~ntification colours on insulation of each phase. The colour code for power circuits shall be red, yellow and blue for phase conductor and black for neutral conductor.

Light circuits shall have the same colour code as for power cables. Other light circuits shall be red for phase and black for neutral conductor. All d.c.

circuits shall have red colour for positive and bl~ck for negative conductor.

" 11 i

I

IIr

J

<.

.<~'

3-11'

~

~

~

5

2

~

;J.

G

~ r;

,r

,

1

~

"

-

,

,

- 3c

11 KV SWITCHBOARD

(I) Construction

The 11 KV switchboard to be installed at the Sub-

Stations shall be 10 ~~ sheet steel fahl"icCltc"'C1, mounting cubicle type, 50

cIs

a.c.

3 fhab~ earthed neutral system.

The 11 iV swicchboard shall consist of Ring-main units COJl:',-:-r of two circuit breakers and one fus

~-f'dtch.

The circuit breakers shall be connectnd to the rin~ main sides and the fuse-switch shall be to the

Tee-off side to feed the Power Transformer, as shown on the drawings and specified herein.

(a) The rupturing capacity of the switchboard at 11 KV shall be 350 MVA symmetrical.

(b) The switchboard asse~bly shall be suitable for future addition of units on each side.

(c) An earth bar shall .be provided extending to the entire length of the switchboard.

Two earth terminals shall be provided for connecting the body of the switchboard to earth as required.

(d) ·All control switches, meters, meter switches, luminous signalling and position indicating lamps, protective relays etc., shall be mounted flush on the instrument chamber on the front side of the panel.

(e) Desi.qnat.ion

of pleasant appearance and of approved design shall be provided on each panel.

The designations of control relays, trip indications, etc., shall be printed in suitable size letters in black colour over whit0. background.

The switchboard's colour shall be admiralty grey in hammer finish.

The manufacturer's standard colour scheme will be

~cceptable, but it must be cle~rly defined in the offer and approved by the Engineer.

(f) The switchboard ah a i

I be t.o

J '.y

enclosed, dust tight and vermin proof.

:.

1l.1 1.12

clearance from live parts shall bz:' ;Jl:cJvideu so that flashover cannot be caused by v ern: ns.

(q) 'I'ho switchboard sh al I be compl.c

t c.

w i t h all required accessories, attachments, and cable termination arrangement for the ~izes of

"iii

;_

~

...

"

J

1

"...-l

1

I

,

1

J

:3'-12 incoming and outgoing cables shown on the drawings.

The cable termination arrangement shall be suitable for 3 core copper conductor, crosslinked polythene insulated and armoured cable, complete with termination glands, shrouds, stress release shields, silicone lubricant, earth braids, and crutch sealing compounds,

tape, etc., ' ,

If :

(2) Bus Bars

The bus bars shall be made of high conductivity electrolytic copper and shall be comple~ely isolated and insulated and mechanically braced for short-time momentary ampere rating of the largest circuit breaker.

The continuous current rating shall be be by colours applied on full length of bus bars and these shall be red, yellow and blue.

(3) Circuit Breakers

(a) The circuit breakers shall be t r i pLe pole, low oil content or bn l k oil con c s.r.t., manually operated.

The continuous ane s~.,)~t-time ratings and short circuit wit~5tanding capacity shall be as given i,~ Table 2.

(b) The minimum oil circuit breaker or low oil content circuit breaker shall be in drawout pattern.

It shall be triple pole fitted with ring-duct nozzle type arc-quenching device.

Each pole of the breaker shall be mounted rigidlY on the mechanism housing by means of two ribbed cast resin insulators.

The drive mechanism shall be trip free direct acting, manually operated.

For manual operation a handle shall be provided, and reverse action trip shall be incorporated to trip the breaker on hesitant action during movement of the handle.

The drawout type breaker shall have interlocking arrangement to prevent with-drawal of the truck when the breaker is closed and closing of the breaker when the truck is in any intermediate position.

Safety shutters shall be provided which shall automatically cover the live orifices when the circuit breaker is withdrawn.

On and OFF indicators and indicating lamps for ON and OFF shall be provided as mentioned in para 3c(3) (d).

"

\1

.

...,..,.-.~ d

,'I;'

1

,]

1

1

]

1

]

J

]

1

J

~-

-

...,

....

I

,

~

..,

1

!

1

..J

J

.,

J

]

I

...1

f

3-13

A triple pole earthingdevice shall be provided for cable and bus bars earthing, complete with mechanism for interlocking it with the circuit breaker and the roll-out truck.

The operating characteristics and technical data of the minimum oil circuit breaker shall be as per details given in Table 2 of these

Specifications.

The minimum oil circuit breaker shall comply with VDE Specifications 0670 and shall be Siemens type 'T' or equivalent.

The circuit breaker shall be withdrawable type.

It shall be trible pole, double break, fitted with De-ion arc-quenching device, moving contacts for vertical isolation and mounted on a roll-out truck for horizontal withdrawl.

An interlocking device shall be provided such that the breaker can only be closed when it is in fully withdrawn or fully plugged-in position, and the breaker shall trip open on any attempt" to isolate or plug-in the breaker when in closed position.

An earthing device shall be provided to earth the calbe or bus bar through the circuit breaker.

Safety shutters shall be provided which shall automatically cover the live orifices when the circuit breaker is withdrawn.

Padlocking arrangement for safety shutters shall also be prcJided.

ON and OFF indicators and indicating lanps for ON and OFF shall be provided as menti-' j in para 3c(3) (d).

The operating characte~i~tics and technical data of the oil circuit bre~ker shall be as per details given in Table

2 of t~ese Specifications.

The oil circuit

Lreaker shall comply with B.S.ll6-l952, as amended uptc date and shall be Johnson

&

Philips type PDB or equivalent.

.

(d) The circuit breaker shall have automatic, mechanically operated 'ON' and 'OFF' indicators.

Also luminous indicqtors shall be provided for

'ON' and 'OFF' having colours red and green respectively.

'

(e) Each circuit breaker shall be provided with three spare normall~ closed and three spare normally open auxiliary switches .

(f) All circuit breakers of same rating shall be interchangeable.

(g) All circuit breaker shall be complete with necessary secondary wiring with , ferrules

.

to

.•..

_-

-

....

',.'

,

]

]

]

]

..

J

~

J

.,

J

..

,

J

....J

J

]

J r

I

-;

Sp-3-l4 indicate the circuit.

Necessary fuses shall also be provided.

(4) 11 KV FUSE SWITCH

(a) The 11 KV Load Break Fused Switch cub i cI.eto be insta' led in the substation shall be sheet steel fabricated, floor mounting, cubicle type, factory assembled suitable for alignment with the circuit breaker panels on both the sides.

(b) The 11 KV load break fuse switch shall be

400 amps, triple pole suitable for application in a syste~ with fault level of 350 MVA at

11

KV.

The switch should be able to handle the full fault power even on making operations, and shall be provided with high rupturing capacity fuses of current rating as shown on the drawings.

The switch shall have the manual operating mechanism and automatic trip device acting on all the three poles when any or all three fuses operate.

(c) The switch shall be complete with 'ON' and 'OFF' indicators, designat ion na.ue

pl a te, anchor bolts etc.

(d)· The switch shall be provided '>lith Le rrn.i-: nation arrangement for tee off cables.

The cables shall be 11

I(V,

3core, copper conductor, cross linked polythene insulated, armoured and covered overall cable of size indicated on the drawing.

(e) The technical data of the fuse switch to be supplied is shown in Table 3 of these Specifications.

(5)

Instrument Transformers

(a) Current Transformers

Each circuit breaker shall be provided with cast resin insulated current transformers for operating instruments and protective relays in accordance with

.....

- .

~~§[email protected]'

3938: 1973 and lEC recommenda, tions 185: 1966. ---._'-'

Each circuit breaker shall 'be provided w i to -

3 Nos. current transformers having 15 VA burde~ accuracy class 5P

10 for pro t ec t Lon imc1-instrumentation.

'I'heC-~rr-: l.I

bn

(IS

Lnd i car od

1111

'hr'

Ill-ilWlllt,.

r

-J

1

1

]

1

~J

J

']

]

"]

r

,

J

,_..

J

J

_., mI

-1

'

~

\

!

I

...

/

I

':'ij1

3-15

,(b) Potential Transformers

The Ring Main Bus Unit shall be provided with

.

one three phase, cast resin

5 limb potential transformer, w1th~rawable type, 1.1KV/l10 volt, accuracy class l,,!1 ... burden 200

VA per phase ir.

accordance with ~.S.S~ J941:1915.~nd tEC recommendations 186:1969 for rnsb~wrents and for providi~g residual vol_age.of tbe system coil of t.ll€:t

Lc:.a1 relay.

The potential transformer shall be 'Jountedon a drawout mechanism and h~used in

?

separate compartment preferably on the topE'of the panel •.

(c) Protection

Each circuit breaker shall be p~ovided with

Directional Inverse Definite Minimum Time triple pole relay having combined overcurrent and Earth Fault elements.

If single pole relays are provided then three such units shall be used.

The outer two units for overcurrent protection and central unit for earth fault protection.

The overcurrent setting rar.ge

adjustable between 50-200% of current transformer secondary rating, and Earth Fault setting

.20% - 80% of current transformer secondary rating.

The time setting shall be adjustable between

0-3 seconds.

The relay shall be suitable for current transformer secondary rating of 5 amps.

The voltage polarising coil.shall be rated for

110 volts and shall be supplied from the poteptia1 transformer mounted on the Ring-Hain unit.

i

~.

The inverse time unit shall not operate until there is current flow in the correct direction for alarm and tripping when the directional unit contacts should close to dh~rt circuit the shading winding.

The co~rect direction an arrow on the drawing and S\Yb,\t.

be in the dLre ctLon

0:: arrow head , The

"{~\o..i

shall have two sets of'normally opon contac\s-

,-';

The relayi shall be suitable o[ au~iliary supply of 110 volts d.c.

GEC Measurement Relay tYP8 lent shall be acceptable.

COD u~ approved equiva-

-

\ t,'

]

1

----.,.._.-------------,--~

,

.

"

3-16

Cd) Instruments

(i) Each of the Ring-Main units shall be provided with the follm'ling instruments:

One - Movihg iron, spring controlled, voltme~er minimum size 144 mm x 144 mm scaled O-lSKV.

One - Volbmeter selector switch.

(ii)

: I.

Ohe - Moving iroh; spring controlled

~eter, minimum size 144mm x 144mm scaled as indica~ed on the drawing.

Ohe - Ammeter selector switch.

r:

........

-

-

I

.-

I "' r;

r:

~ r;

E

SP.-3-17

Table 2

TECHNICAL DATA OF CIRCUIT BREAKERS

,

'

Rated Current

Rated Voltage

Frequency

Power Frequency withstand Vcltage

Rated Breaking Capacity

Rated Breaking Currents

.:J •

Symmetrical b.

Asymmetrical

Rated making Current

Rated short-time currents (1 sec.)

Operatil1gduty

400 Amps.

11 KV

,

50 cIs

27 KV

350 MVA

18.4

KA

22.4 KA

47 KA

KA

18.4

r=-j-;:~i~-

I

-t \

,

-j

(

I

!

"

.".

,

I

1 .

"

,,~

-

!

"j

',~

"'J

J

....

J

~.,

" sP~;3=i8

TABLE 3

TECHNICAL DATA OF FUSE SWITCH

Rated

Current

Rated Voltage

Rated short time

Current (1 Second)

Rated making Current

Power

Frequency withstand Voltage

400 Amps

l

11 KV

18.4

KA

47

KA .

27

KA

A

1 i i

I

J

_1

~!

j

~

~.~]

I

I_]

-,

.

'

:..-~

-

-

-

.

':].,'--

,

I

:J'

}

--..r

........

~

.'

..

SP.:...3-l9-

3 •d.· L. T.

SWITCHGEAR

"

(I) Main L.T.

Switchboard

(a) General Details

The Main Switchboard shall be free s t o nd i nq , cubicle type, factory assembled, wired, rated for 440/415 volts,

3 phase,

4 wire,

50 Hz. A.C.

system.

The rupturing capacity of switchboard shall be 25 MVA at 415 volts, and suitable for operation in tropical climate at an ambient termperature of 450C.

The switchboard shall be angle iron frame-work fabricat~d, welded and qr ound and clad with

12 SWG sheet sleel.

The board shall be ::;uitable for front operation only.

The board shall be suitably divided into pa!~·,,-\.s

compartments for accornmodani n., the rc;~",\-·"{~ numbe r of circui t breakers, swi tel: ':uses,~ .......

etc.

isntrum.=nts,

The components shall be .'!'(,unted litate ease of maintenarce from front Jr rear.

All metal work shall be cleaned down

'co bare shining metal and then spray painted with two base coats of anti-corrosive paint and finished inside in ivory and outside grey hammer tone, stove enamelled.

Adequate number of lifting eye bolts shall be provided for ease in installation .

The switchboard shall be. supplied complete with foundation bolts and other installation materials as recommended by manufacturer.

Proper size cable clamping channels with galvanized steel clamps and brass cable glands for armoured and

PVC insulated, PVC sheathed cables shall also be provided.

All incoming and outgoing connections from the switchboard shall be from the bottom.

An earth bar of appropriate cross section shall be provided connected to the bodies of all sections of the switchboard.

Two external earth terminal shall be provided for main earth connection to the body of switchboard.

tl i

I

The triple pol~ and neutral bus bars shall be made of hard drawn electrolytic copper of

99.9% purity.

The bus bars shall be red, yellow and blue colour coded for phases and black for neutral for identification.

The bus bars shall be of approp~iate size to meet

, i

.

1"

,_ oj]

"

:

1

I.:J

~

S

~

L

2 r:

,--

,

I f!!II

~.

,_,....;.

\

...

.~

.r-

-

-

Ali

--

,

--

Nt

't11

..

Sp...3-10 the electrical and mechanical re4uirements of system; and the temperature rise shall not exceed 45

0

C at rated current.

Neutral link shall also be provided for making neutral connection.

The cabling inside the switchboard to be suitable harnessed by strapping arrangement.to the satisfaction of Engineer.

All indicating, selecting and control equipment shall be of tropical design, clearly labelled with indelible ink.

The name-plate to be of flame retardant material.

(b) Typical Component Specifications

(i) Circuit Breakers

Tbe circuit breaker wherever required shall be triple pole, 440/415 volts, air break, manually c?~rated with front drive grip handle

I

a~:f.

having a rupturing capacityof 25 MVI\at ·~1l5 On-

Off-Tripped visu~: in(ication shall be provided.

The air Cil.cuitbreakers shall have the following pr)t~ctions:

\

\

Adjustable three pole, resettable thermal overload release of setting range as shown on the drawing.

Magnetic triple pole short circuit release having operating current range as shown on the drawings.

1

Each circuit breaker shall have four auxiliary contacts, two normally open and two normally closed.

In addition to the above, the incoming circuit breakers shall have under voltage release with a drop out ~oltage of

60-70% and pick up voltage of 80~90'; alongwith ON-OFF-TRIPPED indicating lamps .

(ii) Switch - Fuse Units

The switch-fuse unit shall comprise of a triple pole on load isolating switch with H.R.C. fuses.

The fuse shall be supplied complete with the fuse bas~ and shall conform to B.8.88:l967 Class Ql with a fusing factor of 1.5 and suitable for

440/415 volts a.c. systems.

The operating lever of fuse switch unit shall be accessible from outside for switchina.

1 t

_

....

_------

I

1

1

,

1

J l

'"'!

I j

Sp-3.,..2l

\'

(iii) -Ammeters and Voltmeters

All meters &hall be moving iron, spring controlled of measuring range as specified.

The front dimensions shall be 144 x 144 mm for meters and incoming side on

96 x

96 mm on all outgoing circuits.

The meters shall have accuracy class 1.5 according to VDE 0410/8.64, and suitable for connection to

5 Amps secondary .of current transformers as specified.

The ammeters and voltmeters shall be scaled as indicated on the drawings.

A red mark shall be provided at 415 volts on the scale of all voltmeters.

'

(iv)

Current Transformers

Air coIled, ring type current transformers shall be provided having'transformation ratio as indicated on the drawings.

The

CTs shall be of suitabl~ burden having accuracy class 1.0 according to BS 3938

_ 1973.

The current transformers shall have

5 amps secondary.

(v)

Selector switches

Ammeter and Voltmeter selector switches shall be complete with front plate, with R-Y-B and Off positions for a~~eters and RY-YB-

BR-RN and Off positions for voltmeter.

(vi)

Air Break Contactors an~ Accessories

The contactors shall be triple pole,

440/415 volts heavy duty air break magnetic type.

The main contacts shall be silver tipped; butt type with double break per pole.

Each contactor shall be provided with a 240/220 volt operating coil, indication lamp and one normally open and one normally closed type auxiliary contact.

I

(vii) Time Switch

A motorised adjustable time switch shall be provided for automatic switching of street light and floodlight circuits.

It shall comprise of self-starting miniature synchronous motor, having maintenance free, non-lubricating rotating mechanism with a

24 hours front dial, adjustable setting operating time.

The time switch to be connected to external lighting circuits through contactor coil and AUTO-OFF-~~NUAL selector switch.

All interconnecting cablest and protectjve fuses shall llC furnished t i

!

I

I d

._

~

~

~

---

----

....

:

...

,--

.A.

r-'

.J .~

...

,--

...

i

:

-

~ u'

(_:

1.

-..

---

'r

\ i.

/

"

rye ....

• a

'_3( 1

FvnUIM*Sr".

with the'time switch.

(viii) Light control Selector Switch

The selector switch shall be provided on the switchboard for street and flood light control.

This arrangement shall consist of selector switch, fuse and terminal block all provided next to magnetic contactor on panel.

The switch shall be rated for 10 A, 220 V and shall have three positions OFF, REMOTE and

LOCAL.

The position markings shall be provided on the front plate of selector switch.

The fuse for remote circuit control shall be HRC type.

(ix) Push Button Station

The push button stations for controlling lights in trnasit sheds shall be single unit comprising of two momerta ry contact push-buttons enclosed in stael housing and suitable for surface Mlunting.

The push button for switchin~ ~n and off of h i.qh

s shall be red an',green respectively.

Suitable knockouts shall ~e provided for incoming cable in steel :Jnduit.

The push-button st2tions stall be Siemens type 3SAl2 or approved e~uivalent.

(x) Control Boards

Control Boards CB-i and CO-2 jn offices of tronsit sheds are provided for 'uanual control of working lights for external illumination.

The control boards shall comprise of required number of Siemens 3SAl2 push button units described in section (ix) above enclosed in sheet steel board suitable for recess in wall installation.

The control board,shall have a hinged door with cam fastener and push buttons installed inside in a manner similar to miniature circuit breakers in lighting distribution boards.

In general the control boards shall conform to the same specifications as described in section 3.d(2) for lighting distribution boards.

~.I

______

"

.

.

,

-.---~~----.......--"'-.'~ .."...-,'.--- ..-...... "'----'· .......

SP~ 3-2"3

(2) Li2hting Distribution Boards

(a) General Details

(b)

The lighting DBS shall be suitable for recessed or surface amounting on wall, as stated in Bill of Quantities and rated for 440/415 volts, 3 phase 4 wire, 50 Hz system.

The body shall be 14 SWG sheet steel fabircated, front operation type.

All components shall be mounted on a common component mounting plate, fixed inside the enclosure, and the DB shall be provided with screwed sheet steel front plate.

The enclosure shall be of dust and damp proof design with rubber gasketting having lockable hinged door with cam fastener.

All sheet steel work shall be properly cleaned and then spray painted with two base coats of anti-corrosive paint and finished in heavy stove enamelled grey colour unless otherwise instructed by the Engineer.

The distribution board shall be supplied complete with· incoming and outgoing cable termination arrangement, terminal b1ock/ line up terminals, internal wiring,

2 no.

earthing bolts for connecting the frame to earth etc., as required.

The incoming and outgoing cable connection $hall be according to the requirements.

If required, an adaptor box for accommodatting the outgoing conduits may be provided which shall be of same material and finish as the switch board.

The switchboard shall be AEG type

F with specified number of outgoing circuits.

Typical Component Specifications

Wherever applicable the components for

Lighting Distribution shall conform to the following Specifications:

(i) Load-break Switches and Switch-fuse

Units.

The load break switch shall be triple pole, moulded type and suitable for

440/415 volts a.c.system.

The operating lever shall have a spring controlled toggle mechanism.

The switch shall be of AEG type of 'Built in Switches.'

The switch fuse unit shall comprise of a triple

I'ole load break switch as specified in abovo para(a) with

L ....

-

-

-

J

~'~~1

I

·.; !l

SP-3-24

...

HRC fuses.

The fuses shall be diazed type with fuse base and cap, conforming to BS 88:1976 not exceeding 1.5.

The fuses shall also have visual trip indication.

(ii) Miniature Circuit Breakers (m.c.b.)

The m.c.bls shall be moulded case triple pole 440/415 volts or single pole 250 volts of current 'ratings as shown on the drawings.

These shall have magnftic short circuit and thermal overload protection with a rupturing capacity of 10 KA at

415/240 volts and 0.6 power factor.

The m.c.b,

IS shall be' inst;,:lled switching Le ve rs are accessible through t.r e fr on t p la t o fCL" operati.on

\ shall be conspicuously marked to facilitate' installation and mainte~ance •

.

AEG, "ELFA" type of m.c.b.'s. shall be provided conforming to the following requirements:

Lighting circuits

Power Circuits & l5A

Socket Outlets

Three phase circuits

(3) Wall Mounted Load Break Switch

,(4)

AEG - E-7L

AEG E-7G

AEG - E-9G

This shall be provided for local control of equipment.

The load break switches shall be triple pole or single pole metal clad, cast iron or sheet steel fabricated, wall mounting type and suitable for operation at 415/440 volts, or 230/240 volts, 50 Hz, a.c. supply.

The switch shall have double break for each pole wit.h

a rupturing capacity of 10 KA at 415 volts.

The switch shall have a front or side drive operating lever, ON-OFF drive position indicator and interlocking arrangement such that the door of switch cannot be opened unless the lever is in OFF position.

Two external earthing bolts shall be provided on the body of switch for connect~ng to earth.

The switch shall be provided with suitable knock-outs to facilitate cabling and shall have appropriate cable clamping arrangments.

Change-Over Swi_~~~ h.iv

'I'llI' f:witcl\ whr-rr-

~p('cil'i('d, un

RhClI1. '-":'lPlis(' i t s eaeh t ri p lo flcde

.I/tO/41'.

ViI .i

i of t wo r Ilri'dl,

,IIHI manunLl v opnr a t orl , hn:-l)

111PI,'idnjt:-" ,,',: i n :..or l ock ed and i nq it

COmnt()fI tr ou t

"rilli' qrir';1

,'il(',

~l() that on

Co

~".

~

C r; i r; r;

r--'

."

..

r; r; r, r, r;

!

I

Sp..J-25

(5) one incoming supply can be connected to the load circuit.

The switch shall have one normally open and one normally closed auxilliary contacts and shall be similar to SIEMENS type 3KF.

Power Factor Improvement Plant

The power factor improvement plant shall be used for improving the power factor of the system on

415 volts side.

The plant shall be automaticcum-manual.

The power factor improvement plant shall be aligned with the Main L.T. Switchboard.

The l control panel for the plant shall be a part of

Main L.T.Switchboard, whereas the power factor correction capacitors shall be mounted separately either on the rear portion of the cable trench or on a steel bracket to be installed by the contractor for this purpose.

No extra payment shall be made for this bracket.

The capacitors shall be suitable for 3 pahse,

440/415 volts

50 cis system and shall be self cooled, designed for indoo~ use in tropical climate for a maximum ambient termperature of

45

0

C.

The capacitors shall be in the form of bankE divided for required stages.

Each capacitor bank unit shall bE of

50

KVAr.

The KVAr capacity shown on d raw i

IHJ and in

B.O.Q.

shall comprise of

50

KVAr units.

Each capacitor unit shall be complete with discharge resistors and internal fuses and shall be connected with the control panel with proper size of single core PVC insulated cables.

The control panel shall consist'of sheet steel fabricated, cubicle type, floor mounting, factory assembled, and shall in general be of same specification as mentioned earlier for Main Switchboard.

The panel shall be supplied complete with a set of

3 phase, full capacity, insulated copper busbars, interconnections, risers, designation labels, cftble sockets, holding down bolts, fine wiring with cleats and ferrules, earthing sockets and studs.

The control panel shall accommodate the following:

1 No.

Multi-stage power factor correction relay for Automatic/manual control.

I No.

3 phase, 4 wire, 415 volts, unbalanced load Power Factor Indicator.

No.

Current transformer with t; amps secondary current, hav i nq sutiable output burdon and accuracy.

~

~

~

~

-

,

.1

, ,

(6)

,<

--~---

- SP-3-2.6

3 Nos.

Instrument potential fuses.

Following equipment shall be provided for every

50 KVAr capacitor bank.

1 No.

125 amps.

triple pole 415 volts air break contactor with auxiliary contacts.

1 Set

1 No.

1 No.

3 No.

125 amps HRe back-up fuses with base and carrier.

. ";'"

ON and OFF Manual / Au t orna,' i(~ Swi

1 cb .

Red lamp for ION I indico~ion of : ilt:" contactor.

Switch Board for Power Connection to Ships

For supplying power connection to ships at the berth, water tight outdoor type switches shall be provided ana installed along the outer side of the wall of the Transit shed facing the apron of the berth as shown on the drawings.

The general specification of the switchboard shall be same as mentioned earlier in para 3.d.(1)(a) of these specifications for Main L.T.

Switchboard.

The switchboard shall comprise of

(a) One 400 Amps triple pole Switch-Fuse unit for operation on 440/415 volts.

The specification for switch-fuse unit shall be same as mentioned in para 3.d.(1)(b)(ii) of these specifications.

(b) Cable termination arrangement for

" cables.

The number and size of the cables shall be as indicated on the drawings.

(c) Cable termination arrangement for outgoing cables to ships.

The arrangement shall comprise of bare copper busbar and suitable glands and clamps for bottom entry of the cables.

The busbars shall he ve full capacity for

400

Ami?S

and shall have holes suitably drilled for fL·:jYI,~; ~;;ecable \_~\s.

The busbars inside the

SI.>}j.

t.ch

311a

11 be

Q.;.r-t"-:,nged to connect the out.qo

ir«, '__:.-:;bles

('It

\ minimum 9 mm machine screw.

'I'h e sw i t;ct.

:c~,,-ill be capable of padlocking in either the t' open" or "closed" position.

-------.

;

\,

~

~J

_~J

~

I

(7)

Drawings to be Furnished by the Contractor

The drawings to be furnished by the Contractor for switchboards shall as a minimum include the following:

(a) Structural drawings showing:

Dimensional plans and elevations.

Foundation plans, location of anchor bolts, mounting de.tails,etc.

Internal details showing location of bus bars, cable termination position, terminal blocks etc.

Earthing arrangement.

(b) Electrical drawings showing:

Single line diagram.

Detailed wiring dLagr.amsof a-Ll

S\i:1

tchboards.

Internal wiring diagrams of all yelays. motors and instruments •

I

I'

:

:

I

. C1I

I

I

'j.

r

__",,_.--.'

.'" ~.

------------

SP-3-28

[

-2] r

~

J

l

--

l l

J

-l

1

I

3e POWER TRANSFORME~~ .

(1)

General

(a) The power transformers shall be indoor type, oil immersed, naturally cooled, dquble wound, 3 phase, core type, designed and built to give efficient and reliable service at their full rated capacity on the climatic conditions given in the General

Instructions of these specifications. Transformers built to the following standards will be acceptable:

)

(i) British Standards

B.S. 171-1970

C.P. 1010-1969 and other relevant latest British

Standards.

(ii) V.D.E.

V.D.E.

0532

(b) The transformers shall be 'fully tropicalized and for temperature rise, humidity, altitude etc., the local conditions shall be taken into account while following the above standards. The transformers shall be complete with all accessories and attachments detailed in these specifications or otherwise required and the Contractor shall provide all details, drawings, data and complete test results for final apprQval before installation.

(c) The voltage ratio at no load shall be 11000/415 volts. The system frequency shall be 50 c/s. The transformer shall be Delta-Sta= connected with neutral brought out on L.V. side, The neutral brought out on L.V. side. The neutral shall be solidly earthed. The vector group reference shall be 41 Dy 11 for all transformers.

(d) The temperature rise shall be 40°C in oil, as measured by thermometer in oil and 50°C in winding, as measured by resistances of the windings on full load over an ambient temperature of 450C.

All stipulated temperature rises shall not cause damage to the insulation of the winding or any part of the transformer or in any way adversely effect the reliability and efficiency of the transformer.

(e) The transformer shall be supplied with first filling of transformer oil to B.S.S. 148: 1972.

(f) All the transformers shall be suitable for running in parallel with each other.

I '

;

,

11' ,

:

!

.]

']

.-

'J

,''!!II

....

I

J

']

J

J

J

]

-J

'J

J

~')l;,

\' -

.---_-'~.----'

--~---------~----.-,

,

J

.iI, sv-

3-29

(g)

Off load.tappings shall be arranged on the primary s1de winding to give constant pressure of

415 volts at the secondary terminals when the primary line voltage varies plus or minus

2~%, plus or minus 5% minus 7~ % •

(2)

Construction

(a) The transformer tank shall be constructed of welded boiler plates and provided with external radiating tubes. The tanks and radiating tubes shall be designed to withstarid,without devel9Ping any deformation, pressure at least 25% greater than the maximum operating pressure. The steel plate cover shall be bolted to the tank, using gasket for perfect oil seal. Two earth terminals shall be provided at the base of the .tank.

(b) The oil preservation system shall utilize an ~_ sion tank or conservator tank fitted with silicagel breather, oil level indic~tor and a drain valve.

(c) The transformer core shall ~e built of high electrical steel laminations, each lamination insulated to reduce eddy current losses. The core laminations shall be clamped and bolted effectively to reduce humming.

(d) The winding coils shall be of high grade el~lytic copper conductor, flat or round, paper insulated or super enamelled insulated thoroughly dried and impregnated as required.

(e) The high voltage leads shall be,brought out to the cable-end box for external connections.

(f) The low voltage three lines and neutral leads shall be brought out and terminated to glazed porcelain insulator bushings for connections to

L.V. side by copper bus duct or cables.

(g) Off-loa~ operated tap changer shall be provided on H.V. side on the tank cover. The tapping shall be

±

2~%,

± 5%, 7~%. A clear marking illustrated by diagram shall be provided to indicate the tap positions. Switch position No.

1 shall correspond to

+ 5% tap.

l

..

.

~

~L_ r

I

'i

,

~~ ~ __

l_

_]

.J

~1

~

..•..

.•.

;

"

2;J

.J

J n.

J

I'

(h) The trandformer shall be provided with following accessories:

(i) Oil filling valve for vacuum filling of oil

(ii) Oil drain valve with sampling d~vice .

(iii) Bi-direct-ional rollers fixed to the base steel channel, for rolling in ~he directions of both centre lines of the transformer.

,

(iv) Lifting lugs, for handling and un-taking the transformer.

(v) Dial type thermometer for.indicating oil temperature and having two hands, one showing existing oil temperature and the other showing maximum oil.temperature reached since the hand was last reset.

(vi) Diagram and rating pl~tes.

(vii) Oil conservator.

(viii)Two earthing terminals.

(ix)' Inspection hole with cover on top of transformer tank.

(3)

Technical Data

The technical data of transformer shall be as shown in Table-I.

(4)

Drawing and Data

The manufacturer shall supply complete structural drawings showing plan and elevations with·complete dimensions and all relevant details and following technical data of the offered transformer.

(a) Magnetizing current at ratp.dvoltage .

(b)

Percentage impedance.

(c) Percentage regulation at

(i)

UPF

(ii) 0.85

(iii) 0.6

"

-

'_ t, ,

,

·

..

SP-3-31

(d)

Efficiency at

(i)

Full load.

(ii)

3/4 full load.

(iii) 1/2 full load.

(iv)

1/4 full load.

(e) Quantity of oil for filling each transformers

(in litres).

(f) Dry weight of complete transformer (in kg ortdns).

(g) Weight of complete transformer filled with oil

(in kg. or tons).

..

t

-tJ

"t

:J

f

,J

I

I

I

,

' it

"

i

j

':.'~.

~-

..

'

.. -·······1··· ' ..

'.

:1

J

,-;r

~~>.)

-

~.

~

.

~!

4

TRANSFORMERS TECHNICAL DATA

KVA rating

No Load Ratio

H •

V. lUnging:

Line to line volts.

Connections

L.V.

Winding:

Line to line volts.

Connections

Vector Group

Tapping on H.V.

Side

H.V.

Termination

750 llkV/0.41SkV

11000

Delta

415

Star

DY

11

±

2~%, ~

5%,

-7~i

Cable end Box suitable for

XLPE cable

3 core, copper size 185 sq.mm.

conductor

L.V.

Termination

Impedence voltage

Bushing or flange for bus duct.

4.5

- 6%

Iron Losses at rated voltage

(watts) 1500 t

Copper Losses at full

toad

(watts).

Cooling

10,500

ON

Temperature rise over

45

0

C Ambient

Oil

~'linding

\

",.)

-'

'--J

t'

:

,

~~[~

".\

'

.

I.

~ l

I

}

,

"

4

~

~

~

~.

;3

1:3

~

.

.

-.

J'

-..

.....

-

~

.,

~

1

.,~

3 f BUS TIE DUCT·

(1) The Contractor shall supply and install the L.T.

bus-tie duct as specified under and connect the bus-tie duct at transformer L.T. terminals and inc9ming side of Main L.T. switchboard.

The position of transformer, L.T. switchboard and bus-tic ductare schematically shown on the drawing.

The exact arrangement shall, however, depe~d on the

L.T. switchboard supplied.

(2) The bus-tie duct shall be supplied complete in all respects including supports, hangers and other l installation materials.

(3) The bus-tie duct shall be 3 phase and neutral rated for 440/400 volts, 50 Hz, a.c. system.

The conductor shall be high purity copper supported On insulator and enclosed in sheet steel housing.

The bus duct shall be designed for working in an ambient temperature of 45

0

C and to withstand a short circuit level of 25 MVA at 400 volts.

The current rating shall be as shown on Bill of Quantities.

(4) The bus-tie duct housing shall be 16 SWG (1.63 mm) sheet steel, derusted, degreased, painted with two base coats of anti-rust paint and finished in heat resistant grey colour.

Arrangement for continuous earthing,of bus-tie duct all along the length shall be provided by means of an earth bar ..

(5) The design of bus-tie duct shall be co-ordinated with the position of transformer and flange opening in the Main L.T. switchboard.

At the transformer

L.T. side, flexible copper connections shall be provided to prevent the development of stresses.

All materials supplied shall be anti-corrosiv8 and designed for an ambient temperature of 45 C .

.)

I

'f

,{

;

.

..

_

...

-

.....

--------------.---

-

--I

~

G f

.,

1

"-'1

1

_J

J

1

~

[..]

~

~.

~ t'

10.__

J

1

~

,I

".

~

S'P- 3-34

3g CONDUITS, PIPES & ACCESSORIES

...

.,

(1)

General

The work under this section con~ists of supplying all material, labour, services and supervision required for the complete installation of conduit system as specified herein or stated on the drawings and in Bill of Quantiti~s.

The Contractor shall discuss the electrical layout wi th the Engineer and co-ordinate at site with other services for exact route, location and position of electrical lines.

1,,;

I

(2)

PVC Conduits & Accessories

The PVC conduit for lighting and power socket wiring wherever, specified shall be PVC electrical conduits manufactured by Pakistan PVC Limited. The PVC conduits and accessories shall conform to BS-1607, 1970'SUAVYL' brand.

Manufactured smooth bends shall be used where conduit changes direction. Bending of conduits by heating or ' otherwise shall be allowed in special situations only, for which the consent of Engineer shall be required. The use of sharp 90

0 bQpds and tees shall not be allowed.

The bends shall conform to Ui'esame specifications as given above for conduits, and hav i nq enlarged ends to receive conduit without any reduction in the internal diameter at joint.

The round PVC junction boxes jor ceiling light points shall have minimum dimensions of 64 ronl dia. and 64 mm deep. ,

The junction boxes for wall light points shall have minimum

1 l dimensions of 57 mm dia. and 40 mm deep. Round junction j, boxes shall be provided with one piece PVC cover plate fixed to the box by mean.sof brass screws.

(3)

Galvanised Iron Pipes Accessories

,

I r

I

The G.I. pipes wherever specified shall be galvanized inside and outside by hot dip galvanizing process. It shall be free from stains, burs or any other defect, and shall conform to latest eidition of B.S.S 1387. The accessories for G.I. pipes such as sockets, bends etc., shall be galvanized inside and outside and to be of same quality and specifications as the pipe.

i'i,',".

G.T. pipes for underground installations shall be given bituminous paint coating and wrapped with suitable paper or cloth before installation. G.I. pipes as manufactured by Karachi Pipe Mills Ltd., or approved equivalent shall be acceptable.

(4) Flexible Conduit

Flexible conduits shall be furnished and installed by the

Contractor where required~.The flexible conduit for dry

?

?

~

r:

I

~

I

I

SP",:,~-35

(5 ) locations shall comprise of single s t r i p

,,1: galvanized steel, spirally wound and interlocked, dust tight, mechanically continuous and·strong. The water tight flexible metal conduit shall further be provided with rubber covering overall. At all terminations the flexible conduit shall be held firmly in position by approved type of glands. \~ere necessary, flexible conduit to be adequately supported. All accessories for installation of flexible conduits shall be galvanized.

Steel Conduits and Accessories.

(a) All steel conduits supplied by the Contractor at )specified locations shall be of heavy gauge 16 SWG (1.63 mm) black enamelled steel, manufactured and tested in accordance with BS 31-1940 as modified to-date. The conduit shall be protected by two base coats of red oxide anti-rust paint and finished in first quality bLac'kenamel paint.

The coating shall be of heavy enamel, which shall not flake or crack during installation and handling. The entire conduit system along¥ith the accessories shall be given a black enamel coating after installation. Each conduit length shall be furnished with threaded ends and a threaded coupling at one end.

(b) The conduit accessories.such as socketa. elbows, bushings, bends, inspection boxes, pull box~s,junction boxes, saddles, clamps, etc., as required for complete installation shall be furnished by the Contractor. All accessories supplied shall conform to the same qt:alityand specifications as for the conduits. Sof~ metal bushes shall be used at conduit termination to prevent damage to cable during pulling operation. The conduits and conduits accessories shall be as manufactured by International Industries, Karachi or approved equivalent.

(c) Junction boxes shall be 100 mm square, having minimum depths of 38 mm or 65 mm as required for accommodating the number,of wires. The junction boxes shall be of

16 SWG sheet steel provided with anti-rust paint and finished in heavy black enamel paint. The above dimensions are given as a minimum only, and the exact size shall be determined by the Contractor keeping in view the ease of installation and maintenance. All outlet boxes and junction boxes ~hall be provided with one piece cover plate of suitable design. The use of manufactured bends shall be avoided and smooth bends shall be provided by using approved type of bending tools.

..

~ z:=

~ r r

SP-3-36

:

...

(6)

Rigid PVC pipe and accessories

For protection of cable to be laid underground, rigid

PVC pipe shall be used wherever required.

The rigid'PVC pipe shall conform to the requirements of class B or class D of BSS 3505. All pipes upto a nominal pressure 12 kg/cm2) and all pipes of nominal diameter 75mn

(3 inches) and above shall be class B (wor~ing pressure

6 kg/cm2). The pipe shall be as manufactured by Pakistan

PVC Limited under the name SHAVYL PVC

PRE:SSURE

PIPES.

)

The burried PVC pipe should be able to withstand the external load acting upon it by continuc~s movement of heavy duty vehicles such as trucks, cranes, fork lift etc., where pipe changes direction manufactured smooth bends ~hall be used.

Bending of pipes by heating or otherwise shall be allowed in special cases only. Bending of pipes by heating shall be carried out by first filling the pipe with sand and then heating, bending to required angle and cooling with sand inside and then immediately removing the sand. The use of sharp 90

0 bends and tees shall not be allowed. The bends shall conform to same specification as given for pipes. Joining of pipes shall be carried out as per manufacturer's instruction.

=:JI,

-==

..,.,

~

.

~

~

-~

r:

_]

,

_J f \~

SP-3":'37

1,'

3.h.

WIRING ACCESSORIES rn

Switches

(a) Switches for controlling light and fan points shall be single pole, rated for 5 amps, 250 volts, a.c. supply.

The body of the switches shall be made of bakelite, with white face plate suitable for flush mounting on a sheet steel outlet box. The switches shall be piano type having silver tipped contacts and operate with snap action. Switches manufactured by Pakistan

Plastic industries or approved equivalent shall be installed.

(b) Unless otherwise specified, wherever Switchescontrol light points only, these shall be plate type gang swithes installed on common outlet box.

(2)

(c)

For locations 'where switches and fan regulators are installed together, single switches shall be grouped and fixed on 3 mm thick plastic sheet screwed to a sheet steel box of appropriate dimensions. The fixing of plate on outlet boxes shall be by means of flat head countersunk galvanized screws, such that the head of the screw shall finish flush with the surface of the face plate. Except for s1l3.

J

.:ehbs light points, all single switches for fans, socketE,' etc., shall have identificatiolisymbo l, on the operating levers.

The weatherproof, s=.:glepole svr it.chrated for 5

'::1I!IPS,

250 volt shall have =~st iron

0= sheet steel body and cover with weatherproof gasketting. The conduit entry hole in the body shall have long threads to provide water tight fitting. Sealing compounds as recommended for water tight connection shall be used at conduit entry in the body ,of switch.

Ii

Three Phase Switch- Socket & Plug Units

The three phase switch - socket and plug unit shall be four pole, 15 amps, 415 volts, 3 phase, 50c/s a.c. The socket outlet shall be suitable for mounting on a 16 SWG(l.63 mm) sheet steel or cast iron box of appropriate dimension. The sheet steel box shall have conduit entry holes and earth terminal to connect 14 SWG(3 sq.mm) earth continuity copper conductor. The steel box for socket outlet shall be installed or recessed in wall column etc. ,-such that the unit flush with the surface. The socket shall be provided with screwed cover having retaining ring and deeply recessed pins. The earth contact pin shall be effectively connected to the body. The earthing pin and its socket contact shall be greater in diameter than the others so that incorrect position engagement is impossible, even if the lip of the plug or the groove of the socket are damaged and become ineffective. The control switch for the socket outlet shall be intergal with it, mounted on the same board.

~

.~

~

:~

~..,

J

J

J

J

:J r-J

2

~.

( 3)

(4 ) c

SP-3-38

The plug unit shall be protected type hdving faux poles protected by a shroud.

The voltage rating shall be engraved conspicausly on the side of socket and plug.

Sinqle Phase Switch - Socket units switch _ socket units shall be 3 pin rated for 15 amps, combined 2 & 3 pins 5 amps, or 2 pin 5 amps, ·at 250 volts

50

cis a.c.

supply as specified in the Bill of Quantities.

The socket and switch units as manufactured by Pakistan

Plastic Industries or approved equivalent, shall be acceptable.

The 3 pin 15 amps and 2 & 3 pins 5 amps units shall bh moulded type having white plastic fact plate and suitable for mounting on a sheet steel box of appropriate dimensions.

The 3 pin 15 amps sockets shall have shrouded live contacts such that the earth pin is engaged to socket earth before mating with the live contacts.

The 2 pin, 5 amps, 250 volts sockets, outlet fo~ mounting on board in the office area shall b~ of the same shape and dimensions as the piano swi tches insta lIed with i.

t.

i t s h.i

lL be of P.P.I.

made or approved equivalent.

The 2 pin, 5 amps, 250 volts sockets, outlet for mounting on board in the office area shall be of the same shape and dimensions as the piano switches irstalled with it. It shall b of P.P.I.

make or approved equivalent.

The 6utlet boxes for installation of switches, fan regulato~s and socket outlets shall be 16 SWG sheet steel having appropri, dimensions.

The box shall have nipple welded to box for receiv the conduit by force fit. An earth terminal for connecting

14 S\-JG copper earth continuity conductor shall be approved.

The outlet box shall be given two coats of anti-rust red oxide paint.

The box shall be recessed mounted such that the face plate of plastic sheet shall finish flush with the wall surface.

Ceiling Rose

The ceiling rose wherever pr.ovided at light points shall be suitable for 5 amps, 250 volts, single phase a.c.

It shall ha" wh i te plastic moulded base plates, copper or brass terminals f, wiring with 2.5 sq.mm

cable~. 'I'heceiling rose to have a dome cover having cable inlet hole.

J

J

J

J

J

J

1

J

SP-3-39

Connecting Box for Street Lights

(a) Weatherproof connecting boxes are required for street light fixtures.

_"hese shall accommodate connector

1 blocks and fuses for looping of street light fixtures.

(b) 'l'heconnecting box sholl be made of 2. 03mm (14 SWG) shcc t steel painted inside and outside with enamel paint of grey colour over a base coat of anti-rust red oxide paint.

The box shall be derusted and degreased before applying the paint.

The dimensions of the box shall not depend on the dimensions of components arrang~d as shown on the drawings.

It shall be complete with fixing straps and holes, ",eatherproof gasketed removable cover, cable en Lry holes ,vith insulating material bushes etc.

The removable cover shall be fixed by galvanizing screws.

(c) The connecting box shall be provided with a three phase connector block.

The connector block shall have bakelite body, brass terminals and termi.nal barriers of insulating material.

The connector block shall be suitable for upto

450 volts, three phase, four wire system.

The terminals

5Clt111

bc suitable for accepting 35/25/10/6 sq.mm.cuble

conducturs, as required.

'l'heconnoc lor block shall be installed over a

2.50

nun thick insulating mater ial sheet, inside the box.

'I'heconnector shall be same as specified in clause 3h (10) of t.hese specifications.

(d) The connecting box shall accommod:'Le H.R.C.

type f use s complete with porcelain or phenolic mOUlding fuse base and grip.

The current rating of H.R.C.

fuses shall be as specified on drawing.

'fhe H.R.C.

fuse and carrier of English Electric

Type

ISM' or equivalent will be acceptable

1

..J

-

..,

,

-

I

(II )

( <1 )

\'Jeati'er proof Control Gear Box shall be provided and installed near the base of the flood light lower to accommodate t.he connector blocks, fuses (lnd chokes of the flood light fixtures.

-..;- -- o,--::..----:... ..... __

'l'h,'

"l)ldl'ol

'J('.lr

ho x !~h1111 bt~ m"dc' of ).0.1

nun (14

~~WC) r;h('cq-

::1",,1 1',lilll,'cI ill::icl,'

"lid lIl1t.:lidl' w i t h c'll<lmld pa i n t of qn',"

""1,,,"

I " ,

1)\;"1

01

1,,1:;.,

,'",d o f

.\ldi-nl!;1 l'I'd o x i do p a i n t, Tilt,

I

I

!

I I I,., ,','

1 II',' '

.....c'....... ~~ ...~,,~.:

'.J

,I'"

I ".

II, ..

1: .,

'd I"

t { "

I'

,II'"

1 ~' ii,'

I I

II"

!

I.!

I I I I

......,_"" ,_~"' .. ~ ...,~~,_j.lhi~

•..

~~"*"~ ..

,.:,'j..•,.;

.!"•..

IiE.".....,.:..;,

.'C

---'

.

._..

,

~

,_.

f i

,-','

-"

~

~

~

~

~

2

I

--

,

SP-3-40

1'. .:

The box shall have suitable d i );\.:,!;," ons

:_,.;o..(.(J:)""'N\,r,date the required number of chokes

I

fuses :;,Id c~!nn':c'Co, and and ho L..

V' ..:.'1 ther r roo f gasketed removeable cover, cable en h Ln suL: t i nq material bushes etc. The removeable cover shall be fixed by conductor shall also be provided.

(c) The connectof block and fuses for the control qear box shall be provided and installed as required an~ as specified in clauses(c) and (d) for connecting box for street lights. The terminals shall be suitable for'accepting the cable size as required.

Choke Box High Bay Light Fixture

The choke box shall be made of 16 SWG(1.63mm) sheet steel, derusted and degreased and painted with battle grey enamel paint over a base coat of red oxide antirust paint. The box shall be of suitable dimensions and shall be provided with dust-tight hinged cover hav ng dust tight gaskef and latch.

The box shall accommodate terminal block for connecting lighting wiring and control wiring cable. The connector block shall be installed on a bakelite sheet 2.5mm thick fixed inside box. The box shall be provided with appropriate holes for fixing of choke and connector block.

Suitable number and size of holes in the box having insulated material soft bushed fpr looping the cable shall be provided~

Terminal Box for Small Power Connect.ionto Ships

(a) Terminal Boxes shall be provided and installed all along the apron of thE:berths in the mat\-holesprovided for the purpose of supplyin~ portable s'''~ electrical power to the ships aLonq t]'\~

,I t:'

I

I ' ;

'jl V'

(b) 'I'h e terminal box for small P:' -er conn~'2i:ion,i;to be made of 2.03mm(14 SIll/G) painted inside and outside with enamel paint of grey colour over a base coat of anti-rust red oxide paint. Th~ box shall be derusted and degreased before applying the paint. The box shall be of suitable dimensions. It shall be corip Le t e with fixing straps and hole suitable for mounting the box on the

\\'311 of the Man-hole .~·e terminal box shall b~ Weather-proof with gasketed removeable, cover which shall be fixed by galvanized screws. Cable entry holes with insulating material bushes shall be provided.

(c) The terminal box shall be provided with 4 way 30 Amps. 4 pole,

3 phase and neutral 4 wire, terminal block suitable for

I accepting incoming and outgoing 4 core

;')P;;'!Cl.

cab i o conLkch.)r of size 10 sq.mm. The connector block shall be installed over a

2.5 mm thick insulating material sheet supported inside the box. The connector block shall be same as specified in clause 3 h (10) of these specifications.

.

2

::I.

I::

-:3

.

--- -._----_.-._--

~

I l

.

.

...

'-

2

(d)

H.R.C. type fuses on all the three phases, complete with porcelain or phenolic moulding fuse base and grip.

The current rating of H.R.C. fuses shall be 30 Amps.

The H.R.C. fuse and carrier shall be English Electric type

ISM' ot approved equivalent.

Connector or Terminal-Blocks

The 3-phase or single-phase connector shall have mQulded plastic base phase barriers and copper or brass terminals.

The connectors or terminal block shall be suitable for current capacity as required

440/250

volts, 50 c/s.a.c. terminal blocks of siemens type 5VD3 or ~pproved equivalent shall be acceptable.

;

,

')J ..

J~

1,

_..

I

.;_]

~

-.-'"

?

.~ r:

[

~.

2

:j

11 r:

SP- 3-42

"

I' '

3.1

LIGHTING FIXTURES

(I) General

The description of lighting fixtures is given on the drawing and all relevant material is described in detail in this section.

Where a definite manufacturcr·s type and catalogue number is specified, it shall also serve as an illustration of the type and, if the particular type of fixture specified is not available,.approved

equivalent fixture may be acceoted.The

determination of equality will be based on certified photo-mutric data covering the co-efficient of utilization, average brightness data, as well as equivalence of construction material, shape, finish, operation,etc.

For any substituBimn , the Engineer's approval is necessary.The

Contractor shall submit samples of each and every lighting fixture specified and obtain approval of the Engineer before commencing installation.

All fixtures shall be finished in standard colour schemes as mentioned in the manufacturer's catalogue for respective fixtures.

(2) Fluorescent Light Fixtures

The fluorescentlight fixtures shall have lamps and ballast of proper type and wattage as. spe'cified on the drawing.

The fluorescent lamps shall be tubular 1224/610 mm long for 40/20 watts as specified.

The fluorescent colour shall be cool daylight characteristics with an average output of 2600 lumens (+5%) for 40 watts and

1036 lumens

(+ S%) for 20 watts lamps after 100 b.,;:-ning s ~

The ballast shall be po l ye s te r filled tlipc..;~0tally enclosed, and suitable to operate upt.o

2:·CV.>.- 50 cis, single phase supply.

The power loss shal.L not be mo!..e

than 10 watts for 40 watts ballast.

A wiring diagram, wattage, voltage and current figu1es shall be prin~ed on the body of the ballast.

The lamp holders shall be rotary, lock-in ",type.

starters shall be glow type with radio int'erfer€nce by-pass capac t.no

internal wiring of the fluorescent light fixtures shall be done with heat resistant wires at the manufacturer's,factory.Two

or more lamps fittings shall be provided with power factor improvement capacitor to give a minimum power factor

0.9

CJ ifJ

J

]

1

1

]

1

1

1

J

1

'],

..,

.J

i

l l

,

JII', .~ ••

I._n.tlll.1

1112 "' __

'.

( 3)

(4 )

·SP-~-43

The fluorescent li.ght fixtures shall h'-I'..I!:!

s t.ove

enamelled sheet steel body, not less t.lia

n 22 SHG '

(0.711 rom ) thick. Appropriate size bushed

Hire entry holes, f.:i,xing etc.

shall be j_Jrovided.

An earth terminal for connection to 14 Sl'1G wire shall be provided.

Whereever specified, the perspex diffusing panels for light fixtures shall be "040 opal Acry'ic".with

a minimum sheet thickness of J rom, and l ouve rs shall be of plastic.

-

All material-and accessories for light fixtures shall be PHILIPS, G.E.C.

make or approved equivalent.

'\

Incandescent Light Fixtures

The ceiling mounting incandescentlight fixtures shall have white stove enamelled sheet body.The

fixing holes shall match the outlet box.

The glass shade of ceiling mounting light fixtures shall be of first quality glass,free from any air bubbles or voids.

The glass shade shall be spherical, flattened bottom or tablet shape as specified in the drawing.The

glass shall be opal white colour, unless otherwise specified.

.

The wall bracket incandescent light fixtures as mirror light shall have back plate with holes matching those of the conduit outlet box.The

glass shall be cylindrical, closed at one end and with screwed neck and shall be opal white colour.

The back plate shall be of sheet stee~ and matt black colour.

The seat shall be of moulded bakelite or plastic having screwed collar and waterproof rubber ring for water-tight fixing of the glass shade.

The incandescent fixtures shall have bi-pin brass lamp holders.

The lamps shall be Byesons or PHILIPS make or approved equivalent and as specified in the Bill of

Quantities.

Street Light Fixtures:

The street light fixtures shall be mercury vapour type.

The fixture shall consist of, light weight 9lass fibre reinforced polyester housing containing oDticRl system of high purity anodised a i.um i.n i.um

reflector and having clear, heat resistant glass bowl.

~he glass bowl shall be fixed to the body with hinge and latch of toggle.

A tropicalised felt or rubber gasket shall be provided on, the rim of the body carrying refractor b9w1, such that when the body is closed it makes the fitting w('atherproof and watertight.A coTIlpartm.~nt iuq HV ballast

811,111 be provided.

the lxxly of the fitting.

The fixtureshall be Philips type llHe

501 or approved, .

.J

':1

·1 ' i'i

I

I

~

.:.;_---

"

.

'

.

....

"""~'

...

1

~

"j

"",_"

I l

_j

J

,._.:.':1

'J

',

..•

~. 'or

-.

~.'

•.._':.

]

,..,""

,.1

;1

...

,,~

~j

J

'

..

..1

,.

,'

..

SP-3"'44

'rhc street light "f i xt.ur-e

~;Jwll have, r''''~··\~'"<!'1jn lamp hylder and connector block, \dxc:o w.i

r e s • w i t.h

hea r.

·-'·":';~··l.Hd:

(5 )

(6 )

The industrial type mercury l.i~lbt f Lx t.u

r e sha

Ll, consist of c lrcu l.ar re rlec c ar of ariod i zed aluminium p rov

Id i nq ba re

Lamp cut.+o f f at an angle of 62° to the vertical and hdving ventilating slot.s

at the top, under the canopy.

The reflect0~ shall have a1 umi nz.um canopy hav.i nq 3/4" (.l9mm) threaded hole for fixing on the bracket.The

lamp-holder shall be of po rce Lai.n

and wired to the mains t.erminals

with heat resistant wjres.

The fixture shall be provided '<lithmercury vapour lamp of

400/700 wat.t.s

appropriately rated ballast and have terminals providGd for connecting to 2.5

sq.~n.

twin core wires.

The ballast to be housed in the choke box provided separclb:~lywith the fixture.

The fixture shall be

G.E.C.

type F6l076/F61077 or Ph i Li ps type

HDK 459.

Flood Light Fixture.

The flood light fixture shall be suitable for mounting an flood light t.owe

as shown on the drawings.

The light fixture shall be adjustable both ~ertically and horizontally and comprising of spun aluminium reflector with narrow or wide beam front glass secured to the housing by means of sealed, weatherproof gasketted joint.

The fixture to have cast aluminium rear housing provided with adju~table focussing knob, terminal block porcelain lamp holder, internal wiring ,cable gland and other standard accessories.

The rear housing shall be secured to the reflector by means of stainless steel toggles.

A galvanized sleel base for fixing thelight fixture will be furnished.

PHILIPS type NNF - 010 ~lood light fixture shall be acceptable.

'i'he flood

Li.qh

t; fixure shall be provided with high pressure colour corrected mercury vupour l.:=tmp or 700 watt as required .

(7 )

Ballast and Lan~r M{:rcnry VaEour Fixture.

'I'lie ballast for mercury vapour lamp shall be polyester resin filled, totally enclosed and shall have leak-proof body.

The wattage of lamp and ballast, a wirjng diagram and other relevant data shall .be printed on the body of the ballast.

The wattage loss of the ballast sha

11 not be more than lA.5

watt for 250 watt, 26 watt for .400wat+

&

32 watt for

7~O watt lamps.

The ballast shall be provided with insulated block of terminals for wiring.

Sp~-45

The lamp for street a~d flood light fixture shall be high pressure mercury vapour colour corrected type.

It shall be Philips type HPL-N or approved equivalent.

The wattage shall be 400 watts~. 700 watts or as specified.

(8) ~mergency Lighting

To avoid hazard of sudden darkness in case of power failure, emergency lighting system shall be installed by providing emergency lighting unit at strategic points. The emergency light unit shall be a complete unit having light head, battery and charger.

The unit shall be connected to 220 Volts a.c.

system.

In normal condition the emergency lights shall be switched off and shall automatically come up during tile interruption period by means of automatic cilangeover atrangement provided in the unit.

When the power is restored,the lights are switched off and the battery starts recharging.

,

..

'

"

,

,

1

]

1

1

1

J

..

I

,

SP-3-a46

3j EARTHING

(1) General

The earthing system shall cons i s t of supply and

.i

ns t a-: l~ation of earth electrodes, earth connecting points, earthing leads and earth continuity conductor and running earth conductor all along the cable length. All material such as earth continuity conductors, earth connecting points, earthing lead and p.arthelectrode

including the installation material and accessories shall be supplied and installed by the Contractor as specified.

\

(2)

Earth Continuity Conductor

Earth continuity conductor shall br round, hard drawn, bare electrolytic copper wire 9f sizes indicated on the drawing. All fixing accessories, earthi~g clips, sweating sockets, lugs, thimbles, etc., shall be provided for a complete earthing installation.

ECC for transformer central earthing shall be PVC insulated single core copper conductor 'cable of the size indicated on the drawing and it will connect transformer central terminal to the earth connecting point.

(3 )

(4)

Earth Connecting point

I;

Earth connecting points shall comprise of tinned copper bar, rectangular in shape, having dimensions of 255x50x6mm.Terminals for connection shall be arranged' as required.

~I

The terminals shall have brass tinned copper bolts, nuts and washers, for protection against corrosion. There shall one galvanized iron bolt provided in the centre for fixing copper bar to the surface of wall.

Earth Lead

L

(5) electrolytic copper of size shown on the drawing. It shall connect the earth connecting point to the earth plate/pipe.

Earth Plate

The earth plate shall be 600x600x3mm thi.ckelectrolytic copper plate. The surfaceof the plate shall be tinned for protection. The surface shall have two terminals for connecting the each earthing leads. Nuts, bolts, washers etc., shall be eilher of brass or tinned copper for protection.against corrosion•

.

I

,

'.

I!"

L-.

!

f

II

_j j'l

_ --

,

~

~

I ]

?

r'

1

11

r,

r

L2

~

~ r:

1

Sp..3--4/ a.x,

LYGII'l"NDIG PRO'mC'l"ION SYSTEM

..

(1) General

(a) The design of lightning protection system shall be carried out in accordance with

British Standard Code of Practice CP.326

(1965)-'Protection of Structures against

Lightning',-and the Contractor shall install the system as specified herein and in accordance with the referred code.

The extent of work specified or shown on the drawings is schematic and do not indicate ~he position of testing terminals, conductor connections, etc.

However, the Contractor shall ensure that the system is complete in all respect as intended by the specifications.

In general, the earthing resistance of lightning protection system at any point in the system shall not exceed 10 Ohms.

(b) The installation of lightning protection system shall comprise of the following:

Air termination •.

Down conductors.

Testing terminals.

Earth electrodes.

given as under: i.

Air Termination

Horizontal Air Termination or Roof Conductors

The horizontal air termination for lightning protection system shall comprise of soft annealed electrolytic coppe~ strip having dimensions of 25 romx 3 rom. All connections between metal work on the roof and air termination network shall be with the same conductor sizes and material as for air termination.

All accessories for fixing of copper strip to concrete surface shall be of copper or

.brass as approved by the Engineer.

,verticalAir Termination

This shall comprise of 10 wm dia, 2 metres long hard drawn copper rod having pointed tip at one end.

The rod shall be fixed vertically to the roof surface or brazed to ste~l tower top as required.

.,

\<

~

~ t

;J r

. i

.

~

._

..

.....,',

',.

[5'., ' l!

C/

i

i r

'sp-

3-48 ii.

Down Conductor

The down conductor including earthing lead shall conform to the same material specifications as for the horizontal rood conductors •

.iii.

Testing Terminals

For each down conductor, a ~esting point shall be provided in accordance with

Clause 307 of British Standard C.P.

326.101.

It shall be installed 1.5 metres above the finished floor level or a~ convenient for testing purposes as dlrected by the Engineer.

The testing terminals shall have removable terminals.

iv.

~~arth Electrode

The earth electrode for lightning protection system shall comprise of 2.5 metre long

16 romdia hard drawn copper rod with a pointed tip at the bottom end.

At the top of copper rod, copper clamp.brazed to the rod shall be provided suitable for connecting to required number of 25 romx

J nun copper strip.

~

~

~

~

~

~;

...

.....•

.

,-I

:

SP-3-49

3.1.

Po1e,Tower and Bracket

(1) Poles

---

The tubular steel pole shall be

9.77 metre high, having following three sections:-

Top

Section:

2030 mm length,

88.25

nun dia,

3.25 mm wall thickness.

Middle

Section:

3050 rom length,

114.3

mm dia,

3.66 mm wall thickness.

Bottom

Section:

4690 rom leng th, 140.0 mm dia,

4.87 rom walJ. thickness.

1

The pole shall have an anchor steel base plate of size 400 rom x 400 nun and 25 mm in thickness, welded to the bottom of the pole.

Stiffeners as shown on the drawing shall be welded to the pole and base plate.

The base plate shall have suitable hole centred on the pole centre line for connecting

100 rom dia GI pipe for cable entr.y to the pole.

The plate shall have four hoics for insertion of

25 mm bolts through the plate.

Different locations of the pole shall be electrically welded.

Excessive porosity and lack of fusion in welding may be removed by chipping and joints should be rewelded so as to ensure dependable operation of tne pole.

After welding the surface should be cleaned, derusted, degreased and shall be given two coats of approved quality anticorrosion paint.

The pole shall be given a primary coat of red oxide and two coats of first quality aluminium paint.

The time between the two coats of paint shall be a minimum of 24 hours.

An earth terminal and suitable size of holes shall be provided in the poles, if required, for looping the cables in and out to the connecting box for street lights and control box for flood/street lights.

. The transport and storage of the poles ut site shall be carried 01Jt in a n(:;"'t Wood racks wi th grooves sha Ll. be p.r

ed for stacking of poles to prevent any direct contact

\.Ji

til ground.

i\ny po le damaged during transport or storage shall be replaced and any damage to paint work shall be made good before installation.

~.

~,

~ p

~

~

2

~.".

;.

SP-~-50

(2) Street Light-Brackets

The street light bracket shall be made of G.I.

pipe bent'to sh~pe as shown on the drawings and painted with good quality aluminium paint.

The dimensions of the bracket shall be as shown on the drawing.

The bracket shall be painted with aluminium paint over a base coat of red oxide anti-rust paint.

(3) Flood Light Towers and Flood Light Brackets

All steel structural details for flood light towers alongwith the fixing bracket for flood lights $hall conform to Sections 22830 for structural Steel Works given in these specifications.

The same shall be applicable to flood light fixing brackets on tubular steel poles.

~

4

~

?

SP-3-51

4.

INsr ALLA1'ION INsrRUcr IONS

The Contractor shall·furnish all labour and connect,

w

t~rials, tools t~~\ and or not such equipment is furnished.by him or

O\~2 rs ,

For all equipment to be installed by the Contractor shall supply and install all installation rn~~erialssuch as foundation bolts, levelling steel, shims, clamps, cable sockets, lugs, solder, wall plugs, steel rawl bolts, washers, nuts, etc.

as required and without any ad~itional costs.

The Contractor shall himself set out the works as per 1

Specifications and drawings and shall properly position the equipment on given foundations/locations.

In general, th~ manufacturer's instructions for installation shall be followed.

Any defect or faulty operationof equipment due to the Contractor not following the manufacturer's instructions snaIl be connected and repaired by the Contractor at his own cost. For any departures from the working drawing that are deemed necessary by the Contractor due to s~te conditions, he shall submit the details and obtain·the Ehgineer's approval before starting such works.

~

£:

£:

.I

"

".

~

~

~,

~

~

----:--------~---

--_

.....

:rl

}

J

1

[_j

2

~

I

....; _.

SP-3-52

,

:-4 • a •

,

CABLE INSTALLATION

(1)

(2)

Genera-l

The contractor shall provide all labour and materials required for handling, laying, cutting, joint-

,ing, testing and commissioning of the cables as specified herein and as directed at site. All materials such as lugs, sockets, solder, insulation tape, clamps, saddles, bolts, nuts, washers, etc", shall be supplied by the Contractor within the quoted rates against each item and no additional payment will be made for such installation materials.

l

Underground Cable Installation

(a) The cables to be installed directly underground shall be laid in trenches in single tiers. The depth of cable under bare ground shall be

900 mm minimum measured from the top of the largest cable to the general ground leve~. The burial depth may be incr~ased as required due to site conditions or when crossing o t.he

r se i vi ce<:~t' i.r:t:~3 and roads. Burial depth less than

900 mm and more than

1.5

meter!S shall l'equirathe Engineer

IS consent in writing.

(b) When cables cross ro~ds, paved area or other' services pipes and other cables, they shall be laid in protective pipes as specified on the drawings. Also at terminations, where the cable comes out of the floor or ground, it shall pass through protective pipe of required size. Cables entering buildings shall also be laid in ptorective pipes. The ptotective pipe ends, after installation of cables, shall be plugged with sealing compound, impervious to liquids that may be present in the soil. A minimum clearance of

250 rom shall be maintained between cables and other services.

(c) The cable trench shall be excavated as per route and location shown on the drawing. Before laying of cables in the trench, the bed of the trench shall be levelled and filled with a

100 rom thicR layer of fine sand or screened earth

(1.3

rom diameter maximum particles size). The sand layer shall be levelled and the cables placed thereon.

The cables shall be covered with a layer of fine sand or screened earth,

100 rom thick measured above the centre of the largest cable.'The slabs shall bp 50 rom x

300 rom in size (minimum) having compressive strength of not be less than

140 kg/ sq.cm.

,

"I'

.

iI' " i l '.:

I '

..

'f

!

I:

, ~:t

~

1/ _ v ..

. "'~ ," \;'\l'

.

'~~f-

'

-

~

L

,-

;~

(

I

~

~1 r:

r:

i

SP-3-53

Conduit Wiring

(a) The power, 'light and control wiring through conduit shall be started only after the conduit systems is installed and all outlet boxes, junction boxes, etc., are fixed in position. The wires shall be pulled in conduit with the aid of steel wire and using recommended ltibriciantfor decreasing friction. Where serveral wires are to occupy the same conduit, these shall be pulled shall be as per cable manuf~cturer's recommendations.

(b) The wiring for power circuits must be continuous between termination~ and looping-in system shall be f91lowed for light circuits. Any joint is wiring is prohibited. The use of connectors will be allowed for light wiring at locations where looping-in is rendered difficult, for which prior approval of Engineer shall be obtained. The connector shall have porcelain body, ~unkp.n screw terminal and terminal strips~ screws used shall be of brass. The connector shall be wrapped with PVC ins~lation after installation.

boxes and other fixtures, suf f LcLent;slack shall be provided between entry point and cable fixing

At such terminations soft insulated bushes or galvanized cables and brass cable glands for armoured cables shall be provided. The cable glands, terminals, lug&, socket, etc., and all other accessories shall be furnished by the Contractor within the rates quoted against each item.

-

SBi-l3-54

~

_1

J j

.]

_]

1

I

_.4bSWITCHGEAR INSTALLATION

(1) Switchboards

All "the switchboards shall be installed at location shown in the drawing.

The cable trenches and cement concrete supports shall be constructed as part of civil works.

The contractor shall provide foundation bolts and grout them in cement concrete

.floor as required.

All installation materials for physically erecting the 5\·,.i

such as bollt·s, nuts, washers, supporting steel etc., shall be provided and installed by the Contracto~.

The switchboard shall be installed upright and in level and shall be firmly and rigidly bolted on the floor and concrete supports.

The switchboard shall be completely

"-if

~:,lbled and erected as per manufact:urer

I s ins trw: '-1

':ns and as approved by the Engineer.

io~se parls Jcspatched by the manufacturers shall be instal.led ~nd connected as per assembly drawing ,provided hy the manufacturers.

Any safety locking of meterd relays, etc., provided by the manufacturer for safe transport shall be released only after the swithboard is erected in position.

The incoming and outgoing cables shall be connected as per cable manufacturer's instructions.

The cable end boxes, if not provided by the manufacturer, shall be provided and installed by the Contractor and these shall be of the type and quality recommended by the cable manufacturer.

The ar.mour wire shall be connected to the armour clamps of the gland for effective grounding of the wire.

The switchboard body shall be connected to earth as per instructions given in section "Earthing" of these specifications.

The switchboard shall be tested and commissioned in the presence of the Engineer.

The tests to be carried out shall be as per instructions given in section

"Testing"

of

these Specifications.

(2) Distribution Boards

The wall mounting distrilnltion boards shall be installed on wall and shall be anchoCl>d t..

means of bolts or on steel channt"!lsas per n,'CilU facturers instructions for installa.tj.on.

\Jnerc\~.;1-

indicated,

,-1 '

. t '

.

,

;

\

. 1 ,

,

\ t

~

,

"I

-,

",_

~l

'1

,

J

'J

~

J

.n

-

1

I .~

,.

--

,m

/

i

"

, ss-

3-5") switchboards for recessed mounting in wall shall be installed such that the door shall finish flush with the surface of wall.

All loose parts despatched separately by the manufacturer, shall be installed according to his instructions and all adjustments or setting shall be made as required.

The iocations of distribution boards a:2 shown d Laqr amat.Lca

Ll.y on the draw i.nq

s , The c...

~~~a.llocations shall be determined at site, kee~tn~ in view the si~e conditions and coordination Wi~l other equipment's installation.

'i'he t rLbu t Lla cion sha l l, include connecting all incoming and outgoing cables.

The cable compound, insulation tape, sweating scckets, thimbies, solder etc., and all installation mateirais, shall be provided and installed.

T~e earthing connections shall be made as per instructions con~ained in ~he section "Earthing Installation".

The switchboards shali be tested as per instructions coh~ained in section "tESTING" of these specifications.

Aii screws, nuts and bolts used for fixing the distribution board shail be galvanized.

Soft metal bushes shali be used at conduit entries in the board.

For sur~ace mounting board, the conduit entry for incoming cabie sh~ll be from the back of the board.

(3) switchboard for Power Connections to Ships

The switches shall be installed above the general pavement level, as directed at the site.

j

rl

1

J

,

1

J

1

~

2

C

~

,

.\.

• -: l

'\]<. /

/

;/;.

;-sr--

3-56

-4 c

POWER TRANSFORMER INSTALLATION

(1) Transformers shall be installed in transformer stations at locations shown on drawings.

All

·civil works, including making of under-fluor cable trench, transformer oil pit, openings in wall etc., shall he carried out by o th o rs .

This contractor shall, however, be responsihle ror general check of provision in civil work, as per drawings affecting his part of work.

For installation, connecting, testing and commissioning of transformers, the contractor shall provide all labour and materials required.

('2)

The transformer's installation on prepared foundations shall be carried out in accordance with specifications a~d the best generally accepted practice.

Any loose material, shall be assembled, installed and connected in place so as to form a complete transformer assembly.

The transformers roller wheels shall be locked with the foundation steel channel after placing it in position so that the wheels do not move in the channel due. to vibrations.

(3) The H,V, cable connections shall be made at the cable-end box, as per manufacturer's instructions.

The cable compound and all other jointing materials, if required, shall be provided without any additional cost.

(4) After the transformer is installed c:.\.4

connected up, a thorough check shall again be"'N\~ i'o r the proper fixing of accessories, neu t red, conr.ec t i o ns , oil quality and level etc .. The tr",,,,":.,\o~'rnlC'r be tested before ene rg i z \"\O\g po i ...

ru.diol1s

contained in section "Test:ing" of tt2se specifications and in the presence of the Engineer: l

1,

SP-3-57

4 d BUS TIE DUCT INSTALLATION

(1) The bus-tie duct shall he installed betwcen the transformer L.V.

side and the incoming circuit breaker of the main L.T.

switchboard.

installation materials, steel hangers,

All ln-n cko t s .

etc., as required and as recommended by the lll;lllll-

~acturer shall be provided and installed by the contractor without any additional cost.

(2) The bus duct shall be carefully aligned and all steel supporters made up bolted connections using nuts, bolts, washers, etc., shall b~ provided by the contractor with rust resisting coat.

(3) The section of

COPP(':'l' h:ll'S of the bus d!lct

requiring thoroughly ~: eaned 0 f all foreign matter, a}n:1"ftnga coat of no-oxide special compound on the

.ru

r face so t l.a

they are completely covered, after which the surface may be bolted together by means of torque wrenches.

using the bolts provided by the manufacturer.

(4) The connections of the bus bars of the bus duct at transformer L.V.

bushings and switchboard shall be made and checked for tightness before the bus duct covers .a.r

At the transformer L.T.

bushings the flexible bus duct connections are preferred.

If flexible connections arrangement is not ~vailable, solid copper bars connections with proper care for reducing stresses may be allowed.

Prior approval from the Engineer must be obtained for solid copper bars connections.

(5) The bus duct's sheet steel covers shall be effectively connected to earth by means of bare copper wires of sizes shown on the drawings.

:/ lJ i'

.

l

_J

)

~l

_'"J

~

_j

-J

-41

2

~

--,

I

SP-3-58

CONDUITS, PIPES

&

ACCESSORIES INSTALLATICN

. 4.e

(2)

(1)

General

The Contractor shall furnish all labour and material for the installation of conduits on surface or concealed in concrete as required.

The approximate routes and termination point for conduits are shown on the drawings. However, due to site conditions if the Contractor propose an alternate route for conduit run then prior permission of Engineer shall be obtained. For such changes, the Contractor must ensure thatl clearances with other services are maintained and the alternations do not incur any undue additional cost to the client.

PVC Conduit

The conduit shall be concealed in roof, wall, column, floor, etc. At all joints and bends PVC jointing solution as manufactured by Pakistan PVC

Limited must be used to st~engthen and to seal the joint.

The concealed conduit shall have a minimum of

38 romcover of concrete when concealed in roof, columns etc. In the R.C.C. work the conduit shall be laid before pouring of concrete. Under no circum'stancesshall chases be made in t.heR.C.

C.

structure for concealing conduit and ~ccessories, after pouring of concr« t.e , The condi. L t shall be supported on top of bottom reinforcement of slab.

All outlet boxes to be firmly supported and installed such that it finished flush with the soffit of slab or beam.

Where conduits have to be concealed in C.C. work after concreting or in block masonary, chase shall be made with apporpriate tools and, shall not be made deeper than required. The conduit shall then be fixed firmly in the recess and covered with cement concrete mixture to have at least 32 mm cover 'befere plastering.

The work of cutting in the cement concrete work or brick work shall be coordinated with the civil work ,

The Contractor shall obtain approval by the Engineer for the route to suit the site conditions, before starting chasing and cutting.

I

I

I

I

-~

!

I

I

~

J i

t

).

"

~

1

]

J

.1

]

_.1

J

I

I f

,

.

'

SP-3:-59

Steel conduits

The steel conduits for w1r1ng at specified locations shall be installed on the surface of wall, ceiling, etc., by means of steel saddles and clamps of approved design.

The saddles shall be installed on surface uy means of nylon wall plugs and galvanized steel holts or screws.

Appropriate sized holes in structure slldll be made by drilling.

The thickness of saddles shall not be less than 4 rom and clamps shall be of 16 SWG(1.63

rom) sheet steel.

These shall be fixed at a maximum of 1000 rom along horizontal and vertical runs of conduit.

All accessories for complete installation of conduit system shall be installed before wiring is carried out and condu\t shall be removed without damaging the installation.

Under floor conduit installati m shall be at a minimum depth of 120 rom from the finished flo·:)r18"81 as per details shown on the dra\·;ings.The cc.ndult.s shall he installed empty before finishing o f

'loor, vIith a ) 8 SWG steel wire drawin through the conduit for pulling ~able.

,

;

(4)

(a)

(b)

Other requirements of Steel & PVC conduit

,

The entire conduit system shall be installed and tested before wiring is carried out. Any obstruction found shall be cleared by use of a cutting mandral or other approved device and the conduit be cleaned out before the installation of cable.

The-termination of conduits near swith boards, etc., is shown diagramatically on the drawings.

The exact final termination point shall be coordinat0d with the position and dimensions of equipment installed.

Any extension of conduit near the switch board to sUlt the site conditions shall be made without extra cost.

The conduit termination shall conform to the type of equipment enclo~ure to which conduit connections are to be made.

Conduit ends pointing upward and downwards shall be properly plugged, in order to prevent the entry of foreign material.

All openings jn conduit system through which concrete may leak shall be carefully plugged and boxes shall be suitably protected against filling with concrete.

At all terminations of conduit, soft metal bushes shall be provided to prevent sharp edges of conduits ends from cutting or damaging the cables or wires during pulling operations.All

burs shall be removed from cut lengths and surplus screwing oil removed from conduit threads prior to fixing.

~

: t

!

r: i

,'" .1

(c)

Pull boxes and Adaptable boxes shali be provided in conduit run s wherever requi~-ed to facilitate pulling operution.

'fhe drawinqs are -d

L1qr;}~~"'"tic and do not indicate the pos i t ion of pull bo xc.:: (,", boxes.

However, these shall mE'ct the fe,; j o;'!

~l:(J requirements:

~

~

~~

-J

'_] r.

~

~

~

, I

ft

--_.*--- ...

_ .._

SP"'3-60

..

(i)

(Li.)

Pull Boxes

_ straight runs - not more than 60 meters.

_ Runs with one 90 degrees - not more than

30 meters.

_ Runs with two 90 degrees ,.not more than

15 meters.

j

Adaptable Boxes

For conduits upto 25mm dia, the boxes shall be 50mm in depth.

_ For conduits upto 38mm dia, the boces shall be 63mm in dep~h.

_ For co-duits upto 50mrndia, the boces shall be 87mm in depth:

(iii)

The rectangular inspection, or pull boxes shall be 16 SWG(1.63mm) heavy gauge sheet steel having nipples welded to box at entry holes to receive conduit with force fit. The box shall be painted inside and outside with black enamel paint over a base coat of red oxide anti-rust paint. The minimum length of inspection.box shall not be less than four times the cable manufacturers recommended bending radius of the cable.

All concealed type pull boxes shall have a white plastic sheet of apporopriate size fixed to the box by means of galvanized screws.

Adaptable boxes shall also be 16 SWG sheet steel anti-rust painted and finished in the same quality and as the Lighting Distribution

Boards. surface mounted boxes to be finished in the same quality paint as the conduit. Wherever conduit cross expansion join~ iil civil worK, either along the co).umnor

sJdb, suitable expansion fittings shall be provided to

CCTl1pensate for building expansicn and contraction

50 that when the conduit lengths in the expansion joint are s~re~sed, conduit neither develops any cracks nor breaks down. The expansion fittings shall be approved by the

Engineer before installation.

~

2

~'

--

"-J'

.

.

r=

;rJ

2

I(·l r:

-1

_]

J

:J

_J

!

I

Sp-.3..-61

(e)

All electrical conduits sr"

11 run a t least

150mn clear from flues, steam or v,·,lt'.'r s , and ~ the Contractor shall ens~re that the selected routes for conduit run meet the above requirement

. (f)

The conduit system shall be so installed that the wiring can be readily pulled through after the whole conduit work is completed and tested, and all finished to wall, ceiling etc have been provided.

)

5.

Underground pipes

Rigid PVC pipes shall be installed under roads paved areas at crossings with other services and at cable entrance buildings as shown On the rlr3wings. T~~ depth of the pipe shall vary accm:Jing to the conditions at site, 1nd approv~L

)f Engineer

Sh311 be obtained pr i.o

tl:

.i.n

ra

L the pipes shall be installed under~vo.\i.nd

t the following depths measured from the top of r.he pipe •

(a) Under roads and paved surfaces 900mrn below the finished surface.

(b) When crossing other services.

250mm vertical clearance, 500mm horizontal clearance.

After installation, the ends of the pipe shall be plugged with material impervious to water and chemicals.

All joints shall be sealed adequately to prevent entry of foreign elements.

The installation of pipes shall be completed in all respects including its fixing at terminations, before wiring work is started.

All sharp edges and burrs shall be removed by using reamer or any approved device.

The pipe shall be thoroughly cleaned of dirt and dust from inside.

The pipes shQll be installed in proper co-ordination with other works.

-

.

-------'--_

----------

SP-3-62

~

~

~,

~;

--1'

"-\,

__.,~

." r:

\f,

1::

,,'; j;

.e

.r.

WIRING ACCESSORIES INSTALLATION

(1) The mounting heights of all fixtures are stated on the drawings. In case the mounting height is not mentioned, the instructions of the Engineer shall be obtained before fixing.

(2)

Switches and switch socket units shall be ·installed on recessed-in-wall 1.63 rom thick sheet steel boxes as specified, having appropriate dimensions. At locations where switches and fan regulators arc provj,dcdat one place, these shall be grouped together and iastallfd on a common plastic sheet fixed to the sheet steel box so as to finish flush with the surface of t,hewall.

The fixing of plastic sheet on sheet atcel box shall be by means of flat head galvan-izedscr-ewss ur.k

in t.hep

l.a

s ti.c

plate so as to finish flush with the surface. The edges c[ the plastic plate shall be buffed. '

(3 ) The fan hook shall be installea in the R.C.C. ceiling at the time of pouring of concrete. The fan hook extending rods shall be tied to the reinforcement steel firmly so as not to be disturbed during pour~ng of concrete.

The .installationof fan shall include fixing blades, dO\~1J1 rod, clamp and fan regulator and wiring of down rod from the ceiling rose to the fan terminals with 0.5 sq.mm(16/0.20

and commissioning. The down rod shall have long threads and shall be provi~ed with checknuts to secure it firmly with the clamp and with the body of the fan. A split pin shall be provided both at the fan body end and at the clamp for safety. Any scratches on the body of the fan or fan rod appearing during installation shall be cleaned and painted properly with same quality paint as provided by the manufacturer •

1

I

I

I

I

,I f,

"I

;,

.... 'T.·:,;

",',',"

~

+J

,_J

I

,...

'.;....J

1 l

S

J

~

...

;..J

-

,.

.,••• r

4.g.

1 c;p-

3__

LIGHT FIXTURE INSTALLATION

(1) General

The mounting heights of light fixtures are indicated on the drawings, and position of fixtures are according to the scale. The Contractor must ensure that the light fixtures are installed uniformly with respect to the dimensions of the area. Any modifications due to site conditions may be made with the approval of 'Engineer. All fixtures shall be carefully aligned before fixing in position,' so as not to cause any undue damage. The holes for fixing .

the fixtures shall be made by means of electric drill. The

Contractor shall supply and install all li(J'-lt fixtur.esand

accessories as specified alongwith the r equ.i red installation material whether specified herein or otherwise required for completion of work.

(2) Fluorescent and Incandescent Fixtures

(a) The fluoresce~t light fixtures on the surface of ceiling shall be in5talle~ with th~ back of the body flush with the ceiling surface, and in a manner so as

'Jalvanizedsteel bolts or screws shall be used for fix)

11g the light fixture to the ceiling.

The wiring between ceiling rose and fixture shall be

"

PVC insulated, PVC sheathe~.

(b) The incandescent light fixture shall be installed en the surface of R.C.C. ceiling or wall by means of nylon plugs and galvanized steel screws, such that their back finished flush with the surface for exposed conduits and flush with outlet box for concealed conduit system.

Wherever convenient. Screws for fixing light fixtures shall be screwed into the holes, of the outlet box. The wiring between ceiling rose and fixture shall be with twin core 0.75 sq.mm(24/0.20rom)flexible cable, PVC insulated, PVC sheathed.

I

(3) Street Light Fixtures

The street light fixtures shall be installed on G.I. pipe bracket as per details shown on the drawings. Manufacturer's installation instructions shall be follcwed. The G.I. pipe bracket shall be installed on poles by means of galvanized steel clamps 37 romwide, 6 romthick and bent to shape for clamping on the pole and the bracket shall be welded to the clamp as shown on the drawings.

\

I i

'I

.J

_J

J

,"J

_l

.J

__.

1

f

I

1

;

_1

'j i

-.I.

SP-3-64

.....

I!

-~

4.

Flood light Fixture

-

The flood light fixture on top of tower/poles shall be fixed to channel by means of required d i amet.a

r bolts and washers.

The horizontal aiHlt",,",

:ngle of the fixture is determined by the position of fixing lio

Le s provided by the position of fixing holes provided in the channel, whereas the vertical angle wil: be ad j us t.er' at site.

5.

High Bay Mercury Vapour Light Fixture

The mounting bracket shall be of shape and dimensions as shown on drawing.

It shall be attached to the surface of beam by 10 rnrn The choke box of mercury vapour light fixture shall be installed separately on the surface of beam by steel rawl or rag bolts as shown on·drawing.

The light fixture terminal shall be connected frqm the choke terminal by twin core

1.5 sq.rnrn.(48/0.20rnrn) flexible cable •

--

------

_.

,-;,~..

~

~} r

.,.J

r

J

T

.J

r~

·;:-··1

-]

,......._

~

.

.....,

..,

..

!

I

....J

'

....

1 l

I

4h -

EARTHING INSTALLATION

General

Complete earthing systems as shown on the drawing shall be installed by t~e Contractor. The system shall give earth resistance, including the resistance of soil, earth leads and E.C.C. equal to or less than one ohm.

The Contractor shall supply and install all installation materials such as sockets, thimbles, clamps, saddles, pins, nuts, bolts, washers, copper brazing etc., without any additional cost. At all connections of earth continuity conductor to switchboard, cable-end box or any other mettalic body, proper size copper or brass sockets, thimbles or lugs shall be used to which the copper wire shall be welded by copper brazing. The soldering of copper wire at joints or terminations'shall not be allowed.

All tee-off connections shall be by copper brazing using suitable socket and clamps. After brazing, the jointed surface shall be protected by oxide inhibiting compound of low electrical resistance. For connections to mettalic body, the surface shall be thoroughly cleaned to the

I,

I'

Earh transformer, switchboard, distribution board body etc., shall be connected at least at two points by two independent earth wires tapped from the earth connecting point.

(2)

The copper earth wires shall ~n general run exposed on the S4rface of wall or cable trench or in PVC conduits as shown on the drawings. For under-floor runs, these shall be installed in PVC Pipe of appropriate sizes. Where laid along underground cables, these shall be laid directly underground in unpaved area and in pipe in paved area road,~ rail, etc.,

I

garth Plate

~i

I

For installation of earth plate, a pit of appropriate diameter and upto the depth of

4.5

meters, or as directed at site, shall be first excavation in the bare ground. The

_I earth electrode shall be installed upright in the pit and

~J~ shall be surrounded by mixture of charcoal and salt (in

3:1 ratio) in 300 mm dia aroun« the plate upto 600 mm

,

II depth of the pit, and packed hard. The remaining pit shall ;,~ be back filled with excavated earth, tamped in layers. At the ground level an inspection chamber of

1:2:4 mm deep shall be constructed. The chamber shall be

I

~

~ provided with a ~" (13 mm) dia 300 mm long G.!. pipe with

t,',

sockets on both ends, for connecting to water mains, as i shown on the drawing. The inspection chamber shall have

50 x 50 x 5 mm angle iron frame at top and a heavy duty cast iron cover of approved quality, to finish flush with the genral ground level.

f:

;.

_1

J

J

~1'.

·;-Yt~·

~

]

l

I

1

•...1"""

~J

T

-1'

----\

.

.,.

.. ..,j.

!

-'1~

......

! .

', or

_J ~

..,

I

SP-3-66

(3) Earthing Continu~ty Conductor

The earth continuity conductor of

SiZ0~

~h~~n en the drawing shall.be installed u 11 along til..

C.j

ble rum; .

The E.C.C. shall be conneo t ed to sw i t chboards bony a t, ends.

Every pole shall ue earthed.

The e3rth continuity conductor shall be connected each pole at the bolt provided for this purpose.

(4) Earth loop for body earths

The earthing loop wherever required shall be installed for connecting to earth the equipment body etc.

It shall be installed all along the wall at 150 romabove finished floor level by means of saddles and clamps of approved design.

The tee off connections from the earth loop wires shall be made of copper brazing or by compression socket.

(5) Transformer Neutral Earthing

The transformer neutral shall be earthed by single core copper conductor PVC insulated cable in duplicate of size shown on the drawing.

The connect.Lonshall be made from earth connecting point in the Transformer Room to the neutral terminal of the transformer.

"

'.

.,

-I

,

I

• i

, i!

I i

:;

;1

I'"

.

'

:/:

!

I

I,

I'

II

~

:t

-

--

-

---------

rII l.

1

.,

-

-

1

_'

1

,

~

I

~

.., i

--

1

J

...

1

~]

-

-

""'I

]

""!

--

~ r;,.·.

...

8

/

,.

SP-3-67

4. i. Pole and Pole accessories installation

\ '

(1) Pole Erection

A pit of appropriate dimensions shall be first excavated in the bare ground such that aL the base of excavated pit a 150 mm thick and 900 n~ x 900 rom size Class E lean concrete pad shall be provided and above the pad,aClass C concrete foundation block shall be made such that the block extends above the top.level of the paved area or ground level as the case may be.

The concrete foundation block shall have four L- shaped

25 romdia, 1.22 metre long (straight length) anchor bolts embedded in it.

The anchor bolts shall be threaded at the top end)galvani~ed the top 75 rom length of the bolt.

The anchor bolts shall be set parallel to the road centre line.

The 3nchor bolts shall be casted and placed in position to match with the holes on the base plate provided for this purpose.

After making the foundation block, t he rcrr recesses around the foundation block shall be :lll~d with e3rth in layers and shall be well :onsolidated and comp~cted.

The steel tubular pole shall be erected by fixing the base plate on concrete found~tion block with ei~ht

25 mm dia anchor galvanized nuts, shims using w3shers

, :j

\ rot,

While making the foundation block, a 100 mm diu.G.l.

pipe shall be embedded such that the bottom end of the pipe extends into the man-hole or the bare ground as the case may be, for looping all incoming and outgoing cables and E.C.C. to the pole.

The upper end of the pipe shall be so placed that the pipe protrudes into the aperture of the base plate provided for this purpose, after the pole is erected.

All the above work shall be included in the item of supply and installation of steel tubukrr pole.

(2) Connecting Box & Control Box

The pole shall be provided with at least two steel clamps for each box at the base of the pole and the connecting box shall be welded to the clamps, as shown in the drawing.

The control box or connecting box shall be installed such that its lower end shall be

60 cm above finished ground level.

The control box or connecting box shall be installed in accordance with

Manufacturer's instruction.

All screws, nuts and bolts

,\r used for installing the boxes shall be galvanized.

The ~ boxes used with the flood light tower shall be suitably l'~ welded to the steel member, using clamps or steel members , as required.

All fixing arrangements shall be suitable considering the weight and the vo Lutue of the boxes.

The fixing arrangements shall be approv~d by the Engineer before the installatiun work is car.-,_~rl out.

:!

t-

l

Sp-3-68

4.j.

LIGHTNING PROTECTION SYSTEM INSTALLATION

(1)

(2)

(3)

The Contractor shall furnish and installa complete lightning protection system in accordance with these

Specifications and CP-326.l0l.

All material shall be installed alongwith the accessories within the quoted price.

The routes, connections, and termination of conductors are indicated schematically on the drawings.

The Contractor shall, however, decide the exact routes and locations according to the conditions at site, with the approval of Engineer.

The horizontal air terminations or roof donductors comprising of 25 mm x 3 mm copper strip shall be installed on the roof as shown on the drawing. The strip shall be firmly secured to the concrpte surface by means of.copper or brass clamps of approved design at a maximum interval of 1000 mm.

shall be erected vertically to thE s~~facc~y means of copper flange such that the poinL2d end of the rod faces the sky.

'1'he h~

100 .nm d ia hav i nq ., fixing holes for 12.5

mm dia mild s~eel anchor bolts.

The copper rod shall be brazed to the flange.

The anchor bolts shall preferably be placed in positon before concreting is done.

The roof/down conductor shall be connected to the copper rod by means of copper clamp.

The clamp to be tightly fixed to the rod and brazed to ensure low resistance path to earth.

The contact surface between copper clamp and strip shall be cleaned, brazed after bolting and provided with a coat of anti-corrosive paint after installation.

(4)

(5)

The down conductors shall be installed along the shortest possible route from roof conductors to earth electrode.

It shall be secured on the surface of wall by means of copper or brass clamps of type as approved for roof conductors, at a maximum interval of 1000

~n.

In general bends shall be avoided along the routes of roof and down conductors and maximum possible bending radius will be provided at turns.

All joints between conductors shall be electrically and mechanically strong and effective.

straight joints in the copper strip shall be rivetted.

A minimum overlap of 50 mm is recommended at all joints.

At locations where rivetted joints are difficult to make bolted connections shall be provided.

The consent of Engineer shall be obtained for making bolted connections.

The Copper strips shall be thoroughly cleaned and silver plated.

The joint shall be given a coal of anti corrosi vo i"!

i nt after connection.

All accessories s uch zs r.u ts , bo lt s washers, solder, pa ir t.

i~ic.,

~;;h;lll )..

1:, rnrn ish-id hv

Lh o

COil t: rilc't

0.- •

J ~

I •

,,,' d·.

:fI

._-

J

J

1

1

J

1

J

1

]

(6) For each down conductor a removable terminal shall be provided for testing purpose at approximately

].5 metre height.

The location of testing terminals are not shown on the drawings.

The

Contractor must ensure that testing terminal are installed so as to facilitate testing without any interference.

The testing terminals shall be bolted type having a minimum overlap of 100 mm and made in accordance with the specifications for straig~t bolted joints.

The connecting earth lead from test:'9 terminals joint.

All metal work

J and P\~'~S ,at the

-.roof and along conductor route upbo o, d.l~)

:ance

(7) the Engineer shall be obtained

~:o~ -\J1e._ "bonding methods.

The general conditions of soil at site are such that the earth electfodes shall be installe.jby hammering down the electrode in soil, until the top of the pipe is about 350 mm below the proposed ground level.

if hammering down of pipe is not possible due to site conditions, a pit shall be first excavated in bare ground upto the required depth and electrode shall be installed upright in the pit.

The excavated pit shall be back-filled in layers of 250 mm each layer being tamped and consolidated as required.

At the ground level an inspection chamber of ]:2:4 cement concrete shall be constructed having clear internal dimensions of 500 mm square and 500 mm deep as shown on the drawing.

The inspection chamber shall have a heavy cast iron cover supported on angle iron frame.

The cover shall be removable type, as approved by the Engineer and shall finish flush with the ground level.

_j

J

1

I

I

,f

:J

~J

"~a

~

J

"1

~J

, SP- 3-70

I.,

!5.

TESTING

-"J '

(1) General

Upon completion of tQe installation, the Contractor shall perform field t~sts on all equipment, materials and systems. All tests shall be conducted in the presence of the Engineer for the purpose of demonstrating equipment or systens compliance with Specifications.

=1

.,

The Contractor shall furnish, install and maintain all tools, instruments, test equipment, materials, eLc., and furnish all personnel including supervision and

"stand-by" labour required for the testing, setting and adjustment of all electrical facilities and their component parts, including putting the same into operation.

All tests shall be made with proper regard for the protection of the equipment and the Contractor shall be responsible for-adequate protection to all personnel during such tests.

The Contractor shall record all test values of the tests made by him on all equipment, giving both "as found" and "as left" conditions.

Five (5) copies of all test data shall be given to the En9ineer for record purposes.

The witnessing of any tests by the Engineer does not relieve the Contractor of his guarantees for materlals, equipment and workmanship, as specified in the Conditions of Contract.

~.

(2) Insulation Resistance Tests

Insulation resistance tests shall be made on all electrical equipment by using a meggar of 1000 volts.

IThe insulation resistance values of cables, transformers and switchgear, etc., shall be as per B.S.S. and Pakistan

Electricity Rules.

-1

., x

" I

I

"

•!

I

Before making connections at the ends of each cable run, the insulation resistance measurement test of each cable shall be made. Each conductor of a multicore cable shall be tested individually with each other conductor of the group and also with earth. If insulation rrsistance test readings are found to be less than the specified minimum in any conductor, the entire cable shall

~ replaced and the new cable tested.

.

,

,"

' i •

, 'j

]

'1

]

J

]

']

]

]

]

".

l,'

/

I

-;

Sp_3-7l

All transformers a~d switchgears shall be given an inSUlation resistance measurement test to ground after installation but b~fore any wiring is connected.

Insulation tests shall be made between open contacts of circuit breakers, switches and between each phase and earth.

.

If the insulation resistance of the circuit under test is less than that speecified above, the cause of the low reading shall be determined and removed. Corrective mc~sures shall include dry-out procedure by means of he~ters if equipment is found to contain moisture. Where corrective measures have been necessary and the insulation resistance readings taken after the correction has been made, satisfy the requirements herein, repeat insulation resistance measurements shall be made twice and at least 12 hours apart.

The maximum range for each reading in the thtee successive tests shall not exceed

20% of the average value.

After all tests have been made, the equipment shall be reconnected.

(3) Earth Resistance Test

Earth resistance tests shall be.: made by t-

1·",

C::mt:ractor on the earthing system, separating and r2connecting each earth connection as may be required by the Engineer ..

.

It if is indicated that soil tr~atment or other corrective measures are required to lower the ground resistance values, the Engineer ~ill determine the extent of such corrective measures.

The electrical resistance of the E.C.C. together with the resistance-of the earthing lead measured from the connection with earth electrode to any other position in the complete installation shall not exceed one ohm.

Earth resistance test shail be performed as per Electric

Inspector's requirements. Where more earthing sets than one are installed, the earth resistance test between two sets shall be measured by means of resistance bridge instrument. The earth resistance betwee~ two sets shall not exceed one ohm.

The completed Lightning Protection System shall be tested for continuity and earth resistance.

The conmined earth resistance at any point in the system shall not exceed

10 ohm.

(4)

Transformer

In addition to the insulation resistance on the transformer, a polarity and phase rotation test shall also be made.

,

-0

-

1

·1

J

~]

.1

1

-.-

]

J

J

]

~ ,

....

i

""'l

'=-' :

::..1

~]

1

1

..--..Ii

"...

i

f

~~

I

/

.-""" i

Sp,..3...;.72

Insulation resistance of the transformer oil shall be tested in accordance with B.S.S. 148 immediately before use •.

(5) Switchgears

Each circuit breaker shall be operated electrically and mechanically, ascer t aLni.nqthat hand i.e

mcchan i sm are operating.

All iterlock controI c i rcu 1.

L:j shall be checked for proper connections in accordance with the writing diagrams given by the manufacturer.

The Contractor shall identify tho phases of all switchgear and power cable by stencilling the switchgear and tagging the cables so that the phases can be identified for connections to give proper phase sequence.

j

Shunt trip elements shall be checked against rating of equipment served.

Also to be checked for correct size and function are fuses, disconnect switches, number of interlocks, indicating lights, alarms and remote control devices.

Name plates shall be checked for proper designation of equipment served •

(6) Protective Relays

Protective relays points recorded.

operation.

C~T.

shall be set a~d calibrated ~nd test

Trip circuits shall be tested for proper secondary circuit shall be energised and operation of the relays observed.

(7) Completed Tests

After any'equipment has been tested, checked for operatici~ etc., and is accepted by the Engineer, the Contractor shall be responsible for the proper protection of that equipment so that subsequent testing of other equipment systems does not disturb the completed work.

.J

I

<

11

It it

!

1

!

I

I~

, i

!

I

SECTION-IV

BILL OF QUANTITIES

80Q_1

BILL OF QUANTITIES

6.

2.

4.

5.

PREAMBLE

1.

3.

The items mentioned in Bill of Quantities consist of furnishing all p ant, labour, equipment, machinery, app iarice s, materials, fittings, fixtures required for competing the items/works ard the work shall be done in accordance with Bill of Quantities, specifications ard drawings compete in all respects,

The column "Reference Section" irdicates the specification section numbers which as a whole or part (deperding upon Engineer's discretion) of these specifications are to be followed during execution of item of work in accordance with app

icabl

e drawings.

Compete deSCription of items of work in Bill of Quantities, general directions, corditions ard limitations of work, location ard pace of work, app icabte methods, means to be adopted, ty pe ard quality of materials, use of tools, p ant, am machinery are not necessaril y mentioned in the description column of Bill of Quantities.

These shall be referred to in accordance with specifications am drawings.

The bidder may ensure himself for the correctness of quantities ard appication of the irdivid ual items for works as pe r drawings, specifications ard contract documents.

The Quantities contained in the Bill of Quantities are approximate estimated' quantities ard liable to be changed (increase/decrease) or omitted when the work will be actuall y executed.

The Engineer is authorised to delete any item of lJill of Quantities.

The Engineer is al so authorised to incl ud e any nurnbe r of new items in accord ance with contract corriitions.

The Authority does not expressly or by imp ication agree that actual quantities of work to be performed will correspord to B.O.Q.

quantities.

No d aim for the payment will be admissible on account of anticipated profit or variation in overhead experditures for the works not actually performed nor wili any adjustment in the unit fate setforth in the Bill of Quantities be made because of any increase or decrease in the quantities ird icated the-rein.

The rates quoted in the Bill of Quantities are to be full inclusive value of briefly described work indLKling all costs ard expenses together with all risks, profits, liabilities am obligatio!)s se rfo rth ard impl ied wherever in the contract documents.

t.

BOQ--

.J

7.

8.

Unless otherwise stated in the text of the Bill of Quantities the quantities have to be measured ard paid in accord ance with "measurement ard payment of works" clauses given in the relevant specifications or in accord ance with imp! ied meanings of the specification.

Any special rne thod of measurement used as stated in the text of Bill of Quantities is Iimited to the concerned item on! y.

The rates quoted in the rate column are full value of unit price as shown in unit column ard are firm ard final ard shall be for the works invol ved as r:e r drawings, specifications ard contract cord it ions.

PORT QASIM AUTHORITY

BILL OF QUANTITES

SUBJECT:

ANNUAL RUNNING REPAIR/MAINTENANCE CONTRACT FOR

ELECTRICAL EQUIPMENT MACHINERY

&

INSTALLATION AT PQA l

QTY UNIT

RATE

AMOUNT

S.NO

DESCRIPTION

A.

HT SWITCH BOARD (11 KVl

Inspection, repair, maintenance, servicing, over hauling, setting of relay, testing, calibration, adjustment, lubrication, tightening of following par els including all auxiliaries wiring, indication

Lamps, switches, insula.ion, Bus bars, anti-

Corrosive painting complete in all respects a per

Specifications & as directed by the Engineer:-

01.

I IPanels IIKV, 400 Amps, 250MVA HT, OCB

Panal/ H.T. Switch board with J & P OMZ

Mechanism at M.S.S.

+

FOTCO

02.

Same as (1) above but 5 panels at Electrical

Building-A/Sub Station No.12.

03.

Same as (1) above but 4 panels at Electrical

Building-B/S.S.No.5.

04.

Same as (1) above but 18 panels at M.D.S/S.S.

No 2 and 3

(J &

P's Make).

05.

4 Panels 11 KV, 400 Amps 250MVA, H.T.

Switch Board with minimum oil Circuit Breaker

(MOCB) (Siemens type) at S.S.No.l.

06.

Same as (5) above but 9 panels at S.S.No. 4,7.

and MSS Building (Molasses outgoing feeder).

07.

3 Panels, IIK.V.400 Amps,250MVA.H.T.

Switch Board with Bulk oil Circuit Breaker.

(BOCB) (FICO TYPE) at S.S.No.8.

08.

Same as (7) above but S.S.No.9

&

10

09.

3 Panels 11 KV, 400 Amps,250 MVA ,HT.

Switch Board (Delle Alsthom make) at S.S.No.6

10.

5 Panels 11 KVA,400 Amps 250 MVA,HT, OCB

Panel (BOCB) FICO Make, PDS-l at Housing

Complex.

11.

Same as (10) above but 3 panels at SOS.No.5 at

Housing Complex.

12.

Same as (01) above but 3 panels at Industrial

Sub Station.

13.

Same as (5) above but 13 panels in S.S.No.

EMil ,2 & 3 at Molasses Area.

11

05

04

18

04

09

03

06

03

05

03

03

13

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

BOQ-O~

1

B.

POWER TRANSFORMER:

Inspection, Servicing/Over hauling, repairing oil

Leakages from HT/LT Bushing and Main tank

Gas Kit/welding in the metallic part through where the oil leaking and insulated tapping of

HV/L V terminals and socket and providing all reinsulating the life parts on the transformers, checking of Tap changer, operation and oil level

In indicator and providing anti corrosive painting on main tanks of any metallic pat1s if required, checking of net ural earthing, main lead earthig,

I testing and commissioning as pCI'directed by the

Engineer:-

I i

I i

I

I

I i

!

i

I

1 i

I l ___

S.NO

DESCRIPTION QTY UNIT

01.

1500 KVA, 11 KV/415 Volts Step down distribution Power Transformer (Siemensl J & P 05

Make).

02.

Same as (01) above but 1000 KVA Power 01

Transformer (Siemens Make)

Nos.

No.

03.

04.

Same as (01) above but 750 KVA, (Climax/J & P

Make)

250 KVA Power Transformer (Unilec,France

Make) at IOCB.

16

02

Nos.

Nos.

4.

5.

6.

1.

2.

3.

7.

8.

C.

a.

1500 KVA, 11/00415 KV Indoor Power

Transformer (Siemens / J& P Make).

b.

Same as above but 1000 KVA Power Transformer

(Siemens Make).

c.

750 KVA 11100415 KV, Power Transformer

(Siemens/ J & P Make).

d.

250 KVA 11/00415 KV, Power Transformer at

IOCB.

e.

H.T.Switch gear Trollies.

2.

Refurbising & Topping up of Power Transformer

I Switchgear oil as per specifications and as approved by the Engineer.

D.

CENTRIFUGING OF TRANSFORMER OIL

Centrifuging 1 dehydration of oil for HT OCB 1

MOCB Panels and Power Transformer at the site

(without disturbing the power supply) along with replacement of silica gel and checking Iremoving of leakages after dehydration of the following

Power Transformer & HT Switch gear trollies:-

LT.SWITCH

BOARD (llKV/415V)

Insulation, testing, cleaning, adjustment, repair, over hauling, servicing in Switch Board, rectifiers & Power factor improvement plant, anticorrosive painting of existing panels, complete in all respect as per specification and as directed by the Engineer:-

L.T.Switch Board at S.S.No 1 & 2

L.T.Switch Board at S.S.No

4

& 7.

L.T.Switch Board at Bldg B, & MSS.

L.T.Switch Board at S.S.No,

3,8

&

9,

L.T.Switch Board ofS.S.No

6 at IOCB.

L.T.Switch Board at FOTCO,lndustrial and

S.<).No.10

L.T.Switch Board ofEM-I,2 &

3 at Molasses

Area.

L.T.Switch Board ofPDS-I & SDS.No.5 at

Housing complex.

05

04

06

06

06

02

15

10

08

01

16

02

60

500

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

No

Nos

Nos

Nos

Lt.

RATE AMOUNT

BOQ-04

S.NO

DESCRIPTION

E.

BUS TIE DUCTS

Servicing/Over hauling of Main Bus tie duct, tighting of Bus bar connections ,removing the discoloring from the Bus bar, providing complete inulation and air wind if required, re-painting with anti corrosive paint and checking of earthing,

1.

etc,complete in all respects.

Bus Tie ducts of 1200 Amps rating from 750

KVA Power Transformer to main L.T Switch

Board, 2.5 MM thick & cover plate 2 MM thick

QTY UNIT RATE AMOUNT

01

Job

F.

HT/LT POWER CABLES

1.

Providing & laying of following Sizes.

15 KV,3 Core,HT cables Grade copper conductor

XLPEIPVC/PVC/SWAI to IEC 502.

as per specification & directed by the Engineer:-

(Cables shall be, Pakistan cables Ltd. or approved/ i.

ii.

iii.

equivalent

Make).

240 Sq rnm

185 Sq mm

150 Sq mm iv.

V.

\)

\.

2.

01

01

01

RM

RM

RM

120 Sq rnm 01 RM

50Sqrnm

~c..."""e..o..i~~{O~~..s..

,?:>~a

'8."'\""'''''''

01 RM

~_w,.,.""'"

CQ"'~~&.;i

C""\~~ .... ~

600/1000Volts,

4 Core Copper Conductor, ~ \ """ .

U armoured cable,PVC/PVC/SWA of the following sizes:- (cable shall be Pakistan

Cables Ltd. or equivalent approved Make).

a.

b.

f.

g.

h.

c.

d.

e.

i.

'3"

G.

185 Sq mm,

120 Sq mm,

95 Sq mm,

50 Sq mm,

35 Sq mm,

25 Sq mm,

16 Sq mm,

25 Sq mm, 3 Core

10 Sq mm,3 Core.

.2.~()S.~"",,,,,,,,

,",c.~ne.

Grounding I Lightening Protection

Inspection, testing, rectification, measurement of earthing resistance to achieve desired level of resistance and continuity with replacement of copper rod / copper plate size W' x 2' x 2' upto water level , construction of chamber and fixing clamps for earthing leads, complete in all respects

01

01

01

01

01

01

01

01

01 o x

RM

RM

RM

RM

RM

RM

RM

RM

RM

~ ~.

1.

at the following locations linstallations.

Sub Station, H.T/ LT Switchgear, Generator

2.

room earthing / grounding system.

Lightening protection at M.W. Berth No 1 to 4 including bounding of rails etc

3.

Lightening protection of Road Lighting poles

4.

Lightening protection of Berth Lighting Towers

5.

On rooftop of Transit Shed Building NO'1& 2.

6.

Lightning protection on top of Steel Tower

'------

/Antena Tower

01

01

01

01

01

0 I

Job

Job

Job

Job

Job

Job

._------------'------

-

--_._--

L

-_.-.-

BOQ-05

a.

b.

c.

d.

~-

5.

S.NO

H.

1.

2.

3.

4.

5.

I.

1.

2.

3.

4.

a.

b.

c.

d.

e.

6.

a.

h.

DESCRIPTION

ANTI CORROSIVE PAINTING OF STEEL

STRUCTURE:

Anti corrosive painting of the following structures

i/c

complete de rusting , cleaning surface preparation, appliances of one coat epoxy enamel paint and two coats of epoxy primer finish paint, supply of all material , paints , tools, labor and plants , complete as per specification and as directed by the Engineers-Paint shall Bitumen

Paint or equivalent make)

Road light poles having 9.6 meter long including bracket, junction box, foundation plate, nuts bolts and light fixtures, cornp.eie in all respects.

Same as above but Berth lighting Towers

&

Service Jetty.

Same as above but Shore Connection Boxes for

Power Supply

Same as above but Major Power D.B's. at M.W.

Same as above but Antena Tower having

80

Meter high

Location of Fault 1Jointing 1Termination Kits

Excavation of the HT 1

L

T cable trench of required dimensions along with all kinds of soils

Backfilling of the trench including tamping, consolidation placing of tiles etc as per specification

Labor charges for laying of different sizes HT/LT distribution Cable Network in the under ground cable trench C Cables shall be supplied by PQA).

Providing and Fixing of

15

KV, HT cable joint for

3 core Copper Conductor SWA cable Heat Shrink resin type with all Termination Lugs with ferrul etc for following sizes, complete in all respects:

(Cable Joints 1 Termination kits shall be 3 M type or equivalent Make.

240

Sq mm

185

Sq mm

150

Sq mm

50

Sqmm

~oo"2."""''''''-,

~',

"~~J~"""''''~'''''-~.

Providing and Fixing of

11

KV indoor

1

outdoor

Termination, kits heat shrink type for HT cable of the following Sizes:-

240

185

Sq.

mm

Sq. mm

150

120

Sq. mm

Sq mm

50

Sq mm

Supply and installation of

600/1000

Volts 4 core armoured LT cable Jointing Kit, Heat Shrink type of the following sizes, (Cable Joint shall be 3 M type or equivalent make ).

185

Sq mm

120 Sq

111111

'-47..'-\00;;;""",-"",

QTY

300

25

01

04

01

01

01

01

01

01

01

01

01

01

01

01

01 o\'

UNIT

Nos

Nos

No

Nos

Nos

Cum

Cum

RM

No

No

No

No

No

No

No

No

No

~o,

01

No

Q!

J

~(!____

RATE AMOUNT

BOQ-06

_

S.NO.

DESCRIPTION c.

95 Sqmm d.

70 Sqmm e.

50 Sqmm f.

35/25 Sqmm

J.

16/10 Sq mm

7.

Fault locating charges in the HT

/L

T distribution cable network through utilizing fault locating equipments. The equipment shall be utilized in their own vehicle alongwith skilled persons.

8.

Replacement of GI Steel sheet HT

/L

T Switch gear trollies as per site requirement alongwith drilling & installation of nut & bolts etc. complete in all respect. Thickness of sheet shall be 14 SWG.

9.

Overhauling, servicing, major repair/maintenance of power transformers and replacement of gas kit and other leakage inside the tank of transformer etc.

refurbishing and topping up of transformer oil.

a. 750 KVA 1110.415KV Power Transformer

(Siemens/J&P & Climax etc) b. 250 KVA 1110.415KV Power Transformer

(Siemens/J&P & Climax etc)

QTY

01

01

01

01

01

01

01

01

01

J.

Routine inspection, testing, cleaning, adjustment, servicing minor repair/maintenance, repair of all equipments i.e. HT Switch board, L T Switch board, power transformer, Bus Tie ducts & earthing system in this following location:- (This works will be undertaken as and when required basis).

a.

Same as above but SS-1 b.

-do- but SS-2 c.

-do- but SS-3 d.

-do- but SS-4 e.

-do- but SS-5 f.

-do- but SS-6 g.

-do- but SS-7 h.

-do- but SS-8

1.

-do- but SS-9

J.

-do- but SS-1O k.

-do- but SS-EM-l,2 &3

1. -do- but FOTCO S/Station m -do- but Industrial S/Station

01

01

01

01

01

01

01

01

01

01

03

01

01

Job

Job

Job

Job

Job

Job

Job

Job

Job

Job

Job

Job

Job

Job

Job

UNIT

No.

No.

No.

No.

No.

UNIT

RATE

~o&-o"\

TOTAL

AMOUNT

Job

No.

I

n.

o.

p.

K

-do- but MSS Station

-do- but PDS Station

-do- but SDS- V

Replacement of Parts/ Equipment/ Workshop/

Fabrication works

Replacement of HT/LT cables power transformers

HT/LT Switch gear equipment, machinery, lamps, relays, meters, fuse, CT/PTs and other components and parts, workshop/ fabrication work of DB/ panels/ contr~tc profit @

(Contractor will be paid "'~Io of t e rice list of the manufacturing reputed authorized dealers or workshop of DB/

Control box manufacturing.

01

01

01

Total BOQ Value

=

Rs.

Job

Job

Job

~y;~~ \h.'-O '"

C>

~ ~\.1..'M..:-

~~DO/ooi..

L

~"" ~O'-l

-e_~~~\

"'~'l~)

_

(Rupees

(PRICE IN WORDS)

--J

Seal and Signature of the firm

Note:

(Separate Rates of terms as per Annex-I enclosed with BOQ are also to be quoted and these terms shall not be accounted for in the above total).

I

I

I

I

,I

I

I

I

I

I

I

I

·1

I

I

I

I

I

I

I

,I

(1)

Annexure-I

LIST OF PARTS, EQUIPMENT MATERIAL OF WHICH THE RATES ARE TO BE

QUOTED BY THE BIDDERS WHICH SHOULD BE VALID DURING THE

CURRENCY OF THE CONTRACT. THESE ITEMSI WORKS MAY BE ORDERED

TO BE EXECUTED

1

MATERIAL SUPPLIED IN CASE OF EMERGENCY BY THE

ENGINEER.

S.NO.

A.

DESCRIPTION

Providing,

Commissioning fixing, Testing

& of the following· equipment as per specification drawings and as directed by the Engineer.

I

UNIT

RATE

AMOUNT

I

I

I

1.

HT Switchgear panel for 11KV, 250/350

MV A, 3 phase BOCB panel type of the approved make with all protection,

Metering, CT & PTs, complete

111 all respects of the following rating,

Specifications, drawing and as directed by

I

I

I the Engineer.

I a) 400 Amps.

b) 600 Amps.

.

;

(a)

I

IS lime

as

(I) above but 1111l11mUm

Circuit Breaker

(I\'10CB)

type of the

.1

I following ratings.

a) 400 Amps b)

600 Amps.

- ..

•i

(b) IIKV, j phase,

,100

Amps. HT Ringmain outdoor unit oil or vaccum type, similar to KESC standard for Loop IN!

Loop OUT of cable (HT) and providing out going for PMT with all protective relays, Metering, CT/PTs, complete in all respects.

No.

'

No.

.

No.

No.

Job

2.

Power Transformer llKV/415 Volt with double flow at Buchhlay relay, terminal sockets, silica gel breather dial type terminal & conservator type ONAN, cooling with temperature rise 45 to 55°C, temp 40°C of the approved make complete in all respects of the following: a) 250 KVA b) 750KVA c) 1000 KVA d)

1500 KVA

No.

No.

No.

No.

.

?

I

I

I

I

I

I

,

I

I

I

I

I

1

I

I

I i

,

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

(2)

3.

4.

5.

6.

3 Panel, lIKV, 3 phase, 400 Amp. HT

Switch Board comprising of one incoming and outgoing panel including termination kits and all other necessary protective relay, metering, CT and PTs of the approved and specifications.

Job

I' i

I

Same as (3) above but single HT Panel, for IIKV

1 415

Volts Switch Board incoming and 1250 Volts outgoing panel of the approved make and specifications.

Making of earthing system with high conductivity copper plate size 2'x2' x W' or copper earthing electrode 01 inch dia, l

Oft long breading in the earth upto water

Job level with 02 No flexible copper conductor 70Sqmm, Single core, standard conductor drawn in 43mm dia GI pipe for

I wiring in HT/LT Switch gears and Power

I

I

Transformers etc. complete in all respects.

Job

1250 Amps, 415 Volts 3 phase, 4 wire, LT

Bus tie duct suitable for connection between the LT side of Power

Transformer and Main LT Switch Board with OMZ Mechanism.

No.

7.

I

LT Switch Board totally enclosed with

HRC fuses, out door type of the following rating & Energy Meter.

a) 400 Amps. TP & N b) 300 Amps. TP & N c) 200 Amps. TP

&

N d) 100 Amps. TP & N

No.

No.

No.

No.

8.

Energy Meter, 3 Phase, 4 Wire, tropicalized 41515 Volts ofthe following rating Siemens Make or equivalent, 3x-15

Amp 3x230 / 400 Volts.

a) 400 Amps.

b) 300 Amps.

c) 20Q Amps.

d) 100 Amps.

No.

No.

No.

No.

.' j

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

9-

10-

11-

( 3 )

Same above (8) but single phase

Energy meter.

a) 60 Amps.

b)

~O~Amp.~ ..

No.

"

"

Batteries of Nickal cadmium Block

Battery Made in Sweden type

L 302-10.

No.

Am- meter of the following ranges pannel type. ~~ \\. ....,~ c..", '(

~\.~s.

a) 0-1200 Amps.

b) 0-400 c) 0-300

"

" d) 0-200 "

• r

"

"

12-

13-

14-

IS-

Volt meter of the following ranges suitable for pannel mounting of the.

approved size & make.

a) 0-415 Volt (Phase to phase & single phase) b)

0-2S0

Volt (single phase)

RYB Switch pannel type volt meter ~~.

selector

R

YB

Switch pannel type Ammeter .-" selector.

Sodium Lamps of 2?0 Volts of the following sizes

I wattages:, Philips

I

Make.

a) 400 Watts, (SON-400 Watts)

b)2S0" ;;

c)

ISO" ..

d)

2S0

"Mercury Lamps.

e) f)

ISO

"Mercury Lamps

\000" ~ ~~

-\.o.w..."'s

~ 400 "

'{\\?

ccu~

Lam\,

No

"

"

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

16-

17-

19-

20-

21-

( 4 )

220 Volts Ballast for sodium/Mercury lamps for the following wattages of

Philips Make.

a) 400 Watts, (BSN-400 L34) b) 250 " (" 250 ") c) 150 " ( " 150 ") d) 400 Watts ~~,,<:.J.."''\'i\

\_c!"~.

e) 250 " ~ ~ f) 150

"",

~~"S~

.,'\..0"",,,\,,.

g)

.\(,)00

"~c,~ '.',.' '._ , -,

"X.

(100-400) Watts, l.\.

,S;Volts, Ignitor for Son Lamps (SN-58) SoN'

~c

(PHILIPS MAKE).

'\)C\CI~~

'S:.~~\~\~o~\ ~~\...o..~

,~~ \~ ~o.\-~",\

t-,r;,.....~~{...

-

15 Amps., 600 Volts, Proceline lamps

~"-~\l~-holder (Special type).

''t_ u,_o

No.

Providing, fabrication, install: ing

& erecting flood light I street light pole,'fii steel tublur pole No.9770mm height,

I external dia meter varying from 140 to 86.25mm

and wall thickness varying from 4.87 to 3.25 and 25mm thick base plate, nuts, washers etc. all welding. Complete in all respects as per drawing & specifications.

No.

Single street light mounting bracket of37mm dia GI Pipe of require length as shown on drawing, but to shape and as directed at site, including providing & fixing cost iron.

Pole cap, clamps & supporting flat steel installation material l complete in all respects.

No.

Control' box for street light control gear which include providing and fixing incoming & outgoing cable gland, terminal block, HRC fuses of specified capacity and iternal wiring etc. Alongwith installation of ballast, ignitor already supplied with road light fixture.

The control box should be suitable for 250 Watts.

No

I

( 5 )

I

22-

I

I

Sodium lamps street light fixture with.

250 Watts, SON Lamps, Ignitor and ballast built

In compartment for ballast, water proof procelaing lamp holder etc.

The fixture shall be

Philips type HRC-501~or

511.

I

23-

Installation of above street light fixture installed pole bracket.

I

I

I

I

24-

25-

Wiring of street light point from connected Box at the base of the pole to light fixture at the top with 2.5

sq.mm.

Three core,

250/440

Volts grade copper conductor circular, PVC insulated, PVC sheathed cable through hallow of the pole.

Supply and installation of 2.5 sq.mrn,

PVC insulated cable as sec along wiring to light fixture.

I

26-

I

I

I

I

Constructing RCC Manholes of under mentioned types, including excavation, backfilling disposal of surplus earth, providing

& laying class

E and class C concrete using sulphate resistant cement

In foundation and structure, rein - for cement, frame work, vibrating, curing and fixing heavy duty cost iron cover

'/aJ.\~

ongles frame, etc.

Complete in all respects as per drawings and specification.

I

I

I

27.

28.

I

I

I

'-----------'-a) 6 b) 25 c) 50 d) 63

Supply of following SIzes of concealed class "B" PVC Pipes.

a) 50 mm dia b) 100 " c)

150 "

SupPI~nstallation of 50 type ruses with base.

v

Volts Bottle

Amp.

"

"

"

"

"

No

No.

"

"

No.

No.

"

"

No

I

!

I

I

I

I

I

I

I

I

:1

I

I

I

I

I

I

I

I

I

I

I

I

I

29-

30-

31-

32-

33-

( 6 )

BNH type low voltage HRC fuses link 500 volt, AC & DC.

a) FNH - 2 - 60 Amps.

b)" 100" c)" d)"

150

400" e)" 300'

I

I'

Rotary switch

,3 phase 4 wirP. 415

Vil>lt

No.

, a)

.35

Amps .

" b)

63 Amps c) 100 Amps.

"

Luge for the following sizes of copper conductor cables.

a)

6 sq.mm.

b) 10 " c) 16 " d) 25 " e) 35 " f) 70 " g) 95

" h)120 " i) 150 " j) 185

~'!2.b..() ~

No

"

"

"

"

"

"

"

Cleaning Jungle by cutting removing all shrubs, trees up to (152 mm) girth etc. and taking out their entire roots and filling the hollows with soil, including stacking the serviceable materials and disposal of usla:S<~ materials as directed upto

300 RM.

Sqrn.

No.

"

"

"

"

"

-

.

Cleaning of manholes as wheat, slit and dewatering, rebbish, purring etc.

including disposal of excess, designated place.

Complete in all respects.

No

------

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

(7 )

SUBJECT:

S. NO.

DES C RIP T ION

BELECTRICAL WORKS BUILDING

1.

UNIT QTY.

Wiring of light circuits from distribution board to point / switch with 2.5 sq. mm PVC cable including concealed PVC conduit, E.C.C. and ""\~~ all accessories.

RATE AMOUNT

2

Wiring from point to switch including any switch to switch wiring with 1.5 sq. mm PVC ,,~~ cable including concealed PVC conduit,

E.C.C. and all accessories.

3

Wiring from light point to point with 1.5 sq.

~~\: mm PVC cable including concealed PVC conduit, E.C.C. and all accessories.

4

8

6

7

5

Wiring of 3 pin 15 amps socket outlet with ~ sq. mm PVC cable from distribution board to point including concealed PVC conduit,

E.C.C. and all accessories.

Supply and installation of PVC pipe underground at electric / communication service entrance to buildings.

a) 50mm dia.

b) 32mm dia.

<:)

::l.

S ""'-.~

0.-

Supply and installation of plastic moulded gang - switches with sheet steel box:

Meter

Meter

~.d..c.a) I-gang switch b) 2-gang switch c) 3-gangswitch

No

No

No

Supply of one pole, 5 amp. 250 volt, piano type single switch. ~~~

~o....\.<:""'~_

No

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I a.

b.

c.

21.

a.

b c d

20.

(9)

S.NO.

17.

DESCRIPTION

Supp1y~ Installation of 220 volts ceiling fans along with fan hook and fan regular, complete with accessories of the following sizes.

a.

b

18.

UNIT

~6"

'-\~.,

No.

..,,\0

"

No.

Supply and Installation of (8)" inch

220 volts 50

cis

Exhaust fan. The fan shall be tvf/s

~"f;.;_

0 .....

~c~ ~

No.

or equivalent Make -

01

01

01

TV.

19.

Supply & Installation of 440 Voits

3 phase panel type MCCB Tcrasaki

Japan Make of the following sizes.

300 Amps! 400

Amps.

200 Amps

100 Amps

60 Amps

No.

No.

No.

No.

01

01

01

01

No.

No.

No.

01

01

01

RATE

AMOUNT

1.

j.

a b.

c d.

e.

f.

g.

h.

22.

Supply of

PVC insulated nonsheathed cable

4501750

Volts single core copper conductor cable

( I()

I

I of the following Sizes (Ref 6491 x),

Cable shall be M/s Pakistan cables or equivalent make

I a.

b.

1.5 Sq mm

12.5 Sqmm

04 Sq. mm c.

I d.

06 Sq. mm e.

10 Sq. mm

16 Sq. mm f.

I g.

25 Sq. mm r

RM

RM

RM

RM

RM

RM

RM

I

I

I

23.

Supply of PVC Insulated PVC sheathed 300/500 Volts, Two core.

Copper Conductor cable for the

I following sizes (Ref 06192y).

Cable shall be M/S Pakistan cables

Ltd. or equivalent make

I a

1.0 Sq. 111m

I b.

c.

d.

1.5 Sq. 111m

2.5 Sq. 111m

04 Sq. mm

I e.

f.

06 Sq. mm

10 Sq. mm

I

I

24.

Supply of circular PVC insulated

PVC Sheathed 300/500 Volts 3 core copper conductor cable of the following sizes. Cable shall be M/s

Pakistan cables Ltd. or equivalent make.

I a.

') - S qmm b.

4.0 Sq. mm

6.0 Sq. mm

I c.

d.

10.0 Sq. mm

I

7/

I a.

b.

c.

I d.

I

RM

RM

RM

RM

RM

RM

RM

RM

RM

RM

90

90

I

I

I

I

1

90

90

90

90

90

90

90

90

1

I

190

190

1

90

1

90

1

90

1

90

~\\)

SI.

DESCRIPTION QTY UNIT

25. Replacement of 3 pin, 15 Amps combine switch 01 No.

socket (PPI Make)

26. Replacement of regulator/dimmer of ceiling fans

01 No.

27. Rewinding of ceiling fans of the sizes 48"/56" 01 No.

01 No.

28. Painting of 48"/56" ceiling fan

29. Replacement of Garden Light fixtures with lamp, ballast, capacitor etc of the following wattages of

Mis.

Philips Ltd or equivalent make a. 23 or 25 Watts b. 45 Watts

01 No.

01 No.

30. Replacement of 5 or 10 Amps plastic switch sheet with switches, AQWA links or equivalent make a. 01 or 03 gang b. 06 gang c. 08 gang d. 10 gang

01 No.

01 No.

01 No.

01 No.

31. Rewinding, installation & fixing of 03 phase or 01 phase electrical motors installed at existing locations Siemens or equivalent make a. 01 Hp b. 02Hp c. 05 Hp d. 15 Hp e. 40Hp f.

100Hp

01 No.

01 No.

01 No.

01 No.

01 No.

01 No.

UNIT

RATE

32. PVC/MS Bolts for installation of electrical motors the following sizes a. 3"x3" b. 3"x8"

33. Replacement of existing distribution board with new modem MS Steel Board with locking arrangement for safety of DB and painting with animal paint of 02 coats of approved primer to entemal surface including base and rubber seal etc of the following sizes with thickness a. 24"xI8"x8" thickness 14 SWG b. 24"xI8"x6" thickness 14 SWG c. 18"xI5"x6" thickness 14 SWG d. 36"x24"x6" thickness 14 SWG

01

01

01

01

01

01

No.

No.

Job

Job

Job

Job

34. Anti corrosive marine painting of the following flood lighting

Towers/structure including complete de-rusting, cleaning surface preparation, appliance of one coat epoxy enamel painting &

TOTAL

AMOUNT

two coats of epoxy primer finish paint alongwith supply of all material, paints, tools labour and plants etc, complete in all respects. Paint shall be marine standard suitable for flood lighting towers and as directed by the Engineer: a. 20 meters high b. 30 meter high

35 RepairlMaintenance and replacement charges of

1000 Watts Flood Lighting fixtures/components without replacement parts/components to be checked and rectified the faults and replacement of control wiring PVC connectors on the top of the Towers and other major components

& accessories supplied by

PQA.

a. 20 meters high b. 30 meter high

01 No.

01 No.

01

01

Job

Job

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

\\'0)

B

C

D

6.

S.NO

-.-.---~-.c,-

,

-.~~·ci~~o..

OF:SCRIPTION

"'-""-~"* c..~

List of com(!onents

I Accessories of MIS

Siemens Pakistan Engg Com(!any

Make

I.

Replacement of the following MV/LV

Componentsl Accessions ).

MV fused load Break Switch 630- 12KV. type

3C.I 1462- OCr02

Drive Mechanism for load Break Switch type

2.

BUC-6314-1 BB44

MV Fuse - 63, Amps,

3.

10/12

KV type 3GD 1213

01

QTY

01

01

4.

5.

A

-3B

MV Insulators type SIGA - 20

LV ~

. Load Break Switch of the following

Sizes.

400 Amps

250 Amps

160 Amps

100 Amps

Ammeter Amps having CT

-1500/5A

type EQ96

01

01

01

01

01

01 a.

b ..

c.

of the following ration.

400/5

Amps.

300/5

Amps, d.

7.

8.

9.

10.

200'5 Amps.

:50)/5

Amps.

Same as (6) above but

0-400/5A

01

KWI-l Meter 3 phase 4 wire troplicalized 3x - SA.

01

3x

2301

400V,

50C/S

Class - 2

Indicating lamps complete set (Red & Green)

01

LV Fused Load Break Switch. 250 Amps. type 3

01 a

II.

VF-1231 IDK II-OAAO.

LV Moulded case Circuit Breaker. 3 pole.

500/660

Volts having following sizes.

28- 40 Amps

01

01 b

45- 63 Amps c.

100- 250Amps

01

01 d.

250- 400 Amps a

12.

LV Miniature Circuit Breaker Single pole for

3KA pole of the following sizes

32 Amps.

01 b 16 Amps.

01 c

10

Amps,

01

13

(a)

I.V Air Break Contractor TP- 2 No+ 2NC contacts 220V A.t otthe following Sizes.

63 Amps

01

01

(b) 100 Amps

01

( c)

14

(a)

(b)

(c)

(d)

(e)

250 Amps

11 KV epoxy resin IS VA of the following CT ratio.-

400/5

Amps

300/5

Amps

200/5

Amps

10015

Amps

SOlS Amps

01

01

01

01

01

{INIT

No.

No.

Set.

No.

No

No

No

No

No.

No.

No

No.

No.

No

No

No

No

No

No

No

.

.

No.

No.

No.

Set (03

Set

Set

Sd

Sl.!t

RATF:

...

_

......

_

....._

...

AMOUNT

..

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

( \'\)

S.NO

15

(a)

DESCRIPTION

LV Current Transformer type 4 NC having following ratio.

400i5

Amps

(b)

(c)

Cd)

16

17.

200/5 Amps

100/5 Amps

50/5 Amps

LV Pacco switch TP 100 & 63 Amps a b c

18

19.

20.

21.

22.

LV Tumbler Switch TP of the following Sizes

40 Amps.

50 Amps

63 Amps

LV Air Break Contractor TP Size -2 .

2 NO+2NC Contacts 220V AC.

Auto/manual Selector Switch

DZ Fuses 80A with adaptor, Base, Collar, Cap.

Same as (20) above but 63A.

1600A WE Circuit Breaker Drive Installations

23.

24.

Anti condensation heater installations.

Mounting Plates for 60mm Panel.

25.

Breaker Mounting Insulator

26..

Insulator for Bus bars (300)

27.

30.

Wiring for Anti-condensation Heater.

28..

M.C.B. for Heating 6 Amp Insulation

29.

Load Break Switch overhauling.

II KVIlIOVolts, Jphase. live links Potential

Transformer 100 VA Accuracy Class B.

QTY

UNIT

01

01

01

01

01

01

01

01

01.

01

01

01

01

01

01

01

01

01

01

01

01

Set

Set

Set

Set

No.

No

No.

No.

No

No.

No.

No.

No.

No.

No.

No.

Set

No

No

No

No.

RATE

AMOUNT

r

I l '

!

I .

i

I'

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

('\9 .

S.NO

DESCRIPTION

c ~\'~

Replacement, testing and commissioning of the following'

Electrical Installation /

Equipments in the existing

SubStation No. 1 as per specification and as directed by the Engineer.

QTY

(i) 400 Amps three pole; 11 KV

Load Break Switch type LTRI5,

400 Amps (Siemens Make)

(ii)

11 KV HRC Fuse 63 Amps,

Siemens Make Type 3GA-2216

(iii)

Diazed Fuse 80 Amps with adapter, Base, collar, cap, etc

(iv) 6 Amps Selector Switch

(v) ON/OFF Indication lamp with holder

(vi) 50x 5 Square mm Bus bar.

(vii)

NRK Hook up Terminal

(viii)

Painting, Servicing and

Protection, Testing of three additional OCB as per existing position

(ix)

1250 Amps, 3 pole circuit

Breaker IR- 630, ICU-70 KAl415

Volt with over current Release N-

Release :15000 Amps Fixed -

Mounted with under Voltage

Release with connecting leads Ac

50/60HZ 380 to 500 volts W/ 0

Auxiliary. And Alarm Switch accessories

Type # 3VF7211-2BM60-1JAO

(Siemens Make)

01

03

01

01

02

10

03

01

01

UNIT

No.

No.

No.

No.

No.

RM

No.

Job

Job

.

RATE

AMOUNT

I~---------------------------

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

( l6)

7.

8.

S.NO

~~,::\\\)

I.

2.

3.

DESCRIPTION

M/S .. JOHNSON

&

PI-IILIPS LTD.

HT OCB (.I & P ) Make.

QTY

Replacement Of Following

MV/LV Componcnts/ Acccssm'j(.·s.

II K V 3 Phase spout

& shutter assembly for cable

Same as No.

I above but for bus bar to bus bar

01

01

Moving contact assemblies fur 11 KV, 350 MVA.

01

UNIT

No.

No.

Set.

4.

Set.

Long & Short finger contact fur fixed contact 01 assemblies for 11 KV. 350 MV A, J-I.T. J&P.

OCB (36x36) or ( 18 + 18)

5.

6.

Sets of Copper Bus bar AG-16 to

AG- 16

Job.

Set.

Bulbs for Indicating lamps SS/30 B along with 0 I glass and base holder etc.

2-5A Time Limit Fuses.

lIKV/IIOVOLTS

01

3Phase Five Limb Potential 01

Transformer complete in all respect with proper

Set.

Job.

commission / installation as per existing 100va

Class B Accuracy.

Replacement of ~ No. 11 KV.ISV.\ Class 5 PIO epoxy resin CT ratio of the following Sizes

RATE AMOUNT

A

B

C

D

E

16..

,A

B

, C

I

10.

D

II.

I

12.

13.

14.

15.

400/5A.

01

300/5A

01

ISO/SA.

01

50/5A.

01

12KV Fuses Grips for

HRC fuses eX (:,~ , c..

C;;

I

VLO

~""'~s-

0

Power Factor Improvement Plant 150 K VAR.

0 I

I

Capacitor Bank 415 Volts 3 Phase oil

. impregnated light

ON/OFF Push Button 0 I

Timer 50-60HZ, 220Volts & Type: 7LR8020.for

01

24 Hours.

Auto / Manual Selector Switch

01

Ammeter Meter Size 144 x 144mm of the following Sizes

0-800/5 Amps

01

0-400/5 Amps

01

0-200/5 Amps

01

0-100/5 Amps

01

0-50/5 Amps

01

Replacement of OCB Trolley with· OMZ 0

I

Mechanism J & P make II KV 400 MV A as per

PQA Requirement.

I

Set

No.

No

No.

No.

No.

No.

Job

Set

Set

Set

Set

Set

No.

I

I

I

I

I

I

I

I

I

I

I

I

I

I

I

(

,~)

A

B

C

D

E

19..

\a b c d

S.NO

17..

e

18..

B

A.

DESCRIPTION

Control Fuse 415 Volts with Busc collars.

adopter, bottle fuse of the following:-

63 Amps

35 Amps

25 Amps

10 Amps

06Amps

HRC Fuses with for 415 Volts LV base complete in all respect. for the following sizes.

400 Amps

200 Amps

QTY

01

01

125 Amps

100 Amps

63/80

Amps

Magnetic Contractor, SG-IO, 3 Phase, (Fauji I

National Brand with 220 OR 440 Volts Operating

Coil. or equivalent Make)

250

Amps

100 Amps to 400 Amps.

01

01

01

0 I

01

01.

01.

01.

01.

01.

UNIT

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

RATE

C 60 Amps n

35 Amps

~-tV

MIS FAIZI INDUSTRIES COMPONENTS &

I.

2.

3.

01

0 I

ACCESSORIES

II KV 400 Amps 250 MV A. HTOCB

(FICO Make).

Dehydrated Transformer Oil for OCB

01

01

IIKV, 15 VA 5 PIO, 10 VA Class-l rato 501515A

01

Ltr.

No

4.

5.

6.

7.

8.

9.

10.

II.

(P+M).

Same as (3) above but

CTs Ratio 01

4001515Amps (P+M).

FI cq

11 KV.

Potential Transformer's ratio 01

11000/110 Volts. . .

phase. (Resin Cast)

Indicating lamps

(Red/Green) complete set lIKV, 100A, HRC Fuses with grips

01

01

400 Amps, 250 M.V.A. I-I.T. Load Break Switch 01 fuse type, 3 Phase Complete as per existing

Main Bus Bar sets as per specification with 100 0 I

Amps, IIRC Fuse,

63 Amps, Insulators for Bus Bars (400) .

LV, 415 Volts 3 Phase Insulators for Bus bars

0 I

01

Set

Job

Set

No

No

No

No

No

12..

(30D)

Anti Condensation Heater for the following Sizes 01

No

AMOUNT

I

I

S.No.

DESCRJPTION

~.b

RIM OF STEEL STRUCTURE/

1

DOORSIVENTILATORS

RepairlMaintenance, resetting hinges of

QTY

UNIT

RATE

AMOUNT

M.S. Steel Door IIc louver etc of existing

Sub-Stations including anticorrosive painting with one coat of red oxide and two coats of finish point of leI make & as per specification and as directed by the

Engineer.

2.

(a) Steel Doors of Sub-Station

01

(b) Ventilators.

01

Replacement of existing Rubber mat for 50

HT Switch gear inside the sub-station!

equipments etc.

No.

No.

sq.m.

I

Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement