This document contains information for downloading, installing, configuring and operating the JCM Tool Suite
™
Standard Edition Software Program. The
JCM Tool Suite Software Application is intended to aid the iPRO
®
, iVIZION
®
,
TBV
®
, UBA
®
, DBV
®
-400, DBV
®
-500 and EBA
®
-40 Unit User in updating
Software, retrieving performance data and performing calibration of the seven related products. The JCM Tool Suite requires the following hardware support items:
• Required JCM Tool Suite ™ Software components:
– 1 - JCM Tool Suite
™
Software (“JCM Tool Suite
Standard Edition”)
The Software is available at: http://www.jcmglobal.com
– 1 - JCM Tool Suite
™
Software Installation Guide
(JAC Part No. 960-100923R).
• Additional Equipment (not supplied):
– 1 - PS75-002 Power Supply (JAC Part No.
701-000148R) or
– 1 - UAC Device Kit (JAC Part No. 701-100103R for UBA & iPRO OR JAC Part N o
:
701-100112R for iVIZION & TBV)
– 1 - Personal Computer (PC) with an Internet
Connection; Windows and Windows ® 10.
®
7, Windows
®
8
JCM TOOL SUITE HARDWARE REQUIREMENTS
Figure 1 illustrates the JCM Tool Suite Software System’s Bench Technician’s
additional equipment components and download installation requirements.
USB Type A to B, or mini-B Cable (Not Included)
Typical PC System
(Not Included)
JCM is a registered trademark of JCM American Corporation. All other product names mentioned herein may be registered trademarks or trademarks of their respective companies.
Furthermore,
™
,
®
and
© are not always mentioned in each case throughout this publication.
Connection
Required for
Download
For the Americas, E-mail: [email protected]
For Europe, the Middle East, Africa, Russia, the UK & Ireland, E-mail: [email protected]
For Asia & Oceania E-mail: [email protected]
Part No. 960-100923R_ Rev. 4 2 8 © 2016 JCM American Corporation
Typical JCM Tool Suite Installation Equipment & Cable Requirements
Figure 1 Typical JCM Tool Suite Hardware Component Interconnections
Part No. 960-100923R_ Rev. 4 1
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
February, 2016
INTRODUCTION
The “
JCM Tool Suite Standard Edition
™
” Application allows users to perform multiple Unit functions. Such functions include Software updates, performance data retrieval (Statistics), Unit Calibration, Performance Testing and ICB Set-up functions.
NOTE: The available Tool Suite Functions will vary by Unit.
The “
JCM Tool Suite Standard Edition
” Application is Windows
®
7,
Windows ® 8 and Windows ® 10 compatible, and is available for download at the
JCM Website at:
http://www.jcmglobal.com
.
NOTE: The information in this Guide applies to JCM Tool Suite
Standard Edition, Version 1.28. The JCM Tool Suite Application is subject to change and/or updates without notice.
PARTS LIST
February, 2016
A
CCEPTABLE
P
OWER
S
UPPLIES
Part Number
701-000148R
701-100103R
40i-000001R
701-100112R
Description
PS75-002 (UBA)
UBA/iPRO UAC Kit
NOTE: The UAC Device will power both an iPRO
™
Unit and a UBA
®
Unit. The required Test Leads are included with this Kit.
UBA to iVIZION Adapter Cable
NOTE: To use the UBA/iPRO UAC Kit with an iVIZION
®
Unit, this
Adapter Cable is required.
iVIZION/TBV UAC Kit
H
ARNESSES
Part Number
400-000178R
400-000158R
302-200407R
DBV-400 RS-232
DBV-500 UAC
EBA-40 UAC
Description
If additional information is required for downloading or operating The JCM
Tool Suite™ Software Application, contact JCM Customer Support.
Part No. 960-100923R_ Rev. 4 2
© 2016 JCM American Corporation
Part No. 960-100923R_ Rev. 4 2 7
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
February, 2016
ICB S
ETTING
S
CREEN
When the “
2) ICB SETTING
” Screen Button is selected, Figure 20 will appear.
ICB Function Screen
By selecting
2) ICB SETTING
the User is able to input the necessary Parameters for enabling or disabling an Intelligent Cash Box (ICB) System.
If the iVIZION
®
Unit displays an “
ICB Disabled
” Error message, ensure that
BOTH the “
Disable
” Screen Button and the “
Inhibit
” Screen
Button are Clicked to completely disable the currently installed ICB System
a & b ).
a c
JCM Tool Suite™ Software Installation Guide
February, 2016
INSTALLING JCM TOOL SUITE APPLICATION
Perform the following steps to install the “
JCM Tool Suite Standard Edition
”
Software Application onto your PC:
1. Obtain the required “
JCM Tool Suite Standard Edition
” Software Application from the JCM Website at:
http://www.jcmglobal.com
.
2. Save the Application into a File Folder on the PC.
JCM T
OOL
S
UITE
S
TANDARD
E
DITION
S
OFTWARE
I
NSTALLATION
To install the
“JCM Tool Suite”
Application, proceed as follows:
1. Open the directory where the
“JCM Tool Suite Standard Edition”
Application was stored on the PC.
NOTE: To make access to the program easier, create a Shortcut Icon and move it to the PC’s Desktop.
2. Extract the files contained within the compressed (.zip) File.
3. Double-click on the “
Setup
” Application.
4. Follow the onscreen prompts.
When completed, the
“
JCM Tool Suite Standard” icon (Figure 2) will appear on the PC Desktop.
d b e
Figure 20 ICB Utility Function Setting Tool Suite Program Screen
(
The “
ICB Current Status
”
Screen Button and related Data Text Field
c
) provides the ability to retrieve the current ICB Status from a
Unit.
The “
M/C #
” Area’s “
Set M/C
” and “
Get M/C
” Screen Buttons as-well-as their related Data Text Fields
(
d
) provide the ability to
Set-up or Retrieve M/C Numbers to and from a Unit.
The “
Get ICB System Status
” Screen Button and its related Data
Text Field
e
) provides the ability to retrieve the current ICB
Status of the iVIZION Cash Box from a Unit.
The “
Inhibit
” Screen Button
b
) disables the ICB Function on the installed iVIZION Cash Box.
Part No. 960-100923R_ Rev. 4
2 6
© 2016 JCM American Corporation
b
Figure 2 JCM Tool Suite
Standard Icon
R
UNNING
T
OOL
S
UITE
A
S
A
DMINISTRATOR
JCM recommends that the “
JCM Tool Suite Standard Edition
” Application be
“Run as Administrator” for optimum performance. If you have Administrator
Rights on your PC, proceed as follows:
1. Right-click on the “
JCM Tool Suite Standard
” Application Icon.
2. Click “
Properties
” in the list provided.
3. From the JCM Tool Suite “
Properties
” screen, click the “
Compatibility
” tab.
4. Under the “
Compatibility
” tab Options, select the “
Run this program as administrator
” option, then click “
Apply
.”
NOTE: On some PCs running Windows 7, the Compatibility Setting may need to be
“For Windows XP, Service Pack 3.” If so, select this option and click Apply.
5. Click “
OK
” to close the screen.
NOTE: If your PC is controlled under a Company Network, you may not have the required privileges to change Application settings. If so, contact your
Company’s IT Department for assistance.
Part No. 960-100923R_ Rev. 4 3
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
February, 2016
CONNECTING A JCM VALIDATOR TO A PC
The JCM Validator can be installed in a game or located on a workbench when connecting it to the “
JCM Tool Suite
.”
To connect to the “
JCM Tool Suite
,” proceed as follows:
1. Connect the proper USB Cable between the JCM Validator Unit and the PC.
2. Apply power to the JCM Validator Unit.
3. Open the
“
JCM Tool Suite
the Initialization Screen shown in Figure 3 will appear, with “
Connecting
” displayed in the
“
”
Application Icon. Once the Application opens,
Communication Status
”
a ).
JCM Tool Suite™ Software Installation Guide
February, 2016
CIS I
MAGE
S
CREEN
When the “
1) CIS IMAGE
” Screen Button is selected, Figure 19 will appear.
c a a b
Figure 3 Initializing JCM Tool Suite Program Screen
When communication is established, the remaining available Fields will contain
data information (See Figure 4
a
Figure 19 iVIZION Utility Tool Suite CIS Image Program Screen
The image information can then be read from the Unit, saved to a File or read from a File previously saved.
The
UP CIS IMAGE
a ) shows a “Top” Side Surface image of the Banknote as inserted, and the
DOWN CIS IMAGE
Screen area
b ) shows a “Bottom” Side Surface image of the Banknote as inserted.
The “
Read
” , “
File Save
” and “
File Read
” Screen
c ) collectively provide the ability to retrieve or save an image to a File Folder.
Part No. 960-100923R_ Rev. 4 4
© 2016 JCM American Corporation
Part No. 960-100923R_ Rev. 4
2 5
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
February, 2016
UTILITY TOOL- iVIZION/iPRO
The iVIZION
®
/iPRO
®
1.
1) CIS IMAGE
Utility Tool provides the following two (2) Functions:
–
Image Capture of the last Banknote inserted (See Figure 18
a ).
NOTE: The CIS Image Option is NOT available with the iPRO ® Unit. Imaging is a function that is exclusive to the iVIZION
®
Unit using Contact Imaging Sensors
(CIS).
2.
2) ICB SETTING
–
Activation Set-up of the Intelligent Cash Box (ICB) System
b ).
NOTE: In “ICB Settings”, the “Inhibit ICB System” Section will NOT be available when using an iPRO
®
Unit. This option is only available with the RFID Technology utilized within an iVIZION ® Unit.
displays the Connection Status of the Device being tested.
3. To Exit the Utility Tool Suite Program, Click on the “
EXIT
”
d ).
Figure 18 illustrates the Utility Tool Suite Program Primary Screen.
JCM Tool Suite™ Software Installation Guide
February, 2016
The example shown in Figure 4 below is for a UBA
appear when connecting an iPRO
®
, iVIZION
®
®
, TBV
Unit; a similar display will
®
, DBV
®
-400, DBV
®
-500 or EBA
®
-40 Unit.
NOTE: As shown below, the Device Type field will indicate the Validator
Model that is connected to the PC (e.g., UBA).
a c a d b
Figure 18 iVIZION Utility Tool Suite Program Primary Screen c b
Figure 4 UBA Connected JCM Tool Suite Program Screen
Part No. 960-100923R_ Rev. 4 2 4
© 2016 JCM American Corporation
Part No. 960-100923R_ Rev. 4 5
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
JCM TOOL SUITE FUNCTIONS
February, 2016
F
UNCTIONS
A
VAILABLE
The Functions available for a
UBA Unit
a ) using the JCM Tool
Suite’s Service Mode drop-down Menu (Review Figure 4
b ) include the following three types shown in
c
:
c )
c )
• Sensor Adjustment (See Figure 4
c )
When an iPRO/iVIZION Unit (Figure 5
a ) is connected, the following functions are available in the Service Mode drop-down Menu
(
b )
:
c )
c )
c )
If the iPRO/iVIZION Unit is connected to the JCM Tool Suite while in
Maintenance Mode (DIP Switch No. 8 “ON”), the following functions will also be available:
d )
e ) a
JCM Tool Suite™ Software Installation Guide
February, 2016
DBV-400, DBV-500, EBA-40 F
UNCTIONAL
T
EST
D
ESCRIPTIONS
The following Test Descriptions relate to the various tests available for the
DBV-400, DBV-500 and EBA-40 Units (refer to Figure 17):
FEED_MOTOR_FWD_TEST
‒
Runs the Feed Motor in the Forward direction.
Motor Speed is displayed in the
Property - Motor Speed
field on the right side of the screen.
FEED_MOTOR_REV_TEST
‒
Runs the Feed Motor in the Reverse direction.
Motor Speed is displayed in the
Property - Motor Speed
field on the right side of the screen.
LED_TEST
‒
Cycles the Bezel LED through the available colors.
SENSOR_TEST
‒
Activates the Sensors in the Unit. As the state of each Sensor is changed, the value is displayed as
ON
or
OFF
in the
Property - Sensor ON/OFF field on the right side of the screen.
DIPSWITCH1_TEST
‒
Activates DIP Switch Bank 1. As each switch is selected, the current state is displayed in the
DIP switch field on the right side of the screen.
DIPSWITCH2_TEST
the current state is displayed in the
DIP switch field on the right side of the screen.
STACK_TEST
‒
‒
Activates DIP Switch Bank 2. As each switch is selected,
Runs the Stacking mechanism.
CENTERING_TEST
EBA-40 Units only).
‒
Runs the Centering Mechanism (for DBV-500 and
NOTE: Additional Banknote Acceptance Tests are available with the EBA-40 Unit.
c b d e
Figure 5 iPRO/iVIZION Unit Connected JCM Tool Suite Program Screen
Part No. 960-100923R_ Rev. 4 6
© 2016 JCM American Corporation
Part No. 960-100923R_ Rev. 4 2 3
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
February, 2016
PERFORMANCE TEST – DBV-400, DBV-500, EBA-40
To allow access to the Performance Test functions, the DBV ® -400, DBV ® -500 or EBA
®
-40 Unit must first be placed in Maintenance Mode. To do so:
1. Turn DIP Switch Pack 1, DIP Switch #8 ON to activate Maintenance Mode.
2. Connect a USB A-to-mini-B cable from the DBV-400, DBV-500 or EBA-40 Unit to the PC’s USB Port.
3. Apply power to the DBV-400, DBV-500 or EBA-40 Unit.
4. Open the JCM Tool Suite Application.
5. Click the
Service Mode
drop-down menu, then click on
Performance Test
.
6. From the
Performance Test
screen drop-down menu (Figure 17
a ), click on the desired test function (menu item) to be performed.
7. Click the
Start
b ) to begin the Test.
NOTE: When the Test begins running, the Start screen button (Figure 17
b ) changes to a Stop screen button.
8. Click the
Stop
screen button (not shown) to end the Test.
a
JCM Tool Suite™ Software Installation Guide
February, 2016
When a TBV
®
, DBV
®
-400, DBV
®
-500 or EBA
®
a ) is connected while in Operational Mode, the following functions are available in the Service Mode drop-down Menu (See Figure 5 b ):
c )
c )
• Event Log View (See Figure 6
c ).
If the TBV
®
, DBV
®
-400, DBV
®
-500 or EBA additional functions will be available as well:
®
-40 Unit is connected to the JCM
Tool Suite while in Maintenance Mode (DIP Switch No. 8 “ON”), the following
• Sensor Adjustment (See Figure 6
d )
• Performance Test (See Figure 6
e ). a b c b d e
Figure 6 TBV Unit Connected JCM Tool Suite Program Screen
Figure 17 DBV-400/DBV-500/EBA-40 Unit Performance Test Screen
Part No. 960-100923R_ Rev. 4 2 2
© 2016 JCM American Corporation
Part No. 960-100923R_ Rev. 4 7
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
February, 2016
JCM Tool Suite™ Software Installation Guide
February, 2016
D
OWNLOAD
EBA-40
-
I
PRO,
I
VIZION, TBV, UBA, DBV-400, DBV-500
c a
Figure 7 JCM Tool Suite Downloader Program Screen
When this Screen opens, check the following conditions:
1. Ensure that the Green Status Line indicates “
Online
” (
a
).
NOTE: The File location defaults to the last file downloaded.
OR
The Download Program is used to update Software in an iPRO
®
, iVIZION
®
,
TBV
®
, UBA
®
, DBV
®
-400, DBV-500 or EBA
®
loader will open the Screen shown in Figure 7.
-40 Unit.
When selecting the Download option in the drop-down menu, the JCM Downb
2. Use the “
Browse
”
b ) to select the data File to download. To begin the Software download, Click on the “
Download
”
c ).
For complete information on updating iPRO
®
, iVIZION
®
, TBV
®
, UBA
®
,
DBV ® -400, DBV-500 or EBA ® -40 Software, refer to Section 6 of the iPRO ® , iVIZION ® , TBV ® , UBA ® , DBV ® -400, DBV-500 or EBA ® -40 Series Operation and Maintenance Manual.
NOTE: All Manuals are available on the JCM Global Website at: http://www.jcmglobal.com.
TBV F
UNCTIONAL
T
EST
D
ESCRIPTIONS
The following Test Descriptions relate to the various Figure 16 Circle desig-
nated Screen Button Selections:
Operation Test – exercises various Banknote Acceptance configurations of the
Unit. The tests enable Validation or NO-Validation, with or without a Cash Box
)
.
Accept Reject
–
Banknotes are accepted and then rejected (See Figure 16
).
Aging –
A full Banknote Acceptance function is completed; the related Unit will
pause, then repeat until the Unit being tested is powered OFF (See Figure 16
)
.
NOTE: Test results are shown by selecting the “Denomination” Tab and Clicking on
“Update” in the drop-down Menu that appears.
MOTOR TEST
TRANSMITE FWD
Banknote Acceptance direction (See Figure 16
).
TRANSMITE REV
Banknote Return direction (See Figure 16
).
STACKING FWD
).
STACKING REV
).
–
–
–
–
Runs the Unit’s Transport Motor in the forward or
Runs the Unit’s Transport Motor in the reverse or
Runs the Stacking Motor forward function
Runs the Stacking Motor reverse function
CENTERING FWD – Moves the Centering mechanism to the middle of the
Banknote path for the TBV-100 only (See Figure 16
).
CENTERING REV – Moves the Centering Mechanism to the outer, Home
position for the TBV-100 only (See Figure 16
).
TBV-BNF FWD – Activates the BNF Motor in the forward (insert) direction
).
TBV-BNF REV – Activates the BNF Motor in the reverse (return) direction (See
).
BNF KEEP UP – Raises the BNF Pusher Mechanism to its up position (See Figure 16
).
BNF KEEP DOWN – Lowers the BNF Pusher Mechanism to its down position
).
FAN – Tests the Fan’s rotation (See Figure 16
).
MOTOR SPEED TEST–
When a “
Motor Speed Test
” begins, the Motor’s speed will be displayed in mm/sec ( mm/s
) when any of the Motor Test Functions
are being performed (See Figure 16
).
DEVICE FUNCTION TEST
LED Test
– The TBV LED functions are tested (See Figure 16
f ).
Sensor ON/OFF Test
–
The “
Sensor ON/OFF
” Tab selects the Validation and
Positioning Sensors for testing. Each Sensor can be tested. The test results are shown as an
OFF – ON
transition if the Sensor is working properly (See Figure 16
).
DIP Switch Test
)
.
–
The “
Dip Switch
” Tab enables the 8 Position DIP Switch
Pack, and will indicate each Switch’s current status as
OFF
or
ON
Denomination
).
–
The “
Denomination
” Tab displays the results of the Operation
Tests. Test results are displayed by Clicking the “
Update
Part No. 960-100923R_ Rev. 4 8
© 2016 JCM American Corporation
Part No. 960-100923R_ Rev. 4 2 1
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
PERFORMANCE TEST – TBV
February, 2016
To allow access to the TBV ® Performance Test functions, the Unit must first be placed in Maintenance Mode as follows:
1. Turn DIP Switch No. 8 “ON” to activate the Maintenance Mode.
2. Apply power to the TBV
®
Unit. The Bezel light on the TBV
®
4. Open the JCM Tool Suite Application.
5. Using the “
Service Mode
” drop-down Menu, select “
Performance Test
”; the Figure 16 Screen will appear.
will flash White.
3. Connect the Unit being tested to a PC using a USB Type-A to mini-B Cable.
a h b
c
f
g
d e
Figure 16 TBV Performance Test Selection Screen
To activate each Performance Test, proceed as follows:
1. Click on the related function Screen Button to select the desired Test (See Figure
a ).
2. An Error Code will flash on the TBV
®
if an error occurs.
NOTE: Refer to the related Service Manual for an explanation any Error Code that appears.
3. To perform an “
OPERATION TEST
b ), the TBV
®
being tested will need to be powered OFF/ON to stop one of these tests in progress.
4. To perform a “
MOTOR SPEED TEST
”, “
MOTOR TEST
”, or an “
LED TEST
” in the “
DEVICE FUNCTION TEST
” area, Click on the related Screen Button
c , d , e or f ).
Click on the “
Stop
”
Motor Speed Test
g ) to end either a
,
Motor Test or a
Device Function Test
in progress.
5. “
Sensor ON/OFF
”, “
DIP Switch
” or “
Denomination
” Tests can be performed by
click-selecting their related Screen Tab (See Figure 16
).
Part No. 960-100923R_ Rev. 4 2 0
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
February, 2016
S
TATISTICS
-
I
PRO,
I
VIZION, TBV, UBA, DBV-400, DBV-500
OR
EBA-40
The
“Statistics”
Function is used to read “AccLoad ™ a Unit’s Memory.
” Statistics information from
When the
“Statistics”
Tab is selected the
ACCLOAD3
™
Screen automatically
b c d a e f g
Figure 8 Statistics AccLoad Program Screen
To read the AccLoad
™
Data from a Unit’s Memory, Click-on the large “
Read
”
a ).
Part No. 960-100923R_ Rev. 4 9
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
February, 2016
S
TATISTICS
S
CREEN
T
AB
D
EFINITIONS
The “Statistics” AccLoad follows:
™
Data Screen is divided into five (5) individual Sub-
Screen Selection Tabs (See Figure 8
b ) and Screen Buttons briefly described as
Screen Tabs
Statistics Tab
‒
The “
Boxes.
Data summary Tab
Statistics
center Screen area (See Figure 8
c ). The three
Most Common Reject
Errors for
Banknotes and Tickets (See Figure 8
d ) are also displayed within these central
‒ The “
” Tab Screen provides a Unit summary of a Unit’s current performance Statistics.
Unit Information
,
Banknote Information
and
Ticket Information
is displayed in the three (3) Major Boxed Areas located in the
Data summary
” Tab Screen is a Summary Page showing the acceptance activity of the JCM Unit being tested.
Current data Tab
‒ T he “
Current data
” Tab Screen lists the Acceptance Rate for each Banknote denomination inserted and displays its direction of insertion as well.
Past data Tab
‒
The “
Past Data
Acceptor Acceptance.
Currency Assign Table Tab
‒
” Tab Screen provides a history of the Past
The “
Currency Assign Table
” Tab Screen displays the Banknote denominations accepted by the Software in the Acceptor.
The four (4) Screen Buttons, located at the bottom right corner of the Screen, perform the following functions:
Screen Buttons
Read Button
‒
The
“Read”
Screen Button allows the Accload
™
information to be read from the Unit.
Initialize Button
‒
The
“Initialize” of each Field to Zero (0), records the Date & Time from the PC connected to the
Unit, and allows a Machine Number to be input for the Unit being tested.
File Save/File Read Buttons
‒
The e
“File Save” and “File Read”
) sets the value
Screen Buttons
f ) allows the Accload ™ information to be saved to a File, or allows the reading of a pre-recorded saved File information respectively.
EXIT Button
‒
The from the program.
“EXIT”
g ) allows the user to Exit
NOTE: To interpret a specific Unit’s Error Code, refer to the Unit’s Operation and
Maintenance Manual located on the JCM Global Website at: http://www.jcmglobal.com
.
JCM Tool Suite™ Software Installation Guide
February, 2016
I
VIZION F
UNCTIONAL
T
EST
D
ESCRIPTIONS
The following Test Descriptions relate to the various Figure 15 Circle desig-
nated Screen Button Selections:
Transport Motor Forward
‒
The “
Transport motor Forward
) causes the Transport Motor to run in the Banknote insertion direction
(Forward). The Yellow LED will flash if no error is indicated. The Yellow LED will light steady if an error condition is detected.
Transport Motor Reverse
) causes the Transport Motor to run in the Banknote return direction
(Reverse). The Yellow LED will flash if no error is indicated. The Yellow LED will light steady if an error condition is detected.
Stacker Motor Forward
‒
‒
The “
Transport motor Reverse
The “
Stacker motor Forward
” Screen Button (See Figure 15
) causes the Stacker Motor to activate testing the Note Stacking function of the iVIZION
Cycle Test
®
Unit. The Yellow LED will flash if no error is indicated. The Yellow
LED will light steady if an error condition is detected.
‒
The “
Cycle Test
” Screen Button (See Figure 15
) causes a full
Transport and Stacking cycle to occur, then repeats until stopped.
The Yellow LED will flash between cycles; if an error occurs, the RED LED will flash a related Error Code.
Sensor ON/OFF Check
‒
The “
Sensor ON/OFF Check
” Screen Button (See Figure 15
) displays the current condition of each Validator, Transport and Cash Box
Sensor being tested. As Sensor status changes, the Test reflects the new condition.
Display Check
‒
The “ the right side Status LED through a RED , GREEN and BLUE Color lighting sequence.
Dipsw ON/OFF Check
Display Check
‒
The “
” Screen Button (See Figure 15
Dipsw ON/OFF Check
) cycles
” Screen Button (See Figure 15
) displays the current status of each iVIZION or OFF.
Accept Mode
‒
The “
Accept Mode
®
DIP Switch, as either ON
” Screen Button (See Figure 15
) places the iVIZION
®
into a Banknote Acceptance Test. As each denomination Note is accepted, the denomination amount is placed in the DENOMI: Field. If a Bar Code
Ticket is inserted, the indication is “Ticket” in the DENOMI; Field.
To stop the Accept Mode Test, reset the iVIZION
®
Unit
.
NOTE: To enter the Accept Mode, the iVIZION
® have been performed.
Unit must be reset if any other Tests
ICB Control Ticket Read Mode
‒
The “
ICB Control Ticket Read Mode activated (set-up) by using the ICB “Set” Tickets.
” Screen
), allows the Intelligent Cash Box (ICB) Function to be
Part No. 960-100923R_ Rev. 4 1 0
© 2016 JCM American Corporation
Part No. 960-100923R_ Rev. 4 1 9
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
February, 2016
PERFORMANCE TEST -
I
VIZION
To allow access to the iVIZION ® Performance Test function, the iVIZION
®
Unit must first be placed in Maintenance Mode as follows:
1. Turn DIP
Switch No. 8
“
ON
” to activate the Maintenance Mode.
NOTE: The DIP Switch Block is located at the bottom front side of the iVIZION
®
Transport Assembly.
2. Connect a USB Cable between the PC and the iVIZION Unit.
3. Apply power to the iVIZION
®
Unit. The Status Indicator on the Unit’s front right side will light Blue to indicate that the iVIZION
®
Unit is in Maintenance Mode.
4. Open the JCM Tool Suite Application.
5. Using the “
Service Mode
” drop-down Menu, select “
Performance Test
”; the Figure 15 Screen will appear.
a
b
Figure 15 iVIZION Test Item Select Performance Test Selection Screen
To activate each Performance Test proceed as follows:
1. Click on the related function selection Screen Button for the desired Test (See
a ); an activation Dialog Screen for each selected Test will open.
2. Click on the “
START” Screen Button to begin the desired Test.
3. Click on the “
STOP”
Screen Button to end the Test.
4. To close a particular Test function, Click-on the “Exit” Screen Button located at the bottom of the related “
Function Test”
Screen being performed.
For each Function, the expected Test result will be shown in the right hand
Window of the selected Function Test Screen.
5. To exit the Performance Test Screen, Click on the “
Exit(C)
b ).
JCM Tool Suite™ Software Installation Guide
February, 2016
SENSOR ADJUSTMENT - iPRO
The Sensor Adjustment Program is used to calibrate an iPRO
®
Unit.
Place the iPRO
®
into Maintenance Mode by setting DIP Switch No. 8 to the ON position, and then recycle power to the Unit. Connect the USB Cable between the PC and the iPRO Unit. Open the JCM Tool Suite Application, and use the
“
Service Mode
Sensor Adjustment
” from the Menu listings provided.
b a c
Figure 9 iPRO Sensor Adjustment Screen
The iPRO
®
Sensors are adjusted in two steps. First are the Validation Sensors, and second are the Positioning Sensors.
To calibrate the iPRO
®
Validation Sensors, proceed as follows:
NOTE: Two (2) types of Reference Paper are available for the iPRO
®
Unit. The iPRO
100 with a Centering Mechanism uses reference papers KS-081, KS-082, and KS-083.
The iPRO 101 with a fixed path uses reference papers KS-084, KS-085, and KS-086.
1. Click-select the “ Validation Sensor ” Radio Button
a ).
2. Click on the “
Start
”
b ).
3. Follow the Application prompts, and ensure that the resulting message prompts are thoroughly followed.
When the Validation Sensor adjustment is complete, start the Positioning Sensor adjustment procedure as follows:
1. Click-select the “
Positioning Sensor
” Radio Button
c ).
2. Click on “
Start
b ).
3. Follow the Application prompts.
NOTE: For complete details regarding proper use of the iPRO
®
Series Calibration
Program, refer to Section 6, of the iPRO Series Operation and Maintenance
Manual. This Manual is available on the JCM Global Website at: http://www.jcmglobal.com
.
Part No. 960-100923R_ Rev. 4 1 8
© 2016 JCM American Corporation
Part No. 960-100923R_ Rev. 4 1 1
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
February, 2016
SENSOR ADJUSTMENT - iVIZION
The Sensor Adjustment Program is used to calibrate an iVIZION
®
Unit.
Place the iVIZION
®
into Maintenance Mode by setting DIP Switch No. 8 to the
ON position, and then recycle the power to the Unit. Connect the USB Cable between the PC and the iVIZION Unit. Open the JCM Tool Suite Application, and use the “
Service Mode
” drop-down Menu (Review
Sensor Adjustment
” from the Menu listings provided.
NOTE: iVIZION
®
Calibration cannot be performed at the Game due to
Cash Box present requirements.
To calibrate the iVIZION
®
Sensors, proceed as follows:
NOTE: The iVIZION
®
Unit uses the KS-089 Reference Paper for calibration of Units with and without Bill Guides installed.
1. Click-on the large “
Start
” Screen Button (See Figure 10
a ).
b a
iVIZION Cash Box
Figure 10 iVIZION Sensor Adjustment Screen
2. Once the Calibration Procedure begins, the Application will test the iVIZION
®
Unit’s Cash Box, Transport, and Head Sensors.
3. When Cash Box Sensor testing is in process, the Applications will prompt the
Operator to “
Slide a Cardboard in between the Frame Outer LR and Pusher
Plate
”.
NOTE: To perform iVIZION
®
Calibration, the Cash Box Stacker must be moved away from its Home Position.This step is very important, and if done incorrectly will error out of the Calibration Procedure!
4. Once the Cardboard is set in position (See Figure 10
b ), select
“OK” and follow the Application prompts provided.
5. Insert the KS-089 Reference Paper when instructed by the Screen prompts.
6. Follow the Screen prompts until the Calibration Procedure is complete.
NOTE: For complete details regarding proper use of the iVIZION
®
Series Calibration
Program, refer to Section 6, of the iVIZION Series Operation and Maintenance
Manual. This Manual is available on the JCM Global Website at: http://www.jcmglobal.com
.
Part No. 960-100923R_ Rev. 4 1 2
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
February, 2016
I
PRO F
UNCTIONAL
T
EST
D
ESCRIPTIONS
The following Test Descriptions relate to the various Figure 14 Circle desig-
nated Screen Button Selections:
Operation Test – exercises various Banknote Acceptance configurations of the
Unit. The test enables Validation or NO-Validation, with or without a Cash Box
)
.
Accept Reject
–
Banknotes are accepted and then rejected (See Figure 14
).
Aging –
A full Banknote Acceptance function is completed; the related Unit will
pause, then repeat until the Unit being tested is powered OFF (See Figure 14
)
.
NOTE: Test results are shown by selecting the “Denomination” Tab and Clicking on
“Update” in the drop-down Menu that appears.
Device Function Test
Stacking Test
–
The Cash Box stacking function is tested
)
.
Centering Test
–
For iPRO 100
)
.
®
only. Tests the Centering Mechanism
Solenoid Test
).
PB Test
–
–
For iPRO 100
®
only. Tests the Centering Solenoid for proper
Tests the anti-Pull Back Assembly for proper operation
).
Motor Test
)
Transmite FWD
Acceptance direction.
Transmite REV
Return direction.
Stacking FWD
–
–
–
Runs the Unit’s Transport Motor in the forward or Banknote
Runs the Unit’s Transport Motor in the reverse or Banknote
Runs the Stacking Motor function.
NOTE: For the iPRO
®
, a pop-up Screen will direct the Operator to remove the
Cash Box before the Test can begin.
Motor Speed Test –
When a “
Motor Speed Test
” begins, the Motor’s speed will be displayed in mm/sec ( mm/s
) when any of the Motor Test Functions are being
).
–
The “
Sensor ON/OFF
” Tab selects the Validation and Position-
Sensor ON/OFF
ing Sensors for testing. Each Sensor can be tested. The test results are shown as an
OFF – ON
transition if the Sensor is working properly (See Figure 14
).
DIP Switch
–
The “
Dip Switch
” Tab enables the 8 Position DIP Switch Pack, and will indicate each Switches current status as
OFF
or
ON
)
.
Denomination
).
–
The “
Denomination
” Tab displays the results of the Operation
Tests. Test results are displayed by Clicking the “
Update
Recycler
–
The “
Recycler
” Tab function is used with the iPRO-RC Unit to test the
Banknote cycling function from-and-to the Recycle Bins (See Figure 14
).
Part No. 960-100923R_ Rev. 4 1 7
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
PERFORMANCE TEST – IPRO
February, 2016
To allow access to the iPRO ® Performance Test functions, the Unit must first be placed in Maintenance Mode as follows:
1. Turn DIP Switch No. 8 “ON” to activate the Maintenance Mode.
2. Apply power to the iPRO
®
Unit. The Status LEDs on the iPRO steady RED and GREEN respectively.
®
Unit will light a
3. Connect the Unit being tested to a PC using a USB Type-A to mini-B Cable.
4. Open the JCM Tool Suite Application.
5. Using the “
Service Mode
” drop-down Menu, select “
Performance Test
”; the
iPRO Performance Tool window in Figure 14 will appear.
a g b
c
d e
f
Figure 14 iPRO Performance Test Selection Screen
To activate each Performance Test, proceed as follows:
1. Click on the related function Screen Button to select the desired Test (See Figure
a ).
2. An Error Code will flash on the iPRO
®
if an error occurs.
NOTE: Refer to the related Operation and Maintenance Manual for an explanation of any Error Code that appears.
3. To perform an “
Operation Test
b ), the iPRO
®
being tested will need to be powered OFF/ON to stop the Test in progress.
4. To perform a “
Motor Speed Test
”, “
Device Function Test
”, or a “
Motor Test
”,
Click on the related Screen Button (See Figure 14
c , d or e ). Click on the related
“
Stop
” Screen Button (See Figure 14
f ) to end a
Device Function Test
, or a
Motor
Test
in progress.
5. “
Sensor ON/OFF
”, “
DIP Switch
”, “
Denomination
”, or “
Recycler
” Tests can be
performed by click-selecting their related Screen Tab (See Figure 14
g ).
Part No. 960-100923R_ Rev. 4 1 6
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
February, 2016
SENSOR ADJUSTMENT - TBV
The Sensor Adjustment Program is used to calibrate a TBV
®
Unit.
Place the TBV
®
into Maintenance Mode by setting DIP Switch No. 8 to the ON position and then recycle power to the Unit. Connect the USB Cable between the PC and the TBV Unit. Open the JCM Tool Suite Application, and use the
“
Service Mode
Sensor Adjustment
” from the Menu listings provided.
NOTE: To perform the Validation Sensor procedure, the TBV must be removed from the Frame to allow rear access to the Acceptor Sensors.
b a c
Figure 11 TBV Sensor Adjustment Screen
To calibrate the TBV
®
Validation Sensors, proceed as follows:
NOTE: Two (2) types of Reference Paper are available for the TBV
®
Unit. The TBV
100 with a Centering Mechanism uses reference papers KS-073, KS-074,
KS-075 and KS-076. The TBV 101 with a fixed path uses reference papers KS-076,
KS-077, KS-078, and KS-079.
1. Click-select the “
Validation Sensor
” Radio Button
a ).
2. Click on the “
Start
”
Screen Button (Review Figure 11
b ).
3. Follow the Application prompts, and ensure that the resulting message prompts are thoroughly followed.
When the Validation Sensor adjustment is complete, start the Positioning
Sensor Adjustment Procedure as follows:
NOTE: The TBV
®
must be reinstalled into a Frame containing an installed Cash Box to calibrate Positioning Sensors.
1. Click-select the “
Positioning Sensor
” Radio Button
c ).
2. Click on the “
Start
” Screen Button (Review Figure 11
b ).
3. Follow the Application prompts.
NOTE: For complete details regarding proper use of the TBV
®
Series Calibration
Program, refer to Section 6, of the TBV Series Operation and Maintenance
Manual. This Manual is available on the JCM Global Website at: http://www.jcmglobal.com
.
Part No. 960-100923R_ Rev. 4 1 3
© 2016 JCM American Corporation
JCM Tool Suite™ Software Installation Guide
February, 2016
SENSOR ADJUSTMENT - UBA
The Sensor Adjustment Program is used to calibrate a UBA
®
Unit.
To open the Sensor Adjustment Program, select the
“Sensor Adjustment”
Option within the JCM Tool Suite Application
“Service Mode”
drop-down Menu
c ).
To calibrate the UBA ® Sensors, proceed as follows:
NOTE: The UBA
®
Unit uses KS-062/KS-063/KS-064 Reference Paper and a Magtool for calibration.
1. Click-on the “
START
”
UBA
®
Calibration Process.
a ) to begin a d c a b
JCM Tool Suite™ Software Installation Guide
February, 2016
SENSOR ADJUSTMENT - DBV-400, DBV-500, EBA-40
The Sensor Adjustment Program is used to calibrate DBV ® -400, DBV ® -500 and
EBA ® -40 Units.
To manage access to the Sensor Adjustment Application, the Unit must first be placed in Maintenance Mode. To do so, proceed as follows:
NOTE: For the DBV
®
-400 Unit, KS-095A Reference Paper is used for calibration.
For the DBV
®
-500 Unit, KS-091 Reference Paper is used for calibration.
For the EBA
®
-40 Unit, KS-090 Reference Paper is used for calibration.
1. Turn DIP Switch Pack 1, DIP Switch #8 ON to activate Maintenance Mode.
2. Connect the DBV
®
-400, DBV
®
-500 or EBA
®
-40 Unit to the PC using a USB A to mini B cable.
3. Apply power to the Unit.
4. Open the JCM Tool Suite Application.
5. Click on the
Sensor Adjustment
option in the JCM Tool Suite Application
Service Mode
drop-down menu (Review Figure 6
d ). The Sensor Adjustment
Application will launch automatically.
6. Click the blue
Sensor Calibration
a ).
Figure 12 UBA Sensor Adjustment Program Screen
2. Follow the onscreen prompts and insert Calibration Paper as requested.
3. Click-on the “
STOP
”
Calibration Process.
b ) to end a UBA
4. To change the UBA
®
Units Serial Number during a Sensor Calibration Procedure, Click-select the “ Change Serial #
c ).
5. The
“Status”
Field shows a Text Message of the Calibration Procedure progress
d ).
®
NOTE: For the complete details and requirements regarding proper use of the UBA
®
Series Calibration Program, refer to Section 6, of the UBA Series Operation and
Maintenance Manual. This Manual is available on the JCM Global Website at: http://www.jcmglobal.com
.
Part No. 960-100923R_ Rev. 4 1 4 a b
Figure 13 Sensor Calibration Screen icon (Sensor Adjustment Application)
7. Follow the on-screen prompts to complete the Sensor Calibration procedure.
NOTE: As each Calibration step is completed, an onscreen Checklist display will indicate successful completion.
8. When Calibration is complete, click the red
Close
box in the top right
corner of the Sensor Adjustment Application screen (Figure 13
b ) to exit the
Sensor Calibration application.
© 2016 JCM American Corporation
Part No. 960-100923R_ Rev. 4 1 5
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project