JCM Tool Suite™ Software Installation Guide

PERSONAL NOTES AND COMMENTS

Add relevant notes and comments regarding your installation here.

February, 2016

February, 2016

Installation Guide

JCM Tool Suite

Software

Program Installation and Operation

This document contains information for downloading, installing, configuring and operating the JCM Tool Suite

Standard Edition Software Program. The

JCM Tool Suite Software Application is intended to aid the iPRO

®

, iVIZION

®

,

TBV

®

, UBA

®

, DBV

®

-400, DBV

®

-500 and EBA

®

-40 Unit User in updating

Software, retrieving performance data and performing calibration of the seven related products. The JCM Tool Suite requires the following hardware support items:

• Required JCM Tool Suite ™ Software components:

– 1 - JCM Tool Suite

Software (“JCM Tool Suite

Standard Edition”)

The Software is available at: http://www.jcmglobal.com

– 1 - JCM Tool Suite

Software Installation Guide

(JAC Part No. 960-100923R).

• Additional Equipment (not supplied):

– 1 - PS75-002 Power Supply (JAC Part No.

701-000148R) or

– 1 - UAC Device Kit (JAC Part No. 701-100103R for UBA & iPRO OR JAC Part N o

:

701-100112R for iVIZION & TBV)

– 1 - Personal Computer (PC) with an Internet

Connection; Windows and Windows ® 10.

®

7, Windows

®

8

JCM TOOL SUITE HARDWARE REQUIREMENTS

Figure 1 illustrates the JCM Tool Suite Software System’s Bench Technician’s

additional equipment components and download installation requirements.

USB Type A to B, or mini-B Cable (Not Included)

Typical PC System

(Not Included)

JCM is a registered trademark of JCM American Corporation. All other product names mentioned herein may be registered trademarks or trademarks of their respective companies.

Furthermore,

,

®

and

© are not always mentioned in each case throughout this publication.

Connection

Required for

Download

For the Americas, E-mail: [email protected]

For Europe, the Middle East, Africa, Russia, the UK & Ireland, E-mail: [email protected]

For Asia & Oceania E-mail: [email protected]

Part No. 960-100923R_ Rev. 4 2 8 © 2016 JCM American Corporation

Typical JCM Tool Suite Installation Equipment & Cable Requirements

Figure 1 Typical JCM Tool Suite Hardware Component Interconnections

Part No. 960-100923R_ Rev. 4 1

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

February, 2016

INTRODUCTION

The “

JCM Tool Suite Standard Edition

” Application allows users to perform multiple Unit functions. Such functions include Software updates, performance data retrieval (Statistics), Unit Calibration, Performance Testing and ICB Set-up functions.

NOTE: The available Tool Suite Functions will vary by Unit.

The “

JCM Tool Suite Standard Edition

” Application is Windows

®

7,

Windows ® 8 and Windows ® 10 compatible, and is available for download at the

JCM Website at:

http://www.jcmglobal.com

.

NOTE: The information in this Guide applies to JCM Tool Suite

Standard Edition, Version 1.28. The JCM Tool Suite Application is subject to change and/or updates without notice.

JCM Tool Suite™ Software

PARTS LIST

Installation Guide

February, 2016

A

CCEPTABLE

P

OWER

S

UPPLIES

Part Number

701-000148R

701-100103R

40i-000001R

701-100112R

Description

PS75-002 (UBA)

UBA/iPRO UAC Kit

NOTE: The UAC Device will power both an iPRO

Unit and a UBA

®

Unit. The required Test Leads are included with this Kit.

UBA to iVIZION Adapter Cable

NOTE: To use the UBA/iPRO UAC Kit with an iVIZION

®

Unit, this

Adapter Cable is required.

iVIZION/TBV UAC Kit

H

ARNESSES

Part Number

400-000178R

400-000158R

302-200407R

DBV-400 RS-232

DBV-500 UAC

EBA-40 UAC

Description

If additional information is required for downloading or operating The JCM

Tool Suite™ Software Application, contact JCM Customer Support.

Part No. 960-100923R_ Rev. 4 2

© 2016 JCM American Corporation

Part No. 960-100923R_ Rev. 4 2 7

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

February, 2016

ICB S

ETTING

S

CREEN

When the “

2) ICB SETTING

” Screen Button is selected, Figure 20 will appear.

ICB Function Screen

By selecting

2) ICB SETTING

the User is able to input the necessary Parameters for enabling or disabling an Intelligent Cash Box (ICB) System.

If the iVIZION

®

Unit displays an “

ICB Disabled

” Error message, ensure that

BOTH the “

Disable

” Screen Button and the “

Inhibit

” Screen

Button are Clicked to completely disable the currently installed ICB System

(See Figure 20

a & b ).

a c

JCM Tool Suite™ Software Installation Guide

February, 2016

INSTALLING JCM TOOL SUITE APPLICATION

Perform the following steps to install the “

JCM Tool Suite Standard Edition

Software Application onto your PC:

1. Obtain the required “

JCM Tool Suite Standard Edition

” Software Application from the JCM Website at:

http://www.jcmglobal.com

.

2. Save the Application into a File Folder on the PC.

JCM T

OOL

S

UITE

S

TANDARD

E

DITION

S

OFTWARE

I

NSTALLATION

To install the

JCM Tool Suite

Application, proceed as follows:

1. Open the directory where the

JCM Tool Suite Standard Edition

Application was stored on the PC.

NOTE: To make access to the program easier, create a Shortcut Icon and move it to the PC’s Desktop.

2. Extract the files contained within the compressed (.zip) File.

3. Double-click on the “

Setup

” Application.

4. Follow the onscreen prompts.

When completed, the

JCM Tool Suite Standard” icon (Figure 2) will appear on the PC Desktop.

d b e

Figure 20 ICB Utility Function Setting Tool Suite Program Screen

(

The “

ICB Current Status

Screen Button and related Data Text Field

See Figure 20

c

) provides the ability to retrieve the current ICB Status from a

Unit.

The “

M/C #

” Area’s “

Set M/C

” and “

Get M/C

” Screen Buttons as-well-as their related Data Text Fields

(

See Figure 20

d

) provide the ability to

Set-up or Retrieve M/C Numbers to and from a Unit.

The “

Get ICB System Status

” Screen Button and its related Data

Text Field

(

See Figure 20

e

) provides the ability to retrieve the current ICB

Status of the iVIZION Cash Box from a Unit.

The “

Inhibit

” Screen Button

(

See Figure 20

b

) disables the ICB Function on the installed iVIZION Cash Box.

Part No. 960-100923R_ Rev. 4

2 6

© 2016 JCM American Corporation

b

Figure 2 JCM Tool Suite

Standard Icon

R

UNNING

T

OOL

S

UITE

A

S

A

DMINISTRATOR

JCM recommends that the “

JCM Tool Suite Standard Edition

” Application be

Run as Administrator” for optimum performance. If you have Administrator

Rights on your PC, proceed as follows:

1. Right-click on the “

JCM Tool Suite Standard

” Application Icon.

2. Click “

Properties

” in the list provided.

3. From the JCM Tool Suite “

Properties

” screen, click the “

Compatibility

” tab.

4. Under the “

Compatibility

” tab Options, select the “

Run this program as administrator

” option, then click “

Apply

.”

NOTE: On some PCs running Windows 7, the Compatibility Setting may need to be

“For Windows XP, Service Pack 3.” If so, select this option and click Apply.

5. Click “

OK

” to close the screen.

NOTE: If your PC is controlled under a Company Network, you may not have the required privileges to change Application settings. If so, contact your

Company’s IT Department for assistance.

Part No. 960-100923R_ Rev. 4 3

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

February, 2016

CONNECTING A JCM VALIDATOR TO A PC

The JCM Validator can be installed in a game or located on a workbench when connecting it to the “

JCM Tool Suite

.”

To connect to the “

JCM Tool Suite

,” proceed as follows:

1. Connect the proper USB Cable between the JCM Validator Unit and the PC.

2. Apply power to the JCM Validator Unit.

3. Open the

JCM Tool Suite

the Initialization Screen shown in Figure 3 will appear, with “

Connecting

” displayed in the

Application Icon. Once the Application opens,

Communication Status

field (See Figure 3

a ).

JCM Tool Suite™ Software Installation Guide

February, 2016

CIS I

MAGE

S

CREEN

When the “

1) CIS IMAGE

” Screen Button is selected, Figure 19 will appear.

c a a b

Figure 3 Initializing JCM Tool Suite Program Screen

When communication is established, the remaining available Fields will contain

data information (See Figure 4

a

5).

Figure 19 iVIZION Utility Tool Suite CIS Image Program Screen

The image information can then be read from the Unit, saved to a File or read from a File previously saved.

The

UP CIS IMAGE

Screen area (See Figure 19

a ) shows a “Top” Side Surface image of the Banknote as inserted, and the

DOWN CIS IMAGE

Screen area

(See Figure 19

b ) shows a “Bottom” Side Surface image of the Banknote as inserted.

The “

Read

” , “

File Save

” and “

File Read

” Screen

Buttons (See Figure 19

c ) collectively provide the ability to retrieve or save an image to a File Folder.

Part No. 960-100923R_ Rev. 4 4

© 2016 JCM American Corporation

Part No. 960-100923R_ Rev. 4

2 5

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

February, 2016

UTILITY TOOL- iVIZION/iPRO

The iVIZION

®

/iPRO

®

1.

1) CIS IMAGE

Utility Tool provides the following two (2) Functions:

Image Capture of the last Banknote inserted (See Figure 18

a ).

NOTE: The CIS Image Option is NOT available with the iPRO ® Unit. Imaging is a function that is exclusive to the iVIZION

®

Unit using Contact Imaging Sensors

(CIS).

2.

2) ICB SETTING

Activation Set-up of the Intelligent Cash Box (ICB) System

(See Figure 18

b ).

NOTE: In “ICB Settings”, the “Inhibit ICB System” Section will NOT be available when using an iPRO

®

Unit. This option is only available with the RFID Technology utilized within an iVIZION ® Unit.

Figure 18 c

displays the Connection Status of the Device being tested.

3. To Exit the Utility Tool Suite Program, Click on the “

EXIT

Button (See Figure 18

d ).

Figure 18 illustrates the Utility Tool Suite Program Primary Screen.

JCM Tool Suite™ Software Installation Guide

February, 2016

The example shown in Figure 4 below is for a UBA

appear when connecting an iPRO

®

, iVIZION

®

®

, TBV

Unit; a similar display will

®

, DBV

®

-400, DBV

®

-500 or EBA

®

-40 Unit.

NOTE: As shown below, the Device Type field will indicate the Validator

Model that is connected to the PC (e.g., UBA).

a c a d b

Figure 18 iVIZION Utility Tool Suite Program Primary Screen c b

Figure 4 UBA Connected JCM Tool Suite Program Screen

Part No. 960-100923R_ Rev. 4 2 4

© 2016 JCM American Corporation

Part No. 960-100923R_ Rev. 4 5

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

JCM TOOL SUITE FUNCTIONS

February, 2016

F

UNCTIONS

A

VAILABLE

The Functions available for a

UBA Unit

(Review Figure 4

a ) using the JCM Tool

Suite’s Service Mode drop-down Menu (Review Figure 4

b ) include the following three types shown in

Figure 4

c

:

• Download (See Figure 4

c )

• Statistics (See Figure 4

c )

• Sensor Adjustment (See Figure 4

c )

When an iPRO/iVIZION Unit (Figure 5

a ) is connected, the following functions are available in the Service Mode drop-down Menu

(

Figure 5

b )

:

• Download (Figure 5

c )

• Statistics (Figure 5

c )

• Utility (Figure 5

c )

If the iPRO/iVIZION Unit is connected to the JCM Tool Suite while in

Maintenance Mode (DIP Switch No. 8 “ON”), the following functions will also be available:

• Sensor Adjustment (Figure 5

d )

• Performance Test (Figure 5

e ) a

JCM Tool Suite™ Software Installation Guide

February, 2016

DBV-400, DBV-500, EBA-40 F

UNCTIONAL

T

EST

D

ESCRIPTIONS

The following Test Descriptions relate to the various tests available for the

DBV-400, DBV-500 and EBA-40 Units (refer to Figure 17):

FEED_MOTOR_FWD_TEST

Runs the Feed Motor in the Forward direction.

Motor Speed is displayed in the

Property - Motor Speed

field on the right side of the screen.

FEED_MOTOR_REV_TEST

Runs the Feed Motor in the Reverse direction.

Motor Speed is displayed in the

Property - Motor Speed

field on the right side of the screen.

LED_TEST

Cycles the Bezel LED through the available colors.

SENSOR_TEST

Activates the Sensors in the Unit. As the state of each Sensor is changed, the value is displayed as

ON

or

OFF

in the

Property - Sensor ON/OFF field on the right side of the screen.

DIPSWITCH1_TEST

Activates DIP Switch Bank 1. As each switch is selected, the current state is displayed in the

DIP switch field on the right side of the screen.

DIPSWITCH2_TEST

the current state is displayed in the

DIP switch field on the right side of the screen.

STACK_TEST

Activates DIP Switch Bank 2. As each switch is selected,

Runs the Stacking mechanism.

CENTERING_TEST

EBA-40 Units only).

Runs the Centering Mechanism (for DBV-500 and

NOTE: Additional Banknote Acceptance Tests are available with the EBA-40 Unit.

c b d e

Figure 5 iPRO/iVIZION Unit Connected JCM Tool Suite Program Screen

Part No. 960-100923R_ Rev. 4 6

© 2016 JCM American Corporation

Part No. 960-100923R_ Rev. 4 2 3

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

February, 2016

PERFORMANCE TEST – DBV-400, DBV-500, EBA-40

To allow access to the Performance Test functions, the DBV ® -400, DBV ® -500 or EBA

®

-40 Unit must first be placed in Maintenance Mode. To do so:

1. Turn DIP Switch Pack 1, DIP Switch #8 ON to activate Maintenance Mode.

2. Connect a USB A-to-mini-B cable from the DBV-400, DBV-500 or EBA-40 Unit to the PC’s USB Port.

3. Apply power to the DBV-400, DBV-500 or EBA-40 Unit.

4. Open the JCM Tool Suite Application.

5. Click the

Service Mode

drop-down menu, then click on

Performance Test

.

6. From the

Performance Test

screen drop-down menu (Figure 17

a ), click on the desired test function (menu item) to be performed.

7. Click the

Start

screen button (Figure 17

b ) to begin the Test.

NOTE: When the Test begins running, the Start screen button (Figure 17

b ) changes to a Stop screen button.

8. Click the

Stop

screen button (not shown) to end the Test.

a

JCM Tool Suite™ Software Installation Guide

February, 2016

When a TBV

®

, DBV

®

-400, DBV

®

-500 or EBA

®

-40 Unit (See Figure 6

a ) is connected while in Operational Mode, the following functions are available in the Service Mode drop-down Menu (See Figure 5 b ):

• Download (See Figure 6

c )

• Statistics (See Figure 6

c )

• Event Log View (See Figure 6

c ).

If the TBV

®

, DBV

®

-400, DBV

®

-500 or EBA additional functions will be available as well:

®

-40 Unit is connected to the JCM

Tool Suite while in Maintenance Mode (DIP Switch No. 8 “ON”), the following

• Sensor Adjustment (See Figure 6

d )

• Performance Test (See Figure 6

e ). a b c b d e

Figure 6 TBV Unit Connected JCM Tool Suite Program Screen

Figure 17 DBV-400/DBV-500/EBA-40 Unit Performance Test Screen

Part No. 960-100923R_ Rev. 4 2 2

© 2016 JCM American Corporation

Part No. 960-100923R_ Rev. 4 7

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

February, 2016

JCM Tool Suite™ Software Installation Guide

February, 2016

D

OWNLOAD

EBA-40

-

I

PRO,

I

VIZION, TBV, UBA, DBV-400, DBV-500

c a

Figure 7 JCM Tool Suite Downloader Program Screen

When this Screen opens, check the following conditions:

1. Ensure that the Green Status Line indicates “

Online

” (

See Figure 7

a

).

NOTE: The File location defaults to the last file downloaded.

OR

The Download Program is used to update Software in an iPRO

®

, iVIZION

®

,

TBV

®

, UBA

®

, DBV

®

-400, DBV-500 or EBA

®

loader will open the Screen shown in Figure 7.

-40 Unit.

When selecting the Download option in the drop-down menu, the JCM Downb

2. Use the “

Browse

Screen Button (See Figure 7

b ) to select the data File to download. To begin the Software download, Click on the “

Download

Screen Button (See Figure 7

c ).

For complete information on updating iPRO

®

, iVIZION

®

, TBV

®

, UBA

®

,

DBV ® -400, DBV-500 or EBA ® -40 Software, refer to Section 6 of the iPRO ® , iVIZION ® , TBV ® , UBA ® , DBV ® -400, DBV-500 or EBA ® -40 Series Operation and Maintenance Manual.

NOTE: All Manuals are available on the JCM Global Website at: http://www.jcmglobal.com.

TBV F

UNCTIONAL

T

EST

D

ESCRIPTIONS

The following Test Descriptions relate to the various Figure 16 Circle desig-

nated Screen Button Selections:

Operation Test – exercises various Banknote Acceptance configurations of the

Unit. The tests enable Validation or NO-Validation, with or without a Cash Box

installed (See Figure 16

)

.

Accept Reject

Banknotes are accepted and then rejected (See Figure 16

).

Aging

A full Banknote Acceptance function is completed; the related Unit will

pause, then repeat until the Unit being tested is powered OFF (See Figure 16

)

.

NOTE: Test results are shown by selecting the “Denomination” Tab and Clicking on

“Update” in the drop-down Menu that appears.

MOTOR TEST

TRANSMITE FWD

Banknote Acceptance direction (See Figure 16

).

TRANSMITE REV

Banknote Return direction (See Figure 16

).

STACKING FWD

(See Figure 16

).

STACKING REV

(See Figure 16

).

Runs the Unit’s Transport Motor in the forward or

Runs the Unit’s Transport Motor in the reverse or

Runs the Stacking Motor forward function

Runs the Stacking Motor reverse function

CENTERING FWD – Moves the Centering mechanism to the middle of the

Banknote path for the TBV-100 only (See Figure 16

).

CENTERING REV – Moves the Centering Mechanism to the outer, Home

position for the TBV-100 only (See Figure 16

).

TBV-BNF FWD – Activates the BNF Motor in the forward (insert) direction

(See Figure 16

).

TBV-BNF REV – Activates the BNF Motor in the reverse (return) direction (See

Figure 16

).

BNF KEEP UP – Raises the BNF Pusher Mechanism to its up position (See Figure 16

).

BNF KEEP DOWN – Lowers the BNF Pusher Mechanism to its down position

(See Figure 16

).

FAN – Tests the Fan’s rotation (See Figure 16

).

MOTOR SPEED TEST

When a “

Motor Speed Test

” begins, the Motor’s speed will be displayed in mm/sec ( mm/s

) when any of the Motor Test Functions

are being performed (See Figure 16

).

DEVICE FUNCTION TEST

LED Test

– The TBV LED functions are tested (See Figure 16

f ).

Sensor ON/OFF Test

The “

Sensor ON/OFF

” Tab selects the Validation and

Positioning Sensors for testing. Each Sensor can be tested. The test results are shown as an

OFF – ON

transition if the Sensor is working properly (See Figure 16

).

DIP Switch Test

)

.

The “

Dip Switch

” Tab enables the 8 Position DIP Switch

Pack, and will indicate each Switch’s current status as

OFF

or

ON

(See Figure 16

Denomination

Figure 16

).

The “

Denomination

” Tab displays the results of the Operation

Tests. Test results are displayed by Clicking the “

Update

” Screen Button (See

Part No. 960-100923R_ Rev. 4 8

© 2016 JCM American Corporation

Part No. 960-100923R_ Rev. 4 2 1

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

PERFORMANCE TEST – TBV

February, 2016

To allow access to the TBV ® Performance Test functions, the Unit must first be placed in Maintenance Mode as follows:

1. Turn DIP Switch No. 8 “ON” to activate the Maintenance Mode.

2. Apply power to the TBV

®

Unit. The Bezel light on the TBV

®

4. Open the JCM Tool Suite Application.

5. Using the “

Service Mode

” drop-down Menu, select “

Performance Test

”; the Figure 16 Screen will appear.

will flash White.

3. Connect the Unit being tested to a PC using a USB Type-A to mini-B Cable.

 a h b

 c

 f

 g

 d e

Figure 16 TBV Performance Test Selection Screen

To activate each Performance Test, proceed as follows:

1. Click on the related function Screen Button to select the desired Test (See Figure

16

a ).

2. An Error Code will flash on the TBV

®

if an error occurs.

NOTE: Refer to the related Service Manual for an explanation any Error Code that appears.

3. To perform an “

OPERATION TEST

” (See Figure 16

b ), the TBV

®

being tested will need to be powered OFF/ON to stop one of these tests in progress.

4. To perform a “

MOTOR SPEED TEST

”, “

MOTOR TEST

”, or an “

LED TEST

” in the “

DEVICE FUNCTION TEST

” area, Click on the related Screen Button

(See Figure 16

c , d , e or f ).

Click on the “

Stop

Motor Speed Test

Screen Button (See Figure 16

g ) to end either a

,

Motor Test or a

Device Function Test

in progress.

5. “

Sensor ON/OFF

”, “

DIP Switch

” or “

Denomination

” Tests can be performed by

click-selecting their related Screen Tab (See Figure 16

 ).

Part No. 960-100923R_ Rev. 4 2 0

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

February, 2016

S

TATISTICS

-

I

PRO,

I

VIZION, TBV, UBA, DBV-400, DBV-500

OR

EBA-40

The

“Statistics”

Function is used to read “AccLoad ™ a Unit’s Memory.

” Statistics information from

When the

“Statistics”

Tab is selected the

ACCLOAD3

Screen automatically

opens as shown in Figure 8.

b c d a e f g

Figure 8 Statistics AccLoad Program Screen

To read the AccLoad

Data from a Unit’s Memory, Click-on the large “

Read

Screen Button (See Figure 8

a ).

Part No. 960-100923R_ Rev. 4 9

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

February, 2016

S

TATISTICS

S

CREEN

T

AB

D

EFINITIONS

The “Statistics” AccLoad follows:

Data Screen is divided into five (5) individual Sub-

Screen Selection Tabs (See Figure 8

b ) and Screen Buttons briefly described as

Screen Tabs

Statistics Tab

The “

Boxes.

Data summary Tab

Statistics

center Screen area (See Figure 8

c ). The three

Most Common Reject

Errors for

Banknotes and Tickets (See Figure 8

d ) are also displayed within these central

‒ The “

” Tab Screen provides a Unit summary of a Unit’s current performance Statistics.

Unit Information

,

Banknote Information

and

Ticket Information

is displayed in the three (3) Major Boxed Areas located in the

Data summary

” Tab Screen is a Summary Page showing the acceptance activity of the JCM Unit being tested.

Current data Tab

‒ T he “

Current data

” Tab Screen lists the Acceptance Rate for each Banknote denomination inserted and displays its direction of insertion as well.

Past data Tab

The “

Past Data

Acceptor Acceptance.

Currency Assign Table Tab

” Tab Screen provides a history of the Past

The “

Currency Assign Table

” Tab Screen displays the Banknote denominations accepted by the Software in the Acceptor.

The four (4) Screen Buttons, located at the bottom right corner of the Screen, perform the following functions:

Screen Buttons

Read Button

The

Read

Screen Button allows the Accload

information to be read from the Unit.

Initialize Button

The

Initialize of each Field to Zero (0), records the Date & Time from the PC connected to the

Unit, and allows a Machine Number to be input for the Unit being tested.

File Save/File Read Buttons

Screen Button (See Figure 8

The e

File SaveandFile Read

) sets the value

Screen Buttons

(See Figure 8

f ) allows the Accload ™ information to be saved to a File, or allows the reading of a pre-recorded saved File information respectively.

EXIT Button

The from the program.

EXIT

Screen Button (See Figure 8

g ) allows the user to Exit

NOTE: To interpret a specific Unit’s Error Code, refer to the Unit’s Operation and

Maintenance Manual located on the JCM Global Website at: http://www.jcmglobal.com

.

JCM Tool Suite™ Software Installation Guide

February, 2016

I

VIZION F

UNCTIONAL

T

EST

D

ESCRIPTIONS

The following Test Descriptions relate to the various Figure 15 Circle desig-

nated Screen Button Selections:

Transport Motor Forward

The “

Transport motor Forward

” Screen Button (See

Figure 15

) causes the Transport Motor to run in the Banknote insertion direction

(Forward). The Yellow LED will flash if no error is indicated. The Yellow LED will light steady if an error condition is detected.

Transport Motor Reverse

Figure 15

 ) causes the Transport Motor to run in the Banknote return direction

(Reverse). The Yellow LED will flash if no error is indicated. The Yellow LED will light steady if an error condition is detected.

Stacker Motor Forward

The “

Transport motor Reverse

” Screen Button (See

The “

Stacker motor Forward

” Screen Button (See Figure 15

) causes the Stacker Motor to activate testing the Note Stacking function of the iVIZION

Cycle Test

®

Unit. The Yellow LED will flash if no error is indicated. The Yellow

LED will light steady if an error condition is detected.

The “

Cycle Test

” Screen Button (See Figure 15

 ) causes a full

Transport and Stacking cycle to occur, then repeats until stopped.

The Yellow LED will flash between cycles; if an error occurs, the RED LED will flash a related Error Code.

Sensor ON/OFF Check

The “

Sensor ON/OFF Check

” Screen Button (See Figure 15

) displays the current condition of each Validator, Transport and Cash Box

Sensor being tested. As Sensor status changes, the Test reflects the new condition.

Display Check

The “ the right side Status LED through a RED , GREEN and BLUE Color lighting sequence.

Dipsw ON/OFF Check

Display Check

The “

” Screen Button (See Figure 15

Dipsw ON/OFF Check

) cycles

” Screen Button (See Figure 15

) displays the current status of each iVIZION or OFF.

Accept Mode

The “

Accept Mode

®

DIP Switch, as either ON

” Screen Button (See Figure 15

) places the iVIZION

®

into a Banknote Acceptance Test. As each denomination Note is accepted, the denomination amount is placed in the DENOMI: Field. If a Bar Code

Ticket is inserted, the indication is “Ticket” in the DENOMI; Field.

To stop the Accept Mode Test, reset the iVIZION

®

Unit

.

NOTE: To enter the Accept Mode, the iVIZION

® have been performed.

Unit must be reset if any other Tests

ICB Control Ticket Read Mode

The “

ICB Control Ticket Read Mode activated (set-up) by using the ICB “Set” Tickets.

” Screen

Button (See Figure 15

), allows the Intelligent Cash Box (ICB) Function to be

Part No. 960-100923R_ Rev. 4 1 0

© 2016 JCM American Corporation

Part No. 960-100923R_ Rev. 4 1 9

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

February, 2016

PERFORMANCE TEST -

I

VIZION

To allow access to the iVIZION ® Performance Test function, the iVIZION

®

Unit must first be placed in Maintenance Mode as follows:

1. Turn DIP

Switch No. 8

ON

” to activate the Maintenance Mode.

NOTE: The DIP Switch Block is located at the bottom front side of the iVIZION

®

Transport Assembly.

2. Connect a USB Cable between the PC and the iVIZION Unit.

3. Apply power to the iVIZION

®

Unit. The Status Indicator on the Unit’s front right side will light Blue to indicate that the iVIZION

®

Unit is in Maintenance Mode.

4. Open the JCM Tool Suite Application.

5. Using the “

Service Mode

” drop-down Menu, select “

Performance Test

”; the Figure 15 Screen will appear.

a

 b

Figure 15 iVIZION Test Item Select Performance Test Selection Screen

To activate each Performance Test proceed as follows:

1. Click on the related function selection Screen Button for the desired Test (See

Figure 15

a ); an activation Dialog Screen for each selected Test will open.

2. Click on the “

START” Screen Button to begin the desired Test.

3. Click on the “

STOP”

Screen Button to end the Test.

4. To close a particular Test function, Click-on the “Exit” Screen Button located at the bottom of the related “

Function Test

Screen being performed.

For each Function, the expected Test result will be shown in the right hand

Window of the selected Function Test Screen.

5. To exit the Performance Test Screen, Click on the “

Exit(C)

” Screen Button (See

Figure 15

b ).

JCM Tool Suite™ Software Installation Guide

February, 2016

SENSOR ADJUSTMENT - iPRO

The Sensor Adjustment Program is used to calibrate an iPRO

®

Unit.

Place the iPRO

®

into Maintenance Mode by setting DIP Switch No. 8 to the ON position, and then recycle power to the Unit. Connect the USB Cable between the PC and the iPRO Unit. Open the JCM Tool Suite Application, and use the

Service Mode

” drop-down Menu (Review

Figure 5

) to select “

Sensor Adjustment

” from the Menu listings provided.

b a c

Figure 9 iPRO Sensor Adjustment Screen

The iPRO

®

Sensors are adjusted in two steps. First are the Validation Sensors, and second are the Positioning Sensors.

To calibrate the iPRO

®

Validation Sensors, proceed as follows:

NOTE: Two (2) types of Reference Paper are available for the iPRO

®

Unit. The iPRO

100 with a Centering Mechanism uses reference papers KS-081, KS-082, and KS-083.

The iPRO 101 with a fixed path uses reference papers KS-084, KS-085, and KS-086.

1. Click-select the “ Validation Sensor ” Radio Button

(See Figure 9

a ).

2. Click on the “

Start

Screen Button (See Figure 9

b ).

3. Follow the Application prompts, and ensure that the resulting message prompts are thoroughly followed.

When the Validation Sensor adjustment is complete, start the Positioning Sensor adjustment procedure as follows:

1. Click-select the “

Positioning Sensor

” Radio Button

(See Figure 9

c ).

2. Click on “

Start

” Screen Button (See Figure 9

b ).

3. Follow the Application prompts.

NOTE: For complete details regarding proper use of the iPRO

®

Series Calibration

Program, refer to Section 6, of the iPRO Series Operation and Maintenance

Manual. This Manual is available on the JCM Global Website at: http://www.jcmglobal.com

.

Part No. 960-100923R_ Rev. 4 1 8

© 2016 JCM American Corporation

Part No. 960-100923R_ Rev. 4 1 1

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

February, 2016

SENSOR ADJUSTMENT - iVIZION

The Sensor Adjustment Program is used to calibrate an iVIZION

®

Unit.

Place the iVIZION

®

into Maintenance Mode by setting DIP Switch No. 8 to the

ON position, and then recycle the power to the Unit. Connect the USB Cable between the PC and the iVIZION Unit. Open the JCM Tool Suite Application, and use the “

Service Mode

” drop-down Menu (Review

Figure 5

) to select “

Sensor Adjustment

” from the Menu listings provided.

NOTE: iVIZION

®

Calibration cannot be performed at the Game due to

Cash Box present requirements.

To calibrate the iVIZION

®

Sensors, proceed as follows:

NOTE: The iVIZION

®

Unit uses the KS-089 Reference Paper for calibration of Units with and without Bill Guides installed.

1. Click-on the large “

Start

” Screen Button (See Figure 10

a ).

b a

iVIZION Cash Box

Figure 10 iVIZION Sensor Adjustment Screen

2. Once the Calibration Procedure begins, the Application will test the iVIZION

®

Unit’s Cash Box, Transport, and Head Sensors.

3. When Cash Box Sensor testing is in process, the Applications will prompt the

Operator to “

Slide a Cardboard in between the Frame Outer LR and Pusher

Plate

”.

NOTE: To perform iVIZION

®

Calibration, the Cash Box Stacker must be moved away from its Home Position.This step is very important, and if done incorrectly will error out of the Calibration Procedure!

4. Once the Cardboard is set in position (See Figure 10

b ), select

“OK” and follow the Application prompts provided.

5. Insert the KS-089 Reference Paper when instructed by the Screen prompts.

6. Follow the Screen prompts until the Calibration Procedure is complete.

NOTE: For complete details regarding proper use of the iVIZION

®

Series Calibration

Program, refer to Section 6, of the iVIZION Series Operation and Maintenance

Manual. This Manual is available on the JCM Global Website at: http://www.jcmglobal.com

.

Part No. 960-100923R_ Rev. 4 1 2

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

February, 2016

I

PRO F

UNCTIONAL

T

EST

D

ESCRIPTIONS

The following Test Descriptions relate to the various Figure 14 Circle desig-

nated Screen Button Selections:

Operation Test – exercises various Banknote Acceptance configurations of the

Unit. The test enables Validation or NO-Validation, with or without a Cash Box

installed (See Figure 14

)

.

Accept Reject

Banknotes are accepted and then rejected (See Figure 14

).

Aging

A full Banknote Acceptance function is completed; the related Unit will

pause, then repeat until the Unit being tested is powered OFF (See Figure 14

)

.

NOTE: Test results are shown by selecting the “Denomination” Tab and Clicking on

“Update” in the drop-down Menu that appears.

Device Function Test

Stacking Test

The Cash Box stacking function is tested

(See Figure 14

)

.

Centering Test

For iPRO 100

operation (See Figure 14

 )

.

®

only. Tests the Centering Mechanism

Solenoid Test

operation (See Figure 14

).

PB Test

For iPRO 100

®

only. Tests the Centering Solenoid for proper

Tests the anti-Pull Back Assembly for proper operation

(See Figure 14

).

Motor Test

(See Figure 14

 )

Transmite FWD

Acceptance direction.

Transmite REV

Return direction.

Stacking FWD

Runs the Unit’s Transport Motor in the forward or Banknote

Runs the Unit’s Transport Motor in the reverse or Banknote

Runs the Stacking Motor function.

NOTE: For the iPRO

®

, a pop-up Screen will direct the Operator to remove the

Cash Box before the Test can begin.

Motor Speed Test

When a “

Motor Speed Test

” begins, the Motor’s speed will be displayed in mm/sec ( mm/s

) when any of the Motor Test Functions are being

performed (See Figure 14

).

The “

Sensor ON/OFF

” Tab selects the Validation and Position-

Sensor ON/OFF

ing Sensors for testing. Each Sensor can be tested. The test results are shown as an

OFF – ON

transition if the Sensor is working properly (See Figure 14

).

DIP Switch

The “

Dip Switch

” Tab enables the 8 Position DIP Switch Pack, and will indicate each Switches current status as

OFF

or

ON

(See Figure 14

)

.

Denomination

ure 14

).

The “

Denomination

” Tab displays the results of the Operation

Tests. Test results are displayed by Clicking the “

Update

” Screen Button (See Fig-

Recycler

The “

Recycler

” Tab function is used with the iPRO-RC Unit to test the

Banknote cycling function from-and-to the Recycle Bins (See Figure 14

).

Part No. 960-100923R_ Rev. 4 1 7

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

PERFORMANCE TEST – IPRO

February, 2016

To allow access to the iPRO ® Performance Test functions, the Unit must first be placed in Maintenance Mode as follows:

1. Turn DIP Switch No. 8 “ON” to activate the Maintenance Mode.

2. Apply power to the iPRO

®

Unit. The Status LEDs on the iPRO steady RED and GREEN respectively.

®

Unit will light a

3. Connect the Unit being tested to a PC using a USB Type-A to mini-B Cable.

4. Open the JCM Tool Suite Application.

5. Using the “

Service Mode

” drop-down Menu, select “

Performance Test

”; the

iPRO Performance Tool window in Figure 14 will appear.

 a g b

 c

 

 d e

 f

Figure 14 iPRO Performance Test Selection Screen

To activate each Performance Test, proceed as follows:

1. Click on the related function Screen Button to select the desired Test (See Figure

14

a ).

2. An Error Code will flash on the iPRO

®

if an error occurs.

NOTE: Refer to the related Operation and Maintenance Manual for an explanation of any Error Code that appears.

3. To perform an “

Operation Test

” (See Figure 14

b ), the iPRO

®

being tested will need to be powered OFF/ON to stop the Test in progress.

4. To perform a “

Motor Speed Test

”, “

Device Function Test

”, or a “

Motor Test

”,

Click on the related Screen Button (See Figure 14

c , d or e ). Click on the related

Stop

” Screen Button (See Figure 14

f ) to end a

Device Function Test

, or a

Motor

Test

in progress.

5. “

Sensor ON/OFF

”, “

DIP Switch

”, “

Denomination

”, or “

Recycler

” Tests can be

performed by click-selecting their related Screen Tab (See Figure 14

g ).

Part No. 960-100923R_ Rev. 4 1 6

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

February, 2016

SENSOR ADJUSTMENT - TBV

The Sensor Adjustment Program is used to calibrate a TBV

®

Unit.

Place the TBV

®

into Maintenance Mode by setting DIP Switch No. 8 to the ON position and then recycle power to the Unit. Connect the USB Cable between the PC and the TBV Unit. Open the JCM Tool Suite Application, and use the

Service Mode

” drop-down Menu (Review

Figure 6

) to select “

Sensor Adjustment

” from the Menu listings provided.

NOTE: To perform the Validation Sensor procedure, the TBV must be removed from the Frame to allow rear access to the Acceptor Sensors.

b a c

Figure 11 TBV Sensor Adjustment Screen

To calibrate the TBV

®

Validation Sensors, proceed as follows:

NOTE: Two (2) types of Reference Paper are available for the TBV

®

Unit. The TBV

100 with a Centering Mechanism uses reference papers KS-073, KS-074,

KS-075 and KS-076. The TBV 101 with a fixed path uses reference papers KS-076,

KS-077, KS-078, and KS-079.

1. Click-select the “

Validation Sensor

” Radio Button

(Review Figure 11

a ).

2. Click on the “

Start

Screen Button (Review Figure 11

b ).

3. Follow the Application prompts, and ensure that the resulting message prompts are thoroughly followed.

When the Validation Sensor adjustment is complete, start the Positioning

Sensor Adjustment Procedure as follows:

NOTE: The TBV

®

must be reinstalled into a Frame containing an installed Cash Box to calibrate Positioning Sensors.

1. Click-select the “

Positioning Sensor

” Radio Button

(Review Figure 11

c ).

2. Click on the “

Start

” Screen Button (Review Figure 11

b ).

3. Follow the Application prompts.

NOTE: For complete details regarding proper use of the TBV

®

Series Calibration

Program, refer to Section 6, of the TBV Series Operation and Maintenance

Manual. This Manual is available on the JCM Global Website at: http://www.jcmglobal.com

.

Part No. 960-100923R_ Rev. 4 1 3

© 2016 JCM American Corporation

JCM Tool Suite™ Software Installation Guide

February, 2016

SENSOR ADJUSTMENT - UBA

The Sensor Adjustment Program is used to calibrate a UBA

®

Unit.

To open the Sensor Adjustment Program, select the

“Sensor Adjustment”

Option within the JCM Tool Suite Application

“Service Mode”

drop-down Menu

(Review Figure 4

c ).

To calibrate the UBA ® Sensors, proceed as follows:

NOTE: The UBA

®

Unit uses KS-062/KS-063/KS-064 Reference Paper and a Magtool for calibration.

1. Click-on the “

START

UBA

®

Calibration Process.

Screen Button (See Figure 12

a ) to begin a d c a b

JCM Tool Suite™ Software Installation Guide

February, 2016

SENSOR ADJUSTMENT - DBV-400, DBV-500, EBA-40

The Sensor Adjustment Program is used to calibrate DBV ® -400, DBV ® -500 and

EBA ® -40 Units.

To manage access to the Sensor Adjustment Application, the Unit must first be placed in Maintenance Mode. To do so, proceed as follows:

NOTE: For the DBV

®

-400 Unit, KS-095A Reference Paper is used for calibration.

For the DBV

®

-500 Unit, KS-091 Reference Paper is used for calibration.

For the EBA

®

-40 Unit, KS-090 Reference Paper is used for calibration.

1. Turn DIP Switch Pack 1, DIP Switch #8 ON to activate Maintenance Mode.

2. Connect the DBV

®

-400, DBV

®

-500 or EBA

®

-40 Unit to the PC using a USB A to mini B cable.

3. Apply power to the Unit.

4. Open the JCM Tool Suite Application.

5. Click on the

Sensor Adjustment

option in the JCM Tool Suite Application

Service Mode

drop-down menu (Review Figure 6

d ). The Sensor Adjustment

Application will launch automatically.

6. Click the blue

Sensor Calibration

screen icon (Figure 13

a ).

Figure 12 UBA Sensor Adjustment Program Screen

2. Follow the onscreen prompts and insert Calibration Paper as requested.

3. Click-on the “

STOP

Calibration Process.

Screen Button (See Figure 12

b ) to end a UBA

4. To change the UBA

®

Units Serial Number during a Sensor Calibration Procedure, Click-select the “ Change Serial #

” Check Box (See Figure 12

c ).

5. The

“Status”

Field shows a Text Message of the Calibration Procedure progress

(See Figure 12

d ).

®

NOTE: For the complete details and requirements regarding proper use of the UBA

®

Series Calibration Program, refer to Section 6, of the UBA Series Operation and

Maintenance Manual. This Manual is available on the JCM Global Website at: http://www.jcmglobal.com

.

Part No. 960-100923R_ Rev. 4 1 4 a b

Figure 13 Sensor Calibration Screen icon (Sensor Adjustment Application)

7. Follow the on-screen prompts to complete the Sensor Calibration procedure.

NOTE: As each Calibration step is completed, an onscreen Checklist display will indicate successful completion.

8. When Calibration is complete, click the red

Close

box in the top right

corner of the Sensor Adjustment Application screen (Figure 13

b ) to exit the

Sensor Calibration application.

© 2016 JCM American Corporation

Part No. 960-100923R_ Rev. 4 1 5

© 2016 JCM American Corporation

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

Download PDF

advertisement