NEP BDM-600 Installation And Operation Manual
NEP BDM-600 is a dual module microinverter designed for grid-tied photovoltaic (PV) systems. It can handle one or two 60 or 72 cell modules, converting DC power from the panels into AC electricity that feeds back into the grid. The BDM-600 includes integrated surge protection and a user-friendly LED status indicator for easy monitoring.
PDF
Download
Document
Advertisement
Advertisement
Installa�on and Opera�on Manual l North American Version BDM-600 Dual Module Microinverter USA Address: 2570 N. First Street, Suite 200, San Jose, CA 95131 TEL: +1 888-598-9901 Japan Address: 812-0011 福岡市博多区博多駅前 3-10-24 藤井ビル 1F TEL: +81 092-433-3252 FAX: +81 092-433-3171 China Address: No.1 Anhe Rd Tsingtao Export Processing Zone, Tsingtao, China 266113 TEL: +86 532 87963900 FAX: +86 532 81100917 Email: [email protected] Web: h�p://www.northernep.com h�p://www.nep-japan.com h�p://www.micro-inverter.jp Rev. 2017-01-12 SAA 152167 CONTENTS COMPANY PROFILE 1. INTRODUCTION 1.1 Gree�ng 1.2 System Compa�bility 1.3 How to Use This Manual 1.4 Label 2. SAFETY INSTRUCTION 3. FCC COMPLIANCE 4. DESIGN 5. PARTS NEEDED 5.1 NEP Parts 5.2 Addi�onal Parts and Tools Requires 5.3 Lightning and Surge Suppression 5.4 Shipping Informa�on 6. INSTALLATION 6.1 Pre-installa�on 6.2 Installa�on Steps Step 1 - System Layout Step 2 - Connect the Wiring Harnesses Step 3 - Install the AC Branch Circuit Junc�on Box Step 4- Ground the System Step 5 - Complete the Connec�on Map Step 6 - Connect the PV Modules Step 7 - Install the BDG 256 Monitoring Gateway 7. COMMISSIONING 8. OPERATING INSTRUCTIONS 9. TROUBLESHOOTING MAINTENANCE 10. SPECIFICATIONS 11. WARRANTY AND PRODUCT INFORMATION 01 02 02 02 02 02 03 03 04 04 04 05 05 05 05 05 06 06 07 08 08 09 09 09 10 10 11 14 16 COMPANY PROFILE Northern Electric & Power Inc. (NEP) is an interna�onal supplier of cu�ng-edge clean energy technologies headquartered in the United States. The company maintains facili�es both here and abroad, including a more than 18 acre site in the Tsingtao Export Processing Zone and has more than 650,000 square feet of building space. The company’s founders are well-known experts in the fields of power electronics, automa�c control, signal processing, and communica�ons; each holding mul�ple U.S. and world patents in their specialty areas. NEP has a complete product line of grid-�ed solar inverters, including 180W~600W micro inverters, 1.5kW~5kW single phase solar inverters, 10kW~500kW three-phase solar inverters, and rapid shutdown devices. Field deployment results demonstrated high system efficiency and reliability of NEP solar inverters. NEP is commi�ed to develop Clean, Reliable, Affordable and Efficient (CARE) products for worldwide customers to aid in the transi�on to a green economy. 01 1. INTRODUCTION 1.1 Gree�ng Thank you for choosing the BDM-600 micro inverter from NEP. This product will maximize your inversion benefit with the minimal amount of design and installa�on complexity. This document should provide you with all of the necessary steps to correctly install the NEP-600 dual module microinverter in sites located in North America. However, should you have addi�onal ques�ons please contact NEP’s technical representa�ve at [email protected]. 1.2 System Compa�bility The BDM-600 is designed to support either one or two 60 or 72 cell modules in grid-�ed PV system consists of PV panels, grid-�ed inverter and junc�on boxes. The DC output from the PV panels is converted into AC energy and fed back to the grid through the BDM-600. The BDM-600 also provides effec�ve an�-islanding isola�on between the PV module and AC grid output. 1.3 How to Use This Manual This manual provides detailed product informa�on and installa�on instruc�ons for the BDM-600 micro solar inverter. Please read through this manual before installa�on and opera�on. WARNING: This indicates a situa�on where failure to follow instruc�ons may be a safety hazard or cause equipment malfunc�on. Use extreme cau�on and follow instruc�ons carefully. WARNING: PLEASE READ THIS MANUAL PRIOR TO INSTALLATION. PRODUCT DAMAGE RESULTING FROM FAILURE TO FOLLOW THIS MANUAL IS NOT COVERED BY THE WARRANTEE. INSTALLATIONS SHOULD BE DONE ONLY BY CERTIFIED ELECTRICIANS. NOTHING INSIDE THE INVERTER SHOULD BE MODIFIED ONLY NEP APPROVED CABLING SHOULD BE USED TO CONNECT MICROINVERTERS ALL INSTALLATIONS SHOULD FOLLOW THE LOCAL ELECTRICAL CODES. ADDITIONAL PROTECTION FOR THE AC WIRING FROM THE INVERTERS SHOULD BE PROVIDED AND MAY BE REQUIRED BY LOCAL AND NATIONAL WIRING REGULATIONS. THIS PROTECTION IS LIKELY TO INCLUDE RESIDUAL CURRENT DEVICES, EARTH FAULT MONITORS AND CIRCUIT BREAKERS. THIS PRODUCT MAY CAUSE AC CURRENT WITH A DC COMPONENT. IF A RESIDUAL CURRENT-OPERATED PROTECTIVE DEVICE (RCD) OR A MONITORING DEVICE (RCM) IS USED FOR PROTECTION IN CASE OF DIRECT OR INDIRECT CONTACT, ONLY AN RCD OR RCM OF TYPE B IS ALLOWED ON THE AC SIDE OF THIS PRODUCT. NEVER DISCONNECT THE PV MODULES FROM THE MICRO-INVERTER WITHOUT FIRST ISOLATING THE AC MAINS. ALL PV AND AC CONNECTORS ARE NOT TO BE DISCONNECTED UNDER LOAD. THE AC BRANCH CIRCUIT BREAKERS MUST BE FIRST SWITCHED OFF. PLEASE CONTACT AUTHORIZED SERVICE AGENTS FOR ANY SERVICE WORK. BDM-600 IS A GRID-TIED SOLAR INVERTER. IT MAY REQUIRE APPROVAL FROM THE LOCAL UTILITY COMPANY PRIOR TO CONNECTION TO THE POWER GRID. THE BDM-600 DOES NOT INCLUDE ANY USER SERVICABLE COMPONENTS. WARNING: THE PV ARRAY SUPPLIES A DC VOLTAGE TO THE MICROINVERTER WHEN EXPOSED TO 1.4 Label LIGHT. A label is located on the side of the inverter which includes technical data as well as type and serial number of the device. Safety instruc�ons are listed and explained below: 3. FCC COMPLIANCE Danger! The term “danger” describes an issue which, if ignored can cause personal injury. A�en�on! With the term “a�en�on” a circumstance is listed which may cause property damage if disregarded. Instruc�ons for use! Under “Instruc�ons for Use“, it is pointed out that installa�on and opera�ng instruc�ons are to be read and understood before installa�on or repair. Cau�on, hot surface! Under “Cau�on, hot surface”, it should be noted that surfaces of equipment may be hot and create a burn hazard. Special disposal instruc�ons! With “Note Separate Disposal”, it is pointed out that this product may not be disposed of with normal garbage. An improperly conducted disposal can lead to damage to the environment. 02 2. SAFETY INSTRUCTION ETL Cer�fica�on This marks cer�fies that the product complies with all relevant UL requirements for sale in North America. This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protec�on against harmful interference in a residen�al installa�on. This equipment generates uses and can radiate radio frequency energy and, if not installed and used in accordance with the instruc�ons, may cause harmful interference to radio communica�ons. However, there is no guarantee that interference will not occur in a par�cular installa�on. If this equipment does cause harmful interference to radio or television recep�on, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: ● Reorient or relocate the receiving antenna. ● Increase the separa�on between the equipment and the receiver. ● Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. ● Consult the dealer or an experienced radio/TV technician for help. Changes or modifica�ons not expressly approved by the party responsible for compliance may void the user’s authority to operate the equipment. 03 4. DESIGN Microinverter technology greatly simplifies the design process compared to conven�onal string inverter systems. The BD-600 allows for the PV modules to be placed with different azimuths and orienta�ons to maximize site genera�on. In addi�on to the layout configura�on, a successful design needs to take into account two other considera�ons: branch circuit sizing and voltage rise calcula�on. Layout: A layout map showing the loca�on of each PV module and its corresponding microinverter should be first constructed. Care should be taken to review the DC lead length of the PV modules to see if addi�onal jumpers are required to reach the dual DC inputs of the BD-600. Each microinverter comes with a number of peelable serial number s�ckers. Remove a pair of s�ckers and a�ach them to the corresponding modules on the site map. Branch Circuit Sizing: Since the BD-600 uses #12 AWG cabling, NEC code specifies a maximum breaker size of 20A. This limits the branch size to a maximum of seven (7) devices for a 240V system and six (6) devices for a 208V system. 5.2 Addi�onal Parts and Tools Required In addi�on to the PV modules, racking, and associated hardware, you’ll need the following parts: ● MLPE rail or frame a�ach clamps (2 per microinverter) • AC junc�on boxes (mul�ple op�ons possible) • Cordgrip with locknut or strain relief fi�ng (one per branch circuit) • A subpanel may be required for systems with mul�ple branch circuits • Cable clips • Sockets, wrenches, torque wrench, mul�meter, small flat head screwdriver, and mirror with extension rod • Lightning and surge suppressor (recommended) 5.3 Lightning and Surge Suppression 5. PARTS NEEDED Since the NEP Limited Warranty does not cover “acts of God”, such as lightning strikes or grid irregulari�es, NEP strongly recommends inclusion of a surge protec�on device in all systems. Lightning does not actually need to strike the equipment or building where PV system is installed to cause damage. O�en, a strike nearby will induce voltage spikes in the electrical grid that can damage equipment. Addi�onally, many areas can experience irregulari�es in electrical grid that can generate similar voltage spikes. While the BDM-600 includes integrated surge protec�on circuitry, if the surge has sufficient energy the protec�on circuitry can be exceeded and the equipment can be damaged. Installa�on of a suitable surge protector significantly increases the protec�on against such events. 5.1 NEP Parts 5.4 Shipping Informa�on In addi�on to the micro inverters, you’ll need the following parts from NEP: The BDM-600 Ships six (6) to a box with each box measuring approximately 18” x 13.5” x 16”and weighing 57 lbs. A typical pallet contains 27 boxes. Voltage Rise Calcula�on: The addi�on of daisy chained, current producing microinverters on the AC bus results in a sequen�al rise in voltage along the bus, with the highest at the furthest device. Care must be taken that the resul�ng voltage doesn’t exceed the maximum permissible by code. For a 240 V system, this is 264V and 229V for a 208V system. Please contact NEP technical support should you need more informa�on on this subject. ● AC trunk cable (one per micro) 6. INSTALLATION ● Protec�ve end cap (one per branch circuit) 6.1 Pre-installa�on ● Tail cable (one per branch circuit- 16’ long) ● Male connector (op�onal) Used to make extension cables Prior to installa�on, use the mul�meter to check the electrical panel to confirm the correct service voltage per the below table. If this voltage is too high it can prevent proper opera�on of the microinverters. If this is the case, the u�lity should be no�fied. However, an NEP technical representa�ve may be able to adjust microinverter opera�onal parameters to accommodate the situa�on. Residen�al Commercial L1 to L2 L1 to L2 to L3 240 Vac 208 Vac ● BDG-256 (or BDG-256P3) 04 Also, please check all microinverters and cabling for any poten�al damage prior to site deployment. Remember to first create and bring a copy of the layout map. This map should show the physical loca�on of each BDM-600 and their associated PV modules in your installa�on. 05 6.2 Installa�on Steps Step 2 – Connect the Wiring Harnesses WARNING: CONNECT BDM-600S TO THE ELECTRICAL UTILITY GRID ONLY AFTER RECEIVING PRIOR APPROVAL FROM THE UTILITY COMPANYAND LOCAL AHJ. WARNING: BE AWARE THAT ONLY QUALIFIED PERSONNEL CAN CONNECT BDM-600 TO THE ELECTRICAL UTILITY GRID. Step 1 – System Layout Mark the approximate loca�on of each pair of PV modules on the racking system. Place the microinverters at the loca�on called out in the layout map and loosely a�ach to the rails using the MLPE clamps. Check the reach of all DC and AC cabling. DC jumpers may be required for some modules. Reposi�on as needed. WARNING: ALLOW A MINIMUM OF 2.75 INCHES BOTH BETWEEN THE TOP OF THE ROOF AND THE BOTTOM OF THE BDM-600 AND BETWEEN THE BACK OF THE PV MODULE AND THE TOP OF THE BDM-600. DO NOT PLACE THE BDM-600 IN A LOCATION SUBJECT TO DIRECT SUNLIGHT. WARNING: DO NOT EXCEED THE MAXIMUM NUMBER OF SEVEN (7) BDM-600s IN A 240V AC BRANCH CIRCUIT (SIX(6) FOR 208V) AND EACH BDM-600 AC BRANCH CIRCUIT MUST BE SOURCED FROM A 20A MAXIMUM BREAKER. Install a protec�ve end cap on the open female AC connector on the last microinverter at the end of the truck cable. WARNING: MAKE SURE PROTECTIVE END CAPS HAVE BEEN INSTALLED ON ALL UNUSED 1. AC CONNECTORS. UNUSED AC BDM-600 WIRE HARNESS CONNECTORS ARE LIVE WHEN THE SYSTEM IS ENERGIZED BY T 2. 3. Each BDM-600 comes with an integrated trunk cable to simplify the AC connec�on process. The AC trunk cable includes a male connector on one end and a female connector at the other end. Plug the male AC connector of the first BDM-600 into the connector on the tail cable. Plug the female AC connector of the first BDM-600 into the male connector of the next BDM-600 (or jumper cable) and con�nue this “daisy chain” process to form a con�nuous AC branch circuit. Terminate the final female connector on the last microinverter in the branch circuit with the protec�ve cap. The connectors are keyed with a snap lock pin. A “click” indicates proper ma�ng. Secure the mated connector pairs and any excess AC cable to the rail or racking using cable clips or wire �es JUMPER “Optional, to connect separate array” The AC branch circuit should look as pictured below: 4. 5. For ground mount, ballasted, or flat roof deployments it may be necessary to a�ach the microinverters to the racking frame. Once the final posi�on is confirmed, secure the microinverters using the MLPE clamps and torque per the manufacturer’s specifica�ons. Typical values are about 12 �lbs (16.3 NM). 06 07 Step 3 – Install the AC Branch Circuit Junc�on Box Step 5 – Complete the Connec�on Map 1. Install an appropriate junc�on box on to the moun�ng plate. Each BDM-600 has a removable serial number label located on the moun�ng plate as well as addi�onal s�ckers included in the microinverter’s protec�ve bag. Remove one and affix it to the corresponding loca�on on the layout map. A�er entering this data, the BDM-256 will create a virtual array from the map you create. 2. Mount the adapter plate at a suitable loca�on on the racking or frame. is typically near the end of a row of modules. This 3. Feed the open wire end of the tail cable into the junc�on box and secure with an appropriate cord grip or strain relief fi�ng. The AC tail cable requires a strain relief connector with an opening of 3/8” in diameter. 4. Feed the connec�ng wires from either the main service panel or subpanel (if mul�ple branch circuits are deployed) into the junc�on box. This is most likely via metal conduit. 5. Connect L1, L2 and Ground from the branch circuit to their corresponding connec�ons from the electrical panel with wire nuts. NEP recommends the applying sealant to the inside cavity of the wire nuts. Seal the junc�on box. Step 6 – Connect the PV Modules Connect all AC all system inter-wiring connec�ons prior to installing the PV modules. 1. Mount the PV modules in the posi�ons corresponding to their associated BDM-600 microinverter. Each BDM-600 comes with two sets of oppositely sexed DC connectors. 2. Connect the posi�ve DC wire from the first PV module to the nega�vely marked DC connector (male pin)on the BDM-600. Then connect the nega�ve DC wire from the PV module to the positively marked DC connector (female socket) of the BDM-600. Next, do the same for the second set of DC connectors from the second module. Repeat for all remaining PV modules using one BDM-600 for each set of modules. If the system contains an odd number of modules, it is acceptable to connect only one PV module to the BDM-600. Step 4 – Ground the System Each BDM-600 has an integrated ground protec�on circuit. The grounding wire is through the trunk cable, and should be securely connected to the ground connector in the junc�on box. Ground the System Through Racking (Op�on) BDM-600 may also be grounded through the racking as shown below. 08 Step 7 – Install the Monitoring Gateway The BDG-256 (or BDG-256P3) is a versa�le gateway that connects each of the BDM-600 microinverter to the NEP server via the cloud, allowing for collec�on of produc�on and other data useful in system monitoring and trouble shoo�ng. It is easily installed either by plugging into an exis�ng 120V AC interior outlet or by hardwiring into the 240V service in a suitable protec�ve enclosure. Connec�ng to 240V will maximize the strength of the PLC signal, thereby improving communica�on. The BDG-256P3 is designed to support commercial three phase systems and should only be located in a protec�ve enclosure. The gateway then will connect to the server via either WiFi or direct Ethernet connec�on. Follow the instruc�ons in the NEP Gateway BDM-256/256P3 Installation and Operations Manual for specific details on registering the individual microinverters in the PV system. 09 7. COMMISSIONING WARNING: ENSURE THAT ALL AC AND DC WIRING IS CORRECT. ENSURE THAT NONE OF THE AC AND DC WIRES ARE PINCHED OR DAMAGED AND THAT ALL JUNCTION BOXES ARE PROPERLY SEALED CLOSE. Following these steps to commission the BDM-600 PV system: 1. Turn on the circuit breakers for each of the BDM-600 AC branch circuits. Status: grounding fault The LED light is in solid red color. In case of a fault, the BDM-600 enters a protec�ve mode and stops outputing power. The fault message is usually sent to a connected BDG-256 gateway through the power line communica�on. The error message is then displayed on the screen of BDG-256 gateway by a 16-bit error code. The table below shows the codes: Error code Error 2. Turn on the main service panel u�lity-grid AC circuit breaker. Your system will start producing power a�er no more than 5 minutes. Bit-0 DC over voltage Bit-1 DC under voltage 3. The BDM-600 will start to send performance data over the power lines using power line communica�on (PLC) to the BDG-256. The �me required for each BDM-600 in the system to communicate to the BDG-256 will vary with the number of microinverters in the system. For a typical residen�al system data acquisi�on should take no more than 20-25 minutes. Bit-2 hardware error Bit-3 Inverter over voltage Bit-4 Frequency over Bit-5 Frequency under Bit-6 AC voltage RMS over 8. OPERATING INSTRUCTIONS Bit-7 AC voltage RMS under The BDM-600 begins opera�on only a�er sufficient DC voltage from the PV module is received. At this point the status LED will start flashing. Bit-8 Peak AC voltage over Bit-9 AC current RMS over Bit-10 Peak AC current over Status: standby Bit-11 Temperature over The LED light toggles on and off at two (2) second intervals Bit-12 ADC error Red: error detected Bit-13 GFDI fault indicator Orange: no error, but not yet communica�ng to the BDG-256 Bit-14 Relay fault (BDM-250-AU/BDM-250-EU only) Green: no error, and communica�ng to the BDG-256 Bit-15 PLC Communica�on Error Status: producing power The LED light toggles on and off at one (1) second intervals Orange: not communica�ng to the BDG-256 Green: communica�ng to the BDG-256 9. TROUBLESHOOTING AND MAINTENANCE WARNING: DO NOT ATTEMPT TO REPAIR THE BDM-600; IT CONTAINS NO USER-SERVICEABLE PARTS. IF TROUBLESHOOTING METHODS FAIL, PLEASE CONTACT NEP FOR FURTHER ASSISTANCE. WARNING: NEVER DISCONNECT THE DC WIRE CONNECTORS UNDER LOAD. ENSURE THAT NO CURRENT IS FLOWING IN THE DC WIRES PRIOR TO DISCONNECTING. AN OPAQUE COVERING MAY BE USED TO COVER THE MODULE PRIOR TO DISCONNECTING. WARNING: BDM-600 IS POWERED BY DC POWER FROM PV MODULES. MAKE SURE YOU DISCONNECT THE DC CONNECTIONS AND RECONNECT DC POWER TO WATCH FOR THE TWO SECONDS LED ON/OFF TOGGLE AFTER DC IS APPLIED. 10 11 WARNING: ALWAYS DISCONNECT AC POWER BEFORE DISCONNECTING PV MODULE WIRES FROM THE BDM-600. THE AC CONNECTOR OF THE FIRST BDM-600 IN A BRANCH CIRCUIT IS SUITABLE AS A DISCONNECTING MEANS ONCE THE AC BRANCH CIRCUIT BREAKER IN THE LOADCENTER HAS BEEN OPENED. LED indica�on of error error mode (except for grounding error) The LED light flashes in red color. NOT communica�ng with BDG-256, and with no error The LED light flashes in orange color. grounding fault The LED light is in solid red color. Troubleshoo�ng an inoperable BDM-600 To troubleshoot an inoperable BDM-600, follow the steps in the order shown: 1. Check the connec�on to the u�lity grid. Verify that the u�lity voltage and frequency are within allowable ranges shown in the label of BDM-600. 2. Verify u�lity power is present at the inverter in ques�on by removing AC, then DC power. Never disconnect the DC wires while the BDM-600 is producing power. Re-connect the DC module connectors, and then watch for the LED blinks. 3. Check the AC branch circuit interconnec�on harness between all the BDM-600. Verify that each inverter is energized by the u�lity grid as described in the previous step. 4. Make sure that any AC disconnects are func�oning properly and are closed. 5. Verify the PV module DC voltage is within the allowable range shown in the label of BDM-600. 6. Check the DC connec�ons between the BDM-600 and the PV module. 7. PLC signal quality may be checked through the interface on the BDG-256 gateway. If the PLC signal is weak, it might be due to the distance between the micro inverters and the gateway. It may also be caused by the interference from other electronic devices. In most cases, signal quality may be significantly improved by moving the BDG-256 to closer to the micro inverter arrays, and/or farther away from other interferers. In some cases, a signal filter (LCF) may be installed to reduce the interference to PLC communica�on. If there are two or more separate BDM systems close by, it is highly recommended to install LCF for each micro inverter system to block interference from adjacent other systems. Disconnec�ng a BDM-600 from the PV Module To ensure the BDM-600 is not disconnected from the PV modules under load, adhere to the following disconnec�on steps in the order shown: 1. Disconnect the AC by opening the branch circuit breaker. 2. Disconnect the first AC connector in the branch circuit. 3. Cover the module with an opaque cover. 4. Using a DC current probe, verify there is no current flowing in the DC wires between the PV module and the BDM-600. 5. Care should be taken when measuring DC currents, most clamp-on meters must be zeroed first and tend to dri� with �me. 6. Disconnect the PV module DC wire connectors from the BDM-600. 7. Remove the BDM-600 from the PV array racking. Installing a replacement BDM-600 1. A�ach the replacement BDM-600 to the PV module racking using hardware recommended by your module racking vendor in the same loca�on as the one previously removed. 2. Connect the AC cable of the replacement BDM-600 and the neighboring BDM-600s to complete the branch circuit connec�ons. 3. Obtain serial number of the replacement BDM-600 Each BDM-600 has a removable serial number located on the moun�ng plate and addi�onal s�ckers in the shipping bag. 4. Reconnect the PV Modules. First connect the posi�ve DC wire from the PV module to the nega�vely marked DC connector (male pin) of the BDM-600. Then connect the nega�ve DC wire from the PV module to the posi�vely marked DC connector (female socket) of the BDM-600. Repeat for the remaining PV modules. 5. Replace the old PLC ID in the BDG-256 gateway with the new PLC ID of the newly installed micro inverter. 7. If the problem persists, please call customer support at NEP. WARNING: DO NOT ATTEMPT TO REPAIR THE BDM-600; IT CONTAINS NO USER-SERVICEABLE PARTS. IF TROUBLESHOOTING METHODS FAIL, PLEASE RETURN THE BDM-600 TO YOUR DISTRIBUTOR FOR MAINTENANCE. 12 13 10. SPECIFICATIONS MODEL INPUT(DC) OUTPUT(AC) BDM-600 Max Recommended PV Power(Wp) 340 x 2 Max DC Open Circuit Voltage(Vdc) 60 Max DC Input Current (Adc) 12 x 2 MPPT Tracking Accuracy >99.5% MPPT Tracking Range(Vdc) 22-55 Peak AC Output Power(Wac) 550 Rated AC Output Power(Wac) 500 Nominal Power Grid Voltage(Vac) 240 Allowable Power Grid Voltage(Vac) 211-264 (Adjustable*) Allowable Power Grid Frequency(Hz) 59.3-60.5(Adjustable*) THD Power Factor <3% (at rated power) >0.99 (at rated power) 95.5% SYSTEM CEC Efficiency EFFICIENCY Night Time Tire Loss(W) 0.11 Over/Under Voltage Protec�on Yes Over/Under Frequency Protec�on Yes An�-Islanding Protec�on Yes Over Current Protec�on Yes PROTECTION Reverse DC Polarity Protec�on Yes FUNCTIONS Overload Protec�on Yes Ground Fault Detec�on Integrated Protec�on Degree NEMA-6 OTHER PARAMETERS Environment Temperature -40℃ ~+65℃ Opera�ng Temperature -40℃ ~ +85℃ Display LED LIGHT Communica�ons POWERLINE Dimension (D-W-H mm) 277*132*50 Weight(Kg) 14 *per IEEE1547A 2.9 15 11. WARRANTY AND PRODUCT INFORMATION What does this warranty cover and how long does it last? This Limited Warranty is provided by Northern Electric & Power Co. Ltd (NEP) and covers defects in workmanship and materials in your BDM-300X2 Grid-Tied Inverter. This Limited Warranty is transferable to subsequent owners but only for the unexpired por�on of the Warranty Period. Subsequent owners also require original proof of purchase as described in "What proof of purchase is required?" What will NEP do? Disclaimer Product During the Warranty Period, NEP will, at its op�on, repair the product (if economically feasible) or replace the defec�ve product free of charge, provided that you no�fy NEP of the product defect within the Warranty Period, and provided that NEP through inspec�on establishes the existence of such a defect and that it is covered by this Limited Warranty. THIS LIMITED WARRANTY IS THE SOLE AND EXCLUSIVE WARRANTY PROVIDED BY NEP IN CONNECTION WITH YOUR NEP PRODUCT AND IS, WHERE PERMITTED BY LAW, IN LIEU OF ALL OTHER WARRANTIES, CONDITIONS, GUARANTEES, REPRESENTATIONS, OBLIGATIONS AND LIABILITIES, EXPRESS OR IMPLIED, STATUTORY OR OTHERWISE IN CONNECTION WITH THE PRODUCT, HOWEVER ARISING (WHETHER BY CONTRACT, TORT, NEGLIGENCE, PRINCIPLES OF MANUFACTURER'S LIABILITY, OPERATION OF LAW, CONDUCT, STATEMENT OR OTHERWISE), INCLUDING WITHOUT RESTRICTION ANY IMPLIED WARRANTY OR CONDITION OF QUALITY, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE TO THE EXTENT REQUIRED UNDER APPLICABLE LAW TO APPLY TO THE PRODUCT SHALL BE LIMITED IN DURATION TO THE PERIOD STIPULATED UNDER THIS LIMITED WARRANTY. NEP will, at its op�on, use new and/or recondi�oned parts in performing warranty repair and building replacement products. NEP reserves the right to use parts or products of original or improved design in the repair or replacement. NEP repairs or replaces a product, its warranty con�nues for the remaining por�on of the original Warranty Period or 90 days from the date of the return shipment to the customer, whichever is greater. All replaced products and all parts removed from repaired products become the property of NEP. How do you get service? If your product requires troubleshoo�ng or warranty service, contact your merchant. If you are unable to contact your merchant, or the merchant is unable to provide service, contact NEP directly at: Northern Electric & Power Inc Email:[email protected] What does this warranty not cover? Claims are limited to repair and replacement or if in NEP's discre�on that is not possible, reimbursement up to the purchase price paid for the product. NEP will be liable to you only for direct damages suffered by you and only up to a maximum amount equal to the purchase price of the product. This Limited Warranty does not warrant uninterrupted or error-free opera�on of the product or cover normal wear and tear of the product or costs related to the removal, installa�on, or troubleshoo�ng of the customer's electrical systems. This warranty 16 does not apply to and NEP will not be responsible for any defect in or damage to: a) the product if it has been misused, neglected, improperly installed, physically damaged or altered, either internally or externally, or damaged from improper use or use in an unsuitable environment; b) the product if it has been subjected to fire, water, generalized corrosion, biological infesta�ons, or input voltage that creates opera�ng condi�ons beyond the maximum or minimum limits listed in the NEP product specifica�ons including high input voltage from generators and lightning strikes; c) the product if repairs have been done to it other than by NEP or its authorized service centers (herea�er "ASCs"); d) the product if it is used as a component part of a product expressly warranted by another manufacturer; e) the product if its original iden�fica�on (trade-mark, serial number) markings have been defaced, altered, or removed; f) the product if it is located outside of the country where it was purchased; and g) any consequen�al losses that are a�ributable to the product losing power whether by product malfunc�on, installa�on error or misuse. IN NO EVENT WILL NEP BE LIABLE FOR: (a) ANY SPECIAL, INDIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES, INCLUDING LOST PROFITS, LOST REVENUES, FAILURE TO REALIZE EXPECTED SAVINGS, OR OTHER COMMERCIAL OR ECONOMIC LOSSES OF ANY KIND, EVEN IF NEP HAS BEEN ADVISED, OR HAD REASON TO KNOW, OF THE POSSIBILITY OF SUCH DAMAGE, (b) ANY LIABILITY ARISING IN TORT, WHETHER OR NOT ARISING OUT OF NEP'S NEGLIGENCE, AND ALL LOSSES OR DAMAGES TO ANY PROPERTY OR FOR ANY PERSONAL INJURY OR ECONOMIC LOSS OR DAMAGE CAUSED BY THE CONNECTION OF A PRODUCT TO ANY OTHER DEVICE OR SYSTEM, AND (c) ANY DAMAGE OR INJURY ARISING FROM OR AS A RESULT OF MISUSE OR ABUSE, OR THE INCORRECT INSTALLATION, INTEGRATION OR OPERATION OF THE PRODUCT. IF YOU ARE A CONSUMER (RATHER THAN A PURCHASER OF THE PRODUCT IN THE COURSE OF A BUSINESS) AND PURCHASED THE PRODUCT IN A MEMBER STATE OF THE EUROPEAN UNION, THIS LIMITED WARRANTY SHALL BE SUBJECT TO YOUR STATUTORY RIGHTS AS A CONSUMER UNDER THE EUROPEAN UNION PRODUCT WARRANTY DIRECTIVE 1999/44/EC AND AS SUCH DIRECTIVE HAS BEEN IMPLEMENTED IN THE EUROPEAN UNION MEMBER STATE WHERE YOU PURCHASED THE PRODUCT. FURTHER, WHILE THIS LIMITED WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS, YOU MAY HAVE OTHER RIGHTS WHICH MAY VARY FROM EU MEMBERSTATE TO EU MEMBERSTATE OR, IF YOU DID NOT PURCHASE THE PRODUCT IN AN EU MEMBER STATE, IN THE COUNTRY YOU PURCHASED THE PRODUCT WHICH MAY VARY FROM COUNTRY TO COUNTRY AND JURISDICTION TO JURISDICTION. 17 Warranty Card Customer Informa�on Name: Address: City: State: Zip Code: Tel: Fax: E-mail: System Informa�on Fault Product(s) Serial Numbers: System Commissioning Date: Product Models: No. of Products Used: Bill of Lading Date: Fault Product(s) Quan��es: Fault Time/Date: Fault Message(s) or Code(s): Brief Fault Descrip�on and Photos (monitoring gateway is required for verifica�on): Installa�on Informa�on Modules Used: Modules Quan�ty: Inverters quan�ty per string: Installa�on Company Name: Installer Name: For the informa�on on our warranty terms and condi�ons, please see our website: www.northernep.com/en All fields must be completed in order to process claim. Customer Signature: Date: *All rights reserved by NEP. This informa�on is subject to changes without no�ce. 19 USA Address: 2570 N. First Street, Suite 200, San Jose, CA 95131 TEL: +1 888-598-9901 Japan Address: 812-0011 福岡市博多区博多駅前 3-10-24 藤井ビル 1F TEL: +81 092-433-3252 FAX: +81 092-433-3171 China Address: No.1 Anhe Rd Tsingtao Export Processing Zone, Tsingtao, China 266113 TEL: +86 532 87963900 FAX: +86 532 81100917 Email: [email protected] Web: h�p://www.northernep.com h�p://www.nep-japan.com h�p://www.micro-inverter.jp ">

Public link updated
The public link to your chat has been updated.
Advertisement
Key features
- Dual Module Support
- Grid-Tied Operation
- Integrated Surge Protection
- LED Status Indicator
- Powerline Communication
- CEC Efficiency 95.5%
- MPPT Tracking Accuracy
- Adjustable Voltage/Frequency
- Easy Installation
- Ground Fault Detection
Frequently asked questions
The maximum recommended PV power for the BDM-600 is 340 Wp per module, for a total of 680 Wp.
The maximum allowable power grid voltage for the BDM-600 is 264 Vac.
No, the BDM-600 does not include any user-serviceable parts. If troubleshooting fails, contact NEP for assistance.
The BDM-600 has an integrated ground protection circuit. The grounding wire is through the trunk cable, and should be securely connected to the ground connector in the junction box. It can also be grounded through the racking system.