The Palmako FRG28-4032 is a garden house kit designed for DIY assembly. It's constructed from high-quality fir wood and comes with a detailed installation manual. This house is perfect for creating a cozy retreat, a storage space, or an extra room in your garden. Be sure to use proper tools and follow the instructions carefully for a successful build.

advertisement

Assistant Bot

Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.

Palmako FRG28-4032 Installation Manual | Manualzz
Inspection Certificate
Controlecertificaat ● Kontrollschein ● Bulletin de contrôle ● Certificato
di controllo ● Certificado de control ● Kontrollskjema ● Kontrol
Certifikat
Art. Nr. FRG28-4032
ZL-Art.-Nr. 881392
Please keep safely!
Zorgvuldig te bewaren! ● Bitte gut aufbewahren! ● A bien conserver,
s.v.p.! ● Da conservare! ● ¡A conservar! ● Ta vare på denne! ●
Opbevares sikkert!
w
w
English: The house you have purchased was manufactured in accordance with the high quality norms. The building unit has been carefully
inspected and packed. In order to avoid possible problems during the assembly carried out by yourself or the building company of your choice, we
recommend that you inspect the delivery for its completeness in accordance with the list of pieces before assembly. This inspection must be carried
out within 14 days after delivery to your place. Warranty claims are limited to the exchange of defective materials. Defective building parts, which
have already been used or painted, are excluded from being replaced. All further claims are excluded! In cases of complaints, please pay attention
to the following procedures: Please present this inspection certificate along with the sales receipt to your place of purchase. Only in cases where
these documents are presented will the complaint be dealt with quickly and without complications.
.s
w
Dutch: Het door U gekochte tuinhuis werd vervaardigd volgens de hoge kwaliteitsnormen. Het tuinhuis werd zorgvuldig gecontroleerd en verpakt.
Om tijdens de montage, uitgevoerd door Uzelf of een door U gekozen aannemer, problemen te vermijden, raden we U aan, vÓÓr de montage, de
levering te controleren op volledigheid in overeenstemming met de onderdelenlijst. Deze controle dient te gebeuren binnen 14 dagen na levering bij
U thuis. Waarborgvorderingen zijn beperkt tot het vervangen van gebrekkig materiaal. Gebrekkige onderdelen die reeds gebruikt of geschilderd
zijn, zijn uitgesloten van vervanging. Alle latere vorderingen zijn uitgesloten! In geval van klachten, gelieve dan te letten op de volgende procedure:
Leg dit controlecertificaat, samen met Uw aankoopbewijs voor aan Uw verkoper. Enkel in gevallen waarbij deze documenten voorgelegd worden,
zal de klacht snel en zonder complicaties behandeld worden.
pl
im
Deutsch: Das von Ihnen gekaufte Haus wurde nach der hohen Qualitätsnorm gefertigt. Der Bausatz wurde sorgfältig geprüft und verpackt. Um
etwaige auftretende Probleme während des Aufbaus durch Sie oder Ihre Aufbaufirma zu vermeiden, kontrollieren Sie bitte die Lieferung auf
Vollständigkeit laut Stückliste vor dem Aufbau. Diese Kontrolle muss innerhalb 14 Tagen nach Anlieferung bei Ihnen erfolgen. Ansprüche auf
Gewährleistung beschränken sich auf den Austausch von fehlerhaftem Material. Fehlerhafte Bauteile, die bereits verbaut oder gestrichen wurden,
sind vom Umtausch ausgeschlossen. Alle weiteren Ansprüche sind ausgeschlossen! Sollte es zu einer Beanstandung kommen, beachten Sie
folgende Vorgehensweise: Legen Sie Ihrem Fachhändler diesen Kontrollschein zusammen mit dem Einkaufsbeleg vor. Nur bei Vorlage dieser
Unterlagen ist eine schnelle und problemlose Bearbeitung Ihrer Beanstandung möglich.
ca
og
yl
Français: La cabane que vous venez d’acheter a été fabriqué en respectant de hautes normes de qualité. L’ensemble de construction a été testé
et emballé avec soin. Afin d’éviter des problèmes éventuels pendant la construction par vous-même ou la société de construction mandatée, nous
vous prions de bien vouloir vérifier que toutes les pièces ont été fournies selon la liste des pièces avant que vous ne commenciez la construction. Il
vous incombe de faire ce contrôle dans les 14 jours après la fourniture. Les revendications en dédommagement se limitent à l’échange de matériel
défectueux. Des pièces de construction défectueuses, déjà construites ou peintes, sont exclues de tout échange. Toutes les revendications
ultérieures sont exclues ! Si une réclamation avait lieu, veuillez respecter le déroulement suivant : Il vous faudra présenter, à votre commerçant
spécialisé, ce bulletin de contrôle avec le récépissé de l’achat. Ce ne sera que moyennant présentation de ces documents qu’un traitement rapide
et sans problème de votre réclamation sera possible!
bi
Italiano: La casetta che avete acquistato è stata prodotta secondo la norma di alta qualità. Il kit è stato controllato ed imballato con cura. Per
evitare eventuali inconvenienti durante il montaggio, si prega di verificare, prima del montaggio, la completezza della fornitura in base alla distinta
dei pezzi. Tale verifica deve essere effettuata entro 14 giorni dalla consegna. Eventuali diritti di garanzia si limitano alla sostituzione di materiale
difettoso. Gli elementi difettosi già montati o verniciati sono esclusi dal diritto alla sostituzione. Ogni altro diritto resta escluso! In caso di
reclamazione, procedere nel modo seguente: presentare questo certificato di controllo unitamente alla prova d’acquisto al rivenditore. Solo in
questo modo la Sua reclamazione potrà essere evasa rapidamente e senza problemi.
o.
.c
ns
Español: La casa que ha adquirido ha sido fabricada de acuerdo con normas de alta calidad. Las piezas de la casa han sido cuidadosamente
inspeccionadas y embaladas. Con el fin de evitar posibles problemas durante el montaje, hecho por usted o por la empresa de construcción de su
elección, le recomendamos revisar el paquete entregado, con la lista de piezas, antes de armar la casa. Haga la revisión dentro de 14 días
después de recibir el paquete. La garantía se limita a reemplazar las piezas defectuosas. No se reemplazarán las partes defectuosas que ya hayan
sido utilizadas o pintadas. ¡No se aceptan otras reclamaciones! En casos de queja, por favor, presente este certificado junto con la factura en el
lugar donde hizo la compra. Sólo presentando estos documentos podremos resolver su problema rápidamente y sin complicaciones.
Norsk: Produktet du har kjøpt, ble produsert i henhold til høye kvalitetskrav. Produktet har blitt kontrollert nøye og deretter omhyggelig pakket. For
å unngå mulige problemer under monteringen, uansett om du gjør det selv eller får en godkjent håndverker til å gjøre det, anbefaler vi at du
kontrollerer leveransen mot delelisten for å se om alle delene er inkludert. Denne kontrollen må gjøres innen 14 dager etter at delene ble levert til
din adresse. Garantikrav begrenser seg til bytte av defekte deler. Defekte elementer som allerede har blitt brukt eller malt/beiset/limt, vil ikke bli
erstattet. Alle andre krav er utelukket! Dersom du har en reklamasjon, vennligst gjør som følger: Lever dette kontrollskjema med kvitteringen til
salgsstedet. Bare når du har med disse dokumentene kan klagen behandles raskt og uten komplikasjoner.
uk
Dansk: Det købte hus er fremstillet i overensstemmelse med de høje kvalitets krav. Produktet er blevet omhyggeligt inspiceret og pakket. For at
undgå eventuelle problemer i løbet af monteringen udført af dig selv eller håndværker af dit eget valg, anbefaler vi, at du undersøger leverancen for
fuldstændighed i overensstemmelse med listen over dele før samling. Denne inspektion skal foretages inden 14 dage efter levering til din plads.
Garantikrav er begrænset til udveksling af defekte materialer. Defekte bygningsdele, som allerede er brugt eller malet, er udelukket fra at blive
erstattet. Alle yderligere krav er udelukket! I tilfælde af klager, skal du være opmærksom på følgende procedurer: Venligst præsentere denne
kontrol certifikat sammen med kvitteringen til det sted hvor produktet er købt. Kun i de tilfælde, hvor disse dokumenter er forelagt kan klagen
behandles hurtigt og uden komplikationer.
Factory inspection by ● Fabriekscontrole door ● Werkskontrolle
durch ● Contrôle à partir de l’usine par ● Collaudato da ● Inspector
de fábrica ● Fabrikkkontroll utført av ● Fabriks Kontrol udført af :
Pack number ● Pack Nr. ● Pack Nr.● Packet n° ● Pacco N. ●
o
Paquete N ● Serienr:
…………………………………………………………………………….
……………………………………………………………………………..
Date ● Datum ● Date ● Data ● Fecha ● Dato:…..............…………
To be completed by buyer! (Please use block letters) ● In te vullen door de verkoper! (Graag in drukletters) ● Vom Käufer auszufüllen!
(Bitte in Druckschrift) ● A remplir par l’acheteur! (en lettres d’imprimerie, s’il vous plaît) ● Da compilare dall’acquirente! (in stampatello) ●
¡Completa el cliente! (en mayúsculas) ● Fylles ut av kjøper! (Vær vennlig å bruke blokkbokstaver) ● Udfyldes af køber! (Benyt venligst
Blokbogstaver):
Place of purchase ● Plaats van aankoop ●
Buyer’s address ● Adres koper ● Kundenanschrift ● Adresse du client ● Indirizzo
Bezugsquelle ● Source d’achat ● Acquistato presso del cliente ● Dirección del kliente ● Kjøpers adresse ● Købers adresse :
● Lugar de compra ● Salgssted ● Salgs sted:
.…………………………………………………………………………………………………
…………………………………………………………… ………………………………………………………………………………………………….
…………………………………………………………… Telephone ● Telefoon ● Telefon ● Téléphone ● Teléfono ● Telefon ● Telefon nr:
Sales receipt No. ● Aankoopbewijs Nr. ●
...……………………..……............................................................................................
Sales receipt date ● Aankoopbewijs -Datum ● Kaufbeleg-Datum ● Date du
Kaufbeleg-Nr. ● Récépissé n° ● Prova d’acquisto
o
N. ● Recibo N ● Kvitteringsnr ● Kasse Bon nr
récépissé ● Data prova d’acquisto ● Fecha recibo ● Kvitteringsdato ● Kasse bons
.…….......................................................................... dato:…….…...……………………………………………………………………………….
Delivery date ● Leveringsdatum ● Lieferdatum ●
Pick-up
Others ● Door:
Verzending
Zelf afhalen
Forwarder:
Date de livraison ● Data di consegna ● Fecha de
Spedition
Selbstabholer ● Par: Transporteur
Propres moyens ● Tramite:
Endrega ● Leveringsdato ● Leverings dato:
Spedizioniere
Mezzo proprio ● Entrega:Transporte organizado
transporte
.………………………………………………………….
propio ● Transportør: Sendes
Hentes ● Transportør: Sendes
Hentes
Description of complaint ● Beschrijving van de klacht ● Schilderung der Beanstandung ● Déscription de la réclamation ● Descrizione
della reclamazione ● Descripción del problema ● Beskrivelse av feil/ mangel ● Beskrivelse af fejl / Mangel: Please keep the parts which
are the object of the complaint until the complaint is settled! ● Gelieve de betrokken onderdelen te bewaren tot de klacht is
afgehandeld ● Veuillez garder les pièces contestées jusqu’à ce que la réclamation soit traitée définitivement! ● Si prega di conservare i
pezzi reclamati fino all’evasione della reclamazione! ● Por favor, conserve las piezas objeto de la queja hasta que el problema haya sido
resuelto ● Please Vær vennlig å ta vare på de aktuelle delene/ produktet inntil saken er avsluttet! ● Venligst ta hånd om de aktueller dele /
produkt indtil sagen er afsluttet!
□
□
□
□
□
□
□
□
□
□
□
□
□
□
.s
w
w
w
□
………………...........................................................................................………………....................................................………..
im
………....................................................………………....................................................……………….........................................
...........………………....................................................………………....................................................………………....................
................................………………....................................................………………....................................................……………..
pl
…....................................................………………....................................................……………….................................................
...………………....................................................………………....................................................………………............................
yl
........................………………....................................................………………....................................................……………….......
........................………………....................................................………………....................................................……………….......
og
........................………………....................................................………………....................................................……………….......
........................………………....................................................………………....................................................……………….......
.............................................……………….....................................................................................................................................
ca
.......................................................................................................................................................................................................
.......................................................................................................................................................................................................
bi
.......................................................................................................................................................................................................
o.
.c
ns
uk
Whitewoood Halmstadt
Assembly Instructions
Installation manual
Log cabin FRG28-4032
ZL-Art.-Nr. 881392
.s
w
w
w
Montageanleitung ● Notice de montage ● Istruzioni per il montaggio
Manual de montaje ● Monteringsanvisning ● Installatiegids
Blockhaus ● Maisonnette en poutres ● Casa di travi ● Casa de jardin ● Anneks ● Tuinhuis
im
Width 400 x Depth 320 cm
Breite/Tiefe ● Largeur/Profondeur ● Lunghezza/Profondita ● Ancho/Profundidad ● Bredde/Dybde ● Breedte/Diepte
pl
Log thickness 28 mm
Bohlenstärke ● Épaisseur des murs ● Spessore delle pareti ● Grosor de pared ● Tykkelse ● Wanddikte
bi
ca
og
yl
o.
.c
ns
uk
The producer shall have the right to make technical changes to the product ● Technische Änderungen vorbehalten ● Le
producteur réserve le droit d’effectuer des modifications techniques au produit ● Il produttore mantiene il diritto di apportare
modifiche tecniche al prodotto ● Reservado el derecho a modificaciones técnicas ● Produsent forbeholder seg retten til å endre
tekniske egenskaper ved produktet ● Alle rechten en technische wijzigingen voorbehouden
Installation manual
1 General information
Dear client,
w
We are glad that you have decided in favour of our garden house!
w
Please read the assembly manual carefully before proceeding with the house installation! You
will thus avoid problems and will not waste time.
w
Recommendations:

.s

Keep the house package until its complete assembly in a dry place, but not in direct contact with
the ground, protected from weather conditions (moisture, the sun, etc.). Do not keep the house
package in a heated room!
pl
im
When selecting the garden house location, make sure that the house will not be subjected to
extreme weather conditions (areas of strong snowfall or winds); otherwise you should attach the
house (for instance, with anchors) to the subsoil.
yl
Warranty
og
Your house is made from high quality fir and delivered in the natural (unprocessed) form. If, despite
our thorough inspection, you should have complaints, please submit the filled out control sheet and
purchase invoice to the product seller.
The warranty does not cover:
ca
ATTENTION: Please be sure to keep the documentation accompanying the house package! The
control sheet includes the control number of the house. We can only review complaints if you
submit the control number of the house to the seller!
Peculiarities of wood as a natural material

Wooden details already painted (processed with a wood preservative)

Wooden details containing whole branches that do not endanger the stability of the house

Colour tone variations caused by wood structure differences that do not influence wood lifetime

Wooden details containing (caused by drying) small cracks/gaps that do not pass through and do
not influence the structure of the house

Twisted wooden details if they can nevertheless be installed

Roof and floor boards that may have on their concealed surfaces some non-planed areas, colour
differences and waning

Complaints resulting from an incompetent manner of the installation of the house or the house
subsiding due to an incompetently made foundation

Complaints caused by introducing self-initiative changes to the house, such as the deformation of
wooden details and doors/windows due to an incompetent manner of wood processing; the
attachment of storm braces too rigidly, doorframes being screwed onto wall logs, etc.
bi

o.
.c
ns
uk
The complaints covered by the warranty are satisfied to the extent of replacing the
deficient/faulty material. All other demands will be excluded!
Installation manual
Garden house painting and maintenance
Wood is a natural material, growing and adapting depending on weather conditions. Large and small
cracks, colour tone differences and changes, as well as a changing structure of wood are not errors,
but a result of wood growing and a peculiarity of wood as a natural material.
w
w
Unprocessed wood (except for foundation joists) becomes greyish after having been left untouched for
a while, and can be turn blue and become mouldy. To protect the wooden details of your garden
house, you must immediately process them with a wood preservative.
w
We recommend that you cover the floor boards in advance with a colourless wood impregnation
agent, especially the bottom sides of the boards, to which you will no longer have access when the
house is assembled. Only this will prevent moisture penetration.
im
.s
We definitely recommend that you also process the doors and windows with a wood impregnation
agent, and do that namely both inside and outside! Otherwise the doors and windows can become
twisted.
After the house assembly is completed, we recommend for the conclusive finishing a weather
protection paint that will protect wood from moisture and UV radiation.
pl
When painting, use high quality tools and paints, follow the paint application manual and
manufacturer’s safety and usage instructions. Never paint a surface in strong sunlight or rainy
weather. Consult a specialist regarding paints suitable for unprocessed softwood and follow the paint
manufacturer’s instructions.
yl
Having been properly painted, your garden house’s lifetime will increase substantially. We recommend
that you inspect the house thoroughly once every six months.
og
2 Preparation for assembly
ca
Tools and preparation of components
To assemble the garden house, you will need the following tools:
knife
screwdriver
measuring tape
hammer
o.
.c
ns
water-level
ladder
bi
assembly aid
saw
pliers
drill
uk
ADVICE: To avoid splinters, we recommend that you wear the corresponding protective gloves during
the assembly process.
Installation manual
Preparation of components:
w
Sort the components based on the
wall
plans
(see
Technical
specifications) and place them at
the four sides of the house in the
installation sequence.
.s
w
w
ATTENTION: Never place the
components directly on grass or a
muddy surface because it will be
very difficult or even impossible to
clean them up later!
im
Foundation
pl
A good foundation is the most important aspect guaranteeing the duration and safety of your house.
Only a completely level, rectangular and bearing foundation will ensure problem-free installation of the
house, its stability and especially the matching of the doors. With a good foundation, your house will
stand for many years more.
yl
Prepare the foundation so that its upper edge extends from the ground to a height of at least 5 cm. At
the same time make sure that there are sufficient air apertures under the house floor for ventilation.
og
We recommend the following foundation options:
 Strip or spot foundation
 Foundation from concrete or pavement slabs
 Cast concrete bed
ca
Prepare the foundation so that the foundation joists are propped up on every side with intervals not
exceeding 50-60 cm.
Consult an expert in this field or have the foundation prepared by specialists.
o.
.c
ns
ATTENTION:
bi
3 Garden house assembly

You will find included in the house package one spare log (longest wall log).

You will find included in the house package one spare board (longest roof or floor board).

The house package also includes 2-3 marked hitting blocks (wall profile approximately 20-30 cm
long).
All of the details listed above ARE NOT mentioned in the specification list.

uk
The drawings have the details marked with three-digit position numbers. The exact positions of
those details that have the third digit “x” can be found in the specification list.
Installation manual
Base frame (Foundation joists)
The base frame of the house must be completely flat and level to ensure that the installation proceeds
without problems.
ATTENTION: different house can have different foundation placements – see the appended
base frame drawing (in Technical specifications)!
w
Place the impregnated foundation joists on the prepared foundation in accordance with the drawing at
equal intervals. Make sure that the joists are level and rectangular prior to screwing them together.
w
ADVICE: It is recommended to place between the foundation joists and foundation a damp-proof
course that will protect the house from moisture and decay.
.s
w
ADVICE: To ensure protection from wind and storm, it is recommended to attach the foundation joists
to the foundation (for this, you can use for instance metal angles, anchors, etc.). The corresponding
materials are not included in the supplied kit!
Installation of foundation joists:
pl
im
When installing the walls, it is important to remember that:
bi
ca
og
yl
Walls
o.
.c
ns

The logs are always assembled with their tongue upwards!

If necessary, use the hitting block and hammer! Never directly hit the tongue with the hammer!
Install the walls in accordance with the appended wall plans (see Technical specifications).
ATTENTION: After the first layer of logs, measure the
diagonal lengths and, if necessary, re-install the logs. Only if
the diagonal lengths are completely equal is the base frame
rectangular and you can mutually attach the logs.
The first layer of logs:
uk
First of all place half logs of front and back wall at the
correct location and attach them with screws to the
foundation joists. Then install the side wall logs. Make sure
that the first layer of logs extends a bit over the foundation
joists: the logs must extend over the joists by some 3-5 mm.
You will thus protect the house from moisture, allowing the
free flow of rainwater into the ground.
Installation manual
Continue the installation of the walls by strongly forcing the wall logs into one another. If necessary,
use the hitting block and hammer. At the same time, do not forget to begin the installation of the door
and windows. You should definitely begin the door installation after the 5th-6th layer of logs.
Door and window
Doorframe:
If it is a double door, the
doorframe
is
supplied
in
separate
parts
due
to
transportation requirements and
you will have to begin by
assembling it.
w
w
w

Doorframe installation (Only necessary for a double door!):

.s

To do this, place together the 4
parts of the frame and screw
them onto one another.
im
Make sure that the part of the
frame with the deeper notch is
installed upwards. The lateral
jamb parts have hinges and are
mirrored.
It is recommended to install the
leaves later.

If it is a single door, its frame and
leaf
are
supplied
already
assembled.
pl

bi
o.
.c
ns
Window installation:
ca
The doorframe is placed at the
formed aperture and pushed with
force onto the lower log. If it is a
double door, place the leaves on the
hinges now. To open and close the
door, fit the separately packaged lock
and handle.
og
yl
Door installation:
Continue with the installation of the wall logs until you reach the window height. The wall plans (see
Technical specifications) show how many logs go under the window. Install the window similarly with
the door. Just like the door, push the window frame with the window into the window aperture onto the
lower log, applying force. Make sure that the window is not fitted backwards (topsy-turvy).
uk
ADVICE: Definitely make sure that the windows and doors open in the proper direction. The doors
always open from the inside to the outside. The revolving-tilting windows open to the inside. The
revolving and the slinging windows open to the outside (the window handles are on the inside).
ATTENTION: It is not necessary to fix the doors and windows to the wall logs! If you wish to do this, it
will be sufficient to fix them with a couple of screws in the lower part of the frame because as they dry,
the wall logs will begin subsiding.
You can conduct the final adjustments of the doors and windows only some 2-3 weeks after the house
installation, when the house will have become adapted to weather conditions and its logs settled.
Installation manual
Apex
In most cases, the apex is supplied in one piece (attention: in some house options, the apex can comprise
several parts! In this case, these parts will have to be screwed together prior to other actions). Having installed
the last wall logs, place the apex on the front and back walls and attach them with screws.
The apexes have indents for the rafters. The rafters also have the corresponding indents, ensuring that the
roof is placed firmly and in the right place.
the Installation of rafters:
the
w
w
Now place the rafters in
corresponding indents in
apexes.
pl
im
.s
w
Make sure that the upper wall log,
apexes and rafters are level. Having
fitted the rafters, screw them onto
the apex from above.
Roof
og
yl
ATTENTION: If the wall logs are not properly pressed on top of one another without gaps, the upper wall log
may not be on the same level with the apexes. In this case you should tap the wall logs downwards as
necessary or plane the apex or sidewall log somewhat lower.
ca
Before installing the roof boards, make sure that the house is completely level. Use the water-level to
check all walls.
ATTENTION: When placing the roof, use a stable ladder. Do not step on the roof as the structure is
suitable to sustain only an even load (snow, wind, etc.), and not a point load!
bi
Begin the installation of the roof boards from the front edge of the roof. Tap the boards lightly and
attach them from above and below with nails to the rafters and upper wall log.
o.
.c
ns
ATTENTION: Do not press the roof boards together too densely and you will avoid moisture-causing
bulging! Leave an interval of about 1 mm between the boards to allow for swelling.

During the whole process of installing the roof boards, make sure that their crest rafters coincide
and the eave sides of the boards extend at a uniform distance. Verify this with a rope or the lateral
eave lath that you may install for verification purposes.

The roof boards must be even with the rafter ends in front and behind. If necessary, saw both last
roof boards so narrow that they are even with the rafter ends.
uk
Installation manual
Having installed the roof boards, the roof felt and roof
slats must be attached.
Installation of roof slats:
The table of components shows whether the roof
cover material and slats are included with this
house option!
w
pl
im
.s
w
w
First of all, screw the roof edge reinforcements and eave
edgings under the roof board ends. Then install the roof
cover material.
Roof cover material (NB! Some house options do not include it in the kit!)
og
yl
Cut the roof felt in accordance with the roof length into suitable pieces and begin installing them
parallel to the lower edge of the roof, moving toward the crest and placing the felt strips in the direction
from the back wall to the front wall. The felt should extend from the edge by approximately 2-4 cm.
Attach the roof felt to the roof boards with the supplied felt nails at intervals of about 15 cm. Make sure
that the felt strips overlap by at least 10 cm.
Installation of wind braces and facia boards:
ca
Having installed the roof cover material, attach the
wind braces to the roof and the facia boards to the
rafters and upper wall logs.
bi
o.
.c
ns
Floor
uk
Only when the house is built completely you can install the floor boards, thus avoiding unnecessary
smudging on the floor.
Place the floor boards on the base frame, tap them lightly against one another and then nail them with
force to the foundation joists. If necessary, cut the last floor board to the suitable width.
The final operation is the fitting of the floor beadings to cover the spaces between the floor boards and
walls. If necessary, cut the floor beadings to the suitable length.
ATTENTION: Depending on the climate at the house location, the floor boards can either swell or
diminish. If the floor boards are very dry while the climate is damp, they will easily absorb moisture. In
Installation manual
this case, the floor boards should not be attached very densely to avoid likely bulging. Leave some
space (1-2 mm) between the floor boards to allow for swelling. But if your climate is warm and dry, you
can install the boards densely because they will become drier and spaces may appear between them.
Storm braces (NB! Not included in some house option kits!)
.s
w
w
w
Attach the storm braces (if included in
the supplied kit) to the inner sides of Installation of storm braces:
the front (2 units) and back (2 units)
walls with the supplied bolts. It is
important for the logs to be drilled
through in advance. Please keep the
distances indicated in the drawing so
that no problems occur due to wood
swelling or diminishing.
im
ADVICE: Make sure that the storm
braces are attached to the apex log
from above and to the middle of the
first full-length wall log from below. If
necessary, shorten the upper ends of
the slats.
pl
Do not turn the screws tightly so wood
can further swell or diminish.
General advice:
ca
Problem:
Cause:
og
yl
With the house having settled, you
should adjust the attachments so the
wall logs can settle.
Problem:
Cause:
Solution:
Cause:
Solution:
The doors and windows become stuck.
The house/foundation has settled.
Check whether the house is level. Level the foundation joists and walls.
The doors and windows have swelled due to moisture.
Adjust the door and window hinges; if necessary, plane the door or window narrower.
bi
Solutions:
Gaps appear between the wall logs
Additional details are attached to the house that do not allow wood to
swell/diminish.
If the door/window is attached to the wall logs with screws/nails, remove these
screws/nails;
If the storm brace is screwed on too tightly, loosen its attachment;
If (rain water) pipes are installed on the wall, loosen their attachments;
o.
.c
ns
uk
We wish you total success with the garden house installation and much
joy with this house for many years to come!
pl
im
.s
w
w
w
bi
ca
og
yl
o.
.c
ns
uk
pl
im
.s
w
w
w
bi
ca
og
yl
o.
.c
ns
uk
pl
im
.s
w
w
w
bi
ca
og
yl
o.
.c
ns
uk
pl
im
.s
w
w
w
bi
ca
og
yl
o.
.c
ns
uk
pl
im
.s
w
w
w
bi
ca
og
yl
o.
.c
ns
uk
pl
im
.s
w
w
w
bi
ca
og
yl
o.
.c
ns
uk
pl
im
.s
w
w
w
bi
ca
og
yl
o.
.c
ns
uk
pl
im
.s
w
w
w
bi
ca
og
yl
o.
.c
ns
uk
pl
im
.s
w
w
w
bi
ca
og
yl
o.
.c
ns
uk
pl
im
.s
w
w
w
bi
ca
og
yl
o.
.c
ns
uk

advertisement

Key Features

  • DIY assembly
  • High-quality fir wood
  • Detailed installation manual
  • Storage space
  • Extra room

Frequently Answers and Questions

What are the dimensions of the Palmako FRG28-4032?
This house measures 400 cm wide and 320 cm deep.
What kind of foundation is recommended for the Palmako FRG28-4032?
A level, rectangular, and bearing foundation is essential.
How often should I inspect my Palmako FRG28-4032 garden house?
It's recommended to inspect the house thoroughly every six months.