ABB HT582778, TPS57-F32 Operation Manual

ABB HT582778, TPS57-F32 Operation Manual

ABB TPS57-F32 is a turbocharger designed for use on diesel engines to generate the necessary air volume and charging pressure for efficient operation. Its design ensures reliable performance and meets stringent safety standards. The device features a robust construction, efficient operation, and built-in safety features. The turbocharger is compatible with various engine models and can be customized to meet specific application requirements.

advertisement

Assistant Bot

Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.

ABB TPS57-F32 Operation Manual - Download PDF | Manualzz
Operation Manual
TPS57-F32
ABB Turbo Systems Ltd
CH 5401 Baden
Type
TPS57-F32
n Mmax 707
HT582778
t Mmax 710
1/s
n Bmax 672
SOLD06
Year
°C
t Bmax 680
00410 kg
2018
12
50
50
Application according to
the Operation Manual
Original Operation Manual
HZTL2412 English
made in Switzerland
ABB Turbocharging
Operating condition and replacement intervals
The operational limits for the turbocharger nBmax, tBmax, nMmax, tMmax, inspection- and replacement intervals for the components concerned on the rating plate are valid for the operational mode and compressor inlet condition, which has been agreed upon
between the engine builder and ABB.
Note:
Replacement intervals of components depends on the load profile, turbine inlet temperature, suction air temperature and
turbocharger speed. In case the operation conditions differs significantly from what is considered to be normal for the current application, it is recommended to contact ABB for a re-calculation of replacement intervals. Frequent load alterations,
high temperatures and high speed lower the life of components.
Unless otherwise agreed, the application limits nMmax, tMmax are valid for the test operation for a limited time.
Operation Manual / TPS44-F.. - TPS61-F..
Revision F
HZTL2412_EN
August 2017
Table of contents
Table of contents
1
Preliminary remarks
1.1
Purpose of this manual
1.2
Layout and function
1.3
Intended use of the turbocharger
1.4
Storage of new turbochargers and spare parts
1.5
Essential information
1.6
Symbols and definitions
1.7
Turbocharger rating plate
1.8
Contact information
2
Safety
2.1
Introduction
2.2
CE conformity
2.3
Definition of mandatory signs
2.4
Definition of Safety instructions
2.5
Warning plates on the turbocharger
2.6
Safe operation and maintenance
2.7
Hazards during operation and maintenance
2.8
Deflagration on gas engines
2.9
Periodic checking of the pressure vessel
2.10
Lifting loads
3
Start-up
3.1
Oil supply
3.2
Inspection work
3.3
Commissioning after taking out of operation
4
Operation
4.1
Noise emissions
4.2
Servicing work
4.3
Expected exchange intervals
4.4
Speed measurement
4.5
Stopping the engine
© Copyright 2016 ABB. All rights reserved.
Page 1
Operation Manual / TPS44-F.. - TPS61-F..
5.1
Foreword to Maintenance
5.2
Cleaning the compressor during operation
5.3
Turbine cleaning during operation
5.4
Cleaning components mechanically
6
Troubleshooting
6.1
Malfunctions when starting
6.2
Surging of the turbocharger
6.3
Malfunctions during operation
6.4
Malfunctions when stopping
6.5
Speed measurement system
7
Removal and installation
7.1
Transport
7.2
Turbocharger weights
7.3
Remove the turbocharger
7.4
Installing the turbocharger
8
Disassembly and assembly
8.1
Introduction
8.2
Module weights
8.3
Disassembling and assembling turbocharger
8.4
Axial clearance A and radial clearance B
8.5
Radial clearances N and R
8.6
Table of tightening torques
9
Taking out of operation
9.1
Shutting down the turbocharger
10
Mothballing the turbocharger
10.1
Taking the engine out of operation for up to 12 months
10.2
Taking the engine out of operation for more than 12 months
11
Disposing of turbocharger components
12
Spare parts
12.1
Ordering spare parts
12.2
View of turbocharger showing part numbers
12.3
View of cartridge group showing part numbers
© Copyright 2016 ABB. All rights reserved.
August 2017
Maintenance
HZTL2412_EN
5
Page 2
Revision F
Table of contents
Operation Manual / TPS44-F.. - TPS61-F..
Preliminary remarks
1
Purpose of this manual
1.1
Page 3
August 2017
1 Preliminary remarks
1.1
1.1 Purpose of this manual
HZTL2412_EN
This operation manual belongs to the turbocharger with the identical HT
number (01), see the cover sheet of the operation manual and the turbocharger rating plate.
Operation Manual
This Operation Manual enables you to familiarize yourself with the turbocharger supplied by ABB Turbo Systems and to use it as intended.
It provides important information in order that the turbocharger can be operated safely, correctly and efficiently.
This Operation Manual complements and expands existing national regulations concerning work safety and accident prevention.
Target group
Revision F
This Operation Manual is intended for engineers and qualified mechanics
who are responsible for operating the engine and the turbocharger installed on it.
Availability of operation manual
An operation manual must be available at all times at the place where the
turbocharger is used.
Everyone who operates or works on the turbocharger must have first read
and understood the operation manual.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
1
Layout and function
1.2
Page 4
1.2 Layout and function
1 Suction branch / filter silencer
8 Gas outlet flange
2 Compressor casing
9 Nozzle ring
3 Diffuser
10 Turbine casing
4 Bearing casing
11 Turbine-end bearing flange
5 Axial thrust bearing
12 Compressor-end bearing flange
6 Radial plain bearing (visible only
at turbine end)
13 Compressor wheel
7 Turbine
© Copyright 2016 ABB. All rights reserved.
Revision F
HZTL2412_EN
August 2017
1.2
Preliminary remarks
Operation Manual / TPS44-F.. - TPS61-F..
Preliminary remarks
1
Layout and function
1.2
Page 5
August 2017
Mode of operation
The turbocharger is a turbomachine consisting of the following main components:
€ Turbine
€ Compressor
These are mounted on a common shaft.
Exhaust gases from the diesel or gas engine flow through the turbine casing (10) and the nozzle ring (9) to impinge on the turbine (7).
HZTL2412_EN
The turbine (7) uses the energy contained in the exhaust gas to drive the
compressor wheel (13). The compressor draws in fresh air, compresses it
and then forces it into the engine's cylinders.
The exhaust gases escape into the ambient air through the exhaust gas
pipe, which is connected to the gas outlet flange (8).
The air, which is necessary for operation of the diesel or gas engine and
is compressed in the turbocharger, is drawn into the compressor wheel
(13) through the suction branch or filter silencer (1). It then passes
through the diffuser (3) and leaves the turbocharger through the outlet on
the compressor casing (2).
The rotor runs in two radial plain bearings (6), which are located in the
bearing flanges (11/12) between the compressor and the turbine. The axial thrust bearing (5) is located between the two radial plain bearings.
Revision F
The bearings are connected to a central lubricating oil duct which is supplied by the engine's lubricating oil circuit. The oil outlet is always at the
lowest point of the bearing casing (4).
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Preliminary remarks
1
Intended use of the turbocharger
1.3
Page 6
State of the art
WARNING
This turbocharger was built according to state-of-the-art technology and is
operationally safe according to recognised safety regulations.
Improper operation and maintenance of the turbocharger can result in
danger to life and limb of the user or third parties. In addition, improper
use may cause damage to the machine.
τ The machine may be operated only by trained personnel.
HZTL2412_EN
NOTICE
This turbocharger supplied by ABB Turbo Systems has been developed
for use on diesel engines to generate the volume of air and the charging pressure required to operate the engine.
The engine builder has provided ABB Turbo Systems with information
regarding the intended use of the engine, from which the operating limits specific to the turbocharger shown on the rating plate (such as operating speeds, temperatures, exchange intervals / replacement intervals)
have been derived.
If it is used in conjunction with a gas engine, the engine must not be installed in a potentially explosive environment, and precautionary
measures must be taken to ensure that the machine room as a whole is
classified as not potentially explosive.
Any other use will be regarded as a special application which must first
be discussed with ABB Turbo Systems. The manufacturer accepts no
liability for other applications. If it is used otherwise, ABB Turbo Systems reserves the right to reject all warranty claims.
August 2017
1.3 Intended use of the turbocharger
1.3
Perfect condition
The turbocharger may be installed only when in technically perfect condition while observing the instructions given in the engine builder's manual.
It may be used only for the intended purpose and operated in compliance
with the operation manual.
τ Malfunctions which could affect safety must be eliminated immediately.
The manufacturer accepts no liability for any damage resulting from unauthorised alterations to the turbocharger.
© Copyright 2016 ABB. All rights reserved.
Revision F
Use of the turbocharger as intended also includes observance of the installation / fitting, disassembly / removal, operating, maintenance / servicing and repair conditions specified by the manufacturer. Disposal regulations set down by local authorities must be observed.
August 2017
Operation Manual / TPS44-F.. - TPS61-F..
1.4
Preliminary remarks
1
Storage of new turbochargers and
spare parts
1.4
Page 7
1.4 Storage of new turbochargers and spare
parts
Storage of new turbochargers and spare parts up to 6 months
New turbochargers and spare parts from ABB Turbo Systems can be stored
in sealed packaging without additional mothballing measures for up to 6
months from the date of delivery (marked by the VCI label on the package).
Volatile Corrosion Inhibitor (VCI)
Only dry rooms in which the relative humidity is between 40…70 % and
no condensation can form are suitable for storage.
HZTL2412_EN
Storage of new turbochargers and spare parts for more than 6 months (VCI)
Protection of health when handling VCIs
WARNING
VCI products are not hazardous in the sense of the Hazardous Substances Ordinance. Nevertheless, the following points are to be observed when handling VCIs:
τ Ensure good room ventilation.
τ Do not eat, drink or keep food at the workplace while working with
VCIs.
τ Wear safety gloves.
τ Clean hands and face after working with VCIs.
τ For further information refer to www.branopac.com.
Wear safety gloves to protect against chemical hazards.
Revision F
The following mothballing measures are required every 6 months:
τ Open the package.
τ Remove the VCI corrosion protection emitter from the package and
replace it with a new, identical VCI corrosion protection emitter. New
VCI corrosion protection emitters can be obtained at
www.branopac.com.
τ Dispose of the old VCI corrosion protection emitter in an environmen-
tally compatible manner, professionally and in accordance with local
regulations.
τ Seal the package. The better the external seal is designed, the more
permanent the protection.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Preliminary remarks
1
Storage of new turbochargers and
spare parts
1.4
Page 8
Per order, turbochargers or cartridge groups will be prepared by ABB Turbo Systems for prolonged storage. The package is equipped with a hygrometer (see illustration).
August 2017
Long-term storage of replacement turbochargers or spare parts
The following measures are required every 6 months:
in the wooden crate which allows this check to be carried out. When
the display field has changed colour at the 70% level, the maximum
permissible humidity has been exceeded. In this case the turbocharger
or rotor must be inspected by an ABB Turbocharging Service Station
and repacked.
τ Inspect the package for damage. If the package is damaged, the tur-
bocharger or cartridge group must be inspected by an ABB Turbocharging Service Station and repacked.
HZTL2412_EN
τ Check the hygrometer (02) in the sight-glass. There is an opening (01)
After every 3 years the following work steps must be performed by an
ABB Turbocharging Service Station:
€ Inspect the components
€ Exchange the desiccant agent
€ Repackage the components.
NOTICE
If the 70% display field of the hygrometer (02) has not changed colour
and the package is undamaged, the replacement turbocharger or replacement cartridge group can be placed into operation without any prior testing by an ABB Turbocharging Service Station.
Unpacking replacement turbochargers or spare parts
The corrosion protection effect ends after the material is unpacked from
the VCI package.
To avoid the formation of condensation, the surroundings and the content
of the package must have the same temperature during unpacking.
© Copyright 2016 ABB. All rights reserved.
Revision F
Replacement components ready for operation
Operation Manual / TPS44-F.. - TPS61-F..
Preliminary remarks
1
Essential information
1.5
Page 9
1.5 Essential information
August 2017
1.5
Organisational measures
In addition to this manual, the general, statutory regulations applicable in
the respective country for the prevention of accidents and the protection of
the environment must be observed.
This also applies to the provision and wearing of personnel protection
equipment.
The safety and risk consciousness of the personnel working on and
with the turbocharger must be checked regularly with reference to this
manual.
NOTICE
HZTL2412_EN
τ The turbocharger must be shut down immediately by stopping the en-
gine in the event of alterations affecting safety or of corresponding operating behaviour. The fault must be reported to the person or department responsible.
Additions and alterations to, and conversions of the turbocharger that
could compromise safety require the prior approval of ABB Turbo Systems.
Revision F
NOTICE
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Preliminary remarks
1
Essential information
1.5
Page 10
Original parts and accessories are specially designed for the turbocharger
supplied by ABB Turbo Systems.
August 2017
Original parts and safety
Use original parts
WARNING
Operation of the turbocharger with non-original parts can impair the
safety of the turbocharger and can cause serious damage to property
and injury to personnel.
τ Only use original parts from ABB Turbo Systems.
ABB Turbo Systems accepts no liability for any damage resulting from the
use of non-original parts and corresponding accessories.
Revision F
The turbocharger must only be operated and serviced by trained and authorised personnel. Basic mechanical training is a prerequisite.
HZTL2412_EN
Competence of personnel
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Preliminary remarks
1
Essential information
1.5
Page 11
August 2017
Design variants
This document is valid for different design variants of turbochargers.
There may be sections and descriptions of components that are not relevant for a specific turbocharger variant.
ABB Turbocharging Service Stations will be happy to provide information
on questions regarding a design variant (see Contact information at
www.abb.com/turbocharging).
Accuracy of illustrations
The illustrations in this document are general in nature and intended for
ease of understanding. Differences in detail are therefore possible.
Registered trademarks of external companies are used in this document.
The trademarks are marked with ®.
Revision F
HZTL2412_EN
Registered Trademarks
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Preliminary remarks
1
Symbols and definitions
1.6
Page 12
The following symbols are used in the documents:
ϖ Prerequisite
τ Step of a procedure
August 2017
1.6 Symbols and definitions
1.6
€ List, first level
- List, second level
[➙ ] Refers to a page number
Definition of notes
A note provides suggestions which facilitate the work on the product.
NOTICE
HZTL2412_EN
Note
Definition of mandatory signs
Mandatory signs show the protective equipment to be worn for a task. The
mandatory signs are described in chapter Safety and must be complied
with.
Definition of caution / warning
The caution and warning signs are described in the chapter Safety.
In this document, ABB Turbo Systems Ltd is abbreviated to ABB Turbo
Systems.
Official ABB Turbo Systems Service Stations
In this document, official service stations are referred to as ABB Turbocharging Service Stations. They are inspected and certified regularly by
ABB Turbo Systems. See also chapter Contact information [➙ 15].
© Copyright 2016 ABB. All rights reserved.
Revision F
ABB Turbo Systems
Operation Manual / TPS44-F.. - TPS61-F..
1
Turbocharger rating plate
1.7
Page 13
1.7 Turbocharger rating plate
August 2017
1.7
Preliminary remarks
HZTL2412_EN
Operating limits
Recommended inspection
and replacement intervals
of turbocharger components
Turbocharger operating limits at engine overload (110%).
Only when operating in the test rig unless otherwise agreed with the
enginebuilder.
02
Turbocharger operating limits during operation
03
Inspection interval of plain bearings in 1000 h
04
Replacement interval of compressor in 1000 h
05
Replacement interval of turbine in 1000 h
06
Customer part number
07
Designation of the special design
08
Weight of turbocharger in kg
09
Turbocharger type
10
Serial number
11
Year of construction of turbocharger
Revision F
Further data
01
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
1
Turbocharger rating plate
1.7
Page 14
Explanation of the rating plate
The recommended replacement intervals and the corresponding operational limits are jointly defined with the engine manufacturer. This information is specific to the system.
August 2017
1.7.1
Preliminary remarks
Operation above the indicated values n Bmax, tBmax can considerably shorten the
recommended replacement intervals. In such cases, we recommend that you
contact the nearest official ABB Turbocharging service station.
nMmaxand tMmax normally apply only when running at overload (110%) during trials on the engine test bed. These limits can also be permitted during operation
for special applications. Operation above nMmax and tMmax is not permitted.
Non-observance of the recommended replacement intervals can increase the
risk of unpredictable component failures.
Positions of the rating plates
HZTL2412_EN
1.7.2
Revision F
One rating plate (01) each is attached on the left and the right side of the
turbocharger bearing casing.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
August 2017
1.8
Preliminary remarks
1
Contact information
1.8
Page 15
1.8 Contact information
Contact information
Contact information for the official service stations of ABB Turbo Systems
is available online.
τ Scan the QR code to access our website.
ABB Turbo Systems Ltd
Bruggerstrasse 71a
CH-5401 Baden
Switzerland
Revision F
HZTL2412_EN
www.abb.com/turbocharging
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Safety
2
Introduction
2.1
Page 17
August 2017
2 Safety
2.1
2.1 Introduction
Turbochargers manufactured by ABB Turbo Systems are state of the art
and comply with the pertinent safety and health-protection requirements
that applied when the turbocharger was manufactured. Consequently, the
turbocharger is safe to operate. Nevertheless, during turbocharger operation and when working on the turbocharger, residual risks can exist which:
€ originate from the turbocharger itself and its accessories
€ originate from the operating and auxiliary materials used
€ are the consequence of insufficient observance of the safety instructions
HZTL2412_EN
€ are the consequence of unsatisfactory and improper execution of
maintenance and inspection work
The operator is responsible for access to the turbocharger as well as the
organisational measures which regulate the safe handling of the turbocharger by his personnel.
All instructions in this chapter must be observed to ensure safe and trouble-free turbocharger operation and during work on the turbocharger.
Revision F
In the same vein, all other specially marked safety instructions in every
chapter of this manual must be observed (see the section entitled Definition of safety instructions).
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
2
CE conformity
2.2
Page 18
2.2 CE conformity
Information
Revision F
HZTL2412_EN
ABB turbochargers fulfil Directive 2006/42/EC on machinery and are considered partly completed machinery in the sense of Article 2 g.
August 2017
2.2
Safety
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
August 2017
2.3
Safety
2
Definition of mandatory signs
2.3
Page 19
2.3 Definition of mandatory signs
To be worn at all times
Protective clothing
Safety footwear to protect
against mechanical hazard
and risk of falling
Revision F
HZTL2412_EN
To be worn according to the specific work
© Copyright 2016 ABB. All rights reserved.
Safety glasses
Safety goggles
Safety gloves to protect
against
- Mechanical hazard
- Chemical hazard
- Thermal hazard
Respiratory mask to protect
against
- Dusts
- Gases
Safety helmet
Ear protection
Operation Manual / TPS44-F.. - TPS61-F..
2
Definition of Safety instructions
2.4
Page 20
2.4 Definition of Safety instructions
The following symbols and terms used in this manual concern safety or
refer to possible hazards:
August 2017
2.4
Safety
Definition of warning
WARNING
Serious personal injuries and even accidents with fatal consequences
may occur if work and operating instructions marked with this symbol and
the word WARNING are either not followed or not followed precisely.
τ Warning signs must be observed at all times.
Revision F
CAUTION
Serious machine or property damage may occur if work and operating
instructions marked with this symbol and the word CAUTION are either
not followed or not followed precisely.
τ Caution signs must be observed at all times.
HZTL2412_EN
Definition of caution
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
HZTL2412_EN
August 2017
2.5
Safety
2
Warning plates on the turbocharger
2.5
Page 21
2.5 Warning plates on the turbocharger
Warning plates are attached to the turbocharger at the following places:
If warning plates are not present at the intended places or are not legible,
then proceed as follows:
τ Order new warning plates from ABB Turbocharging Service Stations.
τ Remove unreadable warning plates.
τ Clean and degrease surfaces provided for warning plates.
τ Attach new warning plates.
Revision F
Uninsulated turbochargers
When uninsulated turbochargers are delivered to the engine builder, the
warning plates must be subsequently attached to the insulation. This is
the responsibility of the engine builder.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
2
Safe operation and maintenance
2.6
Page 22
2.6 Safe operation and maintenance
The instructions specified in this section are for the safety of personnel.
Together with the instructions in the Hazards during operation and
maintenance section, they allow the user to safely use the turbocharger.
August 2017
2.6
Safety
Work safety and work area safety
Risk of falling
τ Observe all general regulations for the prevention of accidents.
τ Do not work on the turbocharger if you are under physical or mental
stress.
τ Work only with suitable tools as well as equipment and working mate-
HZTL2412_EN
WARNING
There is the risk that someone can fall when working on the turbocharger.
τ Do not climb on the turbocharger or on parts attached to it or use
these as climbing aids.
τ When working at levels above the head, use climbing aids and work
platforms suitable for this purpose.
rials that are in perfect condition.
τ Electric tools must be solidly earthed, and connecting cables may not
be damaged.
τ Keep the workplace clean, clear away loose objects and remove ob-
stacles on the floor.
τ Keep the floor, equipment and the turbocharger clean.
τ Have oil binding materials ready at hand and keep oil catch pans
ready or in position
τ Eliminate leaks.
Welding work in the vicinity of the turbocharger
τ When performing welding work in the vicinity of the turbocharger, al-
ways cover the filter silencer to prevent the filter mat from being damaged.
τ Keep flammable objects and substances out of the range of flying
sparks.
τ Cover all connections on the turbocharger so that no foreign objects
can enter the turbocharger.
τ Wear personal protective equipment (PPE) for welding operations.
© Copyright 2016 ABB. All rights reserved.
Revision F
τ Keep fire-protection materials and fire-extinguishing equipment ready.
Operation Manual / TPS44-F.. - TPS61-F..
Safety
2
Safe operation and maintenance
2.6
Page 23
August 2017
Safety during start-up / commissioning and operation
The turbine casing insulation of the TPS44-F supplied by ABB Turbo
Systems is also burst protection.
WARNING
Serious personal injuries or fatal accidents can occur, if the turbine casing insulation of the TPS44-F supplied by ABB Turbo Systems is removed. The burst protection is integrated into the turbine casing insulation of the TPS44-F supplied by ABB Turbo Systems.
Separate burst protection is fitted to TPS44-F turbochargers without insulation that have been ordered from ABB Turbo Systems.
HZTL2412_EN
τ Never operate TPS44-F turbochargers that have been supplied by
ABB Turbo Systems with insulation if this insulation from ABB Turbo
Systems is not in place.
τ Never operate turbochargers without burst protection. If the insulation from ABB Turbo Systems is not in place, the separate burst protection (57200) must be fitted before operation. (See View of turbocharger showing part numbers [➙ 126].)
τ Before starting work, carry out visual inspection of working area.
τ Remove any obstacles and objects lying around.
τ Before start-up / commissioning, check all pipes from and to turbo-
charger for damage and leaks.
τ Don't work in any way that could impair safety when working on turbo-
charger.
τ After about every 12 hours of operation or at least once a day, inspect
turbocharger for visible damage and defects.
τ Immediately report any damage or changes in operational perfor-
mance to person responsible.
τ If damage is discovered, immediately shut down turbocharger and se-
cure it against inadvertent or unauthorized use.
Revision F
τ When switching on auxiliary power sources (hydraulics, pneumatics,
electricity, water), keep an eye open for any hazards resulting from
supplying these power sources.
Safety during cleaning
If cleaning agents or solvents are used for cleaning, the corresponding
material safety data sheet and the safety instructions in section "Hazards
due to operating and auxiliary materials" must be observed.
τ Observe the material safety data sheet for the cleaning agent or solvent.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Safety
2
Safe operation and maintenance
2.6
Page 24
τ Wear personal protective equipment (PPE) according to the material
τ Inspect the electric cables for abrasion and damage before and after
your cleaning work.
Safety during disassembly, assembly, maintenance and troubleshooting
August 2017
safety data sheet.
τ Always perform the specified adjustments, servicing as well as inspec-
tion work and observe inspection intervals.
τ Inform operating personnel about all service and repair work before
beginning.
τ Before opening a cover or removing a protective device on a turbo-
charger, the engine must be switched off and the turbocharger must
have come to a standstill.
τ Ensure that the supply of oil is interrupted, especially with an external
oil supply.
properly.
Mechanical work on the turbocharger
CAUTION
Possible damage to or destruction of components on the turbocharger.
τ Perform only those tasks that are described in this manual.
τ Perform work only for which training has been carried out.
HZTL2412_EN
τ Put the engine into operation only after all parts have been refitted
Safety when taking out of operation or preparing for mothballing
τ Secure the rotor so it cannot turn. The rotor can turn on its own from
the force of the stack draught.
τ Clean the turbocharger before mothballing it.
τ Observe the material safety data sheet for the cleaning and mothballτ Wear personal protective equipment (PPE) according to the material
safety data sheet.
© Copyright 2016 ABB. All rights reserved.
Revision F
ing agents.
Operation Manual / TPS44-F.. - TPS61-F..
2
Hazards during operation and
maintenance
2.7
Page 25
2.7 Hazards during operation and maintenance
August 2017
2.7
Safety
Mechanical hazards during operation
During normal operation, no mechanical hazards emanate from the turbocharger if it has been installed properly.
Risk of injury
HZTL2412_EN
WARNING
Contact with rotating parts can lead to serious injuries. The turbocharger must never be operated without a filter silencer or an air suction
branch. When the engine is at a standstill, the rotor can turn on its own
because of stack draught.
τ Operate the turbocharger in accordance with instructions.
τ During maintenance work, secure the rotor against unintentional rotation.
Mechanical hazards when working on the turbocharger
During maintenance work, various risks can occur through the improper
handling of components, through the non-observance of work instructions,
due to inadequate care or as a consequence of insufficient training.
Mechanical hazards
Revision F
WARNING
Severe injuries to personnel or fatal accidents can be caused by mechanical influences as a consequence of hazardous and inadequate
operational procedures.
τ Observe the general rules for occupational safety and prevention of
accidents.
τ Ensure workplace safety.
τ Only perform operations that are described in this document.
τ Only perform operations for which you have previously received instruction or training.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Safety
2
Hazards during operation and
maintenance
2.7
Page 26
The development of noise during operation is influenced by the installation
and operating conditions. Noise with a sound pressure level exceeding
85 dB(A) is harmful.
August 2017
Hazards due to noise
Hazards due to noise
WARNING
Noise can cause impaired hearing, damage to health, mental disturbances, diminished attention and irritation.
τ Always wear ear protection when the engine is running.
τ When the sound pressure level is above 85 dB(A), always wear ear
protection.
Hazards due to hot surfaces and substances
During operation, turbocharger surfaces and attached parts as well as operating materials (lubricating oil) become hot. The surface temperature is
dependent on the effectiveness of the insulation being used. The temperature can become high enough so that it falls into ranges where burns
are possible.
HZTL2412_EN
Wear ear protection.
Risk of burning
Wear safety gloves to protect against thermal hazards.
© Copyright 2016 ABB. All rights reserved.
Revision F
WARNING
Touching hot surfaces or contact with hot operating materials can lead
to serious burns.
τ Do not touch hot surfaces and heed the warning plate on the turbocharger.
τ Wear heat-resistant safety gloves and protective clothing.
τ Allow the turbocharger to cool down before carrying out any work.
Operation Manual / TPS44-F.. - TPS61-F..
Safety
2
Hazards during operation and
maintenance
2.7
Page 27
August 2017
Hot surfaces on the non-insulated turbocharger
WARNING
Non-insulated turbochargers can cause serious injuries to personnel
(burns).
The turbocharger is supplied by ABB Turbo Systems without insulation
depending on the order from the enginebuilder. If supply is without insulation, the enginebuilder is responsible for providing the turbocharger
with proper insulation and for providing protection against contact with
hot surfaces.
τ Compliance with the instructions and specifications given by the enginebuilder to protect against hot turbocharger surfaces is compulsory.
Wear safety gloves to protect against thermal hazards.
Hazards due to operating and auxiliary materials
HZTL2412_EN
Operating and auxiliary materials are substances used for operation or the
execution of maintenance work. Oils, greases, coolants, cleaning agents
and solvents, acids, etc. can be regarded as hazardous materials. Operating and auxiliary materials can be combustible and easily ignited.
Handling operating and auxiliary materials
WARNING
Ingestion or inhalation of vapours of operating and auxiliary materials or
contact with such can cause damage to health.
τ Avoid inhalation and contact with the skin.
τ Ensure good ventilation.
τ Observe details in the safety data sheets of the operating and auxiliary materials.
τ Observe local laws.
Wear safety goggles.
Revision F
Wear safety gloves to protect against chemical hazards.
Wear a respiratory mask to protect against gases.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Safety
2
Hazards during operation and
maintenance
2.7
Page 28
WARNING
Flammable and combustible operating materials and supplies can catch
fire or resulting vapours can lead to an explosion.
τ Observe the details in the material safety data sheets of the operating and auxiliary materials.
τ Comply with local legislation.
τ Do not allow any exposed flame or ignition source during cleaning
work.
τ Carry out cleaning in the open or provide sufficient aeration and ventilation.
August 2017
Risk of fire, explosion
Risk of environmental damage
τ Heed the instructions for use, safety data sheets and hazard notices
on the containers of the operating and auxiliary materials.
τ Wear appropriate protective clothing.
HZTL2412_EN
CAUTION
The escape of operating and auxiliary materials into the atmosphere or
contamination of the ground and water due to improper disposal can
lead to environmental damage.
τ Handle operating and auxiliary materials carefully.
τ Avoid inhalation and contact with the skin.
τ Ensure that the work space is adequately ventilated.
τ Seal containers tightly immediately after use and put them away.
τ Collect used working and auxiliary materials safely, store them sepa-
rately in suitable containers and dispose of them properly and in an
environmentally compatible manner in accordance with statutory regulations.
τ In the event of leaks or after spilling, immediately spread a suitable
Revision F
binding agent and dispose of it properly and in an environmentally
compatible manner in accordance with statutory regulations.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Safety
2
Hazards during operation and
maintenance
2.7
Page 29
August 2017
Hazards when handling insulating materials
Hazards due to insulating materials
WARNING
Dust and fibres from insulating materials can cause damage to health
or irritations. Unsuitable, combustible insulating materials signify a fire
hazard.
τ Use only suitable, non-combustible insulating materials.
τ Ensure that the work area is well ventilated.
τ Avoid stirring up dust.
τ Use tools and processes which keep dust to a minimum.
τ Remove packing materials only in the work area.
τ Take particular care when removing old insulating materials.
τ Dispose of insulating materials properly and in an environmentally
compatible way in accordance with applicable local regulations.
HZTL2412_EN
Wear safety goggles.
Wear a respiratory mask to protect against dusts.
Wear safety gloves to protect against chemical hazards.
τ Use only suitable, non-combustible insulating materials.
τ Ensure that the work area is well ventilated.
τ Wear suitable work clothing (safety glasses, respiratory mask).
τ Avoid stirring up dust.
τ Use tools and processes which keep dust to a minimum.
τ Remove packing materials only in the work area.
τ Take particular care when removing old insulating materials.
τ Dispose of insulating materials properly and in an environmentally
Revision F
compatible way in accordance with applicable local regulations.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Safety
2
Hazards during operation and
maintenance
2.7
Page 30
Hazards due to electrical components
Revision F
HZTL2412_EN
WARNING
Electrical components operate with voltages which can present hazards
to humans.
τ All work on or with electrical components may only be performed by
trained specialists.
τ Heed any country-specific regulations.
August 2017
Hazards due to electrical components
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
August 2017
2.8
Safety
2
Deflagration on gas engines
2.8
Page 31
2.8 Deflagration on gas engines
ABB turbochargers can tolerate a deflagration with a transient pressure
increase of 12 bar.
After a deflagration event ABB Turbo Systems recommends verifying the
following points on the turbocharger:
€ Position of the turbine and compressor casings to the bearing casing
€ Shifting of the bearing casing in relation to the bracket
€ Cracks in casings
Revision F
HZTL2412_EN
If during external inspection anomalies are found or if a particularly strong
deflagration event has taken place, it is also recommended to check the
bearings of the turbochargers before the next start. This inspection and
evaluation must be carried out by an ABB Turbocharging Service Station.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
2
Periodic checking of the pressure
vessel
2.9
Page 32
2.9 Periodic checking of the pressure vessel
The pressure vessels used by ABB Turbo Systems, such as those for wet
or dry cleaning, are so-called "simple pressure vessels".
€ The local, statutory regulations covering periodic checks of pressure
vessels must be observed.
August 2017
2.9
Safety
€ The operator is responsible for the safe operation of the pressure vessel.
Hazards from pressure vessels
Revision F
HZTL2412_EN
WARNING
The operator must keep the pressure vessel in a proper condition and
monitor it. Necessary repair or maintenance work must be carried out
without delay and the required safety precautions must be taken.
τ Pressure equipment must not be operated if it has defects.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
August 2017
2.10
Safety
2
Lifting loads
2.10
Page 33
2.10 Lifting loads
Suspended loads
WARNING
Loads not suspended in compliance with regulations may lead to personal injury or accidents with fatal consequences.
τ Loads must always be fastened to technically perfect lifting gear with
sufficient loading capacity.
τ Make sure the load is suspended properly on the crane hook.
τ Do not let anyone stand beneath a suspended load.
Wear safety gloves to protect against mechanical hazards.
HZTL2412_EN
Wear safety helmet.
In the case of two or more suspension points, the slinging angle must not
exceed 45°. This avoids excessive loading due to inclined tensile loading.
Revision F
τ Fasten turbocharger assemblies / components as described in respec-
tive handling steps.
τ Before attaching slings, allow turbocharger components to cool down
(maximum 80°C).
τ Use suitable protection at sharp edges.
τ Completely screw in assembly / fitting devices without fail so that they
cannot work loose during use.
τ Use assembly / fitting devices only for applications described.
τ Make sure removed turbocharger components stand safely and se-
curely.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Start-up
3
Oil supply
3.1
Page 35
August 2017
3 Start-up
3.1 Oil supply
3.1
A carefully designed and installed oil supply, which functions in all possible operational conditions, is an important prerequisite for trouble-free turbocharger operation.
The turbocharger is normally lubricated with oil from the engine oil circuit.
If a separate lubricating system is used, then emergency lubrication is also to be provided.
τ Heed the instructions of the engine builder when selecting the lubricat-
ing oil and oil-change intervals.
HZTL2412_EN
Oil filtration
Depending on the turbine specifications and bearings used, varying
amounts of contaminants have to be filtered out of the lubricating oil to
avoid dangerous wear of the bearing parts.
CAUTION
The standard oil filter specification for the turbocharger is 34 µm. This
means that contaminants larger than 0.034 mm must be filtered out of the
oil with a separation efficiency > 99%.
τ Fit an accessory filter if engine oil filter is not efficient enough.
τ If the engine is started cold and the flow resistance rises to above 0.5
bar due to deposits of dirt in the accessory filter, a bypass must open
which ensures that oil flows to the turbocharger by circumventing the
filter.
Revision F
τ Check that oil filters are clean before commissioning.
Also follow the enginebuilder's instructions regarding filter mesh and
separation efficiency.
NOTICE
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Start-up
3
Oil supply
3.1
Page 36
All lubricating oils used for engines are admissible.
August 2017
Lubricant
NOTICE
Oil inlet viscosity and temperature
1)
Kinematic viscosity (mm2/s = cSt)
2)
Oil-inlet temperature (°C)
A
Permissible range
Falling below the minimum oil inlet temperature
CAUTION
Serious machine or property damage can be caused by excessively
high oil viscosity and the resulting lack of oil in the bearings.
τ Do not allow the oil inlet temperature to fall below the minimum 30 ºC
when starting the engine.
τ The oil inlet temperature must never be less than 10 °C.
© Copyright 2016 ABB. All rights reserved.
Revision F
HZTL2412_EN
The oil-inlet temperature must not exceed 105°C. Permissible oil-inlet viscosities and oil-inlet temperatures are shown in the following chart.
Operation Manual / TPS44-F.. - TPS61-F..
Start-up
3
Oil supply
3.1
Page 37
Oil pressure
August 2017
The oil pressure in front of the turbocharger must be maintained precisely
to ensure trouble-free operation.
Status for operation
Oil pressure in front of
turbocharger
[bar]
Normal operation
2.0 … 4.5
Engine start: cold oil, permissible for maximum
15 minutes
≤ 8.0
Engine idling
≥ 0.2
Pre- and post-lubrication (engine stopped)
≤ 1.0
CAUTION
Serious machine or property damage might result if the turbocharger is
not supplied with oil when the engine is starting.
τ Activate prelubrication device before starting engine.
Revision F
HZTL2412_EN
Prelubrication
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Start-up
3
Oil supply
3.1
Page 38
Machine damage
Status for operation
Oil temperature at inlet
Toil,inlet
Permissible
30 … 105 °C
Temporarily permissible (< 1 h) → alarm
> 105 °C
Not permissible → stop engine
> 110 °C
Not permissible → do not start engine (before
starting: preheat oil)
< 30 °C
HZTL2412_EN
CAUTION
Machine damage may result if the oil temperature at the oil inlet exceeds the permissible range.
τ Keep the oil temperature at the oil inlet as specified in the following
table.
August 2017
Lubricating oil temperature at the inlet
Lubricating oil temperature at the outlet
The oil temperature at the outlet depends mainly on:
€ lubricating oil temperature and pressure at the oil inlet
€ engine load and turbocharger speed
€ exhaust gas temperature
The maximum permissible oil temperature at the outlet is listed in the following table. The specified oil outlet temperature must be regarded as an
alarm value for turbocharger operation and be monitored in accordance
with standard regulations.
Oil temperature at outlet
Toil,outlet
Permissible
≤ 160 °C
Temporarily permissible → alarm
> 160 °C
Not permissible → stop engine
> 180 °C
Permissible
≤ Toil,inlet + 55 K
Temporarily permissible → alarm
> Toil,inlet + 55 K
If the turbocharger has been operated outside the permissible range for a
prolonged period of time, ABB Turbo Systems recommends having the
turbocharger inspected by an ABB Turbocharging Service Station.
© Copyright 2016 ABB. All rights reserved.
Revision F
Status for operation
Operation Manual / TPS44-F.. - TPS61-F..
3
Inspection work
3.2
Page 39
3.2 Inspection work
3.2
August 2017
Inspection work includes preventive visual controls plus monitoring and
measuring work before and during commissioning. Inspections help detect
changes to the turbocharger. Machine damage can be avoided.
3.2.1
HZTL2412_EN
Start-up
Inspection before commissioning
Monitoring devices
τ Check for correct functioning.
Filter mat
τ Inspect for damage.
Lubricating system
τ Check oil filter for cleanliness before commissioning.
Contaminated oil
CAUTION
Particles of dirt and solid matter in the oil can cause serious damage to
the machine or property.
τ During initial commissioning and after all service work, the complete
lubricating system must be flushed thoroughly with warm oil.
τ When running in the engine and after all service work on the lubricating system, special running-in filters must be used.
τ Check oil pressure in oil supply lines.
Prelubrication
Revision F
CAUTION
Warning plates on turbocharger
Serious machine or property damage might result if the turbocharger is
not supplied with oil when the engine is starting.
τ Activate prelubrication device before starting engine.
τ Check whether the warning plates are present and legible.
τ Check whether the protective sheets have been removed.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
3
Inspection work
3.2
Page 40
Check after start-up (engine at idling speed)
Lubricating system
τ Check oil pressure in oil supply lines.
August 2017
3.2.2
Start-up
τ Check oil inlet temperature.
The permissible values are listed in the section Oil supply.
Gas, air and oil lines
τ Check all gas, air and oil lines for leaks after starting the engine.
Check when running up engine
τ Measure speed, oil pressure and charging pressure at various engine
performance levels.
τ Measure exhaust gas temperature in front of and behind turbine.
τ Measure air temperature in front of and behind compressor.
HZTL2412_EN
3.2.3
The measured values must be compared with the values in the acceptance
test report, while taking different operating conditions into account.
3.2.4
Inspection after 100 service hours
Clean or replace lubricating oil filters after the first 100 service hours.
© Copyright 2016 ABB. All rights reserved.
Revision F
NOTICE
Lubricants and pastes used during assembly of the turbocharger liquefy
or vaporise and might escape as an oily liquid in the first few hours after
commissioning. If oily liquid continues to escape after this period, an oil
leak must be suspected. The first step is to check for leakage of the oil
supply to the turbocharger. If this is leaky, contact an official ABB Turbocharging service station.
Operation Manual / TPS44-F.. - TPS61-F..
August 2017
3.3
If provided
Start-up
3
Commissioning after taking out of
operation
3.3
Page 41
3.3 Commissioning after taking out of operation
τ Remove cover plates (blind flanges) between compressor casing out-
let and charge air duct, before gas inlet and after gas outlet.
τ Inspect exhaust gas duct / line in front of and after turbine for any
combustion deposits, foreign matter or residual water. Clean and remove.
τ Inspect air supply line or filter silencer for any foreign matter. Clean
and remove.
τ Start up turbocharger oil circulation system at engine end.
τ Prepare turbocharger for operation as instructed in section "Inspection
work before start-up / commissioning" of chapter headed "Start-up /
commissioning".
Revision F
HZTL2412_EN
τ Start up turbocharger.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Operation
4
Noise emissions
4.1
Page 43
August 2017
4 Operation
4.1
4.1 Noise emissions
Hazards due to noise
WARNING
Noise can cause impaired hearing, damage to health, mental disturbances, diminished attention and irritation.
τ Always wear ear protection when the engine is running.
τ When the sound pressure level is above 85 dB(A), always wear ear
protection.
Wear ear protection.
HZTL2412_EN
The sound pressure level (A-weighted) of emissions is measured at a distance of 1 metre from the turbocharger.
The highest sound pressure level of emissions1) reaches a maximum of
105 dB(A) near the filter silencer and over the entire speed range.
The following prerequisites must be fulfilled on the turbocharger in order
to observe this limit value:
€ Fitted air-inlet system
€ All standard, noise-reducing measures have been taken2).
Revision F
€ The bellows at the air outlet have been perfectly insulated acoustically
by the engine builder. He is also responsible for insulating the charge
air / scavenging air line and the charge air cooler.
1)
Directive 2006/42/EC, 1.7.4.2 / u / Paragraphs 5 + 7 :
A-weighted emission sound pressure level
2)
In the event of divergent insulation designs, the engine builder must ensure that equivalent acoustic insulating measures are taken.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Operation
4
Noise emissions
4.1
Page 44
Compressor casing
04
Insulation pads
02
Bellows
05
Insulation mat (at least 15 mm)
03
Charge air duct / scavenging
air line
06
Sheet metal cover
Revision F
01
HZTL2412_EN
August 2017
Suggestion for noise insulation of the bellows
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Operation
4
Servicing work
4.2
Page 45
4.2 Servicing work
4.2
August 2017
Service work to be carried out during operation involves visual checks,
monitoring, measuring, inspection work and functional checks. It is then
possible for changes to the turbocharger to be identified and rectified. In
this way, it can be ensured that the turbocharger remains in full working
order.
Service intervals
CAUTION
Service work on the turbocharger that is neglected or carried out too
late can lead to excessive contamination and wear as well as operating
failures.
τ Carry out service work at specified time intervals.
HZTL2412_EN
Shortened service intervals
CAUTION
Despite observance of the service intervals, unusual loads, such as
several start-stops a day, harsh environmental factors, poor fuel quality
or heavy installation vibration can lead to premature machine damage.
τ A shortened service interval must be arranged with ABB Turbo Systems.
Service inspection after 5 years
NOTICE
4.2.1
To prevent age- and stoppage-related machine damage, an inspection
by an ABB Turbocharging Service Station is recommended at the latest
5 years after the last service.
Service work every 25 … 50 hours
τ Visual inspection for air, exhaust gas, water and oil leaks.
Revision F
τ Record operating data and enter it in the engine logbook.
τ Clarify the cause of any variances.
Unknown changes during operation
CAUTION
The consequences can range from an impairment to a breakdown.
τ Have unknown causes clarified by an ABB Turbocharging service
station.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
4
Servicing work
4.2
Page 46
Servicing work according to the engine manufacturer's instructions
τ Clean or replace oil filter in supply line to turbocharger when engine is
Oil filter
August 2017
4.2.2
Operation
not running.
4.2.3
Service work in accordance with instructions on rating plate
(In general, after 8000 - 12000 hours of operation)
Rotor and bearing parts must be inspected and assessed by an ABB Turbocharging Service Station. The following work can be carried in preparation.
τ Remove cartridge group as described in chapter Disassembly and asτ Measure clearances.
τ Clean turbine and compressor casings and check them for cracks and
erosion / corrosion.
τ Clean bearing casing and blow air through oil ports / holes.
HZTL2412_EN
sembly.
Revision F
τ Clean nozzle ring and check for cracks and erosion.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
August 2017
4.2.4
Operation
4
Servicing work
4.2
Entries in engine logbook
By monitoring the engine, conclusions can be drawn about the turbocharger performance.
The following operating data and measured values must be entered regularly in the engine manufacturer's engine logbook:
€ Engine performance and speed
€ Air intake temperature
€ Exhaust gas temperature in front of and behind the turbine
€ Pressure of charge air
€ Pressure drop in charge air cooler
€ Lubricating oil pressure and lubricating oil temperature
If provided
€ Air temperature behind compressor and charge air cooler
€ Turbocharger speed
€ Pressure loss in air filter
Revision F
HZTL2412_EN
Page 47
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
4
Expected exchange intervals
4.3
Page 48
4.3 Expected exchange intervals
Rotating components
The recommended replacement intervals for compressor wheels and turbine wheels are defined depending on the operating conditions and based
on the safety concept (SiKo) for rotating parts. These intervals can be
found on the turbocharger rating plate.
August 2017
4.3
Operation
Non-rotating components
Depending on the system-specific operating conditions, a distinction is
made between:
€ the replacement interval for the bearing parts and
Decisive in this respect are various influencing parameters, which can
drastically shorten the replacement intervals of these parts in extreme
cases.
During the specified periodic service work, the individual components are
inspected for wear and, if necessary, replaced.
HZTL2412_EN
€ the replacement interval for those non-rotating components that are
exposed to hot gases.
GAS / MDO
HFO
25000 … 50000
25000 … 50000
Nozzle ring
50000
10000 … 25000
Gas outlet flange
50000
35000 … 50000
Partition wall
50000
35000 … 50000
Rotor components
See the data on the rating plate
Turbine casing
Bearing parts
12000 … 24000
12000 … 24000
Other casings
50000
50000
GAS = Natural gas
MDO = Marine diesel oil
HFO = Heavy fuel oil
The specified values are a guide only and not guaranteed (see following
section Influencing parameters).
© Copyright 2016 ABB. All rights reserved.
Revision F
Expected replacement intervals [h]
Operation Manual / TPS44-F.. - TPS61-F..
Operation
4
Expected exchange intervals
4.3
Page 49
August 2017
Influencing parameters
The specified values are only guide values and not guaranteed. The actual values can deviate considerably from the guide values due, for example, to the following influences:
€ Fuel quality and preparation
€ Load profile (thermal load cycles, also starts / stops, emergency shutdowns)
€ Gas inlet temperature
€ Frequency and execution of turbine and compressor cleaning
€ Turbocharger specification
€ System-specific operating conditions (operating point, combustion
quality, composition of exhaust gas)
HZTL2412_EN
For bearing parts
€ Lubricating oil quality (oil filtration, condition of lubricating oil, oil monitoring)
€ Load profile (rpm / speed, pressure conditions, temperature)
Revision F
€ State of rotor unbalance (degree of contamination)
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
4
Speed measurement
4.4
Page 50
4.4 Speed measurement
A speed measuring system permits continuous monitoring of the turbocharger speed.
August 2017
4.4
Operation
Do not use cables as a climbing aid
86505(A) Speed sensor (cable not integrated)
86526 F/I converter
86505(B) Speed sensor (cable integrated)
86528 Tachometer
86515(A) Cable connector to 86505(A)
01 Screw plug
86515(B) Cable connector to 86505(B)
02 Gasket
© Copyright 2016 ABB. All rights reserved.
Revision F
HZTL2412_EN
CAUTION
If you pull the speed measurement cables too hard, contacts can be
pulled out.
τ Do not tension the speed measurement cables.
Operation Manual / TPS44-F.. - TPS61-F..
August 2017
4.4.1
Operation
4
Speed measurement
4.4
Page 51
Speed differences with multiple turbochargers per engine
The speeds of all turbochargers on one engine differ only slightly from
each other in normal operation.
The difference between the highest and the lowest turbocharger speed
must not be more than 3 % relative to the speed limit nBmax.
If this permissible range of difference is exceeded, the following steps
must be carried out:
τ Reduce engine performance immediately until the highest turbo-
charger speed no longer exceeds 70% of nBmax.
τ If the engine cannot be stopped, continue to run at this reduced engine
performance or turbocharger speed.
τ If the turbocharger surges continuously, engine performance must be
reduced further.
HZTL2412_EN
τ Measure the temperatures in the air and gas lines to and from the tur-
bochargers and compare them with standard values.
If the engine can be stopped for a short time:
τ Inspect the air and gas lines as well as the turbocharger and eliminate
any problems.
τ In any event, it is recommended that you contact the nearest ABB
Revision F
Turbocharging Service Station.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
4
Speed measurement
4.4
Page 52
Replacing the speed sensor
Hot cable connector and hot speed sensor
WARNING
Risk of burning. During operation, the cable connector and the speed
sensor can reach temperatures exceeding 100 °C.
τ Wear safety gloves when removing the cable connector and speed
sensor.
August 2017
4.4.2
Operation
HZTL2412_EN
Wear safety gloves to protect against thermal hazards.
τ Reduce engine performance to the idling speed, then stop the engine.
τ Switch off the lubricating oil supply to the turbocharger.
τ Disconnect the cable connector from the speed sensor.
τ Screw out defective speed sensor.
τ Screw in a new speed sensor up to the limit block.
Part number
TPS44
TPS48
TPS52
TPS57
TPS61
86505
15 Nm
15 Nm
15 Nm
15 Nm
15 Nm
© Copyright 2016 ABB. All rights reserved.
Revision F
τ Adhere to tightening torque.
August 2017
Operation Manual / TPS44-F.. - TPS61-F..
Operation
4
Speed measurement
4.4
Page 53
Sealing the speed sensor
NOTICE
The speed sensor is designed with a sealing lip and does not require an
additional gasket when fitted.
τ Connect cable connector to speed sensor.
τ Switch on lubricating oil supply to turbocharger.
4.4.3
Failure of speed measuring system
Revision F
HZTL2412_EN
Possible reasons for failure of the speed measuring system are described
in the chapter Troubleshooting.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
4
Stopping the engine
4.5
Page 54
4.5 Stopping the engine
Stopping the engine of oil-cooled turbocharger version
CAUTION
Heat in the turbocharger must be dissipated by the further circulating
lubricating oil.
τ Post-lubricate for 15 … 20 minutes.
τ Maintain oil pressure of 0.5 … 1.0 bar for post-lubrication.
August 2017
4.5
Operation
Stopping the engine of water-cooled turbocharger version
Revision F
HZTL2412_EN
CAUTION
Heat in the turbocharger must be dissipated.
τ Allow turbocharger cooling water to run for 15 … 20 minutes after
stopping engine.
τ Allow oil lubrication to continue running until rotor comes to a stop.
Further post-lubrication is not required and not recommended.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Foreword to Maintenance
5.1
Page 55
August 2017
5 Maintenance
5.1 Foreword to Maintenance
5.1
General maintenance work involves regular visual checks and cleaning
tasks which are intended to ensure the trouble-free functioning of the turbocharger.
The maintenance points described here are differentiated as follows:
€ Cleaning during operation:
– Compressor
– Turbine and nozzle ring.
€ Mechanical cleaning of individual components:
HZTL2412_EN
– Filter silencer
– Casings, diffuser, nozzle ring
– Cartridge group: Compressor, turbine
Risk of damage during mechanical cleaning
CAUTION
If mechanical cleaning is carried out too often, this can lead to damage
and corrosion on the components.
τ If cleaning during operation is not sufficient to achieve acceptable
values regarding thermal load and engine performance, mechanical
cleaning of certain spots can be carried out.
τ Perform mechanical cleaning, especially of the cartridge group, only
once within the service interval.
Cleaning method
Revision F
NOTICE
To allow you to observe the standard service intervals and to maintain a
high turbocharger efficiency, ABB Turbo Systems recommends that the
cleaning procedure be carried out during operation. This allows the
thermal load of the engine to be kept low while ensuring maximum fuel
efficiency.
τ Dispose of dirty water and cleaning agents in an environmentally com-
patible manner, professionally and in accordance with valid local regulations.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Cleaning the compressor during
operation
5.2
Page 56
The contamination of the compressor stage (compressor wheel, wall insert and diffuser) depends on the degree of purity of the taken-in air.
General
Deposits can form in the flow channels if salt, oil mist, exhaust gas or dust
are sucked in with the air.
August 2017
5.2 Cleaning the compressor during operation
5.2
Consequences of contamination:
€ Impaired compressor efficiency
€ Higher exhaust gas temperatures
€ Increased fuel consumption
Periodic cleaning of the compressor during operation prevents or delays
any major increase in contamination. But it never replaces the regular
service work where the turbocharger is completely dismantled and the
compressor is mechanically cleaned.
If the coating of dirt is very thick and hard, the compressor can only be
cleaned manually when disassembled. This cleaning must be carried
out by an ABB Turbocharging Service Station.
HZTL2412_EN
€ Increased rotor unbalance
NOTICE
Cleaning interval
The interval between periodic cleaning is very dependent on the operating
conditions. In general, cleaning should be carried out every 25 ... 100 operating hours.
Revision F
Should the specified cleaning intervals prove incompatible with engine
operation, please contact ABB Turbo Systems.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Cleaning the compressor during
operation
5.2
Page 57
Cleaning method
August 2017
Cleaning the compressor while in operation is carried out as wet cleaning.
This cleaning method has been tested and approved by ABB Turbo Systems.
Principle of wet cleaning
To clean the compressor stage during operation, water is injected in front
of the compressor wheel through an injection pipe fitted in the filter silencer or the suction branch.
The water does not act as a solvent, but the dirt deposit is removed by the
mechanical impact of the droplets. This is a very suitable process, provided that the degree of contamination is not too high.
Corrosion and deposits when cleaning
HZTL2412_EN
CAUTION
CAUTION
Damage and impairment of turbocharger parts due to salt water and
cooling water additives
τ Don't use salt water for cleaning, but only clean fresh water.
The injection pipe must on no account be connected directly via a cock
to a water pipe or a dosing vessel larger than the one supplied. This
prevents uncontrolled volumes of water entering the turbocharger and
engine, which can lead to serious damage.
In the case of V-engines with several turbochargers on each engine, we
recommend parallel cleaning of the compressors. This cleaning process is
faster and the risk of turbocharger surging is reduced.
Sequential charging
In the case of sequential charging, care must be taken to ensure that turbocharger compressors are cleaned regularly, especially after periods of
operation in the lower performance range.
Revision F
V-engines
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
5
Cleaning the compressor during
operation
5.2
Page 58
5.2.1
Wet cleaning compressor using external water pressure vessel (XC1)
Approval by enginebuilder
These instructions for wet cleaning only apply when cleaning is carried out
with clean water and under the precondition that the enginebuilder approves the process.
NOTICE
August 2017
Maintenance
Supplying water from the externally mounted water vessel is suitable
only for those applications where a negative pressure exists in front of
the compressor wheel (not used for: blowers connected in front of the
compressor or high-pressure compressor stages with two-stage charging).
Revision F
NOTICE
To be able to carry out a satisfactory cleaning process that has been
tested and is recommended by ABB Turbo Systems, the following prerequisites must be fulfilled:
τ Run engine at load from 50 … 85 %.
τ Start cleaning cycle according to following description Wet cleaning
operation with XC1.
HZTL2412_EN
Operating state prerequisites for cleaning compressor with XC1
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Cleaning the compressor during
operation
5.2
Page 59
HZTL2412_EN
August 2017
Procedure for wet cleaning the compressor with XC1
X Sealing plug
D Compressed air
Y Valve activator
W Water
Z Vessel
Operating the water pressure vessel
τ Remove sealing plug (X).
τ Fill the vessel (Z) with clean water.
τ Screw in the sealing plug.
τ Push the valve activator (Y) against the spring and hold for 10 to
15 seconds until the entire volume of water has been injected.
τ Do not repeat the cleaning cycle until a stabilisation period of at least
Revision F
10 minutes has elapsed.
NOTICE
Cleaning parameters per
turbocharger compressor
Whether or not cleaning has been successful can be seen from the
charging or flushing pressure and also from the exhaust gas temperatures. If the cleaning process is unsatisfactory, it can be repeated up to
2 times.
If the cleaning result is still not satisfactory after three attempts and the
engine values are also unsatisfactory, we recommend that you have the
turbocharger inspected and cleaned by an official ABB Turbocharging
Service Station.
Product
Engine load
Contents
of cleaning medium vessel
[dm3]
Water
injection time
t1 [s]
TPS
50 … 85 %
0.4
10
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Turbine cleaning during operation
5.3
Page 60
The combustion of fuels such as heavy fuel oil (HFO) in diesel engines
produces contamination of the turbocharger's turbine components. In
combination with a high exhaust gas temperature, poor quality fuel can
lead to particularly hard deposits on the nozzle ring and especially on the
gas outlet flange.
August 2017
5.3 Turbine cleaning during operation
5.3
ABB Turbo Systems recommends using fuels with a low ash, sulphur, sodium and vanadium content.
Consequences of contamination:
€ Poor turbine efficiency
€ elevated exhaust gas temperatures
€ higher charging and ignition pressures as turbocharger speed rises
€ After stopping the engine, the rotor can become stuck in contamination
deposits.
Experience with turbocharger operation shows that the intervals between
overhauls can be extended if cleaning while in operation is carried out periodically. Wet cleaning the turbine, as described below, should be used
for 4-stroke applications when there are heavy deposits from, for example,
HFO.
HZTL2412_EN
€ lower engine performance.
Under no circumstances is periodic cleaning of the turbine during operation a substitute for the service work carried out when the turbocharger is
completely dismantled and cleaned mechanically.
Turbines which are very heavily contaminated cannot be cleaned this way
any longer. In this case, the contaminated components must be mechanically cleaned by an ABB Turbocharging Service Station.
NOTICE
Regular turbine cleaning during operation prevents or delays excessive
build-up of contamination.
Cleaning intervals
The interval between periodic cleaning is very dependent on the operating
conditions. In general, cleaning should be carried out every 50 to 200 operating hours.
© Copyright 2016 ABB. All rights reserved.
Revision F
Regular cleaning
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Turbine cleaning during operation
5.3
Page 61
August 2017
Cleaning intervals
NOTICE
Should the specified cleaning intervals prove incompatible with engine
operation, please contact ABB Turbo Systems.
Cleaning method
Turbine components are cleaned during operation using the wet cleaning
processes described in the following. These have been tested and are
approved by ABB Turbo Systems.
The turbine casing design and the type of turbine casing sealing are decisive for the choice of cleaning method.
HZTL2412_EN
Approval by engine manufacturer
NOTICE
5.3.1
The prerequisite for wet cleaning is that the engine manufacturer approves the method and his instructions are followed.
Wet cleaning methods
Process with short water injection time (3 x 30 seconds cleaning)
The cleaning process with short water injection time is used for turbocharger designs without additional sealing by means of C-rings.
The process is based on the principle of thermal shock in combination
with a subsequent flushing phase.
Revision F
Process with long water injection time (10 minutes cleaning)
The cleaning process with a long water injection time is used for turbocharger designs with additional sealing by means of C-rings.
Based on a 10-minute injection phase, this cleaning process utilises the
water solubility of the dirty deposits.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Turbine cleaning during operation
5.3
Page 62
NOTICE
5.3.2
If you need information about the choice of cleaning method (short /
long), you can contact the engine builder or an official ABB Turbocharger service station.
August 2017
Choice of cleaning method
Prerequisites
Risk of corrosion and deposits
Maximum temperature in front of turbine during cleaning
CAUTION
When cleaning, the temperature in front of the turbine will rise and can
heavily stress the material of turbine components. The temperature at
the turbine inlet can be up to 100 °C higher than the exhaust gas temperature after the cylinder. This should be taken into consideration
when setting the operating point before cleaning.
τ Don't exceed maximum temperature in front of turbine when cleaning.
HZTL2412_EN
CAUTION
Impairment and damage of turbocharger by salt water and cooling water additives in flow ducts
τ Don't use salt water for cleaning, but only clean fresh water.
τ Avoid corrosion on casing inner surfaces.
τ Let engine run for 10 minutes after wet cleaning.
Impermissible thermal stressing and flooding of the turbine
V-engines
NOTICE
In the case of V-engines with several turbochargers on each engine, we
recommend parallel cleaning of both turbochargers. This cleaning process is faster and the risk of turbocharger surging is reduced.
© Copyright 2016 ABB. All rights reserved.
Revision F
CAUTION
Smaller volumes of water can result in poor cleaning. Larger volumes of
water lead to impermissible thermal stressing of the turbine components and can cause flooding of the turbine.
τ Be absolutely sure to observe turbine cleaning parameters.
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Turbine cleaning during operation
5.3
Page 63
August 2017
Recommended operating state for turbine wet cleaning
The following operating state has been tested and is approved by ABB
Turbo Systems:
Characteristic / component
Conditions
short
water injection time
Engine load (guide value)
Turbine inlet temperature
TTE before water injection
20 … 40 %
350 - 400 °C
Water supply
Water pressure (overpressure over atmosphere) pWT
long
water injection time
350 - 430 °C
ensured
2.0 bar
1.5 bar
The cleaning cycle can now be started based on the following description.
Revision F
HZTL2412_EN
If necessary, engine performance must be reduced to maintain these
conditions.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
5
Turbine cleaning during operation
5.3
Page 64
Procedure for method with short water injection time
ϖ Prerequisites have been fulfilled.
τ Wait 10 minutes during a stabilising phase after reducing the engine
load.
August 2017
5.3.3
Maintenance
τ Open the shut-off valve.
τ Set the required water flow rate as specified in the table of cleaning
parameters using the flowmeter and inject for 30 seconds.
τ Observe a pause of 3 or 5 minutes as specified in the table.
τ Repeat the 30-second water injection two times.
τ Close the shut-off valve.
τ Wait 10 minutes during a stabilising phase before increasing engine
load again.
Cleaning parameters during the process
Water
volume flow 1)
[dm3/min]
Injection time
[min]
Pause between
injections
[min]
≤ 450
4.5
0.5
(3 x)
3
44
48
6
52
8
57
11
61
17
1) corresponds to a water pressure p
mosphere)
5
WT of 2.0 bar (overpressure over at-
Maximum temperature in front of turbine during cleaning
CAUTION
When cleaning, the temperature in front of the turbine will rise and can
heavily stress the material of turbine components. The temperature at
the turbine inlet can be up to 100 °C higher than the exhaust gas temperature after the cylinder. This should be taken into consideration
when setting the operating point before cleaning.
τ Don't exceed maximum temperature in front of turbine when cleaning.
© Copyright 2016 ABB. All rights reserved.
Revision F
TPS
Temperature in
front of the turbine
during cleaning
[°C]
HZTL2412_EN
This completes the turbine cleaning process.
August 2017
Operation Manual / TPS44-F.. - TPS61-F..
5.3.4
Maintenance
5
Turbine cleaning during operation
5.3
Page 65
Procedure for method with long water injection time
ϖ Prerequisites have been fulfilled.
τ Wait 10 minutes as a stabilising phase after reducing the engine load.
τ Open the shut-off valve.
τ Set the required water flow rate as specified in the table of cleaning
parameters using a flowmeter and inject for 10 minutes.
τ Close the shut-off valve.
τ Wait 10 minutes as a stabilising phase before increasing the engine
load again.
This completes the turbine cleaning process.
HZTL2412_EN
Cleaning parameters during the process
TPS
Temperature in
front of the turbine
during cleaning
[°C]
44
≤ 530
Water
Injection time Stabilising phase
1)
before / after water
volume flow
[min]
injection
3
[dm /min]
[min]
2.5
48
4
52
5.5
57
8.5
61
12
1) corresponds to a water pressure p
mosphere)
10
10
WT of 1.5 bar (overpressure over at-
Revision F
Maximum temperature in front of turbine during cleaning
CAUTION
When cleaning, the temperature in front of the turbine will rise and can
heavily stress the material of turbine components. The temperature at
the turbine inlet can be up to 100 °C higher than the exhaust gas temperature after the cylinder. This should be taken into consideration
when setting the operating point before cleaning.
τ Don't exceed maximum temperature in front of turbine when cleaning.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Cleaning components mechanically
5.4
Page 66
5.4.1
Introduction
August 2017
5.4 Cleaning components mechanically
5.4
Choosing cleaning tools
CAUTION
Turbocharger components are sensitive to mechanical damage. The
use of needle guns or other impact tools, for example, damages the
components. Depending on the specification, nozzle rings and turbine
casings have protective coatings, which can also be damaged.
τ Only use soft tools such as cloths, brushes or wire brushes.
τ In the event of heavy contamination, the cleaning methods that have
been described such as soaking can be repeated until a satisfactory
result has been achieved.
patible manner, professionally and in accordance with valid local regulations.
Disassembly and assembly
The disassembly and assembly of the components is described in
chapter Disassembly and assembly.
Revision F
NOTICE
HZTL2412_EN
τ Dispose of dirty water and cleaning agents in an environmentally com-
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
5
Cleaning components mechanically
5.4
Page 67
Cleaning the filter silencer
HZTL2412_EN
August 2017
5.4.2
Maintenance
81135 Filter silencer body
81266 Cover grid
81136 Absorption segment
81270 Tension band
81137 Sheet-metal covering
81271 Lock
81265 Filter ring
Disassembly and assembly
NOTICE
The procedure for disassembly and assembly of the filter silencer is described in the chapter entitled Disassembly and Assembly.
Cleaning the filter ring (if provided)
τ Remove filter ring (81265).
Revision F
τ Clean filter ring (81265) as required or every 500 operating hours, and
replace after the fifth cleaning operation at the latest.
The degree of contamination of the filter ring depends on the cleanliness of the air that is drawn in.
τ Wash filter ring (81265) using water containing light-duty detergent or,
if very heavily contaminated, soak it while squeezing carefully. Rinse
in cold water. Avoid rough handling (do not use a water jet).
τ Allow the filter ring to dry out completely before assembly.
τ Dispose of dirty water and gentle detergents in accordance with valid
local regulations.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Cleaning components mechanically
5.4
Page 68
τ Loosen the tension bands (81270).
τ Remove the cover grid (81266).
τ Pull out the sheet-metal coverings (81137), bend them up and remove
the absorption segments (81136).
August 2017
Cleaning the absorption segments
τ Clean the absorption segments (81136).
During cleaning, ensure that the absorption segments (81136) are only
cleaned with a mild jet of compressed air, soft brush or a damp cloth.
τ Have absorption segments which are heavily contaminated replaced
by an official ABB Turbocharging Service Station.
Fitting the filter silencer
τ Insert the absorption segments (81136) into the sheet-metal coverings
(81137).
and insert them into the slot guides in the silencer body (81135).
τ Fit the cover grid (81266).
τ Fit the tension bands (81270) and apply tension at the locks (81271).
τ Damaged tension bands must be replaced with new ones.
HZTL2412_EN
τ Bend the sheet-metal coverings (81137) back into their original shape
Revision F
τ If provided, fit the filter ring (81265).
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
August 2017
5.4.3
Maintenance
5
Cleaning components mechanically
5.4
Page 69
Compressor-end, non-rotating parts
Handling operating materials and supplies
WARNING
Swallowing or inhaling vapours of operating materials and supplies or
contact with them may be harmful to health.
τ Do not breathe in these substances and avoid contact with the skin.
τ Ensure proper ventilation.
τ Observe the information in the material safety data sheet for the operating materials and supplies.
τ Wear personal protective equipment (PPE) according to the material
safety data sheet.
τ Comply with local legislation.
Wear safety goggles.
HZTL2412_EN
Wear safety gloves to protect against chemical hazards.
Wear a respiratory mask to protect against gases.
Revision F
The following performance-relevant parts can be cleaned according to the
following description.
72000
Compressor casing
77000
Wall insert
79000
Diffuser
τ Clean the components specified above with steam or allow to soak in
diesel oil or water with household detergent. After soaking, remove the
dirt with a brush.
τ Dry components completely.
τ Spray cleaned surfaces with penetrating oil. Do not spray the outer
surfaces of the turbocharger.
τ Dispose of dirty water and cleaning agent in accordance with the spec-
ifications in the safety data sheet.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
5
Cleaning components mechanically
5.4
Page 70
Turbine-end, non-rotating parts
August 2017
5.4.4
Maintenance
Handling operating materials and supplies
WARNING
Swallowing or inhaling vapours of operating materials and supplies or
contact with them may be harmful to health.
τ Do not breathe in these substances and avoid contact with the skin.
τ Ensure proper ventilation.
τ Observe the information in the material safety data sheet for the operating materials and supplies.
τ Wear personal protective equipment (PPE) according to the material
safety data sheet.
τ Comply with local legislation.
Wear safety gloves to protect against chemical hazards.
Wear a respiratory mask to protect against gases.
HZTL2412_EN
Wear safety goggles.
51000
Turbine casing
52400
Gas outlet flange
56001
Nozzle ring
τ Place contaminated parts in hot water or in a liquid such as carbon
remover to soften the contamination.
τ Brush away the contamination or remove with a steam cleaner.
τ Repeat the soaking and brushing if necessary.
τ Use clean water to completely clean parts of any solvents.
τ Dry components completely.
© Copyright 2016 ABB. All rights reserved.
Revision F
Baked layers of contamination, for example, from heavy fuel oil or coked
oil occur at the turbine end. The following parts, which are relevant in
terms of performance, can be cleaned in accordance with the description
below.
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Cleaning components mechanically
5.4
Page 71
τ Spray cleaned surfaces with penetrating oil. Do not spray the outer
surfaces of the turbocharger.
August 2017
τ Dispose of contaminated water and cleaning agents in accordance
with the information in the material safety data sheet.
5.4.5
Cartridge group
Introduction
Corrosion
HZTL2412_EN
CAUTION
If the cartridge group is not put into operation again immediately after
cleaning, parts may corrode.
τ Re-install and use the cartridge group immediately after cleaning.
Compressor wheels or turbines may be heavily contaminated due to
heavy fuel oil operation or coked oil. Such contamination may possibly no
longer be removed through cleaning during operation and must be
cleaned mechanically during the standard service intervals (see chapter
entitled Service work).
τ Remove turbocharger from the engine (see chapter Removal and in-
stallation [➙ 85]).
τ Remove cartridge group (see chapter Disassembly and assembly
[➙ 91]).
Revision F
First clean the compressor end and then the turbine end in accordance
with the following description.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Cleaning components mechanically
5.4
Page 72
Selection of the cleaning agent
CAUTION
Cleaning agents which contain chlorine attack metals.
τ Use only pH-neutral cleaning agents which do not attack metals.
τ Observe safety data sheet.
August 2017
Cleaning the compressor end
Water and contamination in the cartridge group
τ Clean compressor wheel with a cloth or soft brush soaked in water
with household detergent. Do not use any wire brushes!
τ Dry the compressor wheel and the gap between the compressor and
the bearing casing with a weak jet of compressed air.
HZTL2412_EN
CAUTION
If water or contamination penetrates the cartridge group, this can impair
the function of the turbocharger and damage parts inside the cartridge
group.
τ Make sure that no water or contamination can enter into the cartridge
group.
τ Lightly spray the compressor wheel and the gap between the com-
pressor and the bearing casing with penetrating oil.
τ Dispose of dirty water and cleaning agent in accordance with the safe-
Revision F
ty data sheet.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Cleaning components mechanically
5.4
Page 73
Soaking the dirt
Baked-on layers of dirt from heavy fuel oil or coked oil, occur at the turbine end. The contamination can be removed by soaking and brushing.
The soaking of the layers of dirt as well as the cleaning of the turbine are
described below.
HZTL2412_EN
August 2017
Cleaning the turbine end
Product
A [mm]
B [mm]
C [mm]
TPS44
91
15
173
TPS48
108
17
205
TPS52
128
20
245
TPS57
157
25
300
TPS61
187
30
357
To soak the layers of dirt on the turbine, the cartridge group can be submerged vertically in a tank (02) with liquid.
τ Place the tank (02) in a larger container (03), so that the excess liquid
Revision F
can be collected.
Selection of the cleaning agent
CAUTION
Cleaning agents which contain chlorine attack metals.
τ Use only pH-neutral cleaning agents which do not attack metals.
τ Observe safety data sheet.
τ Fill the tank (02) with soaking liquid.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Cleaning components mechanically
5.4
Page 74
To shorten the soaking time the liquid can be heated to maximum 60 ºC.
NOTICE
August 2017
Heat the liquid
Heating up of cleaning agents and operating fluids
WARNING
When cleaning agents or operating fluids are heated up, explosive vapours can be produced which are hazardous to health.
τ Observe the information in the material safety data sheet.
Wear a respiratory mask according to material safety data sheet.
CAUTION
If water or dirt gets into the cartridge group, the turbocharger function
may be impaired and parts in the cartridge group may be damaged.
τ Place the cartridge group on suitable wooden or metal supports (01).
τ Maintain dimension (B) for the supports (01), so that the cartridge
group does not submerge too deep.
HZTL2412_EN
Water and dirt in the cartridge group
Revision F
τ Allow the layers of dirt on the turbine to soak for four hours.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Maintenance
5
Cleaning components mechanically
5.4
Page 75
August 2017
Removing the dirt
Health hazard due to soot particles
WARNING
If soot particles enter the eyes or respiratory tract, this can be harmful
to health.
τ Avoid the formation of dust.
τ Vacuum up dust with a suitable vacuum cleaner.
τ Wear a respiratory mask to protect against particles (P1 or P2 mask).
τ Wear safety goggles.
Wear safety goggles.
Wear a respiratory mask to protect against dusts.
Wear safety gloves to protect against mechanical hazards.
τ Remove dirt manually with a soft brush or wire brush.
Revision F
HZTL2412_EN
τ Raise the cartridge group and align horizontally.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
5
Cleaning components mechanically
5.4
Page 76
Water and dirt in the cartridge group
CAUTION
If water or dirt gets into the cartridge group, the turbocharger function
may be impaired and parts in the cartridge group may be damaged.
τ Make sure that water or dirt does not get into the gap between the
partition wall and turbine.
August 2017
Maintenance
Non-permissible rotor unbalance after cleaning
CAUTION
Unevenly distributed residual contamination deposits lead to rotor unbalance. This can result in bearing or turbocharger damage.
τ Remove all traces of contamination from the turbine.
τ After brushing off the contamination, fill the tank (02) with clean water,
not salt water.
loose particles of dirt detach completely.
τ Raise the cartridge group and align horizontally.
τ Clamp the partition wall with the bearing casing.
τ Dry the turbine and the gap between the turbine and partition wall with
HZTL2412_EN
τ Submerge the turbine of the cartridge group in clean water, so that
a weak jet of compressed air.
τ Lightly spray the turbine and the gap between the turbine and partition
wall with penetrating oil.
τ Dispose of dirty water and cleaning agent in accordance with the spec-
Revision F
ifications in the safety data sheet.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Troubleshooting
6
Malfunctions when starting
6.1
Page 77
August 2017
6 Troubleshooting
6.1
6.1 Malfunctions when starting
Sluggish start-up
Possible causes
Elimination
Turbocharger
Turbocharger contaminated
Clean it
Damaged bearing
Contact an ABB Turbocharging Service Station
Rubbing rotor
Foreign object in turbocharger
HZTL2412_EN
Vibrations
Possible causes
Elimination
Turbocharger
Contact an ABB Turbocharging Service Station
Rotor unbalance
Damaged turbine or compressor
Damaged bearing
Rubbing of rotating parts
Normal behaviour, no malfunction
Revision F
Turbocharger
© Copyright 2016 ABB. All rights reserved.
Minor uniform wear around the periphery of rotor components,
caused by slight local rubbing of adjacent components, is permissible. The compressor blades and turbine blades are then
shortened somewhat. Certain tolerances must be observed to
avoid a significant loss of efficiency.
€ If there is any doubt about the extent of rubbing, then an ABB
Turbocharging Service Station must be contacted.
€ Have a dimension check carried out by an ABB Turbocharging Service Station.
Operation Manual / TPS44-F.. - TPS61-F..
6
Surging of the turbocharger
6.2
Page 78
6.2 Surging of the turbocharger
Turbocharger surging
Possible causes
Elimination
Engine
Guard in front of the turbocharger is contaminated or
damaged
Clean / replace it
Turbocharger
Filter silencer or diffuser con- Clean it
taminated
August 2017
6.2
Troubleshooting
Heavy deposits of dirt in the
turbine or nozzle ring
Charge air
cooler
Cooler contaminated
Clean it
Charge air duct blocked
CAUTION
Possible damage to components, such as the compressor wheel, turbine blades, bearings and filter silencer
τ Have the cause clarified immediately by an ABB Turbocharging service station and rectified.
τ Have components inspected for damage and, if necessary, replaced
by an ABB Turbocharging service station.
HZTL2412_EN
Prolonged or periodic surging
Sporadic surge blows
€ A surge blow is accompanied by a loud bang and escape of hot air
from the filter silencer.
© Copyright 2016 ABB. All rights reserved.
Revision F
Surging of the turbocharger can occur during certain operating conditions
such as when reducing the engine performance quickly when manoeuvring. At the same time, the flow direction in the compressor is momentarily reversed. Such sporadic surge blows do not impair the safe operation of
the turbocharger.
Operation Manual / TPS44-F.. - TPS61-F..
August 2017
6.3
Troubleshooting
6
Malfunctions during operation
6.3
Page 79
6.3 Malfunctions during operation
Lubricating oil pressure too low
Possible causes
Elimination
Engine
Oil filter heavily contaminated
Clean it
Defective oil pump in lubricating system
Check / replace it
Manometer display wrong
Replace the manometer
Turbocharger
Rotor axial clearance too large Contact an ABB Turbocharging
Service Station
HZTL2412_EN
Reduction in speed
Possible causes
Elimination
Engine
Defects of connected cylinders when pulse charging
Contact the enginebuilder
Turbocharger
Heavy contamination of the
turbine
Clean it
Damaged rotor components or Contact an ABB Turbocharging
bearing
Service Station
Pipes
Defects such as leaks in the
exhaust gas pipes or charge
air ducts
Make repairs
Increase in speed
Possible causes
Revision F
Turbocharger
© Copyright 2016 ABB. All rights reserved.
Elimination
Heavily contaminated nozzle Contact an ABB Turbocharging
ring (with 4-stroke application) Service Station
Operation Manual / TPS44-F.. - TPS61-F..
Troubleshooting
6
Malfunctions during operation
6.3
Page 80
Engine performance and engine speed unchanged
Possible causes
Elimination
Engine
Malfunctioning injection system
Repair it or contact the manufacturer
Turbocharger
Air starvation, for example filter
silencer clogged with dirt
Clean it
August 2017
Exhaust gas temperature too high
Clean or repair the boiler or
exhaust silencer
Damaged or eroded turbine
Contact an ABB Turbocharging Service Station
Cooler contaminated
Clean it
Cooling water volume too low
Top up the water
Entry temperature of cooling
water too high
Inspect / clean the cooling
system
Inadequate ventilation
Improve the ventilation
Revision F
Charge air
cooler
Exhaust counterpressure too
high
HZTL2412_EN
Compressor / turbine contaminated
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Troubleshooting
6
Malfunctions during operation
6.3
Page 81
August 2017
Charge air pressure too low
Engine performance and engine speed unchanged, air intake condition
normal
Possible causes
Elimination
Engine
Make repairs
Air receiver leaking
Gas piping between the engine
and the turbine leaking
Poorly adjusted injection system
Correct it
Poorly adjusted valve control
Turbocharger
Manometer display wrong
Replace the manometer
Line to manometer leaking
Repair the leak
Contaminated filter silencer caus- Clean it
ing excessive loss of pressure
Compressor / turbine contaminated
HZTL2412_EN
Damaged compressor / turbine
Contact an ABB Turbocharging Service Station
Exhaust counterpressure too high Clean or repair the boiler or
exhaust silencer
Charge air pressure too high
Revision F
Engine performance and engine speed unchanged, air intake condition
normal
Possible causes
Elimination
Engine
Malfunctioning injection system
Repair it or contact the manufacturer
Poorly adjusted injection system
Correct it
Engine performance higher than
expected
Check engine performance
Manometer display wrong
Replace the manometer
Turbocharger
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Troubleshooting
6
Malfunctions during operation
6.3
Page 82
Reduced compressor performance/efficiency, hence engine performance
losses
Possible causes
Remedy
Turbocharger
Heavy fouling of the compressor components
Clean compressor
Increased vibrations, compressor blade damage
Correct the feed of ventilation
gases according to instructions
of enginebuilder.
August 2017
Fouling of the compressor due to the feeding in of ventilation gases
Optimize oil separation
Possible causes
Remedy
Turbocharger
Check the fuel and its corrosive
components, and change fuel if
necessary.
Revision F
Material of compressor
wheel corroded
HZTL2412_EN
Reduced fatigue strength of the compressor wheel, compressor blade
failure.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
August 2017
6.4
Troubleshooting
6
Malfunctions when stopping
6.4
Page 83
6.4 Malfunctions when stopping
Noises during run-down
Possible causes
Elimination
Turbocharger
Turbocharger contaminated
Clean it
Damaged bearing
Contact an ABB Turbocharging Service Station
Rubbing rotor
Foreign object in turbocharger
Run-down time too short
Possible causes
Elimination
Turbocharger
Turbocharger contaminated
Clean it
Damaged bearing
Contact an ABB Turbocharging Service Station
HZTL2412_EN
Rubbing rotor
Revision F
Foreign object in turbocharger
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
6
Speed measurement system
6.5
Page 84
6.5 Speed measurement system
Possible causes
No signal or
amplitude is
poor
Elimination
Fitting error
The screw plug for the sensor is fitted with
an additional gasket (copper ring).
When fitting the speed sensor, this gasket
must be removed. If the gasket is fitted by
mistake, the distance from the sensor tip to
the signal-generating sealing disc increases.
As a result, the voltage amplitude of the
speed signal decreases, which can cause
problems for the evaluation electronics.
This problem is eliminated by removing the
gasket.
August 2017
6.5
Troubleshooting
Contaminated
sensor tip
The sensor tip is magnetic and can thus attract metal particles. As a result, the distance to the signal-generating sealing disc is
reduced, which can lead to amplification of
the noise component and consequently to
faulty triggering.
Dismantle the sensor, clean its tip and refit
the sensor using the specified tightening
torque.
Measured
speed too low
--
Contact an ABB Turbocharging Service Station
Other sources
of errors
--
If none of the above measures eliminates
the malfunction, we recommend that you
have the speed measuring system inspected
by an ABB Turbocharging Service Station.
Revision F
Measured
speeds too
high
HZTL2412_EN
Defective sensor Contact an ABB Turbocharging Service Station
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Removal and installation
7
Transport
7.1
Page 85
Revision F
HZTL2412_EN
August 2017
7 Removal and installation
7.1
7.1 Transport
Suspension of uninsulated turbocharger
Turbocharger with oil-cooled bearing
casing
Complete turbocharger with gas outlet
casing
Suspension of insulated turbocharger
Turbocharger with oil-cooled bearing
casing
© Copyright 2016 ABB. All rights reserved.
Complete turbocharger with gas outlet
casing
Operation Manual / TPS44-F.. - TPS61-F..
7
Turbocharger weights
7.2
Page 86
7.2 Turbocharger weights
Lifting gear with a sufficient load limit must be used for removing and installing the turbocharger. The following weight specification is the heaviest
possibility. This guide value can differ from data on the rating plate, depending on the specification.
TPS44
[kg]
TPS48
[kg]
TPS52
[kg]
TPS57
[kg]
TPS61
[kg]
120
180
250
410
650
August 2017
7.2
Removal and installation
Revision F
HZTL2412_EN
Turbocharger weights
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
August 2017
7.3
Removal and installation
7
Remove the turbocharger
7.3
Page 87
7.3 Remove the turbocharger
τ Disconnect all exhaust gas and air lines according to the instructions
of the enginebuilder.
Version with water-cooled bearing casing:
τ Disconnect the water pipes according to the instructions of the en-
HZTL2412_EN
ginebuilder.
If present, remove hard insulation as follows:
τ Remove screws and sheet metal (B) from the bearing casing insula-
tion.
τ Remove the remaining screws from the bearing casing insulation (A).
τ Pull the bearing casing insulation up and off. The bearing casing insu-
lation can be compressed to facilitate the removal process.
Revision F
τ Unplug the cable connector from the speed sensor.
τ Attach lifting gear to bearing casing.
τ If a gas outlet bend is present, sling lifting gear around it or secure it to
the lifting gear with a swivel lifting eye (C).
τ Loosen the fixing screws (D) on the bearing casing.
τ Lift the turbocharger from the engine and put it down.
τ Cover oil connections.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
7
Installing the turbocharger
7.4
Page 88
τ Visually inspect O-ring gaskets of oil supply and drain pipe (O-ring
gaskets for engine are not delivered by ABB Turbo Systems).
**) When the turbocharger is mounted on the engine support, the bolt
threads and screw heads must be lightly oiled (assumed friction coefficient µ = 0.12 for tightening torque)
Product
Through hole in
bearing casing
[mm]
Thread size
[mm]
Tightening
torque
[Nm]
Strength class
in acc. with
DIN/ISO 898
TPS44
17
M16
230
10.9/12.9
TPS48
17
M16
230
10.9/12.9
TPS52
21
M20
455
10.9/12.9
TPS57
21
M20
455
10.9/12.9
TPS61
25
M24
780
10.9/12.9
τ Attach lifting gear to bearing casing.
τ If a gas outlet manifold is provided, sling lifting gear around it addition-
ally or fasten it to lifting gear using a swivel lifting eye (C) (see also
section Transport / Weights).
τ Lift turbocharger, place on bracket and align.
τ Tighten fixing screws (D) to the bearing casing in accordance with the
table above.
τ Fasten all gas, water and air lines in accordance with the enginebuild-
er's instructions.
© Copyright 2016 ABB. All rights reserved.
HZTL2412_EN
τ Remove covers from oil connections.
August 2017
7.4 Installing the turbocharger
Revision F
7.4
Removal and installation
Operation Manual / TPS44-F.. - TPS61-F..
Removal and installation
7
Installing the turbocharger
7.4
Page 89
August 2017
If present:
τ Fit speed sensor and plug in cable connector.
τ Adapt and fit bearing casing insulation (A).
τ Adapt and fit sheet metal (B) of bearing casing insulation.
Version with water-cooled bearing casing:
τ Remove the screw plugs from the water connections and fit the water
Revision F
HZTL2412_EN
pipes in accordance with the enginebuilder's instructions.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Introduction
8.1
Page 91
August 2017
8 Disassembly and assembly
8.1 Introduction
8.1
Precondition for the work described below is a turbocharger removed from
the engine (refer to the chapter entitled Removal and Installation).
Further work
HZTL2412_EN
CAUTION
Only the work described in this Operation Manual may be carried out.
Incorrectly performed disassembly and assembly of the cartridge group
can lead to serious machine damage.
τ ABB Turbo Systems recommends having further work carried out only by trained personnel from an ABB Turbocharging Service Station.
Marking casing positions for assembly
NOTICE
ABB Turbo Systems recommends that the casing positions are marked
before disassembling the turbocharger.
Identifying assembly devices
Not all assembly devices are marked with a part number. They can be
identified using the tool list. This list is enclosed in the toolbox.
Maintaining assembly devices
Revision F
WARNING
Assembly devices must be checked for damage before and after use.
τ Visually check for corrosion, cracks, deformation and wear.
τ Don't use damaged assembly devices, but replace them.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Introduction
8.1
Page 92
Before beginning work, ensure that the required customer spare parts
sets are available.
τ See chapter Spare parts.
August 2017
Customer spare parts set
Oil orifice
τ When disassembling the turbocharger, a fitted oil orifice must not be
removed.
Tightening torques for turbocharger components
Tightening torques for assembly devices of ABB Turbo Systems
If nothing else is described, the screws and nuts of the assembly devices
must be tightened down firmly.
HZTL2412_EN
The specified tightening torques of screw connections for turbocharger
components must be observed. (See section Table of tightening torques.)
Suspended loads
WARNING
Loads not suspended in compliance with regulations may lead to personal injury or accidents with fatal consequences.
τ Attach turbochargers, assemblies or individual components only to
lifting gear which is in technically perfect condition and has sufficient
load capacity.
τ Make sure the load is suspended properly on the crane hook.
τ Do not let anyone stand beneath a suspended load.
Wear safety helmet.
Definition of terms
€ Suspension point
Defined load carrying point on a component or an assembly (blind hole
thread, eye, lug).
€ Assembly device
Devices mounted on the turbocharger to create a suspension point.
Assembly devices are calculated and designed especially for the de© Copyright 2016 ABB. All rights reserved.
Revision F
Wear safety gloves to protect against mechanical hazards.
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Introduction
8.1
Page 93
August 2017
fined application. They are not commercially available products. Use
assembly / fitting devices only for the applications described.
€ Lifting gear
Equipment for lifting and transporting loads (ropes, chain hoists,
cranes). Lifting gear is not supplied by ABB Turbo Systems.
Swivel lifting eye to be used
A swivel lifting eye is required to lift loads safely (not supplied by ABB).
Revision F
HZTL2412_EN
Swivel lifting eye
© Copyright 2016 ABB. All rights reserved.
Product
Thread Length
M
L
Minimum
load limit
(loading
capacity)
TPS44
M8
13 mm
150 kg
TPS48
M10
17 mm
250 kg
TPS52
M10
17 mm
250 kg
TPS57
M12
21 mm
350 kg
TPS61
M12
21 mm
500 kg
Operation Manual / TPS44-F.. - TPS61-F..
8
Module weights
8.2
Page 94
TPS44 TPS48 TPS52 TPS57 TPS61
[kg]
[kg]
[kg]
[kg]
[kg]
Description
1 Filter silencer
15
19
30
40
65
2 Radial air suction branch
5
6
8
11
21
3 Axial air suction branch
3
4
4
6
9
4 Compressor casing
17
24
35
55
90
5 Wall insert
4
7
10
13
30
6 Diffuser
2
2
3
6
10
7 Cartridge group
25
35
50
85
140
8 Nozzle ring
1
1
2
3
6
9 Burst ring
1
2
3
5
12
10 Turbine casing 1 inlet
with external
2 inlets
burst protection
3 inlets
30
35
50
80
130
30
35
50
90
150
-
-
55
95
170
4 inlets
-
-
-
95
170
11 Gas outlet flange
4
4
8
16
30
12 Exhaust manifold
16
18
25
40
60
© Copyright 2016 ABB. All rights reserved.
HZTL2412_EN
The specified weights of individual parts or assemblies are guides rounded off to the next highest value.
August 2017
8.2 Module weights
Revision F
8.2
Disassembly and assembly
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Disassembling and assembling
turbocharger
8.3
Page 95
8.3 Disassembling and assembling turbocharger
August 2017
8.3
Removing the compressor casing
Risk of burning
WARNING
Touching hot surfaces or contact with hot operating materials can lead
to serious burns.
τ Do not touch hot surfaces and heed the warning plate on the turbocharger.
τ Wear heat-resistant safety gloves and protective clothing.
τ Allow the turbocharger to cool down before carrying out any work.
τ Disconnect all air lines in accordance with the enginebuilder’s instruc-
tions.
If provided
τ Remove the screws for the compressor casing insulation and disman-
tle the insulation.
Revision F
HZTL2412_EN
Wear safety gloves to protect against thermal hazards.
τ Undo the V-clamp (72020) and remove the filter silencer (81000) or air
suction branch (82000).
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Disassembling and assembling
turbocharger
8.3
Page 96
If provided
τ Loosen and remove the screws for the insulation plates (1, 2).
τ If provided: Remove the insulation plates (1, 2).
τ Remove the remaining screws for the insulation (3).
August 2017
Removing the insulation
Revision F
HZTL2412_EN
τ Remove the insulation (3).
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Disassembling and assembling
turbocharger
8.3
Page 97
τ Slightly loosen the screws (72011) and turn the compressor casing
HZTL2412_EN
August 2017
(72000) until the swivel lifting eye can be fastened to the lifting gear.
(77006* only provided with the wall insert with acceleration aid.)
NOTICE
If the compressor casing cannot be removed easily, it can be pressed
off using the press-off tool (90042) against the turbine casing. To do
this, the two cover plates (1, 2) must be removed from the hard insulation on the turbine casing.
Revision F
Axial force
CAUTION
The press-off tool can generate a high axial force and, if it is not used
properly (too much pressure on one side), it can damage the rotor.
τ It should thus be used alternately on both sides while avoiding excessive pressure on either side.
τ Loosen the screws (72011) and remove them together with the fas-
tening strips (72012).
τ Move the compressor casing (72000) with the wall insert (77000) care-
fully away, doing so horizontally.
τ Tap the wall insert (77000) out of the compressor casing using a nylon
hammer and remove the O-ring seal (77005).
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Disassembling and assembling
turbocharger
8.3
Page 98
τ Fasten lifting beam (90258) to wall insert.
τ Fasten swivel lifting eye (a) to lifting beam.
HZTL2412_EN
τ Remove wall insert (77000) using lifting gear.
August 2017
TPS61 wall insert removal
Revision F
Disassembly of diffuser
TPS..-F31/32 / FV31/32
τ Loosen screws (72041) and remove them together with lockwashers
(72040) and diffuser (79000) from compressor casing (72000).
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Disassembling and assembling
turbocharger
8.3
Page 99
August 2017
Installing compressor casing
τ Refit wall insert (77000) and O-ring (77005) in the reverse order.
O-rings
NOTICE
τ Refit diffuser in reverse order.
τ Fit compressor housing in reverse order.
τ Thoroughly clean fastening strips (72012) before fitting them.
Revision F
HZTL2412_EN
Fitting the diffuser
TPS..-F31/32 / FV31/32
Used O-rings must always be replaced with new ones. O-rings are only
available as a set (see chapter Spare parts).
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Disassembling and assembling
turbocharger
8.3
Page 100
τ Check the lifting gear and fasten it to bearing casing (42001).
τ Disconnect all lines in accordance with the engine builder's instruc-
If provided
tions, remove the insulation, remove the turbocharger and compressor
casing together with the filter silencer (also see the previous chapter).
August 2017
Removing the cartridge group
Risk of burning
WARNING
Touching hot surfaces or contact with hot operating materials can lead
to serious burns.
τ Do not touch hot surfaces and heed the warning plate on the turbocharger.
τ Wear heat-resistant safety gloves and protective clothing.
τ Allow the turbocharger to cool down before carrying out any work.
ϖ The bearing casing is difficult to loosen.
τ Use the press-off tool (90042) against the turbine casing to press off
the bearing casing (see the following illustration).
HZTL2412_EN
Wear safety gloves to protect against thermal hazards.
Axial force
Revision F
CAUTION
The press-off tool can generate a high axial force and, if it is not used
properly (too much pressure on one side), it can damage the rotor.
τ It should thus be used alternately on both sides while avoiding excessive pressure on either side.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
8
Disassembling and assembling
turbocharger
8.3
Page 101
August 2017
Disassembly and assembly
and withdraw bottom part of service support (90012).
If provided
τ Remove C-ring (51105).
Disassembly of diffuser
TPS..-F33
Revision F
HZTL2412_EN
τ Withdraw nozzle ring (56001) using two extraction devices (90070)
τ Mount the cartridge group on the service support (90012) and bolt
it down firmly.
τ Loosen screw (42008) and remove diffuser (79000) complete with
O-ring (42012).
τ Measure the axial and radial clearances (see the section Axial and
radial clearances).
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Disassembling and assembling
turbocharger
8.3
Page 102
O-rings
NOTICE
Used O-rings must always be replaced with new ones. O-rings are only
available as a set (see chapter Spare parts).
August 2017
Installing the cartridge group
Protruding insulation
HZTL2412_EN
NOTICE
The insulation on the turbine casing may protrude at the gas outlet side.
This can be pushed back in with a screw driver.
τ Fit the lamellar sealing ring (56005, if present) in the correct slot (see
τ Secure the lamellar sealing ring with adhesive tape.
τ Insert the nozzle ring (56001) (with the cam facing forwards) into the
turbine casing as far as it will go. Align the cam on the nozzle ring with
the recesses of the turbine casing and insert it into the turbine casing
(51000) as far as it will go. Do not remove the adhesive tape (01).
If present
τ Insert the C-ring (51105) into the turbine casing and secure with high-
vacuum grease.
© Copyright 2016 ABB. All rights reserved.
Revision F
detail A). When doing this, pay attention to correct winding of the lamellar sealing ring (see detail B).
August 2017
Operation Manual / TPS44-F.. - TPS61-F..
8
Disassembling and assembling
turbocharger
8.3
Page 103
To ensure the nozzle ring is held in place during operation, it must be
clamped between the partition wall and the turbine casing.
NOTICE
Nozzle ring press fit for
single inlet turbine casing
HZTL2412_EN
Disassembly and assembly
τ Calculate the press fit (PD) as shown.
If the calculated value (PD) is less than 0.1 mm, an official ABB Turbocharging Service Station must be contacted.
NOTICE
τ Measure the axial and radial clearances (see the section Axial and ra-
Revision F
dial clearances).
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
8
Disassembling and assembling
turbocharger
8.3
Page 104
August 2017
τ Calculate the press fit (PD) as shown.
If the calculated value (PD) is outside ±0.2 mm, an official ABB Turbocharging Service Station must be contacted.
NOTICE
HZTL2412_EN
Nozzle ring press fit for
multiple inlet turbine casing
Disassembly and assembly
τ Measure the axial and radial clearances (see the section Axial and ra-
Revision F
dial clearances).
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Disassembling and assembling
turbocharger
8.3
Page 105
August 2017
Assembly of diffuser
TPS..-F33
HZTL2412_EN
τ Fasten diffuser (79000) and O-ring (42012) using screw (42008).
τ Check lifting gear and fasten to bearing casing (42001).
τ Unscrew the cartridge group and lift it out of the service support
(90012).
τ Apply high-temperature grease to the centering points and screw
Revision F
threads.
τ Remove temporary covers from oil connections.
Don't damage or shift gasket rings (A) in the mounting support when
fitting the cartridge group. The gasket rings (A) are supplied by the engine builder.
CAUTION
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Disassembling and assembling
turbocharger
8.3
Page 106
If two turbochargers are mounted on an engine, one with a left-hand
and one with a right-hand oil inlet, a pin can be fitted in the bracket as a
precaution against incorrect positioning. This pin (B) locates in a correspponing groove in the foot of the bearing casing.
August 2017
8
HZTL2412_EN
NOTICE
Disassembly and assembly
τ Fasten the cartridge group using fastening strips (51002), Verbus
Ripp® washers (51003) and nuts (51007) (also see the chapter entitled Table of tightening torques).
τ Fasten the bearing casing (42001) using the fixing screws (C).
τ Tighten the fixing screws (C) to the torques listed in the following table.
Product
Hole in the bearing casing
[mm]
Fixing screws
C [mm]
Tightening torques
[Nm] **)
TPS44
Ø 17
M16
230
TPS48
Ø 17
M16
230
TPS52
Ø 21
M20
455
TPS57
Ø 21
M20
455
TPS61
Ø 25
M24
780
© Copyright 2016 ABB. All rights reserved.
Revision F
**) For the assembly of the turbocharger on the engine support, the
threads of the screws and screw heads must be lightly oiled (assumed
coefficient of friction µ = 0.12 for the tightening torque).
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Disassembling and assembling
turbocharger
8.3
Page 107
August 2017
If provided
HZTL2412_EN
τ Plug in the cable connector (86515) for the speed sensor (86505) and
(if provided) fit the insulation plates (1, 2).
Removing gas outlet bend and gas outlet flange
τ Disconnect all lines in accordance with engine builder's instructions
and remove insulation. (See also preceding chapter.)
Revision F
If provided
τ Loop lifting gear around gas outlet bend (51100).
τ Remove gas outlet bend (51100) and gasket (52406). Only gas outlet
bends from ABB Turbo Systems have the gasket (52406).
τ Remove gas outlet flange (52400) and, if fitted, C-ring (52408).
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Disassembling and assembling
turbocharger
8.3
Page 108
August 2017
Fitting the gas outlet flange and gas outlet bend
τ Fit the gas outlet flange (52400).
τ In the case of gas outlet bends (51100) from ABB Turbo Systems:
always replace the gasket (52406) (see the chapter entitled Spare
parts).
HZTL2412_EN
τ If provided, fit the C-ring (52408).
τ Apply high-temperature grease to contacting surfaces and threads.
τ Fit the turbine casing using the nuts (52433) while observing tightening
torques specified in the table of tightening torques.
If provided
τ Fasten the insulation.
Revision F
τ Attach pipes in accordance with the enginebuilder's instructions.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Axial clearance A and radial clearance
B
8.4
Page 109
8.4 Axial clearance A and radial clearance B
August 2017
8.4
τ Following removal and before installation of the cartridge group, the axi-
al clearance A and radial clearance B must be measured and noted.
HZTL2412_EN
In order to correctly measure the axial clearance A, the turbine must be
raised slightly.
NOTICE
Risk of injury due to sharp edges on the compressor wheel
WARNING
The compressor wheel has sharp edges which can cause injuries.
τ Wear safety gloves.
Wear safety gloves to protect against mechanical hazards.
Revision F
Axial clearance A and
radial clearance B [mm]
TPS44
TPS48
TPS52
TPS57
TPS61
A minimum
0.08
0.08
0.10
0.12
0.15
A maximum
0.16
0.16
0.18
0.21
0.25
B minimum *
0.51
0.50
0.61
0.72
0.81
B maximum *
1.00
1.00
1.15
1.31
1.55
* Permissible B clearances for standard radial bearings. If the clearances
measured on TPS57 or TPS61 are outside the permissible range, this can
indicate radial bearings with a special bearing geometry. Different permissible values are valid for radial bearings with a special bearing geometry
(see the table below).
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Axial clearance A and radial clearance
B
8.4
Page 110
August 2017
Identifying radial bearings
with a special bearing
geometry
If one run-out time is at least 1.5 times longer than the other, then radial
bearings with a special bearing geometry are installed. The following B
clearances are valid for these special bearings.
TPS57
TPS61
B minimum
0.46
0.52
B maximum
0.73
0.82
HZTL2412_EN
The type of bearing can be determined by measuring the rotor run-out
time. To do so, the rotor must be pushed by hand, once to the left (L) and
once to the right (R), with a force as close to the same in both directions.
The resulting run-out times until the rotor comes to a stop are measured
for the anticlockwise and clockwise rotations and then compared. With
standard radial bearings, the run-out time for anticlockwise and clockwise
rotating rotors is the same.
Clearances out of tolerance
Revision F
CAUTION
Clearances out of tolerance and excessively worn components can be
the cause of serious damage to machinery and property.
τ Have components assessed and, if necessary, replaced by an ABB
Turbocharging Service Station.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
8
Radial clearances N and R
8.5
Page 111
8.5 Radial clearances N and R
August 2017
8.5
Disassembly and assembly
N and R
The minimum and maximum values result from the manufacturing tolerances of the compressor wheel and turbine wheel or the wall insert and
gas outlet flange.
Feeler gauge
Revision F
HZTL2412_EN
These are the theoretical values of the radial clearance between the compressor wheel and the wall insert and / or turbine wheel and the gas outlet
flange.
© Copyright 2016 ABB. All rights reserved.
N1 and N2 as well as R1 and R2 are
each measured at the same time using
two feeler gauges.
To measure N1 and N2, the feeler gauges must be pushed between the wall insert and the compressor wheel free of
play, in each case above and below.
To measure R1 and R2, the feeler gauges must be pushed between the gas outlet flange and the turbine free of play, in
each case above and below.
Operation Manual / TPS44-F.. - TPS61-F..
Disassembly and assembly
8
Radial clearances N and R
8.5
Page 112
August 2017
Measuring N and R
Radial clearances N and
R
Product
N [mm]
R [mm]
TPS44
0.15 … 0.49
0.36 … 0.67
TPS48
0.22 … 0.58
0.47 … 0.77
TPS52
0.30 … 0.67
0.59 … 0.92
TPS57
0.40 … 0.86
0.75 … 1.11
TPS61
0.50 … 0.94
0.90 … 1.32
Clearances out of tolerance
Clearances out of tolerance and excessively worn components can be
the cause of serious damage to machinery and property.
τ Have components assessed and, if necessary, replaced by an ABB
Turbocharging Service Station.
Revision F
CAUTION
HZTL2412_EN
The mean values measured must be within the permissible values of the
radial clearance N and R.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
8
Table of tightening torques
8.6
Page 113
8.6 Table of tightening torques
HZTL2412_EN
August 2017
8.6
Disassembly and assembly
The following tightening torques must be observed for the specified screw
connections:
Position
Part number
TPS44
TPS48
TPS52
TPS57
TPS61
1
72020
60
60
60
60
60
2
42008
6
10
10
20
20
5
52433
20
20
40
65
65
6
51007
25
25
45
75
75
9
72011
35
35
70
105
170
10
86505
15
15
15
15
15
Revision F
Tightening torques [Nm]
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Taking out of operation
9
Shutting down the turbocharger
9.1
Page 115
August 2017
9 Taking out of operation
9.1
9.1 Shutting down the turbocharger
If the turbocharger is damaged and the engine can be shut down for only
a short time for emergency repairs, proceed as follows:
τ Fit the cover plate.
Always heed precisely the engine builder's instructions in case of engine operation with a blocked / throttled turbocharger!
CAUTION
HZTL2412_EN
Dismantling the turbocharger
Revision F
τ Dismantle the turbocharger (see the section Dismantling and fitting the
turbocharger).
τ Do not dismantle the nozzle ring.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Taking out of operation
9
Shutting down the turbocharger
9.1
Page 116
HZTL2412_EN
August 2017
Fitting the cover plate
τ Close the opening in the turbine casing using the cover plate (A).
τ Fasten the cover plate on the turbine casing (51000) using the fas-
tening strips (51002), Verbus Ripp® Verbusripp washers (51003) and
nuts (51007) and screw it down securely on the support.
Thoroughly clean the fastening strips (51002) before fitting them. Apply
high-temperature grease to the stud threads (51006).
Revision F
NOTICE
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Taking out of operation
9
Shutting down the turbocharger
9.1
Page 117
The cover is not supplied by ABB Turbo Systems and must be manufactured by the operator according to the following drawing.
Material: Common structural steel, according to DIN EN 10025-2
Revision F
HZTL2412_EN
August 2017
Cover plate drawing
Product
B1
±0.5
B2
B3
B4
±0.2
B5
B6
TPS44
62.6
54
110
11.0
1
144
TPS48
65.7
60
130
11.7
1.5
150
TPS52
79.6
78
155
14.2
1.5
180
TPS57
98.2
100
190
17.2
2
220
TPS61
116.8
120
226
20.5
2.4
260
Product
B7
ØD1
±0.2
ØD1*
±0.2
ØD2
R1
M
191.3
191.3
17
≤88
M8
TPS44
TPS48
35.7
222.7
227.7
17
≤105
M8
TPS52
39.6
265.7
271.7
21
≤125
M8
TPS57
48.2
325.7
332.5
21
≤153
M10
TPS61
56.8
387.7
395.9
25
≤182
M10
Dimensions in [mm]
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Taking out of operation
9
Shutting down the turbocharger
9.1
Page 118
Information about the turbine casing design (with / without C-ring sealing) can be requested from an ABB Turbocharging Service Station.
August 2017
*) Diameter for turbine casing designs for optional C-ring sealing
Revision F
HZTL2412_EN
NOTICE
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Mothballing the turbocharger
10
Taking the engine out of operation for
up to 12 months
10.1
Page 119
August 2017
10 Mothballing the turbocharger
10.1
10.1 Taking the engine out of operation for up to
12 months
Condition of engine lubricating oil
The turbocharger normally remains mounted on the engine. Mothballing a
turbocharger depends on the condition of the lubricating oil:
€ If the total acid number (TAN) is lower than 2 mg KOH/g, no measures
have to be taken.
HZTL2412_EN
€ If the engine lubricating oil is replaced by preserving oil before taking
the engine out of operation and this is circulated by the pre-lubrication
pump, no measures have to be taken. Any remaining old engine oil will
therefore be flushed away and the bearing sections largely protected
against corrosion.
Mothballing measures
Handling operating materials and supplies
WARNING
Swallowing or inhaling vapours of operating materials and supplies or
contact with them may be harmful to health.
τ Do not breathe in these substances and avoid contact with the skin.
τ Ensure proper ventilation.
τ Observe the information in the material safety data sheet for the operating materials and supplies.
τ Wear personal protective equipment (PPE) according to the material
safety data sheet.
τ Comply with local legislation.
Revision F
Wear safety goggles.
Wear safety gloves to protect against chemical hazards.
Wear a respiratory mask to protect against gases.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
10
Taking the engine out of operation for
up to 12 months
10.1
Page 120
If the total acid number (TAN) is greater than 2 mg KOH/g, the following
mothballing measures are necessary after taking an engine out of operation:
τ Dismantle the turbocharger.
τ The rotor and the bearing parts must be removed by an official ABB
Turbocharging service station and refitted afterwards.
August 2017
Mothballing the turbocharger
τ Clean all parts.
τ Machined, bright surfaces of steel and cast parts must be oiled with
anticorrosive oil.
τ Reassemble complete turbocharger.
Rotor turning in stack draught
If the rotor turns as a result of the stack draught:
τ Install blind flange between compressor casing outlet flange and
Revision F
HZTL2412_EN
charge air duct.
© Copyright 2016 ABB. All rights reserved.
August 2017
Operation Manual / TPS44-F.. - TPS61-F..
10.2
Mothballing the turbocharger
10
Taking the engine out of operation for
more than 12 months
10.2
Page 121
10.2 Taking the engine out of operation for more
than 12 months
If the engine is taken out of service, the following alternatives are possible
with the turbocharger:
€ The turbocharger remains mounted on the engine.
€ The turbocharger casing remains mounted on the engine, but the rotor
and the bearing parts are removed and stored separately by an ABB
Turbocharging Service Station.
€ The turbocharger is removed completely, either as a whole or in individual parts.
HZTL2412_EN
See the section Taking out of operation for up to 12 months, under Mothballing measures, for the measures always necessary when mothballing
turbocharger parts.
If the turbocharger remains mounted on the engine, refer to the section
Taking out of operation for up to 12 months, under Rotating the rotor in
stack draught.
If the entire turbocharger is removed, or if the turbocharger is reassembled from the individual components thereof:
τ Close all turbocharger openings using wooden covers and paraffin paper.
Revision F
Suitable storage locations are only dry rooms where the relative humidity
is between 40 … 70 % and no condensation can form.
Condition of the mothballed turbocharger
τ Check the mothballed turbocharger parts for corrosion once per an-
num.
τ If there are signs of rust: Clean parts thoroughly and renew protection
against corrosion.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Disposing of turbocharger components
11
Taking the engine out of operation for
more than 12 months
10.2
Page 123
August 2017
11 Disposing of turbocharger components
Handling damaged thermal insulation
WARNING
Damaged thermal insulation can lead to dust exposure. The glass fibres
can cause mechanical irritation of the eyes, skin, and respiratory tracts.
τ Avoid the formation of dust.
τ Vacuum up dust with a suitable vacuum cleaner.
τ Wear a respiratory mask to protect against particles (P1 or P2 mask).
τ Wear work gloves made of leather.
Wear safety goggles.
Wear a respiratory mask to protect against dusts.
HZTL2412_EN
Wear safety gloves to protect against mechanical hazards.
Disposal must be environmentally compatible, professional, and in compliance with locally applicable regulations.
The turbocharger consists largely of metal (cast iron materials, steel,
nickel-steel alloys, aluminium and bearing brass).
Further components are: Non-metallic materials (filter components of felt
and polyethylene), lubricants (engine oil), electronic parts (speed sensor
and associated components), and thermal insulation.
τ Dispose of metals as scrap metal for recycling.
τ Dispose of non-metallic materials as waste.
τ Dispose of residues of lubricants as waste oil.
τ Dispose of electronic components as electronic waste.
Revision F
τ Dispose of thermal insulation as hazardous waste.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
Spare parts
12
Ordering spare parts
12.1
Page 125
August 2017
12 Spare parts
12.1
12.1 Ordering spare parts
When making inquiries or ordering spare parts, the following data must be
specified:
€ Turbocharger type
€ Serial number (HT……)
€ Description and part number
Spare parts can be ordered from an official ABB Turbocharging Service
Station.
τ If different design versions have not been taken into consideration in
HZTL2412_EN
this document, please contact an ABB Turbocharging Service Station.
Storage of spare parts
CAUTION
All spare parts ordered with the turbocharger must be kept complete
and ready for use.
τ Parts showing signs of rust should be carefully cleaned and greased.
τ Dispose of replaced and unusable parts in a professional and envi-
ronmentally compatible way.
Customer spare part set (97070)
The customer spare part set (97070) is required for the work described in
this manual.
Description
Part number
1
Socket screw
42008
1
O-ring
42012
1
Gasket
52406 *
1
O-ring
77005
2
Counter-sunk screw
72041
1
O-ring
81010 / 82010
Revision F
Quantity
* This gasket can be used only when using a gas outlet casing from ABB
Turbo Systems.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
12
View of turbocharger showing part
numbers
12.2
Page 126
12.2 View of turbocharger showing part numbers
Revision F
HZTL2412_EN
August 2017
12.2
Spare parts
© Copyright 2016 ABB. All rights reserved.
Revision F
HZTL2412_EN
August 2017
Operation Manual / TPS44-F.. - TPS61-F..
Spare parts
12
View of turbocharger showing part
numbers
12.2
Page 127
Part number
Description
10900
Cartridge group
42008 (in customer spare part set)
Socket screw
42012 (in customer spare part set)
O-ring
51000
Turbine casing
51002
Fastening strips
51100
Exhaust bend
51105*
Metal C-ring
52400
Gas outlet flange
52406 (in customer spare part set)
Gasket
52408*
Metal C-ring
56001
Nozzle ring
57200
Burst protection
57210
Burst ring
72000
Compressor casing
72011
Socket screw
72012
Fastening strips
72020
V-clamp
72041 (in customer spare part set)
Counter-sunk screw with cross slotted
head
77000
Wall insert
77005 (in customer spare part set)
O-ring
79000
Diffuser
81000
Filter silencer
81010 (in customer spare part set)
O-ring
82000
Axial air suction branch
82010 (in customer spare part set)
O-ring
86505(A)*
Speed sensor (cable not integrated)
86505(B)*
Speed sensor (cable integrated)
86515(A)*
Cable connector for 86505(A)
86515(B)*
Cable connector for 86505(B)
86526*
F/I converter
86528*
Tachometer
* depends on the turbocharger specification.
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPS44-F.. - TPS61-F..
View of cartridge group showing part
numbers
12.3
Page 128
12.3 View of cartridge group showing part numbers
August 2017
12
Revision F
HZTL2412_EN
12.3
Spare parts
© Copyright 2016 ABB. All rights reserved.
Spare parts
12
View of cartridge group showing part
numbers
12.3
Part number
Description
21000
Shaft
21002
Piston ring
25000
Compressor wheel
32101
Plain bearing bush
32103
Locking ring
32105
Thrust ring
32106
Thrust bearing
32108
Piston ring
32109
Sealing disc
32110
Bearing flange
32111
Auxiliary bearing
32112
Bearing flange
32113
Socket screw
32114
Socket screw
32221
Bearing cover
32222
O-ring
42001
Bearing casing
42002
Socket screw
42008 (in customer spare part set)
Socket screw
43001
Partition wall
43012*
Metal C-ring
Revision F
HZTL2412_EN
August 2017
Operation Manual / TPS44-F.. - TPS61-F..
© Copyright 2016 ABB. All rights reserved.
Page 129
ABB
ABB Turbo Systems AG
Bruggerstrasse 71a
CH-5400 Baden
Switzerland

advertisement

Key Features

  • Diesel engine application
  • Air volume generation
  • Charging pressure
  • Robust construction
  • Safety features
  • Engine model compatibility
  • Customization options

Frequently Answers and Questions

What is the purpose of ABB TPS57-F32?
The ABB TPS57-F32 is a turbocharger designed for use on diesel engines to generate the air volume and charging pressure needed for efficient operation.
What are the operating limits for the ABB TPS57-F32?
The operating limits for the ABB TPS57-F32 are shown on the rating plate and are specific to the engine and system configuration. These limits include maximum speed, temperature, and replacement intervals for components.
What are the recommended inspection and replacement intervals for the ABB TPS57-F32?
The recommended inspection and replacement intervals for the ABB TPS57-F32 are also shown on the rating plate and are specific to the engine and operating conditions. They are designed to ensure safe and reliable operation.
Download PDF

advertisement