ABB TPS57-F32 is a turbocharger designed for use on diesel engines to generate the necessary air volume and charging pressure for efficient operation. Its design ensures reliable performance and meets stringent safety standards. The device features a robust construction, efficient operation, and built-in safety features. The turbocharger is compatible with various engine models and can be customized to meet specific application requirements.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
▼
Scroll to page 2
of
132
Operation Manual TPS57-F32 ABB Turbo Systems Ltd CH 5401 Baden Type TPS57-F32 n Mmax 707 HT582778 t Mmax 710 1/s n Bmax 672 SOLD06 Year °C t Bmax 680 00410 kg 2018 12 50 50 Application according to the Operation Manual Original Operation Manual HZTL2412 English made in Switzerland ABB Turbocharging Operating condition and replacement intervals The operational limits for the turbocharger nBmax, tBmax, nMmax, tMmax, inspection- and replacement intervals for the components concerned on the rating plate are valid for the operational mode and compressor inlet condition, which has been agreed upon between the engine builder and ABB. Note: Replacement intervals of components depends on the load profile, turbine inlet temperature, suction air temperature and turbocharger speed. In case the operation conditions differs significantly from what is considered to be normal for the current application, it is recommended to contact ABB for a re-calculation of replacement intervals. Frequent load alterations, high temperatures and high speed lower the life of components. Unless otherwise agreed, the application limits nMmax, tMmax are valid for the test operation for a limited time. Operation Manual / TPS44-F.. - TPS61-F.. Revision F HZTL2412_EN August 2017 Table of contents Table of contents 1 Preliminary remarks 1.1 Purpose of this manual 1.2 Layout and function 1.3 Intended use of the turbocharger 1.4 Storage of new turbochargers and spare parts 1.5 Essential information 1.6 Symbols and definitions 1.7 Turbocharger rating plate 1.8 Contact information 2 Safety 2.1 Introduction 2.2 CE conformity 2.3 Definition of mandatory signs 2.4 Definition of Safety instructions 2.5 Warning plates on the turbocharger 2.6 Safe operation and maintenance 2.7 Hazards during operation and maintenance 2.8 Deflagration on gas engines 2.9 Periodic checking of the pressure vessel 2.10 Lifting loads 3 Start-up 3.1 Oil supply 3.2 Inspection work 3.3 Commissioning after taking out of operation 4 Operation 4.1 Noise emissions 4.2 Servicing work 4.3 Expected exchange intervals 4.4 Speed measurement 4.5 Stopping the engine © Copyright 2016 ABB. All rights reserved. Page 1 Operation Manual / TPS44-F.. - TPS61-F.. 5.1 Foreword to Maintenance 5.2 Cleaning the compressor during operation 5.3 Turbine cleaning during operation 5.4 Cleaning components mechanically 6 Troubleshooting 6.1 Malfunctions when starting 6.2 Surging of the turbocharger 6.3 Malfunctions during operation 6.4 Malfunctions when stopping 6.5 Speed measurement system 7 Removal and installation 7.1 Transport 7.2 Turbocharger weights 7.3 Remove the turbocharger 7.4 Installing the turbocharger 8 Disassembly and assembly 8.1 Introduction 8.2 Module weights 8.3 Disassembling and assembling turbocharger 8.4 Axial clearance A and radial clearance B 8.5 Radial clearances N and R 8.6 Table of tightening torques 9 Taking out of operation 9.1 Shutting down the turbocharger 10 Mothballing the turbocharger 10.1 Taking the engine out of operation for up to 12 months 10.2 Taking the engine out of operation for more than 12 months 11 Disposing of turbocharger components 12 Spare parts 12.1 Ordering spare parts 12.2 View of turbocharger showing part numbers 12.3 View of cartridge group showing part numbers © Copyright 2016 ABB. All rights reserved. August 2017 Maintenance HZTL2412_EN 5 Page 2 Revision F Table of contents Operation Manual / TPS44-F.. - TPS61-F.. Preliminary remarks 1 Purpose of this manual 1.1 Page 3 August 2017 1 Preliminary remarks 1.1 1.1 Purpose of this manual HZTL2412_EN This operation manual belongs to the turbocharger with the identical HT number (01), see the cover sheet of the operation manual and the turbocharger rating plate. Operation Manual This Operation Manual enables you to familiarize yourself with the turbocharger supplied by ABB Turbo Systems and to use it as intended. It provides important information in order that the turbocharger can be operated safely, correctly and efficiently. This Operation Manual complements and expands existing national regulations concerning work safety and accident prevention. Target group Revision F This Operation Manual is intended for engineers and qualified mechanics who are responsible for operating the engine and the turbocharger installed on it. Availability of operation manual An operation manual must be available at all times at the place where the turbocharger is used. Everyone who operates or works on the turbocharger must have first read and understood the operation manual. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 1 Layout and function 1.2 Page 4 1.2 Layout and function 1 Suction branch / filter silencer 8 Gas outlet flange 2 Compressor casing 9 Nozzle ring 3 Diffuser 10 Turbine casing 4 Bearing casing 11 Turbine-end bearing flange 5 Axial thrust bearing 12 Compressor-end bearing flange 6 Radial plain bearing (visible only at turbine end) 13 Compressor wheel 7 Turbine © Copyright 2016 ABB. All rights reserved. Revision F HZTL2412_EN August 2017 1.2 Preliminary remarks Operation Manual / TPS44-F.. - TPS61-F.. Preliminary remarks 1 Layout and function 1.2 Page 5 August 2017 Mode of operation The turbocharger is a turbomachine consisting of the following main components: € Turbine € Compressor These are mounted on a common shaft. Exhaust gases from the diesel or gas engine flow through the turbine casing (10) and the nozzle ring (9) to impinge on the turbine (7). HZTL2412_EN The turbine (7) uses the energy contained in the exhaust gas to drive the compressor wheel (13). The compressor draws in fresh air, compresses it and then forces it into the engine's cylinders. The exhaust gases escape into the ambient air through the exhaust gas pipe, which is connected to the gas outlet flange (8). The air, which is necessary for operation of the diesel or gas engine and is compressed in the turbocharger, is drawn into the compressor wheel (13) through the suction branch or filter silencer (1). It then passes through the diffuser (3) and leaves the turbocharger through the outlet on the compressor casing (2). The rotor runs in two radial plain bearings (6), which are located in the bearing flanges (11/12) between the compressor and the turbine. The axial thrust bearing (5) is located between the two radial plain bearings. Revision F The bearings are connected to a central lubricating oil duct which is supplied by the engine's lubricating oil circuit. The oil outlet is always at the lowest point of the bearing casing (4). © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Preliminary remarks 1 Intended use of the turbocharger 1.3 Page 6 State of the art WARNING This turbocharger was built according to state-of-the-art technology and is operationally safe according to recognised safety regulations. Improper operation and maintenance of the turbocharger can result in danger to life and limb of the user or third parties. In addition, improper use may cause damage to the machine. τ The machine may be operated only by trained personnel. HZTL2412_EN NOTICE This turbocharger supplied by ABB Turbo Systems has been developed for use on diesel engines to generate the volume of air and the charging pressure required to operate the engine. The engine builder has provided ABB Turbo Systems with information regarding the intended use of the engine, from which the operating limits specific to the turbocharger shown on the rating plate (such as operating speeds, temperatures, exchange intervals / replacement intervals) have been derived. If it is used in conjunction with a gas engine, the engine must not be installed in a potentially explosive environment, and precautionary measures must be taken to ensure that the machine room as a whole is classified as not potentially explosive. Any other use will be regarded as a special application which must first be discussed with ABB Turbo Systems. The manufacturer accepts no liability for other applications. If it is used otherwise, ABB Turbo Systems reserves the right to reject all warranty claims. August 2017 1.3 Intended use of the turbocharger 1.3 Perfect condition The turbocharger may be installed only when in technically perfect condition while observing the instructions given in the engine builder's manual. It may be used only for the intended purpose and operated in compliance with the operation manual. τ Malfunctions which could affect safety must be eliminated immediately. The manufacturer accepts no liability for any damage resulting from unauthorised alterations to the turbocharger. © Copyright 2016 ABB. All rights reserved. Revision F Use of the turbocharger as intended also includes observance of the installation / fitting, disassembly / removal, operating, maintenance / servicing and repair conditions specified by the manufacturer. Disposal regulations set down by local authorities must be observed. August 2017 Operation Manual / TPS44-F.. - TPS61-F.. 1.4 Preliminary remarks 1 Storage of new turbochargers and spare parts 1.4 Page 7 1.4 Storage of new turbochargers and spare parts Storage of new turbochargers and spare parts up to 6 months New turbochargers and spare parts from ABB Turbo Systems can be stored in sealed packaging without additional mothballing measures for up to 6 months from the date of delivery (marked by the VCI label on the package). Volatile Corrosion Inhibitor (VCI) Only dry rooms in which the relative humidity is between 40…70 % and no condensation can form are suitable for storage. HZTL2412_EN Storage of new turbochargers and spare parts for more than 6 months (VCI) Protection of health when handling VCIs WARNING VCI products are not hazardous in the sense of the Hazardous Substances Ordinance. Nevertheless, the following points are to be observed when handling VCIs: τ Ensure good room ventilation. τ Do not eat, drink or keep food at the workplace while working with VCIs. τ Wear safety gloves. τ Clean hands and face after working with VCIs. τ For further information refer to www.branopac.com. Wear safety gloves to protect against chemical hazards. Revision F The following mothballing measures are required every 6 months: τ Open the package. τ Remove the VCI corrosion protection emitter from the package and replace it with a new, identical VCI corrosion protection emitter. New VCI corrosion protection emitters can be obtained at www.branopac.com. τ Dispose of the old VCI corrosion protection emitter in an environmen- tally compatible manner, professionally and in accordance with local regulations. τ Seal the package. The better the external seal is designed, the more permanent the protection. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Preliminary remarks 1 Storage of new turbochargers and spare parts 1.4 Page 8 Per order, turbochargers or cartridge groups will be prepared by ABB Turbo Systems for prolonged storage. The package is equipped with a hygrometer (see illustration). August 2017 Long-term storage of replacement turbochargers or spare parts The following measures are required every 6 months: in the wooden crate which allows this check to be carried out. When the display field has changed colour at the 70% level, the maximum permissible humidity has been exceeded. In this case the turbocharger or rotor must be inspected by an ABB Turbocharging Service Station and repacked. τ Inspect the package for damage. If the package is damaged, the tur- bocharger or cartridge group must be inspected by an ABB Turbocharging Service Station and repacked. HZTL2412_EN τ Check the hygrometer (02) in the sight-glass. There is an opening (01) After every 3 years the following work steps must be performed by an ABB Turbocharging Service Station: € Inspect the components € Exchange the desiccant agent € Repackage the components. NOTICE If the 70% display field of the hygrometer (02) has not changed colour and the package is undamaged, the replacement turbocharger or replacement cartridge group can be placed into operation without any prior testing by an ABB Turbocharging Service Station. Unpacking replacement turbochargers or spare parts The corrosion protection effect ends after the material is unpacked from the VCI package. To avoid the formation of condensation, the surroundings and the content of the package must have the same temperature during unpacking. © Copyright 2016 ABB. All rights reserved. Revision F Replacement components ready for operation Operation Manual / TPS44-F.. - TPS61-F.. Preliminary remarks 1 Essential information 1.5 Page 9 1.5 Essential information August 2017 1.5 Organisational measures In addition to this manual, the general, statutory regulations applicable in the respective country for the prevention of accidents and the protection of the environment must be observed. This also applies to the provision and wearing of personnel protection equipment. The safety and risk consciousness of the personnel working on and with the turbocharger must be checked regularly with reference to this manual. NOTICE HZTL2412_EN τ The turbocharger must be shut down immediately by stopping the en- gine in the event of alterations affecting safety or of corresponding operating behaviour. The fault must be reported to the person or department responsible. Additions and alterations to, and conversions of the turbocharger that could compromise safety require the prior approval of ABB Turbo Systems. Revision F NOTICE © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Preliminary remarks 1 Essential information 1.5 Page 10 Original parts and accessories are specially designed for the turbocharger supplied by ABB Turbo Systems. August 2017 Original parts and safety Use original parts WARNING Operation of the turbocharger with non-original parts can impair the safety of the turbocharger and can cause serious damage to property and injury to personnel. τ Only use original parts from ABB Turbo Systems. ABB Turbo Systems accepts no liability for any damage resulting from the use of non-original parts and corresponding accessories. Revision F The turbocharger must only be operated and serviced by trained and authorised personnel. Basic mechanical training is a prerequisite. HZTL2412_EN Competence of personnel © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Preliminary remarks 1 Essential information 1.5 Page 11 August 2017 Design variants This document is valid for different design variants of turbochargers. There may be sections and descriptions of components that are not relevant for a specific turbocharger variant. ABB Turbocharging Service Stations will be happy to provide information on questions regarding a design variant (see Contact information at www.abb.com/turbocharging). Accuracy of illustrations The illustrations in this document are general in nature and intended for ease of understanding. Differences in detail are therefore possible. Registered trademarks of external companies are used in this document. The trademarks are marked with ®. Revision F HZTL2412_EN Registered Trademarks © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Preliminary remarks 1 Symbols and definitions 1.6 Page 12 The following symbols are used in the documents: ϖ Prerequisite τ Step of a procedure August 2017 1.6 Symbols and definitions 1.6 € List, first level - List, second level [➙ ] Refers to a page number Definition of notes A note provides suggestions which facilitate the work on the product. NOTICE HZTL2412_EN Note Definition of mandatory signs Mandatory signs show the protective equipment to be worn for a task. The mandatory signs are described in chapter Safety and must be complied with. Definition of caution / warning The caution and warning signs are described in the chapter Safety. In this document, ABB Turbo Systems Ltd is abbreviated to ABB Turbo Systems. Official ABB Turbo Systems Service Stations In this document, official service stations are referred to as ABB Turbocharging Service Stations. They are inspected and certified regularly by ABB Turbo Systems. See also chapter Contact information [➙ 15]. © Copyright 2016 ABB. All rights reserved. Revision F ABB Turbo Systems Operation Manual / TPS44-F.. - TPS61-F.. 1 Turbocharger rating plate 1.7 Page 13 1.7 Turbocharger rating plate August 2017 1.7 Preliminary remarks HZTL2412_EN Operating limits Recommended inspection and replacement intervals of turbocharger components Turbocharger operating limits at engine overload (110%). Only when operating in the test rig unless otherwise agreed with the enginebuilder. 02 Turbocharger operating limits during operation 03 Inspection interval of plain bearings in 1000 h 04 Replacement interval of compressor in 1000 h 05 Replacement interval of turbine in 1000 h 06 Customer part number 07 Designation of the special design 08 Weight of turbocharger in kg 09 Turbocharger type 10 Serial number 11 Year of construction of turbocharger Revision F Further data 01 © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 1 Turbocharger rating plate 1.7 Page 14 Explanation of the rating plate The recommended replacement intervals and the corresponding operational limits are jointly defined with the engine manufacturer. This information is specific to the system. August 2017 1.7.1 Preliminary remarks Operation above the indicated values n Bmax, tBmax can considerably shorten the recommended replacement intervals. In such cases, we recommend that you contact the nearest official ABB Turbocharging service station. nMmaxand tMmax normally apply only when running at overload (110%) during trials on the engine test bed. These limits can also be permitted during operation for special applications. Operation above nMmax and tMmax is not permitted. Non-observance of the recommended replacement intervals can increase the risk of unpredictable component failures. Positions of the rating plates HZTL2412_EN 1.7.2 Revision F One rating plate (01) each is attached on the left and the right side of the turbocharger bearing casing. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. August 2017 1.8 Preliminary remarks 1 Contact information 1.8 Page 15 1.8 Contact information Contact information Contact information for the official service stations of ABB Turbo Systems is available online. τ Scan the QR code to access our website. ABB Turbo Systems Ltd Bruggerstrasse 71a CH-5401 Baden Switzerland Revision F HZTL2412_EN www.abb.com/turbocharging © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Safety 2 Introduction 2.1 Page 17 August 2017 2 Safety 2.1 2.1 Introduction Turbochargers manufactured by ABB Turbo Systems are state of the art and comply with the pertinent safety and health-protection requirements that applied when the turbocharger was manufactured. Consequently, the turbocharger is safe to operate. Nevertheless, during turbocharger operation and when working on the turbocharger, residual risks can exist which: € originate from the turbocharger itself and its accessories € originate from the operating and auxiliary materials used € are the consequence of insufficient observance of the safety instructions HZTL2412_EN € are the consequence of unsatisfactory and improper execution of maintenance and inspection work The operator is responsible for access to the turbocharger as well as the organisational measures which regulate the safe handling of the turbocharger by his personnel. All instructions in this chapter must be observed to ensure safe and trouble-free turbocharger operation and during work on the turbocharger. Revision F In the same vein, all other specially marked safety instructions in every chapter of this manual must be observed (see the section entitled Definition of safety instructions). © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 2 CE conformity 2.2 Page 18 2.2 CE conformity Information Revision F HZTL2412_EN ABB turbochargers fulfil Directive 2006/42/EC on machinery and are considered partly completed machinery in the sense of Article 2 g. August 2017 2.2 Safety © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. August 2017 2.3 Safety 2 Definition of mandatory signs 2.3 Page 19 2.3 Definition of mandatory signs To be worn at all times Protective clothing Safety footwear to protect against mechanical hazard and risk of falling Revision F HZTL2412_EN To be worn according to the specific work © Copyright 2016 ABB. All rights reserved. Safety glasses Safety goggles Safety gloves to protect against - Mechanical hazard - Chemical hazard - Thermal hazard Respiratory mask to protect against - Dusts - Gases Safety helmet Ear protection Operation Manual / TPS44-F.. - TPS61-F.. 2 Definition of Safety instructions 2.4 Page 20 2.4 Definition of Safety instructions The following symbols and terms used in this manual concern safety or refer to possible hazards: August 2017 2.4 Safety Definition of warning WARNING Serious personal injuries and even accidents with fatal consequences may occur if work and operating instructions marked with this symbol and the word WARNING are either not followed or not followed precisely. τ Warning signs must be observed at all times. Revision F CAUTION Serious machine or property damage may occur if work and operating instructions marked with this symbol and the word CAUTION are either not followed or not followed precisely. τ Caution signs must be observed at all times. HZTL2412_EN Definition of caution © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. HZTL2412_EN August 2017 2.5 Safety 2 Warning plates on the turbocharger 2.5 Page 21 2.5 Warning plates on the turbocharger Warning plates are attached to the turbocharger at the following places: If warning plates are not present at the intended places or are not legible, then proceed as follows: τ Order new warning plates from ABB Turbocharging Service Stations. τ Remove unreadable warning plates. τ Clean and degrease surfaces provided for warning plates. τ Attach new warning plates. Revision F Uninsulated turbochargers When uninsulated turbochargers are delivered to the engine builder, the warning plates must be subsequently attached to the insulation. This is the responsibility of the engine builder. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 2 Safe operation and maintenance 2.6 Page 22 2.6 Safe operation and maintenance The instructions specified in this section are for the safety of personnel. Together with the instructions in the Hazards during operation and maintenance section, they allow the user to safely use the turbocharger. August 2017 2.6 Safety Work safety and work area safety Risk of falling τ Observe all general regulations for the prevention of accidents. τ Do not work on the turbocharger if you are under physical or mental stress. τ Work only with suitable tools as well as equipment and working mate- HZTL2412_EN WARNING There is the risk that someone can fall when working on the turbocharger. τ Do not climb on the turbocharger or on parts attached to it or use these as climbing aids. τ When working at levels above the head, use climbing aids and work platforms suitable for this purpose. rials that are in perfect condition. τ Electric tools must be solidly earthed, and connecting cables may not be damaged. τ Keep the workplace clean, clear away loose objects and remove ob- stacles on the floor. τ Keep the floor, equipment and the turbocharger clean. τ Have oil binding materials ready at hand and keep oil catch pans ready or in position τ Eliminate leaks. Welding work in the vicinity of the turbocharger τ When performing welding work in the vicinity of the turbocharger, al- ways cover the filter silencer to prevent the filter mat from being damaged. τ Keep flammable objects and substances out of the range of flying sparks. τ Cover all connections on the turbocharger so that no foreign objects can enter the turbocharger. τ Wear personal protective equipment (PPE) for welding operations. © Copyright 2016 ABB. All rights reserved. Revision F τ Keep fire-protection materials and fire-extinguishing equipment ready. Operation Manual / TPS44-F.. - TPS61-F.. Safety 2 Safe operation and maintenance 2.6 Page 23 August 2017 Safety during start-up / commissioning and operation The turbine casing insulation of the TPS44-F supplied by ABB Turbo Systems is also burst protection. WARNING Serious personal injuries or fatal accidents can occur, if the turbine casing insulation of the TPS44-F supplied by ABB Turbo Systems is removed. The burst protection is integrated into the turbine casing insulation of the TPS44-F supplied by ABB Turbo Systems. Separate burst protection is fitted to TPS44-F turbochargers without insulation that have been ordered from ABB Turbo Systems. HZTL2412_EN τ Never operate TPS44-F turbochargers that have been supplied by ABB Turbo Systems with insulation if this insulation from ABB Turbo Systems is not in place. τ Never operate turbochargers without burst protection. If the insulation from ABB Turbo Systems is not in place, the separate burst protection (57200) must be fitted before operation. (See View of turbocharger showing part numbers [➙ 126].) τ Before starting work, carry out visual inspection of working area. τ Remove any obstacles and objects lying around. τ Before start-up / commissioning, check all pipes from and to turbo- charger for damage and leaks. τ Don't work in any way that could impair safety when working on turbo- charger. τ After about every 12 hours of operation or at least once a day, inspect turbocharger for visible damage and defects. τ Immediately report any damage or changes in operational perfor- mance to person responsible. τ If damage is discovered, immediately shut down turbocharger and se- cure it against inadvertent or unauthorized use. Revision F τ When switching on auxiliary power sources (hydraulics, pneumatics, electricity, water), keep an eye open for any hazards resulting from supplying these power sources. Safety during cleaning If cleaning agents or solvents are used for cleaning, the corresponding material safety data sheet and the safety instructions in section "Hazards due to operating and auxiliary materials" must be observed. τ Observe the material safety data sheet for the cleaning agent or solvent. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Safety 2 Safe operation and maintenance 2.6 Page 24 τ Wear personal protective equipment (PPE) according to the material τ Inspect the electric cables for abrasion and damage before and after your cleaning work. Safety during disassembly, assembly, maintenance and troubleshooting August 2017 safety data sheet. τ Always perform the specified adjustments, servicing as well as inspec- tion work and observe inspection intervals. τ Inform operating personnel about all service and repair work before beginning. τ Before opening a cover or removing a protective device on a turbo- charger, the engine must be switched off and the turbocharger must have come to a standstill. τ Ensure that the supply of oil is interrupted, especially with an external oil supply. properly. Mechanical work on the turbocharger CAUTION Possible damage to or destruction of components on the turbocharger. τ Perform only those tasks that are described in this manual. τ Perform work only for which training has been carried out. HZTL2412_EN τ Put the engine into operation only after all parts have been refitted Safety when taking out of operation or preparing for mothballing τ Secure the rotor so it cannot turn. The rotor can turn on its own from the force of the stack draught. τ Clean the turbocharger before mothballing it. τ Observe the material safety data sheet for the cleaning and mothballτ Wear personal protective equipment (PPE) according to the material safety data sheet. © Copyright 2016 ABB. All rights reserved. Revision F ing agents. Operation Manual / TPS44-F.. - TPS61-F.. 2 Hazards during operation and maintenance 2.7 Page 25 2.7 Hazards during operation and maintenance August 2017 2.7 Safety Mechanical hazards during operation During normal operation, no mechanical hazards emanate from the turbocharger if it has been installed properly. Risk of injury HZTL2412_EN WARNING Contact with rotating parts can lead to serious injuries. The turbocharger must never be operated without a filter silencer or an air suction branch. When the engine is at a standstill, the rotor can turn on its own because of stack draught. τ Operate the turbocharger in accordance with instructions. τ During maintenance work, secure the rotor against unintentional rotation. Mechanical hazards when working on the turbocharger During maintenance work, various risks can occur through the improper handling of components, through the non-observance of work instructions, due to inadequate care or as a consequence of insufficient training. Mechanical hazards Revision F WARNING Severe injuries to personnel or fatal accidents can be caused by mechanical influences as a consequence of hazardous and inadequate operational procedures. τ Observe the general rules for occupational safety and prevention of accidents. τ Ensure workplace safety. τ Only perform operations that are described in this document. τ Only perform operations for which you have previously received instruction or training. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Safety 2 Hazards during operation and maintenance 2.7 Page 26 The development of noise during operation is influenced by the installation and operating conditions. Noise with a sound pressure level exceeding 85 dB(A) is harmful. August 2017 Hazards due to noise Hazards due to noise WARNING Noise can cause impaired hearing, damage to health, mental disturbances, diminished attention and irritation. τ Always wear ear protection when the engine is running. τ When the sound pressure level is above 85 dB(A), always wear ear protection. Hazards due to hot surfaces and substances During operation, turbocharger surfaces and attached parts as well as operating materials (lubricating oil) become hot. The surface temperature is dependent on the effectiveness of the insulation being used. The temperature can become high enough so that it falls into ranges where burns are possible. HZTL2412_EN Wear ear protection. Risk of burning Wear safety gloves to protect against thermal hazards. © Copyright 2016 ABB. All rights reserved. Revision F WARNING Touching hot surfaces or contact with hot operating materials can lead to serious burns. τ Do not touch hot surfaces and heed the warning plate on the turbocharger. τ Wear heat-resistant safety gloves and protective clothing. τ Allow the turbocharger to cool down before carrying out any work. Operation Manual / TPS44-F.. - TPS61-F.. Safety 2 Hazards during operation and maintenance 2.7 Page 27 August 2017 Hot surfaces on the non-insulated turbocharger WARNING Non-insulated turbochargers can cause serious injuries to personnel (burns). The turbocharger is supplied by ABB Turbo Systems without insulation depending on the order from the enginebuilder. If supply is without insulation, the enginebuilder is responsible for providing the turbocharger with proper insulation and for providing protection against contact with hot surfaces. τ Compliance with the instructions and specifications given by the enginebuilder to protect against hot turbocharger surfaces is compulsory. Wear safety gloves to protect against thermal hazards. Hazards due to operating and auxiliary materials HZTL2412_EN Operating and auxiliary materials are substances used for operation or the execution of maintenance work. Oils, greases, coolants, cleaning agents and solvents, acids, etc. can be regarded as hazardous materials. Operating and auxiliary materials can be combustible and easily ignited. Handling operating and auxiliary materials WARNING Ingestion or inhalation of vapours of operating and auxiliary materials or contact with such can cause damage to health. τ Avoid inhalation and contact with the skin. τ Ensure good ventilation. τ Observe details in the safety data sheets of the operating and auxiliary materials. τ Observe local laws. Wear safety goggles. Revision F Wear safety gloves to protect against chemical hazards. Wear a respiratory mask to protect against gases. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Safety 2 Hazards during operation and maintenance 2.7 Page 28 WARNING Flammable and combustible operating materials and supplies can catch fire or resulting vapours can lead to an explosion. τ Observe the details in the material safety data sheets of the operating and auxiliary materials. τ Comply with local legislation. τ Do not allow any exposed flame or ignition source during cleaning work. τ Carry out cleaning in the open or provide sufficient aeration and ventilation. August 2017 Risk of fire, explosion Risk of environmental damage τ Heed the instructions for use, safety data sheets and hazard notices on the containers of the operating and auxiliary materials. τ Wear appropriate protective clothing. HZTL2412_EN CAUTION The escape of operating and auxiliary materials into the atmosphere or contamination of the ground and water due to improper disposal can lead to environmental damage. τ Handle operating and auxiliary materials carefully. τ Avoid inhalation and contact with the skin. τ Ensure that the work space is adequately ventilated. τ Seal containers tightly immediately after use and put them away. τ Collect used working and auxiliary materials safely, store them sepa- rately in suitable containers and dispose of them properly and in an environmentally compatible manner in accordance with statutory regulations. τ In the event of leaks or after spilling, immediately spread a suitable Revision F binding agent and dispose of it properly and in an environmentally compatible manner in accordance with statutory regulations. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Safety 2 Hazards during operation and maintenance 2.7 Page 29 August 2017 Hazards when handling insulating materials Hazards due to insulating materials WARNING Dust and fibres from insulating materials can cause damage to health or irritations. Unsuitable, combustible insulating materials signify a fire hazard. τ Use only suitable, non-combustible insulating materials. τ Ensure that the work area is well ventilated. τ Avoid stirring up dust. τ Use tools and processes which keep dust to a minimum. τ Remove packing materials only in the work area. τ Take particular care when removing old insulating materials. τ Dispose of insulating materials properly and in an environmentally compatible way in accordance with applicable local regulations. HZTL2412_EN Wear safety goggles. Wear a respiratory mask to protect against dusts. Wear safety gloves to protect against chemical hazards. τ Use only suitable, non-combustible insulating materials. τ Ensure that the work area is well ventilated. τ Wear suitable work clothing (safety glasses, respiratory mask). τ Avoid stirring up dust. τ Use tools and processes which keep dust to a minimum. τ Remove packing materials only in the work area. τ Take particular care when removing old insulating materials. τ Dispose of insulating materials properly and in an environmentally Revision F compatible way in accordance with applicable local regulations. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Safety 2 Hazards during operation and maintenance 2.7 Page 30 Hazards due to electrical components Revision F HZTL2412_EN WARNING Electrical components operate with voltages which can present hazards to humans. τ All work on or with electrical components may only be performed by trained specialists. τ Heed any country-specific regulations. August 2017 Hazards due to electrical components © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. August 2017 2.8 Safety 2 Deflagration on gas engines 2.8 Page 31 2.8 Deflagration on gas engines ABB turbochargers can tolerate a deflagration with a transient pressure increase of 12 bar. After a deflagration event ABB Turbo Systems recommends verifying the following points on the turbocharger: € Position of the turbine and compressor casings to the bearing casing € Shifting of the bearing casing in relation to the bracket € Cracks in casings Revision F HZTL2412_EN If during external inspection anomalies are found or if a particularly strong deflagration event has taken place, it is also recommended to check the bearings of the turbochargers before the next start. This inspection and evaluation must be carried out by an ABB Turbocharging Service Station. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 2 Periodic checking of the pressure vessel 2.9 Page 32 2.9 Periodic checking of the pressure vessel The pressure vessels used by ABB Turbo Systems, such as those for wet or dry cleaning, are so-called "simple pressure vessels". € The local, statutory regulations covering periodic checks of pressure vessels must be observed. August 2017 2.9 Safety € The operator is responsible for the safe operation of the pressure vessel. Hazards from pressure vessels Revision F HZTL2412_EN WARNING The operator must keep the pressure vessel in a proper condition and monitor it. Necessary repair or maintenance work must be carried out without delay and the required safety precautions must be taken. τ Pressure equipment must not be operated if it has defects. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. August 2017 2.10 Safety 2 Lifting loads 2.10 Page 33 2.10 Lifting loads Suspended loads WARNING Loads not suspended in compliance with regulations may lead to personal injury or accidents with fatal consequences. τ Loads must always be fastened to technically perfect lifting gear with sufficient loading capacity. τ Make sure the load is suspended properly on the crane hook. τ Do not let anyone stand beneath a suspended load. Wear safety gloves to protect against mechanical hazards. HZTL2412_EN Wear safety helmet. In the case of two or more suspension points, the slinging angle must not exceed 45°. This avoids excessive loading due to inclined tensile loading. Revision F τ Fasten turbocharger assemblies / components as described in respec- tive handling steps. τ Before attaching slings, allow turbocharger components to cool down (maximum 80°C). τ Use suitable protection at sharp edges. τ Completely screw in assembly / fitting devices without fail so that they cannot work loose during use. τ Use assembly / fitting devices only for applications described. τ Make sure removed turbocharger components stand safely and se- curely. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Start-up 3 Oil supply 3.1 Page 35 August 2017 3 Start-up 3.1 Oil supply 3.1 A carefully designed and installed oil supply, which functions in all possible operational conditions, is an important prerequisite for trouble-free turbocharger operation. The turbocharger is normally lubricated with oil from the engine oil circuit. If a separate lubricating system is used, then emergency lubrication is also to be provided. τ Heed the instructions of the engine builder when selecting the lubricat- ing oil and oil-change intervals. HZTL2412_EN Oil filtration Depending on the turbine specifications and bearings used, varying amounts of contaminants have to be filtered out of the lubricating oil to avoid dangerous wear of the bearing parts. CAUTION The standard oil filter specification for the turbocharger is 34 µm. This means that contaminants larger than 0.034 mm must be filtered out of the oil with a separation efficiency > 99%. τ Fit an accessory filter if engine oil filter is not efficient enough. τ If the engine is started cold and the flow resistance rises to above 0.5 bar due to deposits of dirt in the accessory filter, a bypass must open which ensures that oil flows to the turbocharger by circumventing the filter. Revision F τ Check that oil filters are clean before commissioning. Also follow the enginebuilder's instructions regarding filter mesh and separation efficiency. NOTICE © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Start-up 3 Oil supply 3.1 Page 36 All lubricating oils used for engines are admissible. August 2017 Lubricant NOTICE Oil inlet viscosity and temperature 1) Kinematic viscosity (mm2/s = cSt) 2) Oil-inlet temperature (°C) A Permissible range Falling below the minimum oil inlet temperature CAUTION Serious machine or property damage can be caused by excessively high oil viscosity and the resulting lack of oil in the bearings. τ Do not allow the oil inlet temperature to fall below the minimum 30 ºC when starting the engine. τ The oil inlet temperature must never be less than 10 °C. © Copyright 2016 ABB. All rights reserved. Revision F HZTL2412_EN The oil-inlet temperature must not exceed 105°C. Permissible oil-inlet viscosities and oil-inlet temperatures are shown in the following chart. Operation Manual / TPS44-F.. - TPS61-F.. Start-up 3 Oil supply 3.1 Page 37 Oil pressure August 2017 The oil pressure in front of the turbocharger must be maintained precisely to ensure trouble-free operation. Status for operation Oil pressure in front of turbocharger [bar] Normal operation 2.0 … 4.5 Engine start: cold oil, permissible for maximum 15 minutes ≤ 8.0 Engine idling ≥ 0.2 Pre- and post-lubrication (engine stopped) ≤ 1.0 CAUTION Serious machine or property damage might result if the turbocharger is not supplied with oil when the engine is starting. τ Activate prelubrication device before starting engine. Revision F HZTL2412_EN Prelubrication © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Start-up 3 Oil supply 3.1 Page 38 Machine damage Status for operation Oil temperature at inlet Toil,inlet Permissible 30 … 105 °C Temporarily permissible (< 1 h) → alarm > 105 °C Not permissible → stop engine > 110 °C Not permissible → do not start engine (before starting: preheat oil) < 30 °C HZTL2412_EN CAUTION Machine damage may result if the oil temperature at the oil inlet exceeds the permissible range. τ Keep the oil temperature at the oil inlet as specified in the following table. August 2017 Lubricating oil temperature at the inlet Lubricating oil temperature at the outlet The oil temperature at the outlet depends mainly on: € lubricating oil temperature and pressure at the oil inlet € engine load and turbocharger speed € exhaust gas temperature The maximum permissible oil temperature at the outlet is listed in the following table. The specified oil outlet temperature must be regarded as an alarm value for turbocharger operation and be monitored in accordance with standard regulations. Oil temperature at outlet Toil,outlet Permissible ≤ 160 °C Temporarily permissible → alarm > 160 °C Not permissible → stop engine > 180 °C Permissible ≤ Toil,inlet + 55 K Temporarily permissible → alarm > Toil,inlet + 55 K If the turbocharger has been operated outside the permissible range for a prolonged period of time, ABB Turbo Systems recommends having the turbocharger inspected by an ABB Turbocharging Service Station. © Copyright 2016 ABB. All rights reserved. Revision F Status for operation Operation Manual / TPS44-F.. - TPS61-F.. 3 Inspection work 3.2 Page 39 3.2 Inspection work 3.2 August 2017 Inspection work includes preventive visual controls plus monitoring and measuring work before and during commissioning. Inspections help detect changes to the turbocharger. Machine damage can be avoided. 3.2.1 HZTL2412_EN Start-up Inspection before commissioning Monitoring devices τ Check for correct functioning. Filter mat τ Inspect for damage. Lubricating system τ Check oil filter for cleanliness before commissioning. Contaminated oil CAUTION Particles of dirt and solid matter in the oil can cause serious damage to the machine or property. τ During initial commissioning and after all service work, the complete lubricating system must be flushed thoroughly with warm oil. τ When running in the engine and after all service work on the lubricating system, special running-in filters must be used. τ Check oil pressure in oil supply lines. Prelubrication Revision F CAUTION Warning plates on turbocharger Serious machine or property damage might result if the turbocharger is not supplied with oil when the engine is starting. τ Activate prelubrication device before starting engine. τ Check whether the warning plates are present and legible. τ Check whether the protective sheets have been removed. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 3 Inspection work 3.2 Page 40 Check after start-up (engine at idling speed) Lubricating system τ Check oil pressure in oil supply lines. August 2017 3.2.2 Start-up τ Check oil inlet temperature. The permissible values are listed in the section Oil supply. Gas, air and oil lines τ Check all gas, air and oil lines for leaks after starting the engine. Check when running up engine τ Measure speed, oil pressure and charging pressure at various engine performance levels. τ Measure exhaust gas temperature in front of and behind turbine. τ Measure air temperature in front of and behind compressor. HZTL2412_EN 3.2.3 The measured values must be compared with the values in the acceptance test report, while taking different operating conditions into account. 3.2.4 Inspection after 100 service hours Clean or replace lubricating oil filters after the first 100 service hours. © Copyright 2016 ABB. All rights reserved. Revision F NOTICE Lubricants and pastes used during assembly of the turbocharger liquefy or vaporise and might escape as an oily liquid in the first few hours after commissioning. If oily liquid continues to escape after this period, an oil leak must be suspected. The first step is to check for leakage of the oil supply to the turbocharger. If this is leaky, contact an official ABB Turbocharging service station. Operation Manual / TPS44-F.. - TPS61-F.. August 2017 3.3 If provided Start-up 3 Commissioning after taking out of operation 3.3 Page 41 3.3 Commissioning after taking out of operation τ Remove cover plates (blind flanges) between compressor casing out- let and charge air duct, before gas inlet and after gas outlet. τ Inspect exhaust gas duct / line in front of and after turbine for any combustion deposits, foreign matter or residual water. Clean and remove. τ Inspect air supply line or filter silencer for any foreign matter. Clean and remove. τ Start up turbocharger oil circulation system at engine end. τ Prepare turbocharger for operation as instructed in section "Inspection work before start-up / commissioning" of chapter headed "Start-up / commissioning". Revision F HZTL2412_EN τ Start up turbocharger. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Operation 4 Noise emissions 4.1 Page 43 August 2017 4 Operation 4.1 4.1 Noise emissions Hazards due to noise WARNING Noise can cause impaired hearing, damage to health, mental disturbances, diminished attention and irritation. τ Always wear ear protection when the engine is running. τ When the sound pressure level is above 85 dB(A), always wear ear protection. Wear ear protection. HZTL2412_EN The sound pressure level (A-weighted) of emissions is measured at a distance of 1 metre from the turbocharger. The highest sound pressure level of emissions1) reaches a maximum of 105 dB(A) near the filter silencer and over the entire speed range. The following prerequisites must be fulfilled on the turbocharger in order to observe this limit value: € Fitted air-inlet system € All standard, noise-reducing measures have been taken2). Revision F € The bellows at the air outlet have been perfectly insulated acoustically by the engine builder. He is also responsible for insulating the charge air / scavenging air line and the charge air cooler. 1) Directive 2006/42/EC, 1.7.4.2 / u / Paragraphs 5 + 7 : A-weighted emission sound pressure level 2) In the event of divergent insulation designs, the engine builder must ensure that equivalent acoustic insulating measures are taken. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Operation 4 Noise emissions 4.1 Page 44 Compressor casing 04 Insulation pads 02 Bellows 05 Insulation mat (at least 15 mm) 03 Charge air duct / scavenging air line 06 Sheet metal cover Revision F 01 HZTL2412_EN August 2017 Suggestion for noise insulation of the bellows © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Operation 4 Servicing work 4.2 Page 45 4.2 Servicing work 4.2 August 2017 Service work to be carried out during operation involves visual checks, monitoring, measuring, inspection work and functional checks. It is then possible for changes to the turbocharger to be identified and rectified. In this way, it can be ensured that the turbocharger remains in full working order. Service intervals CAUTION Service work on the turbocharger that is neglected or carried out too late can lead to excessive contamination and wear as well as operating failures. τ Carry out service work at specified time intervals. HZTL2412_EN Shortened service intervals CAUTION Despite observance of the service intervals, unusual loads, such as several start-stops a day, harsh environmental factors, poor fuel quality or heavy installation vibration can lead to premature machine damage. τ A shortened service interval must be arranged with ABB Turbo Systems. Service inspection after 5 years NOTICE 4.2.1 To prevent age- and stoppage-related machine damage, an inspection by an ABB Turbocharging Service Station is recommended at the latest 5 years after the last service. Service work every 25 … 50 hours τ Visual inspection for air, exhaust gas, water and oil leaks. Revision F τ Record operating data and enter it in the engine logbook. τ Clarify the cause of any variances. Unknown changes during operation CAUTION The consequences can range from an impairment to a breakdown. τ Have unknown causes clarified by an ABB Turbocharging service station. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 4 Servicing work 4.2 Page 46 Servicing work according to the engine manufacturer's instructions τ Clean or replace oil filter in supply line to turbocharger when engine is Oil filter August 2017 4.2.2 Operation not running. 4.2.3 Service work in accordance with instructions on rating plate (In general, after 8000 - 12000 hours of operation) Rotor and bearing parts must be inspected and assessed by an ABB Turbocharging Service Station. The following work can be carried in preparation. τ Remove cartridge group as described in chapter Disassembly and asτ Measure clearances. τ Clean turbine and compressor casings and check them for cracks and erosion / corrosion. τ Clean bearing casing and blow air through oil ports / holes. HZTL2412_EN sembly. Revision F τ Clean nozzle ring and check for cracks and erosion. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. August 2017 4.2.4 Operation 4 Servicing work 4.2 Entries in engine logbook By monitoring the engine, conclusions can be drawn about the turbocharger performance. The following operating data and measured values must be entered regularly in the engine manufacturer's engine logbook: € Engine performance and speed € Air intake temperature € Exhaust gas temperature in front of and behind the turbine € Pressure of charge air € Pressure drop in charge air cooler € Lubricating oil pressure and lubricating oil temperature If provided € Air temperature behind compressor and charge air cooler € Turbocharger speed € Pressure loss in air filter Revision F HZTL2412_EN Page 47 © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 4 Expected exchange intervals 4.3 Page 48 4.3 Expected exchange intervals Rotating components The recommended replacement intervals for compressor wheels and turbine wheels are defined depending on the operating conditions and based on the safety concept (SiKo) for rotating parts. These intervals can be found on the turbocharger rating plate. August 2017 4.3 Operation Non-rotating components Depending on the system-specific operating conditions, a distinction is made between: € the replacement interval for the bearing parts and Decisive in this respect are various influencing parameters, which can drastically shorten the replacement intervals of these parts in extreme cases. During the specified periodic service work, the individual components are inspected for wear and, if necessary, replaced. HZTL2412_EN € the replacement interval for those non-rotating components that are exposed to hot gases. GAS / MDO HFO 25000 … 50000 25000 … 50000 Nozzle ring 50000 10000 … 25000 Gas outlet flange 50000 35000 … 50000 Partition wall 50000 35000 … 50000 Rotor components See the data on the rating plate Turbine casing Bearing parts 12000 … 24000 12000 … 24000 Other casings 50000 50000 GAS = Natural gas MDO = Marine diesel oil HFO = Heavy fuel oil The specified values are a guide only and not guaranteed (see following section Influencing parameters). © Copyright 2016 ABB. All rights reserved. Revision F Expected replacement intervals [h] Operation Manual / TPS44-F.. - TPS61-F.. Operation 4 Expected exchange intervals 4.3 Page 49 August 2017 Influencing parameters The specified values are only guide values and not guaranteed. The actual values can deviate considerably from the guide values due, for example, to the following influences: € Fuel quality and preparation € Load profile (thermal load cycles, also starts / stops, emergency shutdowns) € Gas inlet temperature € Frequency and execution of turbine and compressor cleaning € Turbocharger specification € System-specific operating conditions (operating point, combustion quality, composition of exhaust gas) HZTL2412_EN For bearing parts € Lubricating oil quality (oil filtration, condition of lubricating oil, oil monitoring) € Load profile (rpm / speed, pressure conditions, temperature) Revision F € State of rotor unbalance (degree of contamination) © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 4 Speed measurement 4.4 Page 50 4.4 Speed measurement A speed measuring system permits continuous monitoring of the turbocharger speed. August 2017 4.4 Operation Do not use cables as a climbing aid 86505(A) Speed sensor (cable not integrated) 86526 F/I converter 86505(B) Speed sensor (cable integrated) 86528 Tachometer 86515(A) Cable connector to 86505(A) 01 Screw plug 86515(B) Cable connector to 86505(B) 02 Gasket © Copyright 2016 ABB. All rights reserved. Revision F HZTL2412_EN CAUTION If you pull the speed measurement cables too hard, contacts can be pulled out. τ Do not tension the speed measurement cables. Operation Manual / TPS44-F.. - TPS61-F.. August 2017 4.4.1 Operation 4 Speed measurement 4.4 Page 51 Speed differences with multiple turbochargers per engine The speeds of all turbochargers on one engine differ only slightly from each other in normal operation. The difference between the highest and the lowest turbocharger speed must not be more than 3 % relative to the speed limit nBmax. If this permissible range of difference is exceeded, the following steps must be carried out: τ Reduce engine performance immediately until the highest turbo- charger speed no longer exceeds 70% of nBmax. τ If the engine cannot be stopped, continue to run at this reduced engine performance or turbocharger speed. τ If the turbocharger surges continuously, engine performance must be reduced further. HZTL2412_EN τ Measure the temperatures in the air and gas lines to and from the tur- bochargers and compare them with standard values. If the engine can be stopped for a short time: τ Inspect the air and gas lines as well as the turbocharger and eliminate any problems. τ In any event, it is recommended that you contact the nearest ABB Revision F Turbocharging Service Station. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 4 Speed measurement 4.4 Page 52 Replacing the speed sensor Hot cable connector and hot speed sensor WARNING Risk of burning. During operation, the cable connector and the speed sensor can reach temperatures exceeding 100 °C. τ Wear safety gloves when removing the cable connector and speed sensor. August 2017 4.4.2 Operation HZTL2412_EN Wear safety gloves to protect against thermal hazards. τ Reduce engine performance to the idling speed, then stop the engine. τ Switch off the lubricating oil supply to the turbocharger. τ Disconnect the cable connector from the speed sensor. τ Screw out defective speed sensor. τ Screw in a new speed sensor up to the limit block. Part number TPS44 TPS48 TPS52 TPS57 TPS61 86505 15 Nm 15 Nm 15 Nm 15 Nm 15 Nm © Copyright 2016 ABB. All rights reserved. Revision F τ Adhere to tightening torque. August 2017 Operation Manual / TPS44-F.. - TPS61-F.. Operation 4 Speed measurement 4.4 Page 53 Sealing the speed sensor NOTICE The speed sensor is designed with a sealing lip and does not require an additional gasket when fitted. τ Connect cable connector to speed sensor. τ Switch on lubricating oil supply to turbocharger. 4.4.3 Failure of speed measuring system Revision F HZTL2412_EN Possible reasons for failure of the speed measuring system are described in the chapter Troubleshooting. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 4 Stopping the engine 4.5 Page 54 4.5 Stopping the engine Stopping the engine of oil-cooled turbocharger version CAUTION Heat in the turbocharger must be dissipated by the further circulating lubricating oil. τ Post-lubricate for 15 … 20 minutes. τ Maintain oil pressure of 0.5 … 1.0 bar for post-lubrication. August 2017 4.5 Operation Stopping the engine of water-cooled turbocharger version Revision F HZTL2412_EN CAUTION Heat in the turbocharger must be dissipated. τ Allow turbocharger cooling water to run for 15 … 20 minutes after stopping engine. τ Allow oil lubrication to continue running until rotor comes to a stop. Further post-lubrication is not required and not recommended. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Maintenance 5 Foreword to Maintenance 5.1 Page 55 August 2017 5 Maintenance 5.1 Foreword to Maintenance 5.1 General maintenance work involves regular visual checks and cleaning tasks which are intended to ensure the trouble-free functioning of the turbocharger. The maintenance points described here are differentiated as follows: € Cleaning during operation: – Compressor – Turbine and nozzle ring. € Mechanical cleaning of individual components: HZTL2412_EN – Filter silencer – Casings, diffuser, nozzle ring – Cartridge group: Compressor, turbine Risk of damage during mechanical cleaning CAUTION If mechanical cleaning is carried out too often, this can lead to damage and corrosion on the components. τ If cleaning during operation is not sufficient to achieve acceptable values regarding thermal load and engine performance, mechanical cleaning of certain spots can be carried out. τ Perform mechanical cleaning, especially of the cartridge group, only once within the service interval. Cleaning method Revision F NOTICE To allow you to observe the standard service intervals and to maintain a high turbocharger efficiency, ABB Turbo Systems recommends that the cleaning procedure be carried out during operation. This allows the thermal load of the engine to be kept low while ensuring maximum fuel efficiency. τ Dispose of dirty water and cleaning agents in an environmentally com- patible manner, professionally and in accordance with valid local regulations. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Maintenance 5 Cleaning the compressor during operation 5.2 Page 56 The contamination of the compressor stage (compressor wheel, wall insert and diffuser) depends on the degree of purity of the taken-in air. General Deposits can form in the flow channels if salt, oil mist, exhaust gas or dust are sucked in with the air. August 2017 5.2 Cleaning the compressor during operation 5.2 Consequences of contamination: € Impaired compressor efficiency € Higher exhaust gas temperatures € Increased fuel consumption Periodic cleaning of the compressor during operation prevents or delays any major increase in contamination. But it never replaces the regular service work where the turbocharger is completely dismantled and the compressor is mechanically cleaned. If the coating of dirt is very thick and hard, the compressor can only be cleaned manually when disassembled. This cleaning must be carried out by an ABB Turbocharging Service Station. HZTL2412_EN € Increased rotor unbalance NOTICE Cleaning interval The interval between periodic cleaning is very dependent on the operating conditions. In general, cleaning should be carried out every 25 ... 100 operating hours. Revision F Should the specified cleaning intervals prove incompatible with engine operation, please contact ABB Turbo Systems. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Maintenance 5 Cleaning the compressor during operation 5.2 Page 57 Cleaning method August 2017 Cleaning the compressor while in operation is carried out as wet cleaning. This cleaning method has been tested and approved by ABB Turbo Systems. Principle of wet cleaning To clean the compressor stage during operation, water is injected in front of the compressor wheel through an injection pipe fitted in the filter silencer or the suction branch. The water does not act as a solvent, but the dirt deposit is removed by the mechanical impact of the droplets. This is a very suitable process, provided that the degree of contamination is not too high. Corrosion and deposits when cleaning HZTL2412_EN CAUTION CAUTION Damage and impairment of turbocharger parts due to salt water and cooling water additives τ Don't use salt water for cleaning, but only clean fresh water. The injection pipe must on no account be connected directly via a cock to a water pipe or a dosing vessel larger than the one supplied. This prevents uncontrolled volumes of water entering the turbocharger and engine, which can lead to serious damage. In the case of V-engines with several turbochargers on each engine, we recommend parallel cleaning of the compressors. This cleaning process is faster and the risk of turbocharger surging is reduced. Sequential charging In the case of sequential charging, care must be taken to ensure that turbocharger compressors are cleaned regularly, especially after periods of operation in the lower performance range. Revision F V-engines © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 5 Cleaning the compressor during operation 5.2 Page 58 5.2.1 Wet cleaning compressor using external water pressure vessel (XC1) Approval by enginebuilder These instructions for wet cleaning only apply when cleaning is carried out with clean water and under the precondition that the enginebuilder approves the process. NOTICE August 2017 Maintenance Supplying water from the externally mounted water vessel is suitable only for those applications where a negative pressure exists in front of the compressor wheel (not used for: blowers connected in front of the compressor or high-pressure compressor stages with two-stage charging). Revision F NOTICE To be able to carry out a satisfactory cleaning process that has been tested and is recommended by ABB Turbo Systems, the following prerequisites must be fulfilled: τ Run engine at load from 50 … 85 %. τ Start cleaning cycle according to following description Wet cleaning operation with XC1. HZTL2412_EN Operating state prerequisites for cleaning compressor with XC1 © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Maintenance 5 Cleaning the compressor during operation 5.2 Page 59 HZTL2412_EN August 2017 Procedure for wet cleaning the compressor with XC1 X Sealing plug D Compressed air Y Valve activator W Water Z Vessel Operating the water pressure vessel τ Remove sealing plug (X). τ Fill the vessel (Z) with clean water. τ Screw in the sealing plug. τ Push the valve activator (Y) against the spring and hold for 10 to 15 seconds until the entire volume of water has been injected. τ Do not repeat the cleaning cycle until a stabilisation period of at least Revision F 10 minutes has elapsed. NOTICE Cleaning parameters per turbocharger compressor Whether or not cleaning has been successful can be seen from the charging or flushing pressure and also from the exhaust gas temperatures. If the cleaning process is unsatisfactory, it can be repeated up to 2 times. If the cleaning result is still not satisfactory after three attempts and the engine values are also unsatisfactory, we recommend that you have the turbocharger inspected and cleaned by an official ABB Turbocharging Service Station. Product Engine load Contents of cleaning medium vessel [dm3] Water injection time t1 [s] TPS 50 … 85 % 0.4 10 © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Maintenance 5 Turbine cleaning during operation 5.3 Page 60 The combustion of fuels such as heavy fuel oil (HFO) in diesel engines produces contamination of the turbocharger's turbine components. In combination with a high exhaust gas temperature, poor quality fuel can lead to particularly hard deposits on the nozzle ring and especially on the gas outlet flange. August 2017 5.3 Turbine cleaning during operation 5.3 ABB Turbo Systems recommends using fuels with a low ash, sulphur, sodium and vanadium content. Consequences of contamination: € Poor turbine efficiency € elevated exhaust gas temperatures € higher charging and ignition pressures as turbocharger speed rises € After stopping the engine, the rotor can become stuck in contamination deposits. Experience with turbocharger operation shows that the intervals between overhauls can be extended if cleaning while in operation is carried out periodically. Wet cleaning the turbine, as described below, should be used for 4-stroke applications when there are heavy deposits from, for example, HFO. HZTL2412_EN € lower engine performance. Under no circumstances is periodic cleaning of the turbine during operation a substitute for the service work carried out when the turbocharger is completely dismantled and cleaned mechanically. Turbines which are very heavily contaminated cannot be cleaned this way any longer. In this case, the contaminated components must be mechanically cleaned by an ABB Turbocharging Service Station. NOTICE Regular turbine cleaning during operation prevents or delays excessive build-up of contamination. Cleaning intervals The interval between periodic cleaning is very dependent on the operating conditions. In general, cleaning should be carried out every 50 to 200 operating hours. © Copyright 2016 ABB. All rights reserved. Revision F Regular cleaning Operation Manual / TPS44-F.. - TPS61-F.. Maintenance 5 Turbine cleaning during operation 5.3 Page 61 August 2017 Cleaning intervals NOTICE Should the specified cleaning intervals prove incompatible with engine operation, please contact ABB Turbo Systems. Cleaning method Turbine components are cleaned during operation using the wet cleaning processes described in the following. These have been tested and are approved by ABB Turbo Systems. The turbine casing design and the type of turbine casing sealing are decisive for the choice of cleaning method. HZTL2412_EN Approval by engine manufacturer NOTICE 5.3.1 The prerequisite for wet cleaning is that the engine manufacturer approves the method and his instructions are followed. Wet cleaning methods Process with short water injection time (3 x 30 seconds cleaning) The cleaning process with short water injection time is used for turbocharger designs without additional sealing by means of C-rings. The process is based on the principle of thermal shock in combination with a subsequent flushing phase. Revision F Process with long water injection time (10 minutes cleaning) The cleaning process with a long water injection time is used for turbocharger designs with additional sealing by means of C-rings. Based on a 10-minute injection phase, this cleaning process utilises the water solubility of the dirty deposits. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Maintenance 5 Turbine cleaning during operation 5.3 Page 62 NOTICE 5.3.2 If you need information about the choice of cleaning method (short / long), you can contact the engine builder or an official ABB Turbocharger service station. August 2017 Choice of cleaning method Prerequisites Risk of corrosion and deposits Maximum temperature in front of turbine during cleaning CAUTION When cleaning, the temperature in front of the turbine will rise and can heavily stress the material of turbine components. The temperature at the turbine inlet can be up to 100 °C higher than the exhaust gas temperature after the cylinder. This should be taken into consideration when setting the operating point before cleaning. τ Don't exceed maximum temperature in front of turbine when cleaning. HZTL2412_EN CAUTION Impairment and damage of turbocharger by salt water and cooling water additives in flow ducts τ Don't use salt water for cleaning, but only clean fresh water. τ Avoid corrosion on casing inner surfaces. τ Let engine run for 10 minutes after wet cleaning. Impermissible thermal stressing and flooding of the turbine V-engines NOTICE In the case of V-engines with several turbochargers on each engine, we recommend parallel cleaning of both turbochargers. This cleaning process is faster and the risk of turbocharger surging is reduced. © Copyright 2016 ABB. All rights reserved. Revision F CAUTION Smaller volumes of water can result in poor cleaning. Larger volumes of water lead to impermissible thermal stressing of the turbine components and can cause flooding of the turbine. τ Be absolutely sure to observe turbine cleaning parameters. Operation Manual / TPS44-F.. - TPS61-F.. Maintenance 5 Turbine cleaning during operation 5.3 Page 63 August 2017 Recommended operating state for turbine wet cleaning The following operating state has been tested and is approved by ABB Turbo Systems: Characteristic / component Conditions short water injection time Engine load (guide value) Turbine inlet temperature TTE before water injection 20 … 40 % 350 - 400 °C Water supply Water pressure (overpressure over atmosphere) pWT long water injection time 350 - 430 °C ensured 2.0 bar 1.5 bar The cleaning cycle can now be started based on the following description. Revision F HZTL2412_EN If necessary, engine performance must be reduced to maintain these conditions. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 5 Turbine cleaning during operation 5.3 Page 64 Procedure for method with short water injection time ϖ Prerequisites have been fulfilled. τ Wait 10 minutes during a stabilising phase after reducing the engine load. August 2017 5.3.3 Maintenance τ Open the shut-off valve. τ Set the required water flow rate as specified in the table of cleaning parameters using the flowmeter and inject for 30 seconds. τ Observe a pause of 3 or 5 minutes as specified in the table. τ Repeat the 30-second water injection two times. τ Close the shut-off valve. τ Wait 10 minutes during a stabilising phase before increasing engine load again. Cleaning parameters during the process Water volume flow 1) [dm3/min] Injection time [min] Pause between injections [min] ≤ 450 4.5 0.5 (3 x) 3 44 48 6 52 8 57 11 61 17 1) corresponds to a water pressure p mosphere) 5 WT of 2.0 bar (overpressure over at- Maximum temperature in front of turbine during cleaning CAUTION When cleaning, the temperature in front of the turbine will rise and can heavily stress the material of turbine components. The temperature at the turbine inlet can be up to 100 °C higher than the exhaust gas temperature after the cylinder. This should be taken into consideration when setting the operating point before cleaning. τ Don't exceed maximum temperature in front of turbine when cleaning. © Copyright 2016 ABB. All rights reserved. Revision F TPS Temperature in front of the turbine during cleaning [°C] HZTL2412_EN This completes the turbine cleaning process. August 2017 Operation Manual / TPS44-F.. - TPS61-F.. 5.3.4 Maintenance 5 Turbine cleaning during operation 5.3 Page 65 Procedure for method with long water injection time ϖ Prerequisites have been fulfilled. τ Wait 10 minutes as a stabilising phase after reducing the engine load. τ Open the shut-off valve. τ Set the required water flow rate as specified in the table of cleaning parameters using a flowmeter and inject for 10 minutes. τ Close the shut-off valve. τ Wait 10 minutes as a stabilising phase before increasing the engine load again. This completes the turbine cleaning process. HZTL2412_EN Cleaning parameters during the process TPS Temperature in front of the turbine during cleaning [°C] 44 ≤ 530 Water Injection time Stabilising phase 1) before / after water volume flow [min] injection 3 [dm /min] [min] 2.5 48 4 52 5.5 57 8.5 61 12 1) corresponds to a water pressure p mosphere) 10 10 WT of 1.5 bar (overpressure over at- Revision F Maximum temperature in front of turbine during cleaning CAUTION When cleaning, the temperature in front of the turbine will rise and can heavily stress the material of turbine components. The temperature at the turbine inlet can be up to 100 °C higher than the exhaust gas temperature after the cylinder. This should be taken into consideration when setting the operating point before cleaning. τ Don't exceed maximum temperature in front of turbine when cleaning. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Maintenance 5 Cleaning components mechanically 5.4 Page 66 5.4.1 Introduction August 2017 5.4 Cleaning components mechanically 5.4 Choosing cleaning tools CAUTION Turbocharger components are sensitive to mechanical damage. The use of needle guns or other impact tools, for example, damages the components. Depending on the specification, nozzle rings and turbine casings have protective coatings, which can also be damaged. τ Only use soft tools such as cloths, brushes or wire brushes. τ In the event of heavy contamination, the cleaning methods that have been described such as soaking can be repeated until a satisfactory result has been achieved. patible manner, professionally and in accordance with valid local regulations. Disassembly and assembly The disassembly and assembly of the components is described in chapter Disassembly and assembly. Revision F NOTICE HZTL2412_EN τ Dispose of dirty water and cleaning agents in an environmentally com- © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 5 Cleaning components mechanically 5.4 Page 67 Cleaning the filter silencer HZTL2412_EN August 2017 5.4.2 Maintenance 81135 Filter silencer body 81266 Cover grid 81136 Absorption segment 81270 Tension band 81137 Sheet-metal covering 81271 Lock 81265 Filter ring Disassembly and assembly NOTICE The procedure for disassembly and assembly of the filter silencer is described in the chapter entitled Disassembly and Assembly. Cleaning the filter ring (if provided) τ Remove filter ring (81265). Revision F τ Clean filter ring (81265) as required or every 500 operating hours, and replace after the fifth cleaning operation at the latest. The degree of contamination of the filter ring depends on the cleanliness of the air that is drawn in. τ Wash filter ring (81265) using water containing light-duty detergent or, if very heavily contaminated, soak it while squeezing carefully. Rinse in cold water. Avoid rough handling (do not use a water jet). τ Allow the filter ring to dry out completely before assembly. τ Dispose of dirty water and gentle detergents in accordance with valid local regulations. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Maintenance 5 Cleaning components mechanically 5.4 Page 68 τ Loosen the tension bands (81270). τ Remove the cover grid (81266). τ Pull out the sheet-metal coverings (81137), bend them up and remove the absorption segments (81136). August 2017 Cleaning the absorption segments τ Clean the absorption segments (81136). During cleaning, ensure that the absorption segments (81136) are only cleaned with a mild jet of compressed air, soft brush or a damp cloth. τ Have absorption segments which are heavily contaminated replaced by an official ABB Turbocharging Service Station. Fitting the filter silencer τ Insert the absorption segments (81136) into the sheet-metal coverings (81137). and insert them into the slot guides in the silencer body (81135). τ Fit the cover grid (81266). τ Fit the tension bands (81270) and apply tension at the locks (81271). τ Damaged tension bands must be replaced with new ones. HZTL2412_EN τ Bend the sheet-metal coverings (81137) back into their original shape Revision F τ If provided, fit the filter ring (81265). © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. August 2017 5.4.3 Maintenance 5 Cleaning components mechanically 5.4 Page 69 Compressor-end, non-rotating parts Handling operating materials and supplies WARNING Swallowing or inhaling vapours of operating materials and supplies or contact with them may be harmful to health. τ Do not breathe in these substances and avoid contact with the skin. τ Ensure proper ventilation. τ Observe the information in the material safety data sheet for the operating materials and supplies. τ Wear personal protective equipment (PPE) according to the material safety data sheet. τ Comply with local legislation. Wear safety goggles. HZTL2412_EN Wear safety gloves to protect against chemical hazards. Wear a respiratory mask to protect against gases. Revision F The following performance-relevant parts can be cleaned according to the following description. 72000 Compressor casing 77000 Wall insert 79000 Diffuser τ Clean the components specified above with steam or allow to soak in diesel oil or water with household detergent. After soaking, remove the dirt with a brush. τ Dry components completely. τ Spray cleaned surfaces with penetrating oil. Do not spray the outer surfaces of the turbocharger. τ Dispose of dirty water and cleaning agent in accordance with the spec- ifications in the safety data sheet. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 5 Cleaning components mechanically 5.4 Page 70 Turbine-end, non-rotating parts August 2017 5.4.4 Maintenance Handling operating materials and supplies WARNING Swallowing or inhaling vapours of operating materials and supplies or contact with them may be harmful to health. τ Do not breathe in these substances and avoid contact with the skin. τ Ensure proper ventilation. τ Observe the information in the material safety data sheet for the operating materials and supplies. τ Wear personal protective equipment (PPE) according to the material safety data sheet. τ Comply with local legislation. Wear safety gloves to protect against chemical hazards. Wear a respiratory mask to protect against gases. HZTL2412_EN Wear safety goggles. 51000 Turbine casing 52400 Gas outlet flange 56001 Nozzle ring τ Place contaminated parts in hot water or in a liquid such as carbon remover to soften the contamination. τ Brush away the contamination or remove with a steam cleaner. τ Repeat the soaking and brushing if necessary. τ Use clean water to completely clean parts of any solvents. τ Dry components completely. © Copyright 2016 ABB. All rights reserved. Revision F Baked layers of contamination, for example, from heavy fuel oil or coked oil occur at the turbine end. The following parts, which are relevant in terms of performance, can be cleaned in accordance with the description below. Operation Manual / TPS44-F.. - TPS61-F.. Maintenance 5 Cleaning components mechanically 5.4 Page 71 τ Spray cleaned surfaces with penetrating oil. Do not spray the outer surfaces of the turbocharger. August 2017 τ Dispose of contaminated water and cleaning agents in accordance with the information in the material safety data sheet. 5.4.5 Cartridge group Introduction Corrosion HZTL2412_EN CAUTION If the cartridge group is not put into operation again immediately after cleaning, parts may corrode. τ Re-install and use the cartridge group immediately after cleaning. Compressor wheels or turbines may be heavily contaminated due to heavy fuel oil operation or coked oil. Such contamination may possibly no longer be removed through cleaning during operation and must be cleaned mechanically during the standard service intervals (see chapter entitled Service work). τ Remove turbocharger from the engine (see chapter Removal and in- stallation [➙ 85]). τ Remove cartridge group (see chapter Disassembly and assembly [➙ 91]). Revision F First clean the compressor end and then the turbine end in accordance with the following description. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Maintenance 5 Cleaning components mechanically 5.4 Page 72 Selection of the cleaning agent CAUTION Cleaning agents which contain chlorine attack metals. τ Use only pH-neutral cleaning agents which do not attack metals. τ Observe safety data sheet. August 2017 Cleaning the compressor end Water and contamination in the cartridge group τ Clean compressor wheel with a cloth or soft brush soaked in water with household detergent. Do not use any wire brushes! τ Dry the compressor wheel and the gap between the compressor and the bearing casing with a weak jet of compressed air. HZTL2412_EN CAUTION If water or contamination penetrates the cartridge group, this can impair the function of the turbocharger and damage parts inside the cartridge group. τ Make sure that no water or contamination can enter into the cartridge group. τ Lightly spray the compressor wheel and the gap between the com- pressor and the bearing casing with penetrating oil. τ Dispose of dirty water and cleaning agent in accordance with the safe- Revision F ty data sheet. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Maintenance 5 Cleaning components mechanically 5.4 Page 73 Soaking the dirt Baked-on layers of dirt from heavy fuel oil or coked oil, occur at the turbine end. The contamination can be removed by soaking and brushing. The soaking of the layers of dirt as well as the cleaning of the turbine are described below. HZTL2412_EN August 2017 Cleaning the turbine end Product A [mm] B [mm] C [mm] TPS44 91 15 173 TPS48 108 17 205 TPS52 128 20 245 TPS57 157 25 300 TPS61 187 30 357 To soak the layers of dirt on the turbine, the cartridge group can be submerged vertically in a tank (02) with liquid. τ Place the tank (02) in a larger container (03), so that the excess liquid Revision F can be collected. Selection of the cleaning agent CAUTION Cleaning agents which contain chlorine attack metals. τ Use only pH-neutral cleaning agents which do not attack metals. τ Observe safety data sheet. τ Fill the tank (02) with soaking liquid. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Maintenance 5 Cleaning components mechanically 5.4 Page 74 To shorten the soaking time the liquid can be heated to maximum 60 ºC. NOTICE August 2017 Heat the liquid Heating up of cleaning agents and operating fluids WARNING When cleaning agents or operating fluids are heated up, explosive vapours can be produced which are hazardous to health. τ Observe the information in the material safety data sheet. Wear a respiratory mask according to material safety data sheet. CAUTION If water or dirt gets into the cartridge group, the turbocharger function may be impaired and parts in the cartridge group may be damaged. τ Place the cartridge group on suitable wooden or metal supports (01). τ Maintain dimension (B) for the supports (01), so that the cartridge group does not submerge too deep. HZTL2412_EN Water and dirt in the cartridge group Revision F τ Allow the layers of dirt on the turbine to soak for four hours. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Maintenance 5 Cleaning components mechanically 5.4 Page 75 August 2017 Removing the dirt Health hazard due to soot particles WARNING If soot particles enter the eyes or respiratory tract, this can be harmful to health. τ Avoid the formation of dust. τ Vacuum up dust with a suitable vacuum cleaner. τ Wear a respiratory mask to protect against particles (P1 or P2 mask). τ Wear safety goggles. Wear safety goggles. Wear a respiratory mask to protect against dusts. Wear safety gloves to protect against mechanical hazards. τ Remove dirt manually with a soft brush or wire brush. Revision F HZTL2412_EN τ Raise the cartridge group and align horizontally. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 5 Cleaning components mechanically 5.4 Page 76 Water and dirt in the cartridge group CAUTION If water or dirt gets into the cartridge group, the turbocharger function may be impaired and parts in the cartridge group may be damaged. τ Make sure that water or dirt does not get into the gap between the partition wall and turbine. August 2017 Maintenance Non-permissible rotor unbalance after cleaning CAUTION Unevenly distributed residual contamination deposits lead to rotor unbalance. This can result in bearing or turbocharger damage. τ Remove all traces of contamination from the turbine. τ After brushing off the contamination, fill the tank (02) with clean water, not salt water. loose particles of dirt detach completely. τ Raise the cartridge group and align horizontally. τ Clamp the partition wall with the bearing casing. τ Dry the turbine and the gap between the turbine and partition wall with HZTL2412_EN τ Submerge the turbine of the cartridge group in clean water, so that a weak jet of compressed air. τ Lightly spray the turbine and the gap between the turbine and partition wall with penetrating oil. τ Dispose of dirty water and cleaning agent in accordance with the spec- Revision F ifications in the safety data sheet. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Troubleshooting 6 Malfunctions when starting 6.1 Page 77 August 2017 6 Troubleshooting 6.1 6.1 Malfunctions when starting Sluggish start-up Possible causes Elimination Turbocharger Turbocharger contaminated Clean it Damaged bearing Contact an ABB Turbocharging Service Station Rubbing rotor Foreign object in turbocharger HZTL2412_EN Vibrations Possible causes Elimination Turbocharger Contact an ABB Turbocharging Service Station Rotor unbalance Damaged turbine or compressor Damaged bearing Rubbing of rotating parts Normal behaviour, no malfunction Revision F Turbocharger © Copyright 2016 ABB. All rights reserved. Minor uniform wear around the periphery of rotor components, caused by slight local rubbing of adjacent components, is permissible. The compressor blades and turbine blades are then shortened somewhat. Certain tolerances must be observed to avoid a significant loss of efficiency. € If there is any doubt about the extent of rubbing, then an ABB Turbocharging Service Station must be contacted. € Have a dimension check carried out by an ABB Turbocharging Service Station. Operation Manual / TPS44-F.. - TPS61-F.. 6 Surging of the turbocharger 6.2 Page 78 6.2 Surging of the turbocharger Turbocharger surging Possible causes Elimination Engine Guard in front of the turbocharger is contaminated or damaged Clean / replace it Turbocharger Filter silencer or diffuser con- Clean it taminated August 2017 6.2 Troubleshooting Heavy deposits of dirt in the turbine or nozzle ring Charge air cooler Cooler contaminated Clean it Charge air duct blocked CAUTION Possible damage to components, such as the compressor wheel, turbine blades, bearings and filter silencer τ Have the cause clarified immediately by an ABB Turbocharging service station and rectified. τ Have components inspected for damage and, if necessary, replaced by an ABB Turbocharging service station. HZTL2412_EN Prolonged or periodic surging Sporadic surge blows € A surge blow is accompanied by a loud bang and escape of hot air from the filter silencer. © Copyright 2016 ABB. All rights reserved. Revision F Surging of the turbocharger can occur during certain operating conditions such as when reducing the engine performance quickly when manoeuvring. At the same time, the flow direction in the compressor is momentarily reversed. Such sporadic surge blows do not impair the safe operation of the turbocharger. Operation Manual / TPS44-F.. - TPS61-F.. August 2017 6.3 Troubleshooting 6 Malfunctions during operation 6.3 Page 79 6.3 Malfunctions during operation Lubricating oil pressure too low Possible causes Elimination Engine Oil filter heavily contaminated Clean it Defective oil pump in lubricating system Check / replace it Manometer display wrong Replace the manometer Turbocharger Rotor axial clearance too large Contact an ABB Turbocharging Service Station HZTL2412_EN Reduction in speed Possible causes Elimination Engine Defects of connected cylinders when pulse charging Contact the enginebuilder Turbocharger Heavy contamination of the turbine Clean it Damaged rotor components or Contact an ABB Turbocharging bearing Service Station Pipes Defects such as leaks in the exhaust gas pipes or charge air ducts Make repairs Increase in speed Possible causes Revision F Turbocharger © Copyright 2016 ABB. All rights reserved. Elimination Heavily contaminated nozzle Contact an ABB Turbocharging ring (with 4-stroke application) Service Station Operation Manual / TPS44-F.. - TPS61-F.. Troubleshooting 6 Malfunctions during operation 6.3 Page 80 Engine performance and engine speed unchanged Possible causes Elimination Engine Malfunctioning injection system Repair it or contact the manufacturer Turbocharger Air starvation, for example filter silencer clogged with dirt Clean it August 2017 Exhaust gas temperature too high Clean or repair the boiler or exhaust silencer Damaged or eroded turbine Contact an ABB Turbocharging Service Station Cooler contaminated Clean it Cooling water volume too low Top up the water Entry temperature of cooling water too high Inspect / clean the cooling system Inadequate ventilation Improve the ventilation Revision F Charge air cooler Exhaust counterpressure too high HZTL2412_EN Compressor / turbine contaminated © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Troubleshooting 6 Malfunctions during operation 6.3 Page 81 August 2017 Charge air pressure too low Engine performance and engine speed unchanged, air intake condition normal Possible causes Elimination Engine Make repairs Air receiver leaking Gas piping between the engine and the turbine leaking Poorly adjusted injection system Correct it Poorly adjusted valve control Turbocharger Manometer display wrong Replace the manometer Line to manometer leaking Repair the leak Contaminated filter silencer caus- Clean it ing excessive loss of pressure Compressor / turbine contaminated HZTL2412_EN Damaged compressor / turbine Contact an ABB Turbocharging Service Station Exhaust counterpressure too high Clean or repair the boiler or exhaust silencer Charge air pressure too high Revision F Engine performance and engine speed unchanged, air intake condition normal Possible causes Elimination Engine Malfunctioning injection system Repair it or contact the manufacturer Poorly adjusted injection system Correct it Engine performance higher than expected Check engine performance Manometer display wrong Replace the manometer Turbocharger © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Troubleshooting 6 Malfunctions during operation 6.3 Page 82 Reduced compressor performance/efficiency, hence engine performance losses Possible causes Remedy Turbocharger Heavy fouling of the compressor components Clean compressor Increased vibrations, compressor blade damage Correct the feed of ventilation gases according to instructions of enginebuilder. August 2017 Fouling of the compressor due to the feeding in of ventilation gases Optimize oil separation Possible causes Remedy Turbocharger Check the fuel and its corrosive components, and change fuel if necessary. Revision F Material of compressor wheel corroded HZTL2412_EN Reduced fatigue strength of the compressor wheel, compressor blade failure. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. August 2017 6.4 Troubleshooting 6 Malfunctions when stopping 6.4 Page 83 6.4 Malfunctions when stopping Noises during run-down Possible causes Elimination Turbocharger Turbocharger contaminated Clean it Damaged bearing Contact an ABB Turbocharging Service Station Rubbing rotor Foreign object in turbocharger Run-down time too short Possible causes Elimination Turbocharger Turbocharger contaminated Clean it Damaged bearing Contact an ABB Turbocharging Service Station HZTL2412_EN Rubbing rotor Revision F Foreign object in turbocharger © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 6 Speed measurement system 6.5 Page 84 6.5 Speed measurement system Possible causes No signal or amplitude is poor Elimination Fitting error The screw plug for the sensor is fitted with an additional gasket (copper ring). When fitting the speed sensor, this gasket must be removed. If the gasket is fitted by mistake, the distance from the sensor tip to the signal-generating sealing disc increases. As a result, the voltage amplitude of the speed signal decreases, which can cause problems for the evaluation electronics. This problem is eliminated by removing the gasket. August 2017 6.5 Troubleshooting Contaminated sensor tip The sensor tip is magnetic and can thus attract metal particles. As a result, the distance to the signal-generating sealing disc is reduced, which can lead to amplification of the noise component and consequently to faulty triggering. Dismantle the sensor, clean its tip and refit the sensor using the specified tightening torque. Measured speed too low -- Contact an ABB Turbocharging Service Station Other sources of errors -- If none of the above measures eliminates the malfunction, we recommend that you have the speed measuring system inspected by an ABB Turbocharging Service Station. Revision F Measured speeds too high HZTL2412_EN Defective sensor Contact an ABB Turbocharging Service Station © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Removal and installation 7 Transport 7.1 Page 85 Revision F HZTL2412_EN August 2017 7 Removal and installation 7.1 7.1 Transport Suspension of uninsulated turbocharger Turbocharger with oil-cooled bearing casing Complete turbocharger with gas outlet casing Suspension of insulated turbocharger Turbocharger with oil-cooled bearing casing © Copyright 2016 ABB. All rights reserved. Complete turbocharger with gas outlet casing Operation Manual / TPS44-F.. - TPS61-F.. 7 Turbocharger weights 7.2 Page 86 7.2 Turbocharger weights Lifting gear with a sufficient load limit must be used for removing and installing the turbocharger. The following weight specification is the heaviest possibility. This guide value can differ from data on the rating plate, depending on the specification. TPS44 [kg] TPS48 [kg] TPS52 [kg] TPS57 [kg] TPS61 [kg] 120 180 250 410 650 August 2017 7.2 Removal and installation Revision F HZTL2412_EN Turbocharger weights © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. August 2017 7.3 Removal and installation 7 Remove the turbocharger 7.3 Page 87 7.3 Remove the turbocharger τ Disconnect all exhaust gas and air lines according to the instructions of the enginebuilder. Version with water-cooled bearing casing: τ Disconnect the water pipes according to the instructions of the en- HZTL2412_EN ginebuilder. If present, remove hard insulation as follows: τ Remove screws and sheet metal (B) from the bearing casing insula- tion. τ Remove the remaining screws from the bearing casing insulation (A). τ Pull the bearing casing insulation up and off. The bearing casing insu- lation can be compressed to facilitate the removal process. Revision F τ Unplug the cable connector from the speed sensor. τ Attach lifting gear to bearing casing. τ If a gas outlet bend is present, sling lifting gear around it or secure it to the lifting gear with a swivel lifting eye (C). τ Loosen the fixing screws (D) on the bearing casing. τ Lift the turbocharger from the engine and put it down. τ Cover oil connections. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 7 Installing the turbocharger 7.4 Page 88 τ Visually inspect O-ring gaskets of oil supply and drain pipe (O-ring gaskets for engine are not delivered by ABB Turbo Systems). **) When the turbocharger is mounted on the engine support, the bolt threads and screw heads must be lightly oiled (assumed friction coefficient µ = 0.12 for tightening torque) Product Through hole in bearing casing [mm] Thread size [mm] Tightening torque [Nm] Strength class in acc. with DIN/ISO 898 TPS44 17 M16 230 10.9/12.9 TPS48 17 M16 230 10.9/12.9 TPS52 21 M20 455 10.9/12.9 TPS57 21 M20 455 10.9/12.9 TPS61 25 M24 780 10.9/12.9 τ Attach lifting gear to bearing casing. τ If a gas outlet manifold is provided, sling lifting gear around it addition- ally or fasten it to lifting gear using a swivel lifting eye (C) (see also section Transport / Weights). τ Lift turbocharger, place on bracket and align. τ Tighten fixing screws (D) to the bearing casing in accordance with the table above. τ Fasten all gas, water and air lines in accordance with the enginebuild- er's instructions. © Copyright 2016 ABB. All rights reserved. HZTL2412_EN τ Remove covers from oil connections. August 2017 7.4 Installing the turbocharger Revision F 7.4 Removal and installation Operation Manual / TPS44-F.. - TPS61-F.. Removal and installation 7 Installing the turbocharger 7.4 Page 89 August 2017 If present: τ Fit speed sensor and plug in cable connector. τ Adapt and fit bearing casing insulation (A). τ Adapt and fit sheet metal (B) of bearing casing insulation. Version with water-cooled bearing casing: τ Remove the screw plugs from the water connections and fit the water Revision F HZTL2412_EN pipes in accordance with the enginebuilder's instructions. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Introduction 8.1 Page 91 August 2017 8 Disassembly and assembly 8.1 Introduction 8.1 Precondition for the work described below is a turbocharger removed from the engine (refer to the chapter entitled Removal and Installation). Further work HZTL2412_EN CAUTION Only the work described in this Operation Manual may be carried out. Incorrectly performed disassembly and assembly of the cartridge group can lead to serious machine damage. τ ABB Turbo Systems recommends having further work carried out only by trained personnel from an ABB Turbocharging Service Station. Marking casing positions for assembly NOTICE ABB Turbo Systems recommends that the casing positions are marked before disassembling the turbocharger. Identifying assembly devices Not all assembly devices are marked with a part number. They can be identified using the tool list. This list is enclosed in the toolbox. Maintaining assembly devices Revision F WARNING Assembly devices must be checked for damage before and after use. τ Visually check for corrosion, cracks, deformation and wear. τ Don't use damaged assembly devices, but replace them. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Introduction 8.1 Page 92 Before beginning work, ensure that the required customer spare parts sets are available. τ See chapter Spare parts. August 2017 Customer spare parts set Oil orifice τ When disassembling the turbocharger, a fitted oil orifice must not be removed. Tightening torques for turbocharger components Tightening torques for assembly devices of ABB Turbo Systems If nothing else is described, the screws and nuts of the assembly devices must be tightened down firmly. HZTL2412_EN The specified tightening torques of screw connections for turbocharger components must be observed. (See section Table of tightening torques.) Suspended loads WARNING Loads not suspended in compliance with regulations may lead to personal injury or accidents with fatal consequences. τ Attach turbochargers, assemblies or individual components only to lifting gear which is in technically perfect condition and has sufficient load capacity. τ Make sure the load is suspended properly on the crane hook. τ Do not let anyone stand beneath a suspended load. Wear safety helmet. Definition of terms € Suspension point Defined load carrying point on a component or an assembly (blind hole thread, eye, lug). € Assembly device Devices mounted on the turbocharger to create a suspension point. Assembly devices are calculated and designed especially for the de© Copyright 2016 ABB. All rights reserved. Revision F Wear safety gloves to protect against mechanical hazards. Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Introduction 8.1 Page 93 August 2017 fined application. They are not commercially available products. Use assembly / fitting devices only for the applications described. € Lifting gear Equipment for lifting and transporting loads (ropes, chain hoists, cranes). Lifting gear is not supplied by ABB Turbo Systems. Swivel lifting eye to be used A swivel lifting eye is required to lift loads safely (not supplied by ABB). Revision F HZTL2412_EN Swivel lifting eye © Copyright 2016 ABB. All rights reserved. Product Thread Length M L Minimum load limit (loading capacity) TPS44 M8 13 mm 150 kg TPS48 M10 17 mm 250 kg TPS52 M10 17 mm 250 kg TPS57 M12 21 mm 350 kg TPS61 M12 21 mm 500 kg Operation Manual / TPS44-F.. - TPS61-F.. 8 Module weights 8.2 Page 94 TPS44 TPS48 TPS52 TPS57 TPS61 [kg] [kg] [kg] [kg] [kg] Description 1 Filter silencer 15 19 30 40 65 2 Radial air suction branch 5 6 8 11 21 3 Axial air suction branch 3 4 4 6 9 4 Compressor casing 17 24 35 55 90 5 Wall insert 4 7 10 13 30 6 Diffuser 2 2 3 6 10 7 Cartridge group 25 35 50 85 140 8 Nozzle ring 1 1 2 3 6 9 Burst ring 1 2 3 5 12 10 Turbine casing 1 inlet with external 2 inlets burst protection 3 inlets 30 35 50 80 130 30 35 50 90 150 - - 55 95 170 4 inlets - - - 95 170 11 Gas outlet flange 4 4 8 16 30 12 Exhaust manifold 16 18 25 40 60 © Copyright 2016 ABB. All rights reserved. HZTL2412_EN The specified weights of individual parts or assemblies are guides rounded off to the next highest value. August 2017 8.2 Module weights Revision F 8.2 Disassembly and assembly Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Disassembling and assembling turbocharger 8.3 Page 95 8.3 Disassembling and assembling turbocharger August 2017 8.3 Removing the compressor casing Risk of burning WARNING Touching hot surfaces or contact with hot operating materials can lead to serious burns. τ Do not touch hot surfaces and heed the warning plate on the turbocharger. τ Wear heat-resistant safety gloves and protective clothing. τ Allow the turbocharger to cool down before carrying out any work. τ Disconnect all air lines in accordance with the enginebuilder’s instruc- tions. If provided τ Remove the screws for the compressor casing insulation and disman- tle the insulation. Revision F HZTL2412_EN Wear safety gloves to protect against thermal hazards. τ Undo the V-clamp (72020) and remove the filter silencer (81000) or air suction branch (82000). © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Disassembling and assembling turbocharger 8.3 Page 96 If provided τ Loosen and remove the screws for the insulation plates (1, 2). τ If provided: Remove the insulation plates (1, 2). τ Remove the remaining screws for the insulation (3). August 2017 Removing the insulation Revision F HZTL2412_EN τ Remove the insulation (3). © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Disassembling and assembling turbocharger 8.3 Page 97 τ Slightly loosen the screws (72011) and turn the compressor casing HZTL2412_EN August 2017 (72000) until the swivel lifting eye can be fastened to the lifting gear. (77006* only provided with the wall insert with acceleration aid.) NOTICE If the compressor casing cannot be removed easily, it can be pressed off using the press-off tool (90042) against the turbine casing. To do this, the two cover plates (1, 2) must be removed from the hard insulation on the turbine casing. Revision F Axial force CAUTION The press-off tool can generate a high axial force and, if it is not used properly (too much pressure on one side), it can damage the rotor. τ It should thus be used alternately on both sides while avoiding excessive pressure on either side. τ Loosen the screws (72011) and remove them together with the fas- tening strips (72012). τ Move the compressor casing (72000) with the wall insert (77000) care- fully away, doing so horizontally. τ Tap the wall insert (77000) out of the compressor casing using a nylon hammer and remove the O-ring seal (77005). © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Disassembling and assembling turbocharger 8.3 Page 98 τ Fasten lifting beam (90258) to wall insert. τ Fasten swivel lifting eye (a) to lifting beam. HZTL2412_EN τ Remove wall insert (77000) using lifting gear. August 2017 TPS61 wall insert removal Revision F Disassembly of diffuser TPS..-F31/32 / FV31/32 τ Loosen screws (72041) and remove them together with lockwashers (72040) and diffuser (79000) from compressor casing (72000). © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Disassembling and assembling turbocharger 8.3 Page 99 August 2017 Installing compressor casing τ Refit wall insert (77000) and O-ring (77005) in the reverse order. O-rings NOTICE τ Refit diffuser in reverse order. τ Fit compressor housing in reverse order. τ Thoroughly clean fastening strips (72012) before fitting them. Revision F HZTL2412_EN Fitting the diffuser TPS..-F31/32 / FV31/32 Used O-rings must always be replaced with new ones. O-rings are only available as a set (see chapter Spare parts). © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Disassembling and assembling turbocharger 8.3 Page 100 τ Check the lifting gear and fasten it to bearing casing (42001). τ Disconnect all lines in accordance with the engine builder's instruc- If provided tions, remove the insulation, remove the turbocharger and compressor casing together with the filter silencer (also see the previous chapter). August 2017 Removing the cartridge group Risk of burning WARNING Touching hot surfaces or contact with hot operating materials can lead to serious burns. τ Do not touch hot surfaces and heed the warning plate on the turbocharger. τ Wear heat-resistant safety gloves and protective clothing. τ Allow the turbocharger to cool down before carrying out any work. ϖ The bearing casing is difficult to loosen. τ Use the press-off tool (90042) against the turbine casing to press off the bearing casing (see the following illustration). HZTL2412_EN Wear safety gloves to protect against thermal hazards. Axial force Revision F CAUTION The press-off tool can generate a high axial force and, if it is not used properly (too much pressure on one side), it can damage the rotor. τ It should thus be used alternately on both sides while avoiding excessive pressure on either side. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 8 Disassembling and assembling turbocharger 8.3 Page 101 August 2017 Disassembly and assembly and withdraw bottom part of service support (90012). If provided τ Remove C-ring (51105). Disassembly of diffuser TPS..-F33 Revision F HZTL2412_EN τ Withdraw nozzle ring (56001) using two extraction devices (90070) τ Mount the cartridge group on the service support (90012) and bolt it down firmly. τ Loosen screw (42008) and remove diffuser (79000) complete with O-ring (42012). τ Measure the axial and radial clearances (see the section Axial and radial clearances). © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Disassembling and assembling turbocharger 8.3 Page 102 O-rings NOTICE Used O-rings must always be replaced with new ones. O-rings are only available as a set (see chapter Spare parts). August 2017 Installing the cartridge group Protruding insulation HZTL2412_EN NOTICE The insulation on the turbine casing may protrude at the gas outlet side. This can be pushed back in with a screw driver. τ Fit the lamellar sealing ring (56005, if present) in the correct slot (see τ Secure the lamellar sealing ring with adhesive tape. τ Insert the nozzle ring (56001) (with the cam facing forwards) into the turbine casing as far as it will go. Align the cam on the nozzle ring with the recesses of the turbine casing and insert it into the turbine casing (51000) as far as it will go. Do not remove the adhesive tape (01). If present τ Insert the C-ring (51105) into the turbine casing and secure with high- vacuum grease. © Copyright 2016 ABB. All rights reserved. Revision F detail A). When doing this, pay attention to correct winding of the lamellar sealing ring (see detail B). August 2017 Operation Manual / TPS44-F.. - TPS61-F.. 8 Disassembling and assembling turbocharger 8.3 Page 103 To ensure the nozzle ring is held in place during operation, it must be clamped between the partition wall and the turbine casing. NOTICE Nozzle ring press fit for single inlet turbine casing HZTL2412_EN Disassembly and assembly τ Calculate the press fit (PD) as shown. If the calculated value (PD) is less than 0.1 mm, an official ABB Turbocharging Service Station must be contacted. NOTICE τ Measure the axial and radial clearances (see the section Axial and ra- Revision F dial clearances). © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 8 Disassembling and assembling turbocharger 8.3 Page 104 August 2017 τ Calculate the press fit (PD) as shown. If the calculated value (PD) is outside ±0.2 mm, an official ABB Turbocharging Service Station must be contacted. NOTICE HZTL2412_EN Nozzle ring press fit for multiple inlet turbine casing Disassembly and assembly τ Measure the axial and radial clearances (see the section Axial and ra- Revision F dial clearances). © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Disassembling and assembling turbocharger 8.3 Page 105 August 2017 Assembly of diffuser TPS..-F33 HZTL2412_EN τ Fasten diffuser (79000) and O-ring (42012) using screw (42008). τ Check lifting gear and fasten to bearing casing (42001). τ Unscrew the cartridge group and lift it out of the service support (90012). τ Apply high-temperature grease to the centering points and screw Revision F threads. τ Remove temporary covers from oil connections. Don't damage or shift gasket rings (A) in the mounting support when fitting the cartridge group. The gasket rings (A) are supplied by the engine builder. CAUTION © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Disassembling and assembling turbocharger 8.3 Page 106 If two turbochargers are mounted on an engine, one with a left-hand and one with a right-hand oil inlet, a pin can be fitted in the bracket as a precaution against incorrect positioning. This pin (B) locates in a correspponing groove in the foot of the bearing casing. August 2017 8 HZTL2412_EN NOTICE Disassembly and assembly τ Fasten the cartridge group using fastening strips (51002), Verbus Ripp® washers (51003) and nuts (51007) (also see the chapter entitled Table of tightening torques). τ Fasten the bearing casing (42001) using the fixing screws (C). τ Tighten the fixing screws (C) to the torques listed in the following table. Product Hole in the bearing casing [mm] Fixing screws C [mm] Tightening torques [Nm] **) TPS44 Ø 17 M16 230 TPS48 Ø 17 M16 230 TPS52 Ø 21 M20 455 TPS57 Ø 21 M20 455 TPS61 Ø 25 M24 780 © Copyright 2016 ABB. All rights reserved. Revision F **) For the assembly of the turbocharger on the engine support, the threads of the screws and screw heads must be lightly oiled (assumed coefficient of friction µ = 0.12 for the tightening torque). Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Disassembling and assembling turbocharger 8.3 Page 107 August 2017 If provided HZTL2412_EN τ Plug in the cable connector (86515) for the speed sensor (86505) and (if provided) fit the insulation plates (1, 2). Removing gas outlet bend and gas outlet flange τ Disconnect all lines in accordance with engine builder's instructions and remove insulation. (See also preceding chapter.) Revision F If provided τ Loop lifting gear around gas outlet bend (51100). τ Remove gas outlet bend (51100) and gasket (52406). Only gas outlet bends from ABB Turbo Systems have the gasket (52406). τ Remove gas outlet flange (52400) and, if fitted, C-ring (52408). © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Disassembling and assembling turbocharger 8.3 Page 108 August 2017 Fitting the gas outlet flange and gas outlet bend τ Fit the gas outlet flange (52400). τ In the case of gas outlet bends (51100) from ABB Turbo Systems: always replace the gasket (52406) (see the chapter entitled Spare parts). HZTL2412_EN τ If provided, fit the C-ring (52408). τ Apply high-temperature grease to contacting surfaces and threads. τ Fit the turbine casing using the nuts (52433) while observing tightening torques specified in the table of tightening torques. If provided τ Fasten the insulation. Revision F τ Attach pipes in accordance with the enginebuilder's instructions. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Axial clearance A and radial clearance B 8.4 Page 109 8.4 Axial clearance A and radial clearance B August 2017 8.4 τ Following removal and before installation of the cartridge group, the axi- al clearance A and radial clearance B must be measured and noted. HZTL2412_EN In order to correctly measure the axial clearance A, the turbine must be raised slightly. NOTICE Risk of injury due to sharp edges on the compressor wheel WARNING The compressor wheel has sharp edges which can cause injuries. τ Wear safety gloves. Wear safety gloves to protect against mechanical hazards. Revision F Axial clearance A and radial clearance B [mm] TPS44 TPS48 TPS52 TPS57 TPS61 A minimum 0.08 0.08 0.10 0.12 0.15 A maximum 0.16 0.16 0.18 0.21 0.25 B minimum * 0.51 0.50 0.61 0.72 0.81 B maximum * 1.00 1.00 1.15 1.31 1.55 * Permissible B clearances for standard radial bearings. If the clearances measured on TPS57 or TPS61 are outside the permissible range, this can indicate radial bearings with a special bearing geometry. Different permissible values are valid for radial bearings with a special bearing geometry (see the table below). © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Axial clearance A and radial clearance B 8.4 Page 110 August 2017 Identifying radial bearings with a special bearing geometry If one run-out time is at least 1.5 times longer than the other, then radial bearings with a special bearing geometry are installed. The following B clearances are valid for these special bearings. TPS57 TPS61 B minimum 0.46 0.52 B maximum 0.73 0.82 HZTL2412_EN The type of bearing can be determined by measuring the rotor run-out time. To do so, the rotor must be pushed by hand, once to the left (L) and once to the right (R), with a force as close to the same in both directions. The resulting run-out times until the rotor comes to a stop are measured for the anticlockwise and clockwise rotations and then compared. With standard radial bearings, the run-out time for anticlockwise and clockwise rotating rotors is the same. Clearances out of tolerance Revision F CAUTION Clearances out of tolerance and excessively worn components can be the cause of serious damage to machinery and property. τ Have components assessed and, if necessary, replaced by an ABB Turbocharging Service Station. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 8 Radial clearances N and R 8.5 Page 111 8.5 Radial clearances N and R August 2017 8.5 Disassembly and assembly N and R The minimum and maximum values result from the manufacturing tolerances of the compressor wheel and turbine wheel or the wall insert and gas outlet flange. Feeler gauge Revision F HZTL2412_EN These are the theoretical values of the radial clearance between the compressor wheel and the wall insert and / or turbine wheel and the gas outlet flange. © Copyright 2016 ABB. All rights reserved. N1 and N2 as well as R1 and R2 are each measured at the same time using two feeler gauges. To measure N1 and N2, the feeler gauges must be pushed between the wall insert and the compressor wheel free of play, in each case above and below. To measure R1 and R2, the feeler gauges must be pushed between the gas outlet flange and the turbine free of play, in each case above and below. Operation Manual / TPS44-F.. - TPS61-F.. Disassembly and assembly 8 Radial clearances N and R 8.5 Page 112 August 2017 Measuring N and R Radial clearances N and R Product N [mm] R [mm] TPS44 0.15 … 0.49 0.36 … 0.67 TPS48 0.22 … 0.58 0.47 … 0.77 TPS52 0.30 … 0.67 0.59 … 0.92 TPS57 0.40 … 0.86 0.75 … 1.11 TPS61 0.50 … 0.94 0.90 … 1.32 Clearances out of tolerance Clearances out of tolerance and excessively worn components can be the cause of serious damage to machinery and property. τ Have components assessed and, if necessary, replaced by an ABB Turbocharging Service Station. Revision F CAUTION HZTL2412_EN The mean values measured must be within the permissible values of the radial clearance N and R. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 8 Table of tightening torques 8.6 Page 113 8.6 Table of tightening torques HZTL2412_EN August 2017 8.6 Disassembly and assembly The following tightening torques must be observed for the specified screw connections: Position Part number TPS44 TPS48 TPS52 TPS57 TPS61 1 72020 60 60 60 60 60 2 42008 6 10 10 20 20 5 52433 20 20 40 65 65 6 51007 25 25 45 75 75 9 72011 35 35 70 105 170 10 86505 15 15 15 15 15 Revision F Tightening torques [Nm] © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Taking out of operation 9 Shutting down the turbocharger 9.1 Page 115 August 2017 9 Taking out of operation 9.1 9.1 Shutting down the turbocharger If the turbocharger is damaged and the engine can be shut down for only a short time for emergency repairs, proceed as follows: τ Fit the cover plate. Always heed precisely the engine builder's instructions in case of engine operation with a blocked / throttled turbocharger! CAUTION HZTL2412_EN Dismantling the turbocharger Revision F τ Dismantle the turbocharger (see the section Dismantling and fitting the turbocharger). τ Do not dismantle the nozzle ring. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Taking out of operation 9 Shutting down the turbocharger 9.1 Page 116 HZTL2412_EN August 2017 Fitting the cover plate τ Close the opening in the turbine casing using the cover plate (A). τ Fasten the cover plate on the turbine casing (51000) using the fas- tening strips (51002), Verbus Ripp® Verbusripp washers (51003) and nuts (51007) and screw it down securely on the support. Thoroughly clean the fastening strips (51002) before fitting them. Apply high-temperature grease to the stud threads (51006). Revision F NOTICE © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Taking out of operation 9 Shutting down the turbocharger 9.1 Page 117 The cover is not supplied by ABB Turbo Systems and must be manufactured by the operator according to the following drawing. Material: Common structural steel, according to DIN EN 10025-2 Revision F HZTL2412_EN August 2017 Cover plate drawing Product B1 ±0.5 B2 B3 B4 ±0.2 B5 B6 TPS44 62.6 54 110 11.0 1 144 TPS48 65.7 60 130 11.7 1.5 150 TPS52 79.6 78 155 14.2 1.5 180 TPS57 98.2 100 190 17.2 2 220 TPS61 116.8 120 226 20.5 2.4 260 Product B7 ØD1 ±0.2 ØD1* ±0.2 ØD2 R1 M 191.3 191.3 17 ≤88 M8 TPS44 TPS48 35.7 222.7 227.7 17 ≤105 M8 TPS52 39.6 265.7 271.7 21 ≤125 M8 TPS57 48.2 325.7 332.5 21 ≤153 M10 TPS61 56.8 387.7 395.9 25 ≤182 M10 Dimensions in [mm] © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Taking out of operation 9 Shutting down the turbocharger 9.1 Page 118 Information about the turbine casing design (with / without C-ring sealing) can be requested from an ABB Turbocharging Service Station. August 2017 *) Diameter for turbine casing designs for optional C-ring sealing Revision F HZTL2412_EN NOTICE © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Mothballing the turbocharger 10 Taking the engine out of operation for up to 12 months 10.1 Page 119 August 2017 10 Mothballing the turbocharger 10.1 10.1 Taking the engine out of operation for up to 12 months Condition of engine lubricating oil The turbocharger normally remains mounted on the engine. Mothballing a turbocharger depends on the condition of the lubricating oil: € If the total acid number (TAN) is lower than 2 mg KOH/g, no measures have to be taken. HZTL2412_EN € If the engine lubricating oil is replaced by preserving oil before taking the engine out of operation and this is circulated by the pre-lubrication pump, no measures have to be taken. Any remaining old engine oil will therefore be flushed away and the bearing sections largely protected against corrosion. Mothballing measures Handling operating materials and supplies WARNING Swallowing or inhaling vapours of operating materials and supplies or contact with them may be harmful to health. τ Do not breathe in these substances and avoid contact with the skin. τ Ensure proper ventilation. τ Observe the information in the material safety data sheet for the operating materials and supplies. τ Wear personal protective equipment (PPE) according to the material safety data sheet. τ Comply with local legislation. Revision F Wear safety goggles. Wear safety gloves to protect against chemical hazards. Wear a respiratory mask to protect against gases. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 10 Taking the engine out of operation for up to 12 months 10.1 Page 120 If the total acid number (TAN) is greater than 2 mg KOH/g, the following mothballing measures are necessary after taking an engine out of operation: τ Dismantle the turbocharger. τ The rotor and the bearing parts must be removed by an official ABB Turbocharging service station and refitted afterwards. August 2017 Mothballing the turbocharger τ Clean all parts. τ Machined, bright surfaces of steel and cast parts must be oiled with anticorrosive oil. τ Reassemble complete turbocharger. Rotor turning in stack draught If the rotor turns as a result of the stack draught: τ Install blind flange between compressor casing outlet flange and Revision F HZTL2412_EN charge air duct. © Copyright 2016 ABB. All rights reserved. August 2017 Operation Manual / TPS44-F.. - TPS61-F.. 10.2 Mothballing the turbocharger 10 Taking the engine out of operation for more than 12 months 10.2 Page 121 10.2 Taking the engine out of operation for more than 12 months If the engine is taken out of service, the following alternatives are possible with the turbocharger: € The turbocharger remains mounted on the engine. € The turbocharger casing remains mounted on the engine, but the rotor and the bearing parts are removed and stored separately by an ABB Turbocharging Service Station. € The turbocharger is removed completely, either as a whole or in individual parts. HZTL2412_EN See the section Taking out of operation for up to 12 months, under Mothballing measures, for the measures always necessary when mothballing turbocharger parts. If the turbocharger remains mounted on the engine, refer to the section Taking out of operation for up to 12 months, under Rotating the rotor in stack draught. If the entire turbocharger is removed, or if the turbocharger is reassembled from the individual components thereof: τ Close all turbocharger openings using wooden covers and paraffin paper. Revision F Suitable storage locations are only dry rooms where the relative humidity is between 40 … 70 % and no condensation can form. Condition of the mothballed turbocharger τ Check the mothballed turbocharger parts for corrosion once per an- num. τ If there are signs of rust: Clean parts thoroughly and renew protection against corrosion. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Disposing of turbocharger components 11 Taking the engine out of operation for more than 12 months 10.2 Page 123 August 2017 11 Disposing of turbocharger components Handling damaged thermal insulation WARNING Damaged thermal insulation can lead to dust exposure. The glass fibres can cause mechanical irritation of the eyes, skin, and respiratory tracts. τ Avoid the formation of dust. τ Vacuum up dust with a suitable vacuum cleaner. τ Wear a respiratory mask to protect against particles (P1 or P2 mask). τ Wear work gloves made of leather. Wear safety goggles. Wear a respiratory mask to protect against dusts. HZTL2412_EN Wear safety gloves to protect against mechanical hazards. Disposal must be environmentally compatible, professional, and in compliance with locally applicable regulations. The turbocharger consists largely of metal (cast iron materials, steel, nickel-steel alloys, aluminium and bearing brass). Further components are: Non-metallic materials (filter components of felt and polyethylene), lubricants (engine oil), electronic parts (speed sensor and associated components), and thermal insulation. τ Dispose of metals as scrap metal for recycling. τ Dispose of non-metallic materials as waste. τ Dispose of residues of lubricants as waste oil. τ Dispose of electronic components as electronic waste. Revision F τ Dispose of thermal insulation as hazardous waste. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. Spare parts 12 Ordering spare parts 12.1 Page 125 August 2017 12 Spare parts 12.1 12.1 Ordering spare parts When making inquiries or ordering spare parts, the following data must be specified: € Turbocharger type € Serial number (HT……) € Description and part number Spare parts can be ordered from an official ABB Turbocharging Service Station. τ If different design versions have not been taken into consideration in HZTL2412_EN this document, please contact an ABB Turbocharging Service Station. Storage of spare parts CAUTION All spare parts ordered with the turbocharger must be kept complete and ready for use. τ Parts showing signs of rust should be carefully cleaned and greased. τ Dispose of replaced and unusable parts in a professional and envi- ronmentally compatible way. Customer spare part set (97070) The customer spare part set (97070) is required for the work described in this manual. Description Part number 1 Socket screw 42008 1 O-ring 42012 1 Gasket 52406 * 1 O-ring 77005 2 Counter-sunk screw 72041 1 O-ring 81010 / 82010 Revision F Quantity * This gasket can be used only when using a gas outlet casing from ABB Turbo Systems. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. 12 View of turbocharger showing part numbers 12.2 Page 126 12.2 View of turbocharger showing part numbers Revision F HZTL2412_EN August 2017 12.2 Spare parts © Copyright 2016 ABB. All rights reserved. Revision F HZTL2412_EN August 2017 Operation Manual / TPS44-F.. - TPS61-F.. Spare parts 12 View of turbocharger showing part numbers 12.2 Page 127 Part number Description 10900 Cartridge group 42008 (in customer spare part set) Socket screw 42012 (in customer spare part set) O-ring 51000 Turbine casing 51002 Fastening strips 51100 Exhaust bend 51105* Metal C-ring 52400 Gas outlet flange 52406 (in customer spare part set) Gasket 52408* Metal C-ring 56001 Nozzle ring 57200 Burst protection 57210 Burst ring 72000 Compressor casing 72011 Socket screw 72012 Fastening strips 72020 V-clamp 72041 (in customer spare part set) Counter-sunk screw with cross slotted head 77000 Wall insert 77005 (in customer spare part set) O-ring 79000 Diffuser 81000 Filter silencer 81010 (in customer spare part set) O-ring 82000 Axial air suction branch 82010 (in customer spare part set) O-ring 86505(A)* Speed sensor (cable not integrated) 86505(B)* Speed sensor (cable integrated) 86515(A)* Cable connector for 86505(A) 86515(B)* Cable connector for 86505(B) 86526* F/I converter 86528* Tachometer * depends on the turbocharger specification. © Copyright 2016 ABB. All rights reserved. Operation Manual / TPS44-F.. - TPS61-F.. View of cartridge group showing part numbers 12.3 Page 128 12.3 View of cartridge group showing part numbers August 2017 12 Revision F HZTL2412_EN 12.3 Spare parts © Copyright 2016 ABB. All rights reserved. Spare parts 12 View of cartridge group showing part numbers 12.3 Part number Description 21000 Shaft 21002 Piston ring 25000 Compressor wheel 32101 Plain bearing bush 32103 Locking ring 32105 Thrust ring 32106 Thrust bearing 32108 Piston ring 32109 Sealing disc 32110 Bearing flange 32111 Auxiliary bearing 32112 Bearing flange 32113 Socket screw 32114 Socket screw 32221 Bearing cover 32222 O-ring 42001 Bearing casing 42002 Socket screw 42008 (in customer spare part set) Socket screw 43001 Partition wall 43012* Metal C-ring Revision F HZTL2412_EN August 2017 Operation Manual / TPS44-F.. - TPS61-F.. © Copyright 2016 ABB. All rights reserved. Page 129 ABB ABB Turbo Systems AG Bruggerstrasse 71a CH-5400 Baden Switzerland
advertisement
Key Features
- Diesel engine application
- Air volume generation
- Charging pressure
- Robust construction
- Safety features
- Engine model compatibility
- Customization options
Frequently Answers and Questions
What is the purpose of ABB TPS57-F32?
The ABB TPS57-F32 is a turbocharger designed for use on diesel engines to generate the air volume and charging pressure needed for efficient operation.
What are the operating limits for the ABB TPS57-F32?
The operating limits for the ABB TPS57-F32 are shown on the rating plate and are specific to the engine and system configuration. These limits include maximum speed, temperature, and replacement intervals for components.
What are the recommended inspection and replacement intervals for the ABB TPS57-F32?
The recommended inspection and replacement intervals for the ABB TPS57-F32 are also shown on the rating plate and are specific to the engine and operating conditions. They are designed to ensure safe and reliable operation.