- Home
- Home furniture
- Outdoor furniture
- Mercia Garden Products
- 0634CSNE0303HGDD2SW-V1
- User manual
- 25 Pages
Mercia Garden Products 0634CSNE0303HGDD2SW-V1 General Instructions Manual
Mercia Garden Products 0634CSNE0303HGDD2SW-V1 is a 3x3m log cabin kit designed for easy assembly. This cabin features half glazed double doors, two short windows, and a sturdy timber frame. It offers a spacious and versatile space for various uses, such as a garden office, a relaxing retreat, or a playhouse for children. With detailed instructions, pre-cut timber components, and a comprehensive parts list, building this cabin is a manageable DIY project.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
▼
Scroll to page 2
of
25
General Instructions Please retain product label and instructions for future reference 0634CSNE0303HGDD2SW-V1 All buildings should be erected by two adults Winter = High Moisture = Expansion Summer = Low Moisture = Contraction For ease of assembly, you MUST pilot drill all screw holes and ensure all screw heads are countersunk. CAUTION Every effort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timber. For ease of assembly use a rubber mallet to fit the log boards. Do NOT use a heavy hammer. Ensure to measure and check before cutting boards. It is advisable to use a hand saw when cutting roof and floor boards. To ensure log boards are even, use a spirit level to check each layer has been installed correctly. Screws & Nails Bolts Measure overall length Measure under the head 34MM LOG CABIN, CORNER STANDARD, NO EXTRAS, 3X3M, HALF GLAZED DOUBLE DOORS, TWO SHORT WINDOWS. BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY - Check the pack and make sure you have all the parts listed. - When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit. - Ensure there is plenty of space and a clean dry area for assembly. TIMBER As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow. BUILDING A BASE When thinking about where the building and base are going to be constructed: Ensure that there will be access (60cm) to all sides for maintenance work and annual treatment. Ensure the base is level and is built on firm ground, to prevent distortion. Refer to diagrams for the base dimensions. The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding ground level to avoid flooding. 2mm Drill bit To identify the fixings required for each step use a measuring tape. TYPES OF BASE - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product. Refer to the instructions pages for your specific product code For assistance please contact customer care on: 01636 821215 Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk P1 0634CSNE0303HGDD2SW-V1 Overall Dimensions: Width = 4425mm Depth = 3316mm Height = 2748mm Please retain product label and instructions for future reference Double Door Contents Roof Assembly 1 9 10 Base Dimensions: Width = 3971mm Depth = 2991mm Roof Assembly 2 Master Door QTY 1 Before assembly please make sure you have a suitable base ready to erect your building (Morticed for lock) AI-06LOGDGMD750X1900-V3 11 Secondary DoorQTY 1 AI-06LOGDGSD750X1900-V3 Door Frame Left Upright - 71x70x2065mm QTY 1 AI-0634LOGDUFL-V3 12 MADE IN GREAT BRITAIN Door Frame Right Upright - 71x70x2065mm QTY 1 AI-0634LOGDUFR-V3 Window Contents 13 Door Frame Top - 84x125x1632mm QTY 1 1 AI-0634LOGDDTF-V3 14 2 Door Frame Bottom - 71x70x1508mm QTY 1 Window Frame Left Upright - 71x70x1412mm QTY 2 AI-0634LOGWUFL-V3 AI-0634LOGDDBF-V3 15 3 Door Strip - 16x60x1880mm QTY 1 S1660-1880mm Window Frame Right Upright - 71x70x1412mm QTY 2 AI-0634LOGWUFR-V3 16 4 17 Adjustable Hinge QTY 6 PI-07-0209 17a 17b 17c Window Frame Top - 84x125x805mm QTY 2 AI-0634LOGWTF-V3 Window QTY 2 AI-06LOGDGW684X1244-V3 6 Rain Guard QTY 1 RG2844-1520 (28x44x1520mm) 5 Window Frame Bottom - 71x70x805mm QTY 2 AI-0634LOGWBF-V3 18 7 Rain Guard QTY 2 RG2844-710 (28x44x710mm) Flag Hinge QTY 4 PI-07-0211 8 21 20 19 Casement Stay QTY 2 PI-07-0187 Handles (Pair) QTY 1 PI-07-0188 Mortice Lock QTY 1 PI-07-0017 Key Plate QTY 1 PI-07-0017 Tower Bolt QTY 2 PI-07-0114 P2 Please retain product label and instructions for future reference 22 Starter Board - 34x66x2191mm QTY 1 Log Board - 34x120x1632mm QTY 7 LB34RT66-AGLR-2191 (1x45 deg cut top, 1x45 deg cut bottom) 23 Log Board - 34x120x311mm QTY 18 Log Board - 34x120x311mm QTY 17 37 Log Board - 34x120x1632mm QTY 1 50 38 Finisher Board - 34x64x1632mm QTY 1 AI-06LOGC3RTC-V1 (2X76 deg parallel cuts, 1x45 deg mid right) 51 Roof Truss D- 40x140x1604mm QTY 1 LB34-AH64GR-1632 (64mm high board, 1x45 deg deep cut right) Log Board - 34x60x311mm QTY 1 39 Finisher Board - 34x64x3000mm QTY 1 LB34-AH64-3000 (64mm high board) Log Board - 34x70x311mm QTY 1 LB34-BH70GR-311 (1x45 deg cut right bottom notch, 70mm height board) 40 52 Roof Purlin - 45x120x1523mm QTY 1 F45120-B-1523 Starter Board - 34x66x3000mm QTY 1 *If you are constructing a 5x3 cabin you will not need this part - see 5x3 instructions for correct part* LB34RT66-A-3000 27 Log Board - 34x120x2191mm QTY 1 LB34-J-2191 (1x45 deg cut left, 1x45 deg cut right top notch) 41 Log Board - 34x120x3000mm QTY 40 Log Board - 34x120x2191mm QTY 1 LB34-JD-2191 (1x45 deg cut left, 1x45 deg cut right top notch, door notch) 42 Finisher Board - 34x80x1945mm QTY 1 Log Board - 34x120x441mm QTY 24 LB34-B-441 43 30 Bearer - 44x58x2692mm QTY 6 F4458-2692-PT Finisher Board - 34x80x676mm QTY 1 Bearer - 44x58x2472mm QTY 1 F4458-G-2492-PT (1x45 deg cut, 2472mm finished) LB34RG80-CGL-676 (2x45 deg cut right, 677mm finished) LB34-BGR-441 (1x45 deg cut right) 44 56 Bearer - 44x58x2194mm QTY 1 F4458-G-2214-PT (1x45 deg cut, 2194mm finished) Finisher Board - 34x80x676mm QTY 1 LB34RG80-CGR-676 (2x45 deg cut left, 677mm finished) Log Board - 34x120x441mm QTY 12 57 LB34-BGL-441 (1x45 deg cut left) 45 Starter Board - 34x66x1632mm QTY 1 Finisher Board - 34x80x633mm QTY 6 LB34RG80-C-633 58 Roof Truss - 40x140x922mm QTY 1 LB34-AGL-1632 (1x45 deg cut left) Bearer - 44x58x1638mm QTY 1 F4458-G-1658-PT (1x45 deg cut, 1638mm finished) 46 Log Board - 34x120x1632mm QTY 6 Bearer - 44x58x1916mm QTY 1 F4458-G-1936-PT (1x45 deg cut, 1916mm finished) LB34RT66-AGL-1632 (1x45 deg cut left) 34 54 55 Log Board - 34x120x441mm QTY 12 33 Bearer - 44x58x2808mm QTY 1 F4458-2808-PT LB34RG80-J-1945 (2x61 deg cut, 1945mm finished) 29 32 53 LB34-A-3000 28 31 Roof Truss C- 40x140x1604mm QTY 1 AI-06LOGC3RTD-V1 (2X76 deg parallel cuts, 1x45 deg mid left) LB34-BH60GR-311 (1x45 deg cut right, 60mm height board) 26 AI-06LOGC3RTB-V1 LB34-JDR-1632 (1x45 deg cut right, window notch) LB34-BGR-311 (1x45 deg cut right) 25 Roof Truss B - 40x140x2225mm QTY 1 LB34-AGR-1632 (1x45 deg cut right) LB34-BGL-311 (1x45 deg cut left) 24 49 36 AI-06LOGC3X3-LRT-V1 59 Bearer - 44x58x1398mm QTY 1 F4458-G-1418-PT (1x45 deg cut, 1398mm finished) Log Board - 34x120x1632mm QTY 1 47 Roof Truss - 40x140x922mm QTY 1 LB34-J-1632 (1x45 deg cut left 50mm bottom notch) 35 Log Board - 34x120x1632mm QTY 1 LB34-JDL-1632 (1x45 deg cut left 50mm bottom notch, window notch) AI-06LOGC3X3-RRT-V1 48 Roof Truss A- 40x140x1604mm QTY 5 AI-06LOGC3RTA-V1 60 Bearer - 44x58x1340mm QTY 1 F4458-G-1360-PT (1x45 deg cut, 1340mm finished) 61 Bearer - 44x58x2076mm QTY 1 F4458-G-2116-PT (2x45 deg cut, 2076mm finished) P3 Please retain product label and instructions for future reference 62 71 Fascia - 16x120x3100mm QTY 1 Roof Board Pack A QTY 1 AI-06LOGC3X3-RBP1-V2 SR16120-3100 63 Fascia - 16x120x2225mm QTY 1 *HINT: keep the roof board packs seperate to prevent mixing them up. S16120-2225 64 Fascia - 16x120x2000mm QTY 2 S16120-2000 65 Fascia - 16x120x1658mm QTY 2 S16120-G-1658 (2x14 deg cuts, length 1658) 66 72 Roof Board Pack B QTY 2 AI-06LOGC3X3RBP2-V2 Storm Brace - 27x44x2000mm QTY 8 F2744-2000 67 Closure Trim - 16x28x2400mm (approx length) QTY 14 *HINT: keep the roof board packs seperate to prevent mixing them up. S1628-2400 68 Felt 73 69 Roof Board Pack C QTY 2 AI-06LOGC3X3RBP3-V2 Roof Spacers QTY 5 PI-07-0208 (20x100x2mm) 70 Floor Board Pack AI-0634CSNE0303HGDD2SW-FBP-V1 *HINT: keep the roof board packs seperate to prevent mixing them up. 74 Gable QTY 1 AI-0634LOGC3-G-V1 P4 Please retain product label and instructions for future reference Nail Bag There may be extra screws present in the nail bag 80mm Bolt Set x 16 70mm Screw x 39 120mm Screw x 12 40mm Screw x 666 90mm Screw x 56 30mm Screw x 182 80mm Screw x 24 Felt Tacks x 850 Pre-assembly *Please note: Each board interlocks at either end in a staggered pattern. TO CONSTRUCT A 5M X 3M LOG CABIN PLEASE REFER TO THE 5X3 INSTRUCTIONS. Before securing ensure that the boards are fitted properly in their respective tongues and grooves. P5 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before fixing screws. Step 1 The following steps show how to construct a 3m x 3m corner cabin. To construct a 5m x 3m cabin, please refer to the 5m x 3m instructions. Parts needed - No. 53 QTY 1 No. 54 QTY 1 No. 59 QTY 1 No. 60 QTY 1 No. 61 QTY 1 Lay the bearers (No. 53, 54, 59, 60 & 61) onto a firm and level surface (free from areas where standing water can collect) as shown in the illustration. IMPORTANT: Pre-drill before fixing screws. Arrange the remaining framing (No. 54, 55, 56, 57, 58) as shown in the illustration. 54 35 *Ensure there is an equal amount of space between each frame. 53 Secure each of the frames in place using 2x90mm screws for each end of each bearer, ensuring the bearers remains level. 54 *Ensure the 58mm side of the bearer is laying on the base, so that you can screw the bearers together on the 44mm side. Fix the bearers together at each corner using 10x90mm screws, ensuring the frame is flush. Step 2 Parts needed - No. 54 QTY 5 No. 55 QTY 1 No. 56 QTY 1 No. 57 QTY 1 No. 58 QTY 1 36x90mm Screws 60 Once fully assembled, ensure the bearers are square by measuring from corner to corner, as illustrate, making sure they are an equal measurement. If the bearers are not alligned equally, unscrew and adjust and re-align accordingly. 59 Pre drill hole 90mm screw 61 58 57 56 36 55 54 54 54 54 54 10x90mm Screws Pre drill hole 90mm screw Example picture 2 screws per bearer per end. P6 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before fixing screws. Step 3 Parts Needed - No. 22 QTY 1 No. 32 QTY 1 No. 36 QTY 1 No. 40 QTY 1 No. 41 QTY 1 IMPORTANT: Pre-drill before fixing screws. Step 4 Parts needed - No. 25 QTY 1 Make the log cabin level by adding another board (No. 25) as shown in the diagram. Fix using 1x70mm screw. a Place the starter boards (No. 22, 32, & 40) on to the assembled base frame and place the first two log boards (No.36 & 41) sitting in the notch as shown. **Ensure to stagger the screws so as not to collide with the previous screw. Ensure the boards sit square on the base using the same method used in Step 1. Measure from corner to corner and ensure they are equal in measurement. 25 1x70mm Screws b Once the boards are square, fix the starter boards (No. 22, 32, & 40) in Pre drill hole place, lift up the log boards (No.36 & 41) and fix each starter board in place. 70mm screw Fix each of the starter boards to the frame by screwing through the notch into the frame with 1x70mm screw as shown in the illustration. 5x70mm Screws Pre drill hole 70mm screw 41 40 Step 5 Parts needed - No. 23 QTY 6 No. 24 QTY 6 No. 33 QTY 6 No. 36 QTY 5 No. 41 QTY 11 5th 3rd 36 32 22 4th 2nd 36 22 1st Lay the first 6 boards (No. 23, 24, 33, 36 & 41) onto the starter boards to create your first level, following the method as shown in the illustrated. 41 41 36 23 24 33 Please note the right hand side of the door will be slightly higher. This will even out when the rest has been assembled. *Ensure that the boards are level and flush with each other as you lay each one. Rubber Mallet may be required to fit parts. P7 Please retain product label and instructions for future reference Step 6 Parts Needed - No. 11 QTY 1 No. 12 QTY 1 No. 13 QTY 1 No. 14 QTY 1 IMPORTANT : Pre-drill before fixing screws. Arrange the left, right, top & bottom door frames (No’s. 11, 12, 13 & 14) onto a level surface. Secure the top and bottom frames to the uprights using 2x80mm screw per corner, ensuring the screws do NOT protrude through the front of the door framing. 13 80mm screw 11 12 a a The Adjustable Door Hinge (No.17) comes in three parts. 17b 17a b Place the master and secondary doors (No’s 9 & 10) onto a flat surface and fix the Adjustable door hinge (No.17c) to the doors using 3x30mm screws per hinge. 14 14 IMPORTANT : Pre-drill before fixing screws. Fasten No. 17a into 17b as shown in the illustration. 8x80mm Screws Pre drill hole Step 7 Parts Needed - No. 9 QTY 1 No. 10 QTY 1 No. 17 QTY 6 Fix 3 x Adjustable Door Hinges (No. 17a & b) into position onto the door frame using 4x30mm screws per hinge. 12 The internal lip of the door frame should be postioned on the inside of the building. b 17 *Ensure the hinges are fitted to the external of the door frame so the doors open outwards from the log cabin. Locate the doors into the hinges ensuring there is equal spacing on each side between the doors and door frame, and that the doors open & close freely without restriction. It is important to fit the doors within the frames at this stage so that you can establish the position of the hinges. The hinges come in three parts. Remove the doors from the frame after fitting. 10 Secondary Door 9 Master Door **Ensure to screw into the framing and not into the channel. 42x30mm Screws Pre drill hole 30mm screw P8 Please retain product label and instructions for future reference Step 10 Parts needed - No. 23 QTY 6 No. 24 QTY 6 No. 29 QTY 12 No. 30 QTY 6 No. 31 QTY 6 No. 41 QTY 11 Step 8 To adjust and align your doors: 1. Lift up the doors to separate the two parts of the hinge. 2. Turn the rotating barrel (No.17a) in / out to move the postion of the doors either in or away from each other. 3. You can then place the door(s) back on to the hinge and check the whether they require more / less adjustments, if further adjustments are required repeat number 2. 17a Lay the next 6 boards (No. 23, 24, 29, 30, 31 & 41 ) onto the log cabin to create your second level, following the method as shown in the illustration. 41 41 29 30 23 29 24 31 *Ensure that the boards are level and flush with each other as you lay each one. Rubber Mallet may be required to fit parts. Step 9 Once you have laid 6 log boards (off of the starter) up the door section, slide the assembled door frame over the boards resting the frame on top of the starter board (if you have not yet assembled the door frame refer to step 6) *Please note: This image is for illustrative purposes and may differ from your choice in product (regarding door position). Nevertheless the process of fitting the door frame is the same. P9 Please retain product label and instructions for future reference IMPORTANT : Pre-drill before fixing screws. Step 11 Parts Needed - No. 2 QTY 2 No. 3 QTY 2 No. 4 QTY 2 No. 5 QTY 2 Arrange the left, right, top & bottom window frames (No’s. 2, 3, 4,& 5) onto a firm and level surface. Secure the top and bottom frames to the uprights using 1x80mm screw per corner, ensuring the screws do NOT protrude through the front of the window framing. 4 2 Use this method to construct 2 windows. 5 3 7 1 Repeat this method for both windows 80mm screw 5 IMPORTANT : Pre-drill before fixing screws. Position the window (No. 1) so that it sits centrally within the window frame. Fix the female part of the flag hinge (No. 7) to the window using 4x30mm screws, attach the male part of the flag hinge (No. 7) to the window frame using 4x30mm screws ensuring that the window can open and close freely. *Ensure to attach the hinge to the horizontal frame of the window* 16x80mm Screws Pre drill hole Step 12 Parts Needed - No. 1 QTY 2 No. 7 QTY 4 **It is important to fit the windows within the frame at this stage so that you can establish the position of the hinges. The hinges come in two parts. Remove the window from the frame after fitting. 3 The internal lip of the window frame should be positioned on the inside of the building. 7 7 32x30mm Screws Pre drill hole 30mm screw P 10 Please retain product label and instructions for future reference Step 13 Step 15 Parts needed - No. 26 QTY 1 Once you have laid the second level of boards onto the log cabin slide the windows between the smaller boards and rest on to the longer board (if you have not yet assembled the window frames refer to step 11) Make the log cabin level by adding another right hand board (No. 26) as shown in the diagram. 26 Rubber Mallet may be required to fit parts. *Ensure the boards are level with each end. *Please note: This image is for illustrative purposes and may differ from your choice in product (regarding window position). Nevertheless the process of fitting the window is the same Step 14 Parts needed - No. 23 QTY 6 No. 24 QTY 5 No. 29 QTY 12 No. 30 QTY 6 No. 31 QTY 6 No. 41 QTY 12 Lay the next 6 boards (No’s. 23, 24, 29, 30, 31 & 41) onto the log cabin, following the method as shown in the illustration, bringing the board level to the top of the window and door frames. Please note when you get to the top of the boards the right hand boards will be slightly lower. **Ensure that the boards are level and flush with each other as you lay each one. Step 16 Parts needed - No. 28 QTY 1 No. 35 QTY 1 No. 37 QTY 1 No. 41 QTY 2 41 41 29 30 29 23 24 31 41 41 Lay the next layer of boards (No.28, 35, 37 & 41) onto the log cabin, following the method as shown in the illustration, bring- 37 ing the board level above the window and doors. *Ensure that the boards are level and flush with each other as you lay each one. 28 35 Rubber Mallet may be required to fit parts. Rubber Mallet may be required to fit parts. P11 Please retain product label and instructions for future reference Step 18 Parts needed - No. 38 QTY 1 No. 39 QTY 1 Step 17 Parts needed - No. 27 QTY 1 No. 34 QTY 1 No. 36 QTY 1 No. 41 QTY 2 Lay the next layer of boards (No. 27, 34, 36 & 41) onto the log cabin, following the method as shown in the illustration. *Ensure that the boards are level and flush with each other as you lay each one. Rubber Mallet may be required to fit parts. 41 41 36 27 34 Lay the Finisher Boards (No. 38 & 39) onto the front of the log cabin to bring the boards level. Fix into position with 2x70mm screws per board by screwing through the notches. IMPORTANT: Pre-drill before fixing screws. 39 38 *Ensure that the boards are level and flush with each other as you lay each one. 4x70mm Screws Pre drill hole 70mm screw Rubber Mallet may be required to fit parts. P 12 Please retain product label and instructions for future reference Step 19 Parts needed - No. 74 QTY 1 ** Please Note: You can place your gable on either side of the log cabin, dependant on your needs. (See Contents page for reference) IMPORTANT: Pre-drill before fixing screws. Roof Assembly 1 74 Step 20 Parts needed - No. 50 QTY 1 No. 51 QTY 1 No. 52 QTY 1 IMPORTANT: Pre-drill before fixing screws. Roof Assembly 1 Align the Roof Purlin (No. 52) into the cut out slots on the gable, ensuring the purlin interlocks the boards. Please ensure to construct your Roof by following either ‘Roof Assembly 1’ or ‘Roof Assembly 2’, dependant on which side you place the Gable. 52 Rubber Mallet may be required to fit parts. Place the gable top (No. 74) onto the log cabin. Fix into position by screwing through the notches as shown in the illustration. *Ensure that the boards are level and flush with each other as you lay each one. 2x120mm Screws Pre drill hole 120mm screw Rubber Mallet may be required to fit parts. Roof Assembly 2 74 Roof Assembly 2 52 P 13 Please retain product label and instructions for future reference Step 21 - Roof Assembly 1 Parts needed - No. 48 QTY 1 No. 50 QTY 1 No. 51 QTY 1 IMPORTANT: Pre-drill before fixing screws. Roof Assembly 1 52 Place the Central roof Truss ‘ Roof Truss D (No.51) flush to the end of the Roof Purlin (No. 52) 50 Place Roof Truss C (No.50) and Roof Truss A (No.48) onto either side of the Roof Purlin (No.52) ensuring they sit flush to the end, creating a ’T’ shape as shown in the illustration. 51 90mm screw Roof Assembly 1 52 48 49 50 Fix in place by screwing into the purlin at an angle as shown in the illustration using 1x90mm screw. 51 *Ensure to stagger screws to avoid screws colliding. 52 1x90mm Screws 48 48 51 Pre drill hole IMPORTANT: Pre-drill before fixing screws. Place ‘Roof Truss B’ (No. 49) between Roof Truss A (No.48) and the Central Roof Truss (Truss D for Roof Assembly 1, and Truss C for Roof Assembly 2) as shown in the illustartion. 48 Fix in place by screwing through the truss into the Purlin at an angle, as shown in the illustration using 1x90mm screw per truss. 3x90mm Screws Step 22 Parts needed - No. 49 QTY 1 Pre drill hole 50 Rubber Mallet may be required to fit parts. 49 90mm screw 51 50 Rubber Mallet may be required to fit parts. Step 21 - Roof Assembly 2 Parts needed - No. 48 QTY 1 No. 50 QTY 1 No. 51 QTY 1 Please note: You can adjust the blocks attached to the roof truss’ if necessary. Roof Assembly 2 48 Place the Central roof Truss Roof Truss C (No.50) flush to the end of the Roof Purlin (No. 52) 52 Roof Assembly 2 48 Please note: You can adjust the blocks attached to the roof truss’ if necessary. Place Roof Truss D (No.51) and Roof Truss A (No.48) onto either side of the Roof Purlin (No.52) ensuring they sit flush to the end, creating a ’T’ shape as shown in the illustration. 50 52 49 51 50 51 Fix in place by screwing through the truss into the Purlin at an angle, as shown in the illustration using 1x90mm screw per truss. 3x90mm Screws 48 48 52 49 51 Pre drill hole 90mm screw 50 Rubber Mallet may be required to fit parts. 51 50 P 14 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before fixing screws. Step 23 Parts needed - No. 48 QTY 3 Place 2x ‘Roof Truss A’ (No. 48) flush to the inside of the gable. Fix in place by screwing into the purlin at an angle as shown in the illustration using 1x90mm screws per Roof Truss. *Ensure to stagger screws to avoid screws colliding. 48 Roof Assembly 1 48 48 90mm screw Secure the shortest Roof Truss’ (No. 46 & 47) to ‘Roof Truss B’ (No.49) as shown in the illustration using 1x90mm screws per truss. IMPORTANT: Pre-drill before fixing screws. Roof Assembly 1 46 *Ensure the angled side of the short truss is flush with the side of the long truss. Then make sure the block under the short truss is flush against the wall of the building. 48 2x90mm Screws Pre drill hole Step 24 Parts needed - No. 46 QTY 1 No. 47 QTY 1 47 *Ensure to stagger screws to avoid screws colliding. Rubber Mallet may be required to fit parts. 2x90mm Screws Pre drill hole 90mm screw 46 Rubber Mallet may be required to fit parts. 47 48 Please note: You can adjust the blocks attached to the roof truss’ if necessary. Please note: You can adjust the blocks attached to the roof truss’ if necessary. Roof Assembly 2 48 Roof Assembly 2 47 46 47 48 46 P 15 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before fixing screws. Step 25 Parts needed - No. 42 QTY 1 No. 43 QTY 1 No. 44 QTY 1 No. 45 QTY 6 Roof Assembly 1 45 45 42mm Place the finisher boards (No. 42, 43, 44 & 45) around the building, locating each board flush to the truss’. Ensure there is at least a 42mm gap between parts No. 45 & 45 on both sides of the log cabin. Some adjustment may required to ensure the roof structure rests correctly. 45 44 45 43 45 be 45 42 Fix in place by screwing into the purlin at an angle as shown in the illustration using 1x90mm screws per Roof Truss. 48 45 48 45 45 4x70mm Screws 2x90mm Screws 14x70mm Screws 70mm screw Some adjustment may be required to ensure the roof structure rests correctly. 45 Roof Assembly 1 Secure the boards (No.45) in place by screwing through the purlin using 1x70mm screw per board, ensuring to stagger the screws to avoid colliding. Secure each board by screwing into the Roof Truss, using 2x70mm screws per board, ensuring to stagger the screws to avoid colliding. Pre drill hole IMPORTANT: Pre-drill before fixing screws. Locate the last two ‘Roof Truss A’ (No. 48) into the 42mm gaps between the finisher boards No.45 & 45 as shown in the illustration. 45 45 Step 26 Parts needed - No. 48 QTY 2 Rubber Mallet may be required to fit parts. 45 Roof Assembly 2 45 42mm Pre drill hole 45 70mm screw 90mm screw Roof Assembly 2 45 45 45 Rubber Mallet may be required to fit parts. 43 45 48 48 44 45 45 42 45 45 45 Please note: You can adjust the blocks attached to the roof truss’ if necessary. P 16 Please retain product label and instructions for future reference Step 27 You can now fix the assembled roof truss’s and Roof Purlin to the log cabin, making sure the attached blocks sit inside the assembly. IMPORTANT: Pre-drill before fixing screws. Roof Assembly 1 Place the first board from each ‘Roof Board Pack’ (A, B, & C ) onto the roof assembly, working around the structure, building each layer of roof boards one by one. Once in position fix the roof truss’ to the log cabin using 1x120mm screw per truss as shown in the diagram. Ensure to stagger screws to avoid colliding. Once you are happy with the fit of the roof boards, fix the boards into place using 2x40mm screws per board, ensuring to fix through the roof board into the truss below. 28x40mm screws Secure the Roof Purlin to the log cabin by screwing through the purlin into the gable using 2x70mm screws Pre drill hole 40mm screw 73 73 Roof Assembly 2 Roof Assembly 1 10x120mm Screws 2x70mm Screws 120mm screw IMPORTANT: Pre-drill before fixing screws. *HINT: keep the roof board packs seperate to prevent mixing them up. Some adjustment may be required to ensure the roof structure rests correctly. Pre drill hole Step 28 Parts needed - No. 71 QTY 1 Pack A No. 72 QTY 2 Pack B No. 73 QTY 2 Pack C C C 72 70mm screw 72 B B C C B 72 A 73 B 72 73 A Roof Assembly 2 71 71 73 73 72 C B C A 52 B 72 C B B 72 73 C 72 A 71 71 Roof Assembly 1 Roof Assembly 2 73 P 17 Please retain product label and instructions for future reference Step 29 Parts needed - No. 71 No. 72 No. 73 *HINT: keep the roof board packs seperate to prevent mixing them up. Continue arranging the Roof Board Packs (A, B, & C) onto the roof assembly, working around the structure, building each layer of roof boards one by one. IMPORTANT: Pre-drill before fixing screws. Roof Assembly 1 *HINT: keep the roof board packs seperate to prevent mixing them up. 73 C 72 B C B A 73 Ensure the roof boards are not laid too close together, use the spacers (No.69) provided to create a 2mm gap. Adjusting the spacing between the boards allows the wood to swell in damp weather. 72 71 84x40mm Screws Pre drill hole Continue arranging the roof board packs (A, B, & C) onto the roof assembly, working around the structure, building each layer of roof boards one by one. IMPORTANT: Pre-drill before fixing screws. Roof Assembly 1 73 C C 72 B B A 73 72 71 Ensure the roof boards are not laid too close together, use the spacers (No.69) provided to create a 2mm gap. Adjusting the spacing between the boards allows the wood to swell in damp weather. Once you are happy with the fit of the roof boards, fix the 2nd, 3rd & 4th boards into place using 40mm screws, ensuring the screws fix through the roof board into the truss below. Repeat this so you have 4 boards screwed down in total on each of the 5 sides. Step 30 Parts needed - No. 71 No. 72 No. 73 Once you are happy with the fit of the roof boards, fix the 5th, 6th & 7th boards into place using 40mm screws, ensuring the screws fix through the roof board into the truss below. Roof Assembly 2 72 73 C 84x40mm Screws B B 40mm screw Repeat this so you have 7 boards high screwed down in total on each of the 5 sides. Roof Assembly 2 73 72 C Pre drill hole 73 71 B B A 72 C 40mm screw C A 73 72 71 P 18 Please retain product label and instructions for future reference Step 31 Parts needed - No. 71 No. 72 No. 73 IMPORTANT: Pre-drill before fixing screws. Step 32 Parts needed - No. 71 No. 72 No. 73 Roof Assembly 1 *HINT: keep the roof board packs seperate to prevent mixing them up. 73 B 73 C B 72 71 A Ensure the roof boards are not laid too close together, use the spacers (No.69) provided to create a 2mm gap. Adjusting the spacing between the boards allows the wood to swell in damp weather. Once you are happy with the fit of the roof boards, fix the 8th, 9th & 10th boards into place using 40mm screws, ensuring the screws fix through the roof board into the truss below. Repeat this so you have 10 boards high screwed down in total on each of the 5 sides. 84x40mm Screws 40mm screw Continue arranging the roof board packs (A, B & C) onto the roof assembly, working around the structure, building each layer of roof boards one by one. 73 C 73 C A The last two boards from Pack C will overhang. 71 72 B 72 B Using a pencil and a straight edge, mark out the line as a guide. Cut along the pencil mark and remove the excess. Place the cut down board’s back onto the roof. Once you are happy with the fit of the roof boards, fix the remaining boards into place using 40mm screws, ensuring the screws fix through the roof board into the truss below. 73 Roof Assembly 2 C 72 B B 73 72 71 Pre drill hole Roof Assembly 1 *HINT: keep the roof board packs seperate to prevent mixing them up. C 72 Continue arranging the roof board packs (A, B & C) onto the roof assembly, working around the structure, building each layer of roof boards one by one. IMPORTANT: Pre-drill before fixing screws. C A Repeat this so you have the rest of the boards screwed down on all of the 5 sides. 140x40mm screws Roof Assembly 2 73 C B B 72 73 72 C 71 A Pre drill hole 40mm screw P 19 Please retain product label and instructions for future reference Step 33 Step 35 Lift each window onto the already existing hooks on the window frame, ensuring the hook and bands connect. Lift each door onto the already existing hooks on the door frame, ensuring the hook and bands connect. *Some adjustment may be required to align properly. *Some adjustment may be required to align properly. Step 34 Parts Needed - No. 8 QTY 2 Fix the casement stay (No. 8) onto the window (No. 1) and the casement stay pins to the window framing using 6x30mm screws. *Ensure the casement stay is centralised on the window. Use this method to fit the casement stays to both the windows. 1 12x30mm Screws Pre drill hole 30mm screw 8 8 P 20 Please retain product label and instructions for future reference Step 36 Parts Needed - No. 18 QTY 1 No. 19 QTY 1 No. 20 QTY 1 a The Mortice Lock is Reversible a Attach the door strip (No. 15) to the back of secondary door using 4x40mm screws as shown in the illustration. a Fit the Mortice lock (No. 19) into the recess in the master door (No. 9) and secure using the screws provided. Attach the Key plate (No. 20) to the secondary door (No. 10) with 4x30mm screws. 20 19 b Fit the door handles (No. 18) and connect with the metalbar to the mortice lock using 8x30mm screws. Ensure the lock mechanism closes correctly. If not, remove the lock and turn the catch around using the small grub screw. *Please note: This image is for illustrative purposes and may differ from your choice in product (regarding ironmongery). Nevertheless the process of fixing the frames is the same. Once components have been fitted, try closing doors to ensure the doors can be closed and the lock works. If your doors do need adjusting please refer to the step 8, if not proceed to step 37 12x30mm Screws Pre drill hole Step 37 Parts Needed - No. 15 QTY 1 No. 21 QTY 2 a b 21 15 b Once fixed, place the Tower Bolts (No. 21) roughly into position and with a pencil mark around the bolt. c 10 9 After marking the bolt onto the frame, drill a hole for the barrel bolt to locate into. c d Following the hole being drilled, place the tower bolts into position and secure using the screws provided. 12x40mm Screws Pre drill hole b 18 40mm screw d 30mm screw P21 Step 38 Parts needed - No. 68 Measure and cut the felt (No.68) using the dimensions given below as a guide. Lay the first piece of felt (1- 1585mmX1000mm) onto the roof as shown (1) and cut down to the individual shape of the roof. Step 39 Parts needed - No. 68 Measure and cut the remaining felt (No.68) using the dimensions given below. 1. Continue this method for each piece of felt (2-8) in the order as shown, ensuring a 50mm overlap between each piece. Secure along the outer edge of each felt section using felt tacks spaced out at approximately 100mm intervals. 5. 8. 4. 2. 7. Roof Assembly 1 4. Secure along the outer edge of each felt section using felt tacks spaced out at approximately 100mm intervals. 3. Roof Assembly 1 250x Felt Tacks 3. 2. 2. Felt tacks 4. 600x Felt Tacks 3. 8. 7. Felt strip dimensions: Felt sheet dimensions: 1 - 1600mm (L) x 1000mm (W) 2 - 2303mm (L) x 1000mm (W) 3 - 1655mm (L) x 1000mm (W) 4 - 3141mm (L) x 1000mm (W) 5 - 1600mm (L) x 1000mm (W) 6 - 820mm (L) x 1000mm (W) 7 - 680mm (L) x 1000mm (W) 8 - 2180mm (L) x 1000mm (W) Lay the fist strip (1- 300mmX200mm) onto the roof as shown (1), ensuring it is overlapping the previously placed sheets. Continue this method for each of the felt strips (2-4) 6. *Ensure there is 50mm of overhanging felt around the base of the roof. Felt tacks Please retain product label and instructions for future reference 1. 6. 1 - 1600mm (L) x 200mm( W) 2 - 2340mm (L) x 200mm (W) 3 - 1700mm (L) x 200mm (W) 4 - 1710mm (L) x 200mm (W) 5. 2. Roof Assembly 2 1. Roof Assembly 2 1. 3. 4. 1 1 2 2 3 3 4 HANDLE WITH CARE 4 HANDLE WITH CARE P 22 Please retain product label and instructions for future reference Step 40 Parts needed - No. 70 QTY 1 IMPORTANT: Pre-drill before fixing screws. Place the floor boards (No. 70) inside the building flush to the log boards on one side. Roof *Measure and cut the closure trims to fit the internal space. *Do NOT secure the boards until the last board has been measured and cut. 70 Following the same method outlined previously measure the gap between the bottom of the tongue (on the last board placed) and the log board. Once in position fix each trim into place by pre drilling a pilot hole and using 6x30mm screws per trim, equally spacing them along the face of the board. 42x30mm Screws Pre drill hole 67 Internal *Measure and cut the closure trims to fit the internal space. Closure Trim 30mm screw *trim to fit 70 **Please note: Mark the final board 2mm under the measurement; This will allow the timber to expand and contract correctly. Step 42 Parts needed - No. 67 QTY 7 Once all the floor boards are in position secure each board into position using 8x40mm screws per board. Once the floor has been laid arrange the closure trim (No. 67) around the outside edge of floor (internally), measure and cut down accordingly to best match the internal space. ***Please Note: Ensure to screw through each of the floor boards into the floor bearers. IMPORTANT: Pre-drill before fixing screws. *Internal view Secure each trim section into place using 6x30mm spaced equally along the board as shown in the illustration. 200x40mm Screws *Do NOT fix the closure trim to the floor boards. Pre drill hole IMPORTANT: Pre-drill before fixing screws. Inside the building place the closure trim (No. 67) against the boarding and align with the roof as shown in the illustration. Continue adding the floor boards (internally) making sure to interlock each individual board. Using a straight edge mark out the measurement onto the last floor board (No. 70) and cut along the length removing the excess. Step 41 Parts needed - No. 67 QTY 7 40mm screw 67 42x30mm Screws *Cut to fit Pre drill hole 30mm screw 67 This is for illustrative purposes only and may differ from your floor. P 23 Please retain product label and instructions for future reference Step 43 Parts needed - No. 62 QTY 1 No. 63 QTY 1 No. 64 QTY 2 No. 65 QTY 2 Attach the first fascias (No.62 & 65) to the back sides of the log cabin, ensuring to trap the felt between the fascia and the building. IMPORTANT: Pre-drill before fixing screws. 65 65 Arrange the storm braces (No. 66) around the building (internally). Place 2x storm braces per side fixing into place using 2x 80mm bolts per brace making sure the washer & nut are tightened from the outside of the building. 62 64 64 63 Secure the fascia into position using 4x40mm screws, making sure to fix through the fascia into the roof purlin, fascia block and/or log boards. 66 *Ensure the storm braces are secured at the highest point possible on each side. The storm braces will need to be altered during the buildings life as the moisture content within the log boards changes. The boards will expand during periods of high moisture (Winter) and shrink during periods of low moisture (Summer.) Once in place, mark the excess fascia with a pencil and then trim the fascias to follow the shape of building as shown in the illustration. 66 **Storm braces will help your building expand and contract properly. ***It is important that each bolt is tightened using a washer so as not to damage the log boards. Attach the rest of the fascias (No. 63, & 64) to the front sides of the log cabin and cut to size in the same way as previously stated. 16x80mm Bolt Sets 34x40mm Screws Pre drill hole Step 44 Parts needed - No. 66 QTY 8 Pre drill hole 80mm bolt 40mm screw 65 62 65 P 24 Please retain product label and instructions for future reference Step 45 Parts Needed: No. 6 QTY 2 No. 16 QTY 1 Attach the Rain Guards (No.6) to the window frame, fixing in place onto the framing above each window using 3x70mm screws per guard. 6 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. Attach the Rain Guard (No.16) to the door frame, fixing in place onto the framing above the Door using 3x70mm screws. 9x70mm Screws. Pre drill hole 70mm screw 6 16 6 P 25
advertisement
Key Features
- 3x3m (9.8ft x 9.8ft) size
- Half Glazed Double Doors
- Two Short Windows
- Pre-Cut Timber Components
- Detailed Instructions
- Easy Assembly
Frequently Answers and Questions
What tools are required to assemble this log cabin?
The required tools include a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
How should I prepare the base for the log cabin?
The base should be level and built on firm ground, slightly smaller than the external measurement of the building to allow for cladding overlap. The floor should be at least 25mm above the surrounding ground level to prevent flooding.
Is it necessary to pre-drill screw holes?
Yes, pre-drilling screw holes is essential for ease of assembly and to prevent splitting the timber.