Mercia Garden Products 0634CSNE0303HGDD2SW-V1 General Instructions Manual

Mercia Garden Products 0634CSNE0303HGDD2SW-V1 General Instructions Manual

Mercia Garden Products 0634CSNE0303HGDD2SW-V1 is a 3x3m log cabin kit designed for easy assembly. This cabin features half glazed double doors, two short windows, and a sturdy timber frame. It offers a spacious and versatile space for various uses, such as a garden office, a relaxing retreat, or a playhouse for children. With detailed instructions, pre-cut timber components, and a comprehensive parts list, building this cabin is a manageable DIY project.

advertisement

Assistant Bot

Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.

Mercia Garden Products 0634CSNE0303HGDD2SW-V1 Log Cabin Kit Instructions | Manualzz
General Instructions
Please retain product label and instructions for future reference
0634CSNE0303HGDD2SW-V1
All buildings should be
erected by two adults
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
CAUTION
Every effort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
For ease of assembly use a
rubber mallet to fit the log
boards. Do NOT use a heavy
hammer.
Ensure to measure and check before cutting
boards.
It is advisable to use a hand
saw when cutting roof and
floor boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
Screws & Nails
Bolts
Measure
overall
length
Measure
under the
head
34MM LOG CABIN, CORNER STANDARD, NO EXTRAS, 3X3M, HALF GLAZED DOUBLE
DOORS, TWO SHORT WINDOWS.
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be affected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on firm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
off for water. It is also recommended that the floor be at least 25mm above the
surrounding ground level to avoid flooding.
2mm Drill bit
To identify the fixings
required for each step use a
measuring tape.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your specific product code
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
P1
0634CSNE0303HGDD2SW-V1
Overall Dimensions:
Width = 4425mm
Depth = 3316mm
Height = 2748mm
Please retain product label and instructions for future reference
Double Door Contents
Roof Assembly 1
9
10
Base Dimensions:
Width = 3971mm
Depth = 2991mm
Roof Assembly 2
Master Door QTY 1
Before assembly
please make sure you have a
suitable base ready to erect your
building
(Morticed for lock)
AI-06LOGDGMD750X1900-V3
11
Secondary DoorQTY 1
AI-06LOGDGSD750X1900-V3
Door Frame Left Upright - 71x70x2065mm QTY 1
AI-0634LOGDUFL-V3
12
MADE IN GREAT BRITAIN
Door Frame Right Upright - 71x70x2065mm QTY 1
AI-0634LOGDUFR-V3
Window Contents
13
Door Frame Top - 84x125x1632mm QTY 1
1
AI-0634LOGDDTF-V3
14
2
Door Frame Bottom - 71x70x1508mm QTY 1
Window Frame Left Upright - 71x70x1412mm QTY 2
AI-0634LOGWUFL-V3
AI-0634LOGDDBF-V3
15
3
Door Strip - 16x60x1880mm QTY 1
S1660-1880mm
Window Frame Right Upright - 71x70x1412mm QTY 2
AI-0634LOGWUFR-V3
16
4
17 Adjustable Hinge QTY 6 PI-07-0209
17a
17b
17c
Window Frame Top - 84x125x805mm QTY 2
AI-0634LOGWTF-V3
Window QTY 2
AI-06LOGDGW684X1244-V3
6
Rain Guard QTY 1
RG2844-1520 (28x44x1520mm)
5
Window Frame Bottom - 71x70x805mm QTY 2
AI-0634LOGWBF-V3
18
7
Rain Guard QTY 2
RG2844-710 (28x44x710mm)
Flag Hinge QTY 4
PI-07-0211
8
21
20
19
Casement Stay QTY 2
PI-07-0187
Handles (Pair)
QTY 1
PI-07-0188
Mortice Lock
QTY 1
PI-07-0017
Key Plate
QTY 1
PI-07-0017
Tower Bolt
QTY 2
PI-07-0114
P2
Please retain product label and instructions for future reference
22
Starter Board - 34x66x2191mm QTY 1
Log Board - 34x120x1632mm QTY 7
LB34RT66-AGLR-2191 (1x45 deg cut top, 1x45 deg cut bottom)
23
Log Board - 34x120x311mm QTY 18
Log Board - 34x120x311mm QTY 17
37
Log Board - 34x120x1632mm QTY 1
50
38
Finisher Board - 34x64x1632mm QTY 1
AI-06LOGC3RTC-V1 (2X76 deg parallel cuts, 1x45 deg mid right)
51
Roof Truss D- 40x140x1604mm QTY 1
LB34-AH64GR-1632 (64mm high board, 1x45 deg deep cut right)
Log Board - 34x60x311mm QTY 1
39
Finisher Board - 34x64x3000mm QTY 1
LB34-AH64-3000 (64mm high board)
Log Board - 34x70x311mm QTY 1
LB34-BH70GR-311 (1x45 deg cut right bottom notch, 70mm height board)
40
52
Roof Purlin - 45x120x1523mm QTY 1
F45120-B-1523
Starter Board - 34x66x3000mm QTY 1
*If you are constructing a 5x3 cabin you will not need
this part - see 5x3 instructions for correct part*
LB34RT66-A-3000
27
Log Board - 34x120x2191mm QTY 1
LB34-J-2191 (1x45 deg cut left, 1x45 deg cut right top notch)
41
Log Board - 34x120x3000mm QTY 40
Log Board - 34x120x2191mm QTY 1
LB34-JD-2191 (1x45 deg cut left, 1x45 deg cut right top notch, door notch)
42
Finisher Board - 34x80x1945mm QTY 1
Log Board - 34x120x441mm QTY 24
LB34-B-441
43
30
Bearer - 44x58x2692mm QTY 6
F4458-2692-PT
Finisher Board - 34x80x676mm QTY 1
Bearer - 44x58x2472mm QTY 1
F4458-G-2492-PT (1x45 deg cut, 2472mm finished)
LB34RG80-CGL-676 (2x45 deg cut right, 677mm finished)
LB34-BGR-441 (1x45 deg cut right)
44
56
Bearer - 44x58x2194mm QTY 1
F4458-G-2214-PT (1x45 deg cut, 2194mm finished)
Finisher Board - 34x80x676mm QTY 1
LB34RG80-CGR-676 (2x45 deg cut left, 677mm finished)
Log Board - 34x120x441mm QTY 12
57
LB34-BGL-441 (1x45 deg cut left)
45
Starter Board - 34x66x1632mm QTY 1
Finisher Board - 34x80x633mm QTY 6
LB34RG80-C-633
58
Roof Truss - 40x140x922mm QTY 1
LB34-AGL-1632 (1x45 deg cut left)
Bearer - 44x58x1638mm QTY 1
F4458-G-1658-PT (1x45 deg cut, 1638mm finished)
46
Log Board - 34x120x1632mm QTY 6
Bearer - 44x58x1916mm QTY 1
F4458-G-1936-PT (1x45 deg cut, 1916mm finished)
LB34RT66-AGL-1632 (1x45 deg cut left)
34
54
55
Log Board - 34x120x441mm QTY 12
33
Bearer - 44x58x2808mm QTY 1
F4458-2808-PT
LB34RG80-J-1945 (2x61 deg cut, 1945mm finished)
29
32
53
LB34-A-3000
28
31
Roof Truss C- 40x140x1604mm QTY 1
AI-06LOGC3RTD-V1 (2X76 deg parallel cuts, 1x45 deg mid left)
LB34-BH60GR-311 (1x45 deg cut right, 60mm height board)
26
AI-06LOGC3RTB-V1
LB34-JDR-1632 (1x45 deg cut right, window notch)
LB34-BGR-311 (1x45 deg cut right)
25
Roof Truss B - 40x140x2225mm QTY 1
LB34-AGR-1632 (1x45 deg cut right)
LB34-BGL-311 (1x45 deg cut left)
24
49
36
AI-06LOGC3X3-LRT-V1
59
Bearer - 44x58x1398mm QTY 1
F4458-G-1418-PT (1x45 deg cut, 1398mm finished)
Log Board - 34x120x1632mm QTY 1
47
Roof Truss - 40x140x922mm QTY 1
LB34-J-1632 (1x45 deg cut left 50mm bottom notch)
35
Log Board - 34x120x1632mm QTY 1
LB34-JDL-1632 (1x45 deg cut left 50mm bottom notch, window notch)
AI-06LOGC3X3-RRT-V1
48
Roof Truss A- 40x140x1604mm QTY 5
AI-06LOGC3RTA-V1
60
Bearer - 44x58x1340mm QTY 1
F4458-G-1360-PT (1x45 deg cut, 1340mm finished)
61
Bearer - 44x58x2076mm QTY 1
F4458-G-2116-PT (2x45 deg cut, 2076mm finished)
P3
Please retain product label and instructions for future reference
62
71
Fascia - 16x120x3100mm QTY 1
Roof Board Pack A QTY 1
AI-06LOGC3X3-RBP1-V2
SR16120-3100
63
Fascia - 16x120x2225mm QTY 1
*HINT: keep the roof board packs
seperate to prevent mixing them up.
S16120-2225
64
Fascia - 16x120x2000mm QTY 2
S16120-2000
65
Fascia - 16x120x1658mm QTY 2
S16120-G-1658 (2x14 deg cuts, length 1658)
66
72
Roof Board Pack B QTY 2
AI-06LOGC3X3RBP2-V2
Storm Brace - 27x44x2000mm QTY 8
F2744-2000
67
Closure Trim - 16x28x2400mm (approx length) QTY 14
*HINT: keep the roof board packs
seperate to prevent mixing them up.
S1628-2400
68
Felt
73
69
Roof Board Pack C QTY 2
AI-06LOGC3X3RBP3-V2
Roof Spacers QTY 5
PI-07-0208 (20x100x2mm)
70
Floor Board Pack
AI-0634CSNE0303HGDD2SW-FBP-V1
*HINT: keep the roof board packs
seperate to prevent mixing them up.
74
Gable QTY 1
AI-0634LOGC3-G-V1
P4
Please retain product label and instructions for future reference
Nail Bag
There may be extra screws present in the nail bag
80mm Bolt Set x 16
70mm Screw x 39
120mm Screw x 12
40mm Screw x 666
90mm Screw x 56
30mm Screw x 182
80mm Screw x 24
Felt Tacks x 850
Pre-assembly
*Please note:
Each board interlocks at either end in a staggered pattern.
TO CONSTRUCT A 5M X 3M LOG CABIN
PLEASE REFER TO THE 5X3
INSTRUCTIONS.
Before securing ensure that the boards are fitted properly in their respective
tongues and grooves.
P5
Please retain product label and instructions for future reference
IMPORTANT: Pre-drill before fixing screws.
Step 1
The following steps show how to
construct a 3m x 3m corner cabin.
To construct a 5m x 3m cabin, please
refer to the 5m x 3m instructions.
Parts needed - No. 53 QTY 1
No. 54 QTY 1
No. 59 QTY 1
No. 60 QTY 1
No. 61 QTY 1
Lay the bearers (No. 53, 54, 59, 60 &
61) onto a firm and level surface (free
from areas where standing water can
collect) as shown in the illustration.
IMPORTANT: Pre-drill before fixing screws.
Arrange the remaining framing
(No. 54, 55, 56, 57, 58) as shown in
the illustration.
54
35
*Ensure there is an equal amount
of space between each frame.
53
Secure each of the frames in place
using 2x90mm screws for each end
of each bearer, ensuring the bearers
remains level.
54
*Ensure the 58mm side of the bearer
is laying on the base, so that you can
screw the bearers together on the
44mm side.
Fix the bearers together at each
corner using 10x90mm screws,
ensuring the frame is flush.
Step 2
Parts needed - No. 54 QTY 5
No. 55 QTY 1
No. 56 QTY 1
No. 57 QTY 1
No. 58 QTY 1
36x90mm Screws
60
Once fully assembled, ensure the
bearers are square by measuring from
corner to corner, as illustrate, making
sure they are an equal measurement.
If the bearers are not alligned equally,
unscrew and adjust and re-align
accordingly.
59
Pre drill
hole
90mm
screw
61
58
57
56
36 55
54 54
54
54
54
10x90mm Screws
Pre drill
hole
90mm
screw
Example picture
2 screws per bearer per end.
P6
Please retain product label and instructions for future reference
IMPORTANT: Pre-drill before fixing screws.
Step 3
Parts Needed - No. 22 QTY 1
No. 32 QTY 1
No. 36 QTY 1
No. 40 QTY 1
No. 41 QTY 1
IMPORTANT: Pre-drill before fixing screws.
Step 4
Parts needed - No. 25 QTY 1
Make the log cabin level by
adding another board (No. 25)
as shown in the diagram. Fix
using 1x70mm screw.
a
Place the starter boards (No. 22, 32, & 40) on to the assembled base
frame and place the first two log boards (No.36 & 41) sitting in the notch as
shown.
**Ensure to stagger the screws
so as not to collide with the
previous screw.
Ensure the boards sit square on the base using the same method used in Step
1. Measure from corner to corner and ensure they are equal in
measurement.
25
1x70mm Screws
b Once the boards are square, fix the starter boards (No. 22, 32, & 40) in
Pre drill
hole
place, lift up the log boards (No.36 & 41) and fix each starter board in place.
70mm
screw
Fix each of the starter boards to the frame by screwing through the notch into
the frame with 1x70mm screw as shown in the illustration.
5x70mm Screws
Pre drill
hole
70mm
screw
41
40
Step 5
Parts needed - No. 23 QTY 6
No. 24 QTY 6
No. 33 QTY 6
No. 36 QTY 5
No. 41 QTY 11
5th
3rd
36
32
22
4th
2nd
36
22
1st
Lay the first 6 boards (No. 23,
24, 33, 36 & 41) onto the starter
boards to create your first level,
following the method as shown
in the illustrated.
41
41
36
23
24
33
Please note the right hand side
of the door will be slightly
higher. This will even out when
the rest has been assembled.
*Ensure that the boards are
level and flush with each other
as you lay each one.
Rubber Mallet
may be required
to fit parts.
P7
Please retain product label and instructions for future reference
Step 6
Parts Needed - No. 11 QTY 1
No. 12 QTY 1
No. 13 QTY 1
No. 14 QTY 1
IMPORTANT : Pre-drill before fixing screws.
Arrange the left, right, top & bottom door
frames (No’s. 11, 12, 13 & 14) onto a level
surface. Secure the top and bottom frames to
the uprights using 2x80mm screw per corner,
ensuring the screws do NOT protrude through
the front of the door framing.
13
80mm
screw
11
12
a
a
The Adjustable Door Hinge (No.17)
comes in three parts.
17b
17a
b Place the master and secondary
doors (No’s 9 & 10) onto a flat surface and fix
the Adjustable door hinge (No.17c) to the
doors using 3x30mm screws per hinge.
14
14
IMPORTANT : Pre-drill before fixing screws.
Fasten No. 17a into 17b as shown in the
illustration.
8x80mm Screws
Pre drill
hole
Step 7
Parts Needed - No. 9 QTY 1
No. 10 QTY 1
No. 17 QTY 6
Fix 3 x Adjustable Door Hinges (No. 17a &
b) into position onto the door frame using
4x30mm screws per hinge.
12
The internal lip of the door
frame should be postioned on
the inside of the building.
b
17
*Ensure the hinges are fitted to the external of the door frame so the doors open
outwards from the log cabin.
Locate the doors into the hinges ensuring
there is equal spacing on each side between
the doors and door frame, and that the
doors open & close freely without restriction.
It is important to fit the doors within the
frames at this stage so that you can establish
the position of the hinges. The hinges come
in three parts. Remove the doors from the
frame after fitting.
10
Secondary Door
9
Master Door
**Ensure to screw into the framing and not
into the channel.
42x30mm Screws
Pre drill
hole
30mm
screw
P8
Please retain product label and instructions for future reference
Step 10
Parts needed - No. 23 QTY 6
No. 24 QTY 6
No. 29 QTY 12
No. 30 QTY 6
No. 31 QTY 6
No. 41 QTY 11
Step 8
To adjust and align your doors:
1. Lift up the doors to separate the two parts
of the hinge.
2. Turn the rotating barrel (No.17a) in / out
to move the postion of the doors either in or
away from each other.
3. You can then place the door(s) back on to
the hinge and check the whether they
require more / less adjustments, if further
adjustments are required repeat number 2.
17a
Lay the next 6 boards (No. 23,
24, 29, 30, 31 & 41 ) onto the log
cabin to create your second
level, following the method as
shown in the illustration.
41
41
29
30
23
29
24
31
*Ensure that the boards are
level and flush with each other
as you lay each one.
Rubber Mallet
may be required
to fit parts.
Step 9
Once you have laid 6 log boards (off of the starter)
up the door section, slide the assembled door
frame over the boards resting the frame on top of
the starter board (if you have not yet assembled
the door frame refer to step 6)
*Please note: This image is for illustrative purposes
and may differ from your choice in product
(regarding door position). Nevertheless the
process of fitting the door frame is the same.
P9
Please retain product label and instructions for future reference
IMPORTANT : Pre-drill before fixing screws.
Step 11
Parts Needed - No. 2 QTY 2
No. 3 QTY 2
No. 4 QTY 2
No. 5 QTY 2
Arrange the left, right, top & bottom window
frames (No’s. 2, 3, 4,& 5) onto a firm and level
surface. Secure the top and bottom frames to
the uprights using 1x80mm screw per corner,
ensuring the screws do NOT protrude through
the front of the window framing.
4
2
Use this method to construct 2 windows.
5
3
7
1
Repeat this method for both windows
80mm
screw
5
IMPORTANT : Pre-drill before fixing screws.
Position the window (No. 1) so that it
sits centrally within the window
frame. Fix the female part of the flag
hinge (No. 7) to the window using
4x30mm screws, attach the male part
of the flag hinge (No. 7) to the
window frame using 4x30mm screws
ensuring that the window can open
and close freely.
*Ensure to attach the hinge to the
horizontal frame of the window*
16x80mm Screws
Pre drill
hole
Step 12
Parts Needed - No. 1 QTY 2
No. 7 QTY 4
**It is important to fit the windows
within the frame at this stage so
that you can establish the position
of the hinges. The hinges come in
two parts. Remove the window
from the frame after fitting.
3
The internal lip of the window
frame should be positioned on
the inside of the building.
7
7
32x30mm Screws
Pre drill
hole
30mm
screw
P 10
Please retain product label and instructions for future reference
Step 13
Step 15
Parts needed - No. 26 QTY 1
Once you have laid the second level
of boards onto the log cabin slide the
windows between the smaller
boards and rest on to the longer
board (if you have not yet
assembled the window frames refer
to step 11)
Make the log cabin level by
adding another right hand
board (No. 26) as shown in the
diagram.
26
Rubber Mallet
may be required
to fit parts.
*Ensure the boards are level with
each end.
*Please note: This image is for
illustrative purposes and may differ
from your choice in product
(regarding window position).
Nevertheless the process of fitting the
window is the same
Step 14
Parts needed - No. 23 QTY 6
No. 24 QTY 5
No. 29 QTY 12
No. 30 QTY 6
No. 31 QTY 6
No. 41 QTY 12
Lay the next 6 boards
(No’s. 23, 24, 29, 30, 31 & 41) onto
the log cabin, following the
method as shown in the
illustration, bringing the board
level to the top of the window and
door frames.
Please note when you get to the
top of the boards the right hand
boards will be slightly lower.
**Ensure that the boards are
level and flush with each other as
you lay each one.
Step 16
Parts needed - No. 28 QTY 1
No. 35 QTY 1
No. 37 QTY 1
No. 41 QTY 2
41
41
29
30
29
23
24
31
41
41
Lay the next layer of boards
(No.28, 35, 37 & 41) onto the log
cabin, following the method as
shown in the illustration, bring- 37
ing the board level above the
window and doors.
*Ensure that the boards are
level and flush with each other
as you lay each one.
28
35
Rubber Mallet
may be required
to fit parts.
Rubber Mallet
may be required
to fit parts.
P11
Please retain product label and instructions for future reference
Step 18
Parts needed - No. 38 QTY 1
No. 39 QTY 1
Step 17
Parts needed - No. 27 QTY 1
No. 34 QTY 1
No. 36 QTY 1
No. 41 QTY 2
Lay the next layer of boards
(No. 27, 34, 36 & 41) onto the
log cabin, following the
method as shown in the
illustration.
*Ensure that the boards are
level and flush with each other
as you lay each one.
Rubber Mallet
may be required
to fit parts.
41
41
36
27
34
Lay the Finisher Boards (No. 38 &
39) onto the front of the log
cabin to bring the boards level.
Fix into position with 2x70mm
screws per board by screwing
through the notches.
IMPORTANT: Pre-drill before fixing screws.
39
38
*Ensure that the boards are
level and flush with each other
as you lay each one.
4x70mm Screws
Pre drill
hole
70mm
screw
Rubber Mallet
may be required
to fit parts.
P 12
Please retain product label and instructions for future reference
Step 19
Parts needed - No. 74 QTY 1
** Please Note:
You can place your gable on
either side of the log cabin,
dependant on your needs. (See
Contents page for reference)
IMPORTANT: Pre-drill before fixing screws.
Roof Assembly 1
74
Step 20
Parts needed - No. 50 QTY 1
No. 51 QTY 1
No. 52 QTY 1
IMPORTANT: Pre-drill before fixing screws.
Roof Assembly 1
Align the Roof Purlin (No. 52) into
the cut out slots on the gable,
ensuring the purlin interlocks the
boards.
Please ensure to construct your
Roof by following either ‘Roof
Assembly 1’ or ‘Roof Assembly 2’,
dependant on which side you
place the Gable.
52
Rubber Mallet
may be required
to fit parts.
Place the gable top (No. 74) onto
the log cabin. Fix into position by
screwing through the notches as
shown in the illustration.
*Ensure that the boards are level
and flush with each other as you
lay each one.
2x120mm Screws
Pre drill
hole
120mm
screw
Rubber Mallet
may be required
to fit parts.
Roof Assembly 2
74
Roof Assembly 2
52
P 13
Please retain product label and instructions for future reference
Step 21 - Roof Assembly 1
Parts needed - No. 48 QTY 1
No. 50 QTY 1
No. 51 QTY 1
IMPORTANT: Pre-drill before fixing screws.
Roof Assembly 1
52
Place the Central roof Truss ‘ Roof
Truss D (No.51) flush to the end of the
Roof Purlin (No. 52)
50
Place Roof Truss C (No.50) and Roof
Truss A (No.48) onto either side of the
Roof Purlin (No.52) ensuring they sit
flush to the end, creating a ’T’ shape
as shown in the illustration.
51
90mm
screw
Roof Assembly 1
52
48
49
50
Fix in place by screwing into the
purlin at an angle as shown in
the illustration using 1x90mm
screw.
51
*Ensure to stagger screws to
avoid screws colliding.
52
1x90mm Screws
48
48
51
Pre drill
hole
IMPORTANT: Pre-drill before fixing screws.
Place ‘Roof Truss B’ (No. 49)
between Roof Truss A (No.48)
and the Central Roof Truss (Truss
D for Roof Assembly 1, and Truss
C for Roof Assembly 2) as shown
in the illustartion.
48
Fix in place by screwing through the
truss into the Purlin at an angle, as
shown in the illustration using
1x90mm screw per truss.
3x90mm Screws
Step 22
Parts needed - No. 49 QTY 1
Pre drill
hole
50
Rubber Mallet
may be required
to fit parts.
49
90mm
screw
51
50
Rubber Mallet
may be required
to fit parts.
Step 21 - Roof Assembly 2
Parts needed - No. 48 QTY 1
No. 50 QTY 1
No. 51 QTY 1
Please note: You can adjust the
blocks attached to the roof
truss’ if necessary.
Roof Assembly 2
48
Place the Central roof Truss Roof Truss
C (No.50) flush to the end of the Roof
Purlin (No. 52)
52
Roof Assembly 2
48
Please note: You can adjust the
blocks attached to the roof
truss’ if necessary.
Place Roof Truss D (No.51) and Roof
Truss A (No.48) onto either side of the
Roof Purlin (No.52) ensuring they sit
flush to the end, creating a ’T’ shape as
shown in the illustration.
50
52
49
51
50
51
Fix in place by screwing through the
truss into the Purlin at an angle, as
shown in the illustration using
1x90mm screw per truss.
3x90mm Screws
48
48
52
49
51
Pre drill
hole
90mm
screw
50
Rubber Mallet
may be required
to fit parts.
51
50
P 14
Please retain product label and instructions for future reference
IMPORTANT: Pre-drill before fixing screws.
Step 23
Parts needed - No. 48 QTY 3
Place 2x ‘Roof Truss A’ (No. 48)
flush to the inside of the gable.
Fix in place by screwing into the
purlin at an angle as shown in
the illustration using 1x90mm
screws per Roof Truss.
*Ensure to stagger screws to
avoid screws colliding.
48
Roof Assembly 1
48
48
90mm
screw
Secure the shortest Roof Truss’
(No. 46 & 47) to ‘Roof Truss B’
(No.49) as shown in the illustration
using 1x90mm screws per truss.
IMPORTANT: Pre-drill before fixing screws.
Roof Assembly 1
46
*Ensure the angled side of the
short truss is flush with the side of
the long truss. Then make sure the
block under the short truss is flush
against the wall of the building.
48
2x90mm Screws
Pre drill
hole
Step 24
Parts needed - No. 46 QTY 1
No. 47 QTY 1
47
*Ensure to stagger screws to avoid
screws colliding.
Rubber Mallet
may be required
to fit parts.
2x90mm Screws
Pre drill
hole
90mm
screw
46
Rubber Mallet
may be required
to fit parts.
47
48
Please note: You can adjust the
blocks attached to the roof
truss’ if necessary.
Please note: You can adjust the
blocks attached to the roof
truss’ if necessary.
Roof Assembly 2
48
Roof Assembly 2
47
46
47
48
46
P 15
Please retain product label and instructions for future reference
IMPORTANT: Pre-drill before fixing screws.
Step 25
Parts needed - No. 42 QTY 1
No. 43 QTY 1
No. 44 QTY 1
No. 45 QTY 6
Roof Assembly 1
45
45
42mm
Place the finisher boards
(No. 42, 43, 44 & 45) around the
building, locating each board
flush to the truss’.
Ensure there is at least a 42mm
gap between parts No. 45 & 45
on both sides of the log cabin.
Some adjustment may
required to ensure the roof
structure rests correctly.
45
44
45
43
45
be
45
42
Fix in place by screwing into
the purlin at an angle as shown
in the illustration using
1x90mm screws per Roof Truss.
48
45
48
45
45
4x70mm Screws
2x90mm Screws
14x70mm Screws
70mm
screw
Some adjustment may be
required to ensure the roof
structure rests correctly.
45
Roof Assembly 1
Secure the boards (No.45) in
place by screwing through the
purlin using 1x70mm screw
per board, ensuring to stagger
the screws to avoid colliding.
Secure each board by screwing
into the Roof Truss, using
2x70mm screws per board,
ensuring to stagger the screws to
avoid colliding.
Pre drill
hole
IMPORTANT: Pre-drill before fixing screws.
Locate the last two ‘Roof Truss
A’ (No. 48) into the 42mm gaps
between the finisher boards
No.45 & 45 as shown in the
illustration.
45
45
Step 26
Parts needed - No. 48 QTY 2
Rubber Mallet
may be required
to fit parts.
45
Roof Assembly 2
45
42mm
Pre drill
hole
45
70mm
screw
90mm
screw
Roof Assembly 2
45
45
45
Rubber Mallet
may be required
to fit parts.
43
45
48
48
44
45
45
42
45
45
45
Please note: You can adjust the
blocks attached to the roof
truss’ if necessary.
P 16
Please retain product label and instructions for future reference
Step 27
You can now fix the assembled roof
truss’s and Roof Purlin to the log
cabin, making sure the attached
blocks sit inside the assembly.
IMPORTANT: Pre-drill before fixing screws.
Roof Assembly 1
Place the first board from each ‘Roof Board Pack’ (A, B, & C ) onto the roof assembly, working around the
structure, building each layer of roof boards one by one.
Once in position fix the roof truss’ to
the log cabin using 1x120mm screw
per truss as shown in the diagram.
Ensure to stagger screws to avoid
colliding.
Once you are happy with the fit of the roof boards, fix the boards into place using 2x40mm screws per board,
ensuring to fix through the roof board into the truss below.
28x40mm screws
Secure the Roof Purlin to the log
cabin by screwing through the
purlin into the gable using 2x70mm
screws
Pre drill
hole
40mm
screw
73
73
Roof Assembly 2
Roof Assembly 1
10x120mm Screws
2x70mm Screws
120mm
screw
IMPORTANT: Pre-drill before fixing screws.
*HINT: keep the roof board packs seperate to prevent mixing them up.
Some adjustment may be required
to ensure the roof structure rests
correctly.
Pre drill
hole
Step 28
Parts needed - No. 71 QTY 1 Pack A
No. 72 QTY 2 Pack B
No. 73 QTY 2 Pack C
C
C
72
70mm
screw
72
B
B
C
C
B
72
A
73
B
72
73
A
Roof Assembly 2
71
71
73
73
72
C
B
C
A
52
B
72
C
B
B
72
73
C
72
A
71
71
Roof Assembly 1
Roof Assembly 2
73
P 17
Please retain product label and instructions for future reference
Step 29
Parts needed - No. 71
No. 72
No. 73
*HINT: keep the roof board packs
seperate to prevent mixing them
up.
Continue arranging the Roof Board
Packs (A, B, & C) onto the roof
assembly, working around the
structure, building each layer of
roof boards one by one.
IMPORTANT: Pre-drill before fixing screws.
Roof Assembly 1
*HINT: keep the roof board
packs seperate to prevent
mixing them up.
73
C
72
B
C
B
A
73
Ensure the roof boards are not laid
too close together, use the spacers
(No.69) provided to create a 2mm
gap. Adjusting the spacing
between the boards allows the
wood to swell in damp weather.
72
71
84x40mm Screws
Pre drill
hole
Continue arranging the roof
board packs (A, B, & C) onto the
roof assembly, working around
the structure, building each
layer of roof boards one by one.
IMPORTANT: Pre-drill before fixing screws.
Roof Assembly 1
73
C
C
72
B
B
A
73
72
71
Ensure the roof boards are not
laid too close together, use the
spacers (No.69) provided to
create a 2mm gap. Adjusting
the spacing between the
boards allows the wood to swell
in damp weather.
Once you are happy with the fit of
the roof boards, fix the 2nd, 3rd &
4th boards into place using 40mm
screws, ensuring the screws fix
through the roof board into the
truss below.
Repeat this so you have 4 boards
screwed down in total on each of
the 5 sides.
Step 30
Parts needed - No. 71
No. 72
No. 73
Once you are happy with the fit
of the roof boards, fix the 5th,
6th & 7th boards into place
using 40mm screws, ensuring
the screws fix through the roof
board into the truss below.
Roof Assembly 2
72
73
C
84x40mm Screws
B
B
40mm
screw
Repeat this so you have 7
boards high screwed down in
total on each of the 5 sides.
Roof Assembly 2
73
72
C
Pre drill
hole
73
71
B
B
A
72
C
40mm
screw
C
A
73
72
71
P 18
Please retain product label and instructions for future reference
Step 31
Parts needed - No. 71
No. 72
No. 73
IMPORTANT: Pre-drill before fixing screws. Step 32
Parts needed - No. 71
No. 72
No. 73
Roof Assembly 1
*HINT: keep the roof board
packs seperate to prevent
mixing them up.
73
B
73
C
B
72
71
A
Ensure the roof boards are not
laid too close together, use the
spacers (No.69) provided to
create a 2mm gap. Adjusting the
spacing between the boards
allows the wood to swell in damp
weather.
Once you are happy with the fit
of the roof boards, fix the 8th, 9th
& 10th boards into place using
40mm screws, ensuring the
screws fix through the roof board
into the truss below.
Repeat this so you have 10
boards high screwed down
in total on each of the 5 sides.
84x40mm Screws
40mm
screw
Continue arranging the roof
board packs (A, B & C) onto the
roof assembly, working around
the structure, building each
layer of roof boards one by one.
73
C
73
C
A
The last two boards from Pack C
will overhang.
71
72
B
72
B
Using a pencil and a straight
edge, mark out the line as a
guide.
Cut along the pencil mark and
remove the excess. Place the cut
down board’s back onto the
roof.
Once you are happy with the fit
of the roof boards, fix the
remaining boards into place
using 40mm screws, ensuring
the screws fix through the roof
board into the truss below.
73
Roof Assembly 2
C
72
B
B
73
72
71
Pre drill
hole
Roof Assembly 1
*HINT: keep the roof board
packs seperate to prevent
mixing them up.
C
72
Continue arranging the roof
board packs (A, B & C) onto the
roof assembly, working around
the structure, building each layer
of roof boards one by one.
IMPORTANT: Pre-drill before fixing screws.
C
A
Repeat this so you have the rest
of the boards screwed down on
all of the 5 sides.
140x40mm screws
Roof Assembly 2
73
C
B
B
72
73
72
C
71
A
Pre drill
hole
40mm
screw
P 19
Please retain product label and instructions for future reference
Step 33
Step 35
Lift each window onto the already existing
hooks on the window frame, ensuring the
hook and bands connect.
Lift each door onto the already existing
hooks on the door frame, ensuring the hook
and bands connect.
*Some adjustment may be required to
align properly.
*Some adjustment may be required to
align properly.
Step 34
Parts Needed - No. 8 QTY 2
Fix the casement stay (No. 8) onto the
window (No. 1) and the casement stay pins
to the window framing using 6x30mm
screws.
*Ensure the casement stay is centralised on
the window.
Use this method to fit the casement stays to
both the windows.
1
12x30mm Screws
Pre drill
hole
30mm
screw
8
8
P 20
Please retain product label and instructions for future reference
Step 36
Parts Needed - No. 18 QTY 1
No. 19 QTY 1
No. 20 QTY 1
a
The Mortice Lock is Reversible
a Attach the door strip (No. 15) to
the back of secondary door using
4x40mm screws as shown in the illustration.
a
Fit the Mortice lock (No. 19) into the
recess in the master door (No. 9) and secure
using the screws provided. Attach the Key
plate (No. 20) to the secondary door (No. 10)
with 4x30mm screws.
20
19
b
Fit the door handles (No. 18) and
connect with the metalbar to the mortice
lock using 8x30mm screws. Ensure the lock
mechanism closes correctly. If not, remove
the lock and turn the catch around using the
small grub screw.
*Please note: This image is for illustrative
purposes and may differ from your choice in
product (regarding ironmongery). Nevertheless the process of fixing the frames is the same.
Once components have been fitted, try closing
doors to ensure the doors can be closed and
the lock works.
If your doors do need adjusting please refer to
the step 8, if not proceed to step 37
12x30mm Screws
Pre drill
hole
Step 37
Parts Needed - No. 15 QTY 1
No. 21 QTY 2
a
b
21
15
b
Once fixed, place the Tower
Bolts (No. 21) roughly into position and
with a pencil mark around the bolt.
c
10
9
After marking the bolt onto the
frame, drill a hole for the barrel bolt to
locate into.
c
d
Following the hole being drilled,
place the tower bolts into position and
secure using the screws provided.
12x40mm Screws
Pre drill
hole
b
18
40mm
screw
d
30mm
screw
P21
Step 38
Parts needed - No. 68
Measure and cut the felt (No.68)
using the dimensions given below as
a guide.
Lay the first piece of felt
(1- 1585mmX1000mm) onto the
roof as shown (1) and cut down to
the individual shape of the roof.
Step 39
Parts needed - No. 68
Measure and cut the remaining
felt (No.68) using the dimensions
given below.
1.
Continue this method for each piece
of felt (2-8) in the order as shown,
ensuring a 50mm overlap between
each piece.
Secure along the outer edge of each
felt section using felt tacks spaced
out at approximately 100mm
intervals.
5.
8.
4.
2.
7.
Roof Assembly 1
4.
Secure along the outer edge of
each felt section using felt tacks
spaced out at approximately
100mm intervals.
3.
Roof Assembly 1
250x Felt Tacks
3.
2.
2.
Felt
tacks
4.
600x Felt Tacks
3.
8.
7.
Felt strip dimensions:
Felt sheet dimensions:
1 - 1600mm (L) x 1000mm (W)
2 - 2303mm (L) x 1000mm (W)
3 - 1655mm (L) x 1000mm (W)
4 - 3141mm (L) x 1000mm (W)
5 - 1600mm (L) x 1000mm (W)
6 - 820mm (L) x 1000mm (W)
7 - 680mm (L) x 1000mm (W)
8 - 2180mm (L) x 1000mm (W)
Lay the fist strip (1- 300mmX200mm) onto the roof as shown
(1), ensuring it is overlapping the
previously placed sheets.
Continue this method for each of
the felt strips (2-4)
6.
*Ensure there is 50mm of
overhanging felt around the base
of the roof.
Felt
tacks
Please retain product label and instructions for future reference
1.
6.
1 - 1600mm (L) x 200mm( W)
2 - 2340mm (L) x 200mm (W)
3 - 1700mm (L) x 200mm (W)
4 - 1710mm (L) x 200mm (W)
5.
2.
Roof Assembly 2
1.
Roof Assembly 2
1.
3.
4.
1
1
2
2
3
3
4
HANDLE
WITH CARE
4
HANDLE
WITH CARE
P 22
Please retain product label and instructions for future reference
Step 40
Parts needed - No. 70 QTY 1
IMPORTANT: Pre-drill before fixing screws.
Place the floor boards (No. 70)
inside the building flush to the log
boards on one side.
Roof
*Measure and cut the closure trims to
fit the internal space.
*Do NOT secure the boards until
the last board has been measured
and cut.
70
Following the same method
outlined previously measure the
gap between the bottom of the
tongue (on the last board placed)
and the log board.
Once in position fix each trim into
place by pre drilling a pilot hole and
using 6x30mm screws per trim,
equally spacing them along the face
of the board.
42x30mm Screws
Pre drill
hole
67
Internal
*Measure and cut the
closure trims to
fit the internal space.
Closure Trim
30mm
screw
*trim to fit
70
**Please note: Mark the final board
2mm under the measurement; This
will allow the timber to expand and
contract correctly.
Step 42
Parts needed - No. 67 QTY 7
Once all the floor boards are in
position secure each board into
position using 8x40mm screws per
board.
Once the floor has been laid arrange the
closure trim (No. 67) around the outside
edge of floor (internally), measure and cut
down accordingly to best match the
internal space.
***Please Note: Ensure to screw
through each of the floor boards into
the floor bearers.
IMPORTANT: Pre-drill before fixing screws.
*Internal view
Secure each trim section into place using
6x30mm spaced equally along the board
as shown in the illustration.
200x40mm Screws
*Do NOT fix the closure trim to the floor
boards.
Pre drill
hole
IMPORTANT: Pre-drill before fixing screws.
Inside the building place the closure
trim (No. 67) against the boarding and
align with the roof as shown in the
illustration.
Continue adding the floor boards
(internally) making sure to interlock
each individual board.
Using a straight edge mark out the
measurement onto the last floor
board (No. 70) and cut along the
length removing the excess.
Step 41
Parts needed - No. 67 QTY 7
40mm
screw
67
42x30mm Screws
*Cut to fit
Pre drill
hole
30mm
screw
67
This is for illustrative purposes only and may differ from your floor.
P 23
Please retain product label and instructions for future reference
Step 43
Parts needed - No. 62 QTY 1
No. 63 QTY 1
No. 64 QTY 2
No. 65 QTY 2
Attach the first fascias (No.62 &
65) to the back sides of the log
cabin, ensuring to trap the felt
between the fascia and the
building.
IMPORTANT: Pre-drill before fixing screws.
65
65
Arrange the storm braces (No. 66) around
the building (internally). Place 2x storm
braces per side fixing into place using 2x
80mm bolts per brace making sure the
washer & nut are tightened from the
outside of the building.
62
64
64
63
Secure the fascia into position
using 4x40mm screws, making
sure to fix through the fascia
into the roof purlin, fascia block
and/or log boards.
66
*Ensure the storm braces are secured at
the highest point possible on each side.
The storm braces will need to be altered
during the buildings life as the moisture
content within the log boards changes.
The boards will expand during periods of
high moisture (Winter) and shrink during
periods of low moisture (Summer.)
Once in place, mark the excess
fascia with a pencil and then
trim the fascias to follow the
shape of building as shown in
the illustration.
66
**Storm braces will help your building
expand and contract properly.
***It is important that each bolt is
tightened using a washer so as not to
damage the log boards.
Attach the rest of the fascias
(No. 63, & 64) to the front sides
of the log cabin and cut to size
in the same way as
previously stated.
16x80mm Bolt Sets
34x40mm Screws
Pre drill
hole
Step 44
Parts needed - No. 66 QTY 8
Pre drill
hole
80mm
bolt
40mm
screw
65
62
65
P 24
Please retain product label and instructions for future reference
Step 45
Parts Needed: No. 6 QTY 2
No. 16 QTY 1
Attach the Rain Guards (No.6) to the
window frame, fixing in place onto the
framing above each window using
3x70mm screws per guard.
6
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
Attach the Rain Guard (No.16) to the
door frame, fixing in place onto the
framing above the Door using 3x70mm
screws.
9x70mm Screws.
Pre drill
hole
70mm
screw
6
16
6
P 25

advertisement

Key Features

  • 3x3m (9.8ft x 9.8ft) size
  • Half Glazed Double Doors
  • Two Short Windows
  • Pre-Cut Timber Components
  • Detailed Instructions
  • Easy Assembly

Frequently Answers and Questions

What tools are required to assemble this log cabin?
The required tools include a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
How should I prepare the base for the log cabin?
The base should be level and built on firm ground, slightly smaller than the external measurement of the building to allow for cladding overlap. The floor should be at least 25mm above the surrounding ground level to prevent flooding.
Is it necessary to pre-drill screw holes?
Yes, pre-drilling screw holes is essential for ease of assembly and to prevent splitting the timber.

Related manuals

Download PDF

advertisement