4M 00-04510 Make Your Garden Stepping Stone Owner Manual

4M 00-04510 Make Your Garden Stepping Stone Owner Manual

4M 00-04510 is a fun and easy-to-use kit that allows you to create personalized garden stepping stones. The kit includes a bag of concrete mix, a mold, assorted plastic color beads, glow stars, glass stones, glitter, a carving tool, and detailed instructions. The kit is intended for children over 8 years old and requires adult supervision. With this kit, you can transform a simple stone into a colorful and unique piece of art that everyone will admire.

advertisement

Assistant Bot

Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.

4M 00-04510 Make Your Garden Stepping Stone Owner Manual | Manualzz
Small parts.
Not for Children under 3 years.
Make your very own garden stepping stone with
your own style. Turn the stone into a colourful and
beautiful stone that everyone admires. It’s fun!
A. Safety Messages
1. Please read through these instructions before you start.
2. Adult assistance and supervision recommended.
3. Intended for children ages over 8.
4. This kit and its finished product contain small parts that may cause choking if
misused. Keep away from children under 3 years old.
5. Concrete mix dust may irritate the eyes, nose and throat. Do not place the material
in the mouth. Avoid contact with the skin and eyes. In case of contact with eyes,
flush with water and consult your doctor if discomfort persists.
6. Concrete mix is safe; however, if you are prone to allergic reactions, it is recommended that you wear a pair of plastic groves when using this product.
7. Do not rub the eyes after you have touched the powder.
8. Wear a mask to avoid inhaling the dust or powder.
9. Wash your hands after making the stone.
B. Contents
1 bag of concrete mix, 1 blister mould, assorted plastic colour beads, 2 glow stars, 8
glass stones, 1 bag of glitter, 1 carving tool and 1 detailed Instructions.
C. Other Remarks
1. Always work on a solid, level surface and keep the area neat and clean.
2. Dispose of the left over concrete mix properly. Do not pour the powder down the
sink or bathtub as it may block the drain. Wash utensils used for concrete mixing
immediately after use with running water.
3. Be patient, it takes nearly 24 hours for the stone to completely dry and harden.
4. DO NOT remove the stone from the mould until completely dry and harden or it will
break.
41-04510/1/ V1
Questions & Comments
We treasure you as a customer and your satisfaction with this product is important to us. If you have
any comments or questions, or you find any parts of this kit missing or defective, please do not hesitate
to contact our distributor in your country, whose address is printed on the package. You are also
welcome to contact our marketing support team at Email: [email protected], Fax (852) 25911566,
Tel (852) 28936241, Web site: WWW.4M-IND.COM
D. Before You Begin
Please note once the cement powder is mixed with water, the resulting concrete
mixture will start to harden. Although this is a gradual process, always check the
condition of the concrete while mixing. Pour the moulding when the concrete
mixture is like a smooth paste, approximately 2-4 minutes after the powder is mixed
with water. If you are new to concrete mixing, it is recommended that you try a small
portion (50g concrete mix with approximately 20ml of water) to first experience how
the mixture develops and hardens.
D1. Mixing The Concrete
Use a mixing bowl, a stirring utensil, and approximately 200-240ml of water. Cut open the bag of
concrete mix and pour it into the mixing bowl.
Gradually add the water while checking the state
of the paste. Stir the mixture gently while pouring
the water.
Note: Do not pour too much water in at once, as
this may make the mixture too runny to mould.
Depending on the atmospheric conditions, the
concrete mix (500g) will normally become a
smooth paste after adding approximately
200-240ml of water.
D2. Moulding
Place the mould on a level surface and carefully
pour the mixture into its cavity. Gently agitate the
mould to release air bubbles. As it will take a day
for the concrete to dry, be sure to place the mould
in a location where it will not be moved or otherwise disturbed.
D3. Decorating The Stone
As it is very difficult to move or rearrange objects
once they have been set in the concrete, we recommend that you draft your design before you start
to decorate the stepping stone. After pouring the
concrete mix, wait 10 minutes to apply the mosaic
pieces, glow star, and glass stones to the stone. If
you want to write words on your stone, allow the
concrete mix to harden around 20-30 minutes
more. At that stage, the stone will not be too soft
or too runny to add words. Use the carving tool
provided or a toothpick to carve any words you
like. You may need to go over the words with a
carving tool or a toothpick several times before
they are deep enough. If the stone is still too wet,
wait for a few minutes, and try again. Finally
sprinkle the glitter on the stone and allow it to dry
completely. After 24 hours, remove the stone from
the mould and enjoy your work of art! Remarks: If
you find the stone has sharp edge, use the carving
tool or sandpaper to smooth the edge.
D1. Mixing ...
200-240ml
Water
Concrete Mix
D2. Moulding ...
D3. Decorating ...
© 2007 4M INDUSTRIAL DEVELOPMENT LIMITED.
Small parts.
Not for Children under 3 years.
Make your very own garden stepping stone with
your own style. Turn the stone into a colourful and
beautiful stone that everyone admires. It’s fun!
A. Safety Messages
1. Please read through these instructions before you start.
2. Adult assistance and supervision recommended.
3. Intended for children ages over 8.
4. This kit and its finished product contain small parts that may cause choking if
misused. Keep away from children under 3 years old.
5. Concrete mix dust may irritate the eyes, nose and throat. Do not place the material
in the mouth. Avoid contact with the skin and eyes. In case of contact with eyes,
flush with water and consult your doctor if discomfort persists.
6. Concrete mix is safe; however, if you are prone to allergic reactions, it is recommended that you wear a pair of plastic groves when using this product.
7. Do not rub the eyes after you have touched the powder.
8. Wear a mask to avoid inhaling the dust or powder.
9. Wash your hands after making the stone.
B. Contents
1 bag of concrete mix, 1 blister mould, assorted plastic colour beads, 2 glow stars, 8
glass stones, 1 bag of glitter, 1 carving tool and 1 detailed Instructions.
C. Other Remarks
1. Always work on a solid, level surface and keep the area neat and clean.
2. Dispose of the left over concrete mix properly. Do not pour the powder down the
sink or bathtub as it may block the drain. Wash utensils used for concrete mixing
immediately after use with running water.
3. Be patient, it takes nearly 24 hours for the stone to completely dry and harden.
4. DO NOT remove the stone from the mould until completely dry and harden or it will
break.
41-04510/1/ V1
Questions & Comments
We treasure you as a customer and your satisfaction with this product is important to us. If you have
any comments or questions, or you find any parts of this kit missing or defective, please do not hesitate
to contact our distributor in your country, whose address is printed on the package. You are also
welcome to contact our marketing support team at Email: [email protected], Fax (852) 25911566,
Tel (852) 28936241, Web site: WWW.4M-IND.COM
D. Before You Begin
Please note once the cement powder is mixed with water, the resulting concrete
mixture will start to harden. Although this is a gradual process, always check the
condition of the concrete while mixing. Pour the moulding when the concrete
mixture is like a smooth paste, approximately 2-4 minutes after the powder is mixed
with water. If you are new to concrete mixing, it is recommended that you try a small
portion (50g concrete mix with approximately 20ml of water) to first experience how
the mixture develops and hardens.
D1. Mixing The Concrete
Use a mixing bowl, a stirring utensil, and approximately 200-240ml of water. Cut open the bag of
concrete mix and pour it into the mixing bowl.
Gradually add the water while checking the state
of the paste. Stir the mixture gently while pouring
the water.
Note: Do not pour too much water in at once, as
this may make the mixture too runny to mould.
Depending on the atmospheric conditions, the
concrete mix (500g) will normally become a
smooth paste after adding approximately
200-240ml of water.
D2. Moulding
Place the mould on a level surface and carefully
pour the mixture into its cavity. Gently agitate the
mould to release air bubbles. As it will take a day
for the concrete to dry, be sure to place the mould
in a location where it will not be moved or otherwise disturbed.
D3. Decorating The Stone
As it is very difficult to move or rearrange objects
once they have been set in the concrete, we recommend that you draft your design before you start
to decorate the stepping stone. After pouring the
concrete mix, wait 10 minutes to apply the mosaic
pieces, glow star, and glass stones to the stone. If
you want to write words on your stone, allow the
concrete mix to harden around 20-30 minutes
more. At that stage, the stone will not be too soft
or too runny to add words. Use the carving tool
provided or a toothpick to carve any words you
like. You may need to go over the words with a
carving tool or a toothpick several times before
they are deep enough. If the stone is still too wet,
wait for a few minutes, and try again. Finally
sprinkle the glitter on the stone and allow it to dry
completely. After 24 hours, remove the stone from
the mould and enjoy your work of art! Remarks: If
you find the stone has sharp edge, use the carving
tool or sandpaper to smooth the edge.
D1. Mixing ...
200-240ml
Water
Concrete Mix
D2. Moulding ...
D3. Decorating ...
© 2007 4M INDUSTRIAL DEVELOPMENT LIMITED.

advertisement

Key Features

  • Concrete mix
  • Mold
  • Decorative elements
  • Carving tool
  • Detailed instructions

Frequently Answers and Questions

How long does it take for the stepping stone to dry?
It takes approximately 24 hours for the stone to completely dry and harden.
What do I do if the concrete mix is too runny?
Do not pour too much water in at once. You can add water gradually while checking the consistency of the paste.
Can I use the stepping stone immediately after it dries?
No, it is recommended to leave the stone in the mold for 24 hours before removing it. This will help ensure that the stone is fully hardened and will not break.

Related manuals

Download PDF

advertisement