TRANSMITTAL
5995 Greenwood Plaza Blvd.
Suite 100
Greenwood Village, CO 80111-4710
303-571-5377
303-629-7467 (fax)
PROJECT:
TO:
ATTN:
No. 12J2003-0118
DATE: 01/23/2013
CHC-Radiology & Procedure Center Remodel
***HKS Inc
1900 Wazee St Ste 209
Denver CO 80202
RE:
230593-Testing and Balancing
Carrie Hinshaw
JOB:
Ph/Fax:
WE ARE SENDING:
SUBMITTED FOR:
12J2003
ACTION TAKEN:
Shop Drawings
Approval
Approved as Submitted
Letter
Your Use
Approved as Noted
Prints
As Requested
Returned After Loan
Change Order
Review and Comment
Resubmit
Submit
Plans
SENT VIA:
Samples
Returned
Specifications / Product Data
Attached
Returned for Corrections
Other: Test & Balance Report
Separate Cover Via:
Due Date: 02/06/2013
NOTES:
Item
Package
Code
Submittal
230593
230593.01
Rev. Copies Date
1
1
01/23/2013
Description
Status
Balance Report - Phase 1
Architect Review
CC: GH Phipps Construction Co., Rebecca Terrazas
GH Phipps Construction Co., James Rivera
Signed:
Max Anderson
NEBB Certification # 3235
JEDI Balancing, Inc.
Certification#BB009025C
568 Briggs Street
P.O. Box 525
Erie, CO. 80516
Phone (720) 839 5333
Website: www.jedibalancing.com
Certified Test; Adjust; & Balance Report
Project
Children’s Hospital Radiology & Procedure Center
Address
Architect
Mechanical Engineer
Contractor
Balancing Supervisors
Date
Job Number
13123 E. 16th Ave. Aurora, CO 80045
HKS Inc.
Caveo Consulting Engineers
GH Phipps
Don Pittser & Greg Barnes
January 21, 2013
2013 3798
Instrumentation:
Digital Manometer
Flowhood
Digital Pressure Gage
Tachometer
Digital Volt Amp Meter
Thermometer
Alnor Balometer EBT 721
Alnor Balometer EBT 721
Alnor Hydronic Manometer HM 680
DT 36M
Fluke 335
Alnor Balometer EBT 721
Method of Balancing:
Supply, Return and Exhaust diffusers, grilles and registers were measured with an Alnor
Balometer EBT 721.
Heating and Chilled water flow rates were measured with an Alnor Hydronic Manometer
HM 680 connected to the installed flow meters.
Warranty Information:
This project was completed according to NEBB Procedural Standards.
The data presented in this report is a record of system measurements and final adjustments
that have been obtained in accordance with the current edition of the NEBB Procedural
Standards for testing, adjusting, and balancing environmental systems. Any variances from
design quantities, which exceed NEBB tolerances, are noted in the Test Adjust Balance
Report Project Summary. If a Test Adjust Balance Report Project Summary is not issued
directly following this cover page, all measurements met the design requirements as specified
by the design mechanical engineer.
This project has a one year guarantee on all Testing, Adjusting & Balancing from the date
listed on this cover page.
Don Pittser
CEO
NEBB Supervisor
JEDI Balancing, Inc.
568 Briggs Street
P.O. Box 525
Erie, CO. 80516
NEBB Certification # 323
Phone (720) 839 5333
Certification#BB009025C
Web www.jedibalancing.com
ABBREVIATION INDEX
AHU: Air Handling Unit
RTU: Roof Top Unit
MAU: Make Up Air Unit
FCU: Fan Coil Unit
CRAC: Computer Room Air Conditioning Unit
VAV: Variable Air Volume
K Factor: Correction Factor
FPB: Fan Powered Box
AK: Area Correction
CUH: Cabinet Unit Heater
UH: Unit Heater
ERV: Energy Recovery Ventilator
ERU: Energy Recovery Unit
EF: Exhaust Fan
KEF: Kitchen Exhaust Fan
SF: Supply Fan
RF: Return Fan
TF: Transfer Fan
SEF: Smoke Exhaust Fan
SPF: Stairwell Pressurization Fan
SP: Static Pressure
TSP: Total Static Pressure
ESP: External Static Pressure
VP: Velocity Pressure
SA: Supply Air
RA: Return Air
OSA: Outside Air
OA: Outside Air
MA: Mixed Air
SD: Supply Diffuser
CD: Ceiling Diffuser
SWD: Sidewall Diffuser
ER: Exhaust Register
RG: Return Grille
CFM: Cubic Feet Per Minute
FPM: Feet Per Minute
Motor FLA: Full Load Amperage
S.F.: Service Factor
P.F.: Power Factor
Nom. Eff.: Nominal Efficiency
RPM: Revolutions per Minute
T1: Terminal 1
T2: Terminal 2
T3: Terminal 3
OD: Outside Diameter
TDH: Total Dynamic Head
PSI: Pounds per Square Inch
BV: Balance Valve
CS: Circuit Setter
Valve D.P.: Discharge Pressure
Valve S.P.: Suction Pressure
Diff.: Differential
Design D.P.: Design Differential Pressure
Actual D.P.: Recorded Differential Pressure
Ind.Imp.Dia. Indicated Impeller Diameter
in. wc: Inches Water Column
HW: Heating Water
CHW: Cooling Water
CW: Condenser Water
HX: Heat Exchanger
DX: Direct Expansion
EAT: Entering Air Temperature
LAT: Leaving Air Temperature
EWT: Entering Water Temperature
LWT: Leaving Water Temperature
MVD: Manual Volume Damper
OBD: Opposed Blade Damper
NAC: No Access
NG: Not Given
NIC: Not in Contract
E: Existing
Air Handling Unit
PROJECT: TCH RADIOLOGY AND PROCEDURE CENTER PHASE I
LOCATION: AURORA, CO
DATE: 1/21/2013
CONTACT: Trevor Quain
AUTHOR: Greg Barnes
Tested By: Greg Barnes
Test Date: January 20, 2013
SYSTEM/UNIT: AC-4-01
AREA:
Unit Data
Motor Data
DATA AIRE
DAPG-0532-P
2012-3186-B
2000 CFM
Unit Manufacturer
Unit Model Number
Unit Serial Number
Total CFM Design
AC-4-01 / Supply Fan
Motor Manufacturer
Motor HP
Motor RPM
Motor Frame
Motor Rated Volts
Motor Phase
Motor FL Amps
Motor Service Factor
Test Data
Total CFM Actual
Return Air CFM Actual
AC-4-01 / Supply Fan
Fan RPM Actual
Motor Volts 1
Motor Volts 2
Motor Volts 3
Motor Amps 1
Motor Amps 2
Motor Amps 3
2005
2005
1102
208
209
210
2.4
2.5
2.6
LESSON
1-1\2
1750
145T
200-230/460
3
5.2-5.4\2.7
1.15
Sheave Data
AC-4-01 / Supply Fan
Motor Sheave Model
Motor Sheave Bore
Fan Sheave Model
Fan Sheave Bore
Number of Belts
Belt Size
1VP50
7\8 in.
1AK69
3/4 in.
1
A40
Test Pressures
ATMOSPHERE in. wc
NO ACCESS in. wc
NO ACCESS in. wc
0.51 in. wc
0.51 in. wc
0.05 in. wc
Filter SP In
Filter SP Out
Cool. Coil SP In
Cool. Coil SP Out
Fan SP In
Fan SP Out
AC-4-01 Supply Outlet Summary
System / Unit
Outlet
Type
Design
Readin
Prelim
Reading
%
Prelim
Outlet-01
400
620
155
395
99
Outlet-02
400
575
144
405
101
Outlet-03
400
555
139
410
103
Outlet-04
400
600
150
405
101
Outlet-05
400
525
131
390
98
2,000
2,875
144- %
2,005
100- %
Totals :
* Notes
AC-4-01
-
Type of
Readin
-
Face
Area
-
AK
Factor
-
20-Jan-13
Greg Barnes
JEDI Balancing, Inc.
JEDI
Final
% Final
Reading Deviati
SHEAVE CHANGED FROM 1VP56
BELT A42
Air Handling Unit
PROJECT: TCH RADIOLOGY AND PROCEDURE CENTER PHASE I
LOCATION: AURORA, CO
DATE: 1/21/2013
CONTACT: Trevor Quain
AUTHOR: Greg Barnes
Tested By: Greg Barnes
Test Date: January 20, 2013
SYSTEM/UNIT: AC-4-02
AREA:
Unit Data
Motor Data
DATA AIRE
DAPG-0532-P
2012-3185-B
2000 CFM
Unit Manufacturer
Unit Model Number
Unit Serial Number
Total CFM Design
AC-4-02 / Supply Fan
Motor Manufacturer
Motor HP
Motor RPM
Motor Frame
Motor Rated Volts
Motor Phase
Motor FL Amps
Motor Service Factor
Test Data
Total CFM Actual
Return Air CFM Actual
AC-4-02 / Supply Fan
Fan RPM Actual
Motor Volts 1
Motor Volts 2
Motor Volts 3
Motor Amps 1
Motor Amps 2
Motor Amps 3
2005
2005
1045
208
209
210
2.5
2.4
2.6
LESSON
1-1\2
1750
145T
200-230/460
3
5.2-5.4\2.7
1.15
Sheave Data
AC-4-02 / Supply Fan
Motor Sheave Model
Motor Sheave Bore
Fan Sheave Model
Fan Sheave Bore
Number of Belts
Belt Size
1VP56
7\8 in.
1AK6.75 OD
3/4 in.
1
A42
Test Pressures
ATMOSPHERE in. wc
NO ACCESS in. wc
NO ACCESS in. wc
0.51 in. wc
0.51 in. wc
0.05 in. wc
Filter SP In
Filter SP Out
Cool. Coil SP In
Cool. Coil SP Out
Fan SP In
Fan SP Out
AC-4-02 Supply Outlet Summary
System / Unit
Outlet
Type
Design
Readin
Prelim
Reading
%
Prelim
Outlet-01
400
410
103
385
96
Outlet-02
400
615
154
400
100
Outlet-03
400
595
149
420
105
Outlet-04
400
545
136
405
101
Outlet-05
400
635
159
395
99
2,000
2,800
140- %
2,005
100- %
Totals :
-
Type of
Readin
-
Face
Area
-
AK
Factor
-
* Notes
JEDI Balancing, Inc.
JEDI
Final
% Final
Reading Deviati
Air Handling Unit
PROJECT: TCH RADIOLOGY AND PROCEDURE CENTER PHASE I
LOCATION: AURORA, CO
DATE: 1/21/2013
CONTACT: Trevor Quain
AUTHOR: Greg Barnes
Tested By: Greg Barnes
Test Date: January 20, 2013
SYSTEM/UNIT: E-AHU-01
AREA:
* Notes
Tested By: Greg Barnes
Test Date: January 17, 2013
SYSTEM/UNIT: E-AHU-01 / FPB-122
AREA:
Unit Data
169
0.52
2.15
VAV Address
Box Inlet Size
K Factor
Test Data
Max Design CFM
Max Actual CFM
Min Design CFM
Min Actual CFM
Reheat Design CFM
Reheat Actual CFM
800 CFM
795 CFM
240 CFM
245 CFM
800 CFM
810 CFM
E-AHU-01 / FPB-122 Supply Outlet Summary
System / Unit
Outlet
Type
Outlet-01
Outlet-02
Design
Readin
Prelim
Reading
%
Prelim
SD
200
210
105
195
98
SD
200
190
95
200
100
Outlet-03
SD
200
165
83
195
98
Outlet-04
SD
200
190
95
205
103
800
755
94- %
795
99- %
Totals :
-
Type of
Readin
-
Face
Area
-
AK
Factor
-
* Notes
JEDI Balancing, Inc.
JEDI
Final
% Final
Reading Deviati
Air Handling Unit
PROJECT: TCH RADIOLOGY AND PROCEDURE CENTER PHASE I
LOCATION: AURORA, CO
DATE: 1/21/2013
CONTACT: Trevor Quain
AUTHOR: Greg Barnes
Tested By: Greg Barnes
Test Date: January 17, 2013
SYSTEM/UNIT: E-AHU-01 / FPB-123
AREA:
Unit Data
170
0.52
2.07
VAV Address
Box Inlet Size
K Factor
Test Data
Max Design CFM
Max Actual CFM
Min Design CFM
Min Actual CFM
Reheat Design CFM
Reheat Actual CFM
800 CFM
810 CFM
240 CFM
245 CFM
800 CFM
820 CFM
E-AHU-01 / FPB-123 Supply Outlet Summary
System / Unit
Outlet
Type
Outlet-01
Outlet-02
Design
Readin
Prelim
Reading
%
Prelim
SD
200
145
73
195
98
SD
200
140
70
195
98
Outlet-03
SD
200
220
110
210
105
Outlet-04
SD
200
195
98
210
105
800
700
88- %
810
101- %
Totals :
-
Type of
Readin
-
Face
Area
-
AK
Factor
-
* Notes
JEDI Balancing, Inc.
JEDI
Final
% Final
Reading Deviati
Air Handling Unit
PROJECT: TCH RADIOLOGY AND PROCEDURE CENTER PHASE I
LOCATION: AURORA, CO
DATE: 1/21/2013
CONTACT: Trevor Quain
AUTHOR: Greg Barnes
Tested By: Greg Barnes
Test Date: January 17, 2013
SYSTEM/UNIT: E-AHU-01 / VAV-121
AREA:
Unit Data
141
0.52
1.98
VAV Address
Box Inlet Size
K Factor
Test Data
Max Design CFM
Max Actual CFM
Min Design CFM
Min Actual CFM
600 CFM
592 CFM
180 CFM
185 CFM
E-AHU-01 / VAV-121 Supply Outlet Summary
System / Unit
Outlet
Type
Outlet-01
Outlet-02
Design
Readin
Prelim
Reading
SD
250
210
84
240
48
SD
50
60
120
52
270
Outlet-03
SD
150
165
110
145
Outlet-04
SD
150
165
110
155
103
600
600
100- %
592
99- %
Totals :
-
Type of
Readin
-
Face
Area
-
AK
Factor
-
* Notes
JEDI Balancing, Inc.
JEDI
%
Prelim
Final
% Final
Reading Deviati
ARCHITECT
HKS, INC.
1900 WAZEE STREET, SUITE 209
DENVER, COLORADO 80202
MECHANICAL /
ELECTRICAL CONSULTANT
CAVEO CONSULTING ENGINEERS, INC.
6143 WILLOW DRIVE, SUITE 405
ENGLEWOOD, COLORADO 80111
TECHNOLOGY CONSULTANT
RIMROCK GROUP
1080 NEW ALLEGIANCE DRIVE, SUITE 400
COLORADO SPRINGS, COLORADO 80921
STRUCTURAL CONSULTANT
STRUCTURAL CONSULTANTS, INC.
3400 EAST BAYAUD AVENUE, SUITE 300
CEILING DEVICE SCHEDULE
Module Neck
Size
Size
Mark Manufacturer Model #
EG-1
ER-1
RR-1
RR-2
RR-3
RR-4
SD-1
SD-2
SD-3
TITUS
TITUS
TITUS
TITUS
TITUS
TITUS
TITUS
TITUS
TITUS
Tag
Type
S1D
S2D
S3B
S3D
S4D
S6B
S7B
S8B
S9B
S10B
S11B
S16B
S21B
S23B
S32A
S34C
S39A
S40A
VAV-1
VAV-2
VAV-3
VAV-4
VAV-6
VAV-7
VAV-8
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
REHEAT
CONSTANT
VOLUME
23RL
PAR
PAR
PAR
PAR
PAR
TMS
TMS
TMS
18x10
12x12
24x24
24x24
24x24
24x24
24x24
24x24
24x24
Max
N.C.
18x10
6x6
6x6
8x8
10x10
12x12
6"Ø
8"Ø
10"Ø
Notes
<30
<30
<30
<30
<30
<30
<30
<30
<30
AIR TERMINAL BOX SCHEDULE
Cooling Air Quantity
Heating Coil
Heating E.A.T. L.A.T.
Flow
Pipe E.W.T. L.W.T.
(°F) BTUH (GPM) Size
(°F)
(°F)
Max. CFM Min. CFM Air CFM (°F)
1500 CFM
1950 CFM
700 CFM
1950 CFM
1500 CFM
400 CFM
1500 CFM
400 CFM
1000 CFM
1500 CFM
1500 CFM
1430 CFM
700 CFM
1500 CFM
1950 CFM
700 CFM
1950 CFM
1950 CFM
570 CFM
1060 CFM
95 CFM
2575 CFM
300 CFM
800 CFM
280 CFM
350 CFM
475 CFM
150 CFM
475 CFM
350 CFM
75 CFM
350 CFM
75 CFM
250 CFM
350 CFM
350 CFM
400 CFM
150 CFM
350 CFM
475 CFM
150 CFM
475 CFM
475 CFM
100 CFM
530 CFM
50 CFM
1290 CFM
300 CFM
400 CFM
280 CFM
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
100
530
50
1290
300
400
280
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
4.1
5.3
1.9
5.3
4.1
1.1
4.1
1.1
2.7
4.1
4.1
4.1
1.9
4.1
5.3
1.9
5.3
5.3
.3
1.7
.2
4.1
0.9
1.3
0.9
4730
25040
2360
60950
14180
18900
13230
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
3/4"
3/4"
3/4"
1"
3/4"
3/4"
3/4"
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
Inlet
Size
12"
14"
8"
14"
12"
6"
12"
8"
10"
12"
12"
12"
8"
12"
14"
8"
14"
12"
8"
10"
6"
10"
6"
10"
6"
Manufacturer Model #
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
TITUS
TITUS
TITUS
TITUS
TITUS
TITUS
TITUS
Service
FCU-1
RADING ROOM AC
UNITS
Manufactur
er
DATA AIRE
Model
DAFC-2834
Operating
Weight
(LBS)
L
970
W
120
Notes
Controls
DESV-8
DESV-10
DESV-6
DESV-10
DESV-6
DESV-10
DESV-6
DDC
DDC
DDC
DDC
DDC
DDC
DDC
FLUID COOLER UNIT
Electric
Dimmensions
Tag
RADIOLOGY / PROCEDURE
DEPARTMENT RENOVATION
DENVER, COLORADO 80209
H
49
40
Controls
INT + DDC
Comments
Voltage
1-4
208
Condenser
Phase
Hz.
60 Hz
3
# of
Condenser
Fans
3
Fan HP
(ea)
.75
Pump
FLA (ea)
4.6
# of Pumps
2
HP (ea)
FLA (ea)
2
6.0
Total Head
(FT.)
GPM
35
90
OWNER
NOTES:
1. SINGLE POINT ELECTRICAL CONNECTION WITH FACTORY DISCONNECT.
2. REDUNDANT PUMPS WITH AUTO CHANGEOVER.
3. FACTORY PROVIDED EXPANSION TANK.
4. SYSTEM TO BE FILLED WITH 40% P.G.
CHILDREN'S HOSPITAL COLORADO
ANSCHUTZ MEDICAL CAMPUS
13123 EAST 16TH AVENUE
AURORA, COLORADO 80045
FAN SCHEDULE
Dimmensions
Fan
Motor
Tag
Drawing
Number
Area
Served
EF-202
2MH1.1A
EF-201 A&B
10TH FLOOR
HOT LAB
Type
INDUSTRIAL
Manufactur
er
MRI-3&4
INLINE
COOK
Model
70-MHA-SD
Operating
Weight
COOK
195R8B
275
L
18
W
H
Controls
420
21
27
44
DDC
27
30
DDC
Notes
CFM
1,2,3,4
Fan Type
800 CFM
INDUSTRIAL
UTILITY
UPBLAST
3600 CFM
Drive
T.S.P. @
Alt. (In.
W.C.)
RPM Max
HP
V-P
Motor Type
Starter
E-Power
BELT
1.0
1379
1.5
460-3
ODP
VFD
YES
BELT
4.0
2841
1.5
460-3
ODP
VFD
YES
Sound
Sound
Outlet
Sound
(LwA)
Inlet (LwA)
88
78
--
78
KEY PLAN
NOTES:
1. MOUNT ON EXISTING INERTIA BASES IN 10TH FLOOR MECHANICAL ROOM.
2. CONNECT TO DUCTWORK WITH FLEXIBLE CONNECTORS.
3. EXTENDED LUBE LINES.
4. BELT GAURD.
5. ADJUSTABLE SUPPORTS.
A
INT & DDC
V
460
AIR CONDITIONING UNIT SCHEDULE
Compressor
Section
Electric
Supply Fan
DX Cooling Coil
Conenser Water
Chilled Water Coil
Humidifier
Final Filter
Single
E.S.P.
E.A.T. L.A.T
Glycol
Max.
Sens. E.A.T.
L.A.T.
Chilled H20
H20
Point
@ Alt.
P.D. (FT.
Face Total Cap.
P.D. (In. Capacity
Total Sens.
Drain
AMP/MCA/
(In.
W.C.
Velocity
(BTU
W.C.
Cap.
Cap.
Cap.
#-Steam/
Conn.
Fan Fan
Motor
Refr.
#
FLA Glygol Glycol
Supply Return Drain
Water Inlet
MERV
% of Type of Supply Return
MOP
Hr
%
Conn. Conn. Conn. (FPM) (MBH) H)
Type Size Size Type Depth Rating
P Hz.
CFM Type Class W.C.) HP (M BH) (MBH) DB WB DB WB Type Comp. (Ea) Type
GPM Max)
DB WB DB WB GPM E.W.T. L.W.T Glycol Glycol Conn. Conn. Max)
3
60
3.6/5.0/15
1200
BELT
I
.5
0.75
1-1/8"
1-1/8"
3/4"
400
27300
24100
INT & DDC
460
3
60
4.5/5.6/15
2500
BELT
I
.5
1.5
1-1/8"
1-1/8"
3/4"
500
57600
52200
INT & DDC
460
3
60
4.5/5.6/15
2500
BELT
I
.5
1.5
1-1/8"
1-1/8"
3/4"
500
57600
52200
INT & DDC
208
3
60
25.3/30.4/50
2000
BELT
I
.5
1.5
48900
41400
75 °F 61 °F 52 °F 50 °F
R-410A
1
9.6
PROPYLENE
40
17.5
15
1-1/8"
1-1/8"
3/4"
INT & DDC
208
3
60
25.3/30.4/50
2000
BELT
I
.5
1.5
48900
41400
75 °F 61 °F 52 °F 50 °F
R-410A
1
9.6
PROPYLENE
40
17.5
15
1-18/"
1-1/8"
3/4"
Dimmensions
Tag
8/16/2012 4:35:05 PM
PLOT DATE:
TEMPLATE VERSION: 2.5.0.20100809
AC-1
Drawing
#
Service
Type
2MH1.1A
ROOM A1470
CONCEALED
AC-2
2MH1.1A
ROOM A1408
AC-3
2MH1.1A
AC-4
AC-5
C
Nom.
Cap.
(TONS) Manufacturer Model
3
DATA-AIRE
DAPC-0334
CONCEALED
5
DATA-AIRE
ROOM A1477
CONCEALED
5
1MH1.1C
C1277
CONCEALED
1MH1.1C
C1277
CONCEALED
Op.
Wt.
L
W
(LBS) (IN) (IN)
Control
H
(IN) Mounting Type Notes
420
26.5
51
24
DAPC-534
530
36
51
24
DATA-AIRE
DAPC-534
530
36
51
24
5
DATA-AIRE
DAPG-0534P
885
54
51
24
5
DATA-AIRE
DAPG-0534P
885
54
51
24
SPRING
ISOLATORS
SPRING
ISOLATORS
SPRING
ISOLATORS
SPRING
ISOLATORS
SPRING
ISOLATORS
75.0
°F
75.0
°F
75.0
°F
61.0 °F 52.5 °F 51.2 °F
11
45.0 °F
50.3 °F
0
NA
1 1/8"
1 1/8"
9.70
5
DCW
1/4"
3/4"
PLEATED
2' - 0"
8
61.0 °F 53.9 °F 52.0 °F
17
45.0 °F
51.0 °F
0
NA
1 1/8"
1 1/8"
20.80
5
DCW
1/4"
3/4"
PLEATED
2' - 0"
8
61.0 °F 53.9 °F 52.0 °F
17
45.0 °F
51.0 °F
0
NA
1 1/8"
1 1/8"
20.80
5
DCW
1/4"
3/4"
PLEATED
2' - 0"
8
PLEATED
2' - 0"
8
PLEATED
2' - 0"
8
NOTES:
1. ABOVE CEILING UNIT WITH DUCTED SUPPLY, PLENUM RETURN.
2. PROVIDE MINI DAP-III CONTROLLER WITH BACNET INTERFACE.
3. NO REHEAT.
4. FACTORY PROVIDED DISCONNECT.
5. FACTORY PROVIDED CONDENSATE PUMP.
6. MICRO-SWTICH FOR CONDENSATE PAN OVERFLOW.
7. STAINLESS STEEL DRAIN PAN.
B
REVISION
NO.
DESCRIPTION
DATE
HKS PROJECT NUMBER
14977.004
DATE
17 AUGUST 2012
ISSUE
PERMIT SET
SHEET TITLE
MECHANICAL
DETAILS AND
SCHEDULES
M501
SHEET NO.
© 2012 HKS, INC.
A-6
A-7
A-8
A-9
A-10
A-11
A-12
A-13
A-14
ARCHITECT
HKS, INC.
1900 WAZEE STREET, SUITE 209
DENVER, COLORADO 80202
A-Z
MECHANICAL /
ELECTRICAL CONSULTANT
CAVEO CONSULTING ENGINEERS, INC.
6143 WILLOW DRIVE, SUITE 405
ENGLEWOOD, COLORADO 80111
MEN'S TOILET-1
A1493A-1
TECHNOLOGY CONSULTANT
STAFF LOUNGE-1
HOLD-1
A1495-1
A1491-1
RIMROCK GROUP
STAIR-1
1080 NEW ALLEGIANCE DRIVE, SUITE 400
AS101-1
COLORADO SPRINGS, COLORADO 80921
STRUCTURAL CONSULTANT
STRUCTURAL CONSULTANTS, INC.
MEN'S LOCKER-1
3400 EAST BAYAUD AVENUE, SUITE 300
A1493-1
STAIR VESTIBULE-1
A-A
DENVER, COLORADO 80209
STOR FACILITIES-1
AV101-1
A0271-1
50"x34"
RR-3
565 CFM
TYP.
CORRIDOR-1
AC146-1
FS
FS
FS
AC148-1
CORRIDOR-1
FLUORO RADIOLOGY-1
STOR FACILITIES-2
A1483A-1
A0271-2
FS
RADIOLOGY STORAGE-1
A1479-1
CT SCAN-1
EQUIP-1
CT SCAN-1
HALL-1
A1483-1
A1481A-1
A1481-1
AH147-1
FS
MRI EQUIPMENT-1
MRI-1
MRI CONTROL-1
MRI-1
A1477-1
A1475-1
A1473-1
A1471-1
A1381-1
SD-2
285 CFM
TYP.
HALL-1
AH146-1
MRI EQUIPMENT-2 ELECTRICAL-3
A1381-3
A1470-2
HALL-1
A1381-2
PREP/RECOVERY INDUCTION-2
A1480-1
A1414
4"
x3
"
50
1
A1416-2
A1440-1
ALCOVE-1
S23B
R
24"x12"
BONE DENSITY-2
A1247-2
HALL-1
2
BONE DENSITY
AH131-1
R
FS
CORRIDOR-2
AC129-2
60 CFM
TYP.
46"x24"
1
2
35 CFM
TYP.
R
16"x10"
FS
R
STORAGE-2
6"x6"
A1244-2
FS
UTILITY LINEN/TRASH-1
1
FS
A1242-1
GENERAL RADIOLOGY-1
A1385-1
FS
VAV-1
READING ROOM
A1427-1
A1372
TOILET-1
A1442-1
CORRIDOR-1
A1435-1
PREP/RECOVERY-1
PREP/RECOVERY
A1425-1
A1412
AC131-1
IMAGE SUPPLY-1
GENERAL RADIOLOGY-1
TOILET-1
A1383-1
A1310A-1
A1375-1
CLEAN SUPPLY
FS
A1379-1
IDF-1
SPECIAL EQUIPMENT-1
A1411
SOILED HOLD
S16B
A1409
FS
S16B
HALL-1
CONTROL-1
AH145-1
A1444-1
A1453-1
EQUIPMENT-1
FAMILY TOILET-1
HALL
A1433-1
HALL
PREP/RECOVERY-1
A1423-1
SPECIAL PROCEDURE-1
CAREGIVER
MEDS
A1431-1
A1406
A1408
A1378-1
AH139
AH144
60"x36"
ED/RAD WAITING-1
1
SWALLOW TEAM-2
S23B
A1240-2
165 CFM
R
PATIENT TLT-1
50"x34"
A1482-1
A-C
12"x6"
S21B
HOLD-1
GENERAL RADIOLOGY
TRAUMA-1
A1455-1
24"x12"
A1387-1
VAV-1
A1389-1
12"x6"
A1324
GENERAL RADIOLOGY-1
A1391-1
A1429-1
HOT LAB-1
DIRECTOR OFFICE
150 CFM
RAD/READ PROCESSING-1
TOILET-1
2
14"x8"
A1314
2
ELECTRICAL-2
AH148-1
CONTROL-1
3
6
1
SD-2
285 CFM
TYP.
ELECTRICAL-1
A-B
4
5
A1393-1
150 CFM
EQUIP-1
S21B
FS
AC148-2
RADIOLOGY / PROCEDURE
DEPARTMENT RENOVATION
44"x24"
CORRIDOR-2
NUC MED-1
A1310-1
ALCOVE
A1410
TOILET
TOILET-1
A1371A
A1307-1
GENERAL RADIOLOGY-1
RADIOLOGY STORAGE
A1451-1
CLEAN ELEVATOR-1 PREP/RECOVERY-1
A1421-1
AE501-1
RADIOLOGY CONSULT
A1404
A1403
FLUORO RADIOLOGY-1
FLUORO RADIOLOGY-1
A1371
A1373-1
A1377-1
S18B
LINEN-1
A1401
12"x12"
16"x8"
TOILET-1
HOT LAB-2
A1303-1
A1367A-1
3
A1306-2 FS
FS
A-D
PREP/RECOVERY
FLUORO RADIOLOGY
R
CORRIDOR-1
30"x14"
AC144-1
60"x36"
FS
FS
A1737-3
A1764-1
A1762-1
6"x6"
MEN'S LOCKER-1
A1741-1
CORRIDOR-1
CAREGIVER-2
WOMEN'S LOCKER-1
A1708A-1
PASSAGE-1
ULTRASOUND 1-1
A1710-1
A1708-1
36"x12"
FS
ARCHIVE-1 STORAGE-1
A1306C-1
A1796-1
6"x6"
TOILET
OWNER
T1306
CHILDREN'S HOSPITAL COLORADO
ANSCHUTZ MEDICAL CAMPUS
13123 EAST 16TH AVENUE
1
AURORA, COLORADO 80045
R
6"ø
TOILET
A1733-2
A1740-1
TEMP. HOT LAB
48"x18"
A1706
A1712-2
A1736
AC177-1
TOILET-1
ULTRASOUND 2-2
PACU
AC171-1
ALCOVE
48"x18"
FS
TOILET-1
12"x6"
SOIL HOLD-3
FS
FS
FS
FS
CORRIDOR-1
TEMP U/S TECH WORK-1
2
R
FS
A1703
2
A1701
CLEAN SCOPE-1
HALL
A1771-1
AH173
1 PHASE 1 DUCTWORK NEW PLAN- AREA A
1 LEVEL
1/8" = 1'-0"
KEY PLAN
C
A
B
GENERAL NOTES:
NEW FLAG NOTES:
1.
2.
3.
REVISION
NO.
RAISE DUCT TIGHT TO STRUCTURE.
EXTEND DUCTWORK TO RELOCATED DEVICES IN
TEMPORARY HOT LAB.
ALL HOT LAB EXHAUST DUCTWORK IS TO BE WELDED
STAINLESS STEEL RATED TO -6.O"WG.
DESCRIPTION
DATE
HKS PROJECT NUMBER
8/16/2012 3:29:09 PM
PLOT DATE:
TEMPLATE VERSION: 2.5.0.20100809
14977.004
DATE
17 AUGUST 2012
ISSUE
PERMIT SET
SHEET TITLE
PHASE 1
MECHANICAL
DUCTWORK PLAN LEVEL 1 AREA A
1MH1.1A
SHEET NO.
© 2012 HKS, INC.
A-6
A-7
A-8
A-9
GENERAL RADIOLOGY-1
A-10
CLEAN ELEVATOR-1 PREP/RECOVERY-1
A1421-1
AE501-1
FLUORO RADIOLOGY-1
FLUORO RADIOLOGY-1
A1371
A1373-1
A1377-1
RADIOLOGY CONSULT
A1404
A1403
A-13
S18B
LINEN-1
A1401
TOILET-1
A-14
12"x12"
16"x8"
ARCHITECT
HOT LAB-2
A1303-1
A1367A-1
HKS, INC.
3
1900 WAZEE STREET, SUITE 209
A1306-2 FS
FS
A-D
PREP/RECOVERY
A-12
FLUORO RADIOLOGY
RADIOLOGY STORAGE
A1451-1
A-11
DENVER, COLORADO 80202
MECHANICAL /
ELECTRICAL CONSULTANT
R
R
CORRIDOR-1
60"x36"
FS
SOIL HOLD-3
6"x6"
CORRIDOR-1
A1741-1
AC177-1
A1762-1
ULTRASOUND 2-2
PACU
ULTRASOUND 1-1
A1710-1
A1708-1
14"x10"
TOILET
TOILET
A1714
A1712A
PACU
CRITICAL ELEVATOR-1
A1733A-1
A1734
16"x10"
TOILET-1
A1771-1
AE601-1
1080 NEW ALLEGIANCE DRIVE, SUITE 400
COLORADO SPRINGS, COLORADO 80921
1
STRUCTURAL CONSULTANT
STRUCTURAL CONSULTANTS, INC.
FS
3400 EAST BAYAUD AVENUE, SUITE 300
6"ø
16"x10"
A1703
DENVER, COLORADO 80209
FS
2
A1701
SUBWAIT
AH173
A1799B
HALL-1
ULTRASOUND 3-1
AH175-1
A1716-1
FS
TECH WORK-1
S11B
CHANGE
CHANGE
A1711-1
PACU-1
HALL-1
RIMROCK GROUP
T1306
R
TOILET
TOILET
HALL
A1773-1
PASSAGE-1
ARCHIVE-1 STORAGE-1
A1306C-1
A1796-1
6"x6"
36"x12"
A1733-2
CLEAN SCOPE-1
DECONTAM-1
A1708A-1
CAREGIVER-2
A1740-1
48"x18"
A1706
A1712-2
A1736
WOMEN'S LOCKER-1
A1702
A1704
A1732-1
NURSE WORK-1
COORDINATOR OFFICE
A1753-1
A1721
HALL-1
50"x14"
AH170-1
AH179-1
24"x10"
CLEAN ELEVATOR-1
AE602-1
ENDO PROCEDURE-1
A1783-1
ENDO PROCEDURE-1
DUMB WAITER-1
A1781-1
AE603-1
ELEC
PACS OFFICE
MANAGER OFFICE
A1718
A1725
A1723
FS
A-E
TOILET-1
TECHNOLOGY CONSULTANT
TEMP. HOT LAB
RADIOLOGY / PROCEDURE
DEPARTMENT RENOVATION
A1764-1
AC171-1
ALCOVE
48"x18"
FS
FS
A1737-3
12"x6"
TOILET-1
FS
FS
FS
FS
CORRIDOR-1
MEN'S LOCKER-1
6143 WILLOW DRIVE, SUITE 405
ENGLEWOOD, COLORADO 80111
30"x14"
AC144-1
TEMP U/S TECH WORK-1
CAVEO CONSULTING ENGINEERS, INC.
2
PACU-2
FS
A1730-2
CAREGIVER-1
A1751-1
PACU-2
HALL
A1731-2
AH172
A-F
HALL-1
50"x50"
50"x30"
AH174-1
78"x28"
FS
42"x20"
SUPPLY
50"x20"
A1804
ARCHIVE
A1800
FS
SCHEDULE
CONF
A1808
A1807
78"x28"
ANEST. WORK-1
A1802
SHARED OFFICE
STAFF TOILET
A1806
A1874-1
ENEMA ROOM-1
BRONCH PROCEDURE-1
A1872-1
A1870-1
TEMP PACU-1
TEMP PACU-1
A1862-1
A1860-1
72"x26"
TOILET-1
STERILE-1
A1872A-1
A1860A-1
PREP/RECOVERY
PREP/RECOVERY
PREP/RECOVERY
PREP/RECOVERY
A1819
A1817
A1815
A1813
A1811
HALL-1
78"x28"
72"x26"
AH189-1
MINOR PROCEDURE-1
MINOR PROCEDURE-1
STRETCHER ALCOVE-1
IDF-1
A1883-1
A1881-1
A1864-1
A1866-1
SOILED ELEVATOR-1
HALL
AE701-1
AH186
SOILED UTILITY-1
TEMP NOURISHMENT-1
A1851-1
T1838-1
50"x32"
A-G
PREP/RECOVERY
CLEAN STORAGE-2
R
A1832-2
PREP
A1812
R
HALL-1
ALCOVE-1
AH184-1
STERILE-1
A1868-1
ELECTRICAL-1
EQUIPMENT STORAGE-1
A1857-1
A1855-1
A1885-1
HALL-1
MEDS-2
CAREGIVER
AH185-1
A1836-2
A1830
CAREGIVER-2
FS
NOURISH
A1838-2
A1834
TOILET-2
TOILET
A1853-2
A-H
A1820
HALL-1
AH188-1
HALL-2
AH182-2
MINOR PROCEDURE-1
MINOR PROCEDURE-1
STRETCHER STORAGE-2
A1882-1
A1880-1
A1835-2
OWNER
CHILDREN'S HOSPITAL COLORADO
ANSCHUTZ MEDICAL CAMPUS
PREP-1
PREP-1
PREP-1
PREP-1
TOILET-1
A1856-1
A1854-1
A1852-1
A1850-1
A1848-1
A1846-1
A1844-1
A1842-1
A1840-1
A1840A-1
13123 EAST 16TH AVENUE
AURORA, COLORADO 80045
FS
PREP-1
FS
PREP-1
FS
PREP-1
FS
EQUIPMENT STORAGE-1
FS
E.S. CLOSET-1
KEY PLAN
1 PHASE 1 DUCTWORK NEW PLAN- AREA B
1 LEVEL
1/8" = 1'-0"
C
A
B
REVISION
NO.
GENERAL NOTES:
DESCRIPTION
DATE
NEW FLAG NOTES:
1.
2.
EXISTING SUPPLY DIFFUSER TO BE RELOCATED.
NEW RETURN DIFFUSER.
HKS PROJECT NUMBER
8/16/2012 3:30:35 PM
PLOT DATE:
TEMPLATE VERSION: 2.5.0.20100809
14977.004
DATE
17 AUGUST 2012
ISSUE
PERMIT SET
SHEET TITLE
PHASE 1
MECHANICAL
DUCTWORK PLAN LEVEL 1 AREA B
1MH1.1B
SHEET NO.
© 2012 HKS, INC.
C-4
C-5
10"ø
12"ø
24"x12"
36"x18"
ARCHITECT
20"x18"
HKS, INC.
1900 WAZEE STREET, SUITE 209
CAVEO CONSULTING ENGINEERS, INC.
6143 WILLOW DRIVE, SUITE 405
TECHNOLOGY CONSULTANT
10"ø
10"ø
FS
R
RIMROCK GROUP
1080 NEW ALLEGIANCE DRIVE, SUITE 400
14"x10"
8"ø
ENGLEWOOD, COLORADO 80111
14"x12"
10"ø
VAV-121
MECHANICAL /
ELECTRICAL CONSULTANT
16"ø
24"x12"
C-B
24"x12"
DENVER, COLORADO 80202
COLORADO SPRINGS, COLORADO 80921
R
22"x16"
R
18"x10"
3400 EAST BAYAUD AVENUE, SUITE 300
FS
R
8"ø
FCU-1A
RADIOLOGY / PROCEDURE
DEPARTMENT RENOVATION
8"ø
8"ø
18"x12"
52"x18"
6"ø
R
FS
FS
DENVER, COLORADO 80209
1
R
R
STRUCTURAL CONSULTANTS, INC.
FPB-122
FPB-123
8"ø
STRUCTURAL CONSULTANT
14"x10"
R
8"ø
AHU-1A
8"ø
R
6"ø
8"ø
8"ø
8"ø
8"ø
52"x36"
R
R
R
R
R
6"ø
C-C
MECHANICAL DUCTWORK PLAN - LEVEL 1
1 DEMOLITION
1/4" = 1'-0"
DEMO FLAG NOTES:
1.
C-4
CEILING DEVICE TO BE RELOCATED,
TYPICAL.
C-5
10"ø
12"ø
24"x12"
36"x18"
R
R
SD-1
400 CFM
8"ø
8"ø
14"x10"
R
8"ø
10"ø
10"ø
SD-1
400 CFM
8"ø
10"ø
10"ø
150
C-C
2
3
16"ø
24"x12"
18"x10"
200
1
10"ø
200
8"ø
2
8"ø
R
1
8"ø
FCU-1A
3 3
C
A
B
8"ø
52"x36"
200
200
R
2
18"x12"
AHU-1A
R
SD-1
400 CFM
FS
10"ø
KEY PLAN
8"ø
200
AURORA, COLORADO 80045
FPB-122
SD-1
400 CFM
8"ø
SD-1
400 CFM
13123 EAST 16TH AVENUE
14"x12"
26"x12"
16"x12"
6"ø
4
10"ø
SD-1
400 CFM
ANSCHUTZ MEDICAL CAMPUS
FPB-122
SD-1
400 CFM
FPB-123
C1227
SD-1
400 CFM
5
CHILDREN'S HOSPITAL COLORADO
FS
FPB-123
1
FS
10"ø
5
READING ROOM
AC-5
FS
10"ø
6"ø
4 1
200
14"x10"
3
2
4
AC-4
OWNER
R
52"x18"
8"ø
14"x12"
2
22"x16"
R
10"ø
R
150
6"
1
10"ø
1
250
6"ø
SD-1
50 CFM
AC-4
AC-4
10"ø
C1219
1
14"x10"
COPY ROOM
VAV-121
10"ø
C1220
26"x12"
2
VAV-121
AV STORAGE
26"x12"
C-B
24"x12"
20"x18"
SD-1
400 CFM
6"ø
4
R
SD-1
400 CFM
4
2
3
REVISION
NO.
DESCRIPTION
DATE
8/16/2012 6:50:15 PM
PLOT DATE:
TEMPLATE VERSION: 2.5.0.20100809
HKS PROJECT NUMBER
14977.001
DATE
17 AUGUST 2012
NEW FLAG NOTES:
DUCTWORK PLAN - LEVEL 1
2 MECHANICAL
1/4" = 1'-0"
1.
2.
3.
ISSUE
PERMIT SET
WATER SOURCE AIR CONDITIONING
UNITS. SUSPEND FROM STRUCTURE
WITH 1" SPRING ISOLATORS. REFER TO
SCHEDULE ON M601.
RELOCATED CEILING DEVICES, TYPICAL.
ADJUST OR PROVIDE NEW FLEX DUCT
AS NEEDED TO ACCOMMODATE NEW
ARRANGEMENT.
SD-1, SUPPLY DIFFUSER, TYPICAL.
SHEET TITLE
PHASE 1 DEMO
AND NEW MECH
DUCTWORK PLAN LEVEL 1 AREA C
1MH1.1C
SHEET NO.
© 2012 HKS, INC.