ICT Module 3 - ICT Systems Check
X30 Monitor Training
ICT Module 3 : ICT Systems Check
Step 1
• Press the Topcon logo for
one second to load the
Global Home screen menu.
ICT Module 3: ict systems check
Step 2
• Navigate to the Mapping
screen.
ICT Module 3: ict systems check
Step 3
• Expand the Job Menu icon.
ICT Module 3: ict systems check
Step 4
• While expanded; Create New
Job
ICT Module 3: ict systems check
Step 5
• Rename the job; SECTIONTEST
ICT Module 3: ict systems check
Step 6
• Return to the Global Home
screen menu and select
SEEDER-HOME.
ICT Module 3: ict systems check
Step 7
• Expand and add a highly
visible product into each of
the Tanks. We recommend
using 46-0-0.
ICT Module 3: ict systems check
Step 8
• Navigate to the Calibration page.
ICT Module 3: ict systems check
Step 9
• Preform a Calibration of the
test product on each of the
Tanks. Refer: to the Calibration
procedure outlined in the X30
User Guide if required.
• MANUAL SPEED ON
• CALIBRATION
• AUTOMATIC CALIBRATION
ICT Module 3: ict systems check
Step 10
• Once the Calibrations are
completed.
• DIVERT THE OIL FLOW BACK
TO THE FAN!!! CLOSE THE
LIDS AND RESUME THE
AIRCART FOR NORMAL
SEEDING OPERATION
(PRODUCT DIVERTERS).
ICT Module 3: ict systems check
Step 11
• Return to the SEEDER-HOME
screen.
ICT Module 3: ict systems check
Step 12
• Ensure the ASC Mode is OFF.
ICT Module 3: ict systems check
Step 13
• Turn ON TANK 1 only.
ICT Module 3: ict systems check
Step 14
• Turn ON Section 1
• RED = OFF
• ORANGE = READY
• GREEN = ENGAGED
ICT Module 3: ict systems check
• Engage the Master Switch for
approximately 10 seconds.
Step 15
• Note: The Section State will change to
the color Green after the Master switch
has been activated and the section ON
/OFF time duration has full counted. This
represents that product has arrived and
is flowing at the openers.
ICT Module 3: ict systems check
Step 16
• SECTION 1 is the outer LEFT
WING (DIAGRAM IS FOR
REFERENCE ONLY).
ICT Module 3: ict systems check
Step 17
• Verify that the Product has
exited out of the openers on
the appropriate drill section.
• Using a stop watch; time how
long it takes for the product to
travel from the metering body
to the openers. Document your
times. (SEE TIME TABLE SHEETS
AT BACK OF MANUAL)
ICT Module 3: ict systems check
Step 18
• Have an operator cycle the
sections several times on/off
while the metering is engaged.
• Inspect the Cylinder and ICT
mechanism for smooth
operation. Keep hands and
clothing clear at all times!
ICT Module 3: ict systems check
Step 19
• Turn OFF Section #1, Turn
ON Section #2. Repeat the
above procedure on the
remaining sections
ICT Module 3: ict systems check
Step 20
• Once you have tested all of
the sections turn the Tank
OFF, and repeat the
complete procedure on Tank
2-3-4 individual.
• We recommend driving the
complete unit forward
several feet, as it makes
product verification easier.
ICT Module 3: ict systems check
Step 21
• When testing is completed
return to the Calibration
screen and Turn Manual
Speed OFF, and Enable all
Sections.
ICT Module 3: ict systems check
Step 22
• Chart Timetable for tests
ICT Module 3: ict systems check