Allen-Bradley Short Flipper Switch HD Rail Installation Instructions

The Allen-Bradley Short Flipper Switch HD Rail is a key component for upgrading MagneMover LITE switches. This rail ensures smooth and reliable operation, delivering increased durability and performance compared to previous versions. This upgrade facilitates the use of Double Shear SF Switch Kits, enabling efficient material handling and automation processes.

PDF Download
Document
Allen-Bradley Short Flipper Switch HD Rail Installation Instructions | Manualzz

Advertisement

Advertisement

Advertisement

Key Features

  • Double Shear SF Switch Kit Compatibility
  • Upgrade for MagneMover LITE switches
  • Enhanced Durability and Performance
  • HD Construction
  • Straight Rail Design

Frequently asked questions

What components are required for the upgrade?

The required parts include the HD rail, flipper axle, bearing spacer, screws, and Loctite 243. You can find the specific information in the Upgrade Preparation section of the viewed document.

How do I install the new rail assembly?

Follow the steps outlined in the Upgrade Installation section of the viewed document. Make sure to align the components correctly and use the appropriate tools, including the alignment pin.

What is the tightening torque for the set screw on the arm bearing assembly?

The set screw should be tightened to 3 in•lb as indicated in the viewed document.
Preparing document for printing…
0%