ADAPTFd

ADAPTFd
ADAPT Free d
TM
Installation – Commissioning – Maintenance
Installation
All connections to the duct system should be done with a
straight duct of the same dimension as the box inlet and
with a length > 2 x ØD. If a flexible duct is used, it should be
stretched so it remains as straight as possible, see figure 1.
1.The commissioning box can be suspended from a ceiling
and connected to a duct system.The diffuser is secured
to the ceiling by connecting the M8 threaded rod (A)
into the popnut on the top of the diffuser, see figure 3.
2.Make sure that the orientation of the sensor module
aligns with the extension of the room, see figure 2. If
the connecting duct does not enter the room as in the
example in figure 4, the frontplate of the diffuser must
20151013 / Art. No. 1545217
be dismantled and rotated in a direction with the sensor
module directed as shown in figure 2. Then fixate and
secure the diffuser with screws or pop rivets. Readjust
the hanger rods of the commissioning box if necessary.
3.The front plate is dismantled by pressing the fixing pins
of the bottom plate outward, which will loosen it from
the upper cone. Detach the safety cord that secures front
plate to the upper cone and disconnect the connector
(C, figure 3) from the top of the front plate. When reassembling, press together the S-hook to prevent it from
coming loose.
B
A
Figure 1. Using a flexible duct.
C
Figure 3. ADAPT Free, installation.
Figure 2. The orientation of the sensor module in a room or in an
office module. The LED’s of the sensor should be aligned with
the extension of the room in a straight line, facing the short sides
of the room as shown by the arrow in the figure.
1
WISE
Figure 4. Lighting fixtures or similar objects must not be installed
beneath the diffuser as this disrupts the presence detection and
room temperature measurement.
Commissioning
Maintenance
All the ADAPT Air diffusers are delivered preset into commissioning mode, which means that the air diffuser is set to
max. airflow by override control.
The exterior surface of the ADAPT air diffusers can be
cleaned whenever necessary using lukewarm water with
dishwashing detergent added.
When the ADAPT air diffuser is in commissioning mode,
the light-emitting diode shines orange. The different LED
indications:
The duct system is accessible through the air diffuser and
the commissioning box.
• Steady green LED: Normal operation, the air diffuser is
operating normally.
• Flashing green LED: The air diffuser has just been
powered on and calibration is in progress.
• Steady red LED: Function failure, see separate documentation inte the TUNE Adapt manual.
• Steady orange LED: The commissioning mode, max.
airflow
• Flashing orange LED: Other commissioning modes and
all the forced control situations of the feedback control
system.
More information about the commissioning process itself
can be read in the Project Manual for the Wise system and
the TUNE Adapt manual.
2
Swegon reserves the right to alter specifications.
20151013
www.swegon.com
WISE
24 V
Modbus
Figure 5. Commissioning with TUNE Adapt.
Electrical connections.
All the connections are wired to the CONNECT Adapt connection box. From there, the Master air diffuser is connected
by means of the LINK Adapt (RJ45) cable included in the
delivery. The slave air diffusers, if required, are connected
by means of the same type of cable to their respective slave
contacts. If there are more than 2 slave air diffusers, a SPLIT
Link Adapt should be used for further connection to the last
slave air diffuser. See Figure 7. If SPLIT Link Adapt is used, the
maximum length of LINK Adapt from the connection box to
the last air diffuser is 15 meters. If ADAPT is to be connected
through Modbus communication, this should be done with
the LINK Modbus (RJ12) cable. The maximum length of
SPLIT Link Modbus is 10 meters from the connection box to
the last air diffuser. Use double CONNECT Adapts if longer
distances are required. All cables and contacts are different
so that they will not be confused or incorrectly connected.
3
2
1
Electrical data
ADAPT is supplied with power via the connection box. See
the wiring diagram in figure 7 or relevant diagram from the
Swegon Templates application, containing details for the
specific installation. It is important that cables with appropriate cross-sectional area, transformers of correct size and
power supply cables of correct length are selected. This
can for example be carried out with the dimensioning tool
“Cable and Transformer Design”, available for download
from www.swegon.com (the application is available in
english and swedish language versions).
Supply voltage
3 VA
Cable rating (controller only)
0,6 A
Swegon reserves the right to alter specifications.
1. Connection for LINK Adapt cable (RJ45)
2. Connection for the LINK Modbus cable (RJ12).
3. Direct 24 V connection if a connection box is not used and the
air diffuser will be completely “stand alone”.
24 V AC ±10 %
Max. power consumption (controller only)
Ambient temperature
Figure 6. Air diffuser connections.
0 °C - +50 °C
20151013
www.swegon.com
3
WISE
6
12
6
12
6
12
11
5
2
1
5
2
5
2
5
6
3
10
20
Master
4
1
7a
2
3 4
21
Slave
5
6
7
22
Slave
8
23
Modbus
9 10 11 12 13 14 15 16
5
1
6
- +C
9
A1 A2 1 3
G
OUT1
G0
7b
7c
1
3
2
8
Figure 7. Wiring of Master/Slave air diffusers and accessories.
1. ADAPT Master air diffuser
2. ADAPT Slave air diffusers
3. CONNECT Adapt, connection box
4. 24 V AC Transformer
5. LINK Adapt (5 m long RJ45 cable)
6. LINK Modbus (5 m long RJ12 cable)
7a. TUNE Temp (1 VA)
7b. DETECT Quality (Room version with display - Q0: 1 VA.
Room version without display Q1 and duct version - Q2: 3 VA)
7c. DETECT RH, humidity sensor (1 VA)
8. ACTUATOR, radiator control (max 3 valves at 6 VA)
9. ADAPT Relay, relay for lighting
10. Connection to main control system (Modbus RTU)
11. SPLIT Link RJ45
12. SPLIT Modbus RJ12, max. stab length, 10 m.
*)
Only one of the accessories in paragraph 7 can be connected at
any one time in a room installation.
4
Swegon reserves the right to alter specifications.
20151013
www.swegon.com