QuickBOLT 17713SS Flashed L Foot Instructions
Below you will find brief information for L-Foot 17713SS. This manual provides instructions on how to install the Flashed L-Foot for asphalt shingle roofs. It covers materials needed and step-by-step instructions including rafter location, pre-drilling, sealant application, screw driving, and flashing placement.
Advertisement
Advertisement
Advertisement
Key features
- Designed for asphalt shingle roofs
- Includes flashing
- Requires sealant for proper installation
- Uses screws for secure mounting
Frequently asked questions
You will need a rafter locator, chalk or crayon, a drill with a 1/4" drill bit, MFG approved sealant, a 1/2" nut setter, and a bar.
The first step is to locate and mark the rafter.
Fill the predrilled hole with MFG approved sealant.
Insert the Flashing underneath the shingles.