GE PMCS Power Manament Control System Quickstart Guide
Below you will find brief information for Power Management Control System PMCS. The PMCS software accesses GE MultilinTM and third-party devices in a substation and provides graphical representations of status and energy trends, remote control, and automated responses. By optimizing methods used to control both processes and equipment, energy efficiency is realized.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
▼
Scroll to page 2
of
24
Copyright © 2013 GE Multilin Inc. All rights reserved. Power Management Control System (PMCS) software revision 7.00. EnerVista, Integrator, Digital Energy, Multilin, and GE Multilin are trademarks or registered trademarks of GE Multilin Inc. The contents of this manual are the property of GE Multilin Inc. This documentation is furnished on license and may not be reproduced in whole or in part without the permission of GE Multilin. The manual is for informational use only and is subject to change without notice. Part number: 1601-0268-A1 (May 2013) PMCS Quickstart Guide Quickstart Guide Introduction The Power Management Control System (PMCS) accesses GE MultilinTM and third-party devices in a substation and provides graphical representations of status and energy trends, remote control, and automated responses. By optimizing methods used to control both processes and equipment, energy efficiency is realized. ® PMCS is intended for installation with CIMPLICITY HMI. The wizards contained in the PMCS software allow you to quickly build accurate and friendly user interfaces with CIMPLICITY. Installation of PMCS adds PMCS and EnerVistaTM IntegratorTM functionality to CIMPLICITY. PMCS typically is installed on one computer, and the option exists to install Remote Viewer capability on other computers. The Remote Viewer provides access to events and waveforms. PMCS QUICKSTART GUIDE 1 QUICKSTART GUIDE Devices supported PMCS supports GE Multilin and third-party devices, including Modbusbased devices. The table outlines the devices supported. The numbered products 239, 339, and so on, are also referred to as SR239, SR339, and so on. Firmware revisions other than those listed may not be compatible. When in doubt, contact your GE Sales Representative or GE Digital Energy as outlined in the For further assistance section. Table 1: Devices supported by PMCS Device family Device Firmware ATS MX150 5.4x, 6.0x MX250 5.4x, 6.0x MX350 1.2x UPS UPS, UPS LP, UPS SG 1.0 Trip Units/Switchgear Spectra MicroVersa Trip 5.1x Enhanced MicroVersa Trip C 4.1x Meters/Switches 2 Enhanced MicroVersa Trip D 4.1x GTU (EntelliGuard TU Trip Unit) 7.0x ELVS (Entellisys) 4.5x MET 12.02.02 PQM 3.3x to 3.6x PQMII 1.0x to 2.2x EPM1000 3.8x EPM2000 1.0x EPM2200 1.0x EPM4000 3.8x EPM5000P 2.4x EPM5300P 2.4x EPM5350P 2.4x EPM6000 1.0x EPM9450Q 2.1x PMCS QUICKSTART GUIDE QUICKSTART GUIDE Device family Distribution Feeder Generator Line Current Differential Protection Transformer Motor PMCS QUICKSTART GUIDE Device Firmware EPM9650Q 2.1x EPM9800 6.1x ML2400 3.0x 350 1.2x to 1.4x F35 2.6x to 5.9x F60 2.6x to 5.9x F650 1.6x to 5.4x MIF 2 4.0 735/737 1.5x 750/760 3.6x to 7.4x G30 4.4x to 5.9x G60 2.6x to 5.9x 489 1.3x to 4.03x D30 5.0x to 5.9x D60 2.6x to 5.9x D90Plus 1.8x L30 5.6x to 5.9x L60 2.6x to 5.9x L90 2.6x to 5.9x 745 2.4x to 5.2x T35 2.6x to 5.9x T60 2.6x to 5.9x 345 1.3x to 1.4x 239 2.3x to 2.7x 269+ 6.0x 339 1.3x to 1.4x 369 1.6x to 3.4x 469 2.5x to 5.1x MM200 1.0x to 1.2x MM300 1.2x to 1.5x 3 QUICKSTART GUIDE Device family Device Firmware MMII 4.0x to 5.2x MMIII 1.0 to 1.2x RRTD 1.4x, 1.5x SPM 2.0x, 2.1x M60 2.6x to 5.9x Network N60 3.4x to 5.9x Bus B30 2.6x to 5.9x B90 4.8x to 5.9x Specialized C30 2.6x to 5.9x Miscellaneous C60 2.6x to 5.9x C90Plus 1.6x to 1.8x MRPO 1.0 FIRETRACER 1.0 VERSAMAX 1.0 PMCS includes a set of customized wizard screens for the devices listed in the following table. Table 2: Customized wizard screens Device family Trip Units/Switchgear Device Spectra MicroVersa Trip Enhanced MicroVersa Trip C Enhanced MicroVersa Trip D GTU (EntelliGuard TU Trip Unit) ELVS (Entellisys) Meters PQM PQMII EPM9450Q EPM9650Q Distribution Feeder 735/737 750/760 4 PMCS QUICKSTART GUIDE QUICKSTART GUIDE Device family Device Generator 489 Transformer 745 Motor 469 Universal Relays UR Unpacking checklist The following items are included with purchase: • PMCS software (on CD) • Quickstart Guide (on CD and printed) • Instruction Manual (on CD) • CIMPLICITY HMI (on DVD) If any of the contents listed are missing or there is physical damage to the product, contact GE Digital Energy immediately using the contact information in the For further assistance section. For product information, document updates, and software updates, visit the GE Multilin website at http://gedigitalenergy.com/multilin. Installation This section outlines how to setup computers and install PMCS. PMCS is installed typically in a control room or office, not a substation. The process is as follows: • Check the computer requirements • Set up the computer system • Install the PMCS software System requirements Use a dedicated computer to run the software. Administrator privileges are required for installation. PMCS QUICKSTART GUIDE 5 QUICKSTART GUIDE Software requirements PMCS requires the following software to be pre-installed: • Windows 7 Professional (64 bit) or Windows 2008 Server Standard (64 bit) • Internet Services Manager (IIS) if using remote workstations • CIMPLICITY HMI version 8.2 with SIM4 (minimum). The OPC Client option must be installed. CIMPLICITY software may be provided with purchase; follow the instructions outlined here if not already installed. • .NET framework 4.0 (if not installed, PMCS installs it) Hardware requirements The computer requirements are as follows: • 2.3 GHz (minimum) single processor Dell OptiPlex • 2 GB (minimum) RAM • Two 10Base-T Ethernet cards with static IP addresses (no DHCP support) The following items are recommended: • Excess hard disk space for increased storage of log and trend data • Uninterruptible power supply (UPS) • 17-inch or larger monitor that supports 16:9 aspect ratio Set up the computer system Installation requires about an hour. The process is as follows: • Optimize Windows 7 (if applicable) • Optimize Windows 2008 (if applicable) • Install Internet Services Manager (IIS; if not already installed and if remote workstations are required) • Install CIMPLICITY (if not already installed) Optimize Windows 7 On a Windows 7 computer, performance can be enhanced by setting a greater share of processing power to the application. 6 PMCS QUICKSTART GUIDE QUICKSTART GUIDE To enhance performance on a Windows 7 computer: 1. 2. 3. 4. Click Start > Settings > Control Panel. Access the System panel. Click the Advanced tab and access the Performance panel. Click the Advanced tab and verify that the processor and memory are optimized for Programs. The virtual memory setting can be left at the default. See the following figure. Figure 1: Optimize performance on Windows 7 PMCS QUICKSTART GUIDE 7 QUICKSTART GUIDE Optimize Windows Server 2008 To install the PMCS software on Windows Server 2008: 1. 2. Right-click My Computer and select Properties. Click the Advanced tab. Figure 2: Optimize Windows Server computer 3. 4. Click the Settings button in the Performance section. Enable the first option to Turn on DEP for essential Windows programs and services only. Figure 3: Protect the data with the DEP option 5. 8 Click the Apply button, then the OK button. PMCS QUICKSTART GUIDE QUICKSTART GUIDE 6. Restart the computer. Install IIS software You install Internet Services Manager (IIS) to use Remote Viewer workstations, else continue the installation without this function. Check if IIS is installed in the Control Panel under Add or Remove Programs. Install it from the Windows disc with the options shown in the following figures selected while configuring IIS server for PMCS. Figure 4: IIS settings for Windows 7 PMCS QUICKSTART GUIDE 9 QUICKSTART GUIDE Figure 5: IIS settings for Windows Server 2008 Install CIMPLICITY software CIMPLICITY HMI for Windows 7/2008 64-bit version 8.2 SIM4 is required. Install it if not already installed. 1. 2. 10 Install CIMPLICITY as outlined with that product, choosing CIMPLICITY HMI as the product to install, then selecting either HMI Server or Viewer as the product option. If you install the Server option, also install the Server Option - Communications - OPC Client. After installation, download SIM pack 4 or higher and apply it. To obtain the SIM pack, you need to be registered with GE. PMCS QUICKSTART GUIDE QUICKSTART GUIDE Typically, installed drivers are viewable at Control Panel > Administrative Tools > Computer Management > System Tools > Device Manager > Network adapters, as shown in the following figure. Install other software If you have other software to install on the computer, such as Microsoft Office, Excel, or COMTRADE, do so. (COMTRADE file browsers are used for analyzing waveform files.) Restart the computer when done. Install PMCS software After setting up the computer and installing any third-party software, install the PMCS software. PMCS typically is installed on one computer, and the option exists to install the PMCS database on one computer and install Remote Viewer functions (waveform and event viewer functions) on other computers. The software license allows for installation on one computer. To install the software on multiple computers, including the Remote Viewer function, you need the appropriate license key for each computer. These activation codes are supplied upon purchase and can be ordered separately. This section outlines how to install PMCS version 7.x. Install PMCS software Install PMCS from the CD. You select in the wizard if the installation is the full PMCS server application or a Remote Viewer workstation. To install PMCS software: 1. 2. 3. 4. Close any open applications. Insert the PMCS CD into the drive. Click Start > Run. In the Run window, enter E:\SetUp.exe, where E is the CD drive. The installation wizard launches. PMCS QUICKSTART GUIDE 11 QUICKSTART GUIDE Figure 6: Enter the path to the PMCS setup file 5. To install requisite software, click the Install button. When not already installed, .NET framework 4 installs. When a database server is not already installed, PMCS installs Microsoft SQL Server 2008 Express with Service Pack 1. Figure 7: Installing SQL Server Express If the following failed installation message displays for the SQL server installation, click the No button to end the installation, restart the computer, and run the PMCS installation again. 12 PMCS QUICKSTART GUIDE QUICKSTART GUIDE Figure 8: Installation error for SQL Server Express 6. Complete the rest of the PMCS wizard. The following figures show the panels for customer information and full installation versus Remote Viewer installation. The PMCS software, documentation, and online help are installed. PMCS QUICKSTART GUIDE 13 QUICKSTART GUIDE Figure 9: Entering customer information during installation Figure 10: Selecting full PMCS install or remote computer install 7. 8. When installation completes, restart the computer at the prompt. Enter the activation code as outlined in the next section. A typical installation is to install the full PMCS server software on one computer, then the Remote Viewer application on other computers. Finish such installations now. 14 PMCS QUICKSTART GUIDE QUICKSTART GUIDE Enter the activation code The software license allows for installation on one computer. Activation codes are specific to full installation or Remote Viewer. After installing PMCS on a computer, use the procedure here to generate an activation code and enter it. To unlock an installation: 1. 2. Launch the Configurator application by clicking Start > All Programs > EnerVista Integrator > EnerVista Configurator. Click Help > License Manager. The License Manager window opens, shown as follows. Figure 11: Activating a PMCS software license 3. 4. Obtain the Site ID and Machine ID from the window. Generate an activation code as follows. Log in to http://apps.gedigitalenergy.com/swmgr using the following credentials: Order number: nnnnnnnn Password: nnnnnnnn PMCS QUICKSTART GUIDE 15 QUICKSTART GUIDE Enter the Site ID and Machine ID, and generate the CD activation code. Record the number. 5. Enter the code in the Activation Code field, and click the Unlock button. This unlocks both PMCS and EnerVista Integrator. More license management procedures are contained in the PMCS Instruction Manual. Install CIMPLICITY remote viewer If you installed the Remote Viewer of PMCS on one or more secondary computers, you can also install the CIMPLICITY remote viewer functions on those computers. To install the CIMPLICITY remote viewer on a remote client and view the screens: 1. 2. 3. 6. Install the Viewer Runtime option of CIMPLICITY HMI 8.2 SIM 4. If not already installed, install the Remote Viewer option of PMCS. Create a project in HMI Server node, with the Enable Project Broadcast option. Configure the wizards using PowerBuilder. In the viewer node, map the drive (preferably CIMPLICITY Directory) of HMI server node. See the following figure. Open the MainMenu.cim file, which is on the HMI server node from the viewer node. Or, in the viewer node, go to Start > All Programs > Proficy HMI SCADA - CIMPLICITY 8.2 > Cimview. In the window that appears, select MainMenu.cim file on the HMI server node. Open the folders to get the configured screens. 16 PMCS QUICKSTART GUIDE 4. 5. QUICKSTART GUIDE Figure 12: Mapping the drive and opening the screens folder Configuration This section outlines how to configure the system. The process is as follows: • Configure the ports • Configure the host computer • Configure any Remote Viewer computer(s) • Configure CIMPLICITY for PMCS by adding a project in CIMPLICITY Configure the ports See the Configure the Ports section in the EnerVista Integrator Quickstart Guide (GEK-119527). PMCS QUICKSTART GUIDE 17 QUICKSTART GUIDE Configure the host computer To configure the host computer running the PMCS software: 1. 2. 3. 4. Configure the DDE/OPC Server. Your host computer likely has several versions of the DDE/OPC Server installed (RS485 Modbus, TCP/IP Modbus, TCP/IP encapsulated Modbus, and Ethernet TCP/IP). Configure only the server appropriate for your PMCS network interface (GE32MODB or GE32MTCP). See the document PMCS Network and Device Configurator (document number GEH-6510) for details. Configure the user interface. If your system was provided with a generic HMI software application, either load or create the custom HMI using the Interface Toolkit wizards, if appropriate. See the PMCS for CIMPLICITY HMI Interface Toolkit (document number DEH-210) or refer to the HMI software documentation. Configure the applications. Configure the following application modules: – Waveform Capture — Use the PMCS Waveform Capture User’s Guide (GEH-6511) – Event Logger — Use the PMCS Event Logger User’s Guide (GEH-6512) Test the applications. Test the host computer to ensure that PMCS operates correctly. Configure Remote Viewer computers Any secondary computers with the Remote Viewer functions installed need to configured for network architecture and tested for waveform capture and event logger. To configure the remote computer for architecture: 1. Add a copy of the network architecture list outlined in the Configure the ports section. See the document PMCS Network and Device Configurator (document number GEH-6510) for details. Test the remote computer: 18 PMCS QUICKSTART GUIDE QUICKSTART GUIDE 1. 2. Verify that the PMCS waveform and event viewers function. If you have the CIMPLICITY remote viewer installed, verify operation. Configure CIMPLICITY for a PMCS project See the PMCS Instruction Manual for a detailed procedure. To add a PMCS project in CIMPLICITY: 1. 2. In CIMPLICITY HMI, create a new project by clicking the New Project button or selecting File > New Project. A window opens. Enter a Project Name and select a folder in which to store the project (usually in the cimplicity\hmi\projects\ folder). Under Options, select PMCS PowerBuilder and under Protocols, select OPC Client. Click the Create button to write the project file to disk and open the Project Properties window. Figure 13: Creating a new project in CIMPLICITY 3. In the Project Properties window, click the Options tab, and select the Enable project broadcast checkbox if you want to use CIMPLICITY HMI remote view nodes. Ensure that the Computer PMCS QUICKSTART GUIDE 19 QUICKSTART GUIDE 4. 5. name field matches the name of the host machine. Disregard the Startup timeout field and the General tab. Click OK to open the CIMPLICITY HMI Project Wizard. Complete the CIMPLICITY Project Wizard. At the end, click Finish to complete the setup. Access the CIMPLICITY Workbench view for the project. Figure 14: CIMPLICITY Workbench window 6. With CIMPLICITY Project no longer running, double-click the PMCS PowerBuilder item. When CIMPLICITY Project is still running, the following error message displays; close the project window. Once PMCS PowerBuilder has launched, you can view device data. Congratulations. PMCS has been installed and configured for use. To launch the application, access it from within CIMPLICITY. To continue, see the PMCS Instruction Manual. 20 PMCS QUICKSTART GUIDE QUICKSTART GUIDE For further assistance For product support, contact the information and call center as follows. Have your software key(s) ready. GE Digital Energy 650 Markland Street Markham, Ontario Canada L6C 0M1 Worldwide telephone: +1 905 927 7070 Europe/Middle East/Africa telephone: +34 94 4854 88 54 North America toll-free: 1 877 547 8630 Fax: +1 905 927 5098 E-mail: [email protected] Website: http://gedigitalenergy.com/multilin Comments about new features or modifications for specific requirements are welcome. PMCS QUICKSTART GUIDE 21
advertisement
Key Features
- Accesses GE MultilinTM and third-party devices
- Provides graphical representations
- Remote control and automated responses
- Energy efficiency optimization
- Installation with CIMPLICITY HMI
- Wizards for user interface creation
- Remote Viewer capability
Frequently Answers and Questions
What devices does PMCS support?
PMCS supports GE Multilin and third-party devices, including Modbus-based devices. Refer to Table 1 and Table 2 for a list of supported devices and their firmware revisions.
What are the software requirements for PMCS?
PMCS requires Windows 7 Professional (64 bit) or Windows 2008 Server Standard (64 bit), Internet Services Manager (IIS) if using remote workstations, CIMPLICITY HMI version 8.2 with SIM4 (minimum) with the OPC Client option installed, and .NET framework 4.0.
What are the hardware requirements for PMCS?
The minimum hardware requirements include a 2.3 GHz single processor Dell OptiPlex, 2 GB RAM, and two 10Base-T Ethernet cards with static IP addresses. Recommended items include excess hard disk space, UPS, and a 17-inch or larger monitor that supports 16:9 aspect ratio.
How do I unlock an installation of PMCS?
To unlock an installation, launch the Configurator application, click Help > License Manager, obtain the Site ID and Machine ID, generate an activation code using the provided credentials and Site ID/Machine ID, and enter the code in the Activation Code field, and click the Unlock button.
How do I configure the host computer running the PMCS software?
Configure the DDE/OPC Server, user interface, and applications (Waveform Capture and Event Logger). Test the applications to ensure that PMCS operates correctly.
How do I configure the remote computer for architecture?
Add a copy of the network architecture list outlined in the Configure the ports section. Test the remote computer to verify that the PMCS waveform and event viewers function and that the CIMPLICITY remote viewer operates correctly.
How do I add a PMCS project in CIMPLICITY?
Create a new project in CIMPLICITY HMI, enter a Project Name and select a folder, under Options, select PMCS PowerBuilder and under Protocols, select OPC Client, and complete the CIMPLICITY Project Wizard.