Modine Roof Curb, Discharge and Return Air Connector Installation & submittal data

Modine Roof Curb, Discharge and Return Air Connector Installation & submittal data

Below you will find brief information for Roof Curb, Discharge and Return Air Connector. This document guides users on the correct installation and submittal of roof curbs and discharge and/or return air connectors designed for Modine gas-fired weatherproof duct furnace/make-up air units. It covers installation instructions, dimensions, and assembly procedures.

advertisement

Assistant Bot

Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.

Modine Roof Curb, Discharge and Return Air Connector Installation | Manualzz
5-590.4
5H76358A Rev.D
September, 2006
installation & submittal data
roof curb and discharge and/or return air connectors
gas-fired weatherproof duct furnace/make-up air units
model series: “H” & “O”
Application
A roof curb installation is designed to provide a watertight
method for mounting an outdoor heating, ventilating, and/or
cooling unit on the roof of a building. The roof curb also raises
the height of the unit to prevent snow build-up below fresh air
inlet opening.
Figure 1.1
Typical Curb Details with Unit Installed over Areas
where Sound is Not Critical
Counterflashing
(By Others)
Installation Instructions
1.
2.
3.
4.
5.
Roof curbs are fabricated from 16 gauge galvanized steel
and supplied knocked down for assembly on the job site.
The curb consists of two side pieces, two end pieces, curb
gasketing, four joiner angles, four 2x4 inch wood nailing
strips, nuts, bolts, and washers. Roof curbs over 120
inches long include two additional side pieces and two
splice plates.
Outside dimensions must be held when installing curb.
Refer to page 2 for dimensions. All dimensions are ±
1/8 inch. Top surface must be level and straight to insure
weathertightness. All corners must be square.
Final electric and gas connections must be made after unit
is installed to allow for tolerance in setting of unit on curb.
For electrical power supply allow approximately eight feet
of wire, plus provisions for weathertight flexible conduit for
connection to unit, as required by local codes.
Maintain a 12 inch minimum height from top of roof deck to
top of curb.
If discharge and/or return air connectors were included,
refer to page 3 for installation and orientation instructions.
Wooden
Nailing
Strip
(By Modine)
Roofing
Material
(By Others)
Curb
(By Modine)
Insulation
(By Others)
2" Acoustic
Fiberglass
(By Others)
Cant Strip
(By Others)
Roof Insulation
(By Others)
Roof
Truss
6" Inverted
Channel
Both Sides
(By Others)
Roof
Deck
Figure 1.2
Installation and Construction Method
Curb Gasketeting
(Supplied with Curb Kit)
Base of unit
Roof Curb
Metal Flashing
Extends under Cap*
2x4 Wood Nailing
Strips Supplied
(Supplied with Curb Kit)
Roofing
Membrane*
* BY INSTALLER
1.75
6.00
Base*
Cant Strip*
Roof Deck*
Caulk Butt Joints
after Curb is Assembled
and Installed on Roof
Structural Members and
Roof Flashing is Added
Insulation*
16.00
dimensions - roof curbs
Figure 2.1
Roof Curb Dimensions
1.68
1.75
TYP
E
RG
HA G
ISC NIN
E DOPE
D
I
S
IN AIR
H
24.00 INSIDE
OPENING
G
24
.94
16.00 1.00
TYP
J
5.5
3
GAS LINE CONN.
(LH ASSY ONLY)
5.5
3
GAS LINE CONN.
(RH ASSY ONLY)
D
2.9
7T
YP
H
B IN
SID
E
A
C
Ou
TS
24.00 INSIDE
OPENING
ELECT. BOTT
PAN CONN.
RN
Tu G
RE NIN
IDE PE
INS IR O
A
1.79
G
3
2.0SPAC
0 = ES
6.0 AT
0(
TY
P
)
ID
E
44
.16
E
SID
F
IN
E
E
ID
TS
Ou
Discharge Air Opening
is for HDG/HDP/HPG/HPP/ODG/ODP/OPG/OPP
models only
Table 2.1 - HBG/HBP/OBG/OBP & HDG/HDP/ODG/ODP Roof Curb Dimensions (All dimensions in inches)
ModelBlower Type
HBG/HBP/OBG/OBP
Size
75
100/125
150/175
200/225
250/300
250/300
350/400
350/400
500/600
500/600
700/800
700/800
840/960
(Digit 16)AB
All
All
All
All
E,F,G, or H
I, J, or K
E,F,G, or H
I, J, or K
G or H
I, J, K, or L
G or H
I, J, K, or L
I, J, K, or L
88.77
88.77
88.77
88.77
88.77
124.61
88.77
124.61
121.89
157.74
121.89
157.74
191.14
Dimensions
HDG/HDP/ODG/ODP
CDAB
76.77
-
76.77
-
76.77
-
76.77
-
76.77
-
112.61
-
76.77
-
112.61
-
109.89
-
145.74 105.98
109.89
-
145.74 105.98
179.14 105.98
-
-
-
-
-
-
-
-
-
39.76
-
39.76
73.16
117.98
117.98
117.98
117.98
117.98
153.83
117.98
153.83
151.10
186.98
151.10
186.98
220.39
105.98
105.98
105.98
105.98
105.98
141.63
105.98
141.63
139.10
174.98
139.10
174.98
208.39
HBG/HBP/HDG/HDP/OBG/OBP/ODG/ODP
CDE
-
-
-
-
-
105.98
-
105.98
105.98
105.98
105.98
105.98
105.98
-
-
-
-
-
35.85
-
35.85
33.12
69.00
33.12
69.00
102.41
39.33
41.84
46.18
48.22
51.25
51.25
62.76
62.76
51.25
51.25
62.76
62.76
62.76
F
G
H
J➀
27.33
29.84
34.18
36.22
39.25
39.25
50.76
50.76
39.25
39.25
50.76
50.76
50.76
3.97
5.22
5.41
6.43
4.96
4.96
4.74
4.74
4.96
4.96
4.74
4.74
4.74
19.52
19.52
23.49
23.49
29.46
29.46
41.40
41.40
29.46
29.46
41.40
41.40
41.40
74.84
74.84
74.84
74.84
74.84
110.41
74.84
110.41
74.84
110.41
74.84
110.41
110.41
Table 2.2 - HCG/HCP/OCG/OCP & HPG/HPP/OPG/OPP Roof Curb Dimensions (All dimensions in inches)
ModelBlower Type
HCG/HCP/OCG/OCP
Size
➀
75
100/125
150/175
200/225
250/300
250/300
350/400
350/400
(Digit 16)AB
All
All
All
All
E,F,G, or H
I, J, or K
E,F,G, or H
I, J, or K
112.74
112.74
112.74
112.74
112.74
148.59
112.74
148.59
Dimensions
HPG/HPP/OPG/OPP
CDAB
100.74
-
100.74
-
100.74
-
100.74
-
100.74
-
136.59 105.98
100.74
-
136.59 105.98
-
-
-
-
-
30.61
-
30.61
141.98
141.98
141.98
141.98
141.98
177.83
141.98
177.83
129.98
129.98
129.98
129.98
129.98
165.83
129.98
165.83
100.74
100.74
100.74
100.74
100.74
105.98
100.74
105.98
Gas connection for 1st furnace. For Models 500-800 add 33.5” for second furnace gas connection.
For Model 840-960 add 33.50” and 67.00” for second and third furnace gas connections.
5-590.4
HCG/HCP/HPG/HPP/OCG/OCP/OPG/OPP
CDE
29.24
29.24
29.24
29.24
29.24
59.85
29.24
59.85
39.33
41.84
46.18
48.22
51.25
51.25
62.76
62.76
F
G
H
J
27.33
29.84
34.18
36.22
39.25
39.25
50.76
50.76
3.97
5.22
5.41
6.43
4.96
4.96
4.74
4.74
19.52
19.52
23.49
23.49
29.46
29.46
41.40
41.40
74.84
74.84
74.84
74.84
74.84
110.41
74.84
110.41
discharge and/or return air connectors
Application
Figure 3.2 - Mounting Hole Locations
Discharge and/or return air connectors are used in conjunction
with the roof curb and allow the discharge and/or return air
ductwork connections to be made before the unit arrives at the
job site. When installed in the roof curb, the connectors create
a mating surface at the height of the bottom of the blower
and/or downturn plenum sections. After caulking the mating
surfaces, the installed unit weight holds the bottom of the unit
to the connectors so that no additional fastening method is
required.
Some curbs may have additional holes.
Always use dimensioned holes
for mounting connectors.
4.30
2.80
Discharge and/or Return Air
Connector mounting holes
Components of kit:
Duct Connector Spreader (2)
Duct Connector Cross-Channel (2)
Plain Washers, Locknuts, and Screws (16)
1.41
25.11
Installation Instructions
1.
2.
3.
4.
5.
6.
Assemble the roof curb as instructed on page 1.
Assemble the discharge and/or return air connector(s)
as shown in Figure 3.1. All dimensions are ± 1/8 inch.
Top surface must be level and straight to insure airtight
connection. All corners must be square.
Determine the proper side of the roof curb on which to
install the connector based configuration of the ordered
unit. Locate the connector mounting holes in the roof curb.
See Figure 3.2. When installing only one connector, it is
important to determine the proper side of the roof curb
on which to install the connector. The location of the duct
connector must match the configuration of the ordered unit.
(Example: If a discharge air connector is being installed,
insure that the connector is installed on the discharge end
of the roof curb. The unit orientation must be determined
by the building plans.)
Install the duct connector using the remaining nuts, screws
and washers. See Figure 3.3.
Insert the 90° flanged ductwork (by others) into the
connector as shown in Figure 3.4. Once the ductwork is
inserted, fasten the ductwork to the connector assembly
sides (from inside the ductwork) using horizontally driven
sheet metal screws (by others).
Prior to unit installation, caulk the top of the roof and the
connector(s).
Figure 3.3 - Duct Connector Installation
locknuts
washers
screws
Figure 3.4 - Field Supplied Ductwork Installation
Figure 3.1
Duct Connector Assembly
caulk surfaces prior
to unit installation
Model SizeA
75/100/125
150-225
250-300
350-400
500-600
700-800
840-960
19.52
23.49
29.46
41.40
29.46
41.40
41.40
field supplied
duct work
A
24.36
LOCKNuTS
WASHERS
SCREWS
5-590.4
Commercial HVAC&R Division • Modine Manufacturing Company • 1500 DeKoven Avenue • Racine, Wisconsin 53403-2552
“H” Model Series - Phone: 1.800.828.4328 (HEAT) • Fax: 1.800.204.6011
“O” Model Series - Phone: 1.866.823.1631 (Toll Free) • Fax: 1.800.204.6011
© 2006 Modine Manufacturing Company 5-590.4
8/06 - .1M Litho in USA

advertisement

Key Features

  • Weathertight Installation
  • Modular Design
  • Pre-Assembled Components
  • Supports Discharge and Return Air Connections
  • Ensures a Secure and Leak-Free Connection
  • Compatible with Modine Gas-Fired Furnaces
  • Includes Installation Instructions
  • Designed for Easy Assembly & Installation
  • Raised Unit Height Prevents Snow Build-Up

Frequently Answers and Questions

What are the dimensions of the roof curbs?
Refer to Figure 2.1 and Tables 2.1 and 2.2 for dimensions.
How do I install the discharge and/or return air connectors?
Always use dimensioned holes for mounting connectors. Refer to Figure 3.2 for location and Figure 3.3 for installation instructions.
What is the minimum height required from the top of the roof deck to the top of the curb?
A 12 inch minimum height is required.
Do I need to make any electrical connections before installing the unit?
Yes, Final electric and gas connections must be made after the unit is installed to allow for tolerance in setting the unit on the curb. Allow approximately eight feet of wire, plus provisions for weathertight flexible conduit for connection to the unit, as required by local codes.
What are the installation instructions for the roof curb?
The roof curb consists of two side pieces, two end pieces, curb gasketing, four joiner angles, four 2x4 inch wood nailing strips, nuts, bolts, and washers. Refer to page 1 for further assembly instructions.

Related manuals

Download PDF

advertisement