FP-90 Floor Anchor

FP-90 Floor Anchor
JAYPRO SPORTS
FLOOR PLATE ASSEMBLY, FP-90
LIST OF MATERIALS
PIECE NO.
1
2
3
4
PART NO.
FP-90
HS2726
HN704
FP891D
DESCRIPTION
FLOOR PLATE ASSEMBLY
HEX HEAD BOLT ½”-13 x 2 ½”
HEX NUT ½”-13
ANCHOR BOLT CEMENT
QTY.
1
1
1
1
ASSEMBLY INSTRUCTIONS
TOOLS REQUIRED: Hammer Drill
1 3/8” Masonry Drill Bit
Mixing Container And Water
Small Vacuum Cleaner
Stiff Circular Brush (Bottle Brush)
Putty Knife Or Scraper
Rag Or Other Absorbent Material
Regular Power Drill
1 3/8” Wood Drill Bit
5/32” Drill Bit
Screwdriver With Wide Blade
NOTICE
The fp-90 floor plate assembly is manufactured with a removable center section which
can be replaced in the event that the internal threads are damaged. Upon original
installation of the floor plates or replacement of threaded sections, be sure that the
replacement threaded sections are installed very tightly using a thread locking sealant to
prevent easy removal or tampering.
PLEASE READ INSTRUCTIONS IN THEIR
ENTIRETY BEFORE BEGINNING INSTALLATION
1) Locate and mark the center locations of the floor plates using the layout diagram in
the equipment instructions sheet. Re-check all center locations for accuracy before
installing the floor plates.
2) Using the 1 3/8” wood drill bit, drill a hole in the wood floor and the wood sub floor
down to the concrete base as shown in figure ‘a’.
3) Screw the ½” bolt with the nut into the bottom of the floor plate. Adjust the bolts so
it will reach ½” x ¼” from the bottom of the hole when the floor plate is in place.
Tighten the nut against the floor plate bottom to lock the bolt into place. In some
cases the bolt supplied with the fp-90 unit will not reach to the bottom of the hole in
the cement. If this happens, a longer bolt or threaded rod should be used to insure
reaching the bottom.
4) Next, completely remove the dust from the hole by using a vacuum cleaner, air
compressor, or battery filler.
5) Fill the hole with water. Scrub the sides and bottom with a stiff brush, such as a
bottle brush. This is very important.
6) Remove excess water and any loose particles with a rag or other absorbent material.
Leave the hole clean and uniformly damp.
7) Mix the anchor bolt cement in a clean container.
Note: mix no more cement than you can use within 10 minutes. Mix cement
with water to form a thick paste. Let stand for about a minute. Then stir
thoroughly. At this point the mixture will become more fluid like.
Do not add sand, gravel, or other foreign substances to the cement. These weaken
the cement and affect the setting.
Do not add too much water or re-tempering cement, which has begun to set up in
the container, with no additional water. This will result in failure of the cement to
attain the proper strength.
8) Turn a ½” bolt into the floor plate enough to hold it securely. Pour the cement
mixture into the hole until it is about ¾ full. Dip the floor plate in water in order to
wet the outer surface, but do not let any water get inside. Holding the floor plate by
the top of the ½” bolt, slowly lower it into the hole until the top is level with the
surface of the floor. Excess cement should flow around the top. If not, more cement
should be added. Scrape the excess cement from around the floor plate with a putty
knife or scraper. Remove the ½” bolt.
9) Allow 24 hours from the time of installation for complete setting. After 24 hours,
apparatus may be set up and used with the floor plates.
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertising