Marflow - Installation Instructions

Marflow - Installation Instructions
BRITANNIA HOUSE • AUSTIN WAY • HAMSTEAD • INDUSTRIAL ESTATE •BIRMINGHAM • ENGLAND • B42 1DU
T: +44 (0) 121 358 1555 F: +44 (0) 121 358 1444 www.marflow.co.uk www.showerpl8.co.uk
A ‘second fix’ connection for professional bar shower installation
Ensure existing 15mm copper supply pipes are at 150mm
centres and protrude from the tiling surface by 30mm.
FITTING INSTRUCTIONS
Offer up the brass brackets, ensure they are square and
level, mark and then drill holes in the tiles or wall surface
with a suitable drill. Insert wall plugs to suit the screws
you have chosen (not supplied). Fix the brackets in place
with at least two screws in each (preferably four in each).
Slide the compression olive over the pipe and fit the
hexagonal collar by tightening with a spanner. It is
important that the brass bracket is supported by another
spanner while tightening takes place.
2 x Brass brackets
2 x Compression olives
2 x Hexagonal collars
2 x Chrome plated covers
Spin the chrome plated covers on to the hexagonal collar
and the connections are ready for the installation of the bar
shower mixer.
We recommend that the pipe work is well flushed through
before installing the bar shower mixer to prevent debris
damaging the mixer.
October 2010 V.01
© Marflow Engineering Limited
Pdf Supplied By http://www.plumbworld.co.uk/
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertising