SPLIT COLLINS LANYARD INSTALLATION INSTRUCTIONS

SPLIT COLLINS LANYARD INSTALLATION INSTRUCTIONS
Sun Path Products Inc. 404 W Edinborough Ave. Raeford, NC 28376 (910) 875-9002
SPLIT COLLINS LANYARD INSTALLATION INSTRUCTIONS
NOTE:
The Following Split Collins Lanyard Instructions Supersedes all Previous
Skyhook/Collins Lanyard Instructions from the “Javelin Odyssey Owner’s
Manual Feb 2007.”
Split Collins Lanyard Field Installation, Rev. 1, Jan. 2014
Pg. 1of 4
The following are intended to instruct FAA Licensed
Senior Riggers and Foreign Equivalents in the
installation of the Split Collins Lanyard onto a
Skyhook equipped Javelin Odyssey/Student
Odyssey harness/container system. This procedure
can be easily done while the reserve is packed and
the main canopy unpacked.
Collins Lanyard Sizes:
P/N COLLINSLAN-OA- 10 ⅜” (265mm)
P/N COLLINSLAN-B - 11 ⅜” (288mm)
P/N COLLINSLAN-C - 12 ⅝” (322mm)
P/N COLLINSLAN-D - 14 ⅜” (365mm)
ID Label
RSL/Skyhook Lanyard
Fig. 1
STEP 1.
Open the Reserve Pin Cover and right Riser Cover.
Then completely remove the left side release cable
at the Collins/RSL Lanyard. (Fig. 1)
STEP 2.
Slide the reserve riser to the outboard side then
completely remove the RSL lanyard from its
channel beneath the reserve risers. (Fig. 2)
Split Collins Lanyard Field Installation, Rev. 1, Jan. 2014
Fig. 2
Pg. 2 of 4
STEP 3.
Attach the Split Collins Lanyard to the RSL Lanyard
with a Larks Head knot ensuring the positioning is
exactly as shown. Cinch tightly. (Fig’s. 3-4)
ID Label
Fig. 3
Fig. 4
Ensure compatibility by confirming the Yellow
Collins lanyard is ⅜” (± 1/4 in) 10 mm (± 5mm)
shorter than the black RSL Lanyard. (Fig. 5)
⅜”
Fig. 5
STEP 4.
Thread the left side release cable under the black RSL
lanyard and then through the yellow Collins Lanyard.
Continue routing the long side release cable into
the remainder of the release housing. (Fig. 6)
Fig. 6
NOTE:
Ensure that the release cable is not passing through the
reserve toggle or the loop in the black RSL lanyard.
Fig. 7
STEP 5.
Position the Yellow Collins lanyard to the outside
and under the black RSL lanyard, then return both
lanyards back to their retaining channel. (Fig’s. 7-8)
Fig. 8
Return reserve
riser to its original
resting location.
To the Outside
And
Under
And
Split Collins Lanyard Field Installation, Rev. 1, Jan. 2014
Pg. 3 of 4
Fig. 9
STEP 6.
Neatly tuck the three (3) Lanyard junctions under the
reserve riser. (Fig. 9)
Fig. 8
Fig. 10
STEP 7.
Pull tension on the snap shackle end of the lanyard
assembly to remove any slack in the opposite end.
(Fig. 10)
Fig. 11
STEP 8.
Reassemble the left side 3-Ring Riser, close the Riser
Covers and Reserve Pin Cover. (Fig. 11)
•End of Instructions•
Split Collins Lanyard Field Installation, Rev. 1, Jan. 2014
Pg. 4 of 4
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertising